Shoes Tenders

Shoes Tenders

Eastern Railway - ER Tender

Goods
Automobiles and Auto Parts
Ireps
India
Description: Brake Shoe Key Etc
Closing Date24 Mar 2025
Tender AmountRefer Documents 
This is an estimated amount, exact amount may vary.

Indian Army Tender

Goods
GEM
India
Description: CATEGORY: Riding Breaches , Riding Gloves , Feed Hay Net , Winter Rug Horse , Horse Shoe
Closing Date12 Mar 2025
Tender AmountRefer Documents 

West Central Railway - WCR Tender

Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Description: U/s Scraptbu, Pbu With & Without Brake Shoe. (modified & Unmodified)+ Control Block , 181+22=203 Nos, 13.130 Mt. For Stock Holder Sse/s/tkd. Ss-11 No-sse/s/tkd/35/24-25/33 Date 25.01.2025. As Is Where Is Basis.as It Is. Delivery Will Be Given By Actual Weight Only. Material Are Lying In Delhi (tkd) State.
Closing Date29 Mar 2025
Tender AmountRefer Documents 

South Western Railway - SWR Tender

Goods
Ireps
India
Description: Safety Shoe With Steel Toe As Per Attached Annexure.
Closing Date10 Mar 2025
Tender AmountINR 500 K (USD 5.7 K)
This is an estimated amount, exact amount may vary.

Indo Tibetan Border Police - ITBP Tender

Goods
Machinery and Tools...+1Automobiles and Auto Parts
GEM
India
Description: CATEGORY: TRUBO CHARGER ASSY , CAM SENSOR , O RING WATER HOSE , O RING AIR HOSE , O RING INJECTOR , CRANK SENSOR INNER GEAR BOLT , INJECTOR NOZZLE ASSY , FUEL INJECTION PUMP ASSY , SEAT COVER SET COMPLETE , REAR BUMPER LOCK , PROPELLER SHAFT , FRONT ROTTER DISC , SHOCKABSORBER REAR , TAPPER COVER STUD , GEAR BOLT HOUSING BOLT BIG , GEAR BOLT HOUSING SMALL BIG , REAR BRAKE SHOE SET , FRONT BRAKE PAD SET , HOSE PIPE SET WATER , BENJO BOLT TURBOCHARGER , BONNET SHOCKER , ENGINE MOUNTING , FUEL RETURN PIPE PUMP TO TANK , WATER OUTLET PLASTIC PIPE WITH O RING , WIPER BLADE FRONT , WIPER BLADE REAR , DUMPER PULLY CRANK SHAFT , FOG LAMP BULB WITH HOLDER LED , ABS WIRE COUPLER , COMBINATION SWITCH ASSY , TAIL LIGHT ASSY S 10 , TAIL LIGHT BULB 12 VOLT , WIPPER MOTOR ASSY FRT , RELAY 4 PIN 12 VOLT , RELAY 5 PIN 12 VOLT , CRANCK SENSOR 12 V , CAM SENSOR 12 V , VSS SENSOR , AXLE BOOT FRONT , WIPPER MOTOR REAR , WIPPER BLADE REAR , REVERSE LIGHT SWITCH GEAR BOX , INTERIOR MIRROR , MUD FLAP , 7 D FOOT MAT SCORPIO S 10 , GLOVE BOX , ENGINE OH HEADGAS KIT SET COMPLETE , CYLINDER LINNER , PISTON SET , MAIN BEARING , BIG END BEARING , CR BUSH , CAM BUSH , THRUST WASHER , OIL PUMP WITH TIMING PLATE , FLY WHEEL BEARING , ARM TENSIONER PRIMRY , ARM TENSIONER SECONDARY , CHAIN PRIMARY , CHAIN SECONDARY , HYDRAULIC TENSIONER PRIMARY , HYDRAULIC TENSIONER SECONDARY , CAM SHAFT GUIDE , FIXED GUIDE , LONG TENSIONER AUTOMATIC , AC TENSIONER LOWER , WATER TEMP SENSOR , THERMOSTATE VALVE COMP ASSY , HLA SET , FAN BELT 4PK 1171 , FAN BELT 1115 , CLUTCH PLATE , PRESSURE PLATE , FUEL RETURN PIPE FIP TO TANK , FUEL PIPE FIP TO FILTER , CRANK GEAR , CAM GEAR , PIPE OVER FLOW INJECTOR WITH LOCK , OIL JET WITH PACKING , INLET MANIFOLD COMPLETE , WATER HOSE PLASTIC WITH O RING , FIP SPROCKET , SELF SOLONOID , AIR FILTER , FUEL FILTER WITH ASSY , AC FILTER , SIDE MIRROR LH AND RH , BENDEX PINION , GUN METAL BUSH , SELF CARBON BRUSH WITH PLATE , HEAD GASKET , TRANSFER CASE SWITCH 4X4 , FOG LIGHT ASSY , WHEEL CYLINDER REAR , BRAKE SHOES , CLUTCH SLAVE CYL ASSY , BALL BEARING PILOT BRG , REAR VIEW MIRROR LH AND RH , TAIL LIGHT ASSY LH , TAIL LIGHT ASSY RH , WIPER BLADE FRT 12 INCH 18 INCH , SHOCK ABSORBER FRT , SHOCK ABSORBER REAR , BRAKE MASTER CYL , WIPER ARMS , CLUTCH MASTER CYLINDER ASSY , GAS STRUT HOOD
Closing Date11 Mar 2025
Tender AmountRefer Documents 

