Printing Tenders
Printing Tenders
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Software and IT Solutions...+2Electronics Equipment, Electrical and Electronics
United States
Closing Soon15 Jan 2025
Tender AmountRefer Documents
Details: This Is Not A Solicitation Announcement. This Is A Request For Information Only. This Request For Information (rfi) Is Intended For Information And Planning Purposes Only At This Time; And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs. Since This Is Request For Information Announcement, No Evaluation Letters And/or Results Will Be Issued To Respondents. No Solicitation Exits. Therefore, Do No Request A Copy Of A Solicitation. this Is Not A Solicitation Announcement. This Is A Request For Information Only. This Request For Information (rfi) Is Intended For Information And Planning Purposes Only At This Time; And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs. Since This Is Request For Information Announcement, No Evaluation Letters And/or Results Will Be Issued To Respondents. No Solicitation Exists. Therefore, Do No Request A Copy Of A Solicitation. the Department Of Veterans Affairs Visn 4, Network Contracting Office 4 (nco 4), Is Seeking Information And Potential Qualified/verified Businesses Capable Of Meeting Requirement And Salient Characteristics Below To Provide The Wilkes-barre Va Medical Center With Five (5) Pacs Dicom Image Importing/burning Systems. statement Of Need
wilkes-barre Va Medical Center
x-ray Media Burners/importer background: The Wilkes Barre Medical Center Needs Replacement Hardware For Outdated Picture Archiving And Communication System (pacs) Burners And Importing Software Utilized For X-ray Images. Current Software Is No Longer Supported Which Is Critical When Veterans Need Their Media Imported For Appointments And Media Is Requested For Legal Or Medical Purposes. Current Hardware And Software Is Unreliable And Is Constantly Down. We Do Not Have The Hardware Or Software To Support It In The Case Of A Complete Malfunction. software Is Utilized For Importing Veterans X-ray Images Into Pacs From Outside Provider To Minimize X-ray Exposure. System Is Also Utilized To Export Images To Cd/dvd For Legal Or Veterans To Take Their X-ray Images To Outside Providers. Hardware Included With Software Is Utilized To Burn/label Cd/dvd And Scanners Are Utilized To Digitize And Import We Films Into Pacs. System Must Be Able To Index, And Merge Imported Media With Existing Patient Records On Pacs. requirement: Request Is For Replacement Of Five (5) Pacs Media Importing System And Hardware, Three (3) Dicom Digitizing/paper Scanning Software Licenses And Onsite Training For Three (3) Technicians On Utilization Of Software And Hardware At The Time Of Installation. salient Characteristics: three (3) Digitizing/document Scanning Licenses. paper Report Scanner With Multiple Page Scan
paper Scanner Must Have Both Color And Gray Scale Scanning.
digitizing Application Must Be Compatible With Vidar Digitizers.
software Should Support Dicom, Pdf, Tiff, Jpeg, Gif And All Other Formats. five (5) Pacs Dicom Image Importing/burning Systems
software Must Be Able To Import Dicom Images From All X-ray Modalities From Cd, File Or Usb Drive.
import X-ray Media With Encryptions.
export Media With Multiple Security Lever (encrypt, Anonymous, Or Standard)
show History Burnt And Imported Media.
support Multi Import To Pacs Destinations At Once. must Have Interactive Web Control For Import, Burn, And Scan Documents.
software Must Be Able To Run On A Enterprise Servers For Simultaneous Users Utilization From Hospital Owned Pc. allow Use Of Third-party Hardware Such Scanners And Dvd.
must Be Able To Support Separate Accounts For Different User Authentication. one Year Warranty
at Least One-year Warranty media Burner With Dual Stack Autoloader
must Be Able To Create Custom Media Labels Based On Needs
media Burner Must Utilize Muti Color Cartridges To Ensure Label Reflect The Needed Color To Distinguish Disk
burner Must Have Self-cleaning Capability Of Print Heads
burner Must Have Built In Disk Completion Tray
burner Must Have Window To See Burner Internal Status
buner Must Have Two Media Burners To Allow Multi Burning. dvd/cdr Starter Pack
starter Muti Pack Ink Cartridges
200 Paper Cdr/dvr Holders.
one-year Warranty With One For One Exchange pc Requirements operating System
windows 10 Pro (includes Windows 11 Pro License) English, French, Spanish
processor 12th Generation Intel Core I5-12500 (6 Cores/18mb/12t/3.0ghz To 4.6ghz/65w) Or Equivalent - Ram 16gb (1x16gb) Ddr4 Non Ecc Memory Or Equivalent
- M.2 2230 512gb Pcie Nvme Class 35 Solid State Drive Or Equivalent
- 8x Dvd-rom 9.5mm Slimline Optical Disk Drive Or Equivalent
- Graphics Integrated - Wired Keyboard
- Wired Mouse
- Ports
- Usb 3.1 - 5 (1 Front, 4 Rear)
- Usb 3.1 Type-c Port
- External Usb 2.0 - 4 (2 Front, 2 Rear)
- Internal Usb 2.0 1
- Rj-45 1
- Serial Port 1
- Display Port 1.2 2
- Universal Audio Jack - 1
- Line-out - 1
- 19 In Led Monitor (within 2 Inches Lesser Or Greater Than 19 Inches) on-site Installation And Training
company Must Be Able To Install/setup Systems To Properly Import And Export X-ray Images From Pacs. vendor To Provide Three (3) Technicians Onsite Training On Utilization Of Software And Hardware At The Time Of Installation. To Be Coordinated With Station Pacs Administrator Poc. delivery: all Items Must Be Fob Destination To The Following Location: 1111 East End Blvd Wilkes Barre Pa, 18711
radiology Department attn: Amy Klush/michael Wyand monday Friday From 8:00am 4:00pm special Instructions: software And Hardware Should Be Able To Import, Burn And Export Images From Pacs In Dicom Format. Burners Should Be Able To Label Requested Media With Va Approved Image (image Will Be Provided By Va) All Installation Must Be Approved By Wilkes Barre Biomed Department And Or It Department. _____________________________________________________________________ responses To This Rfi Should Include Company Name, Address, Point Of Contact, Phone Number, And Point Of Contact E-mail, Uei Number, Cage Code, Size Of Business Pursuant To North American Industry Classification Code (naics) 334112 Computer Storage Device Manufacturing, The Small Business Size Standard For This Naics Code Is 1,250 Employees. please Answer The Following Questions: (1) Please Indicate The Size Status And Representations Of Your Businessâ in Accordance With The Naics Code 334112, Such As But Not Limited To: Service-disabled Veteran Owned Small Business (sdvosb), Veteran Owned Small Business (vosb),â hubzone, Woman Owned Small Business (wosb), Large Business, Etc.) (2)â is All The Required Equipment Available On A Federal Supply Schedule Or Government Wideâ acquisition Contract?â If So, Please Include The Schedule Number.â (3) Are You The Manufacturer, Distributor, Or An Equivalent Solution To The Items Being Referenced Above?â if Not,â provide Additional Information Shown Below.â This Is To Confirm Compliance With The Non-manufacturer Rule Iaw 13 Cfr 121.406(b) Nonmanufacturers.â Doesâ your Companyâ exceed 500 Employeesâ Primarily Engaged In The Retail Or Wholesale Trade And Normally Sells The Type Of Item Being Supplied;â â â Take Ownership Or Possession Of The Item(s) With Its Personnel, Equipment Or Facilities In A Manner Consistent With Industry Practice;â â Provide The Items Of A Small Business (4) If Your Company Is Aâ large Business, Do You Have Anyâ authorized Small Businessâ distributors? If So, Please Provide Their Company Name, Telephone, Point Of Contact And Size Status (if Available).â (5) If Your Company Isâ a Small Business And You Are An Authorized Distributor/reseller For The Items Identified Above Or An Equivalent Solution, Do You Alter; Assemble; Modify; The Items Requested In Any Way? If You Do, State How And What Is Altered; Assembled; Modified?â (6) Is The Item You Are Supplying Made Or Manufactured In America? This Is To Ensure Compliance With Far 52.225-1 Buy American-supplies. (7) If You Intend Toâ subcontractâ any Work On This Contract, What Portion Of The Total Cost Will Be Self-performed/will Be Performed By Your Organization? Please Provide Estimated Detailed Percentage Breakdowns Related To Sub Contracted Work And Completion Of Job.â (8) General Pricing Of Your Products/solution Is Encouraged. Pricing Will Be Used For The Purpose Of Market Research Only. It Will Not Be Used To Evaluate For Any Type Of Award.â (9) Please Submit Your Capabilitiesâ in Regard Toâ the Salient Characteristics Detailed Above And Any Information Pertaining To Equal To Items To Establish Capabilities For Planning Purposes?â (10) Please Review Salient Characteristics/statement Of Work (if Applicable) And Provide Feedback Or Suggestions. If None, Please Reply As N/a.â (11) Please Provide Your Uei Number.â *** Submissions Addressing Number (10) Should Show Clear, Compelling And Convincing*** Evidence That All Equal To Items" Meet All The Salient Characteristics.â thisâ rfiâ will Be Conducted In Accordance With Federal Acquisition Regulation (far) Part 13. Telephone Responses Will Not Be Accepted. responses Must Be Receivedâ via Email To Contract Specialist Olivia Osborne At Olivia.osborne@va.gov No Later Than 4:00 Pm Eastern Standard Time On January 15, 2025. This Notice Will Help The Va In Determining Available Potential Sources Only.â â do Not Contact Va Medical Center Staffâ regardingâ this Requirement, As They Are Not Authorized To Discussâ this Matterâ related To This Procurement Action. all Firms Responding To This Request For Information Are Advised That Their Response Is Not A Request For Proposal,â therefore Will Not Be Considered For A Contract Award.â â
â
if A Solicitation Is Issued, Information Will Be Posted On Sam.gov Web Site For All Qualified Interested Partiesâ at A Later Dateâ and Interested Parties Must Respond To The Solicitation To Be Considered For Award.â â this Notice Does Not Commit The Government To Contract For Anyâ supplies Orâ services.â â the Government Will Not Pay For Any Information Or Administrative Cost Incurred In Response To This Request For Information.â â information Will Only Be Accepted In Writing Via Email. disclaimerâ â this Rfi Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Rfi That Is Marked As Proprietary Will Be Handled Accordingly.â â responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract.â â responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi.â
