Scrap Tenders
Scrap Tenders
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon9 Jan 2025
Tender AmountRefer Documents
Details: Contact Information|4|n761.34|n00383|215-697-3608|tara.b.kupperstein.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type |n/a |tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months |60 Days After Discovery Of Defect |||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
this Request For Quote (rfq) Is For The Repair Of:
nsn: 1680 015817912
quantity: 2 Ea
if A Firm Fixed Price (ffp) Cannot Be Determined, Please Inform The Pco.
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract.for Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract.
required Rtat: ## 180 Days After Receipt Of Asset
throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month. A Throughput Of ## 2 Per Month Reflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation:a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such
prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Ordersdelivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted And Preferred.
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document.
1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements.
repair Of:
dtsk,aircraft,mater ;7r 1680 015817912; Nsn , ;37900-501-2012; Part Number, Shall Be Performed Iaw: Dtsk,aircraft,mater ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Publication (s).
1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And
recommendations Via Form 1998.
1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
dtsk,aircraft,mater ;37900-501-2012; P/n, ;7r 1680 015817912; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
dtsk,aircraft,mater ;drs Advanced Isr, Llc; Company Name , ;2601 Mission Point Blvd, Ste 250, Beavercreek Oh 45432-6600; Address , ;0cdn3; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
higher-level Contract Quality Requirement|8|||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data --modifications (nov 2021))|7||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|334511|1350|||||||||||
cost Accounting Standard Notices And Certification (deviation 2018-o0015)(may 2018))|1||
requirements For Submission Of Proposals Via Electronic Media (jan 2018)|1|via Email|
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|||
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1||
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein.
early And Incremental Deliveries Accepted.
all Terms And Conditions Are In Accordance With Boa:n00383-21-g-ym01required Mandatory Government Sources Of Supply Have Been Reviewed Inaccordance With Far 8.002 And Dfars 208.002. None Of The Required None Of Therequired Sources Are Able To Provide The Required
item(s).
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
recorder,flight Dat ;s800-3500-11; P/n, ;014968799; Nsn, ;iaw Applicable Manuals; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
recorder,flight Dat ;l-3 Communications Avionics Sys; Company Name , ;5353 52nd Street Se, Grand Rapids Mi 49512-9704; Address , ;25583; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Telangana University Tender
Publishing and Printing
India
Closing DateNA
Tender AmountNA
Tender Id: SCRAP________ | Sealed Quotations Are Invited To Purchasing Of Old Stock/disposal Of Used Answer Booklets (theory & Practical) And Waste Papers/news Papers - Quotations May Be Reached To Registrar Office On Or Before 15/12/2023
DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender
Education And Training Services
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 597.9 K (USD 10.3 K)
