Pumps Tenders
Pumps Tenders
Municipality Of Batuan, Masbate Tender
Civil And Construction...+2Building Construction, Construction Material
Philippines
Closing Date29 Jan 2025
Tender AmountPHP 570.2 K (USD 9.8 K)
Details: Description The Local Government Of Batuan, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors/contractors To Apply For Eligibility And To Bid For The Hereunder Project: Project I.d No: 25-001 Name Of Project: Purchase Of Pmnp Medical Equipment Location: Batuan, Masbate Brief Description: Procurement Of Medical Equipment To Be Used For Implementation Of Philippine Multsectoral Nutrition Program (pmnp) For Batuan, Masbate Approved Budget For The Contract: Php. 570,200.00 Contract Duration: 30 Calendar Days Delivery Period: 30 Calendar Days Amount Of Bid Documents: Php. 1,000.00 Name Of Supply Quantity Unit Buntis Kit Manual Breast Pump 50 Pcs Breastmilk Storage 200ml 50 Box Cotton Balls 50 Pack Baby Bath Soap 50 Pcs Alcohol 100ml 50 Pcs New Born Baby Dress 150 Pcs New Born Mitten 150 Pcs New Born Booties 150 Pcs Receiving Blanket 50 Pcs Family Planning Pills 200 Box Implant 10 Pcs Mother And Child Friendly Space Toys 10 Set Mat 10 Pcs Books 10 Set Measuring Equipment Calibrated Weighing Scale For Children 16 Pcs Heavy Duty Calibrated Weighing Scale For Adult 16 Pcs Digital Weighing Flatform 1 Pcs Height Board For Children 15 Pcs 10kl Calibrated Test Weight 1 Pcs Digital Taring Scaling 200kg Capacity 2 Pcs 1.5 Meter Steel Ruler 2 Pcs T-square 2 Pcs Leveling Tool 2 Pcs Height Board For Adult 15 Pcs Equipment For Birthing Facility 18l Autoclave 1 Pcs Manual Bp 5 Pcs Bucket Pail 2 Pcs Gooseneck Lamp 3 Pcs Baby Bassinet Stand With Crib And Foam 1 Pcs Ambu Bag Manual Resuscutator For Neonates 1 Pcs Ambu Bag Manual Resuscutator For Adults 1 Pcs Dental Cartridge Needle 10 Box Gelfoam/absorben Gelatin Sponge 20 Pcs Cotton 10 Roll Isopropyl 70% 10 Gal Clean Gloves Small 15 Box Surgical Facemask 15 Box Surgical Head Cap 15 Box Surgical Instrument Tray 1 Pcs Dental Bib 3ply 5 Pack Crash Cart 2 Set Rechargeable Nebulizer 4 Pcs Equipment For Trainings And Iec Lcd Projector 1 Pcs 3 In 1 Printer With Photocopier 1 Pcs Portable Speaker 1 Pcs Storage For Nutrition Commodities 4 Layer Steel Cabinets 3 Pcs Prospective Bidders Should Have Experience In Undertaking A Similar Project Within The Last 2 Years With An Amount Of At Least 50% Of The Proposed Project For Bidding. The Eligibility Check/screening As Well As The Preliminary Examination Of Bids Shall Use Non-discretionary “pass/fail” Criteria. Post-qualification Of The Lowest Calculated Bid Shall Be Conducted. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference(s), Evaluation Of Bids, Post-qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 And Its Implementing Rules And Regulations (irr). The Bidder Must Have Completed, Within The Period Specified In The Invitation To Bid And Itb Clause, A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc The Statement Of All Ongoing And Completed Government And Private Contract Shall Include All Such Contracts Within 1 Year Prior To The Deadline For The Submission And Receipt Of The Bids The Abc Is Php. 570,200.00. Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. The Bid Security Shall Be In The Following Amount: 1. 2% Of The Abc, If The Bid Security Is In Cash, Cashier’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. 5% Of The Abc If Bid Security Is In Surety Bond; 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Each Bidder Shall Submit 1 Original And 2 Copies Of The First And Second Components Of Its Bids
National Irrigation Administration Tender
Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Closing Date20 Jan 2025
Tender AmountPHP 9.2 Million (USD 160 K)
