Shoes Tenders

Shoes Tenders

Indian Coast Guard - ICG Tender

Goods
Textile, Apparel and Footwear
GEM
India
Closing Soon5 Mar 2025
Tender AmountRefer Documents 
Description: CATEGORY: T SHIRT FULL SLEEVES SUPER COMBED COTTON QUICK DRY , HAND TOWEL MICROFIBER QUICK DRY SIZE LARGE , BODY TOWEL MICROFIBER QUICK DRY SIZE LARGE , DUFFEL BAG CANVAS WATERPROOF , FLOTABLE SAILING GOOGLES POLARISED , WATERPROOF HIP POUCH , SAILING HAT WITH SUN PROTECTION FOR NECK , SUN PROTECTION SLEEVES FOR ARMS , SUN PROTECTION SLEEVES FOR LEGS , NEOPRENE SCUBA SHOES , SMUFF , QUICK DRY TRACK PANTS COTTON FULL LENGTH WITH POCKETS , RAIN PROOF PONCHO FULL 500 GMS , SAILING GLOVES

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Soon4 Mar 2025
Tender AmountPHP 5.9 Million (USD 101.8 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 8.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each Project Billboard/signboard Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls Occupational Safety And Health Program Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 1.00 10.00 A. Safety Practitioner/officer (part Time) 1.00 30.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 101(1)d Removal Of Concrete Irrigation Structures Quantity 48.40 M3 Dpwh Standard Output Per Day (opd)= 2.00 M3 48.40 M3 Removal Of Concrete Irrigation Structures Direct Cost: A. Materials: 0.10 Set Oxy/acetylene B. Manpower: Number Of Hours 1.00 1.00 A.construction Foreman 1.00 1.00 B. Skilled Labor 2.00 1.00 C. Unskilled Labor C. Equipment And Water: 1.00 0.5 A. Backhoe (0.80 M3) Sle 130 Lc-2, 99hp 1.00 0.25 B. Backhoe W/ Breaker (0.80 M3) Sle 130 Lc-2, 99hp 1.00 0.5 C. Dump Truck (12 Yd3) 1.00 1 D. Cutting Outfit Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 103(1)a Structure Excavation (common Soil) Quantity 518.55 M3 Dpwh Standard Output Per Day (opd)= 20.00 M3 518.55 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A.construction Foreman 1.00 3.00 B. Unskilled Labor C. Equipment And Water: 1.00 2.00 A. Dump Truck (12 Yd3) 1.00 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 101(3)c Removal Of Sidewalk (100 Mm Thk) Quantity 150.00 M2 Dpwh Standard Output Per Day (opd)= 75.00 M2 150.00 M2 Removal Of Sidewalk (100 Mm Thk) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A.construction Foreman 1.00 2.00 B. Unskilled Labor C. Equipment And Water: 1.00 1.00 A. Backhoe W/ Breaker (0.80 M3) Sle 130 Lc-2, 99hp 1.00 1.00 B. Payloader (1.50 M3), Lx80-2c 1.00 0.50 C. Dump Truck (12 Yd3) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 404.00 Reinforcing Steel Bar, Grade 40 (minor Structures) Quantity 17,397.72 Kg Dpwh Standard Output Per Day (opd)= 180.00 Kg 17397.72 Kg Reinforcing Steel Bar, Grade 40 (minor Structures) Direct Cost: A. Materials: 0.02 Kg A. Tie Wire (2% Of Rsb) 1.05 Kg A. Reinforcing Steel Bar , Grade 40 (w/ 5% Wastage) B. Manpower: Number Of Hours 1.00 1 A. Construction Foreman 1.00 2 B. Skilled Labor 1.00 8 C. Unskilled Labor C. Equipment And Water: 1.00 0.5 A. Bar Cutter 1.00 0.5 B. Bar Bender 1.00 0.15 C. Cargo Truck (9-10 Mt) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 405.00 Structural Concrete Class A (minor Structures Including Concrete Covers And Repair Of Sidewalk) Quantity 217.20 M3 Dpwh Standard Output Per Day (opd)= 1.40 M3 217.20 M3 Structural Concrete Class A (minor Structures Including Concrete Covers And Repair Of Sidewalk) Direct Cost: A. Materials: 70.00 Bd-ft A. Lumber, Good - 4 Uses 1.60 Pc B. Marine Plywood (1/2" X 4’ X 8') - 4 Uses 0.70 Kg C. Assorted Cwn (1kg/100 Bd-ft Of Lumber) 9.50 Bag D. Cement 0.50 M3 E. Sand 1.00 M3 F. Gravel B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Labor 8.00 1.00 C. Unskilled Labor Installation /removal Of Formworks 4.00 1.00 A. Skilled Laborer 8.00 1.00 B. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer (4-6) 1.00 1.00 B.concrete Vibrator 1.00 0.10 C. Water Truck/pump (16000 L) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

