Painting Tenders

Painting Tenders

Department Of Public Works And Highways Tender

Civil And Construction...+1Road Construction
Philippines
Closing Date9 Dec 2024
Tender AmountPHP 81.3 Million (USD 1.3 Million)
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Ii Dalan Na Pavvurulun, Rgc, Carig Sur, Tuguegarao City, Cagayan Invitation To Bid For 25b00045 : Oo1: Ensure Safe And Reliable National Road System: Network Development Program - Road Widening - Primary Roads - Manila North Rd - K0617+771 - K0620+557.59, K0620+880 - K0621+092 1.the Dpwh Regional Office Ii, Through The Dpwh Fy 2025 Nep (epa - Early Procurement Activity) Intends To Apply The Sum Of ₱81,326,350.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract 25b00045: Oo1: Ensure Safe And Reliable National Road System: Network Development Program - Road Widening - Primary Roads - Manila North Rd - K0617+771 - K0620+557.59, K0620+880 - K0621+092. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2.the Dpwh Regional Office Ii Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Oo1: Ensure Safe And Reliable National Road System: Network Development Program - Road Widening - Primary Roads - Manila North Rd - K0617+771 - K0620+557.59, K0620+880 - K0621+092 Contract Id No. : 25b00045 Location : Claveria, Cagayan Brief Project Description : Construction Of Pccp Road, Length = 1.305 Km = 4.140 Lane-km (as Per Survey), With Drainage And Slope Protection Works And Road Safety Facilities Scope Of Works : Other General Requirements project Billboard/ Signboard occupational Safety And Health Program traffic Management mobilization/ Demobilization removal And Relocation Of Utilities environmental Management And Monitoring Earthworks individual Removal Of Trees – (small & Large) removal Of Actual Structures/obstruction (0.23 M Thick – Pccp, 610 Mm Dia. – Rcpc, Concrete) removal Of Existing (guardrails, Guardrail Posts) excavation (unsuitable, Surplus Common, Surplus Rock, Structure) foundation Fill embankment From Roadway/structure Excavation subgrade Preparation Subbase And Base Course polymer Stabilized Subbase/base/surface Course Surface Courses pccp, (0.28, 0.30) M Thick, 14-day Concrete pccp, 0.30 M Thick, 7-day Concrete Road/bridge Construction reinforcing Steel Grade (40 & 60) structural Concrete (20.68 & 27.58) Mpa Class A 28 Days (retaining Wall) lean Concrete, Class B, 16.5 Mpa paint Drainage And Slope Protection Structures pipe Culverts 910 Mm Dia. Class Ii Rcpc catch Basins 910 Mm Dia. metal Frames And Grating Miscellaneous Structures metal Guardrail (metal Beam) Including Post Single W-beam metal Beam End Piece Bull Nose road Signs (warning, Regulatory) hazard Markers (chevron Signs) trees (furnishing And Transplanting) reflectorized Thermoplastic Pavement Markings (white) removal Of Existing Reflectorized Thermoplastic Pavement Markings rc Pedestal/ Pole Approved Budget For The Contract (abc) : ₱81,326,350.00 Contract Duration : 252 Calendar Days Inclusive Of 18 Unworkable/rainy Days, 49 Sundays And Holidays 3.the Major Category Of Work For The Project Is Rcp - Roads: Construction – Pccp. 4.prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Size Range Of At Least Medium A. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 5.pursuant To Gppb Resolution No. 15- 2021 Dated October 14, 2021, Prospective Bidders Shall Submit In Their First Envelope The Updated Philgeps Certificate Of Platinum Registration And Membership In Accordance With Sections 23.3, 24.4.3 And 54 Of Republic Act 9184 (ra9184), All Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Supporting The Veracity, Authenticity And Validity Of The Certificate Shall Remain Current And Updated, And That Failure By The Prospective Bidder To Update Its Philgeps Certificate Of Platinum Registration And Membership With The Current And Updated Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Shall Result In The Automatic Suspension Of The Validity Of Its Certificate Of Platinum Registration And Membership Until Such Time That All Of The Expired Class “a” Eligibility Documents Has Been Updated. 6.bidders Are Required To Update Their Existing Philgeps Registration (platinum) In The Dpwh Civil Works Registry Prior To The Scheduled Receipt And Opening Of Bids. 7.bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 8.interested Bidders May Obtain Further Information From The Dpwh Regional Office Ii And Inspect The Bidding Documents At Procurement Staff, 4th Floor, Dpwh Regional Office No. Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan During Weekdays From 8:00 A.m. To 5:00 P.m.. 9.a Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20 - December 09, 2024, From The Address Given Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifty Thousand Pesos Only (₱50,000.00). Pursuant To Section 17. 5 Of The 2016 Revised Irr Of Ra 9184, Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of Ra 9184 And Its Irr. 10.the Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 11.the Dpwh Regional Office Ii Will Hold A Pre-bid Conference On November 27, 2024, 10:00 Am At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan, And/or Through Webcasting Via Youtube Channel (dpwh Regional Office Ii Procurement Livestream) Which Shall Be Open To Prospective Bidders. Prospective Bidders Are Encouraged To Send Their Technical Personnel To Attend The Pre-bid Conference. 12.bid Submission May Be Done Manually Or Electronically. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds Clause 17. 13.bids Must Be Duly Received By The Bac Secretariat For Manual Submission At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Or At Electronicbids_r2@dpwh.gov.ph For Electronic Submission And Receipt Of Bids On Or Before December 09, 2024 At 10:00 Am. Late Bids Shall Not Be Accepted. 14.all Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Bds Clause 15.1. 15.bid Opening Shall Be On December 09, 2024, Immediately After The Deadline For The Submission Of Bid At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 16.the Dpwh Regional Office Ii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra 9184, Updated As Of July 19, 2024, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 17. You May Visit The Following Websites; For Downloading Bidding Documents: Dpwh Website: Www.dpwh.gov.ph Philgeps Website: Www.philgeps.gov.ph Livestreaming Website: Https://www.youtube.com/@dpwh.ro.2 For Online Bid Submission: Electronicbids_r2@dpwh.gov.ph 18.for Further Information, Please Refer To: Hilario Y. Casem Engineer Iv Head, Procurement Staff Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Contact No.: 0935-176-0624 Email Address: Casem.hilario@dpwh.gov.ph Bernard T. Calabazaron Chief, Qah Division Bac Chairperson Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Calabazaron.bernard@dpwh.gov.ph Date Of Posting: Dpwh And Philgeps Websites: November 20-26, 2024 Conspicuous Place (procurement Bulletin Board): November 20-26, 2024

Department Of Agriculture Tender

Automobiles and Auto Parts
Philippines
Closing Date3 Dec 2024
Tender AmountPHP 3.1 Million (USD 52.9 K)
Details: Description Invitation To Bid For The Supply And Delivery Of Sixteen (16) Units Hand Tractor With Accessories 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of Three Million One Hundred Twenty Thousand Pesos (php3,120,000.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Supply And Delivery Of Sixteen (16) Units Hand Tractor With Accessories With Project Identification Number Da-rfo 1-2025-goods-012. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Minimum Specifications, To Wit: Particulars/descriptions Hand Tractor With Accessories I. Prime Mover : Rated Power: 7 Hp Engine: Diesel, Single Cylinder Cooling System: Water Cooled Ii. Design And Performance Actual Field Capacity For Single Passing : 0.125 Ha/hr Peak Transmission Efficiency : 85% Noise Level : 92db (a) Fuel Consumption During Plowing : Must Not Exceed 1.00 L/hr Iii. Classification Transmission System : 60-60 Iv. Attachments 1. Shall Be Compatible With The Size And Power Of Tractor 2. List Of Attachments Including The Following: A.) Cage Wheel And Brand New Pneumatic Tire B.) Two (2) Bottom Disc Plow (2 Pcs X 14" Diameter) 1 Disc Guide And Frame Assembly C.) Comb-tooth Harrow D.) One (1) Mt Capacity Heavy Duty Trailer Having A Brand New Pneumatic Tire 3. With Appropriate Tools Accessories As Specified In Paes V. List Of Applicable Paes/pns For Technical Requirements, The Following Shall Be Used : A.) Paes Walking-type Agricultural Tractor B.) Paes Hexagonal Axle And Hub For Walking-type Agricultural Type C.) Paes Agricultural Trailer Other Requirements: I. To Be Submitted During Bid Opening :  Valid Amtec Test Report  Valid Permit To Operate Issued By Bafe And Certificate Of Namdac Accreditation Issued By Pcaf  With Certificate Of Conformity Issued By Bafe For The Offered Engine  Certificate Of Company Owned/affiliated/authorized Service Center Within The Region And Service Center Must Have A Permit To Operate Issued By Bafe  Notarized Affidavit Of Undertaking After Sales Services That Supplier Must Render Within 72 Hours Upon Receipt Of Notice From The Recipients/procuring Entity  Certificate Of Availability Of Spare Parts Of The Brand/model Being Offered (to Be Issued By The Distributor/manufacturer/authorized Service Center) Within The Region  Notarized Certificate Of Stock Allocation To Be Submitted During Bid Opening Issued By The Distributor/dealer Specifying The Name Of Project To Da Rfo 1  Certificate To Conduct On Site-technical Briefing For Operators On Operation, Maintenance, And/or Repair Of The Supplied Goods By The Supplier Ii. To Be Submitted/verified During Post Qualification  Shall Present 100% Available Stocks Earmarked For Region 1 Iii. To Be Submitted/inspected/verified During Delivery / After Delivery  With Warranty Of One (1) Year For Parts Of Equipment And Two (2) Years Of Service To Be Reckoned From The Date Of Delivery  With Spray-painted (6"x 6") Indicating The Da Logo Labelled With "rfo 1 Rice Program" For The 12 Units And "rfo 1 Livestock Program" For The 4 Units Below The Logo To Be Placed At The Trailer And Reflectorized 2" X 2" Da Logo Sticker At The Top Of The Engine  With Metal Plate Indicating The Company Name And Active Office Landline / Mobile Numbers For Easy Access Of Farmer Clients  With Heavy Duty Polyethylene Tarpaulin (trapal) Per Site Enough To Cover The Items Delivered  Shall Be Subjected To Functionality Testing Upon Completion Of Delivery Of The Units Delivery Schedule: Within Twenty (20) Working Days Upon Receipt Of The Notice To Proceed Drop-off Points Province Quantity Delivery Sites Rice Livestock Pangasinan 2 Da-prec, Sual, Pangasinan 4 2 Da-prec, Sta. Barbara, Pangasinan La Union 2 Da-iliarc, Bacnotan, La Union Ilocos Sur 2 Da-isrec, San Juan, Ilocos Sur Ilocos Norte 2 2 Da-inrec, Batac City, Ilocos Norte Total 12 4 Delivery Of The Goods Is Required Within Twenty (20) Working Days Upon Receipt Of The Notice To Proceed. Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From November 14 2024 To December 3, 2024 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php5,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 21 November 2024, 11:00 Am At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 03 December 2024, 11:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 03 December 2024, 11:00 Am At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa. C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Eligibility Requirements Can Be Fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. The Technical Specifications Of The Project Must Be Duly Signed/countersigned And Sealed By A Licensed Agricultural And Biosystems Engineer In Accordance With Republic Act 8559 Or Republic Act 10915; E. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed By The Bidder/authorized Representative On Each And Every Page Thereof. F. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: F.1. Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or F.2. The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No. :(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo 1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ November 13, 2024 Approved: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-goods-012

C o Amt Schlaubetal Tender

Civil And Construction...+1Building Construction
Germany
Closing Soon28 Nov 2024
Tender AmountRefer Documents 
Details: The building ensemble consists of 3 building sections, which are divided into separate usage units. The building complex, built in 1920/1930, with a 3-storey hotel building and directly adjacent ballroom as well as an annex, served as the official headquarters of the Müllrose forestry administration until 2016. The ballroom was used for citizen forums or festivities until April 2024. The annex building houses the building technology with sanitary facilities. The implementation planning envisages the demolition of the main building with a replacement new building as well as the structural and energetic renovation of the ballroom and annex. Lot 10: - approx. 3030m² of wall surfaces cleaned/primed and painted; Of which 800m² of filling and 700m² of filling fleece - approx. 1500m² of ceiling area cleaning/priming and painting Construction period: 30.06.2025 - 31.10.2025

Department Of Agriculture Tender

Others
Philippines
Closing Date10 Dec 2024
Tender AmountPHP 6 Million (USD 101.7 K)
Details: Description Invitation To Bid For The Supply And Delivery Of Two (2) Units Recirculating Dryer 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of Six Million Pesos (php6,000,000.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Supply And Delivery Of Two (2) Units Recirculating Dryer With Project Identification Number Da-rfo 1-2025-goods-014. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Minimum Specifications, To Wit: Particulars/descriptions Recirculating Dryer Design Holding Capacity: 6 Metric Tons Parts In Contact With The Commodity And Its Body Should Be Non-corrosive Performance Criteria Moisture Gradient (recirculating Type): 2% (maximum) Drying Rate: 2.0 % Per Hour Product Quality For Corn ̵ Cracked Grain/kernel(% Increase):10% Maximum ̵ Brokens/split Kernels (% ): 5% Maximum ̵ Spillage/drying Loss: 0.5% (maximum) ̵ Drying Efficiency: 75% ̵ Heating System Efficiency ̵ Petroleum Based Fuel, Indirect Fired, 75% Or Petroleum Based Fuel, Direct Fired, 90%; And Or Biomass Fuel, Direct Fired, 65% Or Biomass Fuel, Indirect Fired, 50% ̵ Operating Temperature: 60°c ̵ Moisture Reduction Rate: 2.0% Per Hour, From 20% To 14% Mc ̵ Prime Mover/power Source: Single Phase ̵ With Appropriate Electric Motor/s ̵ With Appropriate Diesel Fed Generator Set Which Will Run The Dryer (silent Type/compliant To Air Pollution Act) ̵ Dried Grain Shall Have No Additional Discoloration, Traces Of Unburned Fuel Or Ashes On Grain Surface And Fermented Or Musty Smell Classification: Batch-type, Recirculating Dryer 1. Vertical Recirculating Dryer Heating System: A. Indirect-fired Or B. Direct-fired Burner Fuel: A. Petroleum Or B. Electricity Accessories With Thermometer And Pressure Gauge Provided With Dust Collecting System With Emergency Stop Button/switch For Electric-driven Dryer With Drying Air And Grain Temperature Display With Built-in Moisture Meter With Viewing Window For Every Module With Adequate Provision For Fire Control With Centralized Panel For Switches/control Of Grain And Drying Temperature, Pressure, Voltage And Current Bagging Bin With Capacity Appropriate To The System Parts Manual Containing Full Information On Method Of Installation And Operation. The Manual Shall Be Conformed To Pns/paes Noise Level: 92 Db (a), Maximum For 6 Hours Continuous With Spray-painted Da Logo (0.5 M X 0.5m) Labelled With Rfo 1 Corn Program To Be Placed On The Visible Portion Of The Dryer With Minimum Warranty Of One (1) Year After The Date Of Acceptance Of The Unit On Engine, Accessories And Services By The End-user Except On Fan, Moving And Easy To Wear Parts Such As Fan Belts. Likewise, General Requirements Of Warranty Shall Be In Accordance To Pns-recirculating Dryer 201: 2015/paes With Heavy-duty Polyethylene Tarpaulin (trapal) Per Site Enough To Cover The Delivered Items Other Requirements: I. To Be Submitted During Bid Opening: A. Valid Amtec Test Report B. Valid Permit To Operate Issued By Bafe And Certificate Of Namdac Accreditation Issued By Pcaf C. Certificate Of Company-owned Service Center Within The Region And Service Center Must Have A Permit To Operate Issued By Bafe D. Notarized Affidavit Of Undertaking After Sales Service That Supplier Must Render Within 72 Hours Upon Receipt Of Notice From The Recipients/procuring Entity E. Certificate Of Availability Spare Parts Of The Brand/model Being Offered Within The Region To Be Issued By The Distributor/manufacturer/company Owned Service Center F. Notarized Certificate Of Stock Allocation To Be Submitted During Bid Opening Issued By The Distributor/importer Specifying The Name Of Project To Da Rfo 1 G. Certificate To Conduct On-site Technical Briefing For Operators On Operation, Maintenance, And/or Repair Of The Supplied Goods By The Supplier Ii. To Be Submitted/verified During Post-qualification A. Shall Present At Least 1 Complete Unit During Post Qualification And Valid Certificate Of Conformity Iii. To Be Submitted/inspected/verified During Delivery/after Delivery A. With Warranty Of 1 Year On Parts Of Equipment And 2 Years For Services To Be Reckoned From Date Of Delivery B. With Reflectorized Da Logo Sticker (8"x 8"), Labeled With "corn- Rfo 1" Below The Logo To Be Placed On The Generator Set C. With Metal Plate Indicating The Company Name And Active Office Landline/mobile Numbers For Easy Access Of Farmers Client D. With Heavy Duty Trapal Per Site Enough To Cover The Items Delivered E. All Units Shall Be Subjected To Acceptance Testing Upon Completion Of Delivery Of The Units Delivery Schedule: Within Twenty (20) Working Days From Receipt Of Ntp Drop-off Points: Province Quantity Pangasinan 1 Ilocos Sur 1 Total 2 Delivery Of The Goods Is Required Within Twenty (20) Working Days Upon Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From November 21, 2024 To December 10, 2024 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php10,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 28 November 2024, 11:00 Am At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 10 December 2024, 11:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 10 December 2024, 11:00 Am At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa. C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Eligibility Requirements Can Be Fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. The Technical Specifications Of The Project Must Be Duly Signed/countersigned And Sealed By A Licensed Agricultural And Biosystems Engineer In Accordance With Republic Act 8559 Or Republic Act 10915; E. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed By The Bidder/authorized Representative On Each And Every Page Thereof. F. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: F.1. Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or F.2. The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No. :(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo 1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ November 20, 2024 Approved: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-goods-014

Province Of Negros Oriental Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date3 Dec 2024
Tender AmountPHP 1.2 Million (USD 21.9 K)
Details: Description Invitation To Bid Bid No. B-393-2024 1. The Provincial Government Of Negros Oriental, Through The Responsibility Center: Sp Res. Center:1918-023(18) / Account Code: 100(18), Intends To Apply The Sum Of One Million Two Hundred Ninety Five Thousand Seven Hundred Thirty Six Pesos & 50/100 (php 1,295,736.50) Being The Abc To Payments Under The Contract Seven (7) Lots. Const. Materials For Construction Of Male And Female Comfort Room At Proposed Market Building, Pamplona, Negros Oriental. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Negros Oriental Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By The End-user Within 10 Working Days From The Receipt Of A Written Advice By The Project Engineer. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00pm (monday To Friday). Wilma D. Padilla Bac Secretariat Office, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City Telephone Number : (035) 225-1111, Local 475 Or 477 / Telefax Number Of Bac Secretariat: (035) 226-3804 Email Address Of Bac Secretariat: Bac-secretariat@negor.gov.ph / Bac.secretariat.neg.or@gmail.com 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 14, 2024 To December 3, 2024 Up To 1:00 In The Afternoon From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Five Hundred Pesos (php 1,500.00). 6. The Bids And Awards Committee Will Hold A Pre-bid Conference On November 20, 2024 At 2:30 In The Afternoon At The Bac Conference Room, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City And/or Through Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before December 3, 2024 At 1:00 In The Afternoon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On December 3, 2024 At 1:30 In The Afternoon, Bac Conference Room, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City At The Given Address Below. The Attendance Of The Prospective Bidders Or His/her Duly Representative Is Highly Encouraged 10. Submitted Documents Without Proper Tabbing For All Copies (3 Envelopes) With Name Of The Document (not Letters Or Numbers) And Not Book Bounded (soft/hard) Is Automatically Disqualified. 11. The Bac Of The Province Of Negros Oriental Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Engr. Andre M. Reyes Provincial Engineer’s Office Capitol Area, Dumaguete City Tel. No.:(035) 226-1982; Facsimile No.:(035) 226-1982 Email: Peonegor@yahoo.com.ph Arthur Fran P. Tolcidas Bac Chairman Lot 1 1 956 Bags 280 Portland Cement Terms & Conditions: The Materials Shall Be For Pick Up From The Supplier Within 10 Working Days From The Receipt Of A Written Advice By The Project Engineer. Lot 1 Estimated Cost: P267,680.00 Lot 2 1 1 Sht. 1,400 8’ X 12’ Tarpaulin (w/print & Eyelet) 2 23 Kgs. 85 Assorted Cw Nails (1 ½&4) 3 15 Lgth. 160 8mmø X 6m, Deformed Bar 4 555 Lgth. 242 10mmø X 6m, Deformed Bar 5 165 Lgth. 347 12mmø X 6m, Deformed Bar 6 103 Lgth. 617 16mmø X 6m, Deformed Bar 7 7 Pcs. 250 Cutting Wheel 8 105.50 Kgs. 81 #16 G.i. Tie Wire 9 48 Sheets 750 0.5 Thk., 4’ X 8’ Marine Plywood 10 45 Kgs. 85 2” Cw Nails 11 40 Kgs. 95 3” Cw Nails 12 625 Pcs. 135 0.40m X 0.40m Ceramic Tiles 13 69 Bags 430 Tile Adhesive 14 5 Packs 90 Tile Grout 15 4 Sets 3,000 0.60m X 2.10 Pvc Door (includingaccessories) 16 2 Sets 6,000 0.80m X 2.10 Wooden Panel Door (including Accessories) 17 28 Lgth 900 3/16 X 1 1/2” X 1 ½” X 6m Angle Bar 18 33 Lgth 550 3/16 X 1 X 1 X6m Angle Bar 19 1 Box 3,000 Welding Rod 20 18 Pcs. 910 2” X 3” X 6m C-purlins Terms And Conditions: The Materials Shall Be For Pick Up From The Supplier Within 10 Working Days From The Receipt Of A Written Advice By The Project Engineer. Lot 2 Estimated Cost: P516,016.50 Lot 3 1 2 Unit 6,000 0.5m X 0.5m Sliding Bronze Glass Window (includes Delivery And Installation) Terms & Conditions: The Materials Shall Be Delivered By The Supplier Upon A Written Advice By The Project Engineer And Shall Be Delivered At Project Site Within 10 Working Days From Receipt Of The Advice. Lot 3 Estimated Cost: P12,000.00 Lot 4 1 54.80 Lm 1,300 0.40mm X 1.050m X Ls, Dn-hi Rib 1050 2 14.00 Lght 850 0.40mm X 457mm X 2.44, Dn Ridge Roll 3 1,200 Pcs 2.00 Tek Screw 4 1,300 Pcs 0.85 5-3 Blind Rivets 5 2.00 Pcs 350.00 Rubber Sealant-silver Gray 6 2.00 Cans 130.00 Aerosol Spray Paint-colorlume 400ml (touch-up) Terms And Conditions: The Materials Shall Be For Pick Up From The Supplier Within 10 Working Days From The Receipt Of A Written Advice By The Project Engineer. Lot 4 Estimated Cost: P87,605.00 Lot 5 1 18 Length 375 ½”ø Aqua Pipe 2 20 Pcs. 30 ½”ø Aqua Coupling 3 25 Pcs. 35 ½”ø Aqua Plain Elbow 4 25 Pcs. 150 1/2”ø Pe Iso Tee (plain) 5 2 Pcs. 130 1 X 1/2” Ø Pe Iso Pipe 6 150 Meters 60 1”øsdr 11, Pe Iso Pipe 7 100 Meters 30 ½”ø Sdr 11, Pe Iso Pipe 8 3 Cans 85 Solvent Cement 9 5 Rolls 20 Teflon 10 10 Pcs. 95 2”ø Pvc P-trap 11 15 Pcs. 45 2”ø 90˚ Elbow 12 15 Pcs. 50 2” X 2 Ø Pvc Tee 13 46 Pcs. 260 2”ø Pvc Pipe S-1000 14 6 Pcs. 145 4” X 2”ø Reducer Pvc Tee 15 15 Pcs. 160 4”ø Pvc Wye 16 15 Pcs. 100 4”ø 45˚ Elbow 17 15 Pcs. 100 4”ø 90˚ Elbow 18 8 Pcs. 85 4”ø Cleanout 19 10 Length 670 4”ø X 10’ Pvc Pipe S-100 20 2 Pcs. 80 Hacksaw Blade 21 4 Sets 5,500 Water Closet (flush Type) With Complete Accessories, American Standard And Good Quality 22 5 Sets 3,500 Urinal With Complete Accessories ,american Stadard And Good Quality 23 6 Sets 2,500 Lavatory With Faucet And Complete Accessories Terms And Conditions: The Materials Shall Be Pick Up From The Supplier Within 10 Working Days From The Receipt Of A Written Advice By The Project Engineer. Lot 5 Estimated Cost: P107,235.00 Lot 6 1 70 Cu.m. 1,000 Sand 2 63 Cu.m. 1,100 Gravel 3 2,970 Pcs. 20.00 Chb Terms And Conditions: Any Of The Materials Shall Be Delivered By The Supplier Upon A Written Adive By The Project Engineer And Shall Be Delivered At The Project Site Within 10 Working Days From Receipt Of The Advice. Lot 6 Estimated Cost: P198,700.00 Lot 7 1 1,220 Bd.ft 30 305-2” X 2” X 12’ Coco Lumber 2 1,380 Bd.ft. 30 230-2” X 3” X 12’ Coco Lumber 3 200 Bd.ft. 30 30-2” X 4” X 10’ Coco Lumber 4 750 Bd.ft. 30 150-2” X 3” X 10’ Coco Lumber Terms And Conditions: The Materials Shall Be Pick Up From The Supplier Within 10 Working Days From The Receipt Of A Written Advice By The Project Engineer. Lot 7 Estimated Cost: P106,500.00 Xxxxxxxxxxxxxxxxxxxxxxxxxx Project Name: Construction Of Male And Female Comfort Room At Proposed Market Building, Pamplona, Negros Oriental -x-x-x-x-x-x-x-x-x-x-x-x-x- Total Abc: P1,295,736.50

