Oxygen Tenders

Caraga Regional Hospital Tender

Healthcare and Medicine
location
Philippines
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Ooooooooo @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Bids And Awards Committee Invitation To Bid Ib No. 2025-04-15 (27) Supply And Delivery Of Various Medical Equipment For Pediatric Department Approved Budget For The Contract: Php 5,700,000.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy 2025 Raf / Gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of Five Million Seven Hundred Thousand Pesos Only ( ₱ 5,700,000.00 ) As To Payment Under The Contract For Supply And Delivery Of Various Medical Equipment For Pediatric Department. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding To Wit: Line Item No. Description Qty Unit Of Measurement Unit Cost Total Cost 1 Radiant Warmer With Resuscitaire 1 Unit ₱ 3,200,000.00 ₱ 3,200,000.00 2 Transport Incubator 1 Unit ₱ 2,500,000.00 ₱ 2,500,000.00 Grand Total ₱ 5,700,000.00 Terms Of Reference For Radiant Warmer With Resuscitaire Description Patient Category Resuscitaire Is A Radiant Warmer With Resuscitation Components That Can Be Used In Labor And Delivery, The Nursery, And Surgical Settings. It's Designed To Help Caregivers Focus On Their Patients By Providing Warming Therapy And Emergency Resuscitation Equipment. Purpose Of Use Clinical Department /ward Pediatrics Department Technical Charateristics General Requirements Radiant Warmer With Dual Heating Elements Two Heat Sources - Radiant And Conductive Integrated Resuscitation Module Integrated Spo2 Integrated Weighing Scale Variable Height Adjustment Bed Tilt-continuous Up To 15° In Both Direction Bed Tilt Indicator On Screen Must Have An Integrated Weighing Scale With At Least 8 Tubing Grommets For Guiding Cables And Hoses To Patient Trolley With Four Double Castors With Locking Breaks With Integrated Work Light Dimmable To Three Intensity Levels Operating Volume At The Center Of The Mattress < 40db (a) Kangaroo Mode To Monitor The Patient's Temperature Outside The Radiant Warmer, Timer, Alarm Suppression Dimension Of Soft Bed Mattress Area 470 Mm X 750 Mm X-ray Tray Option With Soft Bed Mattress Integrated X-ray Tray, Operable From Both Sides Maximum Size For X-ray Cassette Or Detector 526 Mm X 511 Mm In X-ray Tray Operation 1. Radiant Warmer A. Radiant Warmer With Two Heating Elements For An Optimal And Even Heat Distribution On The Mattress B. Automatic Adaption Of The Radiant Warmer When The Mattress Is Tilted C. Radiant Warmer Setting: Off, 10% To 100% D. With Automatic Pre-warm Function E. With Skin Temperature Control In Radiant Warmer Operation 2. Skin Temperature Control A. Skin Temperature Measurement Ranges From 13 To 43°c B. Skin Temperature Setting: 34 To 38°c C. Can Connect And Display Second Skin Temperature Sensor For Thermo Monitoring Of Patient D. Can Set Alarm Limit For The Deviation Between The Central And Peripheral Skin Temperature Deviation 3. Resuscitation A. With Integrated Resuscitation Module With Gas Mixer For Blended O2 And Air B. Low Air Or O2 Alarm And Acoustic Signal C. Manual Bag Or T-piece Resuscitation Available D. Smooth Transition From T-piece To Automatic Ventilation Using Single Circuit E. 12 O'clock Setting Concept To Meet Recommended Guidelines F. With Automatic Ventilation To Free Up One Hand And Reduces Inconsistency During Resuscitation G. With Adjustable Respiratory Rate H. With Fixed I:e Ration Of 1:2 I. With Built-in Suction System J. Peep Setting: 0 To 15 Mmhg K. Pip Override: Above 30 Cmh2o L. Flow Control: 0 To 15 L/min M. Fixed Airway Pressure Limit 50 ± 5 Cmh2o N. Operating Noise During T-piece Resuscitation ≤ 40 Db Display 1. At Least 10" Colour Touchscreen Display 2. Different Views Available: Main View, L & D View Thermo Monitoring View, Family View 3. Graphical And Tabular Trend Display From 2 Hrs To 7 Days For Temperatures, Heating, Spo2, Patient's Weight Events 4. Display Configurable For Day And Night 5. Personalization Of User Interface With Configurable Patient Name, Id, Sex, Date Of Birth, Gestational Age And Personal Icon 6. Apgar Timer Integrated 7. Stopwatch Integrated With Time Stamps Apgar And Spo2 Pre-ductal Target Table 