City Of Pasig Tender

Others
Philippines
Closing Soon3 Mar 2025
Tender AmountPHP 85.5 Million (USD 1.4 Million)
Description: Supply And Delivery Of Rubber Shoes For Learners Of Sdo-pasig City S.y. 2025-2026 – Pasig City Education Department , Garments ,city Of Pasig

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Soon4 Mar 2025
Tender AmountPHP 5.9 Million (USD 101.7 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 8.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 101(3)a.1 Removal Existing Concrete And Asphalt Pavement (0.23m Thk) Quantity 1,200.00 M2 Dpwh Standard Output Per Day (opd)= 20.00 M2 1200.00 M2 Removal Existing Concrete And Asphalt Pavement (0.23m Thk) Direct Cost: A. Materials: B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 C. Unskilled Laborer Number Of Hours 1.00 1.00 Backhoe (0.80m3) 1.00 1.00 Payloader (1.50m3), Lx80-2c 0.50 1.00 Dump Truck (12yd3) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 177.60 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 177.60 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 230mm Thk Quantity 1,464.00 M2 Dpwh Standard Output Per Hour (oph)= 107.33 M2 1464.00 M2 Pcc Pavement (plain) -conventional Method, 230mm Thk Direct Cost: A. Materials: 0.43 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.13 M³ Sand 0.23 M³ Gravel 2.19 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 One Bagger Mixer 1.00 2.00 Concrete Vibrator 0.13 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.00 - Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 601(b) Sidewalk (100mm) Quantity 312.00 M2 Dpwh Standard Output Per Hour (oph)= 10 M2 312.00 M2 Sidewalk (100mm) Direct Cost: A. Materials: 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.55 M³ Sand 0.10 M³ Gravel 0.95 Bag Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 One Bagger Mixer 1.00 2.00 Concrete Vibrator 0.13 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 606(2)a Pavement Markings (reflectorized Traffic Paint-white) Quantity 72.00 M2 Dpwh Standard Output Per Hour (oph)= 10 M2 72.00 M2 Pavement Markings (reflectorized Traffic Paint-white) Direct Cost: A. Materials: 1.00 L Reflectorized Traffic Paint (white) Minor Tools (5% Of Labor Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.05 1.00 Cargo Truck (2-5 Mt) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 504(5) Cleaning/reconditioning Drainage Structures Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Cleaning/reconditioning Drainage Structures Direct Cost: A. Materials: B. Manpower: Number Of Hours 80.00 1.00 A. Construction Foreman 80.00 8.00 B. Unskilled Labor C. Equipment And Water: Number Of Hours 20.00 1.00 A. Cargo Truck (9 - 10 Mt) 40.00 1.00 B. Bamboo With Bucket - 4 Uses 0.00 0.00 Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 404.00 Reinforcing Steel Bar, Grade 40 (drainage Cover And Wall Repair) Quantity 890.00 Kg Dpwh Standard Output Per Hour (oph)= 180 Kg 890.00 Kg Reinforcing Steel Bar, Grade 40 (drainage Cover And Wall Repair) Direct Cost: A. Materials: 0.02 Kg A. Tie Wire (2% Of Rsb) 1.05 Kg A. Reinforcing Steel Bar , Grade 40 (w/ 5% Wastage) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Labor 1.00 8.00 C. Unskilled Labor C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender 0.15 1.00 C. Cargo Truck (9-10 Mt) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 405.00 Structural Concrete Class A (drainage Cover And Wall Repair) Quantity 10.00 M3 Dpwh Standard Output Per Hour (oph)= 1.4 M3 10.00 M3 Structural Concrete Class A (drainage Cover And Wall Repair) Direct Cost: A. Materials: 70.00 Bd-ft A. Lumber, Good - 4 Uses 1.60 Pc B. Marine Plywood (1/2" X 4’ X 8') - 4 Uses 0.70 Kg C. Assorted Cwn (1kg/100 Bd-ft Of Lumber) 9.50 Bag D. Cement 0.50 M3 E. Sand 1.00 M3 F. Gravel B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Labor 1.00 8.00 C. Unskilled Labor Installation /removal Of Formworks 1.00 4.00 A. Skilled Laborer 1.00 8.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer (4-6) 1.00 1.00 B.concrete Vibrator 0.10 1.00 C. Water Truck/pump (16000 L) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Municipality Of Aringay, La Union Tender