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 10- Arts And Crafts Support Service Area: Skills Development) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 597,951.44 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 10- Arts And Crafts Support Service Area: Skills Development) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 1,000.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Sewing Machine Singer,15ch 179 Sewmaster, Automatic Bobbin Winder, Variable Stitch Length Control, Forward And Reverse Function, Numbered Dial Tension, Threadle Or Motor Options, Drop Feed Knob 5 Piece Utility Shelf, 1713s Utility Shelf 2 Pieces Table, Folding Table Ft-02 1200mm L X 400mm D X 750mm Ht., Structure: Melamine 3 Pieces Chairs, Cod Armchair Backrest Wood Horn Chair, 43x48x74, Material: High Quality Iron Wood, Max:150kg 6 Pieces Storage Cabinet, Dimension: 48*30*83cm, Material: Plastic, 3 Pieces Cork Bulletin Board, Wooden Frame, 30x40cm 1 Piece Glue Gun, Mitsushi Mit-gl40 40w, 100-240v, Hot Melt Glue Gun 2 Pieces Acrylic Color, Faber Castell, 12ml, 12 Colors 3 Pieces Scissors, Maped Reflex 3d Vivo Scissors, 16cm 4 Pieces Cutters, Ida Wallpaper Blade Cutter, Length 15cm, Width: 15cm 3 Pieces Watercolors, Prang 16 Watercolor Set 3 Sets Art Paper (multiple Colors), Avia Colors Assorted Colored Paper, 250 Sheets, 80 Gsm, Size: 8.5" X 11" 3 Reams Paint Brushes, Deli 73885 Brush Set 3 Pieces Yarn, Color, Dmc Natura Happy Cotton, 100% Cotton Yarnfor Crochet, Knitting And Yarn Crafts, Thickness: Light (8 Ply), Weight: 20 Grams, Length:43 Meters 10 Pieces Glue, Elmer's Glue, White 225 Grams 5 Pieces Colored Pencils, Staedtler Colored Pencil 136 C36 Luna Permanent 36 Colors 3 Sets Colored Pens, Faber-castell Coloring Pen, 12 Colors 3 Sets Sewing Pins, 40 Pieces 3 Pieces Sewing Needles, 16 Pcs Set Hand Sewing Needle, Size: S: 4cm (8pcs), M:4.5cm (6pcs)* L:5cm (2pcs), Mateial;stainless 10 Pieces Rotary Cutter, 45mm Fabric Rotary Cutter, Length:45m, Material:stainless Steel Blade+abs Handle, Color: Orange. Length: 165mm, Blade Diameter:45mm, Suitable For:leather Fabric Vinl Fiber Paper 2 Pieces Tape Measure, Deli 79650 Measuring Tape 150cm/60 Inches (1.5m*7mm) 10 Pieces Crochet Hooks, 100pcs Crochet Hook Set,perfect Round Point, Material: Plastic+metal, Size:18*13*3cm, Hook Size: 2mm,2.5mm,3.0mm,3.5mm,4.0mm,4.5mm,5.00mm,5.5mm,6.0mm,6.5mm 2 Pieces Knitting Needles, Sizes: 4,5,6 And 8 2 Pieces Crochet Thread, 5 Ply Monaco 100% Mercerized Cotton, Assorted Colors, Length:105 Meters, 50 Grams 20 Pieces Sewing Thread, Apple Spun Polyester Sewing Thread, Assorted Colors, 100 Meters, Polyester Material, 10pcs/box 2 Boxes Convertible Drawing And Drafting Table, Size: 24”x36” ▪color:raw Sienna / Brown ▪weight: 10-11kg 1 Piece Studio/painting Easel, Sizes: 85" - 120" Tall 2 Pieces Table/desk Painting Easel, Could Be An H Or An A Easel Type, For A Easel 38" To 75", For H Easel 84" To 96" 5 Pieces Manual And/or Electric Pencil Sharpener, Pencil Sharpener Hand Crank Manual Mechanical Pencil Sharpener,aluminum Alloy Knife Structure,cutting Outer Diameter Of 6.5-8mm Pencil 4 Pieces Wooden Mannequin, With Stand 11.5/14/21/30cm Wooden Human Mannequin Model Artist Movable Limbs Doll 2 Pieces Transparent Edge T-square, Hardwood Blade Dimensions: 30x13.5x0.2 Inches Weight: 14.4 Ounces Color: Wood Size: 36’’ 2 Pieces Carpentry Tools, Tool Set Includes: 1 – 9” Plastic Torpedo Level 1- Magnetic Bit Holder 1” Cr-v Bits Nut Drivers: 3/16”,1/4”,9/32”,5/16”, 11/32”,3/8” 10ft/3m Tape Measure 150mm Mini Saw 7” Locking Pliers 7-12” Diagonal Cutting Pliers 