BARANGAY TETUAN, ZAMBOANGA CITY Tender
Philippines
Closing Date16 Jan 2025
Tender AmountPHP 1 Million (USD 17.2 K)
Details: Description Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0005 M. Nativitad, St., Zamboanga City Invitation To Bid For Purchase Of Four (4) Units Of Aircon Floor Mounted (name Of Project) 1. The City Government Of Zamboanga, Through The Capital Outlay Under Office Equipment 2024 Intends To Apply The Sum Of Four Hundred Eigthy Four Thousand Pesos (p 484,000.00) Only Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Transportation Services Pr No. 24-10-127a. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Zamboanga Now Invites Bids For The Purchase Of Four Units Of Aircon Floor Mounted The Goods Is Required By Ten (10) Calendar Days Bidders Should Have Completed Within A Period Of Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project, With A Value Of At Least (50%) Of The Abc And To Meet Other Eligibility Requirements Stated In The Eligibility Documents. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From Barangay Hall Of Tetuan In The Office Of The Bids And Awards Committee And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20-23, 2024 From The Given Address And Website/s Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P500.00the Method Of Payment Will Be Cash Payable To The Barangay City Treasurer’s Office. The Bidding Documents Shall Be Received Personally By The Prospective Bidder Or His/her Authorized Representative. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees “machine Copy Of The Official Receipt” Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before November 23, 2024 At 10:00 Am At Office Of The Bids And Award Committee, Conference Room, M. Natividad St., Zamboanga City.late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. All Bids Must Be Accompanied By A Bid Security Which Shall Be A Bid Securing Declaration Or At Least One Other Form Of The Following: Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Confirmed By A Universal/commercial Bank, Irrevocable Letter Of Credit Issued By A Universal/commercial Bank Or From Other Bank Certified By The Bangko Sentral Ng Pilipinas As Authorized To Issue Such Financial Instrument, Provided However That It Shall Be Confirmed Or Authenticated By A Universal/commercial Bank If Issued By A Foreign Bank In The Amount Of P1,230.00or Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security In The Amount Of P3,075.00or Any Combination Of The Foregoing In The Amount Proportionate To Share Of Form With Respect To Total Amount Of Security. The Bid Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity. Bidders Are Required To Indicate The Brand Name And/or Name Of Manufacturer Of Goods Offered/quoted, When Appropriate. 8. Bid Opening Shall Be On November 28, 2024 At 10:00 Am At Office Of The Bids And Awards Committee, Conference Room, M. Natividad St., Zamboanga City. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. To Be Delivered In The Barangay Hall Of Tetuan. 10. The Brangay Council Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules Or Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Bidders Are Advised To Use The Bid Form At The Back Of This Itb. Failure To Do So Would Lead To Non-acceptance Of The Bid. 12. For Further Information Please Refer To: Hazel Jane L. Fox Bac Secretariat Barangay Government Of Tetuan M.natividad Street, Zamboanga City Brgytetuan@gmail.com Tel. No. (063) 993-0269 Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0005 M. Natividad Street, Zamboanga City Bid Form Date: _____________________ To: Barangay Council Of Tetuan Address: M. Natividad Zamboanga City Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers Including Bid Bulletin Numbers Tetuan 24-0005 The Receipt Of Which Is Hereby Duly Acknowledge, We, The Undersigned, Offer To Supply/deliver/perform The Procurement Of Four Unit Of Aircon Floor Mounted Nconformity With The Said Philippine Bidding Documents (pbds) For The Sum Of __________________________________________________________________________________________________________________ (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax’ (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules, If Our Bid Is Accepted, We Undertake: A. To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents (pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Period Specified In The Pbds And It Shall Remain Binding Upon As At Any Time Before The Expiration Of That Period. [insert This Paragraph If Foreign-assisted Project With The Development Partner: Commissions Or Gratuities, If Any, Paid, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Amount And Purpose Of Agent Currency Commission Or Gratuity _______________________________________ _______________________________________ _______________________________________ (if None, State “none”)] Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of ________________________________________________________ (name Of Bidder) As Evidenced By The Attached ______________________________________________________________________. (state The Written Authority) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: _________________________________________ Date:__________________________ Price Schedule For Goods Name Of Bidder _____________________________________________________tetuan 24-0005 Page 1 Of 1 2 3 4 5 6 7 8 9 10 Item Description Country Of Origin Quantity Unit Price Exw Per Item Transportation And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col.9) X (col 4) 1 Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation 4 Units Purpose: To Be Installed In Some Of The Offices In Tetuan Barangay Hall. Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ________________________________________ Date: ________________________________ Schedule Of Requirements The Delivery Schedule Expressed As Days/weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Days/weeks/months 1. Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation 4 Unit Of ________________________ Signature Over Printed Name Technical Specifications Item 1 Specification Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation Brand Name Statement Of Compliance Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] __________________________ Signature Over Printed Name Schedule Of Warranty This Serves As Warranty For Purchase Of Four (4) Unit Of Aircon Floor Mounted In The Government Of Barangay Tetuan. Item No. Description Quantity Warranty 1 Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation 4 Unit Of ___________________________ Bidder Signature Over Printed Name Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Office Equipment– Purchase Of Four Unit Of Aircon Floor Mounted B. Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 “subcontracting Is Not Allowed.” 12 The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) At Cgso, Tetuan, Zamboanga City For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P1,230.00; If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than P3, 075.00; If Bid Security Is In Surety Bond. 19.3 The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 [list Here Any Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It.] 21.2 [list Here Any Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity.] Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Abroad, State:] “the Delivery Terms Applicable To The Contract Are Ddp Delivered [indicate Place Of Destination]. In Accordance With Incoterms.” [for Goods Supplied From Within The Philippines, State:] “the Delivery Terms Applicable To This Contract Are Delivered Barangay Hall Of Tetuan, Zamboanga City. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is [indicate Name(s)]. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: Select Appropriate Requirements And Delete The Rest. A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E.training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. [specify Additional Incidental Service Requirements, As Needed.] The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: Select Appropriate Requirements And Delete The Rest. A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B.in The Event Of Termination Of Production Of The Spare Parts: I.advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii.following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Is Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Three (3) Months. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 [if Partial Payment Is Allowed, State] “the Terms Of Payment Shall Be As Follows: _____________.” 4 The Inspections And Tests That Will Be Conducted Are: Quality Inspection By Accounting, Coa, Cgso And End User. Republic Of The Philippines) City Of _____________________ ) S.s Bid Securing Declaration Invitation To Bid No.: [insert Reference Number] To: Government Of Barangay Tetuan, Bids And Awards Committee M. Natividad Street, Tetuan Zamboanga City I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And; C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ___ Day Of [month][year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Barabgay Council Of Tetuan Wishes To Receive Bids For The Purchase Of Four (4) Unit Aircon Floor Mounted (pr. No. 24-10-127a) With Tetuan 24-0005 The Procurement Project (referred To Herein As “project”) Is Composed Of, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For The Capital Outlay Under The Office Equipment 2024 In The Amount Of Four Hundred Eigthy Four Thousand Pesos (p484, 000.00) Only. 2.2. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.b Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 8. Pre-bid Conference 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty Days [120]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On November 25, 2024 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Indicated In Paragraph 6 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids On November 28, 2024 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Specified In Paragraph 8 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds.