Healthcare and Medicine
Philippines
Closing Soon5 Mar 2025
Tender AmountPHP 1.7 Million (USD 30.6 K)
Details: Description Brief Description Of The Project Quantity Unit Item Description 1 Meter 3 Meters Dental Polyurethane Pu Chair Water Vapor Air Hose Tube Blue 8x5.5mm 1 Meter 3 Meters Dental Polyurethane Pu Chair Water Vapor Air Hose Tube White 8x5.5 Mm 1 Piece 3 Way Syringe Tip 5 Piece 9v Square Battery 2 Piece Anti A-anti B Reagent For Blood Typing 122 Pack Applicator Stick, Disposable 10 Piece Bandage Scissor 34 Piece Bp Apparatus 250 Piece Bib Towel, Disposable 8 Packs Blood Lancet 250 Piece Brown Paper Bag 109 Tube Cholesterol Strips 10 Piece Cold Packs 66 Roll Cotton Roll 64 Pack Drug Testing Kit (meth & Thc) 24 Piece Dental Inverted Bars 24 Piece Dental Round Bars 24 Piece Dental Straight Bars 12 Piece D50 45nacl,1l 12 Piece D5lr, 1l 12 Piece D5nss, 1l 12 Piece D5w, 1l 10 Piece Dental Needle, G27, Long 10 Piece Dental Needle, G27, Short 10 Piece Dental Needle, G30, Short 10 Piece Disinfecting Spray 101 Piece Elastic Bandage, 3" 50 Piece Elastic Bandage, 4x5 50 Piece Elastic Bandage, 6" 1 Piece Ems Trauma Kits 1 Piece Ev-906 Tens Unit With Electrode Pads 25 Packs Electrode Pads 25 Pairs 202 Box Examination Gloves, Nitrile, 100pcs Per Box Large 20 Piece Face Shield 230 Box Facemask, Disposable 8 Piece First Aid Kit Bag 10 Piece Flexible Suction Catheter, Fr. 12 10 Piece Flexible Suction Catheter, Fr. 14 10 Piece Flexible Suction Catheter, Fr. 5 10 Piece Flexible Suction Catheter, Fr. 8 17 Roll Gauze Roll 28x24 100 Tube Glucose Strips 1 Piece Hand Piece High Speed 1 Piece Hand Piece Low Speed 24 Piece Hand Held Dopplers 5 Piece Hand Plastic, Sprayer, Small 21 Piece Handsoap 225ml 10 Tube Hbsag Kit (rapid Test) 77 Box Kn95 Air Respirators Mask 2 Piece Head Immobilization Device, Adult 2 Piece Head Immobilization Device, Pediatric 1 Piece Heart Guardian Hr-501 - Dc 12 V, 4.2 Ah, Limno2 Battery 5 Tube Hiv Kit (rapid Test) 5 Piece Hot Compress 361 Bottle Isopropyl Alcohol, 70%, 500ml 40 Piece Iv Catheter G20 40 Piece Iv Catheter G22 40 Piece Iv Catheter G24 5 Piece Kelly Clamp Curve 5 Piece Kelly Straight 3 Piece Lubricating Gel 10 Piece Lidocaine 2%, 1.8ml W/ Epinephrine Carpule 20 Piece Macroset 5 Piece Mayo Scissor Curve 5 Piece Mayo Scissor Straight 31 Piece Medical Splint 80 Piece Medical Disposable Ppe Gown Large 20 Piece Microset 5 Piece Micropore Surgical Tape 20 Piece Microtube 0.5ml Edta K2 50 Piece Nasal Cannula, Adult 50 Piece Nasal Cannula, Pediatric 7 Piece Needle Holder 24 Unit Portable Nebulizer 100 Piece Nebulizer Kit 20 Piece Oxygen Facemask, Adult 20 Piece Oxygen Facemask, Pediatric 1 Unit Parallel Bar 12 Piece Plain Lrs, 1l 12 Piece Plain Nss, 1l 100 Piece Plaster Micropore, 3m, 1" 30 Piece Plaster Micropore, 3m, 1.5" 50 Piece Povidone-iodine, 120ml 30 Unit Portable Glucometer 17 Piece Protective Goggles 16 Piece Pulse Oximeter Adult 5 Piece Pulse Oximeter Pedia 20 Piece Rejuvenating Massage Oil 125 Ml 2 Piece Rigid Cervical Collars, Large 2 Piece Rigid Cervical Collars, Medium 2 Piece Rigid Cervical Collars, Small 1 Piece Saliva Ejector 1 Piece Starter Kit Light Cure Composite 10 Packs Safety Box, For Sharps 2 Packs Sharp Waste Disposal Unit 1 Piece Standard Hot Moist Pack 1 Piece Spider Straps For Spineboard 1 Unit Spine Board 15 Box Sterile Surgical Gloves, 6.5 105 Box Sterile Surgical Gloves, 7.0 25 Box Sterile Surgical Gloves, 7.5, 50pairs Per Box 9 Box Surgical Blade #11, 100pcs Per Box 1 Box Surgical Blade #20, 100pcs Per Box 131 Box Surgical Mask, 100pcs Per Box 10 Packs Surgical Shoe Cover 100s 10 Packs Surgical Head Covers 100s 7 Liters Sterilizing Disinfection Solution 5 Liters 3 Piece Stainless Steel Disinfection Tray 11.5inch 18 Box Suture Catgut Chromic 2.0, 30/40mm, 3/8 Circle Round, 12pcs Per Box 10 Box Suture Catgut Chromic 3.0, 22mm, 3/8 Circle Cutting, 12pcs Per Box 10 Box Suture Silk 3.0 Atraumatic 18inc. 45cm, 12pcs Per Box 1008 Box Specimen Cup 40 Ml 95 Box Syringe 0.5ml G27 Needle, 100pcs Per Box 4 Box Syringe, 1ml, 100pcs Per Box 3 Box Syringe 10ml G25 Needle, 100pcs Per Box 34 Box Syringe 3ml G25 Needle, 100pcs Per Box 20 Box Syringe 5ml G25 Needle, 100pcs Per Box 10 Box Syphilis Kit (rapid Test) 24 Piece Tape Measure 65 Piece Tissue 5 Piece Tissue Forcep 20 Piece Torniquet 1 Piece Traction Strap 20 Piece Triangular Bandage 80 Tube Urinalysis Testing Strips 21 Tube Uric Acid Strips 10 Piece Vaccine Carrier With Cooldogs 1 Piece Vacuum Tube, Purple Cap, Edta K2 1 Piece Vacuum Tube, Red Tap, Plain 20 Piece Venoset, Adult 20 Piece Venoset, Pedia 49 Piece Washproof Adhesive Bandage, 25pcs 24 Unit Weighing Scale