Details: Description Invitation To Bid For Construction Of Malo Sip Cy 2025 Pb # Momaro-028-2025 (early Procurement Activity) 1. The Nia Momaro Imo, Through The National Expenditure Program Of Fy 2025 Intends To Apply The Sum Of Nine Million Two Hundred Eighty-eight Thousand Seven Hundred Sixty-three Pesos And 01/100 (php 9,288,763.01) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Malo Sip Cy 2025 With Project Identification Number Momaro-consmalosip-10m-cy2025-epa Located At Bansud, Oriental Mindoro. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Nia Momaro Imo Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required Two Hundred Forty (240) Calendar Days And The Minimum Equipment Required Are: 3 Units Of Concrete Cylinder 6” Dia X 12”, 1 Unit Of 1-bagger Concrete Mixer, 1 Unit Of Stake Truck 6-8 Tons, 1 Unit Of Dump Truck 4.59 Cu.m., 1 Unit Of Backhoe, Hydraulic, Crawler Mounted With 1.0 Cu.m Bucket, 1 Unit Of Dozer 160hp, 1 Unit Of 4” Centrifugal Pump. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Nia Momaro Imo And Inspect The Bidding Documents At The Address Given Below From 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 28, 2024 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 10,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Nia Momaro Imo Will Hold A Pre-bid Conference On January 6, 2025 10:00 Am At Conference Room Of Nia Momaro Imo, Bayanan Ii, Calapan City, Oriental Mindoro And/or Through Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before January 20, 2025 10:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 20, 2025 10:01 Am At The Given Address Below Or Through Videoconferencing/webcasting Via Google Meet Which Should Be Attended By The Managing Officer. Bids Will Be Opened In The Presence Of The Bidders’ Representatives With Special Power Of Attorney (spa), Who Choose To Attend The Activity At The Given Address Below. No Attorney-in-fact Allowed To Participate In The Bidding. 10. Bidders With Negative 15% Slippage Of Any On-going Contract Or At Least 10% Slippage In Each Of Two (2) Or More Contracts Will Be Automatically Disqualified. 11. The Nia Momaro Imo Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Engr. Jinky M. Mañebo Bac Chairperson Nia Momaro Imo Bayanan Ii, Calapan City, Oriental Mindoro Bacmomaroimo@gmail.com (043) 288 7238 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website December 28, 2024 ________________________________ (sgd)engr. Jinky M. Mañebo Bac Chairperson
BARANGAY MALIANCOG PINAMALAYAN ORIENTAL MINDORO Tender
Civil And Construction...+1Water Storage And Supply
Philippines
Closing Date29 Jan 2025
Tender AmountPHP 132.1 K (USD 2.2 K)
Details: Description Itb No. 2025-01-001 Rehabilitation Of Barangay Water System Phase Ii 1.the Barangay Maliangcog, Pinamalayan, Oriental Mindoro, Through The 20% Barangay Development Fund For The Year 2024 Intends To Apply The Sum Of One Hundred Thirty-two Thousand One Hundred Seventy-six Pesos Only (php.132, 176.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Rehabilitation Of Barangay Water System Phase Ii. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2 .the Sangguniang Barangay Ng Maliangcog, Now Invites Bids For Rehabilitation Of Barangay Water System Phase Ii. Delivery Of Goods Is Required 10 Calendar Days, Upon Receipt Of Notice To Proceed (ntp). Bidders Should Have Completed, Within Five (5) Days, From The Date Of Submission And Receipts Of Bids, A Single Largest Completed Contract (slcc) That Is Similar To The Contract To Be Bid, And Whose Value, Adjusted To Current Prices Using The Philippine Statistics Authority (psa) Consumer Price Indices. Section 23.4.1.3 Of Irr Of Ra 9184. Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The Government Procurement Reform Act”. (i) Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations Within At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Barangay Maliangcog, Pinamalayan, Oriental Mindoro And Inspect The Bidding Documents At The Address Below During Office Hours From Monday To Friday 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders On January 9 To January 28 At The Barangay Maliangcog, Municipality Of Pinamalayan And Upon Payment In Cash Of Non-refundable Fee In The Amount Of Five Hundred Pesos Only (php.500.00) It May Also Be Downloaded Free Of Charge From Website Of Philippine Electronic Procurement System (philgeps) And The Website Of Procuring Entity Provided That Bidders Shall Pay The Applicable Fee For The Bidding Of Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Delivered To The Barangay Maliangcog, Pinamalayan, Oriental Mindoro On Or Before January 29, 2025 At 9:00 Am. All Bids Must Be Accompanied By A Bid Security In Any Of Acceptable Forms And In The Amount Stated In Itb Clause. Bid Opening Shall Be On January 29 At 10:00 Am At The Barangay Hall. