Scrap Tenders

Scrap Tenders

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date10 Feb 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n723.01|ja4|on Telework|carol.a.burke7.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|n/a|n/a|n/a|n/a|n/a|n/a|n/a|n/a||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (jan 2025)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||a1a| 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.3 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: panel,control,elect ;712965-4; P/n, ;014755688; Nsn, ;most Current; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. panel,control,elect ;ge Aviation Sys D/b/a/ge Aviation; Company Name , ;1000 Macarthur Memorial Hwy, Bohemia, Ny 11716; Address , ;1vby9; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

Department Of Labor And Employment Tender

Furnitures and Fixtures
Philippines
Closing Date4 Feb 2025
Tender AmountPHP 400.7 K (USD 6.8 K)
Details: Description 1 Set 1 Set Stainless Steel Cake Spatula (4", 6", 8", 10") /set 1 Unit 1.5l Glass Jar Hjb326 Electric Blender/unit 1 Pc 10" Bread Knife /piece 1 Pcs 10" Non-stick Round Pizza Pan/piece 4 Pcs 1000ml Squeezer Bottle/piece 1 Set 10pcs Measuring Cup And Spoon /set 1 Unit 11kg Gas Tank With Content 15 Pcs 11x11x6 Cm Melamine Rice Bowl/piece 1 Unit 12 Inch Aluminum Alloy Cake Turnable Revolving Stand Non Slip/unit 1 Pcs 12" Non-stick Round Pizza Pan/piece 2 Sack 14-14-14 Fertilizer 50kg/sack 1 Pcs 14" Non-stick Round Pizza Pan/piece 2 Pcs 15x11" Cooling Rack/piece 1 Pc 16cm Diameter Stainless Steel Strainer /piece 15 Pcs 2.5cmx11cm Melamine Saucer/piece 5 Pcs 20x20x3.3cm Flat Baking Tray/piece 2 Pc 21.2 X 3.3 Cm Silicon Pastry Brush 2 Unit 30 Cups Capacity,5.6l,hhrc560hdrc Electric Rice Cooker/unit 1 Unit 30 Inches By 42inches Shampoo Chair With 19" By 10inches Shampoo Bowl Set 1 Pack 3oz Cupcake Liner:bottom Diameter :5cmheight :4cmtop Diameter :7cm. 100pcs/pack 5 Roll 4 Ply Yarn Black/roll 5 Roll 4 Ply Yarn Brown/roll 5 Roll 4 Ply Yarn White /roll 1 Unit 4.5l Stainless Steel Bowl, 6 Speeds Standmixer/unit 1 Unit 4.8 Cu.ft Dual Function Chest Freezer Fc48gdf Solid Top W/ Keylock/unit 1 Unit 52l Insulated Cooler Box Chest/unit 2 Set 6 Holes Cupcake Box W/divider,box Dimensions-length:16cm,width:9cm By Diameter:7.5cm 10pcs/set 5 Pcs 6.5 L Rectangular Food Container/piece 2 Pcs 6" X 3" Round Baking Pan 2 Pcs 7" Stainless Steel Kitchen Knife 3 Pc 8" Doll Cake Pan Mold/piece 2 Pcs 8" X 2" Round Baking Pan/piece 2 Rolls 8mil 20ft By 30m Greenhouse Roofing Plastic Sheet/roll 1 Pcs 8x12large Wooden Chopping Board/piece 1 Set 8x8x15" Cake Box 10pcs/set 1 Pc 9" Glass Mixing Bowl/piece 1 Pack All Purpose Cream 250ml/pack 4 Sack All Purpose Flour 25kg/sack 50 Set Assorted Shoot Toy Guns With Bullets And Target /set 1 Pcs Baker's Blade/piece 4 Kgs Baking Powder/kg 2 Pack Barbeque Stick 100pcs/pack 5 Roll Beige Indophil Yarn 100 Grams/roll 5 Pack Black Forest Milktea Powder 500g/pack 5 Roll Black Indophil Yarn 100 Grams/roll 1 Kilogram Black Pepper /kilogram 1 Pcs Black Storage Box 120l/piece 37 Kilogram Brown Sugar /kilogram 10 Bottle Bubble Solution/liquid 1l/bottle 5 Set Bubble Wand Set Big(liquid Not Included) 24pcs/set 5 Set Bubble Wand Set Small (liquid Not Included) 24pcs/set 1 Set Cake Decorating Tools/set Inclusions: Cake Turntable; Spatula; Cake Slicer; Rubber Scraper; 2 Pcs Piping Nails; 2 Pcs Plastic Coupler; Cleaning Brush; Flower Lifter; Cake Pen; 2 Pcs Piping Bags; 36 Pcs Piping Tips 1 Sack Cake Flour 25kg/sack 2 Pcs Cake Pan ( 12x 12 X 2)/piece 2 Pcs Cake Pan (10 X 10 X 2)/piece 2 Pcs Cake Pan (10 X 14 X 2)/piece 2 Pcs Cake Pan (8 X 8 X 2)/piece 4 Pack Cheese Bar 1kg/pack 2 Tie Cheese Powder,food Flavoring 200g/sachet 5sachet/tie 10 Kgs Chicken Breast/kilogram 3 Kilogram Cocoa Powder /kilogram 10 Pack Concentrated Laundry Detergent , 1.32kgs/pack 10 Can Condensed Milk 390g/can 5 Pack Cookies And Cream Milktea Powder 500g/pack 5 Pack Corn Starch 400g/pack 3 Pack Cream Cheese Powder 500g/pack 3 Pcs Crochet Hook 4mm /pcs 3 Pcs Crochet Hook 5mm /pcs 1 Pack Cup Cake Liner (302 X 1000) /pack 5 Pack Dark Chocolate 1kg/pack 2 Pcs Deep Large