Scrap Tenders

Scrap Tenders

Municipality Of Talusan, Zamboanga Sibugay Tender

Philippines
Details: Description Republic Of The Philippines Province Of Zamboanga Sibugay Municipality Of Talusan -7012- Office Of The Bac Chairman Invitation To Bid Notice To The Public: Notice Is Hereby Served That Sealed Bid Be Received For Public Bidding In The Office Of The Bids And Award Committee(bac), Talusan, Zamboanga Sibugay On Or Before Closing Date And Time Set At Philgeps Format For Furnishing This Office The Articles Served Subject However, To The "terms" And Conditions" Printed Back. Alexander V. Pidor Bac Chairman Item No. Units Articles Qty Unit Cost Total Value Set Air Compressor With Airtrush Cake Decorating Set 2 Piece Beater,electric 5l 4.0 Piece Board.chopping,6 Color,plastic 4 Piece Boiter.double 22 Cm 2 Set Bowl Mixing 6 Pcs/set Stainless Steel Big 12 Set Bowl.mixing 6 Pcs/set Glass Meduim 12 Set Bowl.mixing 6 Pcs/set Glass Small 24 Set Cake Pans,round#4,#8,#10#12,#16 2.00 Piece Cake Stand,3 Tier,60cm Electric 4 Set Cake Turn Table,21 Pc Set 4 Set Coupler 4 Piece Cup.measuring For Solod 15 Piece Cup.measuring,500ml For Liquid 8 Piece Cutter,dough 8 Piece Cutter Pie 4 Piece Dough Kneader 15l Electric 4 Piece Flour Sifter Hand Cranked 2 Piece Grater Stailes Steel 4 Piece Knife Steel Kitchen Set 4 Piece Knife Pallet 4 Piece Ladle.30z 4 Piece Loaf Pan Big Aluminum 4 Piece Loaf Pan Medium Aluminum 4 Piece Loaf Pan Small Aluminum 4 Unit Microwave Oven 2 Piece Mixer Vertical Electric 3 Piece Muffin Pan Big 4 Piece Muffin Pan Midium 4 Piece Muffin Pan, Small 12 Holes 4 Unit Oven Industrial Big Double Deck 1 Piece Pie Pan 10 Inches Diameter Aluminum 8 Set Pie Pan #6 #8 #10 Set 2 Piece Pillars Cake 4 Pack Piping Bag Small 4 Pack Piping Bag Medium 4 Pack Piping Bag Large 5 Piece Rectangular Pan 1x8 Aluminum Set 4 Piece Rolling Pins 4 Piece Rubber Scraper Silicone 4 Piece Sauce Pan 4 Piece Sheet Pan 10 Set Spoon Measurring Set 4 Piece Spoon Wooden Large 4 Unit Steamer Electric 2,8 L 2 Piece Strainer 18 Cm 4 Unit Table Long Stainles Steel 3 Piece Tip Decorating Small 3 Piece Tip Decorating Medium 3 Piece Tip Decorating Large 3 Unit Weighing Scale 10 Kgs 2 Unit Weighing Scale 5 Kgs Digital 2 Unit Weighing Scale 1kg Plastic Portable 3 Piece Wire Whisk,stainles Medium 4 Piece Round Plastic Basin 18 3 Piece Utility Try Multipurpose 4 Unit Kitchen Scale 5 Kls Electric 2 Unit Heavy Duty Flour Mixer 20l 2 Unit Gas Range With Oven 60 Cm 4 Burners 1 Unit Refrigerator 10 Cu Ft Double Door 1 Unit Kneading Table Stainless 3 Layer 2 Piece Oven Thermometer 2 Unit Dough Kneader Machine Planetary Mixer 1 Unit Pastry Slender Black Grip 4 Piece Pastry Wheels Cutter 2.5 Diameter 4 Piece Kitchen Shears Heavy Duty Stainless 4 Unit Electric Blender 2 Piece Aluminum Thong Small 4 Piece Aluminum Thong Medium 4 Set Extension Wires 10 M 3 Gang 4 Unit Gas Tank 12. 1kg 1 Piece Gas Tank Regulator 1 Piece Gas Tank Hose 2 M 1 Unit Portable Generator 15.00 Watss 1 Unit Electric Stand Fan 3 Unit Steel Cabinet Stoage 2 Piece Apron 12 Unit Air Pryer 2 Set Mortar&pestle,medium,marble,6 Diameter 2 Unit Display Rack,closed,glass 4 Layers 2 Unit Garbage Bin With Cover 13l 3 Piece Condiments Containers Medium 10 The Chairperson Bids And Award Committee Municipality Of Talusan Zamboanga Sibugay Sir/madam: Pursuant To The Terms And Condition Of This Bidding, I/we Hereby Submit My/our Bid Of The Price Set Opposite Each Item For Which A Bidders Bond Of P________________ Herewith Proposed/ Enclosed As Guaranty For The Faithful Compliance Of My /our Obligation. Very Truly Yours, (name Of Company) (company Address) ____________________________ (signature) ____________________________ (printed Name)
Closing Date24 Jan 2025
Tender AmountPHP 246.8 K (USD 4.2 K)

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n731.46|n00383|n/a|amanda.m.sweeney4.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo |inspection Site Source Final Acceptance Site Source|tbd|n00383|tbd|tbd|see Schedule |tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days |45 Days Of The Last Delivery Under This Contract ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|334412|750||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||a1a| this Rfq Is For Repair. Navsup Wss Requests That Contractors Submit A Quote That Includes A Firm-fixed Price. the Small Business Administration Representative At Navsup Wss Has Reviewed This Requirement And Determined That A Set-aside Recommendation Was Not Applicable For This Procurement. this Contract/delivery Order/purchase Order/modification Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal constitutes Bilateral Agreement To Issue This Contract/delivery Order/purchase Order/modification. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: circuit Card Assemb ;1002530-001; P/n, ;5998-01-221-2833; Nsn, ;repair Iaw Latest Technical Publications, Instructions And Manuals.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. circuit Card Assemb ;competitive.; Company Name , ;competitive.; Address , ;competitive.; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable international Enterprises Cage Code 50218, Now Owned And Operating Under Elbit America, Cage Code 0wec9, Respectfully Submits "no Bid" In Responseto Subject Rfq. We Do Not Possess Repair Capability For This Item. Reply Sentby Email On March 4, 2024.
