Paint Tenders

Paint Tenders

City Of Malaybalay Tender

Security and Emergency Services...+1Automobiles and Auto Parts
Philippines
Closing Date19 Mar 2025
Tender AmountPHP 10 Million (USD 172.8 K)
Details: Description 1 Unit Brand New 5,000 Liter Fire Truck Minimum Specification: Vehicle Type: ≥ 6-wheeler,4,000 Liter Fire Truck With Foam Proportioning System Engine : ≥ Turbo Charged, Intercooled & Water-cooled Diesel Engine Engine Rated Power: ≥ 150ps @ 2,600 Rpm Engine Displacement: ≥ 5295 Cc Engine Environment Compliance: ≥ Euroiv Fuel Capacity: ≥ 100l Transmission: ≥5 Speed Forward, 1 Reverse Manual Transmission Drive: 6x4 Drive Gross Payload: ≥ 5740 Kg Suspension Front/rear: ≥ Multi Leaf Spring With Shock Absorbers Air Conditioning System : Front, Manual Controls Or Its Equivalent Safety Features : ≥ With 3-point Elr Seat Belts For Driver & Passenger Steering : ≥ Power Steering Wheels/tire: ≥ 7.50-16 Single Front, Double Rear + 1 Spare Tire Fire Pump: Pto Driven, Rear Mounted Inclusion: With Air-conditioning System Audio Entertainment System Standard Tools Decals And Logos Early Warning Device Hydraulic Jack Other Inclusions & Their Specifications: Water Tank (see Attached Doc For Specifications) Foaming System (see Attached Doc For Specifications) Furnishings (see Attached Doc For Specifications) Fire Pump ( See Attached Doc For Specifications) Priming ( See Attached Doc For Specifications) Foam ( See Attached Doc For Specifications) Pump Gauges ( See Attached Doc For Specifications) Crew Accommodation ( See Attached Doc For Specifications) Body Shell ( See Attached Doc For Specifications) Trimming And Plate Paneling ( See Attached Doc For Specifications) Hose Compartment ( See Attached Doc For Specifications) Cabinetry (see Attached Doc For Specifications) Electrical Device (see Attached Doc For Specifications) Fire Fighting Equipment Inclusions (see Attached Doc For Specification) Paint Work (see Attached Doc For Specifications) Training (see Attached Doc For Specifications) Terms And Conditions: ≥ 3 Years Lto Registration ≥ 1 Year Gsis Comprehensive Insurance Coverage ≥ 3 Year Warranty Or 100,000 Kms Whichever Comes First Basic Warranty Coverage

Eastern Coalfields Limited - ECL Tender

Goods
GEM
India
Closing Soon15 Mar 2025
Tender AmountRefer Documents 
Description: CATEGORY: PU Coated Hand gloves , PVC, Heavy Duty Suction Discharge helical water hose , Rubber Spray hose,ID 19mm , Danger Tape Barricade Tape, Size 2 inch, 50 Mtr per Roll , Protective Safety Goggles for U G Use , First Aid Kit containing Pouch , PVC Tarpaulin, Size 18inch x 24 inch, 250 GSM , Canvas Fire Fighting Hose , Hose Coupling 75 MM , Synthetic Enamel Paint Red 4 Liter pack , Synthetic Enamel Paint Yellow, 4 Liter pack , Synthetic Enamel Paint Sky Blue, 4 Liter pack , Aluminium Paint , G.I.Wire Netting mesh

NMDC Limited - NMDC Tender

Services
Paints and Enamels
GEM
India
Closing Soon15 Mar 2025
Tender AmountINR 979.8 K (USD 11.3 K)
Description: CATEGORY: Custom Bid for Services - Painting of structures of SubstationA LT substations Rail poles Transformer Kiosk under Kirandul Township