8” Long Nose Pliers 8” Adjustable Wrench 8” Water Pump Pliers Zinc-alloy Utility Knife Utility Knife Blade Black Cable Ties 160oz Claw Hammer Combination Wrench: ¼”, 5/16”, 3/8”, 7/16”. ½”, 9/16” Precision Screwdrivers:ph1, Ph0, Slotted:1/4, 2.0, 2.4, 3.0mm Metric Hex Keys: 1.5, 2, 2.5, 3, 4,5,5.5, 6mm Sae Hex Keys: 1/16”, 5/65”, 3/32”, 1/8”, 5/32”, 3/16”, 7/32”, ¼” 16” Zipper Tool Bag Item Weight; 8.8 Pounds 17.7x9x9 Inches 2 Sets T50 Staple Gun, Size: 7x9x3 Inches 5/16” Staples 3 Pieces Slop Sink, Size: 30.2x18.4x10.0inch Color: 30”m Style: Single Bowl Material: Stainless Steel Thickness: 3.0-1.2mm 1 Piece Roofing Square Dual Marking Right Angle Picture Framing Carpenter Ruler, Steel 90 Degrees Roofing Square Measuring Size: 20x 30cm/8x12” Rustproof Size: 30x20.5x 20.5 Weight: 0.16kg 3 Pieces Professional Compound Mitre Box & Saw, Adjustable Angle 20x8x9 Inches Miter Box 22 Inches Back Saw 2 Pieces Drawing Lamp, Overall Dimensions: 1.5 “w X 3.5 “d X 29.5 “h Long, Bendable Neck 21” (53 Cm) 28 Led Bulbs Stainless Steel Wattage: 1 Can Be Mounted To Table, Desk Or Easel Usb Plug 2 Pieces Artists Taboret Made Of Beechwood. Measures 35-1/2"h X 17-1/2"w X 14-1/2"d 1 Piece Open Shelves Utility Rack, 72" Height X 48" Width X 18" Depth Five Adjustable Shelves 4,000 Lb. Capacity Steel Frame Particle Board For Shelves Rivet Lock Design With Nuts And Bolts 2 Pieces Chisel Rack For Wood Carving, 3/4″ Thick, And 2 Pieces 3/8″ Tall Plywood Number Of Slots May Vary 2 Pieces Corner Clamp, Maximum Clamping Range 7.5cm, Generally 4 Right-angle Clamp All Together To Use. Material: Aluminum Type: 4 -inch 20.00 X 10.00 X 10.00 8 Pieces Decorative Realistic Artificial Fruits, Assorted Plastic Fruits And/or Eco-friendly Foam Material 2 Sets Geometric Shapes Set, 8-12 Shapes/forms Wood And/or Non-toxic Plastic Shapes Include Sphere, Square, Cylinder, Round Cylinder, Cone, Cube, Hexagonal Prism, Triangular Prism, Square Based Pyramid, Octagonal Prism, Pentagonal Prism, And 1/2 Sphere 2 Sets Geometric Designer Templates, Scale: 0-20 Cm/0-24 Cm Size : 8-1/4" X 5.1" (l*w) Plastic And/or Steel Material 4 Pieces Stack Rack, Dimension: 30 In H X 21 In W X 17 In L At Least 6 Shelves May Be Wooden Or Metal Materials Devised With Rollers To Roll The Rack In Any Location 4 Pieces Picture Frame And Miter Clamp, Weight: 2.5 Pounds Dimensions: 23.9 X 9 X 1.6 Inches Wood Material 4 Pieces Heat Gun, Power: 2,000 Watts Temperature: 50 / 380 / 570 Celcius Steps: 3 Steps Air Flow: 500 / 300 / 500 L/min 4 Pcs Nozzles (air Blast, Reducing, Reflector, Paint Scraper) 1 Pc Scraper 4 Pieces Hot Plate Single Electric Stove, Power:1000w Non-stick Coating Auto-thermostat Various Heat Operations Operating On/off Indicator Light 2 Pieces Tape Dispenser, Weight: 1 Kg Hard Durable Plastic Material 2 Pieces Multi-function Three-hole Puncher, 11.75 X 2.75 X 2.75 Inches High Quality Metal Construction With Clip-in Rings 2 Pieces Metric Scale, 30 Centimeters In Length Scale: 1:1, 1:10, 1:2, 1:20, 1:5, 1:50, 1:100, 1:200, 1:500, 1:1000, 1:1250 And 1:2500 4 Pieces Steel Tape Measure, Tape Rule With First 6 Feet Reinforced With Bladearmor Coating For Maximum Durability 11-inch Tape Standout; 16-inch And 19.2-inch Stud Center Markings Simplify Framing Jobs Mylar Polyester Film Extends The Life Of The Entire Blade Heat-treated Spring Provides Long Life And Smooth Blade Recoil Stanley's Limited Lifetime ; Measures 1-1/4-inch-by-25-feet 3 Pieces Heavy Duty Circular Saw, Corded Or Cordless Adjustable Depth Diameter: 4 1/2 In. With Electric Brake Maximum Cutting Depth At 45 Degrees: 1 In. Maximum Cutting Depth At 