Closing Date31 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Aerospace and Defence
United States
Description: Contact Information|4|n733.12|m5n|215 697 5936|linda.vong2.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo|source|tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days|45 Days Of The Last Delivery Under This Contract||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitations On Pass-through Charges (jun 2020)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413 Other Aircraft Parts And Auxiliary Equipment Manufactur|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a7 || this Rfq Is For A Navy Repair Requirement. navsup Wss Requests That Contractors Submit A Quote That Includes Either A Firm-fixed Price. the Small Business Administration Representative At Navsup Wss Has Reviewed This Requirement And Determined That A Set-aside Recommendation Was Not Applicable For This Procurement. quotes May Be Emailed To The Below Email Address And Must Be Received On Or Before On The Closing Date Listed On Page 1 Of The Solicitation. linda.vong2.civ@us.navy.mil this Contract/delivery Order/purchase Order/modification Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal constitutes Bilateral Agreement To Issue This Contract/delivery Order/purchase Order/modification. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: fairing Assy,sirfc, ;092-00749-002; P/n, ;7rh 1680-01-587-9235; Nsn, ;all Repairs Will Be In Accordance With Technical Drawings And Specifications, To Meet Industry Standards.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. fairing Assy,sirfc, ;meggitt, Inc.; Company Name , ;3310 Carlins Park Drive, Baltimore, Maryland 21215-0000; Address , ;25223; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Date17 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n731.39|n00383|2156972644|marisa.tetkowski@navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|inspection Site Source Final Acceptane Site Source|n/a|n00383|n/a|n/a|n/a|n/a||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|1 Year After Date Of Delivery|45 Days After Discovery Of Defect||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitations On Pass-through Charges (jun 2020)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Is A Competitive Repair Requirement. all Offers Are Due By The Solicitation Closing Date. no Late Offers Will Be Acepted. 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: processor,pwa,aircr ;901-005-654-103; P/n, ;7rh 1680 015302506 V2; Nsn, ;no Government Technical Publication Exists For The Rpair Of This Item. So All Repair Will Be Inaccordance With Technical Drawing And Engineering Specifications.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. processor,pwa,aircr ;project Unlimited Inc.; Company Name , ;6300 Sand Lake Road, Dayton, Oh. 45414; Address , ;04597; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Soon13 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n763.05|p5f|2156971303|charles.f.horan4.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| higher-level Contract Quality Requirement|8|x|||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type|n/a|tbd|n00383|tbd|tbd|see Schedule |tbd|||tbd|||||| monetary Limitation Repair Purchase Orders|1| $10570.00| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336412|1500||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Request For Proposal/ Quote (rfp/q) Is For The Repair Of: Cone,inlet,aircraft nsn: 7rh 2840 145674681 quantity: 3 Ea if A Firm Fixed Price (ffp) Cannot Be Determined, Please Inform The Pco. these Items Require Government Source Approval Prior To Award. If You Are Not An Approved Source, You Must Submit, Together With Your Proposal, Theinformation Detailed In The Navsup Wss Source Approval Brochure Which Can Be Obtained Online athttps://www.navsup.navy.mil/public/navsup/wss/business_opps/ Under "commodities." Offers Received Which Fail To Provide All Data Required By The Source Approval Brochure Will Not Be Considered For Award Under This Solicitation. Please Note, If Evaluation of A Source Approval Request Submitted Hereunder Cannot Be Processed In Time And / Or Approval Requirementsapproval Request Submitted Hereunder Cannot Be Processed In Time And / Or Approval Requirementspreclude The Ability To Obtain Subject Items In Time to Meet Government Requirements, Award Of Requirement May Be Continued Based On Fleet Support Needs. 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: cone,inlet,aircraft ;337-005-118-0; P/n, ;7rh 2840 145674681 F7; Nsn, ;repair Iaw Applicalble Repair Manuals And Publications.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. cone,inlet,aircraft ;jet Aviation Specialist Inc; Company Name , ;3373 Nw 107th Streetmiami, Fl 33167-3714; Address , ;1nlk7; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Date6 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n723.09|b4y|215-697-3770|kristen.n.florczak.civ@us.navy.mil | item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|60 Days After The Defect Was Found||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Is A Repair Requirement For The Item(s) Identified In This Solicitation. repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physicalreceipt Of The F-condition asset At The Contractor?s Facility As Reflected Inthe Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. the Contractor Must Obtain Final Inspection And Acceptance By The Governmentfor All Assets Within The Rtats Established In This Contract. required Rtat: ## ____ Days After Receipt Of Asset throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ##____ Per Month Reflects No Throughput Constraint. induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer. reconciliation: A Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under This Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such Prices Are based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. early And Incremental Deliveries Accepted. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: hydraulic,eng Driv, ;849589; P/n, ;7rh 1680 015854812 F7; Nsn, ;repair In Accordance With Applicaple Repair Publications.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. hydraulic,eng Driv, ;eaton Aerospace Llc; Company Name , ;vickers Fluid Systems5353 Highland Drive, Jackson, Ms 39206-3449; Address , ;62983; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Date23 Jan 2025
Tender AmountRefer Documents 

Western Visayas Sanitarium Doh Tender

Furnitures and Fixtures
Corrigendum : Closing Date Modified
Philippines
Details: Description Item No. Qty Unit Articles / Description Estimated Cost Brand Offered Unit Price Total Price Lot 1 -carpentry Supplies 521,606.00 1 10 Rolls Barbed Wire, No. 12, 150meters 15,000.00 4.25 42.50 2 10 Rolls Cyclone Wire 2''x2''x 6ft Height, 6meters Length 13,000.00 3 10 Lengths 2"x2"x10' S4s Solid Hard Wood 5,280.00 4 10 Lengths 2"x3"x10' S4s Solid Hard Wood 4,750.00 5 20 Lengths 3/4"x8' Lattice Moulding 4,800.00 6 30 Pairs Concealed Hinges Soft Closing Full Overlay 9,600.00 7 30 Pairs Concealed Hinges Soft Closing Half Overlay 9,600.00 8 25 Pairs Drawer Slide 12" Soft Closing 5,000.00 9 50 Sets Stainless Door Knob Lever Type 47,500.00 10 30 Pairs Stainless Ball Bearing Hinges 4"x4" 19,500.00 11 50 Pcs Stainless Cabinet Handle 6" 2,700.00 12 30 Sets Stainless Foot Bolt 6" 12,000.00 13 30 Sets Stainless Chain Bolt 6" 13,500.00 14 10 Liters Wood Glue 2,800.00 15 5 Kgs. Finishing Nail 1" 750.00 16 5 Kgs. Finishing Nail 1 1/2" 750.00 17 5 Kgs. Finishing Nail 2" 750.00 18 5 Kgs. Finishing Nail 2 1/2" 750.00 19 20 Lengths Metal Studs 2"x4"x3m 0.4mm Thk. 4,800.00 20 20 Lengths Metal Tracks 2"x4"x3m 0.4mm Thk. 5,000.00 21 20 Lengths Metal Furring 0.4mm Thk. X 5m 5,040.00 22 20 Lengths Carrying Channel 0.8mm Thk. X 5m 6,840.00 23 50 Lengths Wall Angle 0.4mm Thk. X 3m 6,000.00 24 500 Pcs W Clip 6,000.00 25 20 Sheets 4.5mmthk. Fiber Cement Board 13,200.00 26 20 Lengths Main Tee Runner 38x24x10' 4,896.00 27 15 Boxes 3/4" Metal Black Screw (500s) 9,900.00 28 5 Boxes Blind Rivets 1/8"x1/2", (1000's) 2,011.00 29 5 Boxes Blind Rivets 1/8"x3/4", (1000's) 2,400.00 30 5 Boxes Blind Rivets 3/16"x1/2", (500's) 1,530.00 31 5 Boxes Blind Rivets 3/16"x3/4", (500's) 1,950.00 32 20 Gal. Quick Dry Enamel Paint White, (water Based) 18,260.00 33 10 Gal. Epoxy Primer Paint Gray 13,248.00 34 5 Gal. Epoxy Primer Reducer 4,175.00 35 5 Gal. Lacquer Thinner 4,180.00 36 5 Gal. Body Filler With Hardener 5,100.00 37 3 Sets Marine Epoxy Set A & B (gallon) 11,592.00 38 10 Gal. Masonry Putty 3,470.00 39 10 Rolls Fiber Glass Mesh Tape, 2" X 30m 1,220.00 40 10 Can Latex Color Hanza Yellow, 10ltrs/can 3,500.00 41 20 Can Latex Color Raw Siena, 10ltrs/can 4,000.00 42 10 Can Latex Color Lamp Black, 10ltrs/can 1,800.00 43 12 Can Latex Color Thalo Green, 10ltrs/can 2,880.00 44 10 Can Latex Color Venetian Red, 10ltrs/can 2,640.00 45 30 Sets Paint Roller 4" Cotton Type 2,100.00 46 30 Pcs Paint Brush 1" 900.00 47 20 Pcs Paint Brush 2" 1,000.00 48 1 Roll Sand Paper #120 (12" X 50m) 7,488.00 49 1 Roll Sand Paper #180 (12" X 50m) 7,488.00 50 1 Roll Sand Paper #220 (12" X 50m) 7,488.00 51 5 Pairs Putty Knife W/ Handle 4" 720.00 52 5 Pcs Scraper 3" 720.00 53 5 Pail Polyurethane Waterproofing 37,500.00 54 20 Sets Pad Lock 1" 2,520.00 55 20 Sets Pad Lock 2" 3,600.00 56 20 Sets Pad Lock 3/4" 2,160.00 57 20 Sets Safety Hasp Lock 3" 600.00 58 20 Sets Safety Hasp Lock 4" 720.00 59 20 Sets Safety Hasp Lock 5" 840.00 60 5 Sheets G.i. Plain Sheet 0.5mmthk. 3,300.00 61 15 Tubes Silicone Sealant (white) 12,420.00 62 20 Tubes Polyurethane Sealant 16,992.00 63 2 Units Polyurethane Sealant Gun 4,000.00 64 5 Box Tek Screw 2" (300s) 3,000.00 65 10 Pcs. Masonry Drill Bit 1/4" 876.00 66 20 Pcs Masonry Drill Bit 3/8" 1,920.00 67 2 Pail Polyurethane Water Proofing Primer 12,000.00 68 7 Pail Elastomeric/ Flexible Cementitious Water Proofing 28,000.00 69 10 Pcs Sds Masonry Drill Bit 3/8" 960.00 70 10 Pcs Sds Masonry Drill Bit 1/2" 2,400.00 71 5 Pcs Sds Masonry Drill Bit 5/8" 3,300.00 72 2 Pcs Sds Masonry Drill Bit 3/4" 1,800.00 73 15 Pcs Steel Drill Bit 1/8" 720.00 74 15 Pcs Steel Drill Bit 5/32" 720.00 75 15 Pcs Steel Drill Bit 3/16" 720.00 76 15 Pcs Steel Drill Bit 1/4" 360.00 77 15 Pcs Steel Drill Bit 3/8" 360.00 78 15 Pcs Steel Drill Bit 1/2" 360.00 79 10 Pcs Steel Drill Bit 5/8" 6,600.00 80 50 Pcs Cutting Disc 4" 5,100.00 81 20 Pcs Diamond Cutting Disc 4" Ultra-thin 3,500.00 82 10 Pcs Diamond Cup 4" 6,600.00 83 10 Pcs Grinding Disc 4" 1,020.00 84 10 Pcs Wire Cup Brush 3" 1,800.00 85 10 Pcs Flap Disc 4" #100 600.00 86 15 Pcs Flap Disc 4" #120 900.00 87 3 Pcs Circular Saw Blade 7 1/4" Wood 2,592.00 88 20 Kgs. 6013 Welding Rod 4,800.00 89 5 Kgs. Stainless Welding Rod 2.6mm 4,380.00 Total 521,606.00 Documentary Requirements To Be Submitted Together With The Rfq. (non Submission Of Documentary Requirements Will Be Automatically Disqualified) • Mayor's / Business Permit • Philgeps Registration Number • Omnibus Sworn Statement • Income/business Tax Return • Delivery Period: Twenty (20) Working Days.