Municipality Of Paracelis, Mountain Province Tender

Furnitures and Fixtures
Philippines
Closing Soon26 Nov 2024
Tender AmountPHP 2.4 Million (USD 42.3 K)
Details: Description 1 Unit “silyasi/kawali” Big Size Makapal Aluminium Frying Pan(76*69cmx23cm) Extra Xl 1 2 Unit 0.9m Cake Display Chiller: Glass Fresh-keeping Cabinet Function: Chiller Temperature 0-10⁰c. 1 3 Pack 1000 Pcs/pack 1.5cmx205cm Paper Cup Cake Liner 1 4 Set 2 In 1 Electric Power Tool Set Grinder 9556nb Model (continuous Rating Input 850w, Wheel Diameter 100mm, 220v~3.8a) 5 5 Sacks Sacks Rice (25kg) 3 6 Pc 2000w And 220v Electric Heater Shrink Gun Heat Air Bottle Plastic Sealer Temperature Adjustable 1 7 Set 24 Pcs Piping Bags And Piping Tip Set Stainless Steel Baking Tools 1 8 Set 275 Gallons Ibc Tote With Valve 1000l Intermediate Bulk Container Steel Cage With Plastic Drum 1 9 Unit 4 Burner Gas Range Cooker Gas W/ Oven Comes With Free Gas Cylinder 9 10 Set 4pcs Chisel Wood Carving/sculpting Set: ¼, ½, ¾, 1 1 11 Set 4threads Edging Sewing Machine, Overclock Heavy Duty, Industrial With Table And Stand/accessories 1 12 Set 5 In 1 Stainless Steel Kitchen Utensil Tool (serving Spoons) 2 13 Pc 5 Layers Cake Glass Cabinet (4x4x4ft) 1 14 Unit 5.5l Electric Stand Mixer For Baking With Bowl And 3 Whisks 6 Speed Settings (1200w, 220v50/60hz, Ac Motor, 1.63 Hp., Dimension: 368x246x325mm) 13 15 Unit 6kg/0.5g Waterproof Food Digital Weighing Scale Rechargeable Scale Digital Led Display Kitchen Scale 1 16 Set 6pcs/set Stainless Food Warmer (34x28x16cm) (2sets) 6 17 Set 8 In 1 Stainless Steel Stock Pot Casserole With Cover (4pcs Body And 4 Pcs Cover) 3 18 Set 8.0” 62hrc Hardness 6cr Stainless 5 Hair Scissors Kit + Comb + Hemostatic Forceps Hair Cutting Scissor Kit 6 19 Pcs 8” Tailor Scissor Heavy Duty 2 20 Unit 9inch Band Sawing Cutting Machine Wire Saw Puzzle Wood Working Sawing Machine (specs: 220v~50hz, Power 550w, Cut Height 89mm, Saw Blade Circumference 1511mm Wide 6-13mm, Throat Depth 232mm, No Load 1400r/min, Packing 795x342x426mm, Led Lighting /laser Tool Setting) 1 21 Pc Adjustable Multihead Atomizer Nozzle For Garden & Lawn Watering 2 22 Unit Air Compressor – Portable ½ Hp; Max Pressure: 85psi, 3.7cfm, 46l Tank Capacity 1 23 Unit Air Compressor Coupled Type : Specs: Model/power: 2hp; 1720rpm ; Pole: 4 ; Cap: 160l/min ; Max. Pessure:115psi ; Displacement: 3.7 Cfm ; Pressure: 8kg/cm3 ; Tank Capacity: 25 L 2 24 Unit Air Compressor Coupled Type; Specs: Model/power: 2hp; 1720rpm; Pole: 4; Cap: 160l/min; Max.; Pessure:115psi; Displacement: 3.7 Cfm; Pressure: 8kg/cm3; Tank Capacity: 25 L 4 25 Sack All Purpose Flour 50 Kgs 5 26 Pcs Aluminum Baking Square Pan 8x8x2 4 27 Set Baking Pans (6,8,9,10”) 2 28 Unit Banana Slicer Machine (stainless Steel, 0.5hp W/ Detachable Blade) 2 29 Unit Barber Chair (hydraulic, Reclining: 6ft.fixed Arms) 2 30 Pc Big Ladle 53cm 2 31 Unit Big Pot (#2) 1 32 Pcs Big Strainer 2 33 Pcs Bilao Medium Size (12”) 200 34 Pcs Bilao Small Size (10”) 320 35 Pcs Black Linen Fabric 35”l X 59” W Per Yard (30yards/yard) 4 36 Cone Black Polyester Sewing Thread 3000m/cone 80 37 Sack Cake Flour 50kgs 2 38 Set Cake Pan Set Of 6 Aluminum Materials: #1. 11.5x2.5 , #2. 10.5x2.5 , #3. 9.75x2.5 , #4. 8.75x2.5 , #5. 8x2.5 , #6. 7x2.5 1 39 Pc Cake Turntable Baking Tool 27cm 1 40 Pack Cap Seal For Gallon Round And Slim Container 1 41 Pcs Cast Iron Gas Stove Heavy Duty Single Burner Automatic Ignition Gas Stove Low Pressure 21a/31a, #773 (gas Powered, Heat Output Value 26,000btu/h) 1 42 Pcs Chopping Board 2 43 Unit Circular Saw (1050w,220v,185mm 7-1/4”) Wood Cutter Original With Handle 6 44 Pc Coffee Broiler/percolator Stainless Steel (10l) 2 45 Unit Commerce Heavy Duty Manual Cup Sealer Sealing Machine Plastic Cup (17cm+300film+ring) Complete Set 1 46 Unit Commercial Automatic Plastic Bag Film Sealing Machine (power: 350w, Maximum Sealing Length: 30cm) 1 47 Unit Corn Fertilizing Tol, Top Dressing Device 1 48 Unit Corn, Peanut, Coffee, Rice Heavy-duty Commercial Grinder Wet And Dry (volts: 220v 50-60hz, Motor Power: 2.2kw, Motor Rotational Speed: 1,400r/min., Dimension: 46x25.5x28cm) 5 49 Box Cutting Disk 4” For Metal Per Box 25pcs 1 50 Unit Diesel Water Pump Engine Model Ym178f, Suction 80mmm, Discharge Capacity 50m3/h, Total Head Lift 26m, Self-priming Time 180s/4m, Max Suction Head 8m 12 Hp. 7 51 Unit Double Burner Gas Stove 2 52 Unit Double Quencher Dispenser W/ Free Ladle 1 53 Unit Double Stove Single Cylinder Gas Type Deep Fryer + 2 Frying Baskets Type ; Capacity: 8l+8l ; Machine Size: 55x39x28.5cm ; Valve Type: Low Pressure Valve 4 54 Unit Electric Circular Saw Machine 235mm (9-1/4”) Model: 5900b (1400w, Blade Diameter 235mm, Max Cutting Capacities: At 90°85mm-at 45°60mm, 220v~50/60hz, Power Supply Cord 2.0m) 6 55 Unit Electric Drill Original Variable Speed (power Input: 240v~50/60hz, Continuous Rating Input: 650w) 2 56 Unit Electric Hair Clipper (set With Accessories Comb Size: Cutting Length 3mm,6mm,10mm,13mm) 5 57 Unit Electric Jigsaw Power Tool Wood Set ; Material: Reinforced Nylon Iron ; Voltage: 220, Power: 900w No Load Speed :0-3000rpm Speed Adjustment: 5 Level ; Max. Cutting Capacity: 65mm (wood), 6mm (steel) ; Grinding Materials: Wood, Plastic, Pvc, Aluminum Product, Metal Etc. 5 58 Unit Electric Oil Expeller Food Grade Stainless Steel German Cutley Steel Height 27.3 Cm, Length 36.7 Cm, 220/110 Volt, Motor Power 1500 W Frequency 50 Hz ; 1 Oil Press Machine,1 Stainless Steel Oil Cup, 1 Power Cord, I Glove,1 Hard Cleaning Brush, 1 Manual 1 59 Unit Electric Oven 90l 1 60 Unit Electronic Multifunction Weeding Tool 1 61 Unit Extension Wires Heavy Duty 50m Long Extension Cord Socket (50m) 6 62 Sacks Feeds Fattener (50kg/sack) 3 63 Sacks Feeds Finisher (50kg/sack) 12 64 Sacks Feeds Grower (50kg/sack) 18 65 Sacks Feeds Pre-starter (50kg/sack) 1 66 Sacks Feeds Starter (50kg/sack) 8 67 Unit Filled Gas Tank Gasul 1 68 Sacks Flour (all-purpose) 2 69 Sacks Flour (cake) 2 70 Roll Flux Wire 9 Mm (1kg/roll) 3 71 Unit Food Cart Made With Metal Framing, Aluminum Plain Sheet With Heavy Duty Side Wheel (l160cm X W90cm X H6ft Fully Customized Food Cart) 3 72 Set Food Keeper (6pcs Stainless Food Warmer (34x28x16cm) 1 73 Set French Curve, L-square, Hip Curve, Ruler Aluminium Set 4 74 Unit Garden Net (material: Nylon, Size: 9mx100m, Hole Size: 1.5cmx1.5cm 2 75 Unit Garden Net 200 Meter (material: Nylon, Size: 9mx100m, Hole Size: 1.5cmx1.5cm 1 76 Unit Gas Stove Deep Fryer (oil Frying All In-one Machine) Heating Method: Liquified Gas/gas Valve: Low Pressure Valve Iron Plate Size: 55*35 Overall Size: 84.5*48*30 Iron Plate Thickness: 8mm 1 77 Unit Gasoline Engine Power Sprayer Set (type: Single Cylinder, 4 Stroke, Air Cooling Dhv Displacement: 196cc Hp/rpm: 6.5hp/3,600rpm Bore, Stroke: 68*54, Starting System: Recoil Start Intake System And Exhaust System: Standard) Inclusion: 1 Engine Pulley, 1 Kawasaki Auto Pump, 1 Nozzle Long 1 Meter, 1 Power Spray Hose 10m, 1 Return Hose Power Spray, 1 Suction Hose Power Spray, 2 Belt Power Spray, 1 Wheel Pulley, 1 Base Included) 6 78 Unit Glass Cabinet Storage (w14” X H30” X L20”) 1 79 Unit Glass Food Display (w14” X H30” X L20”) 2 80 Unit Glass Food Display (w14” X H30” X L20”) 81 Pcs Goat 5 82 Unit Grinder 9556nb Model (continuous Rating Input 850w, Wheel Diameter 100mm, 220v~3.8a) 1 83 Unit Hair Straightener Professional Edition Electric Fast Heat Iron Ceramic Hair Iron (input: Ac220-240v, Power 50w) 4 84 Pc Hammer (16oz Large Or 12.5 With Rubber Handle And Nail Puller) 1 85 Unit Heavy Duty Barber Shop Trolley 5 Layers Salon Tools Haircut Accessories Holder Storage-movable 4 86 Unit Heavy Duty Coconut Presser 14t(hydraulic Jack-type Coconut Presser, 14pcsof Grated Coconuts Per Pressing, Driven By A 10-ton Capacity Hydraulic Jack, High-quality Stainless Plate And Tray With A Durable Steel Structure) 5 87 Unit Heavy Duty Foam Tank, Foam Wash Machine 21 Gal. 1 88 Unit Heavy Duty Hand Truck Double And Curved 150-300 Kg 2 89 Unit Heavy Duty Wet And Dry 1.5hp Coconut Grater With Stainless Blade And Basin (1.1k Watts, 1.5hp, High Torque, Stainless Star Blade, Stainless Basin, With Exhaust Fan On Motor, Dual Rotation: Clockwise Or Counter) With Sand 1 90 Unit Heavy Duty Wet And Dry 1.5hp Coconut Grater With Stainless Blade And Basin (1.1k Watts, 1.5hp, High Torque, Stainless Star Blade, Stainless Basin, With The Exhaust Fan On The Motor, Dual Rotation: Clockwise Or Counter) 6 91 Unit Heavy-duty Cast Iron Gas Stove/kalan; 3 Adjustable Gas Valve, 3 Burner Rings 6 92 Unit Heavy-duty Wet And Dry Grinding Machine (3hp) 1 93 Unit High Pressure Electric Airless Paint Spray Paint Machine With (nozzle Diameter: 3.15mm-0.2mm, Power: 1800w, Spray Distance: 50 Cm, Maximum Flow: 1.8l/min, Maximum Working Pressure:20mpa=3000psi, Plug Standard: Eu/us Plug) 5 94 Unit High Quality Cooler Box Polar Ice Box (52 Litters) 1 95 Unit Hog Wire 2 96 Unit Impcat Drill Motor Power 1/2hp (450w) 220v 1 97 Unit Impulse Heat Sealer Plastic Bag Film Sealing Machine 300mm (rated Voltage:110v/220v, Power: 200-350watts) 1 98 Set Industrial Sewing Machine High Speed With Stand And Table With Motor Servo 550v/250v (complete Set) 4 99 Unit Knapsack Electric Sprayer 2in1 Rechargeable Manual 16l (battery Capacity: 8ah, Voltage: Dc12v) 3 100 Set Knife (kitchen Knife Set Stand Knife Holder Stainless Steel Knife Set) 1 101 Unit Kulong Kulong Made With Solid Plain Bar 5/8, Flat Bar And Angle Bar With Heavy Duty Side Wheel (l160cm X W90cm X H6ft Fully Customized Kulong-kulong) 1 102 Unit Lawn Mower Grass Cutter 4 Stroke Grass Cutter (engine Output Power:1,500w, Displacement: 45cc, Engine Type: Air Cooled, 4 Stroke, Single Cylinder, Rated Outer Power: 0.7kw, 7500rpm/0.8kw 7,500rpm) 9 103 Unit Leather Gloves For Welding 12 104 Set Magnetic Screwdriver Set Professional Cushion Grip 5 Flat Head And 4 Philips Tips 2 105 Set Melamine Plate Set ,12 Pcs Plate, 12 Pcs Cups, 6 Pcs Bowl, 12 Pcs Spoon, 12 Pcs Fork 3 106 Set Melamine Plate Set ,12 Pcs Plate, 12 Pcs Cups, 6 Pcs Bowl, 12 Pcs Spoon, 12 Pcs Fork 2 107 Pcs Mirror 3ftx4ft 2 108 Pcs Mixing Bowl 24cm 2 109 Dozen Mugs 9oz (1dozen) 2 110 Unit Nutri-bullet Blender High Speed 600w 1 111 Unit Original Electric Wood Planer 800w (planning Depth: 3mm; 16000rpm 7 112 Unit Oven Two-tier Two-tray Power-off Oven Internal Dimension: 61.5x43x15cm Product Power: 6.4kw Product Size: 88x58x75cm 5 113 Pcs Piglets 20 114 Set Pizza Pan Set Of 6 Aluminum Materials:#1. 11.5x1 , #2. 10.5x1 , #3. 9.75x1 , #4. 8.75x1 , #5. 8x1 , #6. 7x1 1 115 Bale Plastic Cups 10 Oz (1bale) 3 116 Bale Plastic Cups 12 Oz (1bale) 3 117 Dozen Plates 21cm (1dozen) 2 118 Unit Plunge Router ½” W/ Variable Speed 2200w, 220v, Frequency 60 50hz Nut Size – ½” Capacity 12mm,9,000-22,000 Rpm 4 119 Unit Portable Tire Grilling Machine; Range Of Application: 8-19” Tire (center Hole To Edge, Tire Center Hole > 5cm) ; Packing Size: 95x21x21.2cm 3 120 Unit Power Craft 16mm Drill Press (pdp 1016c Model, Motor Power 1/2hp (450w) 220v 1 121 Unit Power Spray Pump Set With 1.5 Electric Motor And 100 Meters Pressure Hose 1 122 Unit Premium Car Tore Air Pressure Inflator Gauge W/ Indicator, 2-200psi 1 123 Set Professional Disassemble Tool Kit 6 In 1 Set ; Size 43*32*9mm; ¼ Sockets: 4, 4.5, 5, 5.5, 6, 7, 8, 9, 10, 11, 12, 13, 14mm; ½ Sockets: 10,11,12,13,14,15,16,17,18,19, 20, 21, 22, 23, 24, 27, 30, 32mm; Spark Plug Sleeve: 16,21mm; Dual Purpose Wrench: 8,9,10,11,12,13,14,15,16,17,18, 19mm 3 124 Unit Professional Hydraulic With Reclining Barber Chair Elite (hydraulic, Reclining: 6ft. Fixed Arms) 4 125 Unit Professional Led Hair Dryer With Temperature Display And Dual Heat Mode (2200w Power, 220-240volts 7 126 Unit Professional Table Saw Machine For Wood Bench Cutting Machine Circular Saw Cutter 1800w8-inch Extended Version (specs: 1800w Power, 220-240 Volts, 50hz Frequency, 2 M Power Cord) 45mm Minimum Cutting Height, 350mm Saw Blade To Backer, Saw Blade Diameter 210mm/200mm, Saw Blade Angle 0-45 Degrees Adjustable, Table Size L52” X W45-60cm Adjustable) Complete Set. 1 127 Unit Rotary Cultivator Scarifier Gasoline Micro Cultivator Mower Rotary Tiller For Farming (gasoline Selection:91 Or 95, Fuel Consumption: 480g/kw*h, Horse Power: 7.5 Hp, Engine 4-stroke Engine) Complete Set 1 128 Pc Round Stool Hydraulic Chair With Wheels Adjustable Size 4 129 Unit Sander Electric Polisher Orbital Sander Machine Power Tool (220 Volts, 200w Power, Rated Frequency 50hz, Plate Size 100x100mm, Size 100x100x125mm) 6 130 Unit Saw Shaft Spindle W/ Pillow Block Spb 3 Ply, 3 Pulley Diameter; 1 ¼ “ 1 131 Roll Sdr-11 Hdpe Black Pipe Garden Irrigation Hose 1” 200meters 1 132 Roll Sdr-11 Hdpe Black Pipe Water Line ½” 1 133 Unit Silyasi/kawali Big Size Makapal Aluminium Frying Pan(76*69cmx23cm) Extra Xl 2 134 Unit Square Tank 1000 Liter (dimension: H1.2mxw1mxl1.2m) 3 135 Set Stainless Steel Rectangular Food Warmer With Glass Lid Cover 6 Sets (34x28x16cm) 2 136 Unit Stainless Steel Thicker Mixing Bowl (40cm Thickened 40cm Width) 1 137 Unit Stainless Steel Welding Machine With One Mig Torch, 1kg; 0.8mm Flux Welding Wire Earth Clamp, Electrode Holder, 2mgas Tube 220v, Ocs: 60v, Mma:200a, Frequency: 20/60hz 8 138 Unit Steamer 3 Layer 9 139 Set Stew Pots Stainless Steel Pot H-05 Stainless Cookware 1 Set (5pcs) 1 140 Pcs Stool Chair With Backrest Chair For Beauty Salon (can Carry 90kg, Adjustable And 360 Degrees Rotation 3 141 Roll Submersible Discharge Duct Flat Hose 2” 2 142 Unit Submersible Water Pump Hose Discharge Duct Flat Blue Hose Pvc 3” (300 Meters) 1 143 Sack Sugar 1 Sack 1 144 Unit Tarpaulin (2x3 Ft) 90 145 Unit Thick “”silyasi/kawali” Big Size, Aluminum Frying Pan(76*69cmx23cm) Extra Xl 6 146 Unit Tire Bead Breaks Manual Tire Repair Stripper, Diameter: 15”-20” 1 147 Pcs Tire Patch Roller 6/12mm 6 148 Unit Tire Patch Roller; Roller Width: 20mm; Roller Diameter: 36mm 1 149 Box Tire Patch Vulcanizing Patel 40mm (150pcs/ Box) 3 150 Unit Tire Pressure Gauge, 200psi 2 151 Unit Tire Vulcanizing Machine; Voltage:220; Input Power: 500w; Temperature: 145 165c 3 152 Unit Trolley Gasoline Engine Sprayer Tf-22a/168f-120 1 153 Set T-wrench, T-handle Sockets; 5 Keys Set Content: 8 - 10 - 12 - 13 - 14mm 1 154 Unit Upright Chiller (7 Cu. Ft. Chiller) 1 155 Unit Vulcanizing Machine 220v W/ Iron Tire Remover 1 156 Unit Water Dispenser (hot And Cold Automatic W/ Pump) 2 157 Pc Water Jug Cooler Insulated Bucket 21l 1 158 Unit Welding Helmet-auto Darkening Helmet/mask For Welding Flames Viewing Window 92.5x42.5mm Lens Dimension, 110x90x9mm, Shade: 13,12,11,10,9 6 159 Unit White Polyester Sewing Thread 3000m/cone 80 160 Unit White Sugar 1 End-user: Dole Beneficiaries

Department Of Education Division Of Pangasinan I Tender

Solar Installation and Products...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Philippines
Closing Soon27 Nov 2024
Tender AmountPHP 139.7 K (USD 2.3 K)
Details: Description Request For Quotation No.: 2024-10-148-gs-rebid Date Published: November 19, 2024 Closing Date: November 27, 2024 At 9:00 Am, Pst (refer To Bac Office Wall Clock) Opening Of Quotation: November 27, 2024 At 9:30 Am, Pst Title Of The Projects: Procurement Of Technical Vocational Livelihood (tvl) Learning Tools And Equipment For Front Office Services (rebid) Approved Budget For The Contract (abc): ₱139,700.00 Funding Source: Sub-aro No. Osec-1-23-1946 Unit Description Quantity Unit Price Ceiling (php) Price Ceiling (php) Unit Calculator Type: Simple Calculator, Non-scientific; Body Material: Hard Plastic ; Minimum Size: 110mm Width X 140mm Long; Lcd Display: At Least Font Size Is 8mm X R5mm; With Dual Power, Solar Cell And Battery; With At Least 8 Digits Display; Includes Spare Battery; Packed With Protective Carton Box User'd Manuel In English Which Includes: A. Parts Manuals With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment, Branded 4 310.27 1,241.08 Unit Cart, Bell Boy Type: Hotel Luggage Trolley Capacity: At Least 450 Kilograms Minimum Dimensions: Length: 1000mm X Width - 600mm X Height - 1700mm Frame Material: Stainless Steel Tubing Stainless Tube Diameter: At Least 35mm Black Powder Coated Steel Platform With Carpeted Surface And Rubber Bumper At The Edge With 4 Pieces X 200mm Diameter Black Pneumatic Swivel Wheels Packed With Shipping Carton Box Branded 2 23,701.166 47,402.33 Unit Cash Register With Drawer Printer: Width: 57mm (minimum) Speed: 2 Lines/sec (minimum) Lcd Display Size: 5cm Width X 10m Long(minimum) With Drawer At Least 4 Bills And 5 Coins Compartments With Drawer Dimension At Least 410mm Width X 450mm Depth Input Method: Numeric 10-key Interface With At Least 2 Ports Power Source: 220- 240volts Ac, 50/60hz: With Ac/dc Adapter Can Be Operated With Battery Programmable User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment, Packed With Carton Box With Styrofoam Protection 1 24,265.37 24,265.37 Unit Detector, Fake Bills Led Display Size: Atleast 5cm X Width 10cm Long: Hard Plastic Casing Uitraviolet (uv) And Magnetic (mg) Sensors, Power Source Built In Rechargeable Battery,12v Output And Ac 100-240v Adapter: With Complete Detection: Accessories Incudes: Tough Plastic Carrying Case, Power Cord,cleaning Brush, And Power Charger, User's Manual In English Which Includes: A. Parts Manual With Labels B.assembly Instructions, C. Operating Procedures On How To Use The Equipment 2 346.233 692.47 Unit Guest Folio Rack Material Hard Plastic Accommodates At Least 50 Room Divider Indexes: With Divider Boards With Metal Tabs: A4 Size Divider: With Metal Sidings 3 1,623.70 4,871.10 Unit Hypercom Memory: 1 Mb Ram (minimum) Lcd Display:160 X 80 Pixel Graphics (minimum) With Card Reader Magnetic Stripe Pin Pad Port: 4wire, Rs48s; With Peripheral Ports For Pc Connection; Electronic Cash Register Or Journal Printer; With At Least 2400bps Modem Support Synchronous (sdlc) And Asynchronous, Lan Operation; With Pin Encryption; With Thermal Printer At Least 576 Dots Per Line; Thermal Paper - 2 Inches Wide X 3 Inches Roll Diameter (min). Keypad: Membrane, 12keys, Water-resistant; Dimension Length: 10 Inches; Width: 5 Inches; Height: 2 Inches (minimum) Power: 220-250 Volts Ac, 50/60 Hz; Dc: 24 V, 1a, User's Manual In English Which Includes (a) Parts Manual With Labels, (b)assembly Instructions, (c) Operating Procedures On How To Use The Equipment 1 13,315.71 13,315.71 Unit Key Rack Rack Material: Wood Number Of Racks: Can Accommodate At Least 40 Key Cards Minimum Rack Size:70mm Width X 110mm Height Depth Of The Rack At Least 50mm Any Color Paint Type: Wall Mounted Rack Pack With Shipping Carton Box 2 12,283.700 24,567.40 Unit Safety Deposit Box/drop Vault Material: Metal, Powder Coated, Solid Steel Door Thickness: 4mm (minimum); Body Thickness: 2mm(minimum) Minimum Outer Dimension L: 30cm X H: 20cm W: 20cm; Electronic Lock System Battery Operated Digital Panel Requires 4x 'aa' Batteries User's Manual In English Which Includes A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures On How To Use The Equipment, Branded 1 20,410.000 20,410.00 Unit Speaker, Lapel Frequency At Least 500mhz With Audio Input Connector; With Operation Range At Least 50 Meters Receiver/70ma; Earphone Output Level: 32ohm, 65mw Operates With Energizer Battery With Minimum Power Consumption Of Transmitter At Least 3v/70ma Receiver:3v/70m 2 1,467.27 2,934.54 Recipient School (1): Bayoyong National High School Total ₱139,700.00 Documentary Requirements: • Valid Mayor’s Permit • Valid Philgeps Registration Certificate/ Membership • Updated Income/ Business Tax Return (for Projects With Abc ₱500,000 Above) • Omnibus Sworn Statement (for Projects With Abc ₱50,000 Above) The Schools Division Office I Pangasinan Hereinafter Referred To As The Procuring Entity Through Its Bids And Awards Committee (bac) Now Invites To Quote Your Lowest Price Inclusive Of All Taxes On The Above-mentioned Project, Subject To The Terms And Condition Of This Request For Quotation (rfq) Documents. All Particulars Relative To This Procurement Shall Be Conducted In Accordance With The Revised Implementing Rules And Regulation Of Republic Act No. 9184. Bid Documents And Price Quotation Forms May Be Acquired By Interested Suppliers At The Bac Office, 4/f, Bldg., 3 Sdo 1 Pangasinan And Upon Payment Of The Applicable Fee Pursuant To The Latest Guidelines Issued By The Gppb. Quotations And Documentary Requirements Must Be Placed In A Sealed Envelope With Marked Rfq For The Procurement Of Technical Vocational Livelihood (tvl) Learning Tools And Equipment For Front Office Services (rebid) And With Signature Over And Across The Sealing Tape When Submitted. Quotation And Documentary Requirements Must Be Submitted At The Division Office Not Later Than November 27, 2024 At 9:00 Am, Pst-refer To Bac Office Wall Clock; The Bac Shall Open The Quotations On November 27, 2024 At 9:30 Am. Schools Division Office I Pangasinan Reserves The Right To Accept Or Reject Any Quotation; To Annul The Bidding Process And Reject All Quotations At Any Time Prior To Contract Award Without Hereby Incurring Any Liability To The Affected Bidder Or Bidders; To Waive Any Minor Defects Or Infirmities Therein; And To Accept Such Quotation As May Be Considered Advantageous To The Government. Very Truly Yours, Arlene B. Casipit, Ceso Vi Bac Chairman Terms Of Reference A. Instructions 1. Supplier Shall Be Responsible For The Source(s) Of Its Goods/equipment And Shall Make The Deliveries In Accordance With The Schedule, And Specifications Of The Award Or Purchase Order. Failure Of The Supplier To Comply With This Provision Shall Be Grounds For Cancellation Of The Award Or Purchase Order Issued To The Supplier. 2. Supplier Shall Pick-up The Purchase Order And Notice To Proceed Issued In Its Favor Within Three (3) Calendar Days From Date Of Receipt Of Notice To That Effect. A Fax Transmission Or Electronic Mail Shall Constitute An Official Notice To The Supplier. Thereafter, If The Purchase Order Remains Unclaimed, The Purchase Order Shall Be Cancelled. 3. To Avoid Delay In The Delivery Of The Requesting Agency’s Requirements, All Defaulting Supplier Shall Be Precluded From Proposing Or Submitting Substitute Quotation(s) Or Item(s). 4. Supplier Who Accepted A Purchase Order And Notice To Proceed But Failed To Deliver The Required Goods Within The Time Called For In The Purchase Order Shall Be Disqualified From Participating In Deped Sdo 1 Pangasinan Or Any Of Deped Sdo 1 Pangasinan Units’ Future Procurement Activities. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a. 9184 And Its Revised Irr Against The Supplier. 5. Rejected Deliveries Shall Be Construed As Non-delivery And Shall Be Replaced By The Supplier Subject To Liquidated Damages For Delayed Deliveries. 6. All Duties, Excise, And Other Taxes And Revenue Charges Shall Be Paid By The Supplier. 7. As A Pre-condition To Payment, Importation Documents Specifically Showing The Conditions And Serial Numbers Of The Imported Equipment Purchased Shall Be Submitted By The Supplier To The Department Of Education. 8. All Transactions Are Subject To Withholding Of Credible Value Added Tax And/or Expanded Value Added Tax Per Revenue Regulation(s) Of The Bureau Of Internal Revenue. B. Packing The Supplier Shall Provide Such Packing Of The Goods Appropriate To Prevent Their Damage Or Deterioration During Transit To The Project Site. Goods Shall Be Packed With Label Identifying Content And Other Applicable Packaging Symbols With Name Of The Purchaser. C. Inspection 1. All Deliveries By Supplier Shall Be Subject To Inspection, And Acceptance By The Deped Sdo 1 Pangasinan Inspection Team And The End-user. All Costs Of The Necessary Laboratory Tests Undertaken By Deped Sdo 1 Pangasinan On The Goods Shall Be To The Account Of Supplier. 2. For The Purpose Of This Condition, Deped Sdo 1 Pangasinan Shall Constitute An Inspectorate Team To Conduct Pre-delivery Inspection Of The Goods At The Supplier’s Warehouse Or Production Site And Inspection Upon Delivery At The Project Site. D. Liquidated Damages A Penalty Of One-tenth Of One Percent (0.001) Of The Total Value Of The Undelivered Goods Shall Be Charged As Liquidated Damages For Every Day Of Delay Of The Delivery Of The Purchased Goods. E. Payment 1. As A General Rule, No Advance Payment, Or Any Payment Made Prior To The Delivery And Acceptance Of Goods, Shall Be Made To Any Supplier/manufacturer/distributor, Subject To The Following Exceptions: A. When There Is Prior Approval By The President; B. For Procurement Of Services Where Requirement Of Down Payment Is A Standard Industry Practice, Such As: Hotel And Restaurant Services, Use Of Conference/seminar And Exhibit Areas, And Lease Of Office Space; C. For Procurement Of Goods Required To Address Contingencies Arising From Natural Or Man-made Calamities; And D. Upon Submission Of An Irrevocable Letter Of Credit Or Bank Guarantee Issued By A Universal Or Commercial Bank. 2. Partial Payment Of The Contract Price Will Only Be Allowed If The Contract Provides/allows For Partial Or Staggered Delivery Of Goods Procured, And Such Partial Payment Must Correspond To The Value Of The Goods Delivered And Accepted. 3. Payment Must Only Be Made After The Appropriate Inspection And Acceptance Procedures, As Mandated By Existing Government Rules And Regulations, Have Been Complied With By The Procuring Entity; And 4. Payment Must Be Made In Accordance With Prevailing Accounting And Auditing Rules And Regulations. F. Warranty In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Security Shall Be Required From The Contract Awardee For A Minimum Period Of Three (3) Months, In The Case Of Expendable Supplies, Or A Minimum Period Of One (1) Year, In The Case Of Non-expendable Supplies, After Acceptance By The Procuring Entity Of The Delivered Supplies. The Obligation For The Warranty Shall Be Covered By Either Retention Money In An Amount Equivalent To At Least One Percent (1%) But Not To Exceed Five Percent (5%) Of Every Progress Payment, Or A Special Bank Guarantee Equivalent To At Least One Percent (1%) But Not To Exceed Five Percent (5%) Of The Total Contract Price. The Said Amounts Shall Only Be Released After The Lapse Of The Warranty Period Or, In The Case Of Expendable Supplies, After Consumption Thereof: Provided, However, That The Supplies Delivered Are Free From Patent And Latent Defects And All The Conditions Imposed Under The Contract Have Been Fully Met.