90 Degrees: 1-9/16 In. Maximum Speed: 4500 Rpm Spindle Lock 20 Volt 5.5 Lb. 4 Pieces Abrasive Disc Cutter Machine, Electric Powered 18.5” H X 12.2” W X 21.25” D 2200w 14” Blade Diameter 15 Amps Motor (3600 Rpm) Cutting Capacity Of 4.5” At 90˚ And 45˚ 2 Pieces Manual Canvas Pliers, Specifically Designed For Electrical And Mechanical Works 3 Pcs. In 1 Set 1 Combination Plier 6" 1 Cutter Plier 6" 1 Long Nose 6" Offers Comfortable Hand Grip 3 Set Jet-bow Compass Set, Set Includes 6" Speed Compass With Inter-changeable Pen, Pencil, Divider Parts, And Replaceable Needle Points. 4½" Bow Compass With Inter-changeable Pen, Pencil, And Divider Parts. 6" Beam Bar And Slide Coupling For Circles Up To 28" In Diameter And 6" Friction Divider With Self Centering Gear Head And Replaceable Needle Points. Set Also Includes Mechanical Lead Holder, Slip Handle For Spare Ruling Pen, Lead Pointer, Center Tack, And Screwdriver. Packaged In See-through, Hard Plastic Case. 2 Sets Human Head Model, Plastic, Life-size Anatomical Cast With Removable Jaw And 3 Removable Lower Teeth Type: Skull Model Material: Pvc Dimension: App.21x15x19cm/8.27x5.91x7.48in Color: As The Picture Shown Quantity: 1 Set 1 Set Screw Drivers Set, Philips Or Slotted Sl 3/16 In. X 3 In. (x2), 3/16 In. X 6 In., Sl 1/4 In. 1.5 In., Sl 1/4 In. X 4 In. (x2), Sl 1/4 In. X 6 In. Ph1 X 4 In. (x 2), Ph2 X 1.5 In., Ph2 X 4 In. (x2) 2 Offset Screwdrivers 6 Precision Screwdrivers: Ph0, Ph1, Sl 1.4 Mm, Sl 2 Mm, Sl 2.4 Mm, Sl 3 Mm 2 Sets Pliers And Grip Set, 10 Piece Tray Set Includes 1 Each Of The Following: 10r, 10wr, 7wr, 7r, 7cr, 6ln, 9ln, 5wr, 6r, 11r Weight: 11.80 Lb 28.00 X 11.80 X 1.30 Inches 2 Sets Artist Stool With Wheels, Height Adjustable & 360° Swivel Soft Pu Leather Cushion Detachable Design Dimension: Seat Diameter: 16.2" Seat Height: 25.6"-35.8" Full Height: 37.4"-47.6" Max Weight Capacity: 300lbs 6 Pieces Screen Print Squeegee, Material: Natural Rubber, Wood, Stainless Hardness: 70 Durometer Length: 25cm/10" Width: 10cm/3.9" Thickness: 2.3cm/0.9'' 8 Pieces Mixing Paint Palette, Material: Stainless Color: Silver Size: Approx 6.75" X 5.5"compact 12 Pieces Carving Chisels For Wood, Material: 45# Steel And Wood Color: Wood Color + Silver Quantity: 12 Pcs Total Weight : 892 Kg Wooden Handle Length Of Each Chisel: 95mm/3.74” Total Length Pf Each Chisel: 20.5mm / 8.07” Size: 1x V-straight Parting Tool: 14.6mm / 0.57” 1x Round Nose Chisel: 7.8 / 0.31 1x Skew Wood Turning Chisel: 7.8mm / 0.31” 1x Bent Chisel: 7.8mm / 0.31” 1x Wood Chisel: 7.8mm / 0.31” 1x Skew Wood Turning Chisel: 8mm / 0.31” 1x Pointed Wood Chisel: 8mm / 0.31” 2x Straight Chisel: 7.8mm 13.7mm”/ 0.31” 0.54” 3x Straight Gouge: 12.8” 16.1mm 11.7mm/ 0.50” 0.63” 0.46” 2 Sets Files Set For Jeweler, Wood Carving, Craft Metal And Glass Stone, 10 Pcs / Set 5x180mm Stone Precision Needle Files Tool Woodworking Carving The Craft Metal Rasp Wood Hand Tools Material: Metal Color: Gray/ Silver Model: Needle Files Size : 14.5x1x1 Weight: 0.05 Kg 2 Sets Heavy Duty Multi-purpose Bench Vise, Jaw Width: 5", Opening: 4-1/4" Durable Cast Steel Construction Head Swivel 360 Degree Full 360-degree Rotational Jaws Unique "v" Jaws Provide 4 Point Holding Power 2 Pieces Anvil, Weight: 55 Lbs. (sculpture) 9 Lbs. (jewelry Works) Metalsmith, Jewelers Forming Tool, Essential For Jewelry Repair, Shaping, Flattening, Hardening Metals Material: Iron Surface Size: (l X W X H): Approx. 6 X 3.3 X 9cm/2.36 X 1.3 X 3.54inch, Height: Approx. 