Closing Soon14 Jan 2025
Tender AmountPHP 521.6 K (USD 8.9 K)

DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender

Education And Training Services
Philippines
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 12-cookery Support Service Area: Skills Development) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 442,032.83 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 12-cookery Support Service Area: Skills Development) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 500.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 14, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 28, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 28, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Chef’s Knife, Stainless Steel Chef Chopping Knife Household Kitchen Knife Size: 8 Inches Blade Material: 3cr14 High Carbon Stainless Steel Blade Handle: Pom Handle 5 Pieces Boning Knife, 6″ Boning Knife Chef’s Edge Handles Are Ergonomically Designed To Minimize Wrist Tension And Provide A Natural Fit. Heat Treatment Process Makes The Knives Extremely Sharp And Corrosion Resistance. Country Of Origin: Germany Blade Material: 3cr14 High Carbon Stainless Steel Blade Handle: Pom Handle 4 Pieces Oysters Knife, Material: Stainless Blade, Plastic Handle Size: 16 Cm Easily Pry Open Oyster/clam Shells Sharp, Beveled Blade 2 Pieces Cleaver Knife, Butcher Cleaver Knife With Ergonomic Design Highly Corrosion Resistant Stainless Steel Wooden Handle Handle Length Measures 5" Blade Length Measures 8" Long And 3.5" Wide Dishwasher-safe Blade Material: Stainless Steel Color: Stainless Steel Handle Material: Wood Blade Edge: Plain 2 Pieces Tenderizer (pin Tenderizer), Stainless-steel Prongs Break Down Tough Meat Fibers. Also Useful For Piercing Meats Before Marinating. Heavy-duty Spring-loaded Mechanism Controls Action Precisely. A Practical Solution For Turning A Tough Cut Of Meat Into A Delicious, Tender Piece Of Meat. Type: Meat Tenderizer Material: Stainless-steel, Abs Size: 5cm X 5.1cm X 19.4cm/1.97" X 2.01" X 7.64" (approx.) 2 Pieces Tenderizer (mallet Tenderizer), Material: Aluminum Weight:100g Size: Length: 19.5cm; Hammer: 4.5 * 4.5cm Integrated Aluminum Construction For Strength And Durability. There Are Two Sides. Use The Spiked Surface To Tenderize And The Flat Surface To Pound Meat. Ideal For Beef, Veal, Pork And Chicken, Etc. Package Content: 1x Two Side Meat Hammer 4 Pieces Skimmer, Fine, 6"x5"length Width 5" Handle: Length11 5/8 Material: Nickel-plated Stainless Steel Handle Material: Nickel Plated 4 Pieces Wire Skimmer, Small, 3" Diameter X 1"depth 13.75 Handle Length Material: Stainless Steel, Bamboo Handle 4 Pieces Skimmers, Spider, Mesh Basket Tool(5inches) Material:18/8 Stainless Steel, Style Stainless Steel Mesh, Asian, Color: Silver 4 Pieces Strainer, Small, Fine, Material: Stainless Steel Diameter: Approx. 8.5cm / 3.35 Inch Total Length: Approx. 22cm / 8.66 Inch Handle Length: Approx. 11.2cm / 4.41 Inch Color: Silver/golden/copper Plating (optional) Package Includes: 1 Piece Fine Mesh Stainless Steel Cocktail Strainer 4 Pieces Colander Strainer Type: Colanders & Strainers Item Type: Pearl Milk Tea Colander Material: 100% Food Grade Stainless Steel Temperature: -40f To +446f (-40c To +230c) Multiple Use Kitchen Gadgets: Kitchen Helper Feature: Made Of Premium Stainless Steel, No Toxic Chemicals, Lead Free, Pvc Free. The Versatile Design Will Fit Nearly All-round Pots, Pans And Bowls. Uses: For Hot Pot Eating, Soup Draining And Pearl Food Holding. 4 Pieces Siever,small, Stainless Steel Fine Mesh Strainer Material: Stainless Steel; Diameter: 12 Inches; Depth: 2 Inches To 2.5 Inches; Fine Mesh:0.025mm To 0.5mm; 4 Pieces Strainer,medium Fine, Strainer Type: Easy-grip Colander Medium:stainless Steel:item Dimensions:lxwxh: 8x4x0.2 Inches 8 Pieces Turner, 3” X 6”, Item Dimension: L40.1 Cm X W9.6 Cm X H13.4 Cm Item Weight: 0.3 Kg Material: 18/10 Stainless Steel Tool Head & High Impact Nsf Approved Polypropylene Textured Handles (pro-gourmet) Lightweight & Easy To Hold Accommodates Right- And Left-handed Users Use & Care Easy To Clean And Dishwasher Safe. 8 Pieces Spatula, Stainless Steel Teppanyaki Spatula L 14.8cmxw11.8cmxh 2cm 8 Pieces Wooden Spoon, Material: Beech Wood Color: Wood Color Size: 26.3cm X 6.3cm 8 Pieces Parisienne Scoop, Stainless Steel Baller Heads - 22mm Diameter And 25mm Diameter. Head Include Small Air Hole For Easy Release. Non-slip Handle Made From Fibrox - Tpe Plastic Able To Withstand Temperatures Of Up To 80°c - 110°c. Dishwasher Safe. 8 Pieces Zester, Durable And Rust Resistant Stainless Steel Material Five Sharp Zester Holes That Quickly And Easily Zest Lemons, Oranges, And Other Citrus Fruits Built-in Channel Knife That Peels Citrus Fruits To Make Beautiful Garnishing Easy To Grip Stainless Steel Handle For Steady Control When Testing With A Built-in Hole For Easy And Proper Storage Easy To Clean And Dishwasher Safe Dimensions: L16.3 X W2.4 X H16.3 Cm 8 Pieces Piping, Bag Size: Small: About 26cm Long, About 15cm Wide At The Opening, Medium: About 30cm Long, About 17cm Wide At The Opening, Large: About 34cm Long, About 21cm Wide At The Opening. Material: Silica Gel Package: 6 * Small Connectors 2 * 12-inch Bags 2 * 14-inch Bags 2 * 16-inch Bags 8 Sets Pastry Tubes, 8pcs/set Stainless Steel Pastry Piping Nozzles Size: Approx. 30cmx17.5cm; Material: Eva And 430 Stainless Steel 8 Pcs. Strainer Chinois,small, Commercial Grade Quality China Cap Strainer With Pot Ring Hang Hook Coarse Mesh - 10" Handle, 8" Diameter, 8" Deep", 18" Total Length Material:18/8 Stainless Steel Color:silver Item Dimensions: Lxwxh 17.13 X 8 X 7.75 Inches Item Weight:0.71 Lbs 3 Pieces Filling Funnel, Material:304 Stainless Steel Size Dimension:14x11cm 4 Pieces Measuring Spoon, Material: Stainless Steel , Weight:110g Size:1/8 Tsp-length: 4.25″,diameter: 0.59″ 1/4 Tsp-length: 4.33″,diameter: 0.71″ 1/2 Tsp-length: 4.45″,diameter: 0.91″ 1 Tsp-length: 4.60″,diameter: 1.10″ 1/2 Tbsp-length: 4.72″,diameter: 1.26″ 1 Tbsp-length: 4.92″,diameter: 1.57 6 Pieces Tongs, 9 Inches, Material: 304 Stainless Steel With Silicone Handle; Size:9 Inches; Feature: Ring Pull Locking System, Scalloped Heads 10 Pieces Tongs, 12 Inches, Material: 304 Stainless Steel With Silicone Handle; Size:12 Inches; Feature: Ring Pull Locking System, Scalloped Heads 8 Pieces Measuring Cup, Material: 304 Stainless Steel; Feature: 4cups/set. 100ml, 50ml, 15ml And 5ml Cup Sizes On A Storage Ring; 1 Set Measuring Urn, Specification: 500ml Colour: Silver Material: 304 Stainless Steel 1 Pc Ice Cream Scoop, Size: 18*4.2cm/18*4.8cm Color: Black/silver Material: Aluminum Alloy; Feature: Anti-freeze Ice Cream Scooper With Comfortable Handle 4 Pieces Cheese Cloth, *made Of Natural Cotton, Never Been Dyed Or Bleached. It's Safe And Healthy To Use And There Is No Color Will Dye Over The Cheese, Yogurt, Turkey Or Any Other Foods. *due To Tight-weave Mesh, It Can Filter