Marikina City Tender

Civil And Construction...+1Building Construction
Philippines
Closing Soon10 Mar 2025
Tender AmountPHP 3.4 Million (USD 59.6 K)
Details: Description Bids And Awards Committee Invitation To Bid The Sangguniang Barangay Barangka, Through Its Committee On Bids & Awards, Hereby Invites All Interested Parties To Submit Sealed Bid For The Hereunder Project: Name Of Project: Repair And Rehabilitation Of Paspasan Multipurpose Hall Approved Budget For The Contract: Php 3,450,000.00 Delivery Of Goods: 15 Days Brief Description: Bill Of Materials Qty Material 370 Cement 60 Rebar 16mm 60 Rebar 12mm 320 Rebar 10mm 9 Elf White Sand 5 Elf Gravel 350 Chb #5 200 Coco Lumber 2x3 20 Flyboard 1/2 5kg Common Nail #2 10kg Common Nail #3 10kg Common Nail #4 60 Tiles 100 Bistay 20 Sahara 20 Hardy Flex 80 Metal Purring 30 Wall Angle 1box Thin Wire #14 2box Thin Wire #12 10 Pvc Orange 1/2 10 Junction Box 5 Electrical Tape 3box Blind Rivet 5/32 10 Drill Beat 5/32 20 Kg Welding Rod Golden Bridge 4 Box Cutting Disk 10 Grinding Disk 2 Diamond Disk 50 Pads Sanding Paper 120cc 16l Water Proofing (mundo) 6 Base Board Saneta 20x40cm 30 Skim Coat 96l Flat Latex White 96l Gloss 40 Kg Tire Wire 10 Abc Adhesive 10 Grout 4 Floor Drain 6 Pvc Orange #3 10 Elbow 1/2 L Neltex 20 Gi Tubular 2x3 1.5 2 Channel Bar 2x3 Light Duty 10 Polycarbonate Brown 5 H-frame 1 Box Text Screw 1 1/2 1gallon Metal Primer 1gallon Paint Thinner 1gallon Final Paint Canopy 5 Flat Bar ¼ 1 Lot Labor Work Description: 1. Fabricate: Column, Footing Tie Beam, Ster Up’s Beam, Form Works Casting, Steel Bar Matting, 2. Flooring: Install Tiles, Grout And Cleaning 3.install: Chb #5 Lay, Plastering Electrical Locate Outlet Switch And Lay Out Electrical 4.ceiling And Electrical Lights 5.dismantling Old Grills, Chipping Wall, Steel Window, Repair Damage 6. Paint Inside And Outside Of First Floor And Second Floor 7. Base Board 8. Canopy Installing Of Polycarbonate And Weld Tubular Prospective Bidders Should Experience Undertaking Have A Similar Project With A Value Of At Least 50% Of The Abc Available For The Prosecution Of The Contract. The Abc Will Use Non-discretionary “pass/fail” Criteria In The Eligibility Check/screening As Well As The Preliminary Examination Of The Bids. The Bac Will Conduct Post-qualification Of The Lowest Calculated Bid. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of Ra 9184 And Its Revised Implementing Rules And Regulations (irr). Complete Sets Of Eligibility Requirements And Bid Documents May Be Obtained At The (bac Secretariat), Barangka Barangay Hall. Duly Accomplished Eligibility Forms Shall Be Submitted In Sealed Envelope Addressed To The Bac Chairman, C/o Bac Secretariat. The Schedule Of Bidding Activities Are As Follows: Activities Schedule 1. Receipt From Prospective Bidders Of Letters Of Intent (loi) February 24, 2025 To February 26, 2025. 2. Issuance Of Bid Documents February 24, 2025 To February 28, 2025 3. Deadline For Submission Of Eligibility Requirement And Bids Is On March 07, 2025 Not Later Than 9:00 Am. 4. Pre- Bid March 07, 2025 At 9:00 Am 5. Opening Of Bids In Sealed Envelope At Barangka Barangay Hall, March 10, 2025, At 8:00 Am. 6. Bid Evaluation March 11, 2025. 7. Post Qualification March 11, 2025. 8. Issuance Of Notice Of Awards March 12, 2025. The Bac Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of Bid & Reserves The Right To Accept Or Reject All Bids Or Part Thereof, To Waive Formality Therein, Or To Accept Such Bids Or To Award Any Work That Is Considered Most Advantageous To The Barangay Barangka, Marikina City Nestor A. Borja Bac Chairman

Indian Army Tender

Goods
Healthcare and Medicine
GEM
India
Closing Soon15 Mar 2025
Tender AmountINR 190.2 K (USD 2.2 K)
Description: CATEGORY: Geru , Urinal Cube , Malathion Power , Garbage Bag , Lime Powwer , Hand Sanitiser , Hit Spray , Antiseptic Liquid , Pocha Cloth , Thinner for paint , White paint , Red paint , Black paint , Green Paint , Apex signal Red , Golden paint brown , Tarpene Oil for paint , paint brush 1 , paint brush 4 , iron brush , naphthalene ball