Mixing Bowl 3.8l (21x21x14cm)/piece 1 Unit Digital Weighing Scale 50kg Capacity/unit 1 Unit Double Burner Gas Stove L 71 X W 37 X H 10 (cm) 10 Can Evaporated Milk 400g/can 10 Bottle Fabric Conditioner 670ml/bottle 1 Unit Facial Steamer With Stand And Magnifying Lamp/unit 2 Roll Gi Tie Wire #14 35kgs/roll 2 Roll Gi Tie Wire #20 35kgs/roll 3 Kgs Ground Beef Per Kilo 1 Unit Hair Removal Device Portable Intense Pulsed Light Technology 220v,300w/unit 1 Unit Hd6335m Metal Frame High Speed Portable Sewing Machine/unit 1 Unit Heavy Duty Outdoor Bbq Grill With Cover And Stand 5.39inches X 27.95 Inches’ X 48.82inches 4.4 Lbs. Coal Capacity With Lid-mounted Thermometer Gauge Equipped With 2 Wheels /unit 1 Unit Heavy Duty Single Gas Stove (high Pressure,automatic Ignition) With Hose And Regulator/unit 2 Unit Heo90rrs 90l Capacity Electric Oven/unit 1 Unit Hhmb120ss Electric Hand Mixer 280x180x300mm/unit 5 Roll Indigo Indophil Yarn 100 Grams/roll 100 Pcs Inflatable Rubber Bouncy Balls Random Designs/piece 5 Roll Khaki Indophil Yarn 100 Grams/roll 20 Set Kitchen Tools Set Toys Random Design /set 5 Roll Lavender Indophil Yarn 100 Grams/roll 5 Roll Light Blue Indophil Yarn 100 Grams/roll 6 Liter Liquid Vegetable Cooking Oil/liter 50 Pcs Magic Spring Rainbow Medium/piece 10 Set Magic Spring Rainbow Small 6pcs/set 5 Pack Matcha Milktea Powder 500g/pack 5 Roll Midnight Blue Indophil Yarn 100 Grams/roll 1 Unit Milktea Package Equipment Set Package 3 ( 1pc Digital Weighing Scale, 1 Unit Manual Sealing Machine, Sealing Film 3,000 Shot,10l Tea Barrel,cup Holder,10pcs Powder Cannister,10pcs Powder Scooper,2pcs Stirrer,2pcs Tapioca Scooper,2pcs Jigger,700ml Shaker,500ml Shaker,mea. Pister 1l,2pcs Large Squeezer,straw Holder,assorted Color Mea.cup, Tea Net) /set 2 Pcs Mixing Bowl 30 Cm/piece 1 Pc Movable Stick Wood Rolling Pin Medium Size/piece 4 Pcs Muffin Pan (350 X 265 X 30 Mm) /pcs 1 Pcs Nonstick Rolling Pin/piece 5 Roll Olive Green Indophil Yarn 100 Grams/roll 5 Liter Palm Oil /liter 5 Roll Pastel Pink Indophil Yarn 100 Grams/roll 6 Pcs Pie Plate 9"/piece 6 Pcs Pizza Pan 10 Inches/piece 2 Pack Plastic Cup 10oz(50pcs/pack) 10 Kilogram Pork /kilogram 10 Kgs Pork Pigue /kilogram 1 Unit Portable Diamond Peel Device:1 Vacuum + Diamond Peel Body 1 Diamond Tips (1 Size) 3 Vacuum Tips (1 Macro Round, 1 Micro Round, & 1 Oval) 1 Packet Of Filter Components 1 Power Source/unit 1 Unit Portable Facial Radio Frequency Machine (220v,50-60hz, 10w Power)/unit 1 Unit Portable Machine Sterilizer For Tools:250-280℃-380℉ Max,sterilization Temperature 160℃ 320℉/unit 10 Piece Premium Whole Chicken /piece 5 Set Pull Back Toy Cars Small 24pcs/set 50 Pcs Push Pull Walk Plane Rod Toddler Toy/piece 2 Bundle Raw Rattan 25pcs/bundle 5 Pack Red Velvet Milktea Powder 500g/pack 4 Kilogram Rock Salt /kilogram 4 Set Rubiks Cube 3by3 20pcs/set 10 Pack Salted Butter 200g/pack 1 Unit Sek-777 2stroke Engine(25l Capacity) Knapsack Power Sprayer/unit 1 Pcs Silicon Baking Mat 15"x19" /piece 1 Unit Sl10010w 49l Table Top Gas Oven,thermostat Control/unit 10 Set Slime Toys 70ml/bottle 20pcs/set 5 Roll Soft Red Indophil Yarn 100 Grams/roll 5 Pack Sour Cream And Onion Powder 200g/pack 8 Liters Soy Sauce /liter 1 Sack Special Commercial Rice (local)(25 Kgs/sack) 2 Unit Stainless Steel 12l Capacity Pressure Cooker Explosion Proof/unit 1 Unit Stainless Steel 43cm Diameter Wok Pan/unit 1 Unit Stainless Steel Burger Griller Gas Type, 24x15x8" /unit 4 Pcs Stainless Steel Ladle Medium 32cm/piece 1 Unit Stainless Steel Medium Deep Fryer Gas Type Single/unit 1 Pcs Stainless Steel Pizza Cutter Wheel/piece 2 Pcs Stainless Steel, Silicon Handle 12inches Tong/piece 1 Unit Stand Mixer, Kw-4502, 5 Adjustable Speed Setting With Turbo Control Switch/unit 2 Pack Standard Toy Balloons Assorted Colors 100pcs/pack 1 Unit Su 70 A2 7cubic Feet Chiller/unit 4 Pack Tapioca Black Pearl 1kg/pack 30 Bundle Tiger Grass /bundle 4 Pcs Tray Cake ( 12 X 12 X 1)/piece 9 Liters Vegetable Oil/liter 8 Liters Vinegar /liter 5 Roll Violet Indophil Yarn 100 Grams/roll 4 Pack Whipping Cream /liter 5 Roll White Indophil Yarn 100 Grams/roll 15 Pack White Sugar/kilogram 5 Pack Wintermelon Milktea Powder 500g/pack 1 Unit Wireless/wired Eyebrow Tattoo Machine Set S600 Lip Liner Permanent Makeup Eyebrow Tattoo Pen With 10 Ink Cartridges 1 Unit Wt16b5240ba/tc 16kgs Capacity Twin Tub Washing Machine/unit 5 Roll Yellow Indophil Yarn 100 Grams/roll