More Impurities And Work Efficiently. *it Could Be Used For Making And Wrapping Homemade Cheese. It Is Used As Greek Yogurt Or Butter, Almond Milk Or Nut Milk, Fruit Juice. Furthermore, More Impurities Will Be Filtered Out When You Filter Cold Brew Coffee Or Homemade Beer Wort, Honey And Etc. Specification: *material:cotton *color:as Show *size:100 X 120 Cm/39.3 X 49.2 In 10 Pieces Serving Spoon, Material: 304 Stainless Steel Color: Silver Size: 24cm 24 Pieces Pepper And Salt Grinder, Size: 5.3cm/2.09"x 19cm/7.48"; Material: Stainless Steel Case Grinder With High Quality Glass Container 4 Set Weighing Scale, 5 Kgs, Type:hanging Scale Origin:cn(origin) Size:18.5*14*1.9cm Rated Load:other Display Type:lcd Digital Screen Power Supply:3*aaa Battery(not Included) Certification:ce Model Number:electric Scale Capacity:10kg/1g,3kg/5kg/0.1g Is Smart Device:no Color:black Unit:g, Lb, Oz Measuring Range:10kg/10g, 3kg/5kg/1g Material:new Abs Engineering Plastic + Stainless Steel Backlight:yes Ftion 1:kitchen Scales Ftion 2:jewelry Scales Ftion 3:electronic Scales Ftion 4:electronic Balance 2 Unit Core Seed Remover, Effortlessly Remove Cores From Fruit Simply Push The Stem Into The Core Of The Apple And Twist To Remove Ultra Stainless Steel Coring Blade Twist And Slide Body For Easy Core Removal Length: Approx. 180mm / 7inch Diameter Of The Core: Approx. 2cm / 0.8 Inch Material: 304 Stainless Steel 8 Pieces Wire Whisk,small, Material: Stainless Steel; Size: H01-8 Inch:21*5cm; 8 Pieces Wire Whisk, Medium, Material: Stainless Steel; Size: H02-10 Inch:26*6cm; 8 Pieces Wire Whisk, Heavy Duty, Material: Stainless Steel; Size: H03-12 Inch:29*6cm 2 Pieces Can Opener, Material: Stainless Steel + Pp Plastic Size: 19.5cm X 7.5cm Color: Silver + Black Features: 1. 100%brand New And High Quality 2. Ergonomic, Non-slip Grip, Comfortable And Safe In Operation. 3. High-quality Stainless Steel Material, Won't Break Or Bend, Corrosion Resistant, Smooth Felling And High Durability. 4. Rotating Handle And Precision Gears, Efficient And Labor Saving, Children, Adults And The Elderly Can Easily Work With. 5. It Combines 3 Functions In One Unit. This Versatile Can Opener Is Designed For Opening A Can Lid, Opening A Bottle Cap, Levering Or Loosening A Can Lid. 6. Easily Pierce And Open Various Types Of Cans, Like Tin Can, Oil Can, Milk Can, Cat Dog Food Can, Metal Can, Beer Can, Small Can, Large Can, Water Bottle, Jar Etc 7. High Quality Food-grade Material - The Sharp Cutting Disc Is Made Of Food-grade Material Especially The Metal Tooth Is Made Of Stainless Steel, Please Rest Assured Use. 8. No Dangerous Sharp Edges - Protect Yourself And Your Family With This Tin Opener That Leaves Edges Completely Smooth. Safely And Easily Opens Big And Small Cans In All Shapes And Sizes In Seconds. 9. Comfortable And Convenient For Storage - The Opener's Soft, Anti-slip Handles Are Easy To Grip - Which Is Especially Handy For Senior Citizens. You Can Store It In A Drawer Or Simply Hang It On A Hook In Your Kitchen. 1 Piece Multi-purpose Kitchen Scissors/shears, Material: Stainless Steel Size: 21 X 9 Cm; Features: Extra Sharp For Cutting Meat, Poultry Or Fish With Cracking And Bottle Opening Function 8 Pieces Soup Ladle, 4 Oz, Material: 18/10 Stainless Steel With Hole On Handle Serving. Size: Length 34cm*diameter 7.5cm 8 Pieces Soup Ladle, 6 Oz, Material: 18/10 Stainless Steel With Hole On Handle Capacity: 6 0z; Handle Length:3 Inches; Size: Length 34cm*diameter 9.5cm 8 Pieces Soup Ladle, 8 Oz, Color: Stainless Steel Material: Stainless Steel Style: 8 Oz Ladle Item Dimension Lxwxh: 14.6 X 2.5 X 3.9 3 Pieces Soup Ladle, 12 Oz, Soup Ladle Food Grade Rust-proof Stainless Steel Dishwasher Safe Hot Pot Soup Ladle Length: 18 Width: 4.6 Height: 2 Freezer Safe: Yes Type: Gravy / Sauce Ladles Dishwasher Safe: Yes Microwave Safe: No Capacity: 10.0-14.9oz Feature: Heavy Duty 2 Pieces Kitchen Spoon, Mirror Finished Durable Stainless Steel Material Dishwasher Safe Ss Dinner Spoon 4.0mm Thickness Length: 21cm Weight: 73gm 8 Pieces Kitchen Spoon, Slotted, Stainless Steel Slotted Spoon Is Ideal For Stirring And Straining Pasta Or Vegetables. The Soft, Non-slip Handle Cushions Your Hand During Use, And The Polished Stainless Steel Is Both Sleek And Durable. Dimensions: 2 X 2.75 X 12.4 Weight: 0.29 8 Pieces Kitchen Fork, Color: Silver Substance: 18/10 Stainless Steel Surface Finishing: Matt/polished Net Weight: 0.11 Kg Length: 33.40 Cm Width: 2.50 Cm Height: 1.90 Cm Handle Length: 12.50 Cm 4 Pieces Carving Fork, Package Dimensions: 13.07 X 1.42 X 0.87 Inches (33.2 X 3.6 X 2.2 Cm) Item Weight: 5.6 Ounces (158.76 Grams) Handle Material: Stainless, Stainless Steel, Abs, Plastic, Steel 3 Pieces Digital Kitchen Thermometer, Digital Kitchen Food Thermometer For Meat Cooking Water Milk Food Probe Temperature Temperature Range: -50°c To 300°c Or -58°f To 572°f Resolution: 0.1°c Or 0.1°f Accuracy: ± 1°c Or ± 1 °f Optional Temperature Unit: °c / °f Material: 304 Stainless Steel & Abs Plastic Buttons: On/off, °c/°f, Hold Power Supply: 1 X 1.5v Lr44/ag13 Battery (not Included) Power Saving: Auto Power Off After 10 Minutes Total Length: 24.6cm Probe Length: 14.5cm 3 Pieces Multi-function Vegetable Fruit Peeler Slicer Cutter Chopper, Stainless Steel Multifunction Fruit And Vegetable Peeler Slicer Shedder Peeler 5 Different Inserts With 11 Different Ways To Cut Cut Into Cubes Or Sticks In 3 Different Sizes Slices In 2 Different Thicknesses Cut In To Quarters, Eighths And Wedges Long- Lasting Super- Sharp Stainless Steel Blades Extra Sharp Grater Mandolin Slicer With Safety Food Holder 1 X Cutting Top With Integrated Stylus 1 X Cutting Base 1 X Transparent Collecting Container (capacity 1,500 Ml) 1 X Fresh Cover For Collecting Container 1 X Knife Insert (6 Mm X 6 Mm Or 12 Mm X 12 Mm) 1 X Knife Insert For Quarter Or Eighth 1 X Planer Insert With Blade Protection 1 X Food Holder With Guide 1 X Detachable Cutting Punch For Eighth 1 X Part Cover For All Knife Inserts 2 Set Stock Pot (big), Stainless Steel Large Stock Pots Casserole Stew Pan Type: Soup & Stock Pots Material: Metal Type: Stainless Steel Feature: Eco-friendly Applicable Stove: General Use For Gas And Induction Cooker Product Name: Soup Pot Usage: Soup, Milk, Noodle Pot, Cooking Pots Shape: Straight Material Type: Stainless Steel Diameter: 25 / 30 / 35/ 40 /45/ 50 Cm 2 Pieces Frying Pan, Small, Frying A Single Egg, Sausages, Seafood, Poultry, Burgers Or Vegetables, Toasting Pine Nuts Or Even Toasting Off Some Spices. Specification: Pot Diameter: 13cm Pot Height: 2.8cm Full Length Of Pot Body: 25cm Pot Bottom Diameter: 11.5cm Included: 1 X Mini Saucepan 12cm Small Nonstick Frying Pan For Household Fried Egg Pancakes Round Mini Saucepan 4 Pieces Frying Pan, Medium, Material: 304 Stainless Steel Size Diameter: 32cm Feature: New Technology Experience, New Design Suitable For: General Use For Gas And Induction Cooker Product Features: 1.13.4 Inch Stir Fry Pan Made Of Stainless Steel, Nonstick Cookware Interior Is Honeycomb Texture, Achieve Separation State Nonstick. 