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 7.the Barangay Maliangcog, Pinamalayan, Oriental Mindoro, Reserves The Right To Inject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidder Materials: 4 Pcs. G.i Pipe 4'' Dia. (schd. 40) 4 Pcs. G.i Pipe 1-1/2'' Dia. (schd. 40) 1 Pc G.i Pipe Elbow 1-1/2'' Dia. (heavy Duty) 1 Pc Female Adapter 1-1/2'' 1 Set Submersible Pump 2hp 1 Box Welding Rod (5kg./box) 6 Roll P.e. Pipe 1-1/2'' 6 Pcs. P.e Union Patente 1-1/2'' Dia. 3 Pcs Teflon Tape 3/4'' 50 Pcs Saddle Clamp 1-1/2'' Dia. 6 Pcs. Compression Male Adaptor 1-1/2
Municipality Of Quezon, Nueva Vizcaya Tender
Civil And Construction...+1Civil Works Others
Philippines
Closing Soon13 Jan 2025
Tender AmountPHP 50 Million (USD 861.5 K)
Details: Description Item No. Description Quantity Unit Part A - Facilitie For The Engineers A.1.1 (6) Provision Of Combined Field Office, Laboratory And Living Quarters Building For The Engineers (rental Basis) 12.00 Month A.1.1 (11) Provision Of Furnitures/fixtures, Equipment & Appliances For The Field Office For The Engineer 1.00 Lump Sum A.1.2 (2) Provision Of 4x4 Pick Up Type Service Vehicle For The Engineer On Bare Rental Basis 12.00 Month Part B - Other General Requirments B.4 (10) Miscellaneous Survey And Staking 1.00 Lump Sum B.5 Project Billboard 2.00 Each B.7(2) Occupational Safety And Health Program 1.00 Lot B.9 Mobilization/demobilization 1.00 Lump Sum Part C - Earthworks 100(1) Clearing & Grubbing (with Stripping) 13,968.00 Sq.m. 101(2)c Removal Of Rcpc (36"ø) - 910mm 14.00 Ln.m. 101(3)b2 Removal Of Exisiting Concrete Pavement (0.20m Thk) 2,338.80 Sq.m. 102(2) Surplus Common Excavation 51,000.00 Cu.m. 102(3)a Surplus Rock Excavation (soft) 10,000.00 Cu.m. 102(3)b Surplus Rock Excavation (hard) - Blasting 2,227.00 Cu.m. 103(1)a Structure Excavation (common Soil) 429.00 Cu.m. 103(6)a Pipe Culvert And Drain Excavation 90.75 Cu.m. 104(1)a Embankment (from Excavation) 8,032.00 Cu.m. 105(1)a Subgrade Preparation 13,968.00 Sq.m. Part D - Subbase And Base Course 200 Aggregate Subbase Course 4,190.40 Cu.m. Part E - Surface Cources 300(1) Gravel Surface Course 663.48 Cu.m. 311(1)a.2 Pcc Pavement (plain)-conventional Method, 200mm Thk. 10,650.60 Sq.m. Part F - Bridge Construction Spl Single Span Flat Slab Bridge 1.00 Lot Spl(2) Over Flow Bridge 1.00 Lot Part G - Drainage And Slope Protection Structures 500(1)b3 Reinforced Concrete Pipe Culverts, 910mm Dia. 50.00 Ln.m. 502(3)a3 Catch Basins 2.00 Ea. 506 Stone Masonry 1,560.00 Cu.m. Equipment Needed (minimum): 1 Unit Backhoe (0.80 Cu.m.) 4 Units Transit Mixer 1 Unit Air Compressor 1 Unit Backhoe W/ Breaker (0.80 Cu.m.) 1 Unit Backhoe, Wheel Mounted (26 Cu.m.) 1 Unit Concrete Saw, 14''ø Blade 1 Unit Bulldozer W/ Ripper, Dx175 1 Unit Water Truck (16000l) 1 Unit Concrete Screeder (5.5 Hp) 1 Unit Bulldozer, Dx175 1 Unit Boom Truck 1 Unit Concrete Vibrator 1 Unit Motorized Road Grader, G710a 1 Unit One Bagger Mixer 1 Unit Plate Compactor (5 Hp) 1 Unit Vibratory Roller (10m.t.), Sd100dc 1 Unit Pneumatic Drilling Machine 1 Unit Bar Bender, Three Phase 1 Unit Payloder (1.5 Cu.m.), Lx80-2c 1 Unit Welding Machine 1 Unit Bar Cutter, Single Phase 1 Unit Cargo Truck (9-10 Mt.) 2 Units 7.5hp Water Pump, 100mmø Suction 3 Units Dump Truck (12 Cu.yd) 1 Unit Rtk W/ Complete Accessories
DEPT OF THE AIR FORCE USA Tender
Electrical Generators And Transformers...+2Machinery and Tools, Electrical and Electronics
United States
Closing Soon11 Jan 2025
Tender AmountRefer Documents
Details: Request For Information (rfi) – Steam Generator Installation At Area 1-42