5.5cm/2.17inch 1 Piece Welding Protective Suite, Made Of High-quality Denim Material, It Can Be Worn Many Times, It Will Not Fade For A Long Time. Unique And Comfortable Design, Wear-resistance And Dirty Resistance. Reinforced And Stitched The Crotch, Cuffs, Pockets To Prevent Accidental Tearing. The Highly Elastic Cuffs Make It Comfortable And Convenient To Wear. Size: 170 Height: 168-173cm Waist: 76-84cm/29.9-33 Inches Weight: 57.5-135kg 5 Pieces Welding Apron, Features: Material: Constructed With Artificial Cow Suede Which Is Not Only Durable But Also Flexible, And The Apron Offer Puncture Resistance, Tear Resistance And Cut Resistance. Size: (approx) (lxw) 90x60cm/35.4x23.6inch, Long Full Coverage Apron Protects You Until The Knee When You Are Working. Friendly: The Straps On The Waist Can Be Adjusted To Fit Your Body Better. They Are Designed To Hang Over The Shoulder Which Means That Weight Is Distributed Evenly Over The Shoulders. Never Suffer Neck And Back Pain Again. Pockets: 6 Pockets For Tools And Work Accessories, Include One Cell Phone Pocket And One Pencil Pocket. You Can Put Everything You Need Close To Hand In It Instead Of Constantly Search For Them. The Cell Phone Pocket Is Deep To Prevent The Phone From Falling Out. Application: Not Only For Woodworking And Welding But Also Useful For Many Other Work And Home Tasks Like Bbq And Gardening, Unique Gift Apron For Men, Women, Mothers, Fathers. Specifications: Material: Artificial Cow Suede Color: Yellow Size: (approx) (lxw) 90x60cm/35.4x23.6inch Package Included: 1 Pc X Apron 5 Pieces Welding Hood Caps, Flame Retardant Cloth Full Protection This Welding Hood Offers An Essential Mix Of Durability, Comfort And Protection. The Hood Features A Mesh Lining To Allow Sweat Vapour To Quickly Evaporate The Presoftened, Lightweight, Air Cushioned Fabric For Maximum Comfort. This Hood Can Protect Your Neck, Face And Head From Welding Fire Flash, Splash Very Well. Wear-resistant, Fire-retardant, Spark-proof, Double Protection Of Personal Safety And Sweat Absorption Specification: - Long :approx. 45cm/ 17.72inch - Shoulder Width: Approx. 43cm/16.93inch(xl) 5 Pieces Welding Gloves 10.5" Welding Leather Gloves Hgvc01 *winland* Product Description • Size: 10.5" • Use For Driver, Machining Operator Etc. • All Applications Which Require A High Level Of Anti-skid And Abrasion-resistant • Applying Universally To The Transporting And Cargo Handling Workers, Recycling Work, And Horticulture Workers, Drivers And Etc. • Cow Split Leather Gloves • Full Palm, Full Lining • Made With Top Quality Material For Industrial And Commercial Use 5 Pieces Welding Protective Visitor Glasses, Protective Visitor Glasses: Anti-fog With Uv Protection Glasses Product Name:safety Eyewear Glasses Color:clear, Dark Grey Feature:protective Glasses Lens Color:clear, Dark Grey Style:work Safety Glasses Package:blister Size: 17*17*7cm 5 Pieces Welding Helmet, Ingco Auto Darkening Welding Helmet Ahm009 Viewing Area:90×35mm Cartridge Size:110×90×10mm Arc Sensor:2 Light State:din 4 Dark State:fixed Shade 10 Shade Control:unadjustable Power On/off:fully Automatic Sensitivity Control:unadjustable,auto Uv/ir Protection:din 16 Power Supply:solar Cells. Re-chargeable Battery .no Battery Change Required Switching Time:1/5000s,from Light To Dark Dark To Light:0.15-0.45s Auto Low Amperage Tig:≥20amps(dc), ≥20amps(ac) Operating Tep:-5°c~+55°c Storing Tep:-20°c~+70°c 5 Pieces Welding Mask, Product Details Of Heavy Duty Welding Mask (108x50x3mm) Movable Glass Impacted Resistant Shell Anti Wear Moveable Type Glass Packing: Polybag With Color Sticker 5 Pieces Hard Hat, Hard Safety Helmet With Chin Strap Color: Blue, Orange, White, Yellow Material: Acrylonitrile Butadiene