Municipality Of Badiangan, Iloilo Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Soon25 Nov 2024
Tender AmountPHP 291.5 K (USD 4.9 K)
Details: Description Section Ii. Instructions To Bidders A. General 1. Scope Of Bid 1.1 The Procuring Entity Named In The Bds Invites Bids For The Supply And Delivery Of The Goods As Described In Section Vii. Technical Specifications. 1.2 The Name, Identification, And Number Of Lots Specific To This Bidding Are Provided In The Bds. The Contracting Strategy And Basis Of Evaluation Of Lots Is Described In Itb Clause 28. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1 Unless Otherwise Specified In The Bds, The Procuring Entity As Well As The Bidders And Suppliers Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Procuring Entity: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows (i) “corrupt Practice” Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Government, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Ra 3019; (ii) “fraudulent Practice” Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition. (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels. (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Any Of The Practices Mentioned In This Clause For Purposes Of Competing For The Contract. 3.2 Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3 Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Bidder Or Supplier In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 3. 4. Conflict Of Interest 4.1 All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) Below And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (f) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; Or (f) (g) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid. A Bidder Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2 In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) (d) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And If The Bidder Is A Cooperative, To All Its Officers, Directors And Controlling Share Holders Or Members; And (e) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1 Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Sixty Percent (60%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Sixty Percent (60%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Sixty Percent (60%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Sixty Percent (60%). 5.2 Foreign Bidders May Be Eligible To Participate When Any Of The Following Circumstances Exist, As Specified In The Bds. (a) When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra 9184 And Its Irr Allow Foreign Bidders To Participate; (b) Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; (c) When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or (d) When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. 5.3 Government Owned Or Controlled Corporations (goccs) May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Attached Agencies Of The Procuring Entity. 5.4 Unless Otherwise Provided In The Bds, The Bidder Must Have Completed A Single Largest Completed Contract (slcc) Similar To The Project The Value Of Which, Adjusted If Necessary, By The Bidder To Current Prices Using The Philippine Statistics Authority (psa) Consumer Price Index, Must Be At Least Equivalent To A Percentage Of The Abc Stated In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In The Bds, And Completed Within The Relevant Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(ii). 5.5 Unless Otherwise Provided In The Bds, The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Which Must Be At Least Equal To The Abc To Be Bid, Calculated As Follows: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. Where: K = 15 The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir, Through Its Electronic Filling And Payment System (efps). If The Prospective Bidder Opts To Submit A Committed Line Of Credit (clc), It Must Be At Least Equal To Ten Percent (10%) Of The Abc To Be Bid And Issued By Auniversal Or Commercial Bank. 6. Bidders Responsibilities 6.1 The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Viii – Bidding Forms As Required In Itb Clause 12.1(b)(iv). 6.2 The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin(s) As Provided Under Itb Clause 10.4; (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting. (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of Ra 9184 In Relation To Other Provisions Of Ra 3019; And (j) (k) (l) Complying With Existing Labor Laws And Standards, In The Case Of Procurement Of Services Ensuring That It Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Of Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3 The Bidder Is Expected To Examine All Instructions, Forms, Terms, And Specifications In The Bidding Documents. Unless Otherwise Indicated In The Bds, Failure To Furnish All Information Or Documentation Required In The Bidding Documents Shall Result In The Rejection Of The Bid And The Disqualification Of The Bidder. 6.4 It Shall Be The Sole Responsibility Of The Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To The Contract To Be Bid, Including: (a) The Location And The Nature Of This Project; (b) Climatic Conditions; (c) Transportation Facilities; And (d) Other Factors That May Affect The Cost, Duration, And Execution Or Implementation Of This Project. 6.5 The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. However, The Procuring Entity Shall Ensure That All Information In The Bidding Documents, Including Bid/supplemental Bid Bulletin/s Issued, Are Correct And Consistent. 6.6 The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.7 Before Submitting Their Bids, The Bidder Is Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect This Project In Any Way. 6.8 The Bidder Should Note That The Procuring Entity Will Accept Bids Only From Those That Have Paid The Non-refundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services Unless Otherwise Indicated In The Bds, There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations, Subject To Itb Clause 27.1. 8. Subcontracts 8.1 Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Goods To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2 Subcontractors Must Comply With The Eligibility Criteria And The Documentary Requirements Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Goods Shall Be Disallowed. 8.3 The Bidder May Identify The Subcontractor To Whom A Portion Of The Goods Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of The Bidding Documents 9. Pre-bid Conference 9.1 If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. 9.2 Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents Discussed During The Pre-bid Conference. 9.3 Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1 Bidders Who Have Purchased The Bidding Documents May Request For Clarifications On Any Part Of The Bidding Documents For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2 Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3 Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components. 12.1 Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents - Class "a" Documents: (i) Philgeps Platinum Certificate Of Registration And Membership With Annex A In Accordance With Section 8.5.2 Of The Irr. (ii) Statement Of All Its Ongoing Government And Private Contracts Within The Period Stated In The Bds, Including Contracts Awarded But Not Yet Started, If Any. Statement Of The Bidder's Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, In Accordance With Itb Clause 5.4, Within The Relevant Period As Provided In The Bds. The Two Statements Required Shall Indicate For Each Contract The Following: (ii.1) Name Of The Contract; (ii.2) Date Of The Contract; (ii.3) Contract Duration; (ii.4) Owner's Name And Address; (ii.5) Kinds Of Goods; (ii.6) (ii.7) (ii.8) (ii.9) For Statement Of Ongoing Contracts- Amount Of Contract And Value Of Outstanding Contracts; For Statement Of Slcc-amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa's Consumer Price Index, If Necessary For The Purpose Of Meeting The Slcc Requirement; Date Of Delivery; And End User's Acceptance Or Official Receipt(s) Or Sales Invoice Issued For The Contract, If Completed, Which Shall Be Attached To The Statements. (iii) The Prospective Bidder’s Computation Of Its Net Financial Contracting Capacity (nfcc) Which Must Be At Least Equal To The Abc To Be Bid, Calculated As Follows: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. Where: K = 15 The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Data Submitted To The Bir, Through Its Electronic Filling And Payment System (efps). Or A Committed Line Of Credit From A Universal Or Commercial Bank (not Applicable To Procurement Of Infrastructure Projects) Class "b" Document: (iv) If Applicable, The Jva In Case The Joint Venture Is Already In Existence, Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. (b) Technical Documents - (i) Bid Security In Accordance With Itb Clause 18. If The Procuring Entity Requires The Bidders To Submit The Bid Security In The Form Of: (i.1) Cash Or Cashier’s/ Manager’s Check, Issued By A Universal Or Commercial Bank; Or (i.2) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Universal/ Commercial Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank, If Issued By A Foreign Bank; Or (i.3) (i.4) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; Bid Securing Declaration (ii) (iii) Statement Of Compliance To The Schedule Of Requirements Conformity With Technical Specifications, As Enumerated And Specified In Sections Vi And Vii Of The Bidding Documents; And (iv) Sworn Statement In Accordance With Section 25.2(a)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Viii – Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1 Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form, Which Includes Bid Prices And The Bill Of Quantities And The Applicable Price Schedules, In Accordance With Itb Clauses 15.1 And 15.4; (b) If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification From The Dti, Sec, Or Cda Issued In Accordance With Itb Clause 27; And (c) Any Other Document Required In The Bds 13.2 Unless Otherwise Stated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. 14. Alternative Bids Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 15. Bid Prices 15.1 The Bidder Shall Complete The Appropriate Price Schedules Included Herein, Stating The Unit Prices, Total Price Per Item, The Total Amount And The Expected Countries Of Origin Of The Goods To Be Supplied Under This Project. 15.2 The Bidder Shall Fill In Rates And Prices For All Items Of The Goods Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) Or A Dash (-) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3 The Terms Ex Works (exw), Cost, Insurance And Freight (cif), Cost And Insurance Paid To (cip), Delivered Duty Paid (ddp), And Other Trade Terms Used To Describe The Obligations Of The Parties, Shall Be Governed By The Rules Prescribed In The Current Edition Of The International Commercial Terms (incoterms) Published By The International Chamber Of Commerce, Paris. 15.4 Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: (a) For Goods Offered From Within The Procuring Entity’s Country (i) The Price Of The Goods Quoted Exw (ex Works, Ex Factory, Ex Warehouse, Ex Showroom, Or Off-the-shelf, As Applicable), Including All Customs Duties And Sales And Other Taxes Already Paid Or Payable (i.1) On The Components And Raw Material Used In The Manufacture Or Assembly Of Goods Quoted Ex Works Or Ex Factory; Or (i.2) On The Previously Imported Goods Of Foreign Origin Quoted Ex Warehouse, Ex Showroom, Or Off-the-shelf And Any Procuring Entity Country Sales And Other Taxes Which Will Be Payable On The Goods If The Contract Is Awarded. (ii) The Price For Inland Transportation, Insurance, And Other Local Costs Incidental To Delivery Of The Goods To Their Final Destination. (iii) The Price Of Other (incidental) Services, If Any, Listed In The Bds. (b) For Goods Offered From Abroad: (i) Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Ddp With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. (ii) The Price Of Other (incidental) Services, If Any, Listed In The Bds 15.5 Prices Quoted By The Bidder Shall Be Fixed During The Bidder’s Performance Of The Contract And Not Subject To Variation Or Price Escalation On Any Account, Unless Otherwise Specified In The Bds. A Bid Submitted With An Adjustable Price Quotation Shall Be Treated As Non-responsive And Shall Be Rejected, Pursuant To Itb Clause 24. 15.6 All Bid Prices Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Indicated In The Bds And Specified In The Gcc And Its Corresponding Scc Provision. 16. Bid Currencies 16.1 Prices Shall Be Quoted In The Following Currencies: (a) For Goods That The Bidder Will Supply From Within The Philippines, The Prices Shall Be Quoted In Philippine Pesos. (b) For Goods That The Bidder Will Supply From Outside The Philippines, The Prices May Be Quoted In The Currency(ies) Stated In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.2 If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Foregoing Exchange Rates. 16.3 Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1 Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2 In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1 The Procuring Entity Shall Prescribe In The Bds The Acceptable Forms Of Bid Security That Bidders May Opt To Use, Which Shall Include The Bid Securing Declaration (bsd) Or Any Other Form Of Bid Security And The Amount Of Which Shall Be Equal To A Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (not Less Than The Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Five Percent (5%) For Biddings Conducted By Lgus, The Procuring Entity May Also Require Bidders To Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. The Bid Securing Declaration Mentioned Above Is An Undertaking Which States, Among Others, That The Bidder Shall Enter Into Contract With The Procuring Entity And Furnish The Performance Security Required Under Itb Clause 33.2, From Receipt Of The Notice Of Award, And Committing To Pay The Corresponding Fine, And Be Suspended For A Period Of Time From Being Qualified To Participate In Any Government Procurement Activity In The Event It Violates Any Of The Conditions Stated Therein As Provided In The Guidelines Issued By The Gppb. 18.2 The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated And Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4 Upon Signing And Execution Of The Contract Pursuant To Itb Clause 32, And The Posting Of The Performance Security Pursuant To Itb Clause 33, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In The Itb Clause 18.2. 18.5 The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 28.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 29.2; Or (iv) Any Other Reason Stated In The Bds. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 32; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 33; Or (iii) Any Other Reason Stated In The Bds. 19. Format And Signing Of Bids 19.1 Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Viii – Bidding Forms On Or Before The Deadline Specified In The Itb Clauses 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2 Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested 19.3 The Bidder Shall Prepare And Submit An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Machine Copies, The Original Shall Prevail. 19.4 Each And Every Page Of The Bid Form, Including The Schedule Of Prices, Under Section Viii Hereof, Shall Be Signed By The Duly Authorized Representative/s Of The Bidder. Failure To Do So Shall Be A Ground For The Rejection Of The Bid. 19.5 Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1 Unless Otherwise Indicated In The Bds, Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12in One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2 Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3 The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Computerized In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4 All Envelopes Shall (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 1.1, (d) Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1.2; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5 Bid Envelopes That Are Not Properly Sealed And Marked As Required In The Bidding Documents, Shall Not Be Rejected, But The Bidder Or Its Duly Authorized Representative Shall Acknowledge Such Condition Of The Bid As Submitted. The Bac Or The Procuring Entity Shall Assume No Responsibility For The Misplacement Of The Contents Of The Improperly Sealed Or Marked Bid, Or For Its Premature Opening. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity 23. Modification And Withdrawal Of Bids 23.1 The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2 A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Letter Of Withdrawal Must Be Executed By The Duly Authorized Representative Of The Bidder Identified In The Omnibus Sworn Statement, A Copy Of Which Should Be Attached To The Letter. 23.3 Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4 No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr 24. Opening And Preliminary Examination Of Bids 24.1 24.2 The Bac Shall Open The Bids In Public, Immediately After The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Bac Shall Take Custody Of The Bids Submitted And Reschedule The Opening Of Bids On The Next Working Day Or At The Soonest Possible Time Through The Issuance Of A Notice Of Postponement To Be Posted In The Philgeps Website Of The Procuring Entity Concerned, If Available. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.3 Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.2, The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison 24.4 Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions 24.5 If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (v). 24.6 In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Described In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.7 Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Requirements In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(v) By Any Of The Joint Venture Partners Constitutes Compliance. 24.8 The Procuring Entity Shall Prepare The Minutes Of The Proceedings Of The Bid Opening That Shall Include, As A Minimum: (a) Names Of Bidders, Their Bid Price, Bid Security, Findings Of Preliminary Examination; And (b) Attendance Sheet. The Bac Members Shall Sign The Abstract Of Bids As Read. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1 Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless Otherwise Allowed In The Bds Or In The Case Of Itb Clause 26. 25.2 Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison, And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered. 27. Domestic Preference 27.1 Unless Otherwise Stated In The Bds, The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With The Following: (a) The Preference Shall Be Applied When (i) The Lowest Foreign Bid Is Lower Than The Lowest Bid Offered By A Domestic Bidder, Or (ii) The Lowest Bid Offered By A Non-philippine National Is Lower Than The Lowest Bid Offered By A Domestic Entity. (b) For Evaluation Purposes, The Lowest Foreign Bid Or The Bid Offered By A Non-philippine National Shall Be Increased By Fifteen Percent (15%). (c) In The Event That (i) The Lowest Bid Offered By A Domestic Entity Does Not Exceed The Lowest Foreign Bid As Increased, Or (ii) The Lowest Bid Offered By A Non-philippine National As Increased, Then The Procuring Entity Shall Award The Contract To The Domestic Bidder/entity At The Amount Of The Lowest Foreign Bid Or The Bid Offered By A Non-philippine National, As The Case May Be. (d) If The Domestic Entity/bidder Refuses To Accept The Award Of Contract At The Amount Of The Foreign Bid Or Bid Offered By A Non-philippine National Within Two (2) Calendar Days From Receipt Of Written Advice From The Bac, The Procuring Entity Shall Award To The Bidder Offering The Foreign Bid Or The Non-philippine National, As The Case May Be, Subject To Post-qualification And Submission Of All The Documentary Requirements Under These Bidding Documents. 27.2 A Bidder May Be Granted Preference As A Domestic Entity Subject To The Certification From The Dti (in Case Of Sole Proprietorships), Sec (in Case Of Partnerships And Corporations), Or Cda (in Case Of Cooperatives) That The (a) Sole Proprietor Is A Citizen Of The Philippines Or The Partnership, Corporation, Cooperative, Or Association Is Duly Organized Under The Laws Of The Philippines With At Least Seventy Five Percent (75%) Of Its Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, (b) Habitually Established In Business And Habitually Engaged In The Manufacture Or Sale Of The Merchandise Covered By His Bid, And (c) The Business Has Been In Existence For At Least Five (5) Consecutive Years Prior To The Advertisement And/or Posting Of The Invitation To Bid For This Project. 27.3 A Bidder May Be Granted Preference As A Domestic Bidder Subject To The Certification From The Dti That The Bidder Is Offering Unmanufactured Articles, Materials Or Supplies Of The Growth Or Production Of The Philippines, Or Manufactured Articles, Materials, Or Supplies Manufactured Or To Be Manufactured In The Philippines Substantially From Articles, Materials, Or Supplies Of The Growth, Production, Or Manufacture, As The Case May Be, Of The Philippines. 28. Detailed Evaluation And Comparison Of Bids 28.1 The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 28.2 The Lowest Calculated Bid Shall Be Determined In Two Steps. (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To The Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 28.3 The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. Unless Otherwise Specified In The Bds, The Bac Shall Consider The Following In The Evaluation Of Bids. (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) Or A Dash (-) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications, If Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 28.4 Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered. 28.5 Unless Otherwise Indicated In The Bds, The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form. 28.6 Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 29. Post-qualification 29.1 The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 29.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Latest Income And Business Tax Returns In The Form Specified In The Bds; (b) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lowest Calculated Bid To Duly Submit The Above Requirements On Time Under This Clause Or A Finding Against The Veracity Of Such Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 29.3 The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 29.4 If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Bid Price Or Its Calculated Bid Price, Whichever Is Lower. 29.5 A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated Responsive Bid Is Determined For Contract Award. 29.6 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. 30. Reservation Clause 30.1 Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 30.2 Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Gop As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 30.3 In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made In Accordance With Section 40 Of The Irr Of Ra 9184. F. Award Of Contract 31. Contract Award 31.1 Subject To Itb Clause 29, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lcrb. 31.2 Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Bidder With The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 31.3 Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Valid Jva, If Applicable, Within Ten (10) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That The Bidder Has The Lcrb; (b) Posting Of The Performance Security In Accordance With Itb Clause 33; (c) Signing Of The Contract As Provided In Itb Clause 32; And (d) Approval By Higher Authority, If Required. 31.4 At The Time Of Contract Award, The Procuring Entity Shall Not Increase Or Decrease The Quantity Of Goods Originally Specified In Section Vi – Schedule Of Requirements. 32. Signing Of The Contract 32.1 At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 32.2 Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security And Sign And Date The Contract And Return It To The Procuring Entity. 32.3 The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 32.4 The Following Documents Shall Form Part Of The Contract. (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Notice Of Award Of Contract; And (f) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 33. Performance Security 33.1 To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 33.2 The Procuring Entity Shall Prescribe At Least One (1) Acceptable Form Of Performance Security Taken From The Categories Below That Bidders May Opt To Use, Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity: Form Of Performance Security Amount Of Performance Security (not Less Than The Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank Five Percent (5%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. Thirty Percent (30%) (d) Performance Securing Declaration (psd) None 33.3 Performance Security As Indicated In Section 17.1 (k) And 39 Of The 2016 Revised Irr Of Ra No. 9184, While Includes The Performance Securing Declaration (psd) As An Alternative Performance Security During A State Of Calamity Or Imposition Of Community Quarantine Pursuant To Gppb Resolution No. 09-2020. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lcrb Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1 Within Seven (7) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed Together With A Copy Or Copies Of The Approved Contract To The Successful Bidder. All Notices Called For By The Terms Of The Contract Shall Be Effective Only At The Time Of Receipt Thereof By The Successful Bidder. 34.2 The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. 35. Protest Mechanism Decision Of The Procuring Entity At Any Stage Of The Procurement Process May Be Questioned In Accordance With Section 55 Of The Revised Implementing Rules And Regulations Of Republic Act 9184. Section Iii – Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is The Local Government Of Badiangan, Iloilo 1.2 The Reference Is: Supply And Delivery Of Lighting Materials For The Socio-cultural Activities (kasanag Sa Paskwa), Municipal Hall, Badiangan, Iloilo. Project Identification No. 2024 – 060 – B. 2.0 The Funding Source Is Through The General Fund Of The Local Government Of Badiangan, Iloilo In The Amount Of P 291,585.00. 5.1 No Further Instructions. 5.2 None Of The Circumstances Mentioned In The Itb Clause Exists In This Project. Foreign Bidders, Except Those Falling Under Itb Clause 5.2(b), May Not Participate In This Project. 5.4 The Bidder Must Have Completed, Within The Period Specified In The Invitation To Bid And Itb Clause 12.1(a)(ii), A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. For This Purpose, Similar Contracts Shall Refer To The Supply And Delivery Of Goods That Is/are Similar In Type And Brand To The Goods Being Bidded-out. 5.5 No Further Instructions. 6.3 No Further Instructions. 7 No Further Instructions. 8.1 Subcontracting Is Not Allowed. 8.2 Not Applicable. 9.1 Not Applicable. 10.1 The Procuring Entity’s Address Is: Badiangan Municipal Hall R.c. Tabiana St., Poblacion, Badiangan, Iloilo 5033 Contact Person: Mr. Humbert S. Recomono Head: Bac Secretariat Municipal Hall, Badiangan, Iloilo Tel. No. (033) 320-7809 C.p. No. 09198501252 12.1 The First Envelope Shall Contain The Eligibility And Technical Documents Stated In The Itb Clause. However, If The Bidder Maintains A Current And Updated File Of Its Class “a” Documents With The Bac Of The Local Government Of Badiangan, Iloilo, A Certification To That Effect Issued By Its Bac May Be Submitted In Lieu Of The Class “a” Documents. 12.1(a)(i) No Other Acceptable Proof Of Registration Is Recognized 12.1(a)(ii) The Statement Of All Ongoing And Single Largest Completed Government And Private Contracts Shall Include All Such Contracts Within The Last Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 13.1 No Additional Requirements. 13.2 The Approved Budget For The Contract (abc) Is: P 291,585.00 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 15.4(a)(iii) No Incidental Services Required. 15.4(b) Not Applicable. 15.5 Bid Prices Shall Be Fixed. Adjustable Price Proposals Shall Be Treated As Non-responsive And Shall Be Rejected. 15.6 Extraordinary Circumstances Refer To Events That May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. 16.1(b) The Bid Prices For Goods Supplied From Outside Of The Philippines Shall Be Quoted In Philippine Pesos. 16.3 No Further Instructions. 17.1 Bids Shall Be Valid Until 120 Calendar Days After Bidding. 18.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration (bsd), Or Any Of The Following Forms: 1. P (2% Of Abc), If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or 2. P (5% Of Abc), If Bid Security Is In Surety Bond 18.2 The Bid Security Shall Be Valid Until 120 Calendar Days After Bidding. 18.5(a)(iv) The Following Are Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. 18.5(b)(iii) No Further Instructions. 20.1 The Documents Enclosed In The Original Bid Should Be Original Copy Or Duly Stamped Certified True/ Machine Copy With Printed Name And Signature Of The Owner Of The Company Or The Duly Authorized Representative Of The Company As Indicated In The Special Power Of Attorney (spa) Or Secretary’s Certificate. The Duly Authorized Representative Should Have A Specimen Signature In The Spa Or Secretary’s Certificate. 20.3 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. The Photocopied Copies Of The Documents Enclosed In The First And Second Components Of The Bid Should Be Duly Stamped Certified True/ Machine Copy With Printed Name And Signature Of The Owner Of The Company Or The Duly Authorized Representative Of The Company As Indicated In The Special Power Of Attorney (spa) Or Secretary’s Certificate. The Duly Authorized Representative Should Have A Specimen Signature In The Spa Or Secretary’s Certificate. 21 The Address For Submission Of Bids Is: Municipal Budget Office, Municipal Hall, Badiangan, Iloilo The Deadline For Submission Of Bid Is: November 25, 2024; 8:30 A.m. 24.1 The Place Of Bid Opening Is: Municipal Social Hall, Badiangan, Iloilo The Date And Time Of Bid Opening Is: November 25, 2024; 09:00 A.m. 25.1 No Further Instructions. 27.1 No Further Instructions. 28.3 No Further Instructions. 28.3(b) Modification Of Bids Is Not Allowed. 28.5 No Further Instructions. 29.2(a) Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing And Payment System (efps) Shall Be Accepted. Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 29.2(d) None Required. 32.4(g) None Required. 34.2 The Effective Date Of The Contract Is Seven (7) Calendar Days Upon Receipt Of Notice To Proceed Issued By The Procuring Entity. Section Iv. General Conditions Of Contract 1. Definitions 1.1 In This Contract, The Following Terms Shall Be Interpreted As Indicated. (a) “the Contract” Means The Agreement Entered Into Between The Procuring Entity And The Supplier, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. (b) “the Contract Price” Means The Price Payable To The Supplier Under The Contract For The Full And Proper Performance Of Its Contractual Obligations. (c) “the Goods” Means All Of The Supplies, Equipment, Machinery, Spare Parts, Other Materials And/or General Support Services Which The Supplier Is Required To Provide To The Procuring Entity Under The Contract. (d) “the Services” Means Those Services Ancillary To The Supply Of The Goods, Such As Transportation And Insurance, And Any Other Incidental Services, Such As Installation, Commissioning, Provision Of Technical Assistance, Training, And Other Such Obligations Of The Supplier Covered Under The Contract. (e) “gcc” Means The General Conditions Of Contract Contained In This Section. (f) “scc” Means The Special Conditions Of Contract. (g) “the Procuring Entity” Means The Organization Purchasing The Goods, As Named In The Scc,. (h) “the Procuring Entity’s Country” Is The Philippines. (i) “the Supplier” Means The Individual Contractor, Manufacturer, Distributor, Or Firm Supplying/manufacturing The Goods And Services Under This Contract And Named In The Scc, (j) The “funding Source” Means The Organization Named In The Scc,. (k) “the Project Site,” Where Applicable, Means The Place Or Places Named In The Scc, (l) “day” Means Calendar Day. (m) The “effective Date” Of The Contract Will Be The Date Of Receipt By The Supplier Of The Notice To Proceed Or The Date Provided In The Notice To Proceed. Performance Of All Obligations Shall Be Reckoned From The Effective Date Of The Contract. (n) “verified Report” Refers To The Report Submitted By The Implementing Unit To The Head Of The Procuring Entity Setting Forth Its Findings As To The Existence Of Grounds Or Causes For Termination And Explicitly Stating Its Recommendation For The Issuance Of A Notice To Terminate. 2. Corrupt, Fraudulent, Collusive, And Coercive Practices 2.1 The Procuring Entity As Well As The Bidders, Contractors, Or Suppliers Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of This Contract. In Pursuance Of This Policy, The Procuring Entity. (a) Defines, For The Purposes Of This Provision, The Terms Set Forth Below As Follows (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And It Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Government, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019. (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition. (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels. (iv) “coercive Practices “ Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Effect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Intimidating Any Party To Prevent If From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Any Of The Practices Mentioned In This Clause For Purposes Of Competing For The Contract. 3. Inspection And Audit By The Funding Source The Supplier Shall Permit The Funding Source To Inspect The Supplier’s Accounts And Records Relating To The Performance Of The Supplier And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 4. Governing Law And Language 4.1 This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4.2 This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Exchanged By The Parties Shall Be Written In English. 5. Notices 5.1 Any Notice, Request, Or Consent Required Or Permitted To Be Given Or Made Pursuant To This Contract Shall Be In Writing. Any Such Notice, Request, Or Consent Shall Be Deemed To Have Been Given Or Made When Received By The Concerned Party, Either In Person Or Through An Authorized Representative Of The Party To Whom The Communication Is Addressed, Or When Sent By Registered Mail, Telex, Telegram, Or Facsimile To Such Party At The Address Specified In The Scc, Which Shall Be Effective When Delivered And Duly Received Or On The Notice’s Effective Date, Whichever Is Later. 5.2 A Party May Change Its Address For Notice Hereunder By Giving The Other Party Notice Of Such Change Pursuant To The Provisions Listed In The Scc For Gcc Clause 5.1. 6. Scope Of Contract 6.1 The Goods And Related Services To Be Provided Shall Be As Specified In Section Vi – Schedule Of Requirements. 6.2 This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. Any Additional Requirements For The Completion Of This Contract Shall Be Provided In The Scc 7. Subcontracting 7.1 Subcontracting Of Any Portion Of The Goods, If Allowed In The Bds, Does Not Relieve The Supplier Of Any Liability Or Obligation Under This Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 7.2 Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 8. Procuring Entity’s Responsibilities 8.1 Whenever The Performance Of The Obligations In This Contract Requires That The Supplier Obtain Permits, Approvals, Import, And Other Licenses From Local Public Authorities, The Procuring Entity Shall, If So Needed By The Supplier, Make Its Best Effort To Assist The Supplier In Complying With Such Requirements In A Timely And Expeditious Manner. 8.2 The Procuring Entity Shall Pay All Costs Involved In The Performance Of Its Responsibilities In Accordance With Gcc Clause 6. 