Municipal Administration Department Tender

Works
Paints and Enamels
India
Closing Soon12 Mar 2025
Tender AmountINR 720.8 K (USD 8.3 K)
Description: Providing Of Beautification Of Central Dividers Painting And Planting Of Trees At Ssvm School To Vadrapalyam In Madakasira Nagara Panchayat

Bangladesh Railway Tender

Works
Civil And Construction...+1Civil Works Others
Bangladesh
Closing Soon10 Mar 2025
Tender AmountRefer Documents 
Description: At Shahjahanpur Railway Officer's Colony, Dhaka: Through Repairs To Quarter No. D/16-b, D/1-h (occupant Change) =02 Units Including Tiles, Plaster Work, Sanitary Work, Sewerage Line, Plastic Paint, Mosquito Net With Thai Alumunium Frame And With Related Other Ancillary Works Under Ssae/works/colony's Jurisdiction.

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Others
United States
Closing Date21 Mar 2025
Tender AmountRefer Documents 
Details: Project Description: F-35 Maintenance Facility, Phase 1 solicitation Number: W9123825ra012 project Location:hill Air Force Base, Davis County, Ut. sam Posting Title: Usace Spk Design Build (db) Construction – F-35 Maintenance Facility, Phase 1 sam Posting Description: this Sources Sought Notice Is Being Issued For Market Research Purposes To Determine The Availability, Capability, And Interest Of Small Business Firms For A Potential Government Requirement. No Solicitation Is Available; Requests For A Solicitation Will Go Unanswered. No Award Will Be Made From This Notice. Responses Will Be Used To Determine Potential Acquisition Strategies, Understand Current Market Capabilities, And To Gain Knowledge Of Potential Sources. the Purpose Of This Notice Is To Obtain A Snapshot Of Current Market Capabilities And Gain Knowledge Of Potential Small Business Sources To Include Small Business In The Following Socioeconomic Categories: Certified Hub Zone; Woman-owned Small Business {wosb) And Serviced-disabled Veteran-owned Small Business {sdvosb); Veteran Owned Small Business {voss) And 8(a) Small Business Concerns To Perform Design And Construct Of The Subject Requirement. Other Than Small Business Is Encouraged To Express Interest And Submit Capability Statements As Well. contractors' Capabilities Will Be Reviewed Solely For The Purpose Of Determining An Appropriate Acquisition Strategy To Include Whether This Prospective Action Is Appropriate To Be Set-aside For The Small Business Community Or Should Proceed As An Unrestricted Full And Open Acquisition. Other Than Small Businesses Are Encouraged To Respond To This Notice To Provide A Greater Context Of Current Market Capabilities. However, Per The Federal Acquisition Regulations, Preference Will Be Given To The Small Business Categories As Listed Above. In Determining The Acquisition Strategy, The Government Must Ensure There Is Adequate Competition Among The Potential Pool Of Available Contractors. general Scope: the United States Army Corps Of Engineers (usace) Sacramento District (spk) Anticipates A Potential Requirement And Acquisition Strategy To Establish A Firm Fixed Price (ffp) Contract To Provide Design Build Construction Services To Include But Is Not Limited To: construct A Multi-dock Medium Bay Fighter Aircraft Maintenance Hangar With Parts Storage/equipment Areas, Back Shop, And Administrative Areas. Project Scope Includes Composite Aircraft Corrosion Control Capability To Include One Paint Bay And One De-paint Bay. The Proposed Facility Will Have Reinforced Concrete Footings, Foundation, Floor Slab, Structural Steel Frame, Insulated Walls, Insulated Roof, Lightning Protection, Fire Detection/suppression, And Intrusion Detection. The Project Will Include Pavements, Site Improvements, Communication Support, Utilities And All Required Supporting Facilities For A Complete And Usable Facility To Fulfill Mission Requirements. Facilities Will Be Designed As Permanent Construction