Styrene (abs) Shell, With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap Tough, Lightweight, Durable With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap. A Hard Hat Is A Type Of Helmet Predominantly Used In Workplace Environments Such As Industrial Or Construction Sites To Protect The Head From Injury Due To Falling Objects, Impact With Other Objects, Debris, Rain, And Electric Shock. Durable, Lightweight And Comfortable 12 Pieces Compact Electric Kilns, Degree F (max): 2300°f Cone: 6 Firebrick: 3" Volt: 240 / 208 Watt: 3,600 Ampere: 15 Recommended Breaker (amp): 20 Receptacle: 6-20 Size Interior (wide X High X Deep): 13.5 X 13.25" Size Exterior Including Stand (wide X High X Deep): 22 X 28 X 25.5" Volume (cu Ft.): 1.22 1 Piece Heat Press Transfer Machine, Electric Powered 21.2 X 20.2 X 19.2 In. 220v 1800w 0-400˚f (0-220˚c) 0-999 Sec. 1 Piece Rubber Mallet, Rubber Hammerhead Fiberglass Handle Packing: Color Label Weight: 32oz 4 Pieces Ball Peen Hammer, Material: Fiberglass Handle & Steel Head Size: 16 Ounce Weight: 3.7 Pound 4 Pieces Cutting Mat, Flexible Cutting Mat A2 Size (24 X 18 Inch) Self-healing 5 Layered Double Sided With Marked Pattern And Grids (green) Material: Polyvinyl Chloride Color: Green Item Dimensions: 15 X 15 X 15 Centimeters Shape: Hexagonal Weight: 200 Grams 6 Pieces Heavy Duty Extension Wire, Heavy Duty Extension Power Strip With Safety Switch Protection Socket 4 Meters, Extension 3 Pieces 36” Smart Led Tv, Width 96.74cm, Gross Weight: 10.8 Kg, Net Weight 7.9kg, Height 57.18, Length 7.99cm, Screen Size: 43-inch, Tv Resolution: Full Hd 2 Piece Laptop Computer, Laptop Screen Size: 15 Inches, Graphics Chipset: Integrated, Storage Capacity:512gb, Storage Type: Ssd, Ports/interface: Usb 2.0, Usb 3.0, Vga, Processor Type: Intel Core I7, Number Of Cores: Dual-core, Os:windows, Weight:3 Kg, Battery Capacity 4910mah, Cpu Frequency: 2.9ghz 1 Piece Photo Printer, Wireless Photo All-in-one With Auto Duplex Printing Print, Scan, Copy Auto Duplex Printing Wireless, Wireless Pictbridge, Mopria, Airprint, Direct Wireless Recommended Monthly Print Volume: 30 - 100 Pages Operating System: Win 8 / Win 7 / Vista / Xp, Mac Os X 10.7.5 And Later Borderless Printing: A4 / Letter / 4 X 6" / 5 X 7" / 8 X 10") Standard Paper Input (front Tray): 100 Sheets (a4/ Ltr) / 20 Sheets ( 4 X 6 “ ) Paper Weight: 64 To 105 G/m2 Up To 300 G/m2 Dimension (w X D X H): 449 X 304 X 152 Mm Weight: 5.4 Kg Interface / Connectivity: Usb 2.0 Hi-speed / Wireless Lan /wireless Pictbridge, Direct Wireless Scanner Type: Flatbed 1 Piece Portable Sound System With Microphone, Led Lights 2 Wireless Microphone Wired Microphone / Guitar / Line In Mic Priority Over Voice On/off Line Out Remote Control Usb / Bluetooth / Nfc / Fm Capabilities Frequency Response: 50hz-20khz Power System: Ac Adaptor / 12vdc In / Internal Rechargeable Battery 100v-240v, 60hz Power Supply Adaptor 1 Set 50” Led Tv, Height: 64.42 Cm, Width:111.68cm, Length:5.99cm, Gross Weight:16kg. Screen Size: 50-inch Led, Net Weight: 11.6kg, Tv Resolution: 4k Ultra Hd, Connectivity: Wireless Lan Built-in (wi-fi), Hdmi Ports: 3, Usb Ports:1 2 Piece Soft Box With Stand, 2 Pcs Studio Lighting Softbox 50*70cm, 2 Pcs 2m Light Stand, 2 Pcs 45w Light Bulb, Photography Kit 100-240v, Maximum Height: 200cm/78", Collapsible Height:65cm/32" 2 Pieces Display Panel Board, Product Weight:8kg, Choose Type:fabric,number Of Panels:4,type: Pole And Panel,graphic Type: Loop Nylon, 900x600mm Or 1000x700mm 6 X 900mm Poles 25 Mm Diameter With Clips Weight Approx 11-14kg 1 Piece Magnetic Whiteboard, Size:4x8 (48x96 