this Request For Information (rfi) Is Issued As Market Research. All Requirements Identified In This Rfi Are Tentative And Will Be Finalized Prior To The Release Of Any Request For Proposal (rfp). This Rfi Is For Planning Purposes Only And Shall Not Be Considered A Request For Proposal (rfp), Request For Quote (rfq), Or As An Obligation On The Part Of The Government To Acquire Any Products Or Services. The Information Provided May Be Utilized By The Air Force Research Laboratory (afrl) In Developing Its Acquisition Strategy Should A Decision Be Made To Proceed With Acquiring The Items/services Listed In This Rfi. The Information Received In Response To This Rfi May Be Included In One Or More Future Solicitations. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Synopsis Or Any Follow-up Information Requests. The Purpose Of This Rfi Is To Gain Knowledge Of Potentially Qualified Sources And Their Size Classifications (small Business, Large Business, Etc.). The Information Provided Is Entirely Voluntary And Will Not Impact The Ability To Bid On Future Requirements. requested Information. the Government Requests Interested Offerors Who Believe They Can Fully Support This Requirement Furnish The Following Information: 1. Company Name, Cage Code And Uei Number, Address, Points Of Contact, Phone Numbers And E-mail Addresses. 2. Information Should Include A Brief Description Of Experience In Providing The Type Of Support Described In The Requirements. The Information Package Must Be Clear, Concise, And Complete. The Air Force Is Under No Obligation To Provide Feedback To The Company, Or To Contact The Company For Clarification Of Any Information Submitted In Response To This Request. 3. Identification Of Business Size (small Or Large) And Identify The Socioeconomic Disadvantaged Category, As Defined The Federal Acquisition Regulation Far Part 19 And Also Currently Listed In The System For Award Management (sam). Small Business Size Standards Are Published By The U.s. Small Business Administration (sba) And May Be Found At Www.sba.gov/size/sizetable2002.html. the Potential North American Industry Classification System (naics) Codes Assigned To This Procurement Is 335312 “motor And Generator Manufacturing” And The Small Business Size Standard Is 1,250 Employees. The Potential Product Service Code Assigned To This Procurement Is 6115 “generators And Generator Sets.” 4. Details Regarding The Requirements Your Company Is Able To Provide And Any Applicable Restrictions. 5. An Industry Day Will Be Held 22 January 2025 For Interested Contractors To View The Site. If You Would Like To Participate, Please Complete The Document Entitled “afrl Visitor Pre-announcement” For Each Individual Who Will Attend In Order To Gain Access To Edwards Air Force Base. - Requirements – Steam Generator Installation *** Please Review Both Attached Statement Of Work Documents For Complete Requirement Information. Please Note The Document Titled Single Steam Generator-sow Covers The Specifications For The Current Requirement Of The Single Steam Generator, While The Document Titled Complete Steam Generator Project-sow Is For The Entire Anticipated Project. The Contractor Shall Reference And Work The Documents Together To Understand The Scope Of Work. *** the Government Is Seeking To Identify Qualified, Experienced, And Interested Firms, Who Can Perform In Accordance With The Requirements Described In The Attached Statement(s) Of Work For The Installation Of One (1) Steam Generator Which Will Be Used To Replace An Aging Steam Generation System In Use At Area 1-42 That Includes Large Spherical Saturated Steam Storage Vessels, Heat Exchangers, Process Heaters, Pumps, Supply And Return Piping And Other Hardware To Generate And Provide The Required Mass Quantity Of Steam At Specified Pressure And Temperature. The Intent Of This Project Is For The Contractor To Provide The Air Force Project Manager One (1) Safe, Complete, Fully Functional And Operable Steam Generator To Be Used To Supply Saturated Steam For The Afrl Area 1-42 Steam Plant. note: The Air Force Is Planning To Install A Total Of Three (3) Identical Steam Generators, Starting With The Single Generator Being Acquired With This Requirement And The Other Two (2) Steam Generators Which Will Be Installed As Part Of The Overall System In The Future. The Scope Of Work For This Acquisition Includes Only The First, Single Steam Generator At This Time. The Air Force Project Manager Has Made A Good Faith Effort To Update All Relative Project Documents To Address The Inclusion Of Only The Single Steam Generator And Clearly Identify Other Two (2) Steam Generators Are Intended For Installation In The