In Accordance With The Department Of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This Project Will Comply With Department Of Defense Antiterrorism/force Protection Requirements Per Unified Facilities Criteria 4-010-01. the Anticipated Requirement May Result In A Solicitation Issued Approximately May 2025. If Solicited, The Government Intends To Award The Contemplated Requirement As A Firm-fixed-price Construction Contract By Approximately First Quarter Of Fiscal Year 2026. in Accordance With Defense Federal Acquisition Regulation Supplement (dfars) 236.204(iii), The Government Currently Estimates The Magnitude Of Construction For This Project To Be Between $100,000,000 And $250,000,000. the North American Industrial Classification System (naics) Code For The Potential Requirement Is Anticipated To Be 236210 – Industrial Building Construction. The Small Business Size Standard For This Naics, As Established By The U.s. Small Business Administration, Is $45,000,000 Annual Revenue. The Product Service Code For The Potential Requirement Is Anticipated To Be Y1eb, Construction Of Maintenance Building. contractors With The Skill, Capabilities, Workload Capacity, And Ability To Obtain Bonding To Complete The Project Described Above (either Through Self-performance And/or Subcontractor Management) Are Invited To Provide Capability Statements To The Point Of Contact Listed Below. Other Than Small Businesses Are Also Encouraged To Submit Capability Statements. capability Statement: the Following Requests Are Designed To Inform The Us Army Corps Of Engineers, Sacramento District, Of Current Service Contractor Market Capabilities. The Submission Is Limited To Ten (10), 8.5 X 11 Inch Pages With A Minimum Font Size Of Point 12. 1) Company Name, System For Award Management Unique Entity Identification Number (sam Uei) Or Employer Identification Number (ein), Address, Point Of Contact, Phone Number, And E-mail Address. 2) Experience And Capability To Complete Contracts Of Similar Magnitude And Complexity To The Potential Requirement, Including At Least Three (3) Examples Of Comparable Work Performed Within The Past Eight (8) Years. Each Example Should Include A Brief Description Of The Project, Description Of The Work Performed (identification Of Self-performance And/or Subcontractor Management), Customer Name, Customer Satisfaction, Timeliness Of Performance, Dollar Value Of The Project And Whether There Were Any Challenges Experienced During The Project (delays, Investigations, Health And Safety Issues, Labor Shortages, Management/organizational Issues, Etc.). 3) Business Size And Socioeconomic Type For The Applicable Naics (ex: Woman-owned Small Business, Serviced-disabled Veteran-owned Small Business (sdvosb), Veteran-owned Small Business (vosb), Certified Historically Underutilized Business Zone (hubzone), 8(a) Participant, Small Business, Or Other Than Small Business (large Business)). 4) Bonding Capability (in The Form Of A Surety Letter). please Submit All Capabilities Statements, Information, Brochures, And/or Marketing Material As One (1) Document, Limited To The Page Maximum Above. disclaimer this Sources Sought Is For Informational Purposes Only. This Is Not A Request For Proposal (rfp) To Be Submitted. It Does Not Constitute A Solicitation And Shall Not Be Construed As A Commitment By The Government. Responses In Any Form Are Not Offers And The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. No Funds Are Available To Pay For Preparation Of Responses To This Announcement. Any Information Submitted By Respondents To This Technical Description Is Strictly Voluntary. please Provide Responses By E-mail To The Contract Specialist, Natalia Gomez, At Natalia.gomez@usace.army.mil By 0900 / 9:00 Am (pst) Wednesday, 21 Mar 2025. please Include The Solicitation Number, ‘w9123825ra012’ In The Subject Line.