Inches) Feet, Aluminum Frame,with Sliding Whiteboard Marker/eraser Tray,protective Plastic Rubber Corners 1 Piece Chalkboard, Length: 60.5", Height: 36.5",unit Weight: 24.00 Lbs Per Unit Color: Black Duro-slate Over ¼”hardboard Backing, Full Length Chalk Tray 1 Piece Offline Mini Compressor, 220v 60hz, Type: Single Cylinder Piston Compressor With Air Tank, Power: 1/6hp, Speed: 1700r.p.m, Air Output Per Min/lit.:20-23l/min, Auto Stop, Start At 3bar (43 Psi) Stop At 4bar (57psi), Working Pressure:0-4 Bar, Air Tank:3.0l, Suitable For Airbrush With Nozzle 0.2mm-1.0mm, Weight: 5kg, Dimension: 31x13x31cm 1 Pieces Styrofoam Cutter, Material:plastic, Size:approx. 190x90mm, Power: 2xc Size Battery (not Included), Feature: Electric Wire Needle Shap, Stainless Steel Wire, Hardness And Diameter Of 0.19mm 1 Piece Potter’s Wheel/electric Potter’s Wheel, Detachable Abs Basin, Advanced High-quality Brushless Motor, Rotary Speed:0-300 Rpm, Pottery Wheel: 25cm, Pottery Forming Machine:350w,electric Pottery Wheel With Foot Pedal And Detachable Basin, Rated Voltage: Ac 110v, Wheel Diameter: 25cm (9.8"), Speed: 0-300r/min, Working Noise:,60 Db, Gross Weight: 14kg (31.1 Lb), Package Dimensions (lxwxh) 53x42x35cm (20.8"x16.53"x13.78") 2 Pieces Weather-proof Safety Box Circuit Breaker, Metal Enclosure Panel Box, Weatherproof, Height:300mm, Depth:150mm, Door: 0.8mm, Body: 0.8mm, Plate: 0.8mm, Metal Body,width:400mm 1 Piece Fire Blanket, 120x99x4cm (l X W X H) Woven Glass Fiber 2 Pieces Exhaust Fan, Size: 12" 9" 6" Rpm: 1350, 1320, 1290 Finish: Power Coated 2 Pieces Medicine Cabinet, Stainless 20x26x5 Inch Single Door Medicine Cabinet 1 Piece Smoke Detector, 120 Volts Ionization Sensor, Clamshell Packaging 1 Piece Disposal Bins, 50 Cubic Movable Bins 2 Pieces Abc = 597,951.44
Municipality Of Bukovany Tender
Civil And Construction...+1Excavation
Czech Republic
Closing Soon16 Jan 2025
Tender AmountCZK 4.2 Million (USD 172.1 K)
Details: The subject of the public contract is construction work. It concerns the removal of the former pig farm on plot No. St.304/2 in the cadastral territory of Bukovany U Kyjova with the subsequent revitalization of the territory with the establishment of a forest park. The former pig farm is located in the southeastern part of the municipality of Bukovany in a former agricultural area, which is currently without permanent use and the buildings there are dilapidated. The area was built after the merger of cooperatives (jzd) in Bukovany, Ostrovánky and Nechvalín in 1961. The building is located on plot No. St. 304/2 in the cadastral territory of Bukovany U Kyjova, in the real estate register it is recorded as a built-up area and a courtyard with a total area of 563 m2. There are other areas on the surrounding plots that are used as handling areas and other agricultural buildings. The single-storey agricultural building that was removed, without a basement, which was originally used as a pig farm, has a rectangular floor plan measuring 63.73 x 8.35 m. On the southwest side of the building, an extension with pig farms measuring 8.61 x 3.53 m adjoins the building. The roof above the building is gable with a ridge height of 3.93 m above the floor of the first floor. The slope of the gable roof above the main mass of the pig farm is 17°. The hipped roof of the extension has a slope of 13° Parameters of the building to be removed: - Area built up by the agricultural building ..................... 563.00 m2 - Floor area of the first floor ......................................….….……. 479.43 M2 - Built-up Area .............................................. ............................... 