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date3 Feb 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n722.12|b4d|215-697-2558|jacob.tarlini@navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336310|1050||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This Contract. required Rtat: 67days After Receipt Of Asset throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initialdelivery Commencesx/month (contractor Fill In #). A Throughput Of ##____ Per Month Reflects No Throughputconstraint. 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: valve,secondary Di, ;3290158-3-2; P/n, ;7rh 2910 015882376 V2; Nsn, ;no Tech Pub In Natec,repair To Drawing Specifications And Engineering Orders; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. valve,secondary Di, ;honeywell International Inc.; Company Name , ;1300 W Warner Roadtempe, Az. 85285-2200; Address , ;59364; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date23 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n722.31|n/a|215-697-2486|thomas.s.mclaughlin7.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|45 Days After Defect Was Found||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. early And Incremental Deliveries Accepted. all Terms And Conditions Are In Accordance With Boa: N0038320gv601 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.3 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 1.5 . Markings Shall Be In Accordance With Mil-std-130. 1.6 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.6.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: compressor,aircraft ;1680 014953691; Nsn , ;2209290-2-1; Part Number, Shall Be Performed Iaw: Compressor,aircraft ;latest Applicable Repair Technical; Publication (s). 1.6.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: compressor,aircraft ;2209290-2-1; P/n, ;1680 014953691; Nsn, ;all Repair Manuals, Drawings, And Specifications.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. compressor,aircraft ;honeywell Intl Inc; Company Name , ;2525 W 190th Street Torrance State: Ca Zip: 90504-6099; Address , ;70210; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n723.01|ja4|n/a|carol.a.burke7.civ@us.navy.mil| commercial Product Procurement Notice|5|||||| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|n/a||n/a|n/a|n/a|n/a|n/a|n/a||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|45 Days After Discovery Of Defect||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| contract Terms And Conditions Required To Implement Statutes Or Executiveorders--commercial Products And Commercial Services (jan 2025))|83|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| continued: Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--commercial Products And Commercial Services (jan 2025))|16||||||||||||||||| offeror Representations And Certifications--commercial Products And Commercialservices (may 2024))|3|||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (jan 2025)|12|335314|750||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||a1a| evaluation--commercial Products And Commercial Services (nov 2021)|4||||| this Is A Repair Requirement. repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirementis Measured From Asset Return To The Date Of Asset Acceptance Under The Termsof The Contract. For Purposes Of This Section, Return Is Defined As Physicalreceipt Of The F-condition Asset at The Contractor?s Facility As Reflected Inthe Action Date Entry In The Commercial Asset Visibility (cav) System. Inaccordance With The Cav Statement Of Work, The Contractor Is Required Toaccurately Report All Transactions By The End Of The Fifth Regular businessday After Receipt And The Action Date Entered In Cav Must Be Dated To Reflectthe Actual Date Of Physical Receipt. required Rtat ## Days After Receipt Of Asset. throughput Constraint: Contractor Must Provide Throughput Constraint For Each Nsn. Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ## Per Month Reflects No Throughput Constraint. 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: panel,control,elect ;713010-2; P/n, ;014381846; Nsn, ;iaw Applicable Manuals; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. panel,control,elect ;ge Aviation; Company Name , ;1000 Macarthur Memorial Hwy, Bohemia, Ny 11716; Address , ;19623; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date3 Feb 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n722.31|n/a|215-697-2486|thomas.s.mclaughlin7.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|45 Days After Defect Was Found ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. early And Incremental Deliveries Accepted. all Terms And Conditions Are In Accordance With Boa: N0038320gv601 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: heat Exchanger,air ;1660 01-464-8900; Nsn , ;2341318-2-1; Part Number, Shall Be Performed Iaw: Heat Exchanger,air ;latest Applicable Repair; Publication (s). 1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: heat Exchanger,air ;2341318-2-1; P/n, ;1660 01-464-8900; Nsn, ;latest Applicable Repair; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. heat Exchanger,air ;honeywell International; Company Name , ;2525 W 190th Street, Torrance State: Ca Zip: 90504-6002; Address , ;(70210); Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|tbd|tbd|tbd|tbd| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type|source|tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Request For Proposal/ Quote (rfp/q) Is For The Repair Of: nsn: 7rh 1680 016106528 E7 pn: 34500042-3 quantity: (15) Ea please Submit Quote Via Email To (email) By The Due Date Specified On Page 1, Block 10. if A Firm Fixed Price (ffp) Cannot Be Determined, Please Inform The Pco. these Items Require Government Source Approval Prior To Award. if You Are Not An Approved Source, You Must Submit, Together With your Proposal, The Information Detailed In The Navsup Wss Source approval Brochure Which Can Be Obtained Online At https://www.navsup.navy.mil/public/navsup/wss/business_opps/ under "commodities." Offers Received Which Fail To Provide All Data required By The Source Approval Brochure Will Not Be Considered For award Under This Solicitation. Please Note, If Evaluation Of A Source approval Request Submitted Hereunder Cannot Be Processed In Time and / Or Approval Requirements Preclude The Ability To Obtain Subject items In Time To Meet Government Requirements, Award Of Requirement may Be Continued Based On Fleet Support Needs. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: bottle/container As ;7rh1680016106528e7; Nsn , ;123scp5210-3; Part Number, Shall Be Performed Iaw: Bottle/container As ;all Available Repair Manuals, Drawings And Specifications Per Part Number Requirements; Publication (s). 1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Waiver/deviation Via The Dcmc To The Navicp Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: bottle/container As ;123scp5210-3; P/n, ;nsn 7rh 1680 016106528 E7; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. bottle/container As ;northrop Grumman Systems Corp; Company Name , ;2000 W Nasa Blvd, Melbourne Fl 32904-2322; Address , ;70974 ; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date14 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n792.14|ja1|see Email|helen.i.carmelo.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00383|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|1 Year After Date Of Delivery|45 Days From Discovery Of Defect||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitations On Pass-through Charges (jun 2020)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|335314|750 Emp||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ all Freight Is Fob Origin. this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. the Government Is Seeking A Repair Turnaround Time (rtat) Of: 152 Days government Source Inspection (gsi) Is Required. please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work. your Quote Should Include The Following Information: Quote Amount And