BARANGAY TETUAN, ZAMBOANGA CITY Tender
Civil And Construction...+1Civil Works Others
Philippines
Closing Soon13 Jan 2025
Tender AmountPHP 216.3 K (USD 3.7 K)
Details: Description Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0021 M. Nativitad, St., Zamboanga City Invitation To Bid For Supply And Delivery Of 1 Lot Various Disaster Equipment (name Of Project) 1. The City Government Of Zamboanga, Through The Annual Budget 2024 Under Other Maintenance And Operarting Expenses (omoe) Intends To Apply The Sum Of Two Hundred Sixteen Thousand Three Hundred Fifty Pesos (p 216,350.00) Only Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Supply And Delivery Of The Purchase Of One (1) Lot Various Disaster Equipment Pr No. 24-06-069 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Zamboanga Now Invites Bids For The Supply And Delivery Of The 1 Lot Various Disaster Equipment The Sol. Goods Is Required By Ten (10) Calendar Days Bidders Should Have Completed Within A Period Of Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project, With A Value Of At Least (50%) Of The Abc And To Meet Other Eligibility Requirements Stated In The Eligibility Documents. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From Barangay Hall Of Tetuan In The Office Of The Bids And Awards Committee And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 03-08, 2025 From The Given Address And Website/s Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P500.00the Method Of Payment Will Be Cash Payable To The Barangay City Treasurer’s Office. The Bidding Documents Shall Be Received Personally By The Prospective Bidder Or His/her Authorized Representative. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees “machine Copy Of The Official Receipt” Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before January 09, 2025 At 10:00 Am At Office Of The Bids And Award Committee, Conference Room, M. Natividad St., Zamboanga City.late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. All Bids Must Be Accompanied By A Bid Security Which Shall Be A Bid Securing Declarationor At Least One Other Form Of The Following: Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Confirmed By A Universal/commercial Bank, Irrevocable Letter Of Credit Issued By A Universal/commercial Bank Or From Other Bank Certified By The Bangko Sentral Ng Pilipinas As Authorized To Issue Such Financial Instrument, Provided However That It Shall Be Confirmed Or Authenticated By A Universal/commercial Bank If Issued By A Foreign Bank In The Amount Of P1,230.00or Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security In The Amount Of P3,075.00or Any Combination Of The Foregoing In The Amount Proportionate To Share Of Form With Respect To Total Amount Of Security. The Bid Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity. Bidders Are Required To Indicate The Brand Name And/or Name Of Manufacturer Of Goods Offered/quoted, When Appropriate. 8. Bid Opening Shall Be On January 13, 2025 At 10:00 Am At Office Of The Bids And Awards Committee, Conference Room, M. Natividad St., Zamboanga City. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. To Be Delivered In The Barangay Hall Of Tetuan. 10. The Brangay Council Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules Or Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Bidders Are Advised To Use The Bid Form At The Back Of This Itb. Failure To Do So Would Lead To Non-acceptance Of The Bid. 12. For Further Information Please Refer To: Hazel Jane L. Fox Bac Secretariat Barangay Government Of Tetuan M.natividad Street, Zamboanga City Brgytetuan@gmail.com Tel. No. (063) 993-0269 Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0021 M. Natividad Street, Zamboanga City Bid Form Date: ____________________ To: Barangay Council Of Tetuan Address: M. Natividad Zamboanga City Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers Including Bid Bulletin Numbers Tetuan 24-0021 The Receipt Of Which Is Hereby Duly Acknowledge, We, The Undersigned, Offer To Supply/deliver/perform The Delivery And Supply Of The 1 Lot Various Disaster Equipment Inconformity With The Said Philippine Bidding Documents (pbds) For The Sum Of (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax’ (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules, If Our Bid Is Accepted, We Undertake: A. To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents (pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Period Specified In The Pbds And It Shall Remain Binding Upon As At Any Time Before The Expiration Of That Period. [insert This Paragraph If Foreign-assisted Project With The Development Partner: Commissions Or Gratuities, If Any, Paid, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Amount And Purpose Of Agent Currency Commission Or Gratuity (if None, State “none”)] Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of ________________________________________________________ (name Of Bidder) As Evidenced By The Attached ______________________________________________________________________. (state The Written Authority) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: _________________________________________ Date:__________________________ Price Schedule For Goods Name Of Bidder _____________________________________________________ Tetuan 24-0021 Page 1 Of 1 2 3 4 5 6 7 8 9 10 Item 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Life Boat Ring Rescue Can With Harness Rescuer’s Throw Bag Rescuer Shovel Rescue Rope 12mmx 50mm Rescue Rope 12 Mm X 100mm Rescue Rain Coat Rescue Booths Big First Aid Kit Rechargeable Flashlights Chainsaw 7m’ Breathable Reflectorized Vest Safety Helmet Safety Glasses Megaphone Fire Extinguisher Small First Aid Kit 4x4 Tent Ambulance Collapsible Stretcher Adult Wheelchair Solar Flood Light 300w Country Of Origin Quantity 2 2 1 2 2 2 10 10 4 10 1 10 4 4 2 4 11 4 1 4 12 Unit Price Exw Per Item Transportation And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col.9) X (col 4) Purpose: For Barangay Tetuan Disaster Preparedness Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ________________________________________ Date: ________________________________ Schedule Of Requirements The Delivery Schedule Expressed As Days/weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Days/weeks/months ________________________ Signature Over Printed Name Technical Specifications Brand Name Statement Of Compliance Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] __________________________ Signature Over Printed Name Schedule Of Warranty This Serves As Warranty For _______________________________________________ In The Barangay Government Of Tetuan. Item No. Description Quantity Warranty _____________________________ Bidder Signature Over Printed Name Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply / Delivery Of The 1 Lot Various Disaster Equipment B. Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 “subcontracting Is Not Allowed.” 12 The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) At Cgso, Tetuan, Zamboanga City For This Project . 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P1,230.00; If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than P3, 075.00; If Bid Security Is In Surety Bond. 19.3 The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 [list Here Any Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It.] 21.2 [list Here Any Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity.] Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Abroad, State:] “the Delivery Terms Applicable To The Contract Are Ddp Delivered [indicate Place Of Destination]. In Accordance With Incoterms.” [for Goods Supplied From Within The Philippines, State:] “the Delivery Terms Applicable To This Contract Are Delivered Barangay Hall Of Tetuan, Zamboanga City. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is [indicate Name(s)]. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: Select Appropriate Requirements And Delete The Rest. A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E.training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. [specify Additional Incidental Service Requirements, As Needed.] The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: Select Appropriate Requirements And Delete The Rest. A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B.in The Event Of Termination Of Production Of The Spare Parts: I.advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii.following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Is Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Three (3) Months. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 [if Partial Payment Is Allowed, State] “the Terms Of Payment Shall Be As Follows: _____________.” 4 The Inspections And Tests That Will Be Conducted Are: Quality Inspection By Accounting, Coa, Cgso And End User. Republic Of The Philippines) City Of _____________________) S.s Bid Securing Declaration Invitation To Bid No.: [insert Reference Number] To: Barangay Government Of Tetuan, Bids And Awards Committee M. Natividad Street, Tetuan Zamboanga City I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And; C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ___ Day Of [month][year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Barangay Council Of Tetuan Wishes To Receive Bids For The Supply And Delivery Of The 1 Lot Various Disaster Equipment With Tetuan 24-0021 The Procurement Project (referred To Herein As “project”) Is Composed Of The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For The Annual Budget 2024 Under The Other Maintenance And Operating Expenses (omoe) In The Amount Of Two Hundred Sixteen Thousand Three Hundred Fifty Pesos ( 216,350.00) 2.2. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.b Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 8. Pre-bid Conference No Pre-bid Conference 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty Days [120]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On January 09, 2025 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Indicated In Paragraph 6 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids On January 13, 2024 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Specified In Paragraph 8 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon13 Jan 2025
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
annual Representations And Certifications (may 2024)|13|332722|600||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
a Material Irpod Is Available At The Bpmi Website.
please Specify (if Other Than 60 Days) ______________ Days.if You Are Submitting Your Quote Via Email Or Neco,please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be 'issued' By The Government When Copies Are Either Depositedin The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
2.2 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
4.2 First Article Test/inspection And Report Submittal-(contractor Destructive Or Non Destructive).
the Contractor Shall Conduct First Article Test/inspection On ; Three (3); Unit(s) In Accordance With The Irpod Requirements Specified In This Contract/purchase Order.
the Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).
first Article Approval Is Required Prior To Manufacturing The Pco.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
the Packaging Label Shall Be Marked With The Nomenclature Cited On The Irpod. date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev). date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev). date Of First Submission=045 Dac
submit For Approval One Package Iaw Di-qcic-8874 Which Identifies The Lower Tier Suppliers Of Material, Supplies And Services.
this Package Shall Be Submitted Within 45 Days After Contract Award To The Contracting Officer, Navsup-wss, Code N9433.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8874a Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8874(latest Rev). date Of First Submission=asreq
submittal Requirements Specified In The Irpod, Under Paragraph 6.1, Contract Data Requirements, Shall Be In Accordance With Either Of The Following:
1. When Specified For Contractor Submittal Of Reports Prior To Manufacturing For Approval, Then The Report Shall Be Submitted For Approval, In Accordance With The Contract Delivery Schedule. Authorization To Start Production Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
resubmittal Not Later Than 45 Days After Disapproval.
