Painting Tenders
Painting Tenders
Municipality Of Argao, Cebu Tender
Manpower Supply
Philippines
Closing Date4 Mar 2025
Tender AmountPHP 5.9 Million (USD 101.7 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 8.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 101(3)a.1 Removal Existing Concrete And Asphalt Pavement (0.23m Thk) Quantity 1,200.00 M2 Dpwh Standard Output Per Day (opd)= 20.00 M2 1200.00 M2 Removal Existing Concrete And Asphalt Pavement (0.23m Thk) Direct Cost: A. Materials: B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 C. Unskilled Laborer Number Of Hours 1.00 1.00 Backhoe (0.80m3) 1.00 1.00 Payloader (1.50m3), Lx80-2c 0.50 1.00 Dump Truck (12yd3) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 177.60 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 177.60 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 230mm Thk Quantity 1,464.00 M2 Dpwh Standard Output Per Hour (oph)= 107.33 M2 1464.00 M2 Pcc Pavement (plain) -conventional Method, 230mm Thk Direct Cost: A. Materials: 0.43 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.13 M³ Sand 0.23 M³ Gravel 2.19 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 One Bagger Mixer 1.00 2.00 Concrete Vibrator 0.13 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.00 - Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 601(b) Sidewalk (100mm) Quantity 312.00 M2 Dpwh Standard Output Per Hour (oph)= 10 M2 312.00 M2 Sidewalk (100mm) Direct Cost: A. Materials: 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.55 M³ Sand 0.10 M³ Gravel 0.95 Bag Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 One Bagger Mixer 1.00 2.00 Concrete Vibrator 0.13 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 606(2)a Pavement Markings (reflectorized Traffic Paint-white) Quantity 72.00 M2 Dpwh Standard Output Per Hour (oph)= 10 M2 72.00 M2 Pavement Markings (reflectorized Traffic Paint-white) Direct Cost: A. Materials: 1.00 L Reflectorized Traffic Paint (white) Minor Tools (5% Of Labor Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.05 1.00 Cargo Truck (2-5 Mt) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 504(5) Cleaning/reconditioning Drainage Structures Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Cleaning/reconditioning Drainage Structures Direct Cost: A. Materials: B. Manpower: Number Of Hours 80.00 1.00 A. Construction Foreman 80.00 8.00 B. Unskilled Labor C. Equipment And Water: Number Of Hours 20.00 1.00 A. Cargo Truck (9 - 10 Mt) 40.00 1.00 B. Bamboo With Bucket - 4 Uses 0.00 0.00 Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 404.00 Reinforcing Steel Bar, Grade 40 (drainage Cover And Wall Repair) Quantity 890.00 Kg Dpwh Standard Output Per Hour (oph)= 180 Kg 890.00 Kg Reinforcing Steel Bar, Grade 40 (drainage Cover And Wall Repair) Direct Cost: A. Materials: 0.02 Kg A. Tie Wire (2% Of Rsb) 1.05 Kg A. Reinforcing Steel Bar , Grade 40 (w/ 5% Wastage) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Labor 1.00 8.00 C. Unskilled Labor C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender 0.15 1.00 C. Cargo Truck (9-10 Mt) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 405.00 Structural Concrete Class A (drainage Cover And Wall Repair) Quantity 10.00 M3 Dpwh Standard Output Per Hour (oph)= 1.4 M3 10.00 M3 Structural Concrete Class A (drainage Cover And Wall Repair) Direct Cost: A. Materials: 70.00 Bd-ft A. Lumber, Good - 4 Uses 1.60 Pc B. Marine Plywood (1/2" X 4’ X 8') - 4 Uses 0.70 Kg C. Assorted Cwn (1kg/100 Bd-ft Of Lumber) 9.50 Bag D. Cement 0.50 M3 E. Sand 1.00 M3 F. Gravel B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Labor 1.00 8.00 C. Unskilled Labor Installation /removal Of Formworks 1.00 4.00 A. Skilled Laborer 1.00 8.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer (4-6) 1.00 1.00 B.concrete Vibrator 0.10 1.00 C. Water Truck/pump (16000 L) Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
City Of Antipolo Tender
Civil And Construction...+2Paints and Enamels, Civil Works Others
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 1.9 Million (USD 32.7 K)
Details: Description A. Contract Id : Antipolo-03march2025-05 B. Name Of Project : Repair/repainting Works Of 17m X 30m Covered Court And Stage At San Jose National High School, Brgy. San Jose, Antipolo City C. Location : Brgy. San Jose, Antipolo City D. Brief Description : Repair/repainting Of Covered Court E. Major Item Of Works : Steel Works; Tinsmithry; Painting Works F. Approved Budget For The Contract : Php 1,900,000.00 G. Duration : 60 C.d Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: February 12 - March 03, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: February 19, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: March 03, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: March 03, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Riyadh Municipality Tender
Others...+2Civil And Construction, Civil Works Others
Saudi Arabia
Closing Date27 Feb 2025
Tender AmountRefer Documents
Description: Implementation of road painting for Al Kharj Governorate
Municipality Of San Agustin , Surigao Del Sur Tender
Civil And Construction...+1Civil Works Others
Philippines
Closing Date20 Feb 2025
Tender AmountPHP 600 K (USD 10.3 K)
Details: Description Qty Unit Description Direct Cost Other General Requirements 1.00 Lot Mobilization/demobilization (not More Than 1% Of Materials, Civil Electrical, Plumbing Works 12.29 Cu.m. Excavation Works 7.66 Cu.m. Structural Concrete Works 1.00 Lot Reinforcing Steel Works 31.20 Sq.m. Formworks & Falseworks 23.04 Sq.m. Painting, Vanishing And Other Related Works 1.00 Lot Lighting Fixtures And Lamps Indirect Cost 1.00 Lot Overhead, Contengencies & Miscellaneous (15% Of Dc) - 1.00 Lot Contractor's Profit (10% Of Dc) - Mobilization/demobilization 1.00 Lot Vat (5% Of Ocm +cp+dc) - Mobilization/demobilization
RIZAL TERESA NATIONAL HIGH SCHOOL DEPED Tender
Publishing and Printing...+1Furnitures and Fixtures
Philippines
Closing Soon17 Feb 2025
Tender AmountPHP 300 K (USD 5.1 K)
Details: Description Ream Bondpaper A4 70gsm 100 Ream Bondpaper Legal 70gsm 150 Pc Board Paper 180/200gsm 100sheets A4- White 5000 Pc Certificate Holder A4 200 Box Matrix Ballpen Black (12pcs) 50 Box Matrix Ballpen Blue(12pcs) 50 Pc Certificate Frame A4 50 Unit Paper Cutter Metal Structure With Adjuster And Stopper 4 Liter Liquid Floor Wax Red 150 Pc Paint Brush "4" 20 Pc Paint Brush "2" 20 Pc Roller Paint 9" 10 Gal Bright Excel Liquid Soap 50 Btls. Liquid Hand Soap With Pump 30 Pc Deodorizer Jasmine With Holder 200 Box Pencil No. 2 20 Piece Tape Dispenser 10 Pack Sticker Paper 20 Piece Doormat 60 Pack Battery Aaa 60 Kl Rags 10 Piece Light-emitting Diode(led) Light Bulb, 7watts 20 Piece Light-emitting Diode(led) Linear Tube, 18watts 40 Roll/pack Trashbag, Xxl 50 Roll/pack Trashbag, Xl 30 Pack Tissue, Interfolded Paper Towel 50 Pouch Detergent Powder, All Purpose 10 Can Disinfectant Spray 30 Box Fastner 10
51-60 of 4929 active Tenders