Rtat - Unit Price:__________ - Total Price:__________ - Repair Turnaround Time (rtat): _______ Days if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location - Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As "awardee Cage": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________ important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: relay,electromagnet ;b-461g; P/n, ;014755859; Nsn, ;iaw Applicable Manuals; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. relay,electromagnet ;te Connectivity Corporation; Company Name , ;175 N Diamond St Mansfield Oh 44902 ; Address , ;74063; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n733.05|n00383|215-697-4946|sophia.l.pugh.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo ||tbd|n00383|tbd|tbd|see Schedule|tbd|see Schedule|||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days|45 Days Of The Last Delivery Under This Contract||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitations On Pass-through Charges (jun 2020)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1,200|1,250|||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a || this Rfq Is For Repair Requirement. repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirementis Measured From Asset Return To The Date Of Asset Acceptance Under The Termsof The Contract. For Purposes Of This Section, Return Is Defined As Physicalreceipt Of The F-condition Asset at The Contractor's Facility As Reflected Inthe Action Date Entry In The Commercial Asset Visibility (cav) System. Inaccordance With The Cav Statement Of Work, The Contractor Is Required Toaccurately Report All Transactions By The End Of The Fifth Regular Business Dayafter Receipt And The Action Date Entered In Cav Must Be Dated To Reflectthe Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established Inthis Contract. proposals Shall Reference The Proposed Rtat And Any Capacity Constraints.navsup Wss Requests That Contractors Submit A Quote That Includes Either Afirm-fixed Price Or Tt&e Pricing As Well As Estimate Costs To Repair This Item. this Contract/delivery Order/purchase Order/modification Is Issued By Thegovernment When Deposited In The Mail, Transmitted By Facsimile Or Sent By Anyelectronic Commerce Method, Including Email. The Government's Acceptance Ofthe Contractor's Proposal Constitutes bilateral Agreement To Issue Thiscontract/delivery Order/purchase Order/modification. 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: printed Wiring Boar ;43460-07; P/n, ;7rh 5998 200091066 V2; Nsn, ;repair In Accordance With Technical Drawing An Perscribed Specificationto Meat Industry Standards.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. printed Wiring Boar ;safran Electronic Canada; Company Name , ;2000 Fisher Drive, Peterborough On. Canada, K9j 7b1; Address , ;l8794; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n722.31|n/a|215-697-2486|thomas.s.mclaughlin7.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|45 Days After Defectwas Found||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. early And Incremental Deliveries Accepted. all Terms And Conditions Are In Accordance With Boa: N0038320gv601 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: control Unit,electr ;control Unit,electr 5841-01-227-0014; Nsn , ;64547 2118220-1-2; Part Number, Shall Be Performed Iaw: Control Unit,electr ;n/a; Publication (s). 1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: control Unit,electr ;2118220-1-2; P/n, ;5841-01-227-0014; Nsn, ;all Repair Manuals, Drawings, And Specifications.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. control Unit,electr ;honeywell International Inc.; Company Name , ;1100 N Oracle Road Tucson Az 85737-9588; Address , ;64547; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes note 1. the Contractor Shall Repair And Test Each Item Using Approved Atp Accepted By The Government. The Contractor Must Also Identify All Special Tools And Test Equipment Required For Repairs/overhauls/modifications Of Subject Item(s) In The Contract. note 2. the "configuration Management" Clause Is Navsupwsstermcz01.
6271-6280 of 6301 archived Tenders