2. When Specified For Contractor Submittal Of Report Per The Contract Delivery Schedule, Then The Report Shall Be Submitted For Approval Per The Contract Delivery Schedule And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
dindtia80809a Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Report Package To Be Iaw Did Di-ndti-80809(latest Rev).
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
transportation Of Supplies By Sea (oct 2024)|2|||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory.
unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The
number Of Days Pricing Is Valid
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
the Bpmi Ecommerce Website Is Being Moved To A New Url (https://logistics.unnpp.gov/ecommerce) Effective 17 July, 2019. The Current Site Address (https://logistics.bpmionline.net) Will Be Active Until 1 August, 2019, But We Encourage You To Ensure You Are Able To
access The New Website At Your Earliest Convenience. If You Have Any Questions, Please Contact The Poc Listed Below.
n9432.41 Danny O'neal, Ph: 717-605-4954, Email: Danny.l.oneal8.civ@us.navy.mil
\
1. If The Irpod For An Individual Item Calls For Mil-p-24503, Please Advise The Name Of The Manufacturer And The Grade Of The Mil-p-24503 Material That You Will Be Offering For That Line Item:
mil-p-24503 Manufacturer's Name _____________________________.
mil-p-24503 Material Grade __________________________________.
2. If The Irpod For An Individual Item Calls For Reports Of Test And Inspection (rotis), The Documentation Is Due 40 Days Prior To Delivery.
3. If The Irpod For An Individual Item Calls For Mil-i-45208 Higher Level Inspection System Requirements, Clause 52.242-11 -- Higher Level Contract Quality Requirement Applies.
4. When Applicable, First Article Test Reports Are Due Within 45 Days From The Date Of Order.
5. "all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
6. Any Subsequent Contract Awarded Will Be A (do) Rated Order. See Clause 52.211-14 For Additional Information.
7. The Government Reserves The Right To Place A Single Order Or Multiple Orders.
8. Please Provide A Quoted Delivery Date For Each Line Item.
9. Unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation.
please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via Email Or Neco,please Specify The Number Of Days Pricing Is Valid.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
6.3 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
mark Packaging Label With Nomenclature Cited In Irpod. date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev). date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
contract Definitization (may 2023)|5|a Firm Fixed Price Purchase Order|firm Fixed Price|repair T&e Proposal: Not To Exceed 90 Days After Award Of Purchase Order Definitization Not To Exceed 180 Days After Award Of Purchase Order|firm Fixed Price|tbd|
limitation Of Government Liability (apr 1984)|2|tbd|tbd|
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||x||
annual Representations And Certifications (may 2024)|13|333998|700||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
if You Have Questions Concerning This Rfq, Please Contact The P.o.c. Carly
gassert, Ph 717-605-5693, Fax 717-605-1569, Email:carly.a.gassert.civ@us.navy.mil
note: This Request For Quotation (rfq) Is Being Issued Only To Open, Inspect
and Evaluate The Subject Item(s) Required To Be Repaired. After Receipt Of
your Quotation, A Contract Will Be Issued, And The Item(s) Needing Repaired
will Be Shipped To Your Company For Opening, Inspection And Evaluation.
unless Otherwise Specified, Your Quotation Is Valid For 60 Days.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,
delivery Orders) And Modifications Related To The Instant Procurement Are
considered To Be 'issued' By The Government When Copies Are Either Deposited
in The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce
methods, Such As Email. The Government's Acceptance Of The Contractor's
proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As
detailed Herein.
with Your Quote For Teardown And Evaluation Pricing, Please Provide The Following Additional Information:
repair Turn Around Time (rtat) Defined As Induction Start Date To End/final Delivery Date (in Days).
throughput Constraint Defined As Total Assets To Be Repaired Monthly After Initial Delivery Commences. A Throughput Of 0000/month Reflects No Throughput Constraint.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
1.2 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Filter Element Flui .
2. Applicable Documents
2.1 Applicable Documents; The Individual Repair Parts Ordering Data, (irpod) Is Located In Section "k" Of The Contract/purchase Order As An Attachment.
2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
2.3 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
drawing Data=820-2177935 |53711| | |c| | | |
drawing Data=820-4383862 |07107| | |f| | | |
drawing Data=820-4383863 |07107| | |c| | | |
drawing Data=820-4383864 |07107| | |c| | | |
drawing Data=820-4383865 |07107| | |c| | | |
drawing Data=820-4383866 |07107| | |c| | | |
drawing Data=820-4383867 |07107| | |c| | | |
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod) As An Attachment To The Contract/purchase Order.
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
tagand Mark The Packaging Of Each Assembly With A Note Stating "this Assembly Meets The Cleanliness Requirements Of Mil-std-767". Clean Per Mil Std 767.packaging And Pack Per Mil Prf 23199, Greenpoly Bags Req. After Packaging,in The Greennpoly The Item Shall Be
placed In A Second Watervapor Proof Bag, Then Placed Cushioned To Prevent Movement And Placed In The Rigid Box.
mark The Packaging Label With The Nomenclature:
element Assy
in Lieu Of:
filter Element Flui
\ date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev). date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev). date Of First Submission=030 Dac
submit For Approval One Package In Accordance With Di-qcic-8874 Which Identifies The Lower Tier Suppliers Of Material, Supplies And Services.
package Shall Be Submitted Within 45 Days After Contract Award To The Contracting Officer, Navsup-wss, Code N9433.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8874 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Report Package To Be Iaw Did Di-qcic-8874(latest Rev).
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon9 Jan 2025
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
first Article Approval--contractor Testing (sep 1989)|10|1|0001|45|30|n/a|n/a|0001|45|x||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
annual Representations And Certifications (may 2024)|13|333998|700||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3||||
please Take Note Of Fat Requirements On This Procurement.
a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory.
unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Daysafter The Closing Date As Indicated On The Quotation. Please Specify (if Otherthan 60 Days) ______________ Days. If You Are Submitting Your Quote Via Emailor Neco, Please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
2.2 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 First Article Test/inspection And Report Submittal-(contractor Destructive Or Non Destructive).
the Contractor Shall Conduct First Article Test/inspection On ;one (1); Unit(s) In Accordance With The Irpod Requirements Specified In This Contract/purchase Order.
the Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).
first Article Approval Is Required Prior To Manufacturing The Pco.
4.2 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
mark The Packaging Label With The Nomenclature:
se Rng Cee Can Jt C
in Lieu Of:
seal Ring,nuclear C
\ date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev). date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev). date Of First Submission=045 Dac
submit For Approval One Package Iaw Di-qcic-8874 Which Identifies The Lower Tier Suppliers Of Material, Supplies And Services.
this Package Shall Be Submitted Within 45 Days After Contract Award To The Contracting Officer, Navsup-wss, Code N9433.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8874a Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8874(latest Rev). date Of First Submission=asreq
submittal Requirements Specified In The Irpod, Under Paragraph 6.1, Contract Data Requirements, Shall Be In Accordance With Either Of The Following:
1. When Specified For Contractor Submittal Of Reports Prior To Manufacturing For Approval, Then The Report Shall Be Submitted For Approval, In Accordance With The Contract Delivery Schedule. Authorization To Start Production Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
resubmittal Not Later Than 45 Days After Disapproval.
2. When Specified For Contractor Submittal Of Report Per The Contract Delivery Schedule, Then The Report Shall Be Submitted For Approval Per The Contract Delivery Schedule And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
dindtia80809a Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Report Package To Be Iaw Did Di-ndti-80809(latest Rev).
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Closing Soon15 Jan 2025
Tender AmountRefer Documents
Details: Combined Synopsis Solicitation (i) This Is A Combined Synopsis/solicitation For Relocation And Removal Services At James A. Haley Veterans Hospital (jahvh), As Prepared In Accordance With The Format In Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. A Firm-fixed Price Purchase Order Is Anticipated. (ii) The Solicitation Number Is 36c24825q0253 And Is Issued As A Request For Quotation (rfq).