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Soon4 Mar 2025
Tender AmountPHP 1 Million (USD 18.9 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 6.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 102(2)b Roadway Excavation (surplus Common) Quantity 22.40 M3 Dpwh Standard Output Per Day (opd)= 80.00 M3 22.40 M3 Roadway Excavation (surplus Common) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Bulldozer, D6h Series Ii Psds/dd 1.00 1.00 B. Payloader (1.50 M3) 0.30 1.00 C. Payloader (1.50 M3) At Disposal Site 1.00 3.00 D. Dump Truck (12 Yd2) 1.00 1.00 E. Backhoe (0.80 M3) Number Of Hours 1.00 1.00 Construction Foreman 1.00 2.00 Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 15.68 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 15.68 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 150mm Thk Quantity 448.00 M2 Dpwh Standard Output Per Hour (oph)= 107.33 M2 448.00 M2 Pcc Pavement (plain) -conventional Method, 150mm Thk Direct Cost: A. Materials: 0.39 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.11 M³ Sand 0.20 M³ Gravel 1.90 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 4.00 Transit Mixer (5 M3) 1.00 2.00 Concrete Vibrator 1.00 1.00 Concrete Batch Plant 1.00 1.00 Payloader (1.5m3) 1.00 1.00 Concrete Screeder (5 Hp) 1.00 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.10 1.00 Bar Cutter, Single Phase Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Region of Ile of France Tender