8. Import And Export Of Patient Data And Device Configuration To Other Devices Physical/chemical Characteristics Configuration: 1. Compatible Hanged Arm For Holding The Circuit 2. Should Have Caster With Braking System Operating Characteristics (ups) Input Capacity: 1000va/600w Input Voltage: 220/230/240v 1 Phase 50hz/60hz Output Socket: 4pcs With Back Up + 4 Pcs Surge Only Transfer Time: Typical 2-6ms Waveform (batt. Mode) Simulated Sine Wave Battery Type: Sealed, Maintenance-free Lead Acid Typical Recharge Time: 6-8 Hours Protection: Automatic Self-test & Discharge Protection, Replace Battery Indicator Back-up Time: 6-30 Minutes (depending On Computer Load) Accessories, Consumables, Spare Parts, Other Components Accessories Grommets: 4 Pcs Drawer: Large Drawer (two-way Opening) Iv Pole & Monitor Table Environmental Factors Context Dependent Requirements Temperature Operating: 0 To 40°c (without Ag And Co2 Module) 10 To 40°c (with Ag And Co2 Module) Storage: -20 To 60°c Humidity Operating: 15 To 95% (non-condensing) Storage: 10 To 95% (non-condensing) Barometric Operating: 427.5 To 805.5 Mmhg (57.0 To 107.4 Kpa Without Ag And Co2 Module) Storage: 120 To 805.5 Mmhg (16.0 To 107.4 Kpa Without Ag And Co2 Module) Training, Installation And Utilization Pre-installation Requirements Supplier To Perform Installation, Safety And Operation Checks Before Handover Requirements For Commissioning Local Clinical Staff To Affirm Completion Of Installation Training Of User/s Training Of Users And Biomed Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit Warranty And Maintenance Warranty 5 Years For Parts And Labor Documentation Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language (hard And Soft Copy) Provide Certificate Of Calibration Upon Delivery/installation List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration And Inspection To Be Provided. Safety And Standards Risk Classification Environmental Friendly With Proper Waste Management International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada And Eu) Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems Iec 60601-1-2:2007 Medical Electrical Equipment - Part 1-2: General Requirements For Basic Safety And Essential Performance - Collateral Standard: Electromagnetic Compatibility - Requirements And Tests Iec 60601-2-21:2009 Specifies The Safety Requirements For Infant Radiant Warmers. This Particular Standard Amends And Supplements Iec 60601-1-:2005 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance. This Second Edition Cancels And Replaces The First Edition Published In 1994 And Its Amendment 1 (1996). This Edition Constitutes A Technical Revision. This Edition Of Iec 60601-2-21 Was Revised To Structurally Align With The 2005 Edition Of Iec 60601-1. Regional/local Standards Pass Fda Regulatory Requirement (certificate Of Product Registration) Other Requirements Supplier Must Have Technical Support In Mindanao Area With Support Facilities And Trained Personnel Delivery Period 90 Calendar Days From Receipt Of Notice To Proceed Terms Of Payment Upon Full Delivery, Installed, Tested And Commissioned. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. Service Center Must Have Service Center Within Caraga Region, Cebu City, Cagayan De Oro Or Davao City Post Qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital And/or Site Visit To Nearest Hospital. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed) Terms Of Reference For Transport Incubator Description Patient Category The Purpose Of Transport Incubator Is Same To An Incubator Used In Intensive Care Unit. It Is Used To Provide A Desired Warm Environment To A Neonate To Reduce In Heat Loss To The Environment. There Is Situation When A Neonate Or Baby Has To Be Transferred Via Air Or Road From One Place To Other, Either In Search Of An Intensive Care Unit Or To A Different Hospital For A Different Therapy Itself. As These Neonates Or Baby Are Already Weak By Nature, And When They Are Ill, Their Condition Becomes Even More Delicate. Under These Circumstances, The Most Challenging Part Of Critical Care Is To Transfer The Baby Without Exposing Them To Temperature Gradient Of The Environment. This Is Achieved By Transferring The