Future But Are Not Included As Part Of The Current Scope Of Work. Likewise, The Air Force Project Manager Has Endeavored To Identify Interface Points On Piping, Platforms, Conduit And Other Systems Where Connections To Provide Service To The Future Steam Generators Will Be Required. If The Contractor Identifies Any Scope, Interfaces Or Other Items That Are Not Clear As To The Intent Of What Is To Be Included In The Current Scope Of Work And What Is Intended Future Installation, The Contractor Shall Bring This To The Attention Of The Air Force Project Manager Immediately. technical Requirements: built In Accordance With Asme B&pvc Section I, 2023 volume: Approx. 12,400 Cubic Feet pressure: Maximum Working Pressure: 600 Psi; Maximum Design Pressure: 620 Psi temperature: Maximum Working Temperature: 500f steam Generation And Pressure: 110 Lbm/sec @ Initial Temperature 500f For 12 Min Total o Yields 79,200 Lbs Of Steam At ~600 Psig minimum Pressure After Release Is 100 Psig minimum 3 Runs Before Make-up Water Is Required steam Reheats At Maximum 20 Hrs the Steam Generator Shall Be Designed, Fabricated, Tested, Inspected And Stamped In Accordance With The Requirements Of The Asme B&pvc Section I, Rules For Construction Of Power Boilers, Latest Edition. The Steam Generator Shall Be Stamped With An Asme B&pvc Section I. “asme” And “s” Certification Mark As Noted In Pg-105 Of Asme B&pvc Section I. The Contractor Shall Be Authorized By Asme To Perform The Identified Code Construction And Shall Have The Appropriate “s” Stamp. the Steam Generator Shall Be A Fire Tube Type Boiler And Meet Requirements For The Same. the Contractor Shall Provide A Manufacturer’s Data Report Form, Form P-2 For The Steam Generator. All Required Documentation, Including, But Not Limited To, Calculations, Welding Certifications, Non-destructive Testing (nde) Records, Certified Material Test Reports (cmtrs), Pressure Testing, Master Data Report Form And All Other Documentation As Required By Asme B&pvc Section I For The Design, Fabrication, Welding, Inspection, Nde, Testing And Any Other Activities Shall Be Furnished As Part Of The Code Package For The Steam Generator. the Steam Generator Shall Meet The Requirements Of Asme B&pvc Section I, Part Pg General Requirements For All Methods Of Construction, Part Pw Requirements For Boiler Fabricated By Welding, Pft Requirements For Fire Tube Boilers. The Contractor Shall Determine, Depending On The Specific Design And Methods Selected To Design And Fabricate The Steam Generator, Other Parts And Appendices Of Asme B&pvc Section I That Are Applicable To The Scope Of This Project. all Pressure Boundary Materials Used In The Fabrication Of The Steam Generator Shall Be Provided With Certified Material Test Reports (cmtrs) As Required In Asme B&pvc Section Ii. All Pressure Boundary Materials Shall Be Clearly Stamped Or Otherwise Marked With The Corresponding Heat Number From The Cmtr. Any Requirements For Marking Or Stamping Plates Or Other Pressure Boundary Materials Identified In Asme B&pvc Section I That Are In Addition To Any Marking Or Identification Of Materials Noted In Asme B&pvc Section Ii Shall Be Met. The Contractor’s Quality Control Plan Shall Address Transfer Of Heat Numbers And Traceability For Individual Pieces And Parts Cut Or Altered. six Major Tasks Include: design And Engineering procurement Of Materials, Parts, Equipment For Fabrication fabrication Of Steam Generator At Afrl Staging Area transport And Placement Of The Steam Generator final Installation Of Generator And Periphery Systems, Piping, Insulation, Blowers And Other Parts And Equipment final Acceptance Testing And Training anticipated Period Of Performance: 1 June 2025 – 31 May 2027 fob Destination: Edwards Afb, Ca 93524. responses. afrl Is Seeking U.s. Sources With The Capability To Provide The Items/services Listed In This rfi. All Replies Are To Be Provided To The Contracting Officer, Tyler Pittmon Tyler.pittmon@us.af.mil And Contract Specialist, Suzanna Kussman, Suzanna.kussman@us.af.mil all Responses To This Rfi Must Be Received No Later Than 10 January 2025 At 4:00 P.m. Pst.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n742.15|er8|7176052982|jocelyne.dzonangfouego.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