Banaras Locomotive Works - BLW Tender

Goods
Textile, Apparel and Footwear
GEM
India
Description: CATEGORY: INDUSTRIAL SAFETY SHOES (Electrical) BLACK LEATHER
Closing Date11 Mar 2025
Tender AmountINR 1 Million (USD 11.7 K)

Fire Service & Civil Defence Department Tender

Goods
Others
Bangladesh
Description: Leverage-19/2024-2025 Oxford Shoe
Closing Soon5 Mar 2025
Tender AmountRefer Documents 

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 6.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 102(2)b Roadway Excavation (surplus Common) Quantity 68.80 M3 Dpwh Standard Output Per Day (opd)= 80.00 M3 68.80 M3 Roadway Excavation (surplus Common) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Bulldozer, D6h Series Ii Psds/dd 1.00 1.00 B. Payloader (1.50 M3) 0.30 1.00 C. Payloader (1.50 M3) At Disposal Site 1.00 3.00 D. Dump Truck (12 Yd2) 1.00 1.00 E. Backhoe (0.80 M3) Number Of Hours 1.00 1.00 Construction Foreman 1.00 2.00 Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 68.80 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 68.80 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 150mm Thk Quantity 1,376.00 M2 Dpwh Standard Output Per Hour (oph)= 107.33 M2 1376.00 M2 Pcc Pavement (plain) -conventional Method, 150mm Thk Direct Cost: A. Materials: 0.39 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.11 M³ Sand 0.20 M³ Gravel 1.90 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 4.00 Transit Mixer (5 M3) 1.00 2.00 Concrete Vibrator 1.00 1.00 Concrete Batch Plant 1.00 1.00 Payloader (1.5m3) 1.00 1.00 Concrete Screeder (5 Hp) 1.00 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.10 1.00 Bar Cutter, Single Phase Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date12 Mar 2025
Tender AmountPHP 3.1 Million (USD 55.2 K)