Baby In A Transport Incubator Which Maintains A Small Environment Or Required Temperature. Purpose Of Use Clinical Department /ward Pediatrics Department Features Main Features: With Head Access/slide Out Mattress Feature To Allow Quick And Easy Access To Baby For Intubation Or Cpr Hand-made Acrylic Hood Should Be Scratch Resistant To Maintain Transparency Over Time With Integrated Led Examination Light, That Gives High Quality Illumination For Visual Evaluation The High Hood Option Further Facilitates Access To Baby And Provides More Room For Larger Babies, Clinical Disposables (diapers, Blankets, Etc.) And Even More Uniform Air Flow And Temperature Distribution. Technical Specifications Dimensions And Weight Device Width Should Be No More Than 21 Inches Height At Least 20 Inches Weight Should Be Less Than 110 Lbs With Battery Included The Distance From Vertical Hood To Mattress Should Be Not Less Than 21 Cm Or 9 Inches (high Hood Option) Thermoregulation Double Walled Hood Permits Full Visibility And Provides An Effective Thermal And Sound Barrier From The Environment Warm-up Time <30min With Humidity Pad Added To Increase The Relative Humidity Within The Incubator Hood That Can Last Up To 10 To 12 Hours The Device Is Designed For Use With Patients Weighing Up To A Maximum Of 10 Kg (22 Lb) Air Temperature Setting Ranges From 22.0 °c - 38 °c (71 °f - 100 °f) Display, Alarm And Safety Features Visual And Audible Alarm If Temperature Alarm Limits Are Violated With 4 Led Indication Of Heater Power; At Least 25-100% Heater Power 4 Led Indication Of Heater Power; At Least 25-100% Displays Infant Temperature Illuminates Ac, Dc, Or External Dc With Alarm Indicators For High Temp, Power Fail, Sensor Fault, Heater Temp, Air Flow, Low Dc High Temperature Alarm If Incubator Air Temp. Is >39 ± 0.5° C The Sensor (temperature) Alarm Actuates If Sensor Fails The Heater Temperature Alarm Actuates If Heater Temp >77° C (170° F) The Power Fail Alarm Actuates If Ac Fails And No Dc Power Present, Activates If Unit Switches Ac To Dc The Air Flow Alarm Actuates During Fan Failure The Low Dc Alarm Actuates If Dc<10.5 Vdc, Or External 28 Vdc Falls Below 25.5 Vdc Nominal Silence/reset Button Must Silence The Audible Portion Of Alarms For 5 Minutes, Except Power Fail The Machine Automatically Resets Sensor & High Temp Alarms After 100% Conditions Corrected The Machine Must Reset Intermittent Power Alert If Unit Switches From Ac To Dc Current Ergonomics Port Doors The Tank Mount Permits Mounting Gas Cylinders With A Diameter At Least Up To 4.5 In (11.6 Cm) And Up To 34 In (85 Cm) In Length With Air Filter That Removes >99% Of Airborne Particles Greater Than 0.5 Micron Diameter Electrical Ac Power Requirements 220/240 V, 50/60/ Hz, Dc Power Requirements 26-30 V, 200 W (max) Battery Rechargeable Battery, 12 Vdc, 24 Ah Gel-type Battery (lead Acid) Battery Condition Status 4 Led Indication Of Battery Charge Condition At Least 25-100% Incubator Maintains A Differential Of 25 °c (77 °f) Between Ambient And Set Point For 90 Minutes On 1 Battery With Available 2nd Battery For Extended Hours Ups Input Capacity: 1000va Input Voltage: 220/230/240v 1 Phase 50hz/60hz Output Socket: 4 Pcs With Back Up + 4pcs Surge Only Transfer Time: Typical 2-6ms Waveform (batt. Mode) Simulated Sine Wave Battery Type: Sealed, Maintenance-free Lead Acid Typical Recharge Time: 6-8 Hours Protection: Automatic Self-test & Discharge Protection, Replace Battery Indicator Backup Time: 6-30minutes (depending On Computer Load) Technical Services As Follows: • Calibration Of The Unit Must Be Performed After Installation With Certificate • Service Call Within 24 Hours Maximum And Must Have Repair Facility In Mindanao Area • Preventive Maintenance For Every Quarter Until Warranty Expires • Service Kits And Consumables To Be Included For One Year Use • Supplier Must Deliver And Install The Unit Without Cost To The Owner Physical/chemical Characteristics • Easy And Safe Transport To Be Possible By Hand. Crash Resistant, Dust Proof. Accessories, Consumables, Spare Parts, Other Components • Double Wall • Skin Temperature Probe • Examination Lamp • 2 Access Doors, 2 Port Doors And 1 Iris Port • 6 Tubing Ports/grommets • 2 