(iii) The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-02 (eff. 1/3/2025). (iv) This Procurement Is Set-aside Based On An Order Of Priority As Established In 38 U.s.c. 8127. the Combined Synopsis/solicitation Is: 100% Set-aside For Service-disabled Veteran Owned Small Business (sdvosb). The Associated North American Industrial Classification System (naics) Code For This Requirement Is Naics Code 484210: Used Household And Office Goods Moving Code And Has A Size Standard Of $34 Million. to Be Considered As A Service-disabled Veteran Owned Small Business (sdvosb), Prospective Offerors Must Be A Verified Sdvosb On The U.s. Small Business Administration (sba) Veteran Small Business Certification (vetcert) Page (https://veterans.certify.sba.gov/) At The Date And Time Set For Receipt Of Offers. responses Shall Be On All Or None Basis, No Partial Submissions Will Be Accepted. Quote Must Be Valid For 90 Days. All Offerors Must Be Registered In System For Award Management (sam) At Https://www.sam.gov At Time Offers Are Due To Be Considered For An Award Of A Federal Contract. Registration Must Be Complete And Not Missing Elements Such As Representations And Certifications. (v) Line-item Numbers (lins): price Schedule
item Number
description Of Supplies/services
quantity
unit
unit Price
amount
0001 8.00
mo
__________________
__________________ the Contractor Shall Provide All Management, Tools, (electrical And Manual), Supplies, Equipment And Labor Necessary To Perform Relocation And Removal Services (to Include Assembly And Disassembly Of Furniture/equipment) In Accordance With (iaw) The Performance Work Statement (pws).
contract Period: Base
pop Begin: 2-1-2025
pop End: 09-30-2025
principal Naics Code: 484210 - Used Household And Office Goods Moving
product/service Code: R699 - Support - Administrative: Other 1001 12.00
mo
__________________
__________________ the Contractor Shall Provide All Management, Tools, (electrical And Manual), Supplies, Equipment And Labor Necessary To Perform Relocation And Removal Services (to Include Assembly And Disassembly Of Furniture/equipment) In Accordance With (iaw) The Performance Work Statement (pws).
contract Period: Option 1
pop Begin: 10-01-2025
pop End: 09-30-2026
principal Naics Code: 484210 - Used Household And Office Goods Moving
product/service Code: R699 - Support - Administrative: Other 2001 12.00
mo
__________________
__________________ the Contractor Shall Provide All Management, Tools, (electrical And Manual), Supplies, Equipment And Labor Necessary To Perform Relocation And Removal Services (to Include Assembly And Disassembly Of Furniture/equipment) In Accordance With (iaw) The Performance Work Statement (pws).
contract Period: Option 2
pop Begin: 10-01-2026
pop End: 09-30-2027
principal Naics Code: 484210 - Used Household And Office Goods Moving
product/service Code: R699 - Support - Administrative: Other 3001 12.00
mo
__________________
__________________ the Contractor Shall Provide All Management, Tools, (electrical And Manual), Supplies, Equipment And Labor Necessary To Perform Relocation And Removal Services (to Include Assembly And Disassembly Of Furniture/equipment) In Accordance With (iaw) The Performance Work Statement (pws).
contract Period: Option 3
pop Begin: 10-01-2027
pop End: 09-30-2028
principal Naics Code: 484210 - Used Household And Office Goods Moving
product/service Code: R699 - Support - Administrative: Other 4001 12.00
mo
__________________
__________________ the Contractor Shall Provide All Management, Tools, (electrical And Manual), Supplies, Equipment And Labor Necessary To Perform Relocation And Removal Services (to Include Assembly And Disassembly Of Furniture/equipment) In Accordance With (iaw) The Performance Work Statement (pws).
contract Period: Option 4
pop Begin: 10-01-2028
pop End: 09-30-2029
principal Naics Code: 484210 - Used Household And Office Goods Moving
product/service Code: R699 - Support - Administrative: Other grand Total
__________________ delivery Schedule: james A. Haley Veterans Hospital (jahvh) 13000 Bruce B. Down Blvd.
tampa, Fl 33612-4745
(vi) See Performance Work Statement (pws) (attachment 1).
(vii) Performance Monitoring: See Performance Standards And Quality Measurement In The Pws. (viii) The Provision At 52.212-1, Instructions To Offerors -- Commercial, Applies To This Acquisition And The Following Clauses And Instructions Are Added As:
addendum To Far 52.212-1 Instructions To Offerors Commercial Products And Commercial Services (sep 2023)
the Following Provisions Are Incorporated Into 52.212-1 As An Addendum To This Solicitation:
additional Instructions To Offerors-
provisions That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available.
offerors Must Ensure That Proposals Are Submitted Timely To Ensure Delivery And Receipt By The Due Date And Time Identified On This Combined Synopsis/solicitation. quote Packages Shall Be Submitted Electronically Via Email, To Jose.ortiz-velez@va.gov. in Addition To The Requirements Of Far 52.212-1, Offerors Shall: 1. Signed And Dated The Combined Synopsis/solicitation. 2. Submit A Narrative Explanation On How Relocation And Removal Services Will Be Executed/provided In Accordance With (iaw) The Pws (contingency Plan/quality Control/etc.).
3. Complete And Sign The Limitations On Subcontracting Clause In Vaar 852.219-75. Contractor Must Complete The Limitation Of Subcontracting Certification (see Vaar 852.219-75 Clause Below) And Submit With Quote.
4. Submit Up To Three (3) Past Performance References, Including Both The Reference Information And Details Of The Work Performance; Past Performance Information Shall Be Recent And Relevant Work. contract:
start Date Of Contract:
end Date Of Contract:
reference S Name And Phone Number:
type Of Work Performed & Product Used:
the Contracting Officer Will Reserve The Right To Utilize All Available Records (e.g., Ppiprs And Fapiis) While Evaluating Past Performance From Each Offeror. failure To Provide Information Above May Result In A Rejection Of Offer. The Government Intends To Make A Single Award To One Offeror. (ix) The Provision At 52.212-2, Evaluation-commercial Products And Commercial Services, Applies To This Acquisition, And The Specific Evaluation Criteria To Be Included In Paragraph (a) Of This Provision. far 52.212-2 Evaluation Commercial Products And Commercial Services (nov 2021) (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers:
see Addendum To Far 52.212-2 (b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s). (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.
(end Of Provision)
addendum To Far 52.212-2 Evaluation- Commercial Products And Commercial Services (nov 2021) the Following Provisions Are Incorporated Into 52.212-2 As An Addendum To This Solicitation:
evaluations Approach:
the Government Will Evaluate Quotes Using In Accordance Far 13. The Government Will Conduct An Initial Preliminary Review Of All Quotations To Determine Suitability. Offerors Must Meet The Minimum Solicitation Requirements To Be Considered Suitable. Offerors Determined To Be Suitable Will Move To A Comparative Evaluation Where Quotations Will Be Compared To One Another To Determine Which Provides The Best Benefit/value To The Government Using The Following Factors:
past Performance
price
past Performance: Past Performance Evaluations Will Be Conducted Using Information Submitted By The Offerors. When Evaluating Past Performance, The Government Will Consider The Currency And Relevancy Of The Information, The Source Of The Information, The Context Of The Data, And The General Trends In The Contractor S Performance. Offerors Without Available Relevant Past Performance History Will Not Be Evaluated Favorably Or Unfavorably. The Government Reserves The Right To Obtain Past Performance Information From Other Available Sources Including By Not Limited To Contractor Performance Assessment Reporting System (cpars).
price: The Government Will Evaluate The Price By Adding The Total Of All Line-item Prices, Including All Options. The Total Evaluated Price Will Be That Sum. Per Far 13.106-3 A (1), The Government Will Base Price Reasonableness On Competitive Quotations Or Offers Being Submitted.
responses Should Contain Your Best Terms, Conditions.
information Not Contained In Quotes Will Not Be Considered During The Evaluation. The Government Intends To Make Award Selection Without Any Follow Up Communication But May Determine After Evaluating Submitted Quotes That Clarification May Be Necessary And Conduct Them As Appropriate. The Government Reserves The Right To Make No Award If No Quotes Meet The Requirements Of This Solicitation. to Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows:
the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition.
(x) Quotes From Offerors Are Advised To Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications -- Commercial Items, With Its Offer If Has Not Been Completed On Sam.gov. Offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required.