9. Prices Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under This Contract Shall Not Vary From The Prices Quoted By The Supplier In Its Bid, With The Exception Of Any Change In Price Resulting From A Change Order Issued In Accordance With Gcc Clause 29, Or If Applicable, Adjustments Authorized In Accordance With The Price Adjustment Provisions Specified In The Scc.. 10. Payment 10.1 Unless Otherwise Specified In The Scc, Payments Shall Be Made Only Upon A Certification By The Head Of The Procuring Entity To The Effect That The Goods Have Been Rendered Or Delivered In Accordance With The Terms Of This Contract And Have Been Duly Inspected And Accepted. Except With The Prior Approval Of The President No Payment Shall Be Made For Services Not Yet Rendered Or For Supplies And Materials Not Yet Delivered Under This Contract. Ten Percent (10%) Of The Amount Of Each Payment Shall Be Retained By The Procuring Entity To Cover The Supplier’s Warranty Obligations Under This Contract As Described In Gcc Clause 17. 10.2 The Supplier’s Request(s) For Payment Shall Be Made To The Procuring Entity In Writing, Accompanied By An Invoice Describing, As Appropriate, The Goods Delivered And/or Services Performed, And By Documents Submitted Pursuant To The Scc Provision For Gcc Clause 6.2, And Upon Fulfillment Of Other Obligations Stipulated In This Contract. 10.3 Pursuant To Gcc Clause 10.2, Payments Shall Be Made Promptly By The Procuring Entity, But In No Case Later Than Sixty (60) Days After Submission Of An Invoice Or Claim By The Supplier. 10.4 Unless Otherwise Specified In The Scc, The Currency In Which Payment Is Made To The Supplier Under This Contract Shall Be In Philippine Pesos. 11. Advance Payment 11.1 Advance Payment Shall Be Made Only After Prior Approval Of The President, And Shall Not Exceed Fifteen Percent (15%) Of The Contract Amount, Unless Otherwise Directed By The President Or In Cases Allowed Under Annex “d” Of Ra 9184. 11.2 For Goods Supplied From Abroad, The Terms Of Payment Shall Be As Follows: (a) On Contract Signature: Fifteen Percent (15%) Of The Contract Price Shall Be Paid Within Sixty (60) Days From Signing Of The Contract And Upon Submission Of A Claim And A Bank Guarantee For The Equivalent Amount Valid Until The Goods Are Delivered And In The Form Provided In Section Viii. Bidding Forms. (b) On Delivery: Sixty-five Percent (65%) Of The Contract Price Shall Be Paid To The Supplier Within Sixty (60) Days After The Date Of Receipt Of The Goods And Upon Submission Of The Documents (i) Through (vi) Specified In The Scc Provision On Delivery And Documents. (c) On Acceptance: The Remaining Twenty Percent (20%) Of The Contract Price Shall Be Paid To The Supplier Within Sixty (60) Days After The Date Of Submission Of The Acceptance And Inspection Certificate For The Respective Delivery Issued By The Procuring Entity’s Authorized Representative. In The Event That No Inspection Or Acceptance Certificate Is Issued By The Procuring Entity’s Authorized Representative Within Forty Five (45) Days Of The Date Shown On The Delivery Receipt The Supplier Shall Have The Right To Claim Payment Of The Remaining Twenty Percent (20%) Subject To The Procuring Entity’s Own Verification Of The Reason(s) For The Failure To Issue Documents (vii) And (viii) As Described In The Scc Provision On Delivery And Documents. 11.3 All Progress Payments Shall First Be Charged Against The Advance Payment Until The Latter Has Been Fully Exhausted. 12. Taxes And Duties The Supplier, Whether Local Or Foreign, Shall Be Entirely Responsible For All The Necessary Taxes, Stamp Duties, License Fees, And Other Such Levies Imposed For The Completion Of This Contract. 13. Performance Security 13.1 Unless Otherwise Specified In The Scc, Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any The Forms Prescribed In The Itb Clause 33.2. 13.2 The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Winning Bidder Is In Default In Any Of Its Obligations Under The Contract. 13.3 The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 13.4 Unless Otherwise Specified In The Scc, The Performance Security May Be Released By The Procuring Entity And Returned To The Supplier After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions. (a) There Are No Pending Claims Against The Supplier Or The Surety Company Filed By The Procuring Entity; (b) The Supplier Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc 13.5 In Case Of A Reduction Of The Contract Value, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 14. Use Of Contract Documents And Information 14.1 The Supplier Shall Not, Except For Purposes Of Performing The Obligations In This Contract, Without The Procuring Entity’s Prior Written Consent, Disclose This Contract, Or Any Provision Thereof, Or Any Specification, Plan, Drawing, Pattern, Sample, Or Information Furnished By Or On Behalf Of The Procuring Entity. Any Such Disclosure Shall Be Made In Confidence And Shall Extend Only As Far As May Be Necessary For Purposes Of Such Performance. 14.2 Any Document, Other Than This Contract Itself, Enumerated In Gcc Clause 14.1shall Remain The Property Of The Procuring Entity And Shall Be Returned (all Copies) To The Procuring Entity On Completion Of The Supplier’s Performance Under This Contract If So Required By The Procuring Entity. 15. Standards The Goods Provided Under This Contract Shall Conform To The Standards Mentioned In The Section Vii – Technical Specifications,; And, When No Applicable Standard Is Mentioned, To The Authoritative Standards Appropriate To The Goods’ Country Of Origin. Such Standards Shall Be The Latest Issued By The Institution Concerned. 16. Inspection And Tests 16.1 The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Contract Specifications At No Extra Cost To The Procuring Entity. The Scc And Section Vii – Technical Specifications Shall Specify What Inspections And/or Tests The Procuring Entity Requires And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. 16.2 If Applicable, The Inspections And Tests May Be Conducted On The Premises Of The Supplier Or Its Subcontractor(s), At Point Of Delivery, And/or At The Goods’ Final Destination. If Conducted On The Premises Of The Supplier Or Its Subcontractor(s), All Reasonable Facilities And Assistance, Including Access To Drawings And Production Data, Shall Be Furnished To The Inspectors At No Charge To The Procuring Entity. 16.3 The Procuring Entity Or Its Designated Representative Shall Be Entitled To Attend The Tests And/or Inspections Referred To In This Clause Provided That The Procuring Entity Shall Bear All Of Its Own Costs And Expenses Incurred In Connection With Such Attendance Including, But Not Limited To, All Traveling And Board And Lodging Expenses. 16.4 The Procuring Entity May Reject Any Goods Or Any Part Thereof That Fail To Pass Any Test And/or Inspection Or Do Not Conform To The Specifications. The Supplier Shall Either Rectify Or Replace Such Rejected Goods Or Parts Thereof Or Make Alterations Necessary To Meet The Specifications At No Cost To The Procuring Entity, And Shall Repeat The Test And/or Inspection, At No Cost To The Procuring Entity, Upon Giving A Notice Pursuant To Gcc Clause 5. 16.5 The Supplier Agrees That Neither The Execution Of A Test And/or Inspection Of The Goods Or Any Part Thereof, Nor The Attendance By The Procuring Entity Or Its Representative, Shall Release The Supplier From Any Warranties Or Other Obligations Under This Contract. 17. Warranty 17.1 The Supplier Warrants That The Goods Supplied Under The Contract Are New, Unused, Of The Most Recent Or Current Models, And That They Incorporate All Recent Improvements In Design And Materials, Except When The Technical Specifications Required By The Procuring Entity Provides Otherwise. 17.2 The Supplier Further Warrants That All Goods Supplied Under This Contract Shall Have No Defect, Arising From Design, Materials, Or Workmanship Or From Any Act Or Omission Of The Supplier That May Develop Under Normal Use Of The Supplied Goods In The Conditions Prevailing In The Country Of Final Destination. 17.3 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier For A Minimum Period Specified In The Scc. The Obligation For The Warranty Shall Be Covered By, At The Supplier’s Option, Either Retention Money In An Amount Equivalent To At Least One Percent (1%) Of Every Progress Payment, Or A Special Bank Guarantee Equivalent To At Least One Percent (1%) Of The Contract Price Or Other Such Amount If So Specified In Thescc. The Said Amounts Shall Only Be Released After The Lapse Of The Warranty Period Specified In The Scc; Provided, However, That The Supplies Delivered Are Free From Patent And Latent Defects And All The Conditions Imposed Under This Contract Have Been Fully Met. 17.4 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Within The Period Specified In The Scc And With All Reasonable Speed, Repair Or Replace The Defective Goods Or Parts Thereof, Without Cost To The Procuring Entity 17.5 If The Supplier, Having Been Notified, Fails To Remedy The Defect(s) Within The Period Specified In Gcc Clause 17.4, The Procuring Entity May Proceed To Take Such Remedial Action As May Be Necessary, At The Supplier’s Risk And Expense And Without Prejudice To Any Other Rights Which The Procuring Entity May Have Against The Supplier Under The Contract And Under The Applicable Law 18 Delays In The Supplier’s Performance 18.1 Delivery Of The Goods And/or Performance Of Services Shall Be Made By The Supplier In Accordance With The Time Schedule Prescribed By The Procuring Entity In Section Vi – Schedule Of Requirements. 18.2 If At Any Time During The Performance Of This Contract, The Supplier Or Its Subcontractor(s) Should Encounter Conditions Impeding Timely Delivery Of The Goods And/or Performance Of Services, The Supplier Shall Promptly Notify The Procuring Entity In Writing Of The Fact Of The Delay, Its Likely Duration And Its Cause(s). As Soon As Practicable After Receipt Of The Supplier’s Notice, And Upon Causes Provided For Under Gcc Clause 22, The Procuring Entity Shall Evaluate The Situation And May Extend The Supplier’s Time For Performance, In Which Case The Extension Shall Be Ratified By The Parties By Amendment Of Contract. 18.3 Except As Provided Under Gcc Clause 22, A Delay By The Supplier In The Performance Of Its Obligations Shall Render The Supplier Liable To The Imposition Of Liquidated Damages Pursuant To Gcc Clause 19, Unless An Extension Of Time Is Agreed Upon Pursuant To Gcc Clause 29 Without The Application Of Liquidated Damages. 19. Liquidated Damages Subject To Gcc Clause 18 And 22, If The Supplier Fails To Satisfactorily Deliver Any Or All Of The Goods And/or To Perform The Services Within The Period(s) Specified In This Contract Inclusive Of Duly Granted Time Extensions If Any, The Procuring Entity Shall, Without Prejudice To Its Other Remedies Under This Contract And Under The Applicable Law, Deduct From The Contract Price, As Liquidated Damages, A Sum Equivalent To The Percentage Specified In Thescc Of The Delivered Price Of The Delayed Goods Or Unperformed Services For Each Week Or Part Thereof Of Delay Until Actual Delivery Or Performance, Up To A Maximum Deduction Of The Percentage Specified In The Scc. Once The Maximum Is Reached, The Procuring Entity Shall Rescind The Contract Pursuant To Gcc Clause 23, Without Prejudice To Other Courses Of Action And Remedies Open To It. 20. Settlement Of Disputes 20.1 If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Procuring Entity And The Supplier In Connection With Or Arising Out Of This Contract, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 20.2 If After Thirty (30) Days, The Parties Have Failed To Resolve Their Dispute Or Difference By Such Mutual Consultation, Then Either The Procuring Entity Or The Supplier May Give Notice To The Other Party Of Its Intention To Commence Arbitration, As Hereinafter Provided, As To The Matter In Dispute, And No Arbitration In Respect Of This Matter May Be Commenced Unless Such Notice Is Given. 20.3 Any Dispute Or Difference In Respect Of Which A Notice Of Intention To Commence Arbitration Has Been Given In Accordance With This Clause Shall Be Settled By Arbitration. Arbitration May Be Commenced Prior To Or After Delivery Of The Goods Under This Contract. 20.4 Arbitration Proceedings Shall Be Conducted In Accordance With The Rules Of Procedure Specified In The Scc. 20.5 Notwithstanding Any Reference To Arbitration Herein, The Parties Shall Continue To Perform Their Respective Obligations Under The Contract Unless They Otherwise Agree; And The Procuring Entity Shall Pay The Supplier Any Monies Due The Supplier. 21 Liability Of The Supplier 21.1 Subject To Additional Provisions, If Any, Set Forth In The Scc, The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 21.2 Except In Cases Of Criminal Negligence Or Willful Misconduct, And In The Case Of Infringement Of Patent Rights, If Applicable, The Aggregate Liability Of The Supplier To The Procuring Entity Shall Not Exceed The Total Contract Price, Provided That This Limitation Shall Not Apply To The Cost Of Repairing Or Replacing Defective Equipment. 22. Force Majeure 22.1 The Supplier Shall Not Be Liable For Forfeiture Of Its Performance Security, Liquidated Damages, Or Termination For Default If And To The Extent That Its Delay In Performance Or Other Failure To Perform Its Obligations Under The Contract Is The Result Of A Force Majeure. 22.2 For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 22.3 If A Force Majeure Situation Arises, The Supplier Shall Promptly Notify The Procuring Entity In Writing Of Such Condition And The Cause Thereof. Unless Otherwise Directed By The Procuring Entity In Writing, The Supplier Shall Continue To Perform Its Obligations Under The Contract As Far As Is Reasonably Practical, And Shall Seek All Reasonable Alternative Means For Performance Not Prevented By The Force Majeure. 23. Termination For Default 23.1 The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attends Its Implementation. (a) Outside Of Force Majeure, The Supplier Fails To Deliver Or Perform Any Or All Of The Goods Within The Period(s) Specified In The Contract, Or Within Any Extension Thereof Granted By The Procuring Entity Pursuant To A Request Made By The Supplier Prior To The Delay, And Such Failure Amounts To At Least Ten Percent (10%) Of The Contact Price; (b) As A Result Of Force Majeure, The Supplier Is Unable To Deliver Or Perform Any Or All Of The Goods, Amounting To At Least Ten Percent (10%) Of The Contract Price, For A Period Of Not Less Than Sixty (60) Calendar Days After Receipt Of The Notice From The Procuring Entity Stating That The Circumstance Of Force Majeure Is Deemed To Have Ceased; Or (c) The Supplier Fails To Perform Any Other Obligation Under The Contract.. 23.2 In The Event The Procuring Entity Terminates This Contract In Whole Or In Part, For Any Of The Reasons Provided Under Gcc Clauses 23 To 26, The Procuring Entity May Procure, Upon Such Terms And In Such Manner As It Deems Appropriate, Goods Or Services Similar To Those Undelivered, And The Supplier Shall Be Liable To The Procuring Entity For Any Excess Costs For Such Similar Goods Or Services. However, The Supplier Shall Continue Performance Of This Contract To The Extent Not Terminated. 23.3 In Case The Delay In The Delivery Of The Goods And/or Performance Of The Services Exceeds A Time Duration Equivalent To Ten Percent (10%) Of The Specified Contract Time Plus Any Time Extension Duly Granted To The Supplier, The Procuring Entity May Terminate This Contract, Forfeit The Supplier's Performance Security And Award The Same To A Qualified Supplier. 24. Termination For Insolvency The Procuring Entity Shall Terminate This Contract If The Supplier Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Supplier, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Supplier. 25. Termination For Convenience 25.1 The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate A Contract For The Convenience Of The Government If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 25.2 The Goods That Have Been Delivered And/or Performed Or Are Ready For Delivery Or Performance Within Thirty (30) Calendar Days After The Supplier’s Receipt Of Notice To Terminate Shall Be Accepted By The Procuring Entity At The Contract Terms And Prices. For Goods Not Yet Performed And/or Ready For Delivery, The Procuring Entity May Elect: (a) To Have Any Portion Delivered And/or Performed And Paid At The Contract Terms And Prices; And/or (b) To Cancel The Remainder And Pay To The Supplier An Agreed Amount For Partially Completed And/or Performed Goods And For Materials And Parts Previously Procured By The Supplier. 25.3 If The Supplier Suffers Loss In Its Initial Performance Of The Terminated Contract, Such As Purchase Of Raw Materials For Goods Specially Manufactured For The Procuring Entity Which Cannot Be Sold In Open Market, It Shall Be Allowed To Recover Partially From This Contract, On A Quantum Meruit Basis. Before Recovery May Be Made, The Fact Of Loss Must Be Established Under Oath By The Supplier To The Satisfaction Of The Procuring Entity Before Recovery May Be Made. 26. Termination For Unlawful Acts 26.1 The Procuring Entity May Terminate This Contract In Case It Is Determined Prima Facie That The Supplier Has Engaged, Before Or During The Implementation Of This Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation. Unlawful Acts Include, But Are Not Limited To, The Following: (a) Corrupt, Fraudulent, And Coercive Practices As Defined In Itb Clause 3.1(a); (b) Drawing Up Or Using Forged Documents; (c) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (d) Any Other Act Analogous To The Foregoing. 27. Procedures For Termination Of Contracts 27.1 The Following Provisions Shall Govern The Procedures For Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Implementing Unit Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Implementing Unit, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Supplier Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Supplier To Show Cause As To Why This Contract Should Not Be Terminated; (iv) Special Instructions Of The Procuring Entity, If Any. (c) The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (d) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Supplier Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why This Contract Should Not Be Terminated. If The Supplier Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating This Contract; (e) The Procuring Entity May, At Anytime Before Receipt Of The Supplier’s Verified Position Paper To Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Supplier’s Receipt Of The Notice; (f) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Supplier Of Its Decision And, Unless Otherwise Provided, This Contract Is Deemed Terminated From Receipt Of The Supplier Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; (g) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity; And (h) The Supplier Must Serve A Written Notice To The Procuring Entity Of Its Intention To Terminate The Contract At Least Thirty (30) Calendar Days Before Its Intended Termination. The Contract Is Deemed Terminated If It Is Not Resumed In Thirty (30) Calendar Days After The Receipt Of Such Notice By The Procuring Entity. 28. Assignment Of Rights The Supplier Shall Not Assign His Rights Or Obligations Under This Contract, In Whole Or In Part, Except With The Procuring Entity’s Prior Written Consent. 29. Contract Amendment Subject To Applicable Laws, No Variation In Or Modification Of The Terms Of This Contract Shall Be Made Except By Written Amendment Signed By The Parties. 30. Application These General Conditions Shall Apply To The Extent That They Are Not Superseded By Provisions Of Other Parts Of This Contract. Section V – Special Conditions Of Contract Scc Clause 1.1(g) The Procuring Entity Is The Local Government Of Badiangan, Iloilo. 1.1(i) The Supplier Is ________________________________. 1.1(j) The Funding Source Is Through The General Fund Of The Local Government Of Badiangan, Iloilo. The Total Approved Budget For The Contract Is Two Hundred Ninety One Thousand Five Hundred Eighty Five Pesos Only (p 291,585.00) 1.1(k) The Project Site Or The Delivery Of The Goods Shall Be At The Municipal Hall, Badiangan, Iloilo. 5.1 The Procuring Entity’s Address For Notices Is: Atty. Suzette A. Mamon Municipal Mayor Badiangan Municipal Hall R.c. Tabiana St., Poblacion, Badiangan, Iloilo 5033 Tel. No: Mayor’s Office (033-320-0807) 6.2 The Additional Requirements For The Completion Of This Contract Are As Follows: Delivery And Documents - For Purposes Of The Contract(s), “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of The Contract(s) Shall Be As Follows: For Domestic Suppliers, “the Delivery Terms Applicable To This Contract Are Delivered To The Municipal Hall, Badiangan, Iloilo. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi – Schedule Of Requirements. The Details Of Shipping And/or Other Documents To Be Furnished By The Supplier Are As Follows: Upon Delivery Of Goods To The Project Site, The Supplier Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: (i) Original And Four Copies Of The Supplier’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; (ii) Original And Four Copies Delivery Receipt/note, Railway Receipt Or Truck Receipt; (iii) Original Supplier’s Factory Inspection Report; (iv) Original And Four Copies Of The Manufacturer’s And/or Supplier’s Warranty Certificate; (v) Original And Four Copies Of The Certificate Of Origin (for Imported Goods); (vi) Delivery Receipt Detailing Number And Description Of Items Received Signed By The Authorized Receiving Personnel; (vii) Certificate Of Acceptance/inspection Report Signed By The Procuring Entity’s Representative At The Project Site; And (viii) Four Copies Of The Invoice Receipt For Property Signed By The Procuring Entity’s Representative At The Project Site. For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Engr. Rosilia A. Villa, Municipal Engineer, Badiangan, Iloilo. Incidental Services - The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi – Schedule Of Requirements. (a) Performance Or Supervision Of On-site Assembly And/or Start Up Of The Supplied Goods; (b) Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; (c) Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; (d) Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And (e) Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Insurance – The Goods Supplied Under This Contract Shall Be Fully Insured By The Supplier In A Freely Convertible Currency Against Loss Or Damage Incidental To Manufacture Or Acquisition, Transportation, Storage, And Delivery. The Goods Remain At The Risk And Title Of The Supplier Until Their Final Acceptance By The Procuring Entity. Transportation - Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure In Accordance With Gcc Clause 22. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Patent Rights - The Supplier Shall Indemnify The Procuring Entity Against All Third Party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 9 Bid Prices Are Considered Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances And Upon Prior Approval Of The Gppb In Accordance With Section 61 Of R.a. 9184 And Its Irr-a. 10.1 No Further Instructions. 10.4 No Further Instructions. 13.1 No Further Instructions. 13.4 No Further Instructions. 13.4 (c) No Further Instructions. 16.1 The Inspection And Test That Will Be Conducted Is Physical Inspection. 17.3 The Goods Shall Have A Warranty Period Of Three (3) Months After Acceptance By The Procuring Entity Of The Delivered Goods Or After The Goods Are Consumed Whichever Is Earlier. 17.4 & 17.5 The Period For Correction Of Defects In The Warranty Period Is Seven (7) Calendar Days From Either Verbal Or Written Notification. 19 The Applicable Rate Is One Tenth (1/10) Of One (1) Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Maximum Deduction Shall Be Ten Percent (10%) Of The Amount Of Contract. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, The Procuring Entity Shall Rescind The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 20.4 In The Case Of A Dispute Between The Procuring Entity And The Supplier, The Dispute Shall Be Resolved In Accordance With Republic Act 9285 (“r.a. 9285”), Otherwise Known As The “alternative Dispute Resolution Act Of 2004.” 21.1 No Additional Provisions. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Days/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site Item No. Description Quantity Total Delivered, Days/months 1. Rope Light (yellow) 3 Rolls 3 Rolls 30 Calendar Days Upon Receipt Of P.o. 2. Rope Light (red) 3 Rolls 3 Rolls 30 Calendar Days Upon Receipt Of P.o. 3. Rope Light (green) 3 Rolls 3 Rolls 30 Calendar Days Upon Receipt Of P.o. 4. Led Bulb 1.5 Watts (red) 30 Pcs. 30 Pcs. 30 Calendar Days Upon Receipt Of P.o. 5. Led Bulb 1.5 Watts (yellow) 30 Pcs. 30 Pcs. 30 Calendar Days Upon Receipt Of P.o. 6. Led Bulb 1.5 Watts (green) 30 Pcs. 30 Pcs. 30 Calendar Days Upon Receipt Of P.o. 7. Rubber Receptacle 90 Pcs. 90 Pcs. 30 Calendar Days Upon Receipt Of P.o. 8. Cable Tie 4” 30 Packs. 30 Packs. 30 Calendar Days Upon Receipt Of P.o. 9. Cable Tie 5” 30 Packs. 30 Packs. 30 Calendar Days Upon Receipt Of P.o. 10. Christmas Lights Led Bulb 200 Pcs. 100 Pcs. 30 Calendar Days Upon Receipt Of P.o. 11. Thhn 5.5mm² 2 Boxes 2 Boxes 30 Calendar Days Upon Receipt Of P.o. 12. Cable Tie 12” 2 Packs. 2 Packs. 30 Calendar Days Upon Receipt Of P.o. 13. Electrical Tape, Big 30 Rolls 30 Rolls 30 Calendar Days Upon Receipt Of P.o. 14. Safety Breaker 30a 3 Sets 3 Sets 30 Calendar Days Upon Receipt Of P.o. 15. Safety Breaker 60a 2 Sets 2 Sets 30 Calendar Days Upon Receipt Of P.o. 16. Flat Cord #16 2 Rolls 2 Rolls 30 Calendar Days Upon Receipt Of P.o. 17. Flat Cord #18 3 Rolls 3 Rolls 30 Calendar Days Upon Receipt Of P.o. 18. Flat Bar 1/8x1/2 35 Lgths. 35 Lgths. 30 Calendar Days Upon Receipt Of P.o. 19. 10mmø Dsb 35 Lgths. 35 Lgths. 30 Calendar Days Upon Receipt Of P.o. 20. 9mmø Dsb 15 Lgths. 15 Lgths. 30 Calendar Days Upon Receipt Of P.o. 21. Plastic Rope #6 4 Rolls 4 Rolls 30 Calendar Days Upon Receipt Of P.o. 22. Welding Rod 10 Kgs. 10 Kgs. 30 Calendar Days Upon Receipt Of P.o. 23. Aluminum Paint 1 Gal. 1 Gal. 30 Calendar Days Upon Receipt Of P.o. 24. Paint Brush 2” 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 25. Paint Thinner 3 Btls. 3 Btls. 30 Calendar Days Upon Receipt Of P.o. 26. 1 ¼ G.i. Pipe Sched. 40 1 Length 1 Length 30 Calendar Days Upon Receipt Of P.o. 27. 1 ½ G.i. Pipe Sched. 40 1 Length 1 Length 30 Calendar Days Upon Receipt Of P.o. 28. #16 Tie Wire 5 Kgs. 5 Kgs. 30 Calendar Days Upon Receipt Of P.o. 29. Bolt 3/8x1 ½ W/ Nut And Washer 20 Pcs. 20 Pcs. 30 Calendar Days Upon Receipt Of P.o. 30. Drill Bit 3/8 (steel) 2 Pcs. 2 Pcs. 30 Calendar Days Upon Receipt Of P.o. 31. Bolt 3/8x4” W/ Nut And Washer 2 Pcs. 2 Pcs. 30 Calendar Days Upon Receipt Of P.o. 32. Convenience Outlet 3-gang 10 Sets 10 Sets 30 Calendar Days Upon Receipt Of P.o. 33. Plastic Screen 4x3/4 Hole (green) 50 Mtrs. 30 Mtrs. 30 Calendar Days Upon Receipt Of P.o. 34. Rope Light (white) 4 Rolls 4 Rolls 30 Calendar Days Upon Receipt Of P.o. 35. Drop Lights (white) 40 Boxes 40 Boxes 30 Calendar Days Upon Receipt Of P.o. 36. Led Strip Light (white) Single 3 Rolls 3 Rolls 30 Calendar Days Upon Receipt Of P.o. 37. Led Adaptor (single) 12 Pcs. 12 Pcs. 30 Calendar Days Upon Receipt Of P.o. 38. Led Controller (led Strip Lights) 6 Pcs. 6 Pcs. 30 Calendar Days Upon Receipt Of P.o. 39. Glue Stick, Big 60 Packs. 60 Packs. 30 Calendar Days Upon Receipt Of P.o. 40. Glue Stick, Small 100 Packs. 100 Packs. 30 Calendar Days Upon Receipt Of P.o. 41. Transparent Plastic Hose 1/2 15 Meters 15 Meters 30 Calendar Days Upon Receipt Of P.o. Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ Date: ___________________________________ Section Vii. Technical Specifications Note: In The Statement Of Compliance Column, Bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Goods Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidders Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Provisions Of Itb Clause 3.1(a)(ii) And/or Gcc Clause 2.1(a)(ii). Item No. Specifications Statement Of Compliance Cross Reference 1. Rope Light (yellow) 2. Rope Light (red) 3. Rope Light (green) 4. Led Bulb 1.5 Watts (red) 5. Led Bulb 1.5 Watts (yellow) 6. Led Bulb 1.5 Watts (green) 7. Rubber Receptacle 8. Cable Tie 4” 9. Cable Tie 5” 10. Christmas Lights Led Bulb 11. Thhn 5.5mm² 12. Cable Tie 12” 13. Electrical Tape, Big 14. Safety Breaker 30a 15. Safety Breaker 60a 16. Flat Cord #16 17. Flat Cord #18 18. Flat Bar 1/8x1/2 19. 10mmø Dsb 20. 9mmø Dsb 21. Plastic Rope #6 22. Welding Rod 23. Aluminum Paint 24. Paint Brush 2” 25. Paint Thinner 26. 1 ¼ G.i. Pipe Sched. 40 27. 1 ½ G.i. Pipe Sched. 40 28. #16 Tie Wire 29. Bolt 3/8x1 ½ W/ Nut And Washer 30. Drill Bit 3/8 (steel) 31. Bolt 3/8x4” W/ Nut And Washer 32. Convenience Outlet 3-gang 33. Plastic Screen 4x3/4 Hole (green) 34. Rope Light (white) 35. Drop Lights (white) 36. Led Strip Light (white) Single 37. Led Adaptor (single) 38. Led Controller (led Strip Lights) 39. Glue Stick, Big 40. Glue Stick, Small 41. Transparent Plastic Hose 1/2 \ Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ Date: ____________________________________ Section Viii. Bidding Forms Bid Form Date: Project Identification No.: To: [name And Address Of Procuring Entity] Gentlemen And/or Ladies: Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To [supply/deliver/perform] [description Of The Goods] In Conformity With The Said Pbds For The Sum Of [total Bid Amount In Words And Figures] Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In Bds Provision For Itb Clause 18.2 And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid, Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents. We Likewise Certify/ Confirm That The Undersigned, [ For Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter's Behalf For The [name Of Project] Of The [name Of Procuring Entity] [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter's Behalf For [name Of Project] Of The [name Of The Procuring Entity]. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 20______. Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ Date: ____________________________________ For Goods Offered From Within The Philippines Name Of Bidder ____________________________ Project Identification No. __. Page Of . All Entries Must Be Computerized Or Typewritten 1 2 3 4 5 6 7 8 9 10 Item No. Description Country Of Origin Quantity Unit Unit Price Exw Per Item Transportation And Insurance And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price Per Unit (col 5 + 6 + 7 + 8) Total Price Delivered Final Destination (col. 9) X (col. 4) 1. Rope Light (yellow) 3 Rolls 2. Rope Light (red) 3 Rolls 3. Rope Light (green) 3 Rolls 4. Led Bulb 1.5 Watts (red) 30 Pcs. 5. Led Bulb 1.5 Watts (yellow) 30 Pcs. 6. Led Bulb 1.5 Watts (green) 30 Pcs. 7. Rubber Receptacle 90 Pcs. 8. Cable Tie 4” 30 Packs. 9. Cable Tie 5” 30 Packs. 10. Christmas Lights Led Bulb 200 Pcs. 11. Thhn 5.5mm² 2 Boxes 12. Cable Tie 12” 2 Packs. 13. Electrical Tape, Big 30 Rolls 14. Safety Breaker 30a 3 Sets 15. Safety Breaker 60a 2 Sets 16. Flat Cord #16 2 Rolls 17. Flat Cord #18 3 Rolls 18. Flat Bar 1/8x1/2 35 Lgths. 19. 10mmø Dsb 35 Lgths. 20. 9mmø Dsb 15 Lgths. 21. Plastic Rope #6 4 Rolls 22. Welding Rod 10 Kgs. 23. Aluminum Paint 1 Gal. 24. Paint Brush 2” 3 Pcs. 25. Paint Thinner 3 Btls. 26. 1 ¼ G.i. Pipe Sched. 40 1 Length 27. 1 ½ G.i. Pipe Sched. 40 1 Length 28. #16 Tie Wire 5 Kgs. 29. Bolt 3/8x1 ½ W/ Nut And Washer 20 Pcs. 30. Drill Bit 3/8 (steel) 2 Pcs. 31. Bolt 3/8x4” W/ Nut And Washer 2 Pcs. 32. Convenience Outlet 3-gang 10 Sets 33. Plastic Screen 4x3/4 Hole (green) 50 Mtrs. 34. Rope Light (white) 4 Rolls 35. Drop Lights (white) 40 Boxes 36. Led Strip Light (white) Single 3 Rolls 37. Led Adaptor (single) 12 Pcs. 38. Led Controller (led Strip Lights) 6 Pcs. 39. Glue Stick, Big 60 Packs. 40. Glue Stick, Small 100 Packs. 41. Transparent Plastic Hose 1/2 15 Meters Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ Omnibus Sworn Statement Republic Of The Philippines ) Iloilocity ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S, 1930, As Amended, Or The Revised Penal Code, In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ___________________________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] Checklist Of Bid Requirements First Envelope Eligibility Documents Class “a” Documents Legal Documents: 1 Certificate Of Philgeps Registration (platinum Membership) And Membership With Annex A In Accordance With Section 8.5.2 Of The Revised Irr. Technical Documents: 2 Statement Of All Its On-going Government And Private Contracts Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids, Including Contracts Awarded But Not Yet Started, If Any, Which Are Similar In Nature And Complexity To The Contract To Be Bid. The Statement Shall Include, For Each Contract, The Following: (a) Name Of The Contract; (b) Date Of The Contract, (c) Kind Of Goods, (d) Amount Of And Value Of Outstanding Contracts, (e) Date Of Delivery, And (f) Notice Of Award, Notice To Proceed, Contract Of Agreements, Purchase Orders And Certificate Of Accomplishments Issued By The Owner. (latest) 3 Statement Of Its Single Largest Completed Contract (slcc) Which Includes Its Government And Private Contracts Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids, Which Are Similar In Nature And Complexity To The Contract To Be Bid. The Statement Shall Include, For Each Contract, The Following: (a) Name Of The Contract; (b) Date Of The Contract, (c) Kind Of Goods, (d) Amount Of And Value Of Awarded And Completed Contracts, (e) Date Of Delivery, (f) End User’s Acceptance And Or Official Receipt(s) Issued For The Contract Supported By Notice Of Award, Notice To Proceed, Contract/ Purchase Order, Certificate Of Completion And Certificate Of Acceptance.(latest) Financial Documents 4 The Prospective Bidder’s Latest Computation For Its Net Financial Contracting Capacity (nfcc) Which Must Be At Least Equal To The Abc To Be Bid. (latest) Or A Committed Line Of Credit From Universal Or Commercial Bank (not Applicable To Procurement Of Infrastructure Projects). Class “b” Documents 5 If Applicable, A Valid Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence, Or, In Lieu Thereof, A Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid . (latest) Technical Documents 1 2 Bid Security In The Prescribed Form, Amount And Validity Period And In Accordance With Itb Clause 18. Statement Of Compliance To The Schedule Of Requirements 3 4 Statement Of Compliance To Technical Specifications Taking Into Consideration The Notations Stated In Section Vii Of The Bidding Documents. Authority Of The Signatory 5 Sworn Statement By The Prospective Bidder Or Its Duly Authorized Representative In Accordance With Section 25.2(b)(iv) Of The Revised Irr Of Ra 9184 And As Indicated In The Omnibus Sworn Statement Of The Bidding Documents Using The Prescribed Form Issued By The Gppb. (latest) Note: Any Missing Document In The Above-mentioned Checklist Is A Ground For Outright Rejection Of The Bid Second Envelope Financial Documents 1 Financial Bid Form Which Includes Bid Prices And The Bill Of Quantities And The Applicable Price Schedules, In Accordance With Itb Clauses 15.1 And 15.4 And The Issued Form In Section Viii Of The Bidding Documents. 2 If A Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti (if A Bidder Is A Sole Proprietor), By Sec (if Bidder Is A Partnership, Or A Corporation); And Cda (if Bidder Is A Cooperative)issued In Accordance With Itb Clause 27, If Applicable, That: A) Sole Proprietor Is A Citizen Of The Philippines, Corporation, Cooperative, Or Association Is A Duly Organized Under The Laws Of The Philippines With At Least Seventy Five (75%) Of Its Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines; B) Habitually Established In Business And Habitually Engaged In The Manufacturing Or Sale Of The Merchandise Covered By His Bid, And C) The Business Has Been In Existence For At Least Five (5) Consecutive Years Prior To The Advertisement And/or The Invitation To Bid.

