Tenders of Satluj Jal Vidyut Nigam Limited
Tenders of Satluj Jal Vidyut Nigam Limited
Satluj Jal Vidyut Nigam Limited - SJVN Tender
Works
Civil And Construction...+1Construction Material
Eprocure
Corrigendum : Closing Date Modified
India
Package P-2 : Construction Of Adit-5 & Adit-6 To Head
race Tunnel, Head Race Tunnel From Sta. 11865.723 M To
17278.009 M, Surge Shaft And Surge Shaft Gates Etc.
Closing Soon30 Jan 2025
Tender AmountRefer Documents
Satluj Jal Vidyut Nigam Limited - SJVN Tender
Goods
Electrical Goods and Equipments...+1Electrical and Electronics
GEM
India
CATEGORY: Control Cable Signal 30m Part No 3HAC7998-4 as per TS
enclosed , Control Cable Power 30m Part No 3HAC8182-4 as
per TS enclosed , Teach Pendant Part No 3HAC028357-001
as per TS enclosed , Earth Fault Breaker - EU 230V AC Part
No 3HAC056484-001 as per TS enclosed , DSQC 661 Power
Supply Part No 3HAC026253-001 as per TS enclosed , DSQC
662 Power Distribution Unit Part No 3HAC026254-001 as per
TS enclosed , O-Ring Part No 3HAC061327-002 as per TS
enclosed , Gasket Part No 3HAC048647-001 as per TS
enclosed , Cable Battery slash SMB Part No 3HAC046287-
001 as per TS enclosed , Lubricating Oil TMO 150 1PC is
equal to 10L Part No 3HAC032140-008 as per TS enclosed ,
Mobile Gear 600xp320 1PC is equal to 10L Part No
3HAC042471001 as per TS enclosed , Optimal Opti Gear
BM100 1PC is equal to 3HAC042564001 as per TS enclosed
Closing Date7 Feb 2025
Tender AmountINR 2.4 Million (USD 28.2 K)
Satluj Jal Vidyut Nigam Limited - SJVN Tender
Works
Energy, Oil and Gas...+2Electrical Goods and Equipments, Electrical and Electronics
Eprocure
Corrigendum : Closing Date Modified
India
Selection Of Re Power Developers For Supply Of 6000 Mwh (1500 Mw X 4 Hours) Assured Peak Power From Ists-connected Renewable Energy (re) Power Projects With Energy Storage System
Closing Date14 Feb 2025
Tender AmountINR 91.9 Billion (USD 1 Billion)
Satluj Jal Vidyut Nigam Limited - SJVN Tender
Machinery and Tools
Corrigendum : Closing Date Modified
India
Supply, Fabrication And Installation Of New Plenum Duct After Removal Of Existing Damaged Plenum Duct Of Ventilation System Installed At Blower Room Of Rampur Hps(pcd-o&m-rhps-704)
Closing Soon27 Jan 2025
Tender AmountRefer Documents
21-30 of 82 active Tenders