U S COAST GUARD USA Tender

Plastic and Rubber
Corrigendum : Closing Date Modified
United States
Closing Soon10 Mar 2025
Tender AmountRefer Documents 
Details: General Requirements scope  intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.  references  coast Guard Drawings  coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only) coast Guard Drawing 750-wmsl-100-013, Rev L, Unit 1210 Structure - Innerbottom To 1st Platform - Fr 10 To Fr 22 (asc100121) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Publications  surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References  astm International (astm) D1330, 2015, Standard Specification For Rubber Sheet Gaskets 3. Requirements  3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.  3.2 Materials. The Contractor Must Obtain All Of The Materials Required To Complete This Job With The Exception Of The Government-furnished Property Shown In Paragraph 1.2 Of Work Item.   3.3. Period Of Performance. The Period Of Performance Window For This Work Starts On 09 April 2025 And Ends On 01 July 2025.  3.4. Location. The Contractor Must Perform The Work While The Uscgc Midgett (wmsl 757) Is Alongside The Pier On 400 Sand Island Pkwy Honolulu, Hi 96819-4326.     12316_1124_flt rec_12136_flt_418’ Wmsl (cgc Midgett) (1124) item 1: Tanks (ballast), Clean And Inspect 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Clean And Inspect The Following Tank(s): table 1 – List Of Tanks type Of Structure location capacity - 95% (gallons) tank Content Disposal (gallons) ballast Tank 5-16-1-w 14,438 760 1.2 Government-furnished Property. none. 2. References coast Guard Drawings coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only) coast Guard Drawing 750-wmsl-100-013, Rev L, Unit 1210 Structure - Innerbottom To 1st Platform - Fr 10 To Fr 22 (asc100121) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Publications surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References astm International (astm) D1330, 2015, Standard Specification For Rubber Sheet Gaskets 3. Requirements 3.1 General. 3.1.1 Cir. none. 3.1.2 Tech Rep. none. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: tlis piping residual Tank Contents/fluids note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. 3.2.1 Perform An Initial Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). 3.2.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). 3.3 Tank Opening. The Contractor Must Remove The Tank Manhole Cover(s) And Ventilate The Confined Spaces In Accordance With Sflc Std Spec 0000, Paragraphs 3.3.1.1 And 3.3.1.2. The Contractor Must Provide Fall Protection To Cover Tank Manhole Cover When Opened For Ventilation/work. 3.4 Tank Content And Waste Disposal. The Contractor Must Dispose Of Residual Tank Contents Listed In Table 1 And Any Cleaning Fluids In Compliance With All Applicable Federal, State, And Local Laws, Ordinances And Regulations. Notify The Cor (in Writing) At Least 48 Hours Prior To Removal Of Wastes And Fluids. Document A Complete Chain Of Custody Record Of The Removed Tank Contents And Generated Wastes, From The Vessel To The Point Of Final Destination Or Delivery. Submit Chain Of Custody Record To The Cor Upon Completion Of Work. 3.5 Temporary Plugs. The Contractor Must Plug All Inlet And Outlet Piping In The Tank To Prevent Contaminants From Entering The Tank Or Piping System. Use Plugs With An Attached Lanyard, Ring Or Other System That Will Ensure Plugs Are Not Lost In The Pipe Openings. 3.5.1 Plug Log. The Contractor Must Keep A Written Record Of All Installed Plugs. Keep A Separate List For Each Tank. Maintain A Plug Accountability Log Posted Immediately Outside The Tank To Prevent Any Of The Installed Temporary Plugs From Being Lost Inside The Tank Or Left Behind Inside At Tank Closure. The Log Must Include The Type And Size Of Each Plug, Installation Date, And Removal Date. Submit This Log To The Cor After Completion Of Work Item Via A Cfr. 3.5.2 The Contractor Must Ensure That All Plugs Are Removed From Each Tank Upon Completion Of Work In The Tank. 3.6 Tank Cleaning. The Contractor Must Clean All Designated Tank Interior Surfaces Free Of All Foreign Materials, Such As Residual Water, Sediment, Sludge, Rust, Or Biological Growth, Taking Care Not To Damage The Coating System (if Applicable). 3.6.1 The Contractor Must Accomplish All Requirements Of Sflc Std Spec 6310, 3.1.6.4 (surface Contaminant Removal) To Achieve The Cleanliness Requirements Of Sspc-sp 1, Including A Low-pressure (maximum 5,000 Psi) Freshwater Wash Down Of The Surfaces. 