Philippine National Oil Company - PNOC Tender

Manpower Supply
Philippines
Details: Description I. Contract Duration: Multi-year Contract Important: Employee Wages And Benefits Must Be In Accordance With Philippine Labor Laws And Existing Social Insurance Issuances (sss, Pag-ibig, Philhealth, Etc.). The Contractor Must Provide The Necessary Equipment And Supplies To Carry Out The Tasks Outlined In The Agreement. The Contractor Shall Provide Drinking Water For Free For Their Employee. Ii. Scope Of Work A. The Contractor Shall Provide Manpower, Equipment And Consumables Necessary To Perform Janitorial, Grass Cutting And Other Custodial Services In Compliance With The Requirements Of Philippine National Oil Company (pnoc) As Specified In These Terms Of Reference. B. All Works Under This Terms Of Reference (tor) Shall Be Performed Under The Direction Of The Park Management Department Thru Its Authorized Representative Or Project Proponent. Work Performance Shall Be In Accordance With This Tor, Schedule Of Works And/or As Per Incorporated Reference Provided For By The Park Management Department. C. Estimated Quantities And The Works To Be Performed Are Described Herein. These Quantities Are Approximate And Are Provided As Information Only To Assist In The Preparation Of Proposals. They Are Not Guaranteed And The Actual Quantities May Be More Or Less Than Shown. However, Minimum Manpower Requirements Are Specified Herein. With Which, All Prospective Bidders Are Required To Visit The Work Site Prior To Submission Of Formal Bid To Determine Actual Site Condition And Verify Quantities Specified Under This Tor. Concerns And Clarification Shall Be Raised Prior To Submission Of Formal Bid. Any Necessary Variation After Submission Of Formal Bid Due To Undiscovered Site Condition Shall Not Be A Justification To Modify The Contract Or Request For Additional Payment. D. Monthly Coordination Meeting Is Scheduled Every 4th Wednesday Of The Month At 2:30 Pm. Aside From The Contractor’s Leadman/ Safety Officer, A Representative Duly Authorized By The Contractor’s Managing Head Or His Representative Is Mandated To Attend The Meeting. Rescheduling Of The Meeting Is Subject For Approval Of Park Management Department And Shall Be Requested A Week Prior To The Scheduled Monthly Meeting. Contractor’s Authorized Representative Must Be Submitted To Pnoc Proponent In Formal Writing. Iii. Location Of Work Works Covered By This Tor Shall Be Performed But Not Limited To The Industrial Park Common Areas And Jetty Port Facilities. Pnoc Will Provide Office For The Leadman/ Safety Officer And Tool Room/dressing Area For The Contractor. Power And Water Consumption Will Be Charged To Contractor. Housekeeping Is A Must For All Work Area. Security Of The Contractor’s Tool Room/dressing Room Area Provided By Pnoc Shall Be Their Own Responsibility, Any Damage To The Tool Room Or Loss Of Equipment/materials Shall Not Be The Responsibility Of Pnoc. Iv. Legal Requirements Compliance All Works Shall Be Performed In Accordance To All Applicable Laws, Regulations, Codes Or Directives Such As, But Not Limited To The Labor Code Of The Philippines, Occupational Safety And Health Standards (osh Standards), Denr Regulations, Etc. Failure Of Pnoc To Specifically Identify Applicable Legal Requirement Shall Not Excuse The Contractor From Complying With The Legal