Infant Restraint Straps • Heavy Duty Oxygen Tank • Dc Cable • Humidity Pad Training, Installation And Utilisation Pre-installation Requirements Supplier To Perform Installation, Safety And Operation Checks Before Handover Requirements For Commissioning Local Clinical Staff To Affirm Completion Of Installation Training Of User/s Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit Warranty And Maintenance Warranty • 5 Years For Parts And Labor Environmental Factors • Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg C And Relative Humidity Of 15 To 90% • Capable Of Operating Continuously In Ambient Temperature Of 10 To 40 Deg C And Relative Humidity Of 15 To 90% Documentation Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language Service Manual In English List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided Safety And Standards International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada And Eu) Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems Iec 60601-1-2:2007 Medical Electrical Equipment - Part 1-2: General Requirements For Basic Safety And Essential Performance - Collateral Standard: Electromagnetic Compatibility - Requirements And Tests Iso 10993-10 Test For Skin Sensitization, Iso 10993-5 Test For In Vitro Cytotoxicity Delivery Period 90 Calendar Days From Receipt Of Notice To Proceed Terms Of Payment Upon Full Delivery, Installed, Tested And Commissioned. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. Service Center Must Have Service Center Within Caraga Region, Cebu City, Cagayan De Oro Or Davao City. Post Qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital And/or Site Visit To Nearest Hospital. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed) Validity Of The Contract / Contract Termination: Without Prejudice To The Provision Of Applicable Laws, Rules And Guidelines, The Contract Shall Be Automatically Terminated Under The Following Conditions: A. When The Total Quantity Specified In The Contract Has Been Exhausted; Or B. For Any Justifiable Reason Ground Where The Contract Will Not Redound To The Benefit Of The Government Or There Is Violation Of The Contract. General Conditions All Other Rules Governing Contract Implementation And Termination Under Ra 12009 And Its Irr, And Relevant Procurement Policies Shall Be Applicable. Technical Specification And Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent (50%) Of The Abc To Be Bid. Slcc Must Be Within 5 Years From The Submission Of Bids. (based On The Completion Date). The Single Largest Completed Contract (slcc) Shall Be The Same Or Similar In Nature (like Rental Of Equipment, Medical Equipment), As Determined And Defined By The Bids And Awards Committee ( Bac ). For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 12009, Otherwise Known As The “new Government Procurement Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On March 25, 2025 To April 15, 2025 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference April 3, 2025 At 9:00 A.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/86142998199?pwd=wora2hc5ksfjutxhjatxmjwvf4zbor.1 Meeting Id: 861 4299 8199 Passcode: 611465 Deadline Of Submission Of Bids April 15, 2025 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com. Please Be Advised That Failure To Submit Bidding Documents To The Designated Official Email Address Will Result In Automatic Rejection And Disqualification. Opening Of Bids April 15, 2025 At 3:30 P.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/82249032996?pwd=2zkmgaxrhrb2ekthfzue2e0a04icbd.1 Meeting Id: 822 4903 2996 Passcode: 174719 Complete Philippine Bidding Documents Please Click The Link Below For The Complete Pbd: Https://drive.google.com/drive/folders/1uh89tkucb6lsfgjhf9i5kbgp6aguzgfy?usp=sharing Bidding Documents Php 10,000.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Philippine Bidding Documents Can Be Accessed In The Philgeps And All Form And Part Of This Invitation To Bid, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents E. Other Documents Essential Documents Required By This Procuring Entity And Ra 12009 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before April 15, 2025 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On April 15, 2025 At 3:30 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding Via Zoom Platform. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted Under Any Circumstances May It Cause. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 12009 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 12009 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore, Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link: Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 (086) 826-9058 Mobile Nos: Globe: 0953-9212-832 / Smart: 0985-0508-783 E-mail Address: Crhprocurement.bac@gmail.com Fb Page: Caraga Regional Hospital – Bids And Awards Committee Approved By: (sgd) Fermarie C. Dulpina, Rmt, Mpa, Jd Chief Health Program Officer Chairman, Bids And Awards Committee
Closing Date15 Apr 2025
Tender AmountPHP 5.7 Million (USD 97.9 K)

Municipality Of Argao, Cebu Tender

Manpower Supply
location
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. B.7(2) Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 30.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil ) Quantity 35.67 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 35.67 M3 Structure Excavation (common Soil ) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Borrow Quantity 54.77 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 54.77 M3 Embankment From Borrow Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 1.20 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 1.20 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: 1.05 M3 A. Plate Compactor (5 Hp) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (slab On Fill And Concrete Wall" Quantity 22.71 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 22.71 M3 " Structural Concrete (slab On Fill And Concrete Wall)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 3.15 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.15 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (pedestal And Lentel Columns)" Quantity 1.21 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 1.21 M3 " Structural Concrete (pedestal And Lentel Columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 2.01 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.01 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 925.81 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 925.81 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (1) Formworks And Falseworks (for Two To Five-storey Building) Quantity 30.00 M2 Dpwh Standard Output Per Day (opd)= 4.5 M2 30.00 M2 Formworks And Falseworks (for Two To Five-storey Building) Direct Cost: A. Materials: 0.35 Pc A. Phenolic Board (0.019 X 1.2 X 2.4) - 5 Uses 4.73 Bd Ft B. Good Lumber - 3 Use C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days Installation 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer Stripping 0.56 1.00 A. Construction Foreman 0.56 6.00 B. Unskilled Laborer C. Equipment And Water: No. Of Hours No. Of Units Name And Capacity "area = 205.01 M2" 0.50 40.00 A. H-frame 1.7 M X 1.2m, Set 0.50 1.00 2 Pes H-frames 4 Pcs Diagonal Cross Braces 4 Pcs Horizontal Braces 8 Pcs Joint Pins 14.00 62.00 B. Shoring Jack, 3.8 M Full Extension 14.00 80.00 C. Adjustable U-head Jack, 0.6m 14.00 80.00 D. Adjustable Base Jack, 0.6m 14.00 62.00 E. 1-1/2" Gi Pipe X 6.0 M 14.00 16.00 F. 1-1/2" Gi Pipe X 3.0 M 14.00 32.00 G. 1-1/2" Gi Pipe X 4.0 M 14.00 216.00 H. 1-1/2" Gi Pipe X 1.0 M 14.00 278.00 I. Tie Rod X 0.60m 14.00 558.00 J. Round Wing Nut Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (5) Metal Structure Accessories (steel Plates) Quantity 17.66 Kg Dpwh Standard Output Per Day (opd)= 12.995 Kg 17.66 Kg Metal Structure Accessories (steel Plates) Direct Cost: A. Materials: 1.05 Kg A. Steel Plates B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof (post And Truss) Quantity 695.39 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 695.39 Kg Structural Steel Roof (post And Truss) Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 567.97 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 567.97 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)a Metal Structure Accessories (anchor Bolts) Quantity 24.00 Pc Dpwh Standard Output Per Day (opd)= 