(xi) The Clause At 52.212-4, Contract Terms And Conditions -- Commercial Items, Applies To This Acquisition And The Following Clauses Are Added As Addenda:
52.252-2 Clauses Incorporated By Reference (feb 1998)
this Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Http://www.acquisition.gov/far/index.html https://www.va.gov/oal/library/vaar/index.asp 52.203-3 Gratuities (apr 1984)
52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights (nov 2023)
52.204-4 Printed Or Copied Double-sided On Postconsumer Fiber Content Paper (may 2011)
52.204-7 System For Award Management (oct 2018)
52.204-13 System For Award Management Maintenance (oct 2018)
52.204-18 Commercial And Government Entity Code Maintenance (aug 2020)
52.209-5 Certification Regarding Public Matters (aug 2020)
52.209-7 Information Regarding Responsibility Matters (oct 2018)
52.209-9 Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018)
52.212-3 Offeror Representations And Certifications Commercial Products And Commercial Services (feb 2024)
52.228-5 Insurance Work On A Government Installation (jan 1997)
52.232-39 Unenforceability Of Unauthorized Obligations (jun 2013)
52.232-40 Providing Accelerated Payments To Small Business Subcontractors (mar 2023)
52.233-2 Service Of Protest (sep 2006)
52.233-4 Applicable Law For Breach Of Contract Claim (oct 2004)
52.242-17 Government Delay Of Work (apr 1984)
852.203-70 Commercial Advertising (may 2018)
852.233-70 Protest Content/alternative Dispute Resolution (oct 2018)
852.233-71 Alternate Protest Procedure (oct 2018) (end Of Clause) vaar 852.219-73 Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) (deviation) (a) Definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb : (1) Means A Small Business Concern (i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar 802.201, Surviving Spouse Definition). (ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran. (iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document. (iv) The Business Has Been Certified For Ownership And Control Pursuant To 38 U.s.c. 8127, 13 Cfr 128, And Is Listed As Certified In The Sba Certification Database At Https://veterans.certify.sba.gov/; And (v) The Business Agrees To Comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size, Government Contracting, And The Veteran Small Business Certification Program At 13 Cfr Parts 121, 125, And 128. (2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16). (3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632). (4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)). (5) The Term Sdvosb Participant Or Certified Sdvosb Means A Small Business That Has Been Certified In The Sba Veteran Small Business Certification Program And Listed In The Sba Certification Database (see 13 Cfr 128.102). (b) General. For A Concern To Submit An Offer And Be Eligible For The Award Of An Sdvosb Set-aside Or Sole Source Contract, The Concern Must Qualify As A Small Business Concern Under The Size Standard Corresponding To The Naics Code Assigned To The Contract And Be Listed As An Sdvosb Participant In The Sba Certification Database As Set Forth In 13 Cfr 128. (1) Offers Received From Entities That Are Not Certified Sdvosbs And Listed In The Sba Certification Database At The Time Of Offer Shall Not Be Considered. (2) Any Award Resulting From This Solicitation Shall Be Made To A Certified Sdvosb Listed In The Sba Certification Database Who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award. (3) The Requirements In This Clause Apply To Any Contract, Order, Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences. (c) Representation. Pursuant To 38 U.s.c. 8127(e), Only Certified Sdvosbs Listed In The Sba Certification Database Are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligible And Certified Sdvosb As Defined In This Clause, 13 Cfr 121, 125, And 128, And Vaar Subpart 819.70. (d) Agreement/los Certification. When Awarded A Contract Action, Including Orders Under Multiple Award Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size, And Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontracting (los) Requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. For Limitations On Subcontracting, Only Certified Sdvosbs Listed In The Sba Certification Database (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Required Los Certification Requirements In This Solicitation (see 852.219 75 Or 852.219 76 As Applicable). These Requirements Are Summarized As Follows: (1) Services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/ Vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract. (2) Supplies/products. (i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract. (ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13 Cfr 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements. (3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database. (4) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database. (5) Subcontracting. An Sdvosb Subcontractor Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Certified And Listed In The Sba Certification Database To Count As Similarly Situated. Any Work That A First Tier Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6. (e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows:
[x] By The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or
[] By The End Of The Performance Period For Each Order Issued Under The Contract. (f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Complies With The Requirements In 13 Cfr 128.402 And The Managing Joint Venture Partner Makes The Representations Under Paragraph (c) Of This Clause. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants. (g) Precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sba Veteran Small Business Certification Program And The Va Veterans First Contracting Program. (h) Misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company S Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406 2 Causes For Debarment).
(end Of Clause) vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) (deviation) (a) Pursuant To 38 U.s.c. 8127(l)(2), The Offeror Certifies That (1) If Awarded A Contract (see Far 2.101 Definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: (i) [x] Services. In The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6. (ii) [] General Construction. In The Case Of A Contract For General Construction, The Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 85% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (iii) [] Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, The Contractor Will Not Pay More Than 75% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 75% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution. (3) If Va Determines That An Sdvosb/ Vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All The Following: (i) Referral To The Va Suspension And Debarment Committee. (ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And (iii) Prosecution For Violating 18 U.s.c. 1001. (b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. Contracting Officers May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed. (c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate. (d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed, And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award.
certification
i Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror].
printed Name Of Signee: ___________
printed Title Of Signee: _____________
signature: ____________
date: ______________
company Name And Address: _______________
(end Of Clause)
vaar 852.232-72 Electronic Submission Of Payment Requests (nov 2018) (a) Definitions. As Used In This Clause (1) Contract Financing Payment Has The Meaning Given In Far 32.001. (2) Designated Agency Office Means The Office Designated By The Purchase Order, Agreement, Or Contract To First Receive And Review Invoices. This Office Can Be Contractually Designated As The Receiving Entity. This Office May Be Different From The Office Issuing The Payment. (3) Electronic Form Means An Automated System Transmitting Information Electronically According To The Accepted Electronic Data Transmission Methods And Formats Identified In Paragraph (c) Of This Clause. Facsimile, Email, And Scanned Documents Are Not Acceptable Electronic Forms For Submission Of Payment Requests. (4) Invoice Payment Has The Meaning Given In Far 32.001; And (5) Payment Request Means Any Request For Contract Financing Payment Or Invoice Payment Submitted By The Contractor Under This Contract. (b) Electronic Payment Requests. Except As Provided In Paragraph (e) Of This Clause, The Contractor Shall Submit Payment Requests In Electronic Form. Purchases Paid With A Government-wide Commercial Purchase Card Are An Electronic Transaction For Purposes Of This Rule, And Therefore No Additional Electronic Invoice Submission Is Required. (c) Data Transmission. A Contractor Must Ensure That The Data Transmission Method And Format Are Through One Of The Following: (1) Va S Electronic Invoice Presentment And Payment System At The Current Website Address Provided In The Contract. (2) Any System That Conforms To The X12 Electronic Data Interchange (edi) Formats Established By The Accredited Standards Center (asc) And Chartered By The American National Standards Institute (ansi). (d) Invoice Requirements. Invoices Shall Comply With Far 32.905. (e) Exceptions. If, Based On One Of The Circumstances In This Paragraph (e), The Contracting Officer Directs That Payment Requests Be Made By Mail, The Contractor Shall Submit Payment Requests By Mail Through The United States Postal Service To The Designated Agency Office. Submission Of Payment Requests By Mail May Be Required For (1) Awards Made To Foreign Vendors For Work Performed Outside The United States. (2) Classified Contracts Or Purchases When Electronic Submission And Processing Of Payment Requests Could Compromise The Safeguarding Of Classified Or Privacy Information. (3) Contracts Awarded By Contracting Officers In The Conduct Of Emergency Operations, Such As Responses To National Emergencies. (4) Solicitations Or Contracts In Which The Designated Agency Office Is A Va Entity Other Than The Va Financial Services Center In Austin, Texas; Or (5) Solicitations Or Contracts In Which The Va Designated Agency Office Does Not Have Electronic Invoicing Capability As Described Above.
(end Of Clause)
supplemental Insurance Requirements
â In Accordance With Far 28.307-2 And Far 52.228-5, The Following Minimum Coverage Shall Apply To This Contract:
â (a)â Workers' Compensation And Employer S Liability:â Contractors Are Required To Comply With Applicable Federal And State Workers' Compensation And Occupational Disease Statutes.â If Occupational Diseases Are Not Compensable Under Those Statutes, They Shall Be Covered Under The Employer's Liability Section Of The Insurance Policy, Except When Contract Operations Are So Commingled With A Contractor's Commercial Operations That It Would Not Be Practical To Require This Coverage.â Employer's Liability Coverage Of At Least $100,000 Is Required, Except In States With Exclusive Or Monopolistic Funds That Do Not Permit Workers' Compensation To Be Written By Private Carriers.
â (b)â General Liability: $500,000.00 Per Occurrences.
â (c)â Automobile Liability: $200,000.00 Per Person; $500,000.00 Per Occurrence And $20,000.00 Property Damage.
â (d)â The Successful Bidder Must Present To The Contracting Officer, Prior To Award, Evidence Of General Liability Insurance Without Any Exclusionary Clauses For Asbestos That Would Void The General Liability Coverage.