4 Pieces Frying Pan, Large, Material: Carbon Steel Wok Handle: 12cm Wood (beechwood) Diameter: 36cm Depth: 10.5cm Handle Socket: Welded Non-stick Pan, Perfect For Your Daily Home Cooking 2 Pieces Colander, Small, Ergonomic Design, Smooth Handle Grip. Top Hanging Ring Design, Free To Hang Up. Specification: Material: Stainless Steel Size: 32 * 10cm / 12.60 * 3.94" Color: As Shown Package Included: 1pc * Colander 3 Pieces Colander, Medium, Features And Usage: Good Quality Stainless Steel Material With Competitive Price Can Be Used For Strain Soup, Juice, Milk, Tea, And Other Liquids. Strong, Sturdy, And Durable. Made For Heavy Work. Rust, Crack, And Stain Resistant Easy To Clean And Carry High, The Goods Quality Support With Your Demand. The Long Handles Protect Your Hands From Hot Grease And Oils While Letting You Cook Your Favorite Foods Product Name: Stainless Kitchen Wire Skimmer/strainer/colander Material: Stainless Steel Size / Capacity: 22cm Color: Silver Shape, Round Type: Strainer Item Number: 22cm F/h Skimmer 2 Pieces Cutting Board, Packing: 1 X 1pcs Chopping Board Material: Bamboo Wood + Stainless Steel Color: Brown, Light Brown (random) Size: 34cmx 1.7cm X 24cm Design: Arc Corners Features: Made Of High-quality Bamboo Anti-mildew And Germ Proofing 100% Brand New And High Quality Easy To Clean And Very Affordable The Whole Bamboo Panel Has A Clear Bamboo Pattern. The Curved Design Of The Handle Makes It Easy To Hang. Thick, Extremely Durable, The Smooth Surface Also Prevents Your Knives From Dulling Too Quickly. 4 Pieces Fish Poacher, Medium, Stainless Steel Fish Streamer For Big Fish, Big Cooking Pot With Complete Accessories Pan Material: Stainless Steel Thickness: 0.7mm (+0.3mm) Dimensions (l X W X D): 18" X 5" X 6" (±0.5") Handle Material: Stainless Steel; With Two Side Handles Includes A Lid With Handle And A Perforated Rack Insert Dishwasher Safe 1 Piece Casserole, Small, Aluminum Casserole High Quality Aluminum Durable Handles & Knobs Size #14 (25cm Diameter, 15cm Height) Color: Aluminum Size: 35cm*28cm*20cm Weight: 0.7kg 6 Pieces Casserole, Medium, Heavy Gauge Aluminum Forged Base For Extreme Strength And Wrap Prevention Durable 3 Layer Blue Diamond Non-stick Coating Coating Lasts Longer Than Any Other Pan Works On All Stovetops: Induction, Gas, Electric, Ceramic, Etc. Heat Resistant Riveted Bakelite Handle And Knob Tempered Glass Lid Heats Up Quickly And Evenly Ideal For Healthy Cooking Easy-to-clean And Dishwasher Safe 4 Pieces Wok, Small, Material: Wok Is Made With Carbon Steel With Wooden Handle Available Size: 34cm Diameter Double Handle Suitable For Gas Stove And Induction Cooker Good Thermal Conductance For Even Cooking Of Vegetables And Meat 4 Pieces Wok, Medium, Features And Usage: Whether Stir-frying Veggies Eggs Meats Or More This Wok Distributes Heat Evenly And Wipes Clean When You’re Finished Riveted Acacia Wood Handles Make Flipping And Releasing Food Easy And Will Add A Touch Of Elegance To Your Kitchen Perfect For Veteran Chefs Or Others Simply Looking To Expand Their Culinary Palette This Wok Serves Up Delicious Results With Effortless Performance Color: Black Size: 14” Material: Carbon Steel Wok Non-stick Surface Healthier Cooking 1 Piece Double Boiler, Medium Specialty Pan Type: Egg Poacher/boiler Cookware Material: Stainless Steel Cookware Capacity: 1.1l - 2l Cookware Diameter (cm): 22 Model: Db22. Cookware Features: Includes Lid, Dishwasher Safe, Induction Safe, Helper Handle, Pfoa Free, Eco Friendly, Cover Included What’s In The Box: 1 X Double Boiler 22cm 1 Piece Paellera, Product Details: Made With Top Grade Carbon Steel, These Pans Conduct Heat Quickly And Evenly Throughout To Create The Perfect Paella. It’s Thin And Lightweight Material Makes This Pan Durable And Trustworthy. It’s Innovative Hammered Dimple Technology Makes The Bottoms Of The Pans Rigid And Perfect For Cooking Paellas Package Dimensions: 15.24 X 13.62 X 2.05 Inches (38.7 X 34.6 X 5.2 Cm) Item Weight: 2 Pounds (0.9 Kg) Material: Carbon Steel Item Diameter: 13 Inches (33 Cm) Color: Silver Capacity: 468 Cubic Inches (1188.7 Cm) 8 Pieces Glass Rack, Description: Product Category: Wine Glass Rack Color: Black Height: 5.5 Cm Width: 22.5 Cm3 5 Rows: 50cm In Length, Can Hold 10-15 Weight: 0.55kg For 5 Rows Application: 4cm- 9cm In Base Diameter, Less Than 3cm In Column Diameter, 10cm In Belly Diameter Of Glass. Material: Iron Product List:1* Wine Glass 2 Pieces Soup Cup Rack, Material: Plastic Color: Grey Shape: Square Length: 19.75" In Width: 19.75" In Height: 4" In Size: Compartment 4.375"l X 4.375"w X 4.25" Temperature Range: Up To 200°f Features: Dishwasher Safe 6 Pieces Plate Rack, Specification: Color: White, Green Material: Stainless Steel Dimension: W X L X H (25cm X 50cm X 43.5cm) Features: Stainless Steel Material, No Rusting, Long Lasting Durability. Saves Tons Of Space And Time By Making It Easier To Access Utensils And Supplies, Making Your Kitchen More Clean And Tidy. Dish Placement Area (16 Dishes) Cutting Board Placement Area (5cm/1.97in) Tool Placement Area: 3 Spaced Grids Hanging Spoon Placement Area: 4 Storage Hooks Bowl Placement Area: More Than 12 Bowls Removable Drain Board 2 Pieces Baking Tray, Small, 1pc Small Rectangular Baking Tray Measurement: 8x12 8x 12 Outside, 6.5x10 Inside Color: Black Made Of Carbon Steel Durable And Good Quality This Can Be Fit To Small Oven 8 Pieces Utility Tray, Stainless, Stainless Steel Food Measurement: 9" Length X 6.75" Width X 1" Height. Material: Stainless Steel. 12 Pieces Roasting Pan, Material: Stainless Steel Color: Silver Size: 42*32*7cm Features: Easy To Clean Up. Big Enough For Whole Chicken Or Turkey. Very Convenient To Serve With Rack. Package Included: 1 X Pan (with A Rack) 4 Pieces Dishtowels, Material: Cotton/linen Blend With High Absorption Capacity. Color: Square Stripe/gray Beige Length: 70 Cm (28 ") Width: 50 Cm (20 ") Package Quantity: 2 Pieces 8 Pack Plastic “silverware” Or Real Silverware, Package Dimensions: 9.92 X 6.57 X 3.23 Inches (25.2 X 16.7 X 8.2 Cm) Item Weight: 7 Pounds (3.15 Kg) Material: Stainless Steel Finish Type: Polished Color: Silver Is Stain Resistant: Yes Is Dishwasher Safe: Yes Number Of Pieces: 60 2 Set Glasses, Capacity: 11.8 Ounces Color: Clear Item Weight: 14.4 Ounces Size: 2.91x5.83 In Product Detail: 11.8-ounce Highball Drinking Glass (set Of 6) With A Sleek Design And A Thick, Sturdy Base; Ideal For Serving Mixed Drinks, Beer, Soda, And Other Ice-cold Beverages Made Of All-purpose 100% Soda-lime Glass (not Tempered Glass); Odor-resistant, Stain-resistant, Shatter-resistant, And Cadmium- And Lead-free; Suitable For Residential And Restaurant Use Crystal-clear Glass Provides Exceptional Clarity For Nicely Highlighting Colorful Concoctions And Bubbly Beverages Residential And Commercial Dishwasher- And