Requirement/s. V. Safety Requirements A. The Contractor Shall Refer To The Osh Standards For All Its Compliance And To Ensure Safe Performance Of Works Required Under This Tor. Pnoc May Prescribed Implementation Of Safety Measures Pursuant To Pnoc’s Ims Policy But Should Not Be Less Than Required By The Osh Standards. B. Medical Report (drug Testing And Medical Certificate/fit To Work) Of All Personnel Indicating That They Are Fit To Work Must Be Submitted To Proponent Within Seven (7) Calendar Days After Receipt Of The “notice To Proceed”. Provision On Surprise Random Drug Testing To Be Done By Pnoc At The Expense/chargeable To Contractor. C. A Daily Toolbox Meeting Is Required To Be Conducted By The Leadman/ Safety Officer To Discuss Precautions In The Performance Of Assigned Works And Current Safety Issues. Minutes Of The Meetings, Ppe Inspection Report And Safe Man Hours Worked Report Shall Be Submitted With The Monthly Accomplishment Report. D. All Personnel/workers Must Wear Standard Basic Ppe At All Times In Their Respective Work Places. Listed Below Are Ppes Needed; • Hard Hat • Safety Goggles/spectacles, • Working Gloves • Face Shield • Apron (leather) • Reflective Vest • Rain Coat • Rain Boots (steel Toe) • Safety Shoes (steel Toe) • Uniforms (long Sleeve) E. Contractor Shall Abide By Pnoc-ip Permit To Work System (as Indicated In Occupational Safety And Health Manual) Prior To The Execution Of All Daily Activities. Only The Contractor Lead/safety Man Is Allowed To Fill Up The Permit To Work (ptw) Form. In The Absence Of The Lead/safety Man, No Activities Shall Commence For Both The Grass Cutters And Manual Laborers, Unless Otherwise An Alternate Lead/safety Man With Equivalent Credentials And Experience Will Be Provided By The Contractor. F. Non-compliance To Safety Requirement Shall Be Ground For Personnel Or Contract Suspension Or Termination Depending On The Gravity Of Non-compliance To Be Determined By Pnoc-ip Hsse Committee. Contractor Personnel Who Are Not Allowed To Perform Works Because Of Failure To Secure Pnoc-ip Permit To Work Due To Non-compliance Of Safety Requirements Shall Be Considered Not Chargeable To Pnoc. G. Pnoc-ip And Locators Properties Shall Not Be Damaged During The Performance Of Works Under This Tor. Service Contractor Shall Be Liable To Damages Incurred To Pnoc-ip Or Locators Properties Caused By Contractor Personnel. Vi. Manpower Requirements A. Regular Manpower Requirement These Regular Manpower Requirements Shall Be Deployed In The Industrial Park Within The Duration Of The Contract To Perform Works Specified In 9.0. The Following Are: 1. Leadman/ Safety Officer Quantity: 1 Work Hours: 8am To 5pm / Monday-friday 2. Janitor/utility Quantity: 1 Work Hours: 7am To 4pm / Monday-friday 3. Grass Cutters/ Power Reapers Quantity: 8 Work Hours: 8am To 5pm / Monday-friday 4. Manual Labor Workers Quantity: 3 Work Hours: 8am To 5pm / Monday-friday 5. Manual Labor Workers Quantity: 1 Work Hours: 7am To 4pm / Monday-friday Contractor Shall Screen The Resumes Of Applicants For The Required Manpower And Shall Submit To Pnoc Within Seven (7) Calendar Days Upon Contractor’s Receipt Of The “notice Of Award”. Final Interview Of The Contractor’s Applicants Shall Be Scheduled By Pnoc Management In Coordination With The Contractor.
Closing Date11 Mar 2025
Tender AmountPHP 4.5 Million (USD 78.7 K)