Others
France
Closing Date14 Mar 2025
Tender AmountNA 
Description: Supply and Delivery of Work Clothing, Safety Shoes and PPE for Headquarters and High School Agents in the Île De France Region

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Soon4 Mar 2025
Tender AmountPHP 2.4 Million (USD 43 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 8.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 103(1)a Structure Excavation (common Soil) Quantity 264.00 M3 Dpwh Standard Output Per Day (opd)= 20.00 M3 264.00 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A.construction Foreman 1.00 3.00 B. Unskilled Labor Number Of Hours 1.00 2.00 A. Dump Truck (12 Yd3) 1.00 1.00 B. Backhoe (0.80 M3) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 101(3)a.1 Removal Existing Concrete A (0.15m Thk) Quantity 220.00 M2 Dpwh Standard Output Per Day (opd)= 20.00 M2 220.00 M2 Removal Existing Concrete A (0.15m Thk) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 C. Unskilled Laborer Number Of Hours 1.00 1.00 Backhoe (0.80m3) 1.00 1.00 Payloader (1.50m3), Lx80-2c 0.50 1.00 Dump Truck (12yd3) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 25.20 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 25.20 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 200mm Thk Quantity 220.00 M2 Dpwh Standard Output Per Hour (oph)= 107.33 M2 220.00 M2 Pcc Pavement (plain) -conventional Method, 200mm Thk Direct Cost: A. Materials: 0.39 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.11 M³ Sand 0.20 M³ Gravel 1.90 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 4.00 Transit Mixer (5 M3) 1.00 2.00 Concrete Vibrator 1.00 1.00 Concrete Batch Plant 1.00 1.00 Payloader (1.5m3) 1.00 1.00 Concrete Screeder (5 Hp) 1.00 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.10 1.00 Bar Cutter, Single Phase Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 404.00 Reinforcing Steel Bar, Grade 40 (minor Structures) Quantity 7,235.96 Kg Dpwh Standard Output Per Hour (oph)= 180 Kg 7235.96 Kg Reinforcing Steel Bar, Grade 40 (minor Structures) Direct Cost: A. Materials: 0.02 Kg Tie Wire (2% Of Rsb) 1.05 Kg Reinforcing Steel Bar , Grade 40 (w/ 5% Wastage) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender 0.15 1.00 C. Cargo Truck (9-10 Mt) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 405.00 Structural Concrete Class A (drainage Flooring, Wall And Sidewalk) Quantity 55.20 M3 Dpwh Standard Output Per Hour (oph)= 1.4 M3 55.20 M3 Structural Concrete Class A (drainage Flooring, Wall And Sidewalk) Direct Cost: A. Materials: 70.00 Bd-ft A. Lumber, Good - 4 Uses 1.60 Pc B. Marine Plywood (1/2" X 4’ X 8') - 4 Uses 0.70 Kg C. Assorted Cwn (1kg/100 Bd-ft Of Lumber) 9.50 Bag D. Cement 0.50 M3 E. Sand 1.00 M3 F. Gravel B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Labor 1.00 8.00 C. Unskilled Labor Installation /removal Of Formworks 1.00 4.00 A. Skilled Laborer 1.00 8.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer (4-6) 1.00 1.00 B.concrete Vibrator 0.10 1.00 C. Water Truck/pump (16000 L) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

The City Of Cannet Tender

Textile, Apparel and Footwear
France
Closing Date12 Mar 2025
Tender AmountRefer Documents 
Description: Map 2025-001 Purchase of Personal Protective Equipment and Cotton Clothing (High Visibility Clothing, Shoes, Gloves, Trousers, T-shirts, etc.)

Province Of Tarlac Tender

Textile, Apparel and Footwear
Philippines
Closing Soon5 Mar 2025
Tender AmountPHP 4.6 Million (USD 79.9 K)
Description: Procurement Of Uniforms, Shoes And Other Supplies And Materials For The 2025 Clraa Proper - B-g-2025-j-018 , General Merchandise ,province Of Tarlac
551-560 of 784 active Tenders