Municipality Of Badiangan, Iloilo Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Soon25 Nov 2024
Tender AmountPHP 427.1 K (USD 7.2 K)
Details: Description Section Ii. Instructions To Bidders A. General 1. Scope Of Bid 1.1 The Procuring Entity Named In The Bds Invites Bids For The Supply And Delivery Of The Goods As Described In Section Vii. Technical Specifications. 1.2 The Name, Identification, And Number Of Lots Specific To This Bidding Are Provided In The Bds. The Contracting Strategy And Basis Of Evaluation Of Lots Is Described In Itb Clause 28. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1 Unless Otherwise Specified In The Bds, The Procuring Entity As Well As The Bidders And Suppliers Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Procuring Entity: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows (i) “corrupt Practice” Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Government, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Ra 3019; (ii) “fraudulent Practice” Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition. (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels. (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Any Of The Practices Mentioned In This Clause For Purposes Of Competing For The Contract. 3.2 Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3 Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Bidder Or Supplier In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 3. 4. Conflict Of Interest 4.1 All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) Below And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (f) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; Or (f) (g) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid. A Bidder Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2 In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) (d) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And If The Bidder Is A Cooperative, To All Its Officers, Directors And Controlling Share Holders Or Members; And (e) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1 Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Sixty Percent (60%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Sixty Percent (60%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Sixty Percent (60%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Sixty Percent (60%). 5.2 Foreign Bidders May Be Eligible To Participate When Any Of The Following Circumstances Exist, As Specified In The Bds. (a) When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra 9184 And Its Irr Allow Foreign Bidders To Participate; (b) Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; (c) When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or (d) When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. 5.3 Government Owned Or Controlled Corporations (goccs) May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Attached Agencies Of The Procuring Entity. 5.4 Unless Otherwise Provided In The Bds, The Bidder Must Have Completed A Single Largest Completed Contract (slcc) Similar To The Project The Value Of Which, Adjusted If Necessary, By The Bidder To Current Prices Using The Philippine Statistics Authority (psa) Consumer Price Index, Must Be At Least Equivalent To A Percentage Of The Abc Stated In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In The Bds, And Completed Within The Relevant Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(ii). 5.5 Unless Otherwise Provided In The Bds, The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Which Must Be At Least Equal To The Abc To Be Bid, Calculated As Follows: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. Where: K = 15 The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir, Through Its Electronic Filling And Payment System (efps). If The Prospective Bidder Opts To Submit A Committed Line Of Credit (clc), It Must Be At Least Equal To Ten Percent (10%) Of The Abc To Be Bid And Issued By A Universal Or Commercial Bank. 6. Bidders Responsibilities 6.1 The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Viii – Bidding Forms As Required In Itb Clause 12.1(b)(iv). 6.2 The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin(s) As Provided Under Itb Clause 10.4; (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting. (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of Ra 9184 In Relation To Other Provisions Of Ra 3019; And (j) (k) (l) Complying With Existing Labor Laws And Standards, In The Case Of Procurement Of Services Ensuring That It Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Of Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3 The Bidder Is Expected To Examine All Instructions, Forms, Terms, And Specifications In The Bidding Documents. Unless Otherwise Indicated In The Bds, Failure To Furnish All Information Or Documentation Required In The Bidding Documents Shall Result In The Rejection Of The Bid And The Disqualification Of The Bidder. 6.4 It Shall Be The Sole Responsibility Of The Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To The Contract To Be Bid, Including: (a) The Location And The Nature Of This Project; (b) Climatic Conditions; (c) Transportation Facilities; And (d) Other Factors That May Affect The Cost, Duration, And Execution Or Implementation Of This Project. 6.5 The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. However, The Procuring Entity Shall Ensure That All Information In The Bidding Documents, Including Bid/supplemental Bid Bulletin/s Issued, Are Correct And Consistent. 6.6 The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.7 Before Submitting Their Bids, The Bidder Is Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect This Project In Any Way. 6.8 The Bidder Should Note That The Procuring Entity Will Accept Bids Only From Those That Have Paid The Non-refundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services Unless Otherwise Indicated In The Bds, There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations, Subject To Itb Clause 27.1. 8. Subcontracts 8.1 Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Goods To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2 Subcontractors Must Comply With The Eligibility Criteria And The Documentary Requirements Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Goods Shall Be Disallowed. 8.3 The Bidder May Identify The Subcontractor To Whom A Portion Of The Goods Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of The Bidding Documents 9. Pre-bid Conference 9.1 If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. 9.2 Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents Discussed During The Pre-bid Conference. 9.3 Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1 Bidders Who Have Purchased The Bidding Documents May Request For Clarifications On Any Part Of The Bidding Documents For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2 Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3 Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components. 12.1 Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents - Class "a" Documents: (i) Philgeps Platinum Certificate Of Registration And Membership With Annex A In Accordance With Section 8.5.2 Of The Irr. (ii) Statement Of All Its Ongoing Government And Private Contracts Within The Period Stated In The Bds, Including Contracts Awarded But Not Yet Started, If Any. Statement Of The Bidder's Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, In Accordance With Itb Clause 5.4, Within The Relevant Period As Provided In The Bds. The Two Statements Required Shall Indicate For Each Contract The Following: (ii.1) Name Of The Contract; (ii.2) Date Of The Contract; (ii.3) Contract Duration; (ii.4) Owner's Name And Address; (ii.5) Kinds Of Goods; (ii.6) (ii.7) (ii.8) (ii.9) For Statement Of Ongoing Contracts- Amount Of Contract And Value Of Outstanding Contracts; For Statement Of Slcc-amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa's Consumer Price Index, If Necessary For The Purpose Of Meeting The Slcc Requirement; Date Of Delivery; And End User's Acceptance Or Official Receipt(s) Or Sales Invoice Issued For The Contract, If Completed, Which Shall Be Attached To The Statements. (iii) The Prospective Bidder’s Computation Of Its Net Financial Contracting Capacity (nfcc) Which Must Be At Least Equal To The Abc To Be Bid, Calculated As Follows: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. Where: K = 15 The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Data Submitted To The Bir, Through Its Electronic Filling And Payment System (efps). Or A Committed Line Of Credit From A Universal Or Commercial Bank (not Applicable To Procurement Of Infrastructure Projects) Class "b" Document: (iv) If Applicable, The Jva In Case The Joint Venture Is Already In Existence, Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. (b) Technical Documents - (i) Bid Security In Accordance With Itb Clause 18. If The Procuring Entity Requires The Bidders To Submit The Bid Security In The Form Of: (i.1) Cash Or Cashier’s/ Manager’s Check, Issued By A Universal Or Commercial Bank; Or (i.2) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Universal/ Commercial Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank, If Issued By A Foreign Bank; Or (i.3) (i.4) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; Bid Securing Declaration (ii) (iii) Statement Of Compliance To The Schedule Of Requirements Conformity With Technical Specifications, As Enumerated And Specified In Sections Vi And Vii Of The Bidding Documents; And (iv) Sworn Statement In Accordance With Section 25.2(a)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Viii – Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1 Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form, Which Includes Bid Prices And The Bill Of Quantities And The Applicable Price Schedules, In Accordance With Itb Clauses 15.1 And 15.4; (b) If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification From The Dti, Sec, Or Cda Issued In Accordance With Itb Clause 27; And (c) Any Other Document Required In The Bds 13.2 Unless Otherwise Stated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. 14. Alternative Bids Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 15. Bid Prices 15.1 The Bidder Shall Complete The Appropriate Price Schedules Included Herein, Stating The Unit Prices, Total Price Per Item, The Total Amount And The Expected Countries Of Origin Of The Goods To Be Supplied Under This Project. 15.2 The Bidder Shall Fill In Rates And Prices For All Items Of The Goods Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) Or A Dash (-) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3 The Terms Ex Works (exw), Cost, Insurance And Freight (cif), Cost And Insurance Paid To (cip), Delivered Duty Paid (ddp), And Other Trade Terms Used To Describe The Obligations Of The Parties, Shall Be Governed By The Rules Prescribed In The Current Edition Of The International Commercial Terms (incoterms) Published By The International Chamber Of Commerce, Paris. 15.4 Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: (a) For Goods Offered From Within The Procuring Entity’s Country (i) The Price Of The Goods Quoted Exw (ex Works, Ex Factory, Ex Warehouse, Ex Showroom, Or Off-the-shelf, As Applicable), Including All Customs Duties And Sales And Other Taxes Already Paid Or Payable (i.1) On The Components And Raw Material Used In The Manufacture Or Assembly Of Goods Quoted Ex Works Or Ex Factory; Or (i.2) On The Previously Imported Goods Of Foreign Origin Quoted Ex Warehouse, Ex Showroom, Or Off-the-shelf And Any Procuring Entity Country Sales And Other Taxes Which Will Be Payable On The Goods If The Contract Is Awarded. (ii) The Price For Inland Transportation, Insurance, And Other Local Costs Incidental To Delivery Of The Goods To Their Final Destination. (iii) The Price Of Other (incidental) Services, If Any, Listed In The Bds. (b) For Goods Offered From Abroad: (i) Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Ddp With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. (ii) The Price Of Other (incidental) Services, If Any, Listed In The Bds 15.5 Prices Quoted By The Bidder Shall Be Fixed During The Bidder’s Performance Of The Contract And Not Subject To Variation Or Price Escalation On Any Account, Unless Otherwise Specified In The Bds. A Bid Submitted With An Adjustable Price Quotation Shall Be Treated As Non-responsive And Shall Be Rejected, Pursuant To Itb Clause 24. 15.6 All Bid Prices Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Indicated In The Bds And Specified In The Gcc And Its Corresponding Scc Provision. 16. Bid Currencies 16.1 Prices Shall Be Quoted In The Following Currencies: (a) For Goods That The Bidder Will Supply From Within The Philippines, The Prices Shall Be Quoted In Philippine Pesos. (b) For Goods That The Bidder Will Supply From Outside The Philippines, The Prices May Be Quoted In The Currency(ies) Stated In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.2 If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Foregoing Exchange Rates. 16.3 Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1 Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2 In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1 The Procuring Entity Shall Prescribe In The Bds The Acceptable Forms Of Bid Security That Bidders May Opt To Use, Which Shall Include The Bid Securing Declaration (bsd) Or Any Other Form Of Bid Security And The Amount Of Which Shall Be Equal To A Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (not Less Than The Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Five Percent (5%) For Biddings Conducted By Lgus, The Procuring Entity May Also Require Bidders To Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. The Bid Securing Declaration Mentioned Above Is An Undertaking Which States, Among Others, That The Bidder Shall Enter Into Contract With The Procuring Entity And Furnish The Performance Security Required Under Itb Clause 33.2, From Receipt Of The Notice Of Award, And Committing To Pay The Corresponding Fine, And Be Suspended For A Period Of Time From Being Qualified To Participate In Any Government Procurement Activity In The Event It Violates Any Of The Conditions Stated Therein As Provided In The Guidelines Issued By The Gppb. 18.2 The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated And Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4 Upon Signing And Execution Of The Contract Pursuant To Itb Clause 32, And The Posting Of The Performance Security Pursuant To Itb Clause 33, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In The Itb Clause 18.2. 18.5 The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 28.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 29.2; Or (iv) Any Other Reason Stated In The Bds. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 32; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 33; Or (iii) Any Other Reason Stated In The Bds. 19. Format And Signing Of Bids 19.1 Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Viii – Bidding Forms On Or Before The Deadline Specified In The Itb Clauses 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2 Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested 19.3 The Bidder Shall Prepare And Submit An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Machine Copies, The Original Shall Prevail. 19.4 Each And Every Page Of The Bid Form, Including The Schedule Of Prices, Under Section Viii Hereof, Shall Be Signed By The Duly Authorized Representative/s Of The Bidder. Failure To Do So Shall Be A Ground For The Rejection Of The Bid. 19.5 Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1 Unless Otherwise Indicated In The Bds, Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12in One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2 Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3 The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Computerized In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4 All Envelopes Shall (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 1.1, (d) Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1.2; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5 Bid Envelopes That Are Not Properly Sealed And Marked As Required In The Bidding Documents, Shall Not Be Rejected, But The Bidder Or Its Duly Authorized Representative Shall Acknowledge Such Condition Of The Bid As Submitted. The Bac Or The Procuring Entity Shall Assume No Responsibility For The Misplacement Of The Contents Of The Improperly Sealed Or Marked Bid, Or For Its Premature Opening. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity 23. Modification And Withdrawal Of Bids 23.1 The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2 A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Letter Of Withdrawal Must Be Executed By The Duly Authorized Representative Of The Bidder Identified In The Omnibus Sworn Statement, A Copy Of Which Should Be Attached To The Letter. 23.3 Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4 No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr 24. Opening And Preliminary Examination Of Bids 24.1 24.2 The Bac Shall Open The Bids In Public, Immediately After The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Bac Shall Take Custody Of The Bids Submitted And Reschedule The Opening Of Bids On The Next Working Day Or At The Soonest Possible Time Through The Issuance Of A Notice Of Postponement To Be Posted In The Philgeps Website Of The Procuring Entity Concerned, If Available. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.3 Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.2, The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison 24.4 Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions 24.5 If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (v). 24.6 In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Described In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.7 Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Requirements In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(v) By Any Of The Joint Venture Partners Constitutes Compliance. 24.8 The Procuring Entity Shall Prepare The Minutes Of The Proceedings Of The Bid Opening That Shall Include, As A Minimum: (a) Names Of Bidders, Their Bid Price, Bid Security, Findings Of Preliminary Examination; And (b) Attendance Sheet. The Bac Members Shall Sign The Abstract Of Bids As Read. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1 Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless Otherwise Allowed In The Bds Or In The Case Of Itb Clause 26. 25.2 Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison, And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered. 27. Domestic Preference 27.1 Unless Otherwise Stated In The Bds, The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With The Following: (a) The Preference Shall Be Applied When (i) The Lowest Foreign Bid Is Lower Than The Lowest Bid Offered By A Domestic Bidder, Or (ii) The Lowest Bid Offered By A Non-philippine National Is Lower Than The Lowest Bid Offered By A Domestic Entity. (b) For Evaluation Purposes, The Lowest Foreign Bid Or The Bid Offered By A Non-philippine National Shall Be Increased By Fifteen Percent (15%). (c) In The Event That (i) The Lowest Bid Offered By A Domestic Entity Does Not Exceed The Lowest Foreign Bid As Increased, Or (ii) The Lowest Bid Offered By A Non-philippine National As Increased, Then The Procuring Entity Shall Award The Contract To The Domestic Bidder/entity At The Amount Of The Lowest Foreign Bid Or The Bid Offered By A Non-philippine National, As The Case May Be. (d) If The Domestic Entity/bidder Refuses To Accept The Award Of Contract At The Amount Of The Foreign Bid Or Bid Offered By A Non-philippine National Within Two (2) Calendar Days From Receipt Of Written Advice From The Bac, The Procuring Entity Shall Award To The Bidder Offering The Foreign Bid Or The Non-philippine National, As The Case May Be, Subject To Post-qualification And Submission Of All The Documentary Requirements Under These Bidding Documents. 27.2 A Bidder May Be Granted Preference As A Domestic Entity Subject To The Certification From The Dti (in Case Of Sole Proprietorships), Sec (in Case Of Partnerships And Corporations), Or Cda (in Case Of Cooperatives) That The (a) Sole Proprietor Is A Citizen Of The Philippines Or The Partnership, Corporation, Cooperative, Or Association Is Duly Organized Under The Laws Of The Philippines With At Least Seventy Five Percent (75%) Of Its Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, (b) Habitually Established In Business And Habitually Engaged In The Manufacture Or Sale Of The Merchandise Covered By His Bid, And (c) The Business Has Been In Existence For At Least Five (5) Consecutive Years Prior To The Advertisement And/or Posting Of The Invitation To Bid For This Project. 27.3 A Bidder May Be Granted Preference As A Domestic Bidder Subject To The Certification From The Dti That The Bidder Is Offering Unmanufactured Articles, Materials Or Supplies Of The Growth Or Production Of The Philippines, Or Manufactured Articles, Materials, Or Supplies Manufactured Or To Be Manufactured In The Philippines Substantially From Articles, Materials, Or Supplies Of The Growth, Production, Or Manufacture, As The Case May Be, Of The Philippines. 28. Detailed Evaluation And Comparison Of Bids 28.1 The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 28.2 The Lowest Calculated Bid Shall Be Determined In Two Steps. (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To The Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 28.3 The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. Unless Otherwise Specified In The Bds, The Bac Shall Consider The Following In The Evaluation Of Bids. (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) Or A Dash (-) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications, If Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 28.4 Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered. 28.5 Unless Otherwise Indicated In The Bds, The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form. 28.6 Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 29. Post-qualification 29.1 The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 29.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Latest Income And Business Tax Returns In The Form Specified In The Bds; (b) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lowest Calculated Bid To Duly Submit The Above Requirements On Time Under This Clause Or A Finding Against The Veracity Of Such Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 29.3 The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 29.4 If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Bid Price Or Its Calculated Bid Price, Whichever Is Lower. 29.5 A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated Responsive Bid Is Determined For Contract Award. 29.6 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. 30. Reservation Clause 30.1 Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 30.2 Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Gop As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 30.3 In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made In Accordance With Section 40 Of The Irr Of Ra 9184. F. Award Of Contract 31. Contract Award 31.1 Subject To Itb Clause 29, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lcrb. 31.2 Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Bidder With The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 31.3 Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Valid Jva, If Applicable, Within Ten (10) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That The Bidder Has The Lcrb; (b) Posting Of The Performance Security In Accordance With Itb Clause 33; (c) Signing Of The Contract As Provided In Itb Clause 32; And (d) Approval By Higher Authority, If Required. 31.4 At The Time Of Contract Award, The Procuring Entity Shall Not Increase Or Decrease The Quantity Of Goods Originally Specified In Section Vi – Schedule Of Requirements. 32. Signing Of The Contract 32.1 At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 32.2 Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security And Sign And Date The Contract And Return It To The Procuring Entity. 32.3 The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 32.4 The Following Documents Shall Form Part Of The Contract. (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Notice Of Award Of Contract; And (f) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 33. Performance Security 33.1 To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 33.2 The Procuring Entity Shall Prescribe At Least One (1) Acceptable Form Of Performance Security Taken From The Categories Below That Bidders May Opt To Use, Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity: Form Of Performance Security Amount Of Performance Security (not Less Than The Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank Five Percent (5%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. Thirty Percent (30%) (d) Performance Securing Declaration (psd) None 33.3 Performance Security As Indicated In Section 17.1 (k) And 39 Of The 2016 Revised Irr Of Ra No. 9184, While Includes The Performance Securing Declaration (psd) As An Alternative Performance Security During A State Of Calamity Or Imposition Of Community Quarantine Pursuant To Gppb Resolution No. 09-2020. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lcrb Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1 Within Seven (7) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed Together With A Copy Or Copies Of The Approved Contract To The Successful Bidder. All Notices Called For By The Terms Of The Contract Shall Be Effective Only At The Time Of Receipt Thereof By The Successful Bidder. 34.2 The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. 35. Protest Mechanism Decision Of The Procuring Entity At Any Stage Of The Procurement Process May Be Questioned In Accordance With Section 55 Of The Revised Implementing Rules And Regulations Of Republic Act 9184. Section Iii – Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is The Local Government Of Badiangan, Iloilo 1.2 The Reference Is: Supply And Delivery Of Materials For The Establishment Of Rainwater Harvesting, Cabayogan Elementary School, Badiangan Central Elementary School, Tamocol Elementary School, Badiangan, Iloilo. Project Identification No. 2024-063-b. 2.0 The Funding Source Is Through The Mdrrmf 2024 Of The Local Government Of Badiangan, Iloilo In The Amount Of P 427,144.00 5.1 No Further Instructions. 5.2 None Of The Circumstances Mentioned In The Itb Clause Exists In This Project. Foreign Bidders, Except Those Falling Under Itb Clause 5.2(b) And 5.2(c), May Not Participate In This Project. 5.4 The Bidder Must Have Completed, Within The Period Specified In The Invitation To Bid And Itb Clause 12.1(a)(ii), A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. For This Purpose, Similar Contracts Shall Refer To The Supply And Delivery Of Goods That Is/are Similar In Type And Brand To The Goods Being Bidded-out. 5.5 No Further Instructions. 6.3 No Further Instructions. 7 No Further Instructions. 8.1 Subcontracting Is Not Allowed. 8.2 Not Applicable. 9.1 Not Applicable. 10.1 The Procuring Entity’s Address Is: Badiangan Municipal Hall R.c. Tabiana St., Poblacion, Badiangan, Iloilo 5033 Contact Person: Mr. Humbert S. Recomono Head: Bac Secretariat Municipal Hall, Badiangan, Iloilo Tel. No. (033) 320-7809 C.p. No. 09198501252 12.1 The First Envelope Shall Contain The Eligibility And Technical Documents Stated In The Itb Clause. However, If The Bidder Maintains A Current And Updated File Of Its Class “a” Documents With The Bac Of The Local Government Of Badiangan, Iloilo, A Certification To That Effect Issued By Its Bac May Be Submitted In Lieu Of The Class “a” Documents. 12.1(a)(i) No Other Acceptable Proof Of Registration Is Recognized. 12.1(a)(ii) The Statement Of All Ongoing And Single Largest Completed Government And Private Contracts Shall Include All Such Contracts Within The Last Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 13.1 No Additional Requirements. 13.2 The Approved Budget For The Contract (abc) Is: P 427,144.00 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 15.4(a)(iii) No Incidental Services Required. 15.4(b) Not Applicable. 15.5 Bid Prices Shall Be Fixed. Adjustable Price Proposals Shall Be Treated As Non-responsive And Shall Be Rejected. 15.6 Extraordinary Circumstances Refer To Events That May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. 16.1(b) The Bid Prices For Goods Supplied From Outside Of The Philippines Shall Be Quoted In Philippine Pesos. 16.3 No Further Instructions. 17.1 Bids Shall Be Valid Until 120 Calendar Days After Bidding. 18.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration (bsd), Or Any Of The Following Forms: 1. P (2% Of Abc), If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or 2. P (5% Of Abc), If Bid Security Is In Surety Bond 18.2 The Bid Security Shall Be Valid Until 120 Calendar Days After Bidding. 18.5(a)(iv) The Following Are Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. 18.5(b)(iii) No Further Instructions. 20.1 The Documents Enclosed In The Original Bid Should Be Original Copy Or Duly Stamped Certified True/ Machine Copy With Printed Name And Signature Of The Owner Of The Company Or The Duly Authorized Representative Of The Company As Indicated In The Special Power Of Attorney (spa) Or Secretary’s Certificate. The Duly Authorized Representative Should Have A Specimen Signature In The Spa Or Secretary’s Certificate. 20.3 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. The Photocopied Copies Of The Documents Enclosed In The First And Second Components Of The Bid Should Be Duly Stamped Certified True/ Machine Copy With Printed Name And Signature Of The Owner Of The Company Or The Duly Authorized Representative Of The Company As Indicated In The Special Power Of Attorney (spa) Or Secretary’s Certificate. The Duly Authorized Representative Should Have A Specimen Signature In The Spa Or Secretary’s Certificate. 21 The Address For Submission Of Bids Is: Municipal Budget Office, Municipal Hall, Badiangan, Iloilo The Deadline For Submission Of Bid Is: November 25, 2024; 8:30 A.m. 24.1 The Place Of Bid Opening Is: Municipal Social Hall, Badiangan, Iloilo The Date And Time Of Bid Opening Is: November 25, 2024; 9:00 A.m. 25.1 No Further Instructions. 27.1 No Further Instructions. 28.3 No Further Instructions. 28.3(b) Modification Of Bids Is Not Allowed. 28.5 No Further Instructions. 29.2(a) Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing And Payment System (efps) Shall Be Accepted. Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 29.2(d) None Required. 32.4(g) None Required. 34.2 The Effective Date Of The Contract Is Seven (7) Calendar Days Upon Receipt Of Notice To Proceed Issued By The Procuring Entity. Section Iv. General Conditions Of Contract 1. Definitions 1.1 In This Contract, The Following Terms Shall Be Interpreted As Indicated. (a) “the Contract” Means The Agreement Entered Into Between The Procuring Entity And The Supplier, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. (b) “the Contract Price” Means The Price Payable To The Supplier Under The Contract For The Full And Proper Performance Of Its Contractual Obligations. (c) “the Goods” Means All Of The Supplies, Equipment, Machinery, Spare Parts, Other Materials And/or General Support Services Which The Supplier Is Required To Provide To The Procuring Entity Under The Contract. (d) “the Services” Means Those Services Ancillary To The Supply Of The Goods, Such As Transportation And Insurance, And Any Other Incidental Services, Such As Installation, Commissioning, Provision Of Technical Assistance, Training, And Other Such Obligations Of The Supplier Covered Under The Contract. (e) “gcc” Means The General Conditions Of Contract Contained In This Section. (f) “scc” Means The Special Conditions Of Contract. (g) “the Procuring Entity” Means The Organization Purchasing The Goods, As Named In The Scc,. (h) “the Procuring Entity’s Country” Is The Philippines. (i) “the Supplier” Means The Individual Contractor, Manufacturer, Distributor, Or Firm Supplying/manufacturing The Goods And Services Under This Contract And Named In The Scc, (j) The “funding Source” Means The Organization Named In The Scc,. (k) “the Project Site,” Where Applicable, Means The Place Or Places Named In The Scc, (l) “day” Means Calendar Day. (m) The “effective Date” Of The Contract Will Be The Date Of Receipt By The Supplier Of The Notice To Proceed Or The Date Provided In The Notice To Proceed. Performance Of All Obligations Shall Be Reckoned From The Effective Date Of The Contract. (n) “verified Report” Refers To The Report Submitted By The Implementing Unit To The Head Of The Procuring Entity Setting Forth Its Findings As To The Existence Of Grounds Or Causes For Termination And Explicitly Stating Its Recommendation For The Issuance Of A Notice To Terminate. 2. Corrupt, Fraudulent, Collusive, And Coercive Practices 2.1 The Procuring Entity As Well As The Bidders, Contractors, Or Suppliers Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of This Contract. In Pursuance Of This Policy, The Procuring Entity. (a) Defines, For The Purposes Of This Provision, The Terms Set Forth Below As Follows (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And It Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Government, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019. (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition. (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels. (iv) “coercive Practices “ Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Effect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Intimidating Any Party To Prevent If From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Any Of The Practices Mentioned In This Clause For Purposes Of Competing For The Contract. 3. Inspection And Audit By The Funding Source The Supplier Shall Permit The Funding Source To Inspect The Supplier’s Accounts And Records Relating To The Performance Of The Supplier And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 4. Governing Law And Language 4.1 This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4.2 This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Exchanged By The Parties Shall Be Written In English. 5. Notices 5.1 Any Notice, Request, Or Consent Required Or Permitted To Be Given Or Made Pursuant To This Contract Shall Be In Writing. Any Such Notice, Request, Or Consent Shall Be Deemed To Have Been Given Or Made When Received By The Concerned Party, Either In Person Or Through An Authorized Representative Of The Party To Whom The Communication Is Addressed, Or When Sent By Registered Mail, Telex, Telegram, Or Facsimile To Such Party At The Address Specified In The Scc, Which Shall Be Effective When Delivered And Duly Received Or On The Notice’s Effective Date, Whichever Is Later. 5.2 A Party May Change Its Address For Notice Hereunder By Giving The Other Party Notice Of Such Change Pursuant To The Provisions Listed In The Scc For Gcc Clause 5.1. 6. Scope Of Contract 6.1 The Goods And Related Services To Be Provided Shall Be As Specified In Section Vi – Schedule Of Requirements. 6.2 This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. Any Additional Requirements For The Completion Of This Contract Shall Be Provided In The Scc 7. Subcontracting 7.1 Subcontracting Of Any Portion Of The Goods, If Allowed In The Bds, Does Not Relieve The Supplier Of Any Liability Or Obligation Under This Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 7.2 Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 8. Procuring Entity’s Responsibilities 8.1 Whenever The Performance Of The Obligations In This Contract Requires That The Supplier Obtain Permits, Approvals, Import, And Other Licenses From Local Public Authorities, The Procuring Entity Shall, If So Needed By The Supplier, Make Its Best Effort To Assist The Supplier In Complying With Such Requirements In A Timely And Expeditious Manner. 8.2 The Procuring Entity Shall Pay All Costs Involved In The Performance Of Its Responsibilities In Accordance With Gcc Clause 6. 