1 Pc 24.00 Pc Metal Structure Accessories (anchor Bolts) Direct Cost: A. Materials: 1.00 Pc A. Anchor Bolt B. Manpower: Number Of Days 0.10 1.00 A. Construction Foreman 0.10 1.00 B. Skilled Laborer 0.10 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)b Metal Structure Accessories (sagrods) Quantity 48.00 Pc Dpwh Standard Output Per Day (opd)= 1 Pc 48.00 Pc Metal Structure Accessories (sagrods) Direct Cost: A. Materials: 1.00 Pc A. Sagrod With Nuts And Bolts B. Manpower: Number Of Days 0.10 1.00 A. Construction Foreman 0.10 1.00 B. Skilled Laborer 0.10 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)c Metal Structure Accessories (turnbuckle) Quantity 4.00 Pc Dpwh Standard Output Per Day (opd)= 1 Pc 4.00 Pc Metal Structure Accessories (turnbuckle) Direct Cost: A. Materials: 1.00 Pc A. Standard Turnbuckle B. Manpower: Number Of Days 0.15 1.00 A. Construction Foreman 0.15 1.00 B. Skilled Laborer 0.15 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1051(1) Railings Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1 L.s. 1.00 L.s. Railings Direct Cost: A. Materials: 2.00 Lengths A. 2" X 2" X 1.55mm G.i Steel Tubular 4.00 Lengths B. 1" X 1" X 1.55mm G.i Steel Tubular 8.00 Kgs C. Welding Rod 1.00 Set D. Oxygen/acetylene 1.00 Gals E. Epoxy Primer F. Consumable (5% Of Material Cost) B. Manpower: Number Of Days 32.00 1.00 A. Construction Foreman 32.00 1.00 B. Skilled Laborer 32.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 162.49 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 162.49 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1027(1) Cement Plaster Finish Quantity 230.50 M2 Dpwh Standard Output Per Day (opd)= 7.125 M2 230.50 M2 Cement Plaster Finish Direct Cost: A. Materials: 0.33 Bag A. Cement 0.03 Cu.m B. Sand B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 178.94 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 178.94 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 150.40 M Dpwh Standard Output Per Day (opd)= 10.00 M 150.40 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (300mm Gutter) Quantity 143.20 M Dpwh Standard Output Per Day (opd)= 11.80 M 143.20 M Fabricated Metal Roofing Accessory (300mm Gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 178.94 M2 Dpwh Standard Output Per Day (opd)= 178.94 M2 178.94 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Ceiling Quantity 825.63 M2 Dpwh Standard Output Per Day (opd)= 1.243 M2 825.63 M2 4.5mm Fiber Cement Board On Metal Frame Ceiling Direct Cost: A. Materials: 0.37 Pc "a. 4.5mm Fiber Cement Board Plywood" 1.13 Pc "b.metal Furring 3m Length" 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1)e2 Metal Spandrel On Metal Frame Ceiling Quantity 224.64 224.64 Dpwh Standard Output Per Day (opd)= 1.243 M2 224.64 224.64 Metal Spandrel On Metal Frame Ceiling Direct Cost: A. Materials: 1.05 Sq.m. "a. Pre-painted Sheet - Spandrel Plywood" 1.13 Pc "b.metal Furring 3m Length" 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: 0.00 - Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1)e3 Metal Pvc Ceiling Panel On Metal Frame Ceiling Quantity 280.00 M2 Dpwh Standard Output Per Day (opd)= 1.243 M2 280.00 M2 Metal Pvc Ceiling Panel On Metal Frame Ceiling Direct Cost: A. Materials: 1.05 Sq.m. A. Pvc Ceiling Panel 1.13 Pc "b.metal Furring 3m Length " 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Edge Trim 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)a Painting Works (masonry Painting) Quantity 1,650.13 M2 Dpwh Standard Output Per Day (opd)= 2.10 M2 1650.13 M2 Painting Works (masonry Painting) Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1018(1) Glazed Tiles And Trims Quantity 555.15 M2 Dpwh Standard Output Per Day (opd)= 1 .365 M2 555.15 M2 Glazed Tiles And Trims Direct Cost: A. Materials: 1.05 M2 A. Glazed Tiles 0.33 Bags B. Cement 0.03 M3 C.sand 0.13 Bags D. Tile Grout 0.14 Bags E. Tile Adhesive (25 Kg) F. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1018.00 Unglazed Tiles Quantity 69.65 M2 Dpwh Standard Output Per Day (opd)= 1 .95 M2 69.65 M2 Unglazed Tiles Direct Cost: A. Materials: 1.05 M2 A. Unglazed Tiles 0.33 Bag B. Cement 0.03 M3 C.sand 0.13 Bag D. Tile Grout 0.14 Bags E. Tile Adhesive (25 Kg) F. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: 86.88 Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1019(1)d Laminated Wood Tiles Quantity 306.00 M2 Dpwh Standard Output Per Day (opd)= 1 .95 M2 306.00 M2 Laminated Wood Tiles Direct Cost: A. Materials: 1.05 M2 A. Laminated Wood Tiles 0.50 L B. Glue Adhesive 0.33 Bag C. Cement 0.03 M3 D.sand H. Consumables (5% Of Materials Cost) B. Manpower: 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1008(1)a Aluminum Glass Window (sliding) Quantity 32.48 M2 Dpwh Standard Output Per Day (opd)= 0.36 M2 32.48 M2 Aluminum Glass Window (sliding) Direct Cost: A. Materials: 1.00 M2 A.aluminum Glass Window (sliding) B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1008(1)b Aluminum Glass Window (awning) Quantity 8.10 M2 Dpwh Standard Output Per Day (opd)= 0.36 M2 8.10 M2 Aluminum Glass Window (awning) Direct Cost: A. Materials: 1.00 M2 A.aluminum Glass Window (awning) B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1008(1)c Aluminum Glass Window (fixed) Quantity 41.70 M2 Dpwh Standard Output Per Day (opd)= 0.36 M2 41.70 M2 Aluminum Glass Window (fixed) Direct Cost: A. Materials: 1.00 M2 A.aluminum Glass Window (fixed) B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1009 (1)a Jalousie Window (glass) Quantity 5.23 M2 Dpwh Standard Output Per Day (opd)= 0.27 M2 5.23 M2 Jalousie Window (glass) Direct Cost: A. Materials: 1.00 M2 A.jalousie Window (glass B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (1) Frames (jambs, Sill, Head, Transoms And Mullions) Quantity 39.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 39.00 Set Frames (jambs, Sill, Head, Transoms And Mullions) Direct Cost: A. Materials: 1.00 Set A.jambs, Sill, Head, Transoms And Mullion B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 2.00 1.00 A. Construction Foreman 2.00 1.00 B. Skilled Laborer 2.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)a Pvc Doors Quantity 24.57 M2 Dpwh Standard Output Per Day (opd)= 0.315 M2 24.57 M2 Pvc Doors Direct Cost: A. Materials: 0.58 M2 A.pvc Door B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)b Wooden Panel Door Quantity 39.78 M2 Dpwh Standard Output Per Day (opd)= 0.36 M2 39.78 M2 Wooden Panel Door Direct Cost: A. Materials: 1.00 M2 A.wooden Panel Door B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1006 (5) Fire Rated Fire Exit Steel Door Quantity 2.52 M2 Dpwh Standard Output Per Day (opd)= 0.26 M2 2.52 M2 Fire Rated Fire Exit Steel Door Direct Cost: A. Materials: 1.00 M2 A. Hollow Steel Door/ Steel Flush Doorl Grille Door/steel Louver Door B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s. " 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 6.00 Rolls A.3.5 Mm2 Electric Wire Thhn 6.00 Rolls B.5.5 Mm2 Electric Wire Thhn 3.00 M C. 8.00 Mm2 Electric Wire (thhn) 10.00 Set D. Single-gang Switch 8.00 Set E. Two-gang Switch 4.00 Set F. Three-gang Switch 60.00 Set G. 3- Gang Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches Direct Cost: A. Materials: 1.00 Set A. Main Panel Board With 250 At,2p Main Breaker, 1-branches 200 At,2p And 1- 80at,2p 1.00 Set B. Empty Panel Board With 24 Branches 1.00 Set C. Empty Panel Board With 16 Branches 13.00 Pcs B. 30 Amp. Plug-in Breaker 25.00 Pcs C. 20 Amp. Plug-in Breaker 2.00 Pcs D. 15 Amp. Plug-in Breaker E. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures & Lamps Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Lighting Fixtures & Lamps Direct Cost: A. Materials: 40.00 Set A. 9 Watts Led Wall Light 223.00 Set B. 9 Watts Led Down Light Recessed Type 30.00 Units C. Emergency Lamp (twin Head) 4.00 Units D. Exhaust Fan 400.00 L.m E. Led Striplight 14 Watts With Controller B. Manpower: Number Of Days 29.00 1.00 A. Construction Foreman 29.00 1.00 B. Skilled Laborer 29.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 10.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 10.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 2.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 2.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 3.00 Pcs H. Pvc Coupling (50mm D) 3.00 Pcs I. Pvc Coupling3 (101mm D) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 16.00 1.00 A. Construction Foreman 16.00 1.00 B. Skilled Laborer 16.