(end Of Clause)
(xii) The Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, Applies To This Acquisition And The Following Additional Far Clauses Cited In The Clause Are Applicable To The Acquisition:
52.203 6 Restrictions On Subcontractor Sales To The Government (jun 2020), With Alternate I (nov 2021)
52.204-10 Reporting Executive Compensation & First-tier Subcontract Awards (jun 2020)
52.209-6 Protecting The Government S Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (nov 2021)
52.219-8 Utilization Of Small Business Concerns (feb 2024)
52.219-27 Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) 52.219-28 Post Award Small Business Program Representation (feb 2024)
52.222-3 Convict Labor (jun 2003)
52.222-19 Child Labor--cooperation With Authorities And Remedies (feb 2024)
52.222-21 Prohibition Of Segregated Facilities (apr 2015)
52.222-26 Equal Opportunity (sep 2016)
52.222-35 Equal Opportunity For Veterans (jun 2020)
52.222-36 Equal Opportunity For Workers With Disabilities (jun 2020)
52.222-37 Employment Reports On Veterans (jun 2020)
52.222-40 Notification Of Employee Rights Under The National Labor Relations Act (dec 2010)
52.222-41 Service Contract Labor Standards (aug 2018)
52.222-42 Statement Of Equivalent Rates For Federal Hires (may 2014)
52.222-43 Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year And Option Contracts) (aug 2018)
52.222-50 Combating Trafficking In Persons (nov 2021)
52.222-54 Employment Eligibility Verification (may 2022)
52.222-55 Minimum Wages Under Executive Order 14026 (jan 2022), With Deviation (oct 2023)
52.222-62 Paid Sick Leave Under Executive Order 13706 (jan 2022)
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving (jun 2020)
52.225-1 Buy American Supplies (oct 2022)
52.225-3 Buy American--free Trade Agreements--israeli Trade Act (nov 2023)
52.225-13 Restrictions On Certain Foreign Purchases (feb 2021)
52.229-12 Tax On Certain Foreign Procurements (feb 2021)
52.232-33 Payment By Electronic Funds Transfer System For Award Management (oct 2018) (end Of Clause)
52.217-8 Option To Extend Services (nov 1999)
the Government May Require Continued Performance Of Any Services Within The Limits And At The Rates Specified In The Contract. These Rates May Be Adjusted Only Because Of Revisions To Prevailing Labor Rates Provided By The Secretary Of Labor. The Option Provision May Be Exercised More Than Once, But The Total Extension Of Performance Hereunder Shall Not Exceed 6 Months. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within Any Time Prior To Expiration Of The Contract.
(end Of Clause)
52.217-9 Option To Extend The Term Of The Contract (mar 2000)
the Government May Extend The Term Of This Contract By Written Notice To The Contractor Any Time Prior To Expiration Of The Contract; Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 15 Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension.
(b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause.
(c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed Five (5) Years.
(end Of Clause)
wage Determination
the Dol Wage Determination For The Specific Locality Is Available At Www.sam.gov; Please Note The Listing Below Is Not All-inclusive Wage Determination Of Each Area Of Performance. It Is The Contractor S Responsibility To Obtain And Evaluate Each Wage Determination Locality.
area: Florida Counties Of Hernando, Hillsborough, Pasco, Pinellas
wage Determination No.: 2015-4571
revision No.: 25
date Of Last Revision: 12/23/2024
https://sam.gov/wage-determination/2015-4571/25 (xiii) There Are No Additional Contract Requirements, Terms, Or Conditions.
(xiv) The Defense Priorities And Allocations System (dpas) Ratings Are Not Applicable.
(xv) Site-visit: None.
vendor Questions: All Questions Pertaining To This Solicitation Shall Be In Writing, Sent By Email To Jose.ortiz-velez@va.gov And Must Be Received No Later Than (nlt) Sunday, January 12, 2025, By 11:59 Pm Est. No Further Questions Will Be Accepted After That Date And Time.
answers To Vendor Questions: Answers To Vendor Questions Will Be Posted Via Amendment On Www.sam.gov (contract Opportunities) On Monday, January 13, 2025, By 5:00 Pm Est.
quotes Must Be Emailed (along With The Completed Los Certification In Vaar 852.219-75 (signed Above) And All Supporting Documents Required) To Jose.ortiz-velez@va.gov And Received Nlt 12:00 Pm Est. On Wednesday, January 15, 2024.
quotes May Be Submitted On This Document (if You Use This Form, Include Your Company Information Name, Address, Phone Number, Poc, Poc Email, And Unique Entity Identifier (uei) #) Or The Vendor S Own Form. no Late Quotes Will Be Accepted. (xvi) For Questions Regarding The Solicitation, Please Contact Mr. Jose E. Ortiz-velez At Jose.ortiz-velez@va.gov.
end Of Document
Caraga Regional Hospital Tender
Healthcare and Medicine
Philippines
Closing Date24 Jan 2025
Tender AmountPHP 1.8 Million (USD 31 K)
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Bids And Awards Committee Ooooooo ---------------------------------------------------------------------------------------------------------- @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Invitation To Bid Ib No. 2024-01-16 (116) Procurement Of Outsource Calibration Of Medical Equipment (early Procurement Activity) Abc: ₱ 1,800,000.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy2025 Raf/gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of One Million Eight Hundred Thousand Pesos Only ( Php1,800,000.00 ) Under The Contract For The Procurement Of Outsource Calibration Of Medical Equipment (early Procurement Activity). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding, To Wit: Line Item Code Description Qty Unit Of Measure Unit Cost Total Cost 1 Outsource Calibration Of Medical Equipment 1 Lot 1,800,000.00 1,800,000.00 Terms Of Reference 1. Service Provider Must Be Registered At Sec To Engage In, Conduct, And Carry On The Business Of Preventive Maintenance, Repair, Calibration Of All Kinds Of Medical Equipment, And Test And Measurement Equipment. 2. Calibration Equipment To Be Used Must Have Valid And Nist Traceable Certificate Of Calibration Or Other Internationally Accepted Standards Conducted By Iso-certified Calibration Laboratory Only. 3. Electrical Safety Analyzer To Be Used Must Be Compliant With Safety Features: Anzi Z540; Electromagnetic Compatibility Directive: Emc – Directive 89/336/eec And 2004/108/ec As Amended By 92/31/eec, 93/68/eec And Directive 91/263/eec. 4. Manufacturer Of Calibration Equipment To Be Used Must Be Accredited By Lab / Nab. 5. Service Provider Must Own Complete Set Of Test Equipment To Be Used And Provide Proof Of Ownership & Certificates. 6. Service Provider Must Be In The Business Of Test & Measurement Equipment. 7. Service Provider Must Employs At Least Five (5) Licensed And Full-time Biomedical Technicians. 8. Service Provider Must Deploy Trained And Technicians Only To Conduct The Preventive Maintenance And Calibration Services. 9. Calibration Services Must Be Done In-house And Monitored By The Hospital’s In-house Biomedical Technician & Engineering Department. 10. Service Provider Must Has History Of Similar Projects With At Least Two Government Tertiary Hospitals For Iso 9001 Certification In The Last 2 Years. 11. Service Provider Must Issue Complete Service Report, Preventive Maintenance Report, And Calibration Report. Reports Must Be In Digital Format With Printed Hard Copy. 12. All Necessary Office Equipment Like Computers, Printers, Pens, Etc… Will Be Provided By The Service Provider. 13. Equipment Found To Be Unserviceable After Calibration Must Not Be Included In The Billing Statement For Payment. Hence, It Can Be Converted To Other Equipment Found To Be Lacking In Quantity Or Maybe Not Included In The List. 14. Bidder Shall Provide Detailed/itemized Cost Of The Financial Proposal. This Is A Lot Bid. Failure To Quote One Item Is Disqualified. 15. Bidder Shall Have Satellite Office In Mindanao. This Is Important Especially After Sales. 16. Technician / Engineer Must Conduct Quarterly Visit In A Year. This Means That Four (4) Visits Are Required And Shall Provide Service Report For Preventive Maintenance Per Equipment. 17. The Procuring Entity Has An Option To Extend Or Renewal Of Contract Provided That Performance Satisfies The Pe. Extension Of Contract Will Not Exceed One (1) Year. 18. This Agreement Shall Be Valid For One (1) Year Until All Listed Equipment Is Already Consummated And Performed Provided With No Other Concerns And No Gross Contract Violation And Negligence. 