inspection And Acceptance Of Supplies|26|||||||||||||||||||||||||||
desired And Required Time Of Delivery (june 1997)|29|clin 0001aa|1|540days|clin 0001ab |1|540days||||||||||||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications; Combo - Receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|tbd|w25g1u And W62g2t|tbd|n/a|n/a|n/a|n/a|n/a|n/a|n/a||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||x||||||||||||
small Business Program Representations (feb 2024)|4|||||
annual Representations And Certifications (may 2024)|13|335311|800||||||||||||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1.this Requirement Is Pursuant To Emergency Acquisition Flexibilities (eaf).
2.the Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3.all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be ?issued? By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Set Be Other Electronic Commerce Methods Such As Email. The Government?s Acceptance Of The Contractor?s Proposal Constitutes Bilateral Agreement To ?issue? Contractual Documents As Detailed Herein.
4.if Requirement Will Be Packaged At A Location Different From The Offeror?s Address, The Offeror Shall Provide The Name, Street Address And Cage Of The Packaging Facility.
5.any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Will Be A Rated Order.6.if Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website.
after Requesting Access, Send An Email To The Poc Listed On The Solicitation.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,powe .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
drawing Data=8328770 |53711| D| |d|0001 | D|49998|0293088
drawing Data=8328905 |53711| -| |d|0001 | -|49998|0179994
drawing Data=8328906 |53711| -| |d|0001 | -|49998|0208048
document Ref Data=mil-std-129 | | |p |041029|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
document Ref Data=navsea S9320-am-pro-020/mldg | | | |990816|a| |02|
document Ref Data=s9320-am-pro-020/mldg | | | | |a| | |
document Ref Data=mil-std-973 | | | |950113|a| |03|
3. Requirements
3.1 Design, Manufacture, And Performance - Except As Modified Herein,
the Cable Assembly,powe Furnished Under This Contract/purchase Order Shall Meet The
design, Manufacture, And Performance Requirements Specified On Drawing ;8328770;
cage ;53711; .
3.1.1 ;pn-8328770-3;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
3.4.1 Navsea S9320-am-pro-020/mldg - Manufacture Of This Item Requires Vendor Certification In Accordance With Navsea S9320-am-pro-020/mldg.
3.4.2 ;submarine Outboard Cable Assembly That Must Be In Compliance With Molding Man Ual Navsea S9320-am-pro-020/mldg. Product Must Be Manufactured By A Pro-020 Certified Vendor With A Copy Of A Test Inspection Report Accompanying Each Cable Assembly
delivered. The Manual Provides Minimum Guidelines For Cable Assembly Molding, Inspection, And Testing. Vendors Are Audited For Compliance With Personnel Training/certification Requirements, Safety And Environmental Controls, And Equipment Requirements.;
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize This If Desired.;
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon14 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n743.3|cp9|717-605-1332|jennifer.l.mccollum6.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection--time-and-material And Labor-hour (may 2001)|1||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
wide Area Workflow Payment Instructions (jan 2023)|16|x|x|x|x|x|x|x|x|||x||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|336612|1000||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1.the Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
2.all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
3.if Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility.
4.any Contract Awarded As A Result Of This Solicitation Will Be Do/dx Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy Program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
5.if Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
\
extending Quote From 04 Mar 24 To 04 Apr 24.
solicitation Extended To 26 Feb 2024.
quantity Increase By 1 From 2 To 3.