Microwave-safe Up To 95°f; Not Oven Safe; Accommodates Temperatures Ranging From 50°f To 212°f When Heated And Cooled Slowly; Do Not Put Hot Water In Freezing-cold Glass 6 Set Tea Cups, Bc Coffee Cup And Saucer- Black Piggy Pink, Bone Tea Cream, Candy Green 2 Pieces Small Plate/saucers, Material: Ceramic High Quality Can Be Use In Coffee Or Tea Cup Size H: 9.5cm W: 14.5cm Saucer Size H: 2cm W: 15.5cm 6 Pieces Per Set 6 Set Cabinet Dish Organizer Material: Plastic Dimension: L39cmxw35cmx122cm Colors Available: Green & Blue 1 Piece Sink, Surface Treatment: Brushed, Brushed Installation Type: Undermount Bowl Shape: Rectangular Number Of Holes: One Sink Style: Single Bowl Material: Stainless Steel 304-18/8 Dim (inch): 32"x19" Bowl Size (inch): 30"x17" Depth (inch): 10" Thickness (guage): 18 Usage: Kitchen Packing: Carton Box 1 Piece Sponge And Soap Holder For Kitchen Sink, Material: Stainless Steel Size: L X W X H (18.3cm X 10cm X 9cm) Color: Silver 3 Pieces Pots/pans, Product Description: Non-stick With Thermo-spot 9 Pieces Cooking Set Features & Details: Set Contains: ▫️stewpot: 22/24cm With Lids ▫️24cm Fry Pan ▫️28cm Wok Pan ▫️spatula ▫️spoon ▫️slotted Spoon Product Information: Package Dimension: 61.8 X 41.6 X 17.6 Cm Item Diameter: 28 Cm Item Weight: 6.7 Kgs Care Instruction: Dishwasher Safe No. Of Pcs: 9 Pcs 1 Set Cooking Utensils, Stainless Steel 25-piece Set Lids And Accessories Included Comes With 1- And 2-quart Saucepans, A 5-quart Dutch Oven, A 9.5” Skillet, An 8” Frying Pan, A 10” X 15” Cookie Sheet, A Storage Tub And 5 Round Glass Bowls The Stainless-steel Heating Surface Cooks Everything Evenly Made From A Single-ply Stainless Steel That’s Designed To Handle High Heats And Is Easy To Clean Each Piece Comes With A Cover To Keep In The Heat Set Includes 9 Nylon Cooking Tools Like Spatulas, Solid And Slotted Spoons And Turners, Ladle And More 1 Set Rotary Egg Beater, Stainless Steel Whisk Set Come In 2 Sizes. This Two-piece Stainless-steel Kitchen Utensil Set Will Blend In Well When You’re Trying To Outfit Your Kitchen With Everything You Need To Keep Your Chef At Home Happy As Can Be. High Quality Material Wear-resistant And Durable, Not Easy To Rust Size:16cm,21cm Material: Stainless Steel Package Includes: 2x Whisk Beater 2 Set Scraper, Made Of Silicone And Bpa Free, Flexible, Non-stick Nontoxic, Heat Resistance: -40 To + 230 Ergonomically Designed Long Handles And Being Perfectly Shaped With A Rounded Edge For Bowls And A Pointed Edge For Corners. Great Design, Easy To Clean Specification: Type: Cake Tools Material: Silicone Color: Orange, Purple, Green, Red, Yellow, Blue, Black Size: About 21x4.1cm Uses: Stirring, Baking, Scraping Noodles, Etc. Features: Integrated Design, High And Low Temperature Resistance Quantity: 1 Package Includes: 1x Scraper 3 Piece Gas Range And Oven, 3 Gas Burners, 1 Hot Plate Stainless Drip Tray Gas Thermostat Oven Electric Grill With Rotisserie Black Enameled Body 50x50cm Weight: 39.5 Kg Dimensions: 54 × 50 × 88 Cm 1 Piece Refrigerator, Height: 111.5 Cm Width: 51. Cm Length: 53.6 Cm Gross Weight: 34 Kg Refrigerator Type: Single Door Net Weight: 31 Kg Capacity: 5.6 Cu.ft Frost System: Semi-automatic Wattage: 75 Watts Warranty: 1 Year Of Parts And Labor; 5 Years Of Compressor Led Light Safety Glass Shelves Silver Finish 2 Piece Drawers, 3 Layered Drawer ½” Thick Plywood Captured Ceiling Panel ½” Thick Plywood End Panels ¾” Thick Plywood Full Depth Adjustable Shelves ½” Thick Plywood Panel ¾” Thick Full Overlay Doors And Drawer Fronts ½” Thick Plywood Captured Floor Panel ¾” Thick Solid Hardwood Face Frames ½” Thick Plywood Captured “i-beam” Braces ½” Thick Plywood End Panels ¾” Thick Plywood Full Depth Adjustable Shelves 5/8” Thick Solid Wood Dovetail Drawer Box With ¼” Thick Plywood Captured Floor ½” Thick Plywood Captured Floor Panel ¾” Thick Solid Hardwood Face Frames ½” Thick Plywood Captured Toe Kick 1 Piece Cupboards, Completely Made Of High-grade Stainless Steel. Professional Furnishing Systems That Meet The Highest Quality And Functional Standards. The Stainless-steel Furniture Made Of Stainless Steel Aisi 18/10/304 Is Primarily Made According To The Special Needs, The Available Rooms, And The Functional Requirements Of The Operator. All Edges Welded And Polished. Best Solutions In Quality And For Installation Flexibility. Project Solutions And Other Dimensions May Vary. Wall Cupboard With O Bottom Storage Shelf, Intermediate Bottom, O 2 Sliding Doors. Dimensions: Ca. 1500 X 400 X 600 Mm (l X D X H) Carrying Capacity: Max. 200 Kg Net Weight: Approx. 30 Kg. 1 Piece Brush, Feature: 100% Brand New And High Quality Non-toxic And Environmentally Friendly. Multipurpose Kitchen Utensil Tool. Suitable For Baking, Cooking, Bbq Basting. For Brushing Oil On Cookers When Making Cakes, Bread, Butter Or Barbecuing. Practical And Stylish Can Be Used Repeatedly Easy-to-clean And Good Temperature Resistance Material: Silicone Color: Blue, Orange, Red And Violet Size: 21 X 3.3 X 1.1cm Package Included 1 X Silicone Basting Brush 3 Piece Blender, Cord Length: 1.2m Power: 350w Voltage: 220-240v Frequency: 50/60hz Pulp Container: 500ml Blender Jar Capacity: 1l Integrated Cord Storage: Yes Speed Settings: 2 Safety Clamps: Yes Suction Feet: Yes Accessories: Blender, Chopper, Juice Jug, Mill Colors: Bright White With Silver Accents Housing And Clamps Material: Pp Lid Material: San Pusher Material: Pp Product Weight: 2.48kg Box Dimension (w X H X D): 232 X 330 X 470 Mm 1 Year Warranty 1 Piece Microwave Oven, 3-layer Porcelain Coated Metal Body Manual Rotary Control Defrost Function 20l Capacity Measurements: L45 X W34 X H26cm Output Power: 700w Input Power: 1200w 1 Year Warranty 100% Authentic Microwave Features: Stainless Steel Microwave Type: Countertop Inverter: Non-inverter 1 Piece Kitchen Scale, Features: Square And Round Plate Available Mechanical Dial With Zero Adjustment Knob It Includes Removable Pan Colors: Random Spring Kitchen Scale, Mechanical Kitchen Scale, Food Scale Suitable For Shopping E-commerce Sales, Kitchen Activities Dial Display With Clear Mark, Easy To Read And Comfortable. Square Shape, Drip-proof, Durable And Can Hold Things Weighed. Plastic Shell, Lightweight, Durable And Environment Friendly. No Need Electricity, Easy To Operate And Portable To Take And Store Quality Product With Precise Portion Easy To Use, Multi-function Home Scale Compact Scale 5 Kilos Capacity Size: Removable Pan: 15.5cm X 15 Cm X 5cm Kitchen Scale: 12 Cm X 12.5 Cm X 20 Cm Material: Plastic 2 Piece Measuring Spoons, Stainless Steel Measuring Spoons Set Of 7 Stackable Measure Spoon For Dry And Liquid Ingredients Etched Marked Baking Cooking Spoon With Detachable Ring Holder Convenient For Your Life. Stainless Steel Without Bpa And Could Be Used For Any Food, Rust Resistant, Will Not Be Polluted Or Eroded, Make Your Cooking Always Safe And Health. Conveniently Nests Inside One Another Design And One Steel D-ring