9. Prices Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under This Contract Shall Not Vary From The Prices Quoted By The Supplier In Its Bid, With The Exception Of Any Change In Price Resulting From A Change Order Issued In Accordance With Gcc Clause 29, Or If Applicable, Adjustments Authorized In Accordance With The Price Adjustment Provisions Specified In The Scc.. 10. Payment 10.1 Unless Otherwise Specified In The Scc, Payments Shall Be Made Only Upon A Certification By The Head Of The Procuring Entity To The Effect That The Goods Have Been Rendered Or Delivered In Accordance With The Terms Of This Contract And Have Been Duly Inspected And Accepted. Except With The Prior Approval Of The President No Payment Shall Be Made For Services Not Yet Rendered Or For Supplies And Materials Not Yet Delivered Under This Contract. Ten Percent (10%) Of The Amount Of Each Payment Shall Be Retained By The Procuring Entity To Cover The Supplier’s Warranty Obligations Under This Contract As Described In Gcc Clause 17. 10.2 The Supplier’s Request(s) For Payment Shall Be Made To The Procuring Entity In Writing, Accompanied By An Invoice Describing, As Appropriate, The Goods Delivered And/or Services Performed, And By Documents Submitted Pursuant To The Scc Provision For Gcc Clause 6.2, And Upon Fulfillment Of Other Obligations Stipulated In This Contract. 10.3 Pursuant To Gcc Clause 10.2, Payments Shall Be Made Promptly By The Procuring Entity, But In No Case Later Than Sixty (60) Days After Submission Of An Invoice Or Claim By The Supplier. 10.4 Unless Otherwise Specified In The Scc, The Currency In Which Payment Is Made To The Supplier Under This Contract Shall Be In Philippine Pesos. 11. Advance Payment 11.1 Advance Payment Shall Be Made Only After Prior Approval Of The President, And Shall Not Exceed Fifteen Percent (15%) Of The Contract Amount, Unless Otherwise Directed By The President Or In Cases Allowed Under Annex “d” Of Ra 9184. 11.2 For Goods Supplied From Abroad, The Terms Of Payment Shall Be As Follows: (a) On Contract Signature: Fifteen Percent (15%) Of The Contract Price Shall Be Paid Within Sixty (60) Days From Signing Of The Contract And Upon Submission Of A Claim And A Bank Guarantee For The Equivalent Amount Valid Until The Goods Are Delivered And In The Form Provided In Section Viii. Bidding Forms. (b) On Delivery: Sixty-five Percent (65%) Of The Contract Price Shall Be Paid To The Supplier Within Sixty (60) Days After The Date Of Receipt Of The Goods And Upon Submission Of The Documents (i) Through (vi) Specified In The Scc Provision On Delivery And Documents. (c) On Acceptance: The Remaining Twenty Percent (20%) Of The Contract Price Shall Be Paid To The Supplier Within Sixty (60) Days After The Date Of Submission Of The Acceptance And Inspection Certificate For The Respective Delivery Issued By The Procuring Entity’s Authorized Representative. In The Event That No Inspection Or Acceptance Certificate Is Issued By The Procuring Entity’s Authorized Representative Within Forty Five (45) Days Of The Date Shown On The Delivery Receipt The Supplier Shall Have The Right To Claim Payment Of The Remaining Twenty Percent (20%) Subject To The Procuring Entity’s Own Verification Of The Reason(s) For The Failure To Issue Documents (vii) And (viii) As Described In The Scc Provision On Delivery And Documents. 11.3 All Progress Payments Shall First Be Charged Against The Advance Payment Until The Latter Has Been Fully Exhausted. 12. Taxes And Duties The Supplier, Whether Local Or Foreign, Shall Be Entirely Responsible For All The Necessary Taxes, Stamp Duties, License Fees, And Other Such Levies Imposed For The Completion Of This Contract. 13. Performance Security 13.1 Unless Otherwise Specified In The Scc, Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any The Forms Prescribed In The Itb Clause 33.2. 13.2 The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Winning Bidder Is In Default In Any Of Its Obligations Under The Contract. 13.3 The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 13.4 Unless Otherwise Specified In The Scc, The Performance Security May Be Released By The Procuring Entity And Returned To The Supplier After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions. (a) There Are No Pending Claims Against The Supplier Or The Surety Company Filed By The Procuring Entity; (b) The Supplier Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc 13.5 In Case Of A Reduction Of The Contract Value, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 14. Use Of Contract Documents And Information 14.1 The Supplier Shall Not, Except For Purposes Of Performing The Obligations In This Contract, Without The Procuring Entity’s Prior Written Consent, Disclose This Contract, Or Any Provision Thereof, Or Any Specification, Plan, Drawing, Pattern, Sample, Or Information Furnished By Or On Behalf Of The Procuring Entity. Any Such Disclosure Shall Be Made In Confidence And Shall Extend Only As Far As May Be Necessary For Purposes Of Such Performance. 14.2 Any Document, Other Than This Contract Itself, Enumerated In Gcc Clause 14.1shall Remain The Property Of The Procuring Entity And Shall Be Returned (all Copies) To The Procuring Entity On Completion Of The Supplier’s Performance Under This Contract If So Required By The Procuring Entity. 15. Standards The Goods Provided Under This Contract Shall Conform To The Standards Mentioned In The Section Vii – Technical Specifications,; And, When No Applicable Standard Is Mentioned, To The Authoritative Standards Appropriate To The Goods’ Country Of Origin. Such Standards Shall Be The Latest Issued By The Institution Concerned. 16. Inspection And Tests 16.1 The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Contract Specifications At No Extra Cost To The Procuring Entity. The Scc And Section Vii – Technical Specifications Shall Specify What Inspections And/or Tests The Procuring Entity Requires And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. 16.2 If Applicable, The Inspections And Tests May Be Conducted On The Premises Of The Supplier Or Its Subcontractor(s), At Point Of Delivery, And/or At The Goods’ Final Destination. If Conducted On The Premises Of The Supplier Or Its Subcontractor(s), All Reasonable Facilities And Assistance, Including Access To Drawings And Production Data, Shall Be Furnished To The Inspectors At No Charge To The Procuring Entity. 16.3 The Procuring Entity Or Its Designated Representative Shall Be Entitled To Attend The Tests And/or Inspections Referred To In This Clause Provided That The Procuring Entity Shall Bear All Of Its Own Costs And Expenses Incurred In Connection With Such Attendance Including, But Not Limited To, All Traveling And Board And Lodging Expenses. 16.4 The Procuring Entity May Reject Any Goods Or Any Part Thereof That Fail To Pass Any Test And/or Inspection Or Do Not Conform To The Specifications. The Supplier Shall Either Rectify Or Replace Such Rejected Goods Or Parts Thereof Or Make Alterations Necessary To Meet The Specifications At No Cost To The Procuring Entity, And Shall Repeat The Test And/or Inspection, At No Cost To The Procuring Entity, Upon Giving A Notice Pursuant To Gcc Clause 5. 16.5 The Supplier Agrees That Neither The Execution Of A Test And/or Inspection Of The Goods Or Any Part Thereof, Nor The Attendance By The Procuring Entity Or Its Representative, Shall Release The Supplier From Any Warranties Or Other Obligations Under This Contract. 17. Warranty 17.1 The Supplier Warrants That The Goods Supplied Under The Contract Are New, Unused, Of The Most Recent Or Current Models, And That They Incorporate All Recent Improvements In Design And Materials, Except When The Technical Specifications Required By The Procuring Entity Provides Otherwise. 17.2 The Supplier Further Warrants That All Goods Supplied Under This Contract Shall Have No Defect, Arising From Design, Materials, Or Workmanship Or From Any Act Or Omission Of The Supplier That May Develop Under Normal Use Of The Supplied Goods In The Conditions Prevailing In The Country Of Final Destination. 17.3 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier For A Minimum Period Specified In The Scc. The Obligation For The Warranty Shall Be Covered By, At The Supplier’s Option, Either Retention Money In An Amount Equivalent To At Least One Percent (1%) Of Every Progress Payment, Or A Special Bank Guarantee Equivalent To At Least One Percent (1%) Of The Contract Price Or Other Such Amount If So Specified In Thescc. The Said Amounts Shall Only Be Released After The Lapse Of The Warranty Period Specified In The Scc; Provided, However, That The Supplies Delivered Are Free From Patent And Latent Defects And All The Conditions Imposed Under This Contract Have Been Fully Met. 17.4 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Within The Period Specified In The Scc And With All Reasonable Speed, Repair Or Replace The Defective Goods Or Parts Thereof, Without Cost To The Procuring Entity 17.5 If The Supplier, Having Been Notified, Fails To Remedy The Defect(s) Within The Period Specified In Gcc Clause 17.4, The Procuring Entity May Proceed To Take Such Remedial Action As May Be Necessary, At The Supplier’s Risk And Expense And Without Prejudice To Any Other Rights Which The Procuring Entity May Have Against The Supplier Under The Contract And Under The Applicable Law 18 Delays In The Supplier’s Performance 18.1 Delivery Of The Goods And/or Performance Of Services Shall Be Made By The Supplier In Accordance With The Time Schedule Prescribed By The Procuring Entity In Section Vi – Schedule Of Requirements. 18.2 If At Any Time During The Performance Of This Contract, The Supplier Or Its Subcontractor(s) Should Encounter Conditions Impeding Timely Delivery Of The Goods And/or Performance Of Services, The Supplier Shall Promptly Notify The Procuring Entity In Writing Of The Fact Of The Delay, Its Likely Duration And Its Cause(s). As Soon As Practicable After Receipt Of The Supplier’s Notice, And Upon Causes Provided For Under Gcc Clause 22, The Procuring Entity Shall Evaluate The Situation And May Extend The Supplier’s Time For Performance, In Which Case The Extension Shall Be Ratified By The Parties By Amendment Of Contract. 18.3 Except As Provided Under Gcc Clause 22, A Delay By The Supplier In The Performance Of Its Obligations Shall Render The Supplier Liable To The Imposition Of Liquidated Damages Pursuant To Gcc Clause 19, Unless An Extension Of Time Is Agreed Upon Pursuant To Gcc Clause 29 Without The Application Of Liquidated Damages. 19. Liquidated Damages Subject To Gcc Clause 18 And 22, If The Supplier Fails To Satisfactorily Deliver Any Or All Of The Goods And/or To Perform The Services Within The Period(s) Specified In This Contract Inclusive Of Duly Granted Time Extensions If Any, The Procuring Entity Shall, Without Prejudice To Its Other Remedies Under This Contract And Under The Applicable Law, Deduct From The Contract Price, As Liquidated Damages, A Sum Equivalent To The Percentage Specified In Thescc Of The Delivered Price Of The Delayed Goods Or Unperformed Services For Each Week Or Part Thereof Of Delay Until Actual Delivery Or Performance, Up To A Maximum Deduction Of The Percentage Specified In The Scc. Once The Maximum Is Reached, The Procuring Entity Shall Rescind The Contract Pursuant To Gcc Clause 23, Without Prejudice To Other Courses Of Action And Remedies Open To It. 20. Settlement Of Disputes 20.1 If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Procuring Entity And The Supplier In Connection With Or Arising Out Of This Contract, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 20.2 If After Thirty (30) Days, The Parties Have Failed To Resolve Their Dispute Or Difference By Such Mutual Consultation, Then Either The Procuring Entity Or The Supplier May Give Notice To The Other Party Of Its Intention To Commence Arbitration, As Hereinafter Provided, As To The Matter In Dispute, And No Arbitration In Respect Of This Matter May Be Commenced Unless Such Notice Is Given. 20.3 Any Dispute Or Difference In Respect Of Which A Notice Of Intention To Commence Arbitration Has Been Given In Accordance With This Clause Shall Be Settled By Arbitration. Arbitration May Be Commenced Prior To Or After Delivery Of The Goods Under This Contract. 20.4 Arbitration Proceedings Shall Be Conducted In Accordance With The Rules Of Procedure Specified In The Scc. 20.5 Notwithstanding Any Reference To Arbitration Herein, The Parties Shall Continue To Perform Their Respective Obligations Under The Contract Unless They Otherwise Agree; And The Procuring Entity Shall Pay The Supplier Any Monies Due The Supplier. 21 Liability Of The Supplier 21.1 Subject To Additional Provisions, If Any, Set Forth In The Scc, The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 21.2 Except In Cases Of Criminal Negligence Or Willful Misconduct, And In The Case Of Infringement Of Patent Rights, If Applicable, The Aggregate Liability Of The Supplier To The Procuring Entity Shall Not Exceed The Total Contract Price, Provided That This Limitation Shall Not Apply To The Cost Of Repairing Or Replacing Defective Equipment. 22. Force Majeure 22.1 The Supplier Shall Not Be Liable For Forfeiture Of Its Performance Security, Liquidated Damages, Or Termination For Default If And To The Extent That Its Delay In Performance Or Other Failure To Perform Its Obligations Under The Contract Is The Result Of A Force Majeure. 22.2 For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 22.3 If A Force Majeure Situation Arises, The Supplier Shall Promptly Notify The Procuring Entity In Writing Of Such Condition And The Cause Thereof. Unless Otherwise Directed By The Procuring Entity In Writing, The Supplier Shall Continue To Perform Its Obligations Under The Contract As Far As Is Reasonably Practical, And Shall Seek All Reasonable Alternative Means For Performance Not Prevented By The Force Majeure. 23. Termination For Default 23.1 The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attends Its Implementation. (a) Outside Of Force Majeure, The Supplier Fails To Deliver Or Perform Any Or All Of The Goods Within The Period(s) Specified In The Contract, Or Within Any Extension Thereof Granted By The Procuring Entity Pursuant To A Request Made By The Supplier Prior To The Delay, And Such Failure Amounts To At Least Ten Percent (10%) Of The Contact Price; (b) As A Result Of Force Majeure, The Supplier Is Unable To Deliver Or Perform Any Or All Of The Goods, Amounting To At Least Ten Percent (10%) Of The Contract Price, For A Period Of Not Less Than Sixty (60) Calendar Days After Receipt Of The Notice From The Procuring Entity Stating That The Circumstance Of Force Majeure Is Deemed To Have Ceased; Or (c) The Supplier Fails To Perform Any Other Obligation Under The Contract.. 23.2 In The Event The Procuring Entity Terminates This Contract In Whole Or In Part, For Any Of The Reasons Provided Under Gcc Clauses 23 To 26, The Procuring Entity May Procure, Upon Such Terms And In Such Manner As It Deems Appropriate, Goods Or Services Similar To Those Undelivered, And The Supplier Shall Be Liable To The Procuring Entity For Any Excess Costs For Such Similar Goods Or Services. However, The Supplier Shall Continue Performance Of This Contract To The Extent Not Terminated. 23.3 In Case The Delay In The Delivery Of The Goods And/or Performance Of The Services Exceeds A Time Duration Equivalent To Ten Percent (10%) Of The Specified Contract Time Plus Any Time Extension Duly Granted To The Supplier, The Procuring Entity May Terminate This Contract, Forfeit The Supplier's Performance Security And Award The Same To A Qualified Supplier. 24. Termination For Insolvency The Procuring Entity Shall Terminate This Contract If The Supplier Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Supplier, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Supplier. 25. Termination For Convenience 25.1 The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate A Contract For The Convenience Of The Government If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 25.2 The Goods That Have Been Delivered And/or Performed Or Are Ready For Delivery Or Performance Within Thirty (30) Calendar Days After The Supplier’s Receipt Of Notice To Terminate Shall Be Accepted By The Procuring Entity At The Contract Terms And Prices. For Goods Not Yet Performed And/or Ready For Delivery, The Procuring Entity May Elect: (a) To Have Any Portion Delivered And/or Performed And Paid At The Contract Terms And Prices; And/or (b) To Cancel The Remainder And Pay To The Supplier An Agreed Amount For Partially Completed And/or Performed Goods And For Materials And Parts Previously Procured By The Supplier. 25.3 If The Supplier Suffers Loss In Its Initial Performance Of The Terminated Contract, Such As Purchase Of Raw Materials For Goods Specially Manufactured For The Procuring Entity Which Cannot Be Sold In Open Market, It Shall Be Allowed To Recover Partially From This Contract, On A Quantum Meruit Basis. Before Recovery May Be Made, The Fact Of Loss Must Be Established Under Oath By The Supplier To The Satisfaction Of The Procuring Entity Before Recovery May Be Made. 26. Termination For Unlawful Acts 26.1 The Procuring Entity May Terminate This Contract In Case It Is Determined Prima Facie That The Supplier Has Engaged, Before Or During The Implementation Of This Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation. Unlawful Acts Include, But Are Not Limited To, The Following: (a) Corrupt, Fraudulent, And Coercive Practices As Defined In Itb Clause 3.1(a); (b) Drawing Up Or Using Forged Documents; (c) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (d) Any Other Act Analogous To The Foregoing. 27. Procedures For Termination Of Contracts 27.1 The Following Provisions Shall Govern The Procedures For Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Implementing Unit Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Implementing Unit, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Supplier Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Supplier To Show Cause As To Why This Contract Should Not Be Terminated; (iv) Special Instructions Of The Procuring Entity, If Any. (c) The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (d) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Supplier Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why This Contract Should Not Be Terminated. If The Supplier Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating This Contract; (e) The Procuring Entity May, At Anytime Before Receipt Of The Supplier’s Verified Position Paper To Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Supplier’s Receipt Of The Notice; (f) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Supplier Of Its Decision And, Unless Otherwise Provided, This Contract Is Deemed Terminated From Receipt Of The Supplier Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; (g) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity; And (h) The Supplier Must Serve A Written Notice To The Procuring Entity Of Its Intention To Terminate The Contract At Least Thirty (30) Calendar Days Before Its Intended Termination. The Contract Is Deemed Terminated If It Is Not Resumed In Thirty (30) Calendar Days After The Receipt Of Such Notice By The Procuring Entity. 28. Assignment Of Rights The Supplier Shall Not Assign His Rights Or Obligations Under This Contract, In Whole Or In Part, Except With The Procuring Entity’s Prior Written Consent. 29. Contract Amendment Subject To Applicable Laws, No Variation In Or Modification Of The Terms Of This Contract Shall Be Made Except By Written Amendment Signed By The Parties. 30. Application These General Conditions Shall Apply To The Extent That They Are Not Superseded By Provisions Of Other Parts Of This Contract. Section V – Special Conditions Of Contract Scc Clause 1.1(g) The Procuring Entity Is The Local Government Of Badiangan, Iloilo. 1.1(i) The Supplier Is ________________________________. 1.1(j) The Funding Source Is Through The Mdrrmf 2024 Of The Local Government Of Badiangan, Iloilo. The Total Approved Budget For The Contract Is Four Hundred Twenty Seven Thousand One Hundred Forty Four Pesos Only (p 427,144.00) 1.1(k) The Project Site Or The Delivery Of The Goods Shall Be At Cabayogan Elementary School, Badiangan Central Elementary School, Tamocol Elementary School, Badiangan, Iloilo. 5.1 The Procuring Entity’s Address For Notices Is: Atty. Suzette A. Mamon Municipal Mayor Badiangan Municipal Hall R.c. Tabiana St., Poblacion, Badiangan, Iloilo 5033 Tel. No: Mayor’s Office (033-320-0807) 6.2 The Additional Requirements For The Completion Of This Contract Are As Follows: Delivery And Documents - For Purposes Of The Contract(s), “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of The Contract(s) Shall Be As Follows: For Domestic Suppliers, “the Delivery Terms Applicable To This Contract Are Delivered To Cabayogan Elementary School, Badiangan Central Elementary School, Tamocol Elementary School, Badiangan, Iloilo. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi – Schedule Of Requirements. The Details Of Shipping And/or Other Documents To Be Furnished By The Supplier Are As Follows: Upon Delivery Of Goods To The Project Site, The Supplier Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: (i) Original And Four Copies Of The Supplier’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; (ii) Original And Four Copies Delivery Receipt/note, Railway Receipt Or Truck Receipt; (iii) Original Supplier’s Factory Inspection Report; (iv) Original And Four Copies Of The Manufacturer’s And/or Supplier’s Warranty Certificate; (v) Original And Four Copies Of The Certificate Of Origin (for Imported Goods); (vi) Delivery Receipt Detailing Number And Description Of Items Received Signed By The Authorized Receiving Personnel; (vii) Certificate Of Acceptance/inspection Report Signed By The Procuring Entity’s Representative At The Project Site; And (viii) Four Copies Of The Invoice Receipt For Property Signed By The Procuring Entity’s Representative At The Project Site. For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Mr. Anthony O. Batir, Local Disaster Risk Reduction Management Officer Iii, Badiangan, Iloilo. Incidental Services - The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi – Schedule Of Requirements. (a) Performance Or Supervision Of On-site Assembly And/or Start Up Of The Supplied Goods; (b) Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; (c) Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; (d) Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And (e) Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Insurance – The Goods Supplied Under This Contract Shall Be Fully Insured By The Supplier In A Freely Convertible Currency Against Loss Or Damage Incidental To Manufacture Or Acquisition, Transportation, Storage, And Delivery. The Goods Remain At The Risk And Title Of The Supplier Until Their Final Acceptance By The Procuring Entity. Transportation - Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure In Accordance With Gcc Clause 22. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Patent Rights - The Supplier Shall Indemnify The Procuring Entity Against All Third Party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 9 Bid Prices Are Considered Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances And Upon Prior Approval Of The Gppb In Accordance With Section 61 Of R.a. 9184 And Its Irr-a. 10.1 No Further Instructions. 10.4 No Further Instructions. 13.1 No Further Instructions. 13.4 No Further Instructions. 13.4 (c) No Further Instructions. 16.1 The Inspection And Test That Will Be Conducted Is Physical Inspection. 17.3 The Goods Shall Have A Warranty Period Of Three (3) Months After Acceptance By The Procuring Entity Of The Delivered Goods Or After The Goods Are Consumed Whichever Is Earlier. 17.4 & 17.5 The Period For Correction Of Defects In The Warranty Period Is Seven (7) Calendar Days From Either Verbal Or Written Notification. 19 The Applicable Rate Is One Tenth (1/10) Of One (1) Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Maximum Deduction Shall Be Ten Percent (10%) Of The Amount Of Contract. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, The Procuring Entity Shall Rescind The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 20.4 In The Case Of A Dispute Between The Procuring Entity And The Supplier, The Dispute Shall Be Resolved In Accordance With Republic Act 9285 (“r.a. 9285”), Otherwise Known As The “alternative Dispute Resolution Act Of 2004.” 21.1 No Additional Provisions. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Days/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site Item No. Description Quantity Total Delivered, Days/months 1. Portland Cement 66 Bags 66 Bags 30 Calendar Days Upon Receipt Of P.o. 2. Washed Sand 6 Cu.m. 6 Cu.m. 30 Calendar Days Upon Receipt Of P.o. 3. ¾ Gravel 6 Cu.m. 6 Cu.m. 30 Calendar Days Upon Receipt Of P.o. 4. 10mmø Dsb 30 Lgths. 30 Lgths. 30 Calendar Days Upon Receipt Of P.o. 5. 12mmø Dsb 48 Lgths. 48 Lgths. 30 Calendar Days Upon Receipt Of P.o. 6. Ordinary Plywood 1/4x4’x8’ 3 Shts. 3 Shts. 30 Calendar Days Upon Receipt Of P.o. 7. C.w. Nails 4” 6 Kgs. 6 Kgs. 30 Calendar Days Upon Receipt Of P.o. 8. C.w. Nails 2” 3 Kgs. 3 Kgs. 30 Calendar Days Upon Receipt Of P.o. 9. #16 Tie Wire 15 Kgs. 15 Kgs. 30 Calendar Days Upon Receipt Of P.o. 10. 2”x2”x8’ Good Lumber 36 Pcs. 36 Pcs. 30 Calendar Days Upon Receipt Of P.o. 11. 2 ½”ø G.i. Pipe 2.5mm Thk 9 Lgths. 9 Lgths. 30 Calendar Days Upon Receipt Of P.o. 12. 2”ø G.i. Pipe 1.9mm Thk 9 Lgths. 9 Lgths. 30 Calendar Days Upon Receipt Of P.o. 13. 1 ½”ø G.i. Pipe 1.80mm Thk 6 Lgths. 6 Lgths. 30 Calendar Days Upon Receipt Of P.o. 14. 5mmx2” Flat Bar 12 Lgths. 12 Lgths. 30 Calendar Days Upon Receipt Of P.o. 15. 0.4mm Thk Pre-painted Gutter 15 Pcs. 15 Pcs. 30 Calendar Days Upon Receipt Of P.o. 16. Blind Rivets 1/8x1/2 2 Boxes 2 Boxes 30 Calendar Days Upon Receipt Of P.o. 17. ½” Base Plate 20cmx20cm 18 Pcs. 18 Pcs. 30 Calendar Days Upon Receipt Of P.o. 18. 2000l Pvc Water Tank 6 Units 6 Units 30 Calendar Days Upon Receipt Of P.o. 19. Anchor Bolt L-shape 1/2x20cm W/ Nut And Washer 72 Pcs. 72 Pcs. 30 Calendar Days Upon Receipt Of P.o. 20. Pvc Pipe 4” S1000 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 21. ½ Blue Pipe 6 Pcs. 6 Pcs. 30 Calendar Days Upon Receipt Of P.o. 22. ½ Blue Elbow 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 23. ¾” Blue Pipe 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 24. 1” Blue Pipe 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 25. 1” Blue Tee 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 26. 1” Blue Elbow 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 27. ¾” Blue Elbow 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 28. Pvc Solvent Cement 400 1 Can 1 Can 30 Calendar Days Upon Receipt Of P.o. 29. Teflon Tape ¾” 3 Rolls 3 Rolls 30 Calendar Days Upon Receipt Of P.o. 30. Elbow Reducer 1”x3/4” 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 31. Elbow Reducer ¾”x1/2” 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 32. Fta 1/2 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 33. Faucet W/ Hose Bib Pvc 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 34. Fta 1” 3 Pcs. 3 Pcs. 30 Calendar Days Upon Receipt Of P.o. 35. Cutting Disc 4” 6 Pcs. 6 Pcs. 30 Calendar Days Upon Receipt Of P.o. 36. Welding Rod 9 Kgs. 9 Kgs. 30 Calendar Days Upon Receipt Of P.o. 37. Cutting Disc 14” 1 Pc. 1 Pc. 30 Calendar Days Upon Receipt Of P.o. 38. Epoxy Primer Gray 2 Gals. 2 Gals. 30 Calendar Days Upon Receipt Of P.o. 39. Epoxy Reducer 1 Gal. 1 Gal. 30 Calendar Days Upon Receipt Of P.o. 40. Baby Roller 4 Pcs. 4 Pcs. 30 Calendar Days Upon Receipt Of P.o. 41. Paint Brush 3” 2 Pcs. 2 Pcs. 30 Calendar Days Upon Receipt Of P.o. 42. Paint Pan 2 Pcs. 2 Pcs. 30 Calendar Days Upon Receipt Of P.o. 43. ¼ Ord. Plywood 1 Sheet 1 Sheet 30 Calendar Days Upon Receipt Of P.o. 44. Tarpaulin W/ Print 4x8 1 Sheet 1 Sheet 30 Calendar Days Upon Receipt Of P.o. 45. C.w. Nails 4” 1 Kg. 1 Kg. 30 Calendar Days Upon Receipt Of P.o. 46. C.w. Nails 1 ½” 1 Kg. 1 Kg. 30 Calendar Days Upon Receipt Of P.o. 47. 2x2x8 Good Lumber 6 Pcs. 6 Pcs. 30 Calendar Days Upon Receipt Of P.o. Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ Section Vii. Technical Specifications Note: In The Statement Of Compliance Column, Bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Goods Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidders Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Provisions Of Itb Clause 3.1(a)(ii) And/or Gcc Clause 2.1(a)(ii). Item No. Specifications Statement Of Compliance Cross Reference 1. Portland Cement 2. Washed Sand 3. ¾ Gravel 4. 10mmø Dsb 5. 12mmø Dsb 6. Ordinary Plywood 1/4x4’x8’ 7. C.w. Nails 4” 8. C.w. Nails 2” 9. #16 Tie Wire 10. 2”x2”x8’ Good Lumber 11. 2 ½”ø G.i. Pipe 2.5mm Thk 12. 2”ø G.i. Pipe 1.9mm Thk 13. 1 ½”ø G.i. Pipe 1.80mm Thk 14. 5mmx2” Flat Bar 15. 0.4mm Thk Pre-painted Gutter 16. Blind Rivets 1/8x1/2 17. ½” Base Plate 20cmx20cm 18. 2000l Pvc Water Tank 19. Anchor Bolt L-shape 1/2x20cm W/ Nut And Washer 20. Pvc Pipe 4” S1000 21. ½ Blue Pipe 22. ½ Blue Elbow 23. ¾” Blue Pipe 24. 1” Blue Pipe 25. 1” Blue Tee 26. 1” Blue Elbow 27. ¾” Blue Elbow 28. Pvc Solvent Cement 400 29. Teflon Tape ¾” 30. Elbow Reducer 1”x3/4” 31. Elbow Reducer ¾”x1/2” 32. Fta 1/2 33. Faucet W/ Hose Bib Pvc 34. Fta 1” 35. Cutting Disc 4” 36. Welding Rod 37. Cutting Disc 14” 38. Epoxy Primer Gray 39. Epoxy Reducer 40. Baby Roller 41. Paint Brush 3” 42. Paint Pan 43. ¼ Ord. Plywood 44. Tarpaulin W/ Print 4x8 45. C.w. Nails 4” 46. C.w. Nails 1 ½” 47. 2x2x8 Good Lumber Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ Section Viii. Bidding Forms Bid Form Date: Project Identification No.: To: [name And Address Of Procuring Entity] Gentlemen And/or Ladies: Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To [supply/deliver/perform] [description Of The Goods] In Conformity With The Said Pbds For The Sum Of [total Bid Amount In Words And Figures] Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In Bds Provision For Itb Clause 18.2 And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid, Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents. We Likewise Certify/ Confirm That The Undersigned, [ For Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter's Behalf For The [name Of Project] Of The [name Of Procuring Entity] [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter's Behalf For [name Of Project] Of The [name Of The Procuring Entity]. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 20______. Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ For Goods Offered From Within The Philippines Name Of Bidder ____________________________ Project Identification Number __. Page Of . All Entries Must Be Computerized Or Typewritten 1 2 3 4 5 6 7 8 9 10 Item No. Description Country Of Origin Quantity Unit Unit Price Exw Per Item Transportation And Insurance And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price Per Unit (col 5 + 6 + 7 + 8) Total Price Delivered Final Destination (col. 9) X (col. 4) 1. Portland Cement 66 Bags 2. Washed Sand 6 Cu.m. 3. ¾ Gravel 6 Cu.m. 4. 10mmø Dsb 30 Lgths. 5. 12mmø Dsb 48 Lgths. 6. Ordinary Plywood 1/4x4’x8’ 3 Shts. 7. C.w. Nails 4” 6 Kgs. 8. C.w. Nails 2” 3 Kgs. 9. #16 Tie Wire 15 Kgs. 10. 2”x2”x8’ Good Lumber 36 Pcs. 11. 2 ½”ø G.i. Pipe 2.5mm Thk 9 Lgths. 12. 2”ø G.i. Pipe 1.9mm Thk 9 Lgths. 13. 1 ½”ø G.i. Pipe 1.80mm Thk 6 Lgths. 14. 5mmx2” Flat Bar 12 Lgths. 15. 0.4mm Thk Pre-painted Gutter 15 Pcs. 16. Blind Rivets 1/8x1/2 2 Boxes 17. ½” Base Plate 20cmx20cm 18 Pcs. 18. 2000l Pvc Water Tank 6 Units 19. Anchor Bolt L-shape 1/2x20cm W/ Nut And Washer 72 Pcs. 20. Pvc Pipe 4” S1000 3 Pcs. 21. ½ Blue Pipe 6 Pcs. 22. ½ Blue Elbow 3 Pcs. 23. ¾” Blue Pipe 3 Pcs. 24. 1” Blue Pipe 3 Pcs. 25. 1” Blue Tee 3 Pcs. 26. 1” Blue Elbow 3 Pcs. 27. ¾” Blue Elbow 3 Pcs. 28. Pvc Solvent Cement 400 1 Can 29. Teflon Tape ¾” 3 Rolls 30. Elbow Reducer 1”x3/4” 3 Pcs. 31. Elbow Reducer ¾”x1/2” 3 Pcs. 32. Fta 1/2 3 Pcs. 33. Faucet W/ Hose Bib Pvc 3 Pcs. 34. Fta 1” 3 Pcs. 35. Cutting Disc 4” 6 Pcs. 36. Welding Rod 9 Kgs. 37. Cutting Disc 14” 1 Pc. 38. Epoxy Primer Gray 2 Gals. 39. Epoxy Reducer 1 Gal. 40. Baby Roller 4 Pcs. 41. Paint Brush 3” 2 Pcs. 42. Paint Pan 2 Pcs. 43. ¼ Ord. Plywood 1 Sheet 44. Tarpaulin W/ Print 4x8 1 Sheet 45. C.w. Nails 4” 1 Kg. 46. C.w. Nails 1 ½” 1 Kg. 47. 2x2x8 Good Lumber 6 Pcs. Name: ____________________________________________________________ Legal Capacity: _____________________________________________________ Signature: _________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ___________________________ Omnibus Sworn Statement Republic Of The Philippines ) Iloilocity ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S, 1930, As Amended, Or The Revised Penal Code, In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ___________________________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] Checklist Of Bid Requirements First Envelope Eligibility Documents Class “a” Documents Legal Documents: 1 Certificate Of Philgeps Registration (platinum Membership) And Membership With Annex A In Accordance With Section 8.5.2 Of The Revised Irr. Technical Documents: 2 Statement Of All Its On-going Government And Private Contracts Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids, Including Contracts Awarded But Not Yet Started, If Any, Which Are Similar In Nature And Complexity To The Contract To Be Bid. The Statement Shall Include, For Each Contract, The Following: (a) Name Of The Contract; (b) Date Of The Contract, (c) Kind Of Goods, (d) Amount Of And Value Of Outstanding Contracts, (e) Date Of Delivery, And (f) Notice Of Award, Notice To Proceed, Contract Of Agreements, Purchase Orders And Certificate Of Accomplishments Issued By The Owner. (latest) 3 Statement Of Its Single Largest Completed Contract (slcc) Which Includes Its Government And Private Contracts Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids, Which Are Similar In Nature And Complexity To The Contract To Be Bid. The Statement Shall Include, For Each Contract, The Following: (a) Name Of The Contract; (b) Date Of The Contract, (c) Kind Of Goods, (d) Amount Of And Value Of Awarded And Completed Contracts, (e) Date Of Delivery, (f) End User’s Acceptance And Or Official Receipt(s) Issued For The Contract Supported By Notice Of Award, Notice To Proceed, Contract/ Purchase Order, Certificate Of Completion And Certificate Of Acceptance.(latest) Financial Documents 4 The Prospective Bidder’s Latest Computation For Its Net Financial Contracting Capacity (nfcc) Which Must Be At Least Equal To The Abc To Be Bid. (latest) Or A Committed Line Of Credit From Universal Or Commercial Bank (not Applicable To Procurement Of Infrastructure Projects). Class “b” Documents 5 If Applicable, A Valid Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence, Or, In Lieu Thereof, A Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid . (latest) Technical Documents 1 2 Bid Security In The Prescribed Form, Amount And Validity Period And In Accordance With Itb Clause 18. Statement Of Compliance To The Schedule Of Requirements 3 4 Statement Of Compliance To Technical Specifications Taking Into Consideration The Notations Stated In Section Vii Of The Bidding Documents. Authority Of The Signatory 5 Sworn Statement By The Prospective Bidder Or Its Duly Authorized Representative In Accordance With Section 25.2(b)(iv) Of The Revised Irr Of Ra 9184 And As Indicated In The Omnibus Sworn Statement Of The Bidding Documents Using The Prescribed Form Issued By The Gppb. (latest) Note: Any Missing Document In The Above-mentioned Checklist Is A Ground For Outright Rejection Of The Bid Second Envelope Financial Documents 1 Financial Bid Form Which Includes Bid Prices And The Bill Of Quantities And The Applicable Price Schedules, In Accordance With Itb Clauses 15.1 And 15.4 And The Issued Form In Section Viii Of The Bidding Documents. 2 If A Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti (if A Bidder Is A Sole Proprietor), By Sec (if Bidder Is A Partnership, Or A Corporation); And Cda (if Bidder Is A Cooperative)issued In Accordance With Itb Clause 27, If Applicable, That: A) Sole Proprietor Is A Citizen Of The Philippines, Corporation, Cooperative, Or Association Is A Duly Organized Under The Laws Of The Philippines With At Least Seventy Five (75%) Of Its Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines; B) Habitually Established In Business And Habitually Engaged In The Manufacturing Or Sale Of The Merchandise Covered By His Bid, And C) The Business Has Been In Existence For At Least Five (5) Consecutive Years Prior To The Advertisement And/or The Invitation To Bid.