\
this Solicitation Is Being Issued Under Emergency Acquisition Flexibilities Formerly Known As Special Emergency Procurement Authority.
notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of This
contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
military Packaging Is Required. Government Source Inspection Is Required.
this Is A Rated Order Certified For National Defense Use, And The Contractorwill Follow All The Requirements Of The Defense Priorities And Allocations System Regulation (15 Cfr 700).
drawings And Technical Data Are Not Available From The Government. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When
copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed
herein.
notice To Contractors Providing Surplus Material:
a Surplus Material Certificate And Label Must Accompany Your Quotation For Surplus/new Manufactured Surplus Material. All Surplus Material Must Have Traceability Back To A Government Contract In Order To Be Considered For Award. Without This Information We Are
unable To Determine When The Governmentpurchased And Inspected The Item And Therefore, We Cannot Be Assured Of Technical Acceptability.
if Submitting Your Quotation Via Edi, A Faxed Or E-mail Copy Of The Surplus Certificate, Along With A Photo Of The Box And Label Must Be Sent To The Buyer Asap.
it Is Recommended That Vendors Become A Neco Trading Partner And Receive Automated Notifications From Neco (navy Electronic Commerce Online) When Contracts/modifications Are Issued And Posted On Eda. To Become A Trading Partner, Contact The Neco Help Desk At
800-503-6326 (8am-5pm Et) Or Email By Clicking On Neco Support At:
https://www.neco.navy.mil/
and Include The Following Information With Your Request: Cage Code, Company Name And Address And Poc With Phone Number And Email Address.
contractors Can View Their Orders, Contracts And Modifications At The Electronic Document Access (eda) Website:
http://eda.ogden.disa.mil/eda/about.htm
it Is Recommended That Contractors Register On Eda At:
http://eda.ogden.disa.mil/eda/indes_regis.htm
jennifer.l.mccollum6.civ@us.navy.mil
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Connector Traveling .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=7605046 |53711| -| |d|0001 | -|49998|0148712
3. Requirements
3.1 Design, Manufacture, And Performance - Except As Modified Herein,
the Connector Traveling Furnished Under This Contract/purchase Order Shall Meet The
design, Manufacture, And Performance Requirements Specified On Drawing ;7605046;
cage ;53711; .
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon10 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n713.30|haa|717-605-1308 |joshua.j.eshleman.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001|
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo - Invoice And Receiving Report||tbd|n00104 |tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|333415|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Procurement Action Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf/sepa) Iaw Far 13.201(g) And Far Subpart 18.2". Casrep Accelerated Delivery Is Encouraged And Accepted At No Additional Cost To Government.
all Freight Is Fob Origin.
this Rfq Is For A Buy/new Manufacture. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor?s Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection And Acceptance Are Required. Unit Price:__________ Firm Total Price:__________ Firm Procurement Turnaround Time (ptat) :__________ Awardee Cage: __________ Inspection & Acceptance Cage, If Not At Source:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example):__________
if You Are Not The Manufacturer Of The Material You Are Offering, You Must State Who The Manufacturer Is (name & Cage Code) And Be Able To Provide Traceability Information If Requested Prior To Receiving An Award.
by Submitting A Quotation Or Offer, The Contractor Agrees That, When The Contractor Is Not The Manufacturer Of The Item, It Is Confirming That It Currently Has Or Will Obtain Before Award And Shall Retain Documented Evidence (supply Chain Traceability
documentation) That The Item Is From The Approved Manufacturer And Conforms To The Technical Requirements. The Retention Period Is Five Years After Final Payment Under This Contract.
at A Minimum, The Supply Chain Traceability Documentation For The Item Shall Include: Basic Item Description, Part Number And/or National Stock Number, Manufacturing Source, Manufacturing Sources Commercial And Government Entity (cage) Code, And Clear
identification Of The Name And Location Of All Supply Chain Intermediaries Between The Manufacturer To The Contractor To Item(s) Acceptance By The Government. The Documentation Should Also Include, Where Available, The Manufacturer's Batch Identification For The
time(s), Such As Date Codes Lot Codes, Or Serial Numbers As Date Codes Lot Codes, Or Serial Numbers.