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 45.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 20.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 15.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s. " 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 10.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 7.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(5) Plumbing Fixtures Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Plumbing Fixtures Direct Cost: A. Materials: 16.00 Set A. Water Closet With Complete Accessories 4.00 Set B. Urinal With Complete Accessories 14.00 Set C. Lavatory (wall Hung) 23.00 Set D. Floor Drain 2.00 Set E. Soap Holder (toilet Soap / Liquid Soap) 16.00 Set F. Toilet Tissue Holder/dispenser 16.00 Set G. Bidet 14.00 Set H.lavatory Faucet 1.50 M I. 38 Mm Stainless Steel Grab Bar 5.04 Sq.m. J. Facial Mirror With Led 6.00 Set K. Telephone Shower 1.00 Set L. Kitchen Sink B. Consumables (% Of Materials Cost) B. Manpower: Number Of Hours 16.48 1.00 A. Construction Foreman 16.48 1.00 B. Skilled Laborer 16.48 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1201(1) Water Pumping System Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1 I.s. 1.00 I.s. Water Pumping System Direct Cost: A. Materials: 1.00 Unit Stainless Steel Water Tank (4000 Liters Cap.) Diameter 118cm X 220 Cm Height 1.00 Unit Automatic Booster Waterpump Inclusion: 100 Liters Bladder Tank, Automatic Pressure Setting 20 Psi To Cut Off 40 Psi,stainless Steel Flexible Hose, Pressure Switch And Pressure Guage Pp 3 Way Connector. 1.00 Unit Pressure Tank -with Maximum Working Pressure: 125 Psi, Factory Precharge: 20 Psi, Nominal Volume 130 Liters 6.00 Bags Portland Cement 1.00 Cu.m Washed Sand 2.50 Cu.m Coarsed Gravel 6.00 Lengths 10mm Dia. Deformed Bars 2.00 Kgs Gi Tie Wire #16 3.00 Lengths Ppr Pipe 1/2" 2.00 Lengths Ppr Pipe 3/4" 6.00 Lengths Ppr Pipe 1" 2.00 Unit Ppr Ball Valve 1" 4.00 Pcs Teflon (tumbo) 1" 4.00 Pcs P.e Coupling 1/2" 6.00 Pcs Ppr Female Coupling Adaptor 1" 6.00 Pcs Ppr Male Coupling Adaptor 1/2" 8.00 Pcs Ppr Elbow (plain) 1" 4.00 Pcs Ppr Union 1" 2.00 Pcs Ppr Coupling Reducer 1" X 3/4" 3.00 Pcs Ppr Coupling Reducer 1" X 1/2" 1.00 Pcs Ppr Female Elbow 3/4" 1.00 Pcs Float Valve 3/4" 4.00 Pcs Ppr Elbow 1/2" 1.00 Pcs Check Valve 1" 1.00 Unit Liquid Level Switch B. Manpower: Number Of Hours 240.00 1.00 A. Construction Foreman 240.00 1.00 B. Skilled Laborer 240.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1300.00 Installation Of High Pressured Board Comfort Room Cubicle Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1 I.s. 1.00 I.s. Installation Of High Pressured Board Comfort Room Cubicle Direct Cost: A. Materials: 11.00 Sheets 1530mm X 1830mm X 12mm High Pressure Board 8.00 Lengths 3/4" + 1/2" X 3m Length Aluminum Top Rail 4.00 Lengths Aluminum Edge Profile 20mm X 2.44 Meter 6.00 Lengths Aluminum U-channel 20mm X 2.44 Meter 200.00 Pcs 8mm Dia X 11mm Phenolic Board Screw 6.00 Pcs Door Stopper With Coat Hook 16.00 Pcs Adjustable Leg Foot 6.00 Set Indicator Lock 6.00 Pcs Hook Hanger 6.00 Pcs Self Closing Hinge 6.00 Pcs Knob Handle 20.00 Pcs Corner Bracket B. Manpower: Number Of Hours 80.00 1.00 A. Construction Foreman 80.00 1.00 B. Skilled Laborer 80.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1004(2) Finishing Hardware Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Finishing Hardware Direct Cost: A. Materials: 1.00 Set A. Finishing Hardwares (locksetllatches, Bolts, Door Closer, Knobs/handles/ Hinges/ Ladderl Grab Bar) B. Manpower: Number Of Hours 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1600.00 Vent Blocks Quantity 1.00 L.s Dpwh Standard Output Per Day (opd)= 1.00 L.s 1.00 L.s Vent Blocks Direct Cost: A. Materials: 310.00 Pcs A. 200mm X 200mm Vent Blocks 14.00 Bags B. Cement 2.00 Cu.m C. Sand 10.00 Lengths D. 10mm Deformed Bar E. Consumbles (5% Of Material Price) B. Manpower: Number Of Hours 56.00 1.00 A. Construction Foreman 56.00 1.00 B. Skilled Laborer 56.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(2)f Wood Cladding Quantity 57.04 M2 Dpwh Standard Output Per Day (opd)= 1.243 M2 57.04 M2 Wood Cladding Direct Cost: A. Materials: 1.05 Sq.m. A. Wood