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 Ls 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 15.00 A. Backhoe (0.80 Mᶾ) 1.00 15.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: Ppe 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 15.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 800(1) Clearing And Grubbing Quantity 720.00 M² Dpwh Standard Output Per Hour (oph)= 500.00 M² 720.00 M² Clearing And Grubbing Direct Cost: A. Materials: 0.00 0 0 B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B.unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Dumptruck (12 Ydᶾ) 1.00 1.00 B.payloader (1.50 Mᶾ) 1.00 1.00 C.bulldozer (155 Hp), D65a-8 "note: Assumed Hauling Distance Is 3 Km. If Actual Hauling Distance Is Shorter Or Longer Than 3 Km, The Time Of Dump Truck Will Be Adjusted Accordingly Based On The Hauling Cycle Analysis. Based On Assumed 150 Mm Cut All Throughout. A Corresponding Adjustment In The Output Shall Be Computed Based On The Actual Field Requirements ." Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 14.68 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 14.68 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 14.68 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 14.68 M3 Embankment From Structure Excavation Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 0.75 A. Plate Compactor (5 Hp) 1.00 0.75 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1) Embankment Quantity 72.00 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 72.00 M3 Embankment Direct Cost: A. Material: 1.25 Cu.m Embankment Materials (with 25% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 44.79 M3 Dpwh Standard Output Per Hour (oph)= 1.20 M3 44.79 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 8.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Plate Compactor (5 Hp) 0.00 0.00 Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 " Structural Concrete (footing)" Quantity 4.64 M3 Dpwh Standard Output Per Hour (oph)= 0.36 M3 4.64 M3 " Structural Concrete (footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 8.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 " Structural Concrete (wall Footing)" Quantity 4.32 M3 Dpwh Standard Output Per Hour (oph)= 0.36 M3 4.32 M3 " Structural Concrete (wall Footing) " Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 8.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 " Structural Concrete (columns)" Quantity 5.39 M3 Dpwh Standard Output Per Hour (oph)= 0.36 M3 5.39 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 8.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 " Structural Concrete (ground Floor Slab)" Quantity 1.08 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 1.08 M3 " Structural Concrete (ground Floor Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c7 " Structural Concrete (concrete Bench)" Quantity 7.50 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 7.50 M3 " Structural Concrete (concrete Bench)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 1,742.08 Kg Dpwh Standard Output Per Hour (oph)= 143.44 Kg 1742.08 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 84.00 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 84.00 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 103.20 M2 Dpwh Standard Output Per Hour (oph)= 3.83 M2 103.20 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 13.00 Pc B.150mm Thk. Chb(non Load Bearing) 0.53 Bag C. Cement 0.04 Cu.m D.sand 3.24 Kg E. Reinforcing Steel 0.05 Kg F. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 8.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1027(1) Cement Plaster Finish Quantity 206.40 M2 Dpwh Standard Output Per Hour (oph)= 7.13 M2 206.40 M2 Cement Plaster Finish Direct Cost: A. Materials: 0.33 Bag A. Cement 0.03 Cu.m B. Sand B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Metal Structure( 2 Seater Seesaw With Double Swing Set,2 Sets Playground Climber) Quantity 1,131.30 Kgs Dpwh Standard Output Per Hour (oph)= 85.00 Kg 1131.30 Kg Metal Structure( 2 Seater Seesaw With Double Swing Set,2 Sets Playground Climber) Direct Cost: A. Materials: 1.00 Kg A.structural Steel 0.01 Kg M. Acetylene 0.02 Kg N. Oxygen 0.02 Kg O. Welding Rod P. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer - Erection 0.49 3.00 Skilled Labore 0.49 3.00 Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C.truck Mounted Crane(20-25meters) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)b Metal Structure (stair) Quantity 552.12 Kg Dpwh Standard Output Per Hour (oph)= 85.00 Kg 552.12 Kg Metal Structure (stair) Direct Cost: A. Materials: 1.00 Length/s A. Structural Steel 0.01 Tank H. Acetylene 0.02 Tank I. Oxygen 0.02 Box J. Welding Rod K. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Labore 0.49 3.00 B.unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C.truck Mounted Crane(20-25meters) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047(3)a Metal Structure Accessories Quantity 198.00 Each Dpwh Standard Output Per Hour (oph)= 85.00 Kg 198.00 Kg Metal Structure Accessories Direct Cost: A. Materials: 1.00 M A. Anchor Bolt (0.95kg Per 1 Pc - 600mm Anchor Bolt) 1.00 Pc B. Anchor Bolt (0.47kg Per 1 Pc - 300mm Anchor Bolt) C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (hi Rib Roofing, Long Span, 0.427 Mm Thk.) Quantity 9.90 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 9.90 M2 Prepainted Metal Sheets (hi Rib Roofing, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)a1 Fabricated Metal Roofing Accessory Quantity 8.00 M Dpwh Standard Output Per Hour (oph)= 11.800 M 8.00 M Fabricated Metal Roofing Accessory Direct Cost: A. Materials: 1.05 M A. Gi Plain Sheets, Ga. 18x12' (0.701mmx2.44mm) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) " Reflective Insulation" Quantity 9.60 M2 Dpwh Standard Output Per Hour (oph)= 5.560 M2 9.60 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Walling Quantity 9.60 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 9.60 M2 4.5mm Fiber Cement Board On Metal Frame Walling Direct Cost: A. Materials: 1.05 Sq.m A. 4.5mm Fiber Cement Board 1.13 Pc B. Metal Furring 0.36 Pc C. Carrying Channel 1.00 Pc D. Hanger Bars/rods 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc G. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap 0.00 0 H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 220.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 4.00 Set E. Two-gang Switch 16.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1.000 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker 0.00 0 B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 10.00 Set A. 1-18 Watts Downlight/pinlight,recessed Type 1.00 Units B. Emergency Lamp (twin Head) B. Manpower: Number Of Hours 29.00 1.00 A. Construction Foreman 29.00 1.00 B. Skilled Laborer 29.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)b Painting Works (wood Painting) Quantity 210.80 M2 Dpwh Standard Output Per Hour (oph)= 1.890 M2 210.80 M2 Painting Works (wood Painting) Direct Cost: A. Materials: 0.05 Gal A. Glazzing Putty 0.04 Gal B. Flat Wall Enamel 0.04 Gal C. Enamel Quick Dry 0.25 I D. Paint Thinner 0.01 Pint E. Tinting Color (optional) F. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 92.44 M2 Dpwh Standard Output Per Hour (oph)= 2.000 M2 92.44 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner 0.00 0 D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(17) Carpentry & Joinery ( Wooden Balluster) Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Carpentry & Joinery ( Wooden Balluster) Direct Cost: A. Materials: 227.50 Bd.ft A. Good Lumber(210 Pcs 6.5"x1/2"x4ft) 20.00 Kg B. Assorted Cwnails D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 25.00 1.00 A. Construction Foreman 25.00 2.00 B. Skilled Laborer 25.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(18) Carpentry & Joinery ( Roof Framing) Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Carpentry & Joinery ( Roof Framing) Direct Cost: A. Materials: 172.00 Bd.ft A. Good Lumber (43 Pcs 2"x4"x6ft) 68.00 Bd.ft B. Good Lumber (34 Pcs 2'x2"x6ft) 12.00 Kg B. Assorted Cwnails 0.00 0 D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 25.00 1.00 A. Construction Foreman 25.00 2.00 B. Skilled Laborer 25.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(19) Carpentry & Joinery (wood Column) Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Carpentry & Joinery (wood Column) Direct Cost: A. Materials: 907.20 Bd.ft A. Good Lumber (21 Pcs 6"x6"x12ft) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 25.00 1.00 A. Construction Foreman 25.00 2.00 B. Skilled Laborer 25.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(20) Carpentry & Joinery (beam) Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Carpentry & Joinery (beam) Direct Cost: A. Materials: 96.00 Bd.ft A. Good Lumber (10 Pcs 4"x4"x6ft) B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 25.00 1.00 A. Construction Foreman 25.00 3.00 B. Skilled Laborer 25.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(21) Carpentry & Joinery (wood Slab ) Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Carpentry & Joinery (wood Slab ) Direct Cost: A. Materials: 142.50 Bd.ft A. Good Lumber (25 Pcs 1"x9.5"x6ft) 15.00 Kg B.assorted Cwnails D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 25.00 1.00 A. Construction Foreman 25.00 3.00 B. Skilled Laborer 25.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1000(2) Wood Preservative Quantity 20.00 L Dpwh Standard Output Per Hour (oph)= 3.000 L 20.00 L Wood Preservative Direct Cost: A. Materials: 1.00 L A. Termite Control (solignum) 0.00 0 D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 20.00 1.00 A. Construction Foreman 20.00 2.00 B. Skilled Laborer 20.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1027(3) Concrete Pavers Quantity 49.50 M2 Dpwh Standard Output Per Hour (oph)= 0.500 M2 49.50 M2 Concrete Pavers Direct Cost: A. Materials: 0.33 Bag A. Portland Cement 0.03 Cu.m B. Sand 1.00 Sq.m C. Decorative Stone D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) A.1 Playground Wall Climbing Quantity 1.00 Lot Dpwh Standard Output Per Hour (oph)= 1.000 Lot 1.00 Lot Playground Wall Climbing Direct Cost: A. Materials: 1.00 Lot A. Plastic Climbing Grip With Expansion Bolt , Safety Belt& Harness ,steel Pulley Wire Rope Ring Rail Wheel Traction Pulley Lifting Bearing Pulley, Climbing Rope(100 Meters) B. Manpower: Number Of Hours 56.00 1.00 A. Construction Foreman 56.00 3.00 B. Skilled Laborer 56.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) A.2 Playground Amenities Quantity 1.00 Lot Dpwh Standard Output Per Hour (oph)= 1.000 Lot 1.00 Lot Playground Amenities Direct Cost: A. Materials: 10.00 Meter/s A. Cable Wire Rope 10.60 Meter/s B. Abaca Rope 25.20 Meter/s B. Chain D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 40.00 1.00 A. Construction Foreman 40.00 3.00 B. Skilled Laborer 40.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) A.3 Perimeter Fence Quantity 1.00 Lot Dpwh Standard Output Per Hour (oph)= 1.000 Lot 1.00 Lot Perimeter Fence Direct Cost: A. Materials: 30.00 Rolls A. Interlink Wire(4") 4feet D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 40.00 1.00 A. Construction Foreman 40.00 3.00 B. Skilled Laborer 40.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date12 Mar 2025
Tender AmountPHP 3.3 Million (USD 57.5 K)
381-390 of 764 active Tenders