navsupwss Poc: Joshua.j.eshleman.civ@us.navy.mil
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Compressor, Refgrnt .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
document Ref Data=mil-std-129 | | |r |190927|a| |02|
document Ref Data=iso9001 | | | |010417|a| | |
3. Requirements
3.1 Cage Code/reference Number Items - The Compressor, Refgrnt Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No. ;66935 377-05300-000 9d672 377-05300-000;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Spcc Contracting Officer Has Been Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Or A Detailed Description Of The Change, Explaining The Reason Therefore. If Finished Detail Drawings Are Not Available, Shop Drawings Inthe Form Used By The Manufacturer
will Be Acceptable For Government Evaluation. When Notifying The Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change/minor Design Change - If The Manufacturer's Part Number Or Item Design Indicated Thereon Has Changed, But Form, Fit And Function Of The Item Is Not Affected Thereby, And The Design Change Meets The Criteria For Minor, By Not
effecting Form, Fit, Function, Reliability Or Safety , Supply The Item And Advise Spcc Immediately Of The New Part Number, Furnishing A Detail Drawing And/or A Detailed Description Of The Change, As Applicable.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize Mil-i-45208 If Desired.;
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n713.33|haa|717-605-1028|ashley.h.betlock.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|333415|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: 199 Days
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25.
your Quote Should Include The Following Information: Quote Amount And Rtat
unit Price:__________
total Price:__________
check One: Firm-fixed-price ___ Estimated ___ Nte ___
return Material Authorization # (rma), If Applicable:__________
delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract.
repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A
price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section
shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________. Testing And Evaluation If Beyond Repair
t&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to Exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment.
the T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location
awardee Cage: __________
inspection & Acceptance Cage, If Not Same As "awardee Cage": __________
facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________ Iot Compare Repair Price To Price To Buy New
new Unit Price:__________
new Unit Delivery Lead-time:__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Power Unit .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Power Unit Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;66935 376-95133a;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
DEPT OF THE NAVY USA Tender
Chemical Products
United States
Closing Date3 Feb 2025
Tender AmountRefer Documents
Description: Contact Information|4|n744.2|crl|717-605-1332|naryan.smith.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
inspection And Acceptance Of Supplies|26|x||||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
option For Increased Quantity (mar 1989)|1||
option For Increased Quantity--separately Priced Line Item (mar 1989)|1||
limitation Of Liability--high-value Items ($100k)(feb 1997)|1||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
annual Representations And Certifications (may 2024)|13|334511|850||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|do||
1. This Requirement Is Pursuant To Emergency Acquisition Flexibilities (eaf).
2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Suchas Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
4. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility.
5. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
7. The Government Retains The Option To Order An Additional Quantity Up To 100% Of This Order For 180 Days Aro At The Same Price. The Government May Choose To Exercise This Option Or Not.
8. Government- Inspection And Acceptance (g-s I&a) Is Required. If The G-s I&a Will Occur At A Different Cage From The Admin Award Cage, Please Provide The Procurement Facility Cage And/or Packaging Cage With The Quote.
9. Please Provide The Following Information In The Procurement Quote: Your Cage (used As The Awardee Cage):___________________ The Unit Procurement Price: $____________________________________
the Procurement Cage _____________ And Packaging Cage___________ (as Described In #2).
procurement Acquisition Time, Delivered In _____ Days.
note To Distributors/dealers:
if You Are A Distributor, Your Quotation Must Be Accompanied With A Letter From The Actual Manufacturer Indicating That You Are An "authorized" Distributor.
if You Are A Dealer, Your Quotation Must Be Accompanied With A Statement Clearly Identifying Your Firm As A Dealer Along With The Oem's Name/cage Code And P/n That You Intend On Providing.
please Note The Following When Generating Your Quote: We Are Requesting That The Quote's Validity Extend For 8 Months From The Submitted Proposal Date.
10. Since There Is Only One Business Concern Capable Of Procurement On This Nsn, The Small Business Set-aside Requirement Has Been Dissolved.
11. Please Submit A Procurement Quote To Naryan Smith Via Email: Naryan.smith.civ@us.navy.milthis Is The Only Submission Method Authorized.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cover,protective,to .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
drawing Data=2048297 |10001| H|fn |d|0001 | H|49998|0212701
document Ref Data=mil-std-129 | | |p |041029|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
document Ref Data=mil-std-973 | | | |950113|a| |03|
3. Requirements
3.1 Cage Code/reference Number Items - The Cover,protective,to Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No. ;10001 2048297;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize This If Desired.;
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6891-6900 of 6985 active Tenders