Allowing You To Store Them In Any Drawer, Cabinet Or Cupboard. Easy To Clean, Simply Wash With Soap And Warm Water Or Load Them Into The Dishwasher For Fast Cleaning. Color: Silver Material: Stainless Steel Size: Length 12.6* Width 4* Height 2.2cm Package Contents: 7 * Measuring Spoons 1 * D-ring 3 Set Measuring Cups, Product Description: 3-piece Measuring Cup Set Includes One Each: 1-cup, 2-cup And 4-cup Measuring Cups Easy To Read Measurements In Cups, Ounces, And Milliliters. Features A Curved Spout For Precise Pouring And Easy-grip Handles For Comfort Durable High-quality Tempered Glass Is Dishwasher, Freezer, Microwave, And Preheated Oven Safe Nonporous Glass Won’t Absorb Food Odors, Flavors, Or Stains Bpa Free Secure-fit Plastic Lids Are Freezer, Microwave, And Top-rack Dishwasher Safe 1 Pcs. Kitchen Shears, Multifunction Comfortable Handle Kitchen Scissors Heavy Duty Food Shears For Chicken Meat, Vegetable Fish Heb, Poultry Stainless Steel Cooking Scissors Material:30cr13 Stainless Steel Highly Antagonistic And Very Sharp- Soft And Hard Double Plastic Handle Double-edged Blade Non-slip, Stable Removable Rivet Design Flexible Application, Easy To Clean Package Included:1 X Stainless Steel Kitchen Shears Color: Black + Silver Weight: 145g Size: 227 X 78 Mm 2 Pieces Potato Masher, Multifunctional Stainless Steel Potato Masher For Fruit, Vegetable Baby Food Supplement Mashed Potato Tool Selected Materials, Safe And Durable. Strong And Not Easy To Rust. Ergonomic Design, Easy To Use And Save Effort. Suitable For A Variety Of Foods. Material: 304 Stainless Steel 4mm Thickness One-piece Molding Size: 7 Cm X 7 Cm X 13.6 Cm Color: Silver 5 Piece Graters, Product Name: Tabletop Drum Grater High Quality: The 3 Different Rotary Ultra-sharp Cylinders Slicer Made Of Food Grade Stainless Steel. All Pieces Are Detachable For Easy To Clean, Dishwasher Safe Universal Fit: Rotary Drum Grater Is Great For Cheese, Vegetables, Potatoes, Coleslaw, Nuts, Hash Browns, Onions And More With This Hand-powered Rotary Grater Cooking Choice: Rotary Cheese Grater Package Includes 3 Different Interchangeable Rotary Ultra-sharp Cylinders Drums For Different Cooking Choice Features: The Drum Shredder With Suction Base Ensures Solid Grip And Stability On Flat Surface; Simple Hand Crank Turns Drum Creates Perfectly Grated Ingredients Type: Graters Use: Home Kitchen Material: Metal, Stainless Steel & Abs Plastic Blades: 3 Stainless Steel Feature: Kitchen Creative Tools Function: Shred A Wide Variety Of Fruit And Vegetables, As Well As Cheeses Accessories: Chopping / Mixing Blade, Shredding Disc, Slicing Disc Color: Green Size: 26 X 11.5 X 24 Cm Weight: 674g 5 Piece Funnels, Stainless Steel Piston Funnel With Holder For Cream Sauce Dosing Funnel For Sauce Style: Silver Material: Stainless Steel Size: Shelf Height Is About 17cm, Handheld Funnel Height Is 20cm 2 Piece Can Opener, Chef’s Classic Multi Can Opener Features: Durable And Easy To Clean. Material: Designed With High-grade Stainless Steel Size: 18/8 Stainless Steel Ergonomic Stainless-steel Handles Hygienic Design Ensures Easy Cleaning Of All Surfaces 5 Piece Cast Iron Pots And Pans, Pots And Pans Set Cast Iron Cookware Non-stick Wok Pan 316 Stainless Steel Household Frying Pan With Gas-fired Induction Cooker Diameter: 28cm Metal Type: Stainless Steel Wok Type: Non-coating Pans Type: Chef’s Pans Material: Stainless Steel Type: Pans Pot Cover Type: Glass Cover Capacity: 4-5l Applicable Stove: General Use For Gas And Induction Cooker Feature: Eco-friendly Pot Cover: Glass Cover Pot Cover: Glass Cover Product Categories: Wok Application Of The Stove: General-purpose Material:316 Stainless Steel Characteristics: Non-stick Pan Item:316 Xue Ping Guo The Bottom Of A Pan Material: Composite Multi-layer Base Packaging: Carton The Lid Type: The Glass Cover Product Quality Grade: Accepts Style: European 1 Piece Gas Burner, Double Top Gas Stove Automatic Ignition Removable Trivet With Drip Pan Stainless Top And Front Double Detachable Top Burner High Quality And Durable The Powder Coated Pan Support Provide Ample Support At The Base Of The Pan Such That They Maintain Their Balance On The Stove And The Utensils Do Not Fall Or Rattle While Stirring Your Food. Stainless Steel Body Facilitates Anti-rust Property Which Give Our Gas Stove Longevity And Durability. This Range Of Cooktop Comes With A Stainless-steel Body 650mm X390mm X 135mm 1 Piece Double Broiler Steamer, 2 Layer Stainless Steel Steamer Pot Large Capacity Soup Pot With Double Boilers Stockpot Cookware Cooking Tools Feature: Eco-friendly Model Number: Stainless Steel Thicken 2 Layer Steamer Pot Layers: Double Type: Double Boilers Sheet Size: 28cm Material: Stainless Steel Specification: Name: Steamer Pot Material: Stainless Steel Size: Thickened Double Steamer Pot-28cm/11.02inch Packing List: Steamer Pot*1 2 Piece Food Thermometer Weight: 80 G Dimensions: 218 X 34 X 20 Mm Operating Temperature: -20 To +50 °c Product-/housing Material: Abs Protection Class: Ip67 With Topsafe Product Colour: White Length Probe Shaft: 55 Mm Length Probe Shaft Tip: 17 Mm Diameter Probe Shaft: 3 Mm Diameter Probe Shaft Tip: 2.3 Mm Standards: En 13485 Battery Type: 3v Button Cell (cr 2032) Battery Life: 350 H Display Type: Lcd (liquid Crystal Display) Display Size: One-line Display Lighting: No Storage Temperature: -40 To +70 °c Temperature – Ntc Measuring Range: -50 To +275 °c Accuracy: ±1 % Of Mv (+100 To +275 °c) ±0.5 °c (-30 To +99.9 °c) ±1.0 °c (-50 To -30.1 °c) Resolution: 0.1 °c Reaction Time: T₉₉ = 10 S (measured In Moving Liquid) Measuring Rate: 0.5 S 1 Piece Kitchen Knife Set, 8 Pieces Kitchen Knife Set Chef Knives Fruit Stainless Steel Knife Sharpener Rod Peller Scissors Pairing Tools Specifications: Item Name: Kitchen Knife Set Main Material: 3cr13 Stainless Steel Quantity: 8pcs Note: Please Kindly Note That There Could Be A Few Deviations As The Result Of Manual Measurement. Thank You Package Information: Package Size: 31 * 28 * 2.5cm / 12.3 * 11.2 * 0.98in Package Weight: 700g Package List: 2 * Chef Knife 1 * Chopping Knife 1 * Knife Sharpener 2 * Fruit Knife 1 * Scissors 1 * Peeler 5 Piece Meat Slicer, Description: Meat Slicer Material: The Frozen Meat Slicer Is Made Of High-quality Stainless Steel, Which Is Easy To Clean And Has A Long Service Life. It Helps To Cut Frozen Meat Into Various Uses, Including Making Hot Pot, Sukiyaki, Pizza Toppings, Sandwiches Or Ginger. It Can Effectively Avoid The Vibration And Noise Of The Electric Tool During The Working Process, It Is Simple To Operate And Easy To Clean. The Thickness Of The Meat Can Be Adjusted From 0.3mm To 8mm, Just Turn The Knob Slightly. Handle And Suction Cup: Even If There Is Oil On The Hand, It Will Not Slide. The Rubber Suction Cup At The Bottom Is More Suitable For Flat Desktops, And Ceramic Tiles, Glass And Metal Desktops Are Easier To Hold. Specification: Handle Length: 43.5/17.10inch Size (l X W): About 33x17cm / 12.96x6.69inch Blade Length: About 20cm Material: Stainless Steel Package Includes: 1x Vegetable Cutting Machine 2 Piece Bread Toaster, 2 Bread Toaster Includes Removable Crumb Tray For Cleaning Cancel, Reheat, Defrost Button Includes Bun Burner Variable Heating Control 2 Piece Cookie Press, Decorative Tool Use, Press The Front End Of The Handle Button, Use The Above Operating Rod, The Extrusion Is Under Your Control. Features: 100% High Quality Type: Cookie Machine Material: Aluminum Alloy, Abs Plastic Size: Diameter:5.5cm,height:21cm Included: 1 X Cookie Machine 20 X Design Discs 4 X Icing Tips 10 Piece Cake Decorating, "26 Pcs "specifications: Color: Pink / Blue / White / Green Material: Silicone & Stainless Steel Cake Nozzle Size: Approx.1.8cm X 3.3cm Pastry Bag Size (length):approx.32cm X 17.5cm Material: Lfgb Food Grade Eva Material Purpose: Diy Necessary Utensils For Cake Cream Package Included: 24 X Cake Nozzles 1 X Pastry Bag 1 X Plastic Piping Converter 5 Set Serving Tray, Rectangular Brown Serving Tray/ Multi-purpose Utility Tray Non-skid Feature: Non-slip Material Heat Resistance Space Saving Wide Application Fine Workmanship Specification: Item Type: Round Serving Tray Material: Nonslip Rubber, Tempered Glass Fiber Color: Brown Package List: 1 X Round Serving Tray 6 Pieces Electric Oven, 30 Liter Capacity -mechanical Control -30 Minute Timer With Bell Ring -grill/broil Function -convection Function -upper Heating,lower Heating And Upper & Lower Heating Options -90-230 Degrees Centrigrate Tempreture Control -metal Body -keep Warm Function -stainless Steel Finish -timer Settings With Alarm -includes: 1 Food Tray 1 Grill Rack 1 Crumb Tray 1 Tray Handle 230v-60hz,1500 W -20.79 X 16.38 X 12.13 Inches 9 Piece Weighing Scale, Manual Weighing Scale; 10kg.,stainless Small Bowl, Heavy Duty 6 Piece Measuring Cup, 7 Pieces With A Convenient 1/8 Coffee Scoop; Complete Set Of 7with Pouring Lip, Sizes Include 1/8, 1/4, 1/3, 1/2, 2/3, 3/4 And 1 Cup, Food Grade Material Of Stainless Steel, Dishwasher Safe, 12 Set Measuring Spoon, Sizes: 1/8tsp (0.63ml),1/4tsp (1.25ml),1/2tsp (2.5ml), 1 Tsp(5ml), 1/2tbsp (7.5ml),1 Tbsp (15ml), High Quality Stainless Steel, Dishwasher Safe 14 Set Measuring Urn, Glass,capacity: 100 Ml. (with 10 Ml Increments),metric And English System Of Measurement; With Handle And Spout, Clear, Non-porous, Tempered Glass 6 Piece Mixing Bowl, Capacity:2.5l,high Quality,durable, Stain And Rust Resistant, Stainless Steel,diameter 22cm 15 Piece Baking Sheet, 13'x18', Tray Size 46x34cm, Aluminum 30 Piece Wire Whisk, 12inch, Heavy Duty, Stainless Steel, French Wire 9 Piece Muffin Pan, 12 Cups Muffin Bun Cupcake Bakewear Mold Material:carbon Steel With Non-stick Coating, Size:l:35cm X W:26cm X H:3.0cm Large Inner 7.0cm 42 Piece Rubber Scraper, Big Size Silicone Rubber Spatula/scraper, Material:plastic+silicone Rubber, Size 24cm X 5cm 5 Piece Hand Mixer, 5-speed Selection,175w Power Consumption, 1.7m Power Cord, Weight: 1.08g., Dimensions:9.3cm X 19.5cm X 15.1cm, 220-240v 3 Piece Supply And Delivery To Oras East District Sped Center, Oras, Eastern Samar Abc = 442,032.83
Closing Date28 Jan 2025
Tender AmountPHP 442 K (USD 7.6 K)

DEPT OF THE NAVY USA Tender

Others
United States
Details: Contact Information|4|tbd|tbd|tbd|tbd| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type|source|tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Request For Proposal/ Quote (rfp/q) Is For The Repair Of: nsn: 7rh 1680 016106528 E7 pn: 34500042-3 quantity: (15) Ea please Submit Quote Via Email To (email) By The Due Date Specified On Page 1, Block 10. if A Firm Fixed Price (ffp) Cannot Be Determined, Please Inform The Pco. these Items Require Government Source Approval Prior To Award. if You Are Not An Approved Source, You Must Submit, Together With your Proposal, The Information Detailed In The Navsup Wss Source approval Brochure Which Can Be Obtained Online At https://www.navsup.navy.mil/public/navsup/wss/business_opps/ under "commodities." Offers Received Which Fail To Provide All Data required By The Source Approval Brochure Will Not Be Considered For award Under This Solicitation. Please Note, If Evaluation Of A Source approval Request Submitted Hereunder Cannot Be Processed In Time and / Or Approval Requirements Preclude The Ability To Obtain Subject items In Time To Meet Government Requirements, Award Of Requirement may Be Continued Based On Fleet Support Needs. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: bottle/container As ;7rh1680016106528e7; Nsn , ;123scp5210-3; Part Number, Shall Be Performed Iaw: Bottle/container As ;all Available Repair Manuals, Drawings And Specifications Per Part Number Requirements; Publication (s). 1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Waiver/deviation Via The Dcmc To The Navicp Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: bottle/container As ;123scp5210-3; P/n, ;nsn 7rh 1680 016106528 E7; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. bottle/container As ;northrop Grumman Systems Corp; Company Name , ;2000 W Nasa Blvd, Melbourne Fl 32904-2322; Address , ;70974 ; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Soon16 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Details: Contact Information|4|n761.34|n00383|215-697-3608|tara.b.kupperstein.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type |n/a |tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months |60 Days After Discovery Of Defect ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Request For Quote (rfq) Is For The Repair Of: nsn: 1680 015817912 quantity: 2 Ea if A Firm Fixed Price (ffp) Cannot Be Determined, Please Inform The Pco. repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract.for Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract. required Rtat: ## 180 Days After Receipt Of Asset throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month. A Throughput Of ## 2 Per Month Reflects No Throughput Constraint. induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer. reconciliation:a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Ordersdelivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. early And Incremental Deliveries Accepted And Preferred. 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: dtsk,aircraft,mater ;7r 1680 015817912; Nsn , ;37900-501-2012; Part Number, Shall Be Performed Iaw: Dtsk,aircraft,mater ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Publication (s). 1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: dtsk,aircraft,mater ;37900-501-2012; P/n, ;7r 1680 015817912; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. dtsk,aircraft,mater ;drs Advanced Isr, Llc; Company Name , ;2601 Mission Point Blvd, Ste 250, Beavercreek Oh 45432-6600; Address , ;0cdn3; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Soon9 Jan 2025
Tender AmountRefer Documents 
3701-3710 of 3725 active Tenders