19. In The Event That There Is Equipment To Be Calibrated Not In The List, The Contractor And Crh Shall Agree The Conditions And Other Terms To Be Amended. 20. Must Submit Service Report With Recommendations On The Machines Monitored If Found To Be Unserviceable. 21. Must Include Adjustment Or Minor Correction On The Machines If Found To Be Inaccurate. 22. The Bidders Are Also Required To Conduct Training On Preventive Maintenance To Biomedical Staff And End-user. Terms Of Reference Is Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3. (ra 9184) The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent (25%) Of The Abc. Slcc Must Be Within 2 Years From The Submission Of Bids. (based On The Completion Date). Slcc Shall Be The Same Or Similar In Nature, Which Shall Be Determined By The Bac. For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, At Procurement Section, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 04, 2024 – January 16, 2024 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference December 17, 2024 At 9:00 O’clock In The Morning Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/89639272530?pwd=tqlkfioa9yqmtjk61nwdbvzstj57f1.1 Meeting Id: 896 3927 2530 Passcode: 837852 Deadline Of Submission Of Bids January 16, 2024 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com . Opening Of Bids January 16, 2024 At 2:00 P.m. Via Zoom Platform. Join Zoom Meeting Https://us06web.zoom.us/j/81492461816?pwd=e77jr6i1zp5ncb4rkp8rj7mal6tmlp.1 Meeting Id: 814 9246 1816 Passcode: 019339 Complete Philippine Bidding Documents Please Click The Link Below For The Complete Pbd: Https://drive.google.com/drive/folders/1fdrudju0zommvuw-vzhugwwffzzjfdrf?usp=sharing Payment Of Bidding Documents Php 5,000.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Phlippine Bidding Documents Can Be Accessed In The Philgeps, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before January 16, 2024 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On January 16, 2024 At 2:00 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link : Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 Direct Line: (086) 826-9058 Mobile Nos. 09850508783 (smart/tnt) 09539212832 (globe/tm) E-mail Address: Crhprocurement.bac@gmail.com Approved By: (sgd) Atty. Ma. Flordelin T. Ensomo, Cpa Attorney Iv Chairman, Bids And Awards Committee
City Government Iligan Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 6.7 Million (USD 116.1 K)
Details: Description Invitation To Re-bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund / Sb No. 1 Cy 2023 Intend To Apply The Sum Of P6,743,095.30 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Halfway House Including Amenities, Brgy. Rogongon, Iligan City With Project No. Cb(b)-24-123 (ceo-infra) Re-bid. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Construction Of Halfway House Including Amenities, Brgy. Rogongon, Iligan City • Earth Works - Excavation For Foundations , Septic Vault,ground Tank, Grease Trap And Catch Basin - Backfilling, Earth Fill And Gravel Fill For Foundations And Building Area • Concrete Works - Concreting For Foundations ,columns, Beams, Ground Floor And 2nd Floor Slabs, Staircase , Roof, Septic Vault, Ground Tank, Grease Trap And Catch Basin - Formworks For Columns And Beams, And Scaffoldings For Building Construction • Masonry Works - Chb Walling For Building Exterior (foundation To 2nd Floor) ,chb For Ground Floor Interior Walling Up To Floor Line, Chb For Septic Vault, Ground Tank, Grease Trap And Catch Basin • Steel Reinforcement - Installation Of Deformed Steel Reinforcing Bars For Concrete And Masonry Structures • Steel Works - Construction Of Roofing Trusses And Purlins • Doors & Windows - Fabrication & Installation Of Ground Floor Doors And Windows (exterior) • Tinsmithry - Building Roofing Using Prepainted Rib-type Roofing Sheets And Prefab Ridge Rolls • Plumbing - Laying Of Embedded Waste And Water Lines For Ground Floor And Second Floor I. Project Billboard (q = 2.00 Sets) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, 2" X 3" X 14' Coco Lumber, 2" X 3" X 10' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. Ii. Occupational Safety And Health Program (q = 1.00 L.s.) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. Iii. Permits And Clearance (q = 1.00 L.s.) Includes Fire Safety Evaluation Fee, Brgy. Clearance For Construction Fee, Professional Fee, White Print (a-3). Iv. Mobilization / Demobilization (q = 1.00 Lot) V. Earthworks (q = 253.00 Cu.m.) A. Excavation (q = 131.00 Cu.m.) Includes Volume To Be Excavated. B. Earth Fill (q = 85.00 Cu.m.) Includes Volume For Earth Fill (includes Compaction): Petrun Soil (for Earth Fill) (w/ Compaction). C. Gravel Bedding (q = 37.00 Cu.m.) Includes Volume For Gravel Bedding: 1-1/2" Gravel Bedding (0.10m Thk.). Vi. Concrete Work, Formwork &. Scaffolding (q = 148.31 Cu.m.) Includes Portland Cement Type 1astm C-150 Pns 07, Washed Sand, Washed Gravel, (for Formworks And Scaffoldings): 1.2mm Thk. X 1.0m Width Composite Steel Deck, 4'x8'x1/4"thk. Marine Plywood, 2" X 2" X 12' Coco Lumber, Assorted Sizes C.w. Nails, Steel Scaffolding (including Complete Accessories) Vii. Masonry Work ( Q = 598.28 Sq.m.) Includes 4" X 8" X 16" Chb (700psi), Portland Cement Type 1astm C-150 Pns 07, Washed Sand, Skim Coat (20kg). Viii. Steel Reinforcement ( Q = 22,027.74 Kgs.) Includes 20mmø X 6000mm Dsb (grade 40), 16mmø X 6000mm Dsb (grade 40), 12mmø X 6000mm Dsb (grade 40), 10mmø X 6000mm Dsb (grade 40), #16 Gi Tie Wire. Ix. Steel Work ( Q = 257.00 Lengths) Includes 50mm X 50mm X 6mm Thk. Angle Bar (6m/length), 38mm X 38mm X 6mm Thk. Angle Bar (6m/length), 50mm X 50mm X 2mm Thk Tubular Bar (6m/length), 50mm X 100mm X 1.2mm Thk. C-purlins (6m/length), 1.2m X 2.4m X 10mm Thk. Ms Plate, Welding Rod (6011), Grinding Disk, Cutting Disk. X. Doors &. Windows (q = 15.00 Units) Includes D1: 4000mm X 2150mm (4 - 1000mm X 2150mm Panels) Fixed Glass Partition W/ Aluminum Framed Double Glass Swing Door, W/ Complete Accessories; D6: 800mm X 2150mm Flush Door, Including Door Knob, Jambs And Accessories; Wl: 2300mm X 1200mm (4 - 600mm X1200mm Panels) Analok Frame Sliding Window W/ 1/4" Thk. Bronze Glass; W2: 2500mm X 1200mm (2 - 1250mm X 1200mm Panels) Analok Frame Sliding Window W/ 1/4" Thk. Bronze Glass; W3: 2500mm X 800mm (2 - 1250mm X 800mm Panels) Analok Frame Sliding Window W/ 1/4" Thk. Bronze Glass; W4: 600mm X 600mm Analok Frame Awning Window W/ 1/4" Thk. Bronze Glass. Xi. Tinsmithry (q = 227.00 Ln.m.) Includes 1.1m X 0.50mm Thk Prepainted Rib-type Roofing, 0.9m X 2.4m X 0.5mm Thk. Prefab Ridge Roll, Tek Screw, Vulca Seal, 5mm Thk X 1000mm Insulation Foam (50m/roll), Touch-up Paint (500ml/can) . Xii. Plumbing (q = 1.00 Lot) Includes 4"x 4" Floor Drain, Stainless; 6" Dia. X 10' Pvc Pipe, S-1000; 4" Dia. X 10' Pvc Pipe, S-1000; 2" Dia. X 10' Pvc Pipe, S-1000; 6" Dia. Pvc Cleanout; 6" Dia. Pvc Coupling; 4" Dia. Pvc Elbow, 1/4 Bend; 4" Dia. Pvc Sanitary Tee; 4" Dia. Pvc Cleanout; 4" Dia. Pvc P-trap; 4" Dia. Pvc Coupling; 6" To 4" Pvc Tee Reducer; 4" To 2" Pvc Tee Reducer; 4" To 2" Pvc Bushing Reducer; 2" Dia. Pvc Elbow, 1/4 Bend; 2" Dia. Pvc Wye; 2" Dia. Pvc Tee; 2" Dia. Pvc P-trap; 2" Dia. Pvc Cleanout; 2" Dia. Pvc Coupling; Pvc Cement,400 Cc; 1/2" Dia. G.i. Elbow; 1/2" Dia. G.i. Tee; 1/2" Dia. X 4" G.i. Nipple; 1/2" Dia. G.i. Coupling; 1/2" Dia. X 20' G.i. Pipe, S-40; 1/2" Dia. Float Valve; 1/2" Dia. Gate Valve; Teflon Tape (big). Approved Budget For The Contract (abc): P 6,743,095.30 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred Sixty (160) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1.pre - Procurement: October 18, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 2.issuance Of Bid Documents: January 7 – January 28, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 3.pre-bid Conference: January 14, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4.submission Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 5.opening Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P10,000.00 To The Iligan City Government Cashier, At The Bac Office, 2nd Floor, City Hall Main Building, Buhanginan Hills, Pala-o, Iligan City. The Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: January 7, 2025 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-123 (ceo-infra)
4301-4310 of 4342 active Tenders