Municipality Of Carmen, Bohol Tender

Automobiles and Auto Parts
Philippines
Closing Date10 Dec 2024
Tender AmountPHP 3 Million (USD 50.8 K)
Details: Description 1 Land Ambulance (type 1) 1 Unit I. Vehicle Specifications And Requirements · Vehicle Type: Four-wheel Passenger Van With 4 Doors (2 At The Front For The Driver And Passenger, One Sliding Door Or Barn Door At The Right Side And Tailgate Or Barn Door At The Rear) · Wheelbase: At Least 2,500-2,800 Mm · Drive Type: Rear Wheel Drive · Engine Size/displacement: 2,500 To 3,000 Cc · Engine Type: 4 Cylinders, In-line Type, 16 Valves, Double Over Head Cam (dohc), Maximum 3,400 Rpm · Alternator And Battery The Capacity Of The Alternator And Battery Must Be Sufficient To Supply The Additional Load Demands Of All Medical Equipment. The Amperage Capacity Of The Alternator Must Be At Least 110 Amperes. · Fuel-injector System: Direct Injection · Emission Compliance: Euro 4 · Fuel Type: Diesel · Fuel Tank Capacity: At Least 65 Liters · Transmission: Manual With At Least Five (5) Speed + One (1) Reverse · Steering: Left Hand Drive With Power-steering System · Brakes: Ventilated Disk On The Front And Ventilated Disk Or Drum Type On The Rear. With Anti-lock Braking System. With Parking Brake · Front Suspensions: Mcpherson Strut Or Double Wishbone Or Torsion Bar With Stabilizer · Rear Suspensions: Rigid Axle With Leaf Spring And Double Acting Shock Absorbers · Wheels: At Least 15 Inch, Aluminum Mag Wheels Or Steel Wheels With Full Cover · Tires: Radial Type And At Least 195 Mm Tire Width Standard Vehicle Lamps: Head Lamps, Tail Lamps, Stop Lamps, Signal Lamps, License Plate Lamps, Fog Lamps And Step Lamps · Vehicle Body Color: White · Floor Material: Metal With Anti-static Floor Matting. Each Entry Point Of The Patient Compartment Must Be Fitted With A Diamond Tread Plate Flooring. · Standard Dashboard Instrumentations: Speedometer, Odometer, Fuel Gauge, Digital Clock, Warning Lamps For Low Oil Pressure, Cooling Water Level, Overheating, Low Battery Charge, Indicator Lamps For Parking Brake And Head Light High-beam, Engine Check, Door Open. · Dashboard And Rear-view Camera System: Resolution Of At Least 1920x1080@30fps, Angle Of View At Least 120 Degrees Diagonal, At Least 2 Inch Led Display, Minimum Storage Capacity Of 64gb, With Loop Recording, Automatic On/off And Night Vision Recording In Low Light. The Cameras Must Be Permanently Installed On The Dashboard Or Windshield And At The Rear Part Of Vehicle. Rear-view Camera Must Be Have Color-coded Parking Grid Features. The Power Supply Must Be From The Vehicle Battery. · Standard Driver’s Cabin Accessories: Am/fm Radio With Speakers, Usb Connector, Front Personal Lamp For Driver And Passenger, Rear View Mirror, Sun Visor And Assist Grips For The Driver And Passenger. · Vehicle Doors Glass Windows: Central Or Power Door Locking System. Hydraulic / Electric Windows For Driver And Front Passenger Sides. The Vehicle Glass Windows (except The Windshield) Must Be Installed With Medium Shade (35% Visible Light Transmitted) Glass Tint. · Windshield Wipers: With At Least Three (3) Speed Intermittent With Washer · Air Conditioning System: Dual Type; At The Driver’s Cabin And At The Patient Compartment With Independent Controls. · Seat Belts: 3 Point Emergency Locking Retractor (elr) Seatbelts For The Driver And Front Passenger. · Airbags: Supplemental Restraint System (srs) Airbags For The Driver And For The Front Passenger. · Driver And Passenger Side Mirrors: Standard Convex Type, Manual Or Power Adjustment · Vehicle Interior Trim: Moulded Trim. The Ceiling Must Be Provided With Insulation. · Stainless Steel Plate On The Rear Bumper To Protect The Bumper When The Ambulance Stretcher Is Being Loaded To The Ambulance. · Set Of Tools: Hydraulic Jack, Tire Wrench, Flat And Philips Screw Drivers, Set Of Pliers, Adjustable Wrench, Early Warning Device And Spare Wheel And Tire. Ii. Emergency Lights, Sirens And Public Address System · Emergency Lights: Roof Mounted Light Bar With Red And Green Flashing Led Lights. The Length Of The Light Bar Must Be The Same As The Width Of The Vehicle Roof. Electric Siren And Public Address System: Standard Ambulance Siren Tones (horn, Manual, Wail, Yelp, Phaser, Hilo/two Tone) And With At Least Two 100 Watts Amplifier And Siren Speakers. With Rotary Switch And Momentary Push-button Override Control. Public Address Override With Attached Microphone And Volume Control Knob · Red And Green Flashing Led Lights Mounted On The Upper Part Of The Rear Of The Ambulance · Red And Green Led Flashing Lights Mounted On The Front Grill Of The Ambulance Iii. Ambulance Body Marking · The Front Of The Ambulance Shall Be Marked With A Reflectorized And Capitalized Word “ambulance” Which Is Spelled Out In Reverse (mirror Image). The Height Of Each Letter Shall Be No Less Than 10 Centimeters And The Word Shall Be Seen At Least Six (6) Meters Away. · Each Side Of The Ambulance Body Shall Have The Capitalized Word “ambulance” Not Less Than 15 Cm In Height And The Letters Must Be In Red Color. · The Rear Side Of The Ambulance Body Shall Be Marked With A Reflectorized And Capitalized Word “ambulance” Not Less Than 15 Cm In Height And The Letters Must Be In Red Color. · The Prescribed Doh Logo With A Diameter Of Not Less Than 36 Cm Shall Be Placed On The Driver’s Door And On The Front Passenger Door. Iv. Patient Compartment · Compartment Interior Height: At Least 1600mm · Compartment Interior Width: At Least 1500mm · Partition Between The Driver And Patient Compartment: Air Tight Bulkhead Made Of Non-porous Material With A Transparent And Shatter-proof Sliding Window At Least 35 Cm X 30 Cm. · Storage Cabinet For Medicines, Instruments And Medical Equipment > Built-in Cabinet Made Of White Painted Aluminum Panels Or Other Lightweight, Equivalent Strength Material Such As Fiberglass, Composites And Fiberglass Reinforced Plastics. The Cabinet Must Be Mounted On The Upper Left Side Of The Patient Compartment And Must Be At Least 200 Cm But Must Not Be More Than 210 Cm In Length. The Cabinet Must Be Firmly Anchored (bolted Or Welded) To Tapping Plates Of The Body Structure. > The Cabinet Must Have Transparent And Shatter-proof Sliding Doors With Low Profile Handles. The Sliding Doors Must Be Easily Opened But Must Not Open During Transit. The Sliding Doors Must Be Fitted With Automatic Latch Or Friction Holding Device. > The Cabinet Must Have At Least 4 Shelves With At Least One Shelf Designed To Fit And Carry Heavy Medical Equipment Such As The Defibrillator And Nebulizer. The Shelves Must Have A Depth At Least 30 Cm But Must Not Be More Than 50 Cm. · Compartment For The Folding Stretcher And Scoop Stretcher: Installed Below The Storage Cabinet, Made Of White Painted Aluminum Panels Or Other Lightweight, Equivalent Strength Material Such As Fiberglass, Composites And Fiberglass Reinforced Plastics. The Compartment Must Be At Least 200 Cm But Must Not Be More Than 210 Cm In Length. The Cabinet Must Be Firmly Anchored (bolted Or Welded) To Tapping Plates Of The Body Structure. Bench For Medical Personnel: The Ambulance Must Be Fitted With 3-seater Bench Permanently Mounted On The Ambulance Floor; One On The Head Side Of The Patient And One On The Right Side Of The Patient Compartment. The Bench (seat And Backrest) Must Be Made Of Sturdy Aluminum Frame And Panels Coated With White Color Paint Or Other Lightweight, Equivalent Strength Material Such As Fiberglass Reinforced · Plastics Or Plastic Laminated. The Seat And Backrest Must Be Fitted With Mattress Made Of Polyurethane Foam Covered With A Washable Leatherette Material. The Construction Of The Bench Must Be In Such A Way That The Underneath Can Be Used As A Compartment. The Bench Must Have A 2 Point Seatbelt For Each Person. > Overhead Lighting: At Least 2 Led White Lights With Low Light Option > Grab Rail: Aluminum Or Stainless Steel Grab Rail At Least 120 Cm Long, 10 Cm Depth (maximum) Installed On The Ceiling Right Above The Patient/ambulance Stretcher. > 220v Ac Supply: The Patient Compartment Must Be Installed With An Electronic Inverter With A Capacity Of At Least 3kva And An Output Voltage Of 220v, 60 Hz. At Least Five (5) Convenience Outlets Must Be Installed At The Different Points On The Compartment To Supply Power To The Medical Equipment. > Intercom System: Intra-vehicle Intercom System Must Be Fitted To Serve As Voice Communication Between The Driver And Personnel In The Patient Compartment. V. Communication Equipment Two (2) Pieces Cellular Phones (one For The Ambulance And One For The Hospital/base). The Cellular Phones Must Be 4g Network Capable, With Internal Memory Of At Least 64gb And 4gb Ram Smartphones. The Phones Must Be Provided With Sim Cards And Battery Charger. Vi. Medical Equipment And Instruments · Ambulance Stretcher > Length: 180 – 185 Cm > Width: 48 – 55 Cm > Loading Height Should Match The Vehicle Floor Height > Loading Capacity: At Least 175 Kg > Materials: Stainless Steel, High Grade Aluminum Alloy > Head Part Rising Angle: At Least 75° Knee Part Rising Angle: At Least 15° > With Collapsible Side Rails And Quick Release Patient Restrain System > With Durable Folding Leg Mechanism > The Mattress Must Be Made Of High-density Polyester Fiber Foam With A Thickness Of At Least 5 Cm And Covered With Waterproof Vinyl Material. > Wheels: 200 - 210mm Diameter, Fixed Front With Locking Brakes And Auto-directional Rear And With 50-55 Cm Loading Carriage Wheels > Loading Rail Mounted In The Ambulance With Latching System > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment. · Automatic External Defibrillator (aed) > Compact, Lightweight, Easy To Use, Bi-phasic Defibrillator With Manual (with Easy 1-2-3 Operation) > Waveform: Rectilinear Biphasic > Defibrillator Charge Hold Time: Not More Than 30 Seconds > Patient Safety: All Patient Connections Are Electrically Isolated > Charge Time: Less Than 10 Seconds With New Battery Charge To 200j With A Fully-charged Battery > Battery Operated > Self-test: Configurable Automatic Self-test When Device Is Turned-on > Monthly Full-energy Test (200j) > Automatic Self-test Checks: > Battery Capacity > Electrode Connection > Electrocardiogram And Discharge Circuits > Microprocessor Hardware And Software > Cpr Circuitry And Cpr-d Sensor And Audio Circuitry > Cpr: Metronome Rate (variable 60 To 100 Cpm) > Defibrillator Advisory: Evaluates Electrode Connection And Patient Ecg To Determine If Defibrillation Is Required > Shockable Rhythms: > Ventricular Fibrillation With Average Amplitude Of > 100 Microvolts > Wide Complex Ventricular Tachycardia With Rated Greater Than 150 Bpm For Adults And 200 Bpm For Pediatrics > Patient Impedance Measurement Range: At Least 0 To 300 Ohms > Defibrillator: Protected Ecg Circuitry > Display Format: Optional Lcd With Moving Bar > Size: Approximately 2.6” X 1.3” > Ecg Viewing Window: At Least 2.6 Seconds > Optional Ecg Display Sweep Speed: Not More Than 25mm/sec; 1”/sec > Data Recording And Storage > At Least 50 Minutes Of Ecg And Cpr Data. > If Audio Recording Is Installed And Enabled, At Least 20 Minutes Of Audio Recording, Ecg And Cpr Data. > If Audio Recording Is Disabled, At Least 7 Hours Of Ecg And Cpr Data. > Pc Minimum Requirements For Configuration And Patient Data Recovery: Windows® 98, Windows® 2000, Windows® Nt, Windows® Xp, Ibm Compatible Pii With 16550 Uart (or Higher) Computer. 64mb Ram. Vga Monitor Or Better. Cd-rom Drive. Irda Port. 2mb Disk Space. > Available With Pediatric Pacing Cable And Pads Synchronized And Direct Defibrillation > Biphasic Energy Waveform, Adjustable Output, From Approximately 1 Up To 200 Joules > Load Compensation Circuit Allows Precise Delivery Of Selected Energy, Based On Patient’s Impedance > Energy Selection > Charge Controls - Push-button Controls On Front Panel > Charge Time - Less Than 10 Seconds With New Battery Charge To 200j With A Fully-charged Battery > Charge/ready Is Indicated Via Audiovisual > Defibrillator Energy - Approximately ±15% At 50ω > Accuracy - Approximately ±30% Over The Range Of 25 To 100 Ω > Defibrillator Waveform - 5ms Monophasic Pulse Display Shows Ecg, Heart Rate, Battery Status And Energy Output Pre-set > Monitor Display Size: Bright Back-lit Alphanumeric Lcd, Approximately 10 X 6 Cm > Frequency Response: Non-diagnostic > Heart Rate Meter: Three-digit Readout Displays Rates From 20 To 300 Bpm > Heart Rate Alarm: User Selectable Alarm Limits > Self-test Is Performed Each Time The Device Is Switched On > System Reports, With Audiovisual Alert: Status, Operation, Malfunctions And Low Battery > Internal Safety Discharge Upon 40seconds Non-delivery Of Accumulated Energy, Switch-off And Technical Failure > Sensitivity, Adjustable 5, 10 And 20mm/mv Pads: > Shelf Life: 5 Years > Conductive Gel: Polymer Hydrogel > Conductive Element: Tin > Packaging: Multilayer Foil Laminate Pouch > Impedance Class: Low > Cable Length: At Least 36 In (91 Cm) > Sternum: Length: At Least 6.1 In (15.5 Cm); Width: At Least 5.0 In (12.7 Cm); Length, Conductive Gel: At Least 3.5 In (8.9 Cm); Width, Conductive Gel: At Least 3.5 In (8.9 Cm); Area, Conductive Gel: At Least 12.3 Sq In (79.0 Sq Cm) > Apex: Length: At Least 6.1 In (15.5 Cm); Width: At Least 5.6 In (14.1 Cm); Length, Conductive Gel: At Least 3.5 In (8.9 Cm); Width, Conductive Gel: At Least 3.5 In (8.9 Cm); Area, Conductive Gel: At Least 12.3 Sq In (79.0 Sq Cm) > Complete Assembly: Folded Length: At Least 7.6 In (19.4 Cm); Folded Width: At Least 7.0 In (17.8 Cm); Folded Height: At Least 1.5 In (3.8 Cm) > Design Standards: Meets Applicable Requirements Of Ansi/aami/iso Df-39-1993. > Shock Resistant Housing Allows System To Function In Demanding Environment > Integrated Carry Handle Facilitates Transport > Splash-resistant Alphanumeric Function Keys Power Supply: > User Replaceable Battery Is Removable/replaceable By The Operator. (10 Type 123a Photo Flash Lithium Manganese Dioxide Batteries. > Battery Capacity: Typical New (20°c) = 5 Years (at Least 225 Shocks) Or At Least 13 Hours Continuous Monitoring. End Of Life Designated By Red X (typical Remaining = At Least 9 Shocks). Battery Compartment To Be Clearly Labeled, Splash-proof And Requiring Tool For Opening For Battery Replacement > Electrical Source Requirements: Battery Operated > Operating Temperature: 32° To 122°f; 0° To 50°c > Storage Temperature: -22° To 140°f; -30° To 60°c > Humidity: 10 To 95% Relative Humidity, Non-condensing > Vibration: Mil Std. 810f, Min. Helicopter Test > Shock: Iec 68-2-27; 100g > Altitude: 300 To 15,000 Ft.; -91m To 4573m > Particle And Water Ingress: Ip-55. > Defibrillator Pads (self- Adhesive, Disposable And Non-polarized) At Least Five (5) Pairs For Adult And At Least Five (5) Pairs For Pedia Ø Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment. · Nebulizer > Portable, Compressor-driven Nebulizer Pump, And A Four-pole Single Phase Motor Design In Metal Frame Construction > Easy To Operate With Sturdy Design For Use In Demanding Environment > Cup Capacity Minimum 3ml To Maximum 10ml > Nebulization, Approximately 0.1 To 0.2ml/minute > Residual Volume Maximum 2ml > Flow Delivery Range (under Load) 0.5 To Maximum 12 Liters/minute Or Greater > Median Mass Aerodynamic Diameter (mmad) Of Particles 0.5 To 4 Microns > Operating Temperature Range 5 To 50 ⁰c > Operating Relative Humidity Range Up To 65% > Compressor Requires No Maintenance And Delivers Oil-free Flow Diaphragm Type And Maximum Compressor Pressure Of 30 Psig Or Greater > Device, With Carry Handle, Is Provided With Accessory Storage Compartment > Power Supply, 220v/60hz > Power Consumption, Approximately 90w > System Configuration Accessories, Spares And Consumables: · System As Specified · Nebulizer Atomizer Body Piece (dome) · Reusable Mouth Piece, Pediatric Size (fitting Atomizer Body Piece) · Reusable Mouth Piece, Adult Size (fitting Atomizer Body Piece) · Air Tubing, Diameter Approximately 6/9mm (inner/outer), Length Approximately 1 Meter · Dosage Cup · Reusable Mask, Size Pediatric · Reusable Mask, Size Adult · Spare Inlet Filters · Spare Particle Filters · Set Of Spare Fuses · Portable Suction Machine > Electrical Suction Pump Supporting Medical Interventions Such As Resuscitation Or Minor Surgery > With Graduated Plastic Jar Auto-clavable, Capacity 1.2 Liters > Jar Is Covered And Fit With Overflow Valve And Antibacterial Filter > Suction Flow Maximum, Approximately 17l/minute > Vacuum Adjustable From 0 To Approximately - 600mmhg > Vacuum Control Button And On/off-switch > Sturdy Shock Resistant Casing, Easy To Carry And Easy Clean > Silent Operation Supplied With: > 2 X Set Of Silicone Tubes, Diameter 8/14mm (inner / Outer), Length Approximately 2.5m > 2 X Bi-conical Connectors Fitting The Silicone Tubes > 1 X Spare Jar Of 1l With Cover, Gasket And Overflow Valve > 1 X Set Of Spare Antibacterial Filters > 1 X Set Of Spare Fuses > 1 X Instructions For Assembly, Use And Maintenance, And List Of Accessories And Spare Parts With Product Reference Code In English Language > Consumables Should Be Available In The Local Market Power Supply > Power Input To Be 220-240vac (single Phase) / 60hz As Appropriate Fitted With Philippine Standard Plug > Voltage Corrector/stabilizer Of Appropriate Ratings Meeting Philippines Standard Specifications (input 160-260 V And Output 220-240 V And 60 Hz) > Power Consumption Approximately 50 Watts > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Examining Light (mounted On The Head Side Of The Patient) > Mobile Examination Light, Sturdy Construction. > On Heavy Base With 5 Swivel Castors, 2 With Brakes. Low Center Of Gravity For Optimal Stability And Reach > Single Lamp With Led Bulb: White Led Approximately 50,000 Hours Life > Field-of-view Diameter, Approximately 0.15 M At Working Distance > Homogeneous Illumination Across Entire Field-of-view, Approximately 20,000 Lux At 30.5 Cm To 50 Cm Working Distance > Color Temperature, Approximately 5500⁰k > Light Head Mounted On Spring Loaded Articulating Arm, Height Approximately 1.50 M > Touch Less On/off Switch And Electronic Control Box Incorporated In Base Or Spring Loaded Articulating Arm Power Supply: > -power Input To Be 220 Vac (single Phase) / 60hz As Appropriate Fitted With > Philippine Standard Plug > -power Consumption, Approximately 35 Watts Dimensions: > -weight: Total Mobile Stand: Approximately 5.78 Kg. > -height: Total Mobile Stand: Approximately 150.0 Cm (including Luminaire And Control Box) > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Aneroid Sphygmomanometer (mounted On The Ambulance Wall On The Head Side Of The Patient) > The Sphygmomanometer Is Composed Of Cloth Cuff Containing An Inflatable Bag (adult-25 Cm To 35 Cm) > Connected Via A Tube To A Flexible Bulb With Valve And Integrated Manometer Needle Gauge. > Latex And Mercury Free. > Bp Cuffs Are Anti-microbial Treated. > The Adult (25 Cm To 35 Cm) Cuff With Double Velcro Fastening, Enabling It To Be Adjusted To Fit Tightly > Around The Arm. > The Cuff Is Washable, Very Strong And Reinforced At Both Ends. > The Bag Is Inflated By Means Of The Flexible Bulb Connected Via A Tube (length Approximately 60 Cm, > Flexible And With Reliable Quick Connector) > The Quick Connector Can Easily Be Connected To All Types Of Inflation Bulbs > Inflation Bulb With Integrated Manometer Needle Gauge > Dial Graduated Up To 300 Mmhg Aneroid Instrument Mounted At A 20º Angle For Ease Of Viewing Clinical Sphygmomanometer For Desk Type, With Pressure Release Valve > Pressure Gauge To Allow Reading Of Pressure To 2mmhg Accuracy > Gauge Body To Allow Recalibration Of Readings, Yet In Normal Operation Be Sealed And Secure > Plastic Manometer With Chrome Plated Steel Bracket > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Folding Stretcher > Length: At Least 1900 Mm > Width: At Least 530 Mm > Loading Capacity: At Least 120 Kg > The Stretcher Must Have A Quick Release Patient Restrain System > Frame Material: High Grade Aluminum > Frame Must Be Made Of Sturdy Lightweight, Non-twisting