3.6.2 Remove Cleaning Media And Residues Continuously From The Tank During The Washing Process. Remove Any Residual Wash Media And Wipe Up Residual Moisture With Clean Lint-free Cloths. Wipe The Interior Tank Structure Dry And Free Of All Cleaning Agents. 3.7 Inspection. The Contractor Must Visually Inspect All Tank Interior Surfaces, Including, But Not Limited To Bulkheads, Floor And Overhead Plating, Structural Members, Manhole Cover Surfaces, Fasteners And Gasket Seating Surfaces. Submit A Cir Including The Following, As Applicable: tank Structural Condition. condition Of Tank Coating, Including Dimensions, Percentage, Location, And Type Of Coating Failure. tank Level Indicator (tli) And/or Float Switch Condition. sounding/vent Tube And Striker Plate Condition. suction And Discharge Piping Condition. fastener Material And Condition. zinc Anode Condition (remaining Percentage) pit Measurements ultrasonic Thickness (ut) Measurements 3.8 Pit Measurement. The Contractor Must Measure100pitswithin Each Tank/location Listed In Table 1, In Accordance With Sflc Std Spec 0740, Paragraph 3.13 (evaluation Of Pitting Corrosion). The Results Of These Measurements Must Be Included In The Inspection Report, Showing Where Pit Measurements Were Taken And The Depth Of The Pit. 3.9 Ultrasonic Thickness (ut) Measurement. The Contractor Must Take Ut Measurements In The Surrounding Area Of Any Pit Measuring Greater Than 25% Of Plate Thickness. Ut Measurements Must Be Taken In The Four Quadrants At An Equal-distant Radius From The Pit Center Until Full Plate Thickness Is Measured. For Bidding Purposes, Assume 200 Ut Measurements Per Tank Listed In Table 1. Ut Measurements Must Be Conducted In Accordance With Sflc Std Spec 0740, Appendix C, Using Coast Guard Drawings Listed In Section 2. The Results Of These Measurements (original Thickness, Measured Thickness, And Any Observed Cracks) And The Locations Where They Were Taken Must Be Included In The Inspection Report. 3.10 Substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Small Corrosions (i.e. Pits < 25% Or Corrosions < 25%). The Contractor Must Repair Small Pin Holes, Shallow Pitted Substrates (with Remaining Plate Thicknesses Over 75% Of Required Plate Thicknesses), And Fair Corroded Substrates (with Remaining Cross Sections Over 75% Of Required Cross Section Areas), After Removing Coating, In Accordance With Sflc Std Spec 6310 And Manufacturers’ Instructions. procure 3 Kits Of Epoxy Fairing Compounds (e.g. Belzona 1111, 0.5 Gallon/5 Kg Kit Or Equivalent) To Conduct Repairs. turn Over All Unused Kits To The Cor. note “substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Corrosions (i.e. Pits < 25% Or Corrosions < 25%)” Is A Supplement Barrier Intending To Help Delay Penetration. 3.11 Tank Closing. The Contractor Must Ensure That The Tank(s) Remain Open For Approximately 24 Hours After Completion Of Any Authorized Repair And Preservation Procedures. Notify The Cor At Least 48 Hours Prior To Closing The Tank(s). After Satisfactory Inspection By The Coast Guard Inspector And Completion Of All Authorized Repairs, Remove All Installed Temporary Plugs And Document Removal Via Signature On The Plug Log By The Coast Guard Inspector And Contractor Prior To Tank Closing. Close Tank Manhole Cover(s) Using New Gasket Material, Nuts, And Grommets In Accordance With Coast Guard Drawing 750-wmsl-167-001, In The Presence Of The Coast Guard Inspector. Chase Threads On Studs To Ensure Even Installation Of The Access Covers. Submit A Cfr With The Completed Plug Log. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.12 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 3.12.1 Perform A Post-work Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). 3.12.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). 3.13 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Surfaces, And All Manhole Cover External Surfaces To Match Existing Adjacent Surfaces In Accordance With Sflc Std Spec 6310, Paragraph 3.1.13 (touch-ups And Minor Coating Repairs). Do Not Paint Any Manhole Cover Fasteners. 4. Notes this Section Is Not Applicable To This Work Item rdd/pop: 09apr25-01jul25

Western Railway Tender

Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Closing Soon13 Mar 2025
Tender AmountRefer Documents 
Description: Released, Condemned And U/s Scrap Empty Paint Drum (ferrous) Consisting, {(1) Capacity 20liter, Qty- 100nos, (2) Capacity 200liter, Qty- 20nos}, Total Qty- 120 Nos, Location- Coaching Depot Indore. Mode Of Delivery In Number Basis And On As Is Where Is Basis, Custodian Sse-c&w-indb, Fdp-50 Days.
2881-2890 of 4641 active Tenders