2,330 M3 - Roof Ridge Height ................................................................ 3.93 MV The Building Area Contains Asbestos, Eternit Corrugated Roofing, Its Disposal Must Be Proceeded According To Hygienic Regulations So As Not To Endanger The Health Of The Persons Who Will Be Carrying Out The Demolition Work And The Environment Is Not Endangered. Before Commencing The Demolition Work, The Disconnection Of The Building From The Engineering Networks Will Be Verifyed And, If Necessary, Their Course In The Surrounding Area Will Be Marked. When Removing The Building, The Demolition Material Intended For Removal Will Be Ecologically Sorted And Stored In Containers On The Investor's Land. The Collection Of Construction Waste Will Be Contractually Provided. Eternit Corrugated Roofing Sheets Will Be Dismantled, Stored And Transported According To A Special Technological Procedure. The Vast Majority Of The Material Will Be Transported For Recycling. Steel Elements Will Be Transported For Scrap, Wood Will Be Preferably Used As Fuel. At Least 70% Of The Total Weight Of The Construction And Demolition Waste Generated Will Be Prepared For Reuse, Recycling Or Backfilling (Hazardous Waste Is Not Included In This 70%). After The Demolition Of The Building, The Territory Will Be Revitalized On This Land With The Establishment Of A Forest Park. Vegetation Adjustments Will Be Carried Out, Where Grass Will Be Covered With An Area Of 563 M2 And 18 Trees Will Be Planted. The Subject of the Contract Will Be Performed Based on a Contract for Work According to the Binding Model - See Appendix Zd, Wherein Work Is Understood as the Complete and Flawless Execution of All Construction and Demolition Work, Including the Disposal of Hazardous Waste, and the Execution of All Activities Related to the Delivery of Construction and Assembly Work, the Execution of Which Is Necessary for the Proper Completion of the Work According to the Construction Project Documentation and the List of Construction Works, Supplies and Services with the Statement of Construction Dimensions (Appendix Zd). If the Work Is Implemented by an Association of Several Suppliers, All Participating Suppliers Will Be Jointly and Indivisiblely Responsible for the Execution of the Work.
Telangana University Tender
Publishing and Printing
India
Closing DateNA
Tender AmountNA
Tender Id: Scrap Tender Notice________ | Sealed Quotations Are Invited To Purchasing Of Old Stock/disposal Of Used Answer Booklets (theory & Practical) And Waste Papers/news Papers - Quotations May Be Reached To Registrar Office On Or Before 11/09/2023
Metro Railway Tender
Ireps
India
Closing Date28 Mar 2025
Tender AmountRefer Documents
Tender Id: MR-NOA-SCRAP-24-25-20 | Released Unserviceable Wooden Furniture I.e Wooden Chair Wooden Table, Wooden Tool, Wooden Bench, Desk, Ply Board, Desk Trimmer, Drawing Board, Printing Frame, Wooden Switch Board, Dining Table, Meeting Table,stool Ladder, Semi Circular Table, Letter Box, Wooden Tray,drawing Board, Etc. In Broken And Damaged Condition
Metro Railway Tender
Scraps
Ireps
India
Closing Date28 Mar 2025
Tender AmountRefer Documents
Tender Id: MR-NOA-SCRAP-24-25-22 | Released Unserviceable Different Types Of Power Cable,different Type Of Control Cable, E-beam Cross Single Core Copper Cable And Ic X120 Sq.mm Copper Cable In Damaged Condition. Note:- Power Cable & Control Cable Lying In The Lot With Mixed Up Condition.composition As Per Consignee- Copper- 1.851mt (approx) Insulation- 0.529 Mt(approx) (total Qty:-2.380mt(approx)
3711-3720 of 3725 active Tenders