Construction And With Rubber Handles > Stretcher Bed Material Must Be Washable > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Scoop Stretcher > Length: At Least 200 Cm > Adjustable Length > Width: At Least 42 Cm > Loading Capacity: At Least 150 Kg > The Stretcher Must Have At Least Three (3) Quick Release Patient Restrain System > Frame Material: High Grade Aluminum > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Heavy Duty Stethoscopes (dual) > Easy To Dismantle, Clean, And Disinfect. > Double Cup, Dual-use (adult And Pediatric Auscultation) In Stainless Steel Or Chromed Brass. > Adult Diaphragm: Approximately 43mm > Bell Diameter: Approximately 32mm > Y Tube Treated Rubber With Large Diameter: Approximately 10 Mm > Arms: Stainless Steel Or Chrome Brass Or Aerospace Alloy, With Spring Treated To Give Lasting Spring And Maximum Reliability And Comfort. > Removable Plastic/rubber Ear-pieces. > Supplied With Spare Diaphragms Or Diaphragm Membrane, Y Tube And A Pair Of Ear-pieces > Environmental Factors: > The Unit Shall Be Capable Of Being Stored Continuously In Ambient Temperature Of 0 - 50 ⁰c And Relative Humidity Of 15-90%. > The Unit Shall Be Capable Of Operating In Ambient Temperature Of 20-30 ⁰c And Relative Humidity Of Less Than 70%. > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Container Box · Non-contact Thermometer > Measuring Scale: Degree Celsius > Lcd Or Led Display With At Least Three (3) Digit Measurement Display > Components Must Have No Glass And Mercury Materials > Measurement Range: 34°c To 42°c Or Wider Range. > Beep Sound Upon Measurement > Switch Off Automatically When Not In Use. > Battery Operated. > With Low Battery Indicator > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Blood-glucose Meter With Strip > Hand Held Meter > No Routine Maintenance Reading Range/linearity From 20 To 600 Mg/dl > Maximum Reading Time Of Less Than 10 Seconds > Use Of Electrochemical Technology > Use A Minimum Blood Sample Of Less Than 1.5µl > Lcd Display > Measuring Unit In Mg/dl. > Wide Operating Temperature > A Minimum Memory Of 50 Test Results > Should Have Easy Code Entry Technique > Battery Should Be Replaceable Without Using Any Tools > Should Have Facility To Ensure Accuracy Of Measurements. > Should Be Supplied With Three Types Of Control Solutions Of Each At Least 3 Ml > Item Should Have Data Transfer Facility Through Usb Device Or Blue Tooth > The Unit Should Be Cleanable And Sterilizable With Alcohol · Glucose Strips > Should Be Able To Use Capillary Blood Samples. > Should Have A Minimum 4 Months Shelf Life After Opening The Strip Vial. > All Strips Should Have At Least One Year Expiry Date From The Date Of Supply. > Minimum Of 10 Strips, 10 Lancets, And 1 Lancing Device Should Be Supplied Along With The Equipment. > Strips Should Be Available In The Local Market. Power Requirements > Shall Be Battery Operated 3-volt Lithium Ion Cell Battery Or 2 X (aaa) Alkaline Battery. Battery Should Be Supplied With Item And Should Last At Least 1000 Tests. > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Manual Resuscitators For Adult > Resuscitator To Ventilate Adult (body Weight Over 30kg) > Resuscitator Operated By Hand > Ventilation With Ambient Air > Resuscitator Shall Be Easy, To Disassemble And Reassemble, To Clean And Disinfect, And Be Autoclavable. > All Parts Must Be Manufactured From High-strength, Long-life Materials And Require No Special Maintenance Or Storage Conditions. Resuscitator Shall Be Supplied As A Complete Set With: > Compressible Self-refilling Ventilation Bag, Capacity: 1500-2000 Ml > Non-rebreathing Patient Valve With Or Without Pressure Limiting Valve, Patient Connector Outside/inside Diameter (od/id): 22/15 Mm > Inlet Valve With Nipple For 02 Tubing > Oxygen Reservoir Bag Complete, Capacity: 2000-2600 Ml > Masks, Transparent, In 3 Sizes: > 1 Mask, Face Shape Type, Size Adult Small/teenager > 1 Mask, Face Shape Type, Size Adult Medium > 1 Mask, Face Shape Type, Size Adult Large Resuscitator Supplied In A Box As A Complete Set, With Clear Instructions / Diagrams For Use Covering The Technical Performances, The Use And The Maintenance Of The Resuscitator And Assembly In English Language > Materials: Latex-free > Compressible Self-refilling Ventilation Bag: Silicone Rubber, > Non-rebreathing Patient Valve With Pressure Limiting Valve: Polycarbonate/polysulfone/silicone, > Inlet Valve With Nipple For O2 Tubing: Polycarbonate/polysulfone/silicone, > Oxygen Reservoir Bag: Plastic > Masks: Transparent Silicone Rubber. Standards, Safety And Training: > Should Be Fda, Ce, And Ul Approved Product > Conforming To International Standards: Iso, Ce Certification, Fda > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment Or Container · Manual Resuscitators For Neonate/infant > Resuscitator To Ventilate Preterm, Newborn, Small Infant (body Weight 0-7 Kg) > Resuscitator Operated By Hand > Ventilation With Ambient Air > Resuscitator Shall Be Easy, To Disassemble And Reassemble, To Clean And Disinfect, And Be Autoclavable. > All Parts Must Be Manufactured From High-strength, Long-life Materials And Require No Special Maintenance Or Storage Conditions. Resuscitator Shall Be Supplied As A Complete Set With: > Compressible Self-refilling Ventilation Bag, Capacity: 200-250ml > Non-rebreathing Patient Valve With Pressure Limiting Valve, 40± 5 Cmh2o, Patient Connector Outside/inside Diameter (od/id): 22/15mm, > Inlet Valve With Nipple For 02 Tubing > Masks, Transparent, In 3 Sizes: > 1 Mask, One Piece, Round Shape Type, Size Preterm > 1 Mask, One Piece, Round Shape Type, Size Newborn > 1 Mask, One Piece, Round Shape Type, Size Infant Small > Resuscitator Supplied In A Box As A Complete Set, With Clear Instructions / Diagrams For Use Covering The Technical Performances, The Use And The Maintenance Of The Resuscitator And Assembly In English Language > Materials: Latex-free > Compressible Self-refilling Ventilation Bag: Silicone Rubber > Non-rebreathing Patient Valve With Pressure Limiting Valve: Polycarbonate/polysulfone/silicone > Inlet Valve With Nipple For O2 Tubing: Polycarbonate/polysulfone/silicone > Masks: Transparent Silicone Rubber Standards, Safety And Training: > Should Be Fda, Ce, And Ul Approved Product > Conforming To International Standards: Iso, Ce Certification, Fda Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment Or Container Manual Resuscitators For Pedia (child) > Resuscitator To Ventilate Child (body Weight 7-30 Kg) > Resuscitator Operated By Hand > Ventilation With Ambient Air > Resuscitator Shall Be Easy, To Disassemble And Reassemble, To Clean And Disinfect, And Be Autoclavable. > All Parts Must Be Manufactured From High-strength, Long-life Materials And Require No Special Maintenance Or Storage Conditions. > Compressible Self-refilling Ventilation Bag, Capacity: 500-700 Ml > Non-rebreathing Patient Valve With Pressure Limiting Valve, 40 ±5 Cmh2o, Patient Connector Outside/inside Diameter (od/id): 22/15 Mm > Inlet Valve With Nipple For 02 Tubing > Oxygen Reservoir Bag Complete, Capacity: 2000-2600 Ml > Masks, Transparent, In 3 Sizes: · 1 Mask, Round Shape Type, Size Child Small · 1 Mask, Round Shape Type, Size Child Medium · 1 Mask, Face Shape Type, Size Child Large > Resuscitator Supplied In A Box As A Complete Set, With Clear Instructions / Diagrams For Use Covering The Technical Performances, The Use And The Maintenance Of The Resuscitator And Assembly In English Language > Materials: Latex-free > Compressible Self-refilling Ventilation Bag: Silicone Rubber > Non-rebreathing Patient Valve With Pressure Limiting Valve: Polycarbonate/polysulfone/silicone, > Inlet Valve With Nipple For O2 Tubing: Polycarbonate/polysulfone/silicone, > Oxygen Reservoir Bag: Plastic > Masks: Transparent Silicone Rubber · Oxygen Cylinder With Oxygen Therapy Set > At Least 20 Pounds Capacity > Must Be Color Green > Oxygen Therapy Set · Gauge Reading: 1,800 Psi Or Higher · Flowmeter: 0 To 15 Li/min · Humidifier Bottle: Hard Plastic, Capacity: 200ml To 300ml · Accessories: Mouth Piece, Tubing, Open Wrench For Installing The Therapy Set To The Cylinder · The Cylinder Must Be Placed In A Holder Mounted On The Head Side Of The Patient · Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Laryngoscopes Set > Constituted Of A Large Hollow, Cylindrical, Slightly Ribbed Handle And A Set Tongue Depressor In Fiber Optic. > The Handle Is Made Of Fiber Optic Led Light > The Handle Can Be Opened At One End To Insert Two Type C Alkaline Battery > The Other End Has A Stud Contact Which Fits The Various Sizes And Types Of Depressors > The Set Of Autoclavable Depressors Includes: A. 4 Curved Depressors, Macintosh Type: No. 1: Approximately 66 Mm Length No. 2: Approximately 85 Mm Length No. 3: Approximately 105 Mm Length No. 4: Approximately 140 Mm Length B. 5 Straight Depressors, Miller Type: No. 0: Approximately 56 Mm No. 1: Approximately 82 Mm No. 2: Approximately 135 Mm No. 3: Approximately 175 Mm No. 4: Approximately 185 Mm > Contained In Suitable Protective Plastic Box Or Vinyl Sturdy Padding Case > Battery Compartment (if Reusable) To Be Sealed Against Liquid Ingress, Yet Easily Opened > On/off Switch To Be Robust And Easy To Use > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Container Box · Immobilization Devices A) Cervical Collars I. Rigid For Children Ages 2 Years Or Older Ii. Child And Adult Sizes (small, Medium, Large) B) Head Immobilization Device (not Sand Bags): Firm Padding Or Commercial Device C) Lower Extremity (femur) Traction Devices I. Limb-support Slings Ii. Padded Ankle Hitch Iii. Padded Pelvic Support Iv. Traction Strap (adult & Child Sizes) D) Upper And Lower Extremity Immobilization Devices I. Joint-above And Joint-below Fracture (sizes Appropriate For Adults And Children) Ii. Rigid- Support Constructed With Appropriate Material (cardboard, Metal, Pneumatic, Vacuum, Wood Or Plastic) – Various Sizes E) At Least 2 Pieces - Resistant Straps Or Cravats · Delivery Set All Instruments Must Be Surgical Grade Stainless Steel Material With ± 0.4 Inch Measurement Tolerance > 1 Pc. Sponge Holding Forceps, Rampley 9.5" > 1 Pc. Kidney Dish 10" > 1 Pc. Bowl 200mm > 1 Pc. Umbilical Scissors, American, Straight 4.5" > 1 Pc. Needle Holder Mayo Hegar Straight 6.5" > 1 Pc. Episiotomy Scissors 14.5 Cm > 1 Pc. Cusco Vaginal Speculum Medium > 1 Pc. Hartmann Mosquito Artery Forceps Straight 120mm > 1 Pc. Metal Catheter > 1 Pc. Uterine Curette > 1 Pc. Treves Dissecting Forceps, Plain, 200mm > 1 Pc. Spencerwells Artery Forceps Curved 6" > 1 Pc. Kocher Artery Forceps, Toothed Straight 6" Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Instrument Container Box. · Patient Monitor > Atleast 10 Inches Color Tft Led Display > 800 X 600 Pixels Resolution > Maximum Display Of 11 Channels; Auto Channel Height Adjustment Function > Lightweight & Ergonomic Design > Parameters: 3/5 Lead Ecg, Hr, Resp, Nbp, Spo2, Pr, Temp > With St Segment Analysis And 21 Calls Of Arrhythmia > Fast Spo2 Technology With Anti-motion And Low Perfusion Performance > Navigation Wheel For Information Input And Screen Navigation > Backlit Function Buttons For Quick Access To Key Functions > Bed-to-bed Overview Function For Up To 32 Monitors Without Central Monitoring System > Bi-directional Communication Via Lan Networking To A Central Monitoring System > Standard Hl7 Output > Fan-less Design To Reduce Dust Deposits > Applications From Neonate To Adult > With Oxycrg & Minitrend > With Big Number Screen, Dynamic Trend Screen, & Ocrg Screen > 4 User-defined Layout > Timing Clock Configurable From 5-30mins > 1,600 Sets Nbp Table > 1,200-hour Trend Graph Of All Parameters (with Data Manager Function) > 120-minute Full Disclosure Ecg 1 Waveform Review (with Data Manager Function) > 200 Sets Alarm Events & 200 Sets Arrhythmia Events > With Drug Calculation > With Hr Variation & Dynamic Blood Pressure Analysis > Rechargeable Lithium Ion Battery With 2.5 Hrs Of Operation > With Built-in 3-channel Recorder > Standard External Interface Available: Ecg Analog Output, Vga Output, Nurse Call, Lan, Usb > Patient Data Export Using A Usb Data Manager > Net Weight: Approximately 4.2kg Vii. Other Equipment And Accessories Note: The Items Below (except The Iv Holder) Must Be Marked With Non-removable Doh Logo And The Words “for Ambulances Use Only” On The Visible Part Of The Equipment. > Fire Extinguisher (rating 2a10bc), Five (5) Pounds, With Holder Mounted On The Ambulance Floor. > Heavy Duty Led Flashlight With At Least 1,000 Lumens Of Brightness With Extra Batteries. Iv Holder (mounted On The Ambulance Wall Head Side Of The Patient). > Digital Clock With At Least 4 Inch Display Mounted On The Ambulance Wall. > Air Purifier With Multi-stage Air Filters (pre-filter, Hepa, Carbon) And With Uv Light. > Garbage Container At Least 3 Liter Capacity And Made Of Fiberglass Reinforced Plastic Or Acrylonitrile Butadiene Styrene (abs) Plastic Material And With Lid Cover. The Container Must Be Properly Labelled And Must Be Mounted On The Ambulance Floor. > Sharps Container With Sliding Lid And At Least 1 Liter Capacity, Made Of Fiberglass Reinforced Plastic Or Abs Plastic Material. The Container Must Be Mounted On The Ambulance Wall. I. Other Requirments To Be Submitted During The Bid Opening 1. Product Brochure(s) Or Technical Data Sheet(s) In Hard And Soft Copies Showing The Technical Specifications Of The Following In English Language: A) Ambulance Vehicle B) Emergency Lights, Siren And Public Address C) Ambulance Stretcher D) Automatic External Defibrillator E) Nebulizer F) Examining Light G) Aneroid Sphygmomanometer H) Folding Stretcher I) Scoop Stretcher J) Heavy Duty Stethoscopes K) Non-contact Thermometer L) Blood Glucose Meter M) Manual Resuscitators N) Suction Machine O) Oxygen Therapy Set P) Laryngoscopes Set Q) Delivery Set R) Air Purifier S) Patient Monitor · Valid Marketing Authorization, Registration Approval Or Free Sale Certificate For The Automatic External Defibrillator Issued By The Health Authority In The Country Of Origin. · Valid Certificate Of Distributorship (as First Tier Distributor) Issued By The Foreign Manufacturers Or Local Distributors Of The Medical Equipment And Instruments Authorizing The Bidder To Sell/distribute Their Products. · Notarized Certificate From The Bidder: That The Brands Of The Medical Equipment And Instruments Have Been In The Local And/or International Market For At Least Ten (10) Years. > That Medical Equipment And Instruments Are Brand New, Unused, Not Discontinued Models And Were Not Subjected To Any Product Recall. · Bidder’s Valid And Current License To Operate (lto) As A Medical Device Distributor Issued By The Philippine Food And Drug Administration. · Valid And Current Certification Of Product Registration (cpr) For The Thermometer, Lancets In The Blood-glucose Meter And Manual Resuscitator Issued By The Philippine Food And Drug Administration (pfda) · Notarized Certificate From The Manufacturer Or Local Dealer Of The Ambulance/vehicle: > That The Manufacturer Has Been Manufacturing Vehicles With Diesel Engines For The Past Twenty Five (25) Years. > That The Ambulance/vehicle Is Brand New, Unused, Not A Discontinued Model And Was Not Subjected To Any Product Recall. · Proofs (such As Sales Invoice) That The Brand Of The Vehicle Has Already Been Sold In The Country As An Ambulance. Requirement/s If Declared The Lowest/single Calculated Bid · Site Inspection To The Bidder’s Facility To Verify/validate The Capability And Capacity Of The Bidder To Fabricate The Ambulances As Well As Sample Unit With Complete Medical Accessories. The Inspection Shall Be Conducted By The Procuring Entity Technical Working Group. This Requirement Is Not Applicable If The Facility Is Located Outside The Philippines. · Motor Vehicle Service Center Should Be Located In Each Province Namely Cebu, Bohol, & Negros Oriental In Order For The Recipient Facility To Have Easy Access During Preventive Maintenance. Requirements If Awarded The Contract · The Supplier Shall Provide Orientation/training On The Use And Maintenance Of The Ambulance, Medical Equipment And Instruments On A Schedule To Be Agreed Upon By Procuring Entity And The Winning Bidder. · The Supplier Shall Submit/provide The Following To The End User: > Operator’s Manual In English Language For The Ambulance, Medical Equipment And Instruments. > Certification Of Inclusive Preventive Maintenance Services From 10 Kilometer Up To 40 Kilometer With An Interval Of 10,000kms Or 6 Months Whichever Comes First At Any Manufacturer’s Service Center Branches In Central Visayas. > Warranty Certificate For Three (3) Years On Parts And Services For The Ambulance. The Manufacturer/dealer Shall Either Repair Or Replace Any Item Or Part In The Ambulance That Is Found To Be Defective In Material Or In Workmanship Under Normal Use. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. The Warranty Certificate Shall Include The Following: · That The Warranty For The Vehicle Shall Not Be Affected In Case A Change Of Dealer Occurs. That If The Ambulance Is Unable To Return To The Service Center During The Warranty Period, The Manufacturer/dealer Shall Provide Mechanics And/or Technicians That Can Perform On-site Service And Maintenance, Provided That The End User Will Shoulder The Travel Expenses. · Warranty Certificate For Two (2) Years On Parts And Services For Medical Equipment, Instruments And Ambulance Accessories. The Supplier Shall Either Repair Or Replace Any Item Or Part In The Said Equipment That Is Found To Be Defective In Material Or In Workmanship Under Normal Use. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. The Warranty Certificate Shall Include The Following: > The Bidder Shall Conduct The Necessary Corrective Maintenance Within Fifteen (15) Calendar Days Upon Notification Of Equipment Breakdown From The End-user. > The Bidder Shall Have The Primary Responsibility And Accountability To Ensure That In Case Of Defects, The Vehicle, Equipment, Instruments And/or Peripherals Are Appropriately Repaired Or Replaced And Shall Be In Good Working Condition Thereafter. · At Least Three (3) Years Validity Of The Vehicle From Land Transportation Office Region 7 (lto Ro7) Registration With Red Plate. This Is To Allow Easy Accessibility By The Recipient Lgus For The Processing And Transfer Of The Documents. · Third Party Liability (tpl) Vehicle Insurance For One (1) Year And Comprehensive Gsis Vehicle Insurance For One (1) Year. · Delivery > Delivery Schedule: Within 90 Calendar Days Upon The Receipt Of Purchase Order > Upon Delivery, Each Ambulance Shall Undergo Preliminary Physical Inspection By The Inspection Team Of The Procuring Entity To Ascertain The Physical Condition And Acceptability Of The Units. All Medical Equipment, Instruments, Ambulance Accessories And Peripherals Must Be Functioning And Must Have No Physical Damage. > All Land Ambulance Units Shall Be Filled Up With Crude Diesel At Full Tank Capacity Upon Delivery. · Terms And Conditions: > Supplier Must Not Have Any Pending Or Incomplete Delivery, Installation, Training And Demonstration Beyond The Delivery Period Indicated In The Purchase Order With Any Existing Doh-cvchd Projects. > The Supplier Must Coordinate With The Equipment Unit Head And Supply Officer On The Schedule Of The Delivery, Completion Of Training & Demonstration In Order To Facilitate Inspection Of The Doh Cvchd Inspection Team. Payment Will Only Be Made After Delivery And Installation. > Demonstration, Training & Completion Of The Accessories And Equipment Should Be Within 5 Days After The Delivery Of The Equipment. O *recipient Facility Shall Sign The Ptr Only If The Supplier Fully Complied With The Above The Supplier Shall Conduct Comprehensive Demonstration & Training For Staff And Support Services Till Familiarity With The Unit. A Copy Of The Certificate Of Training And Documentation During The Training Session Shall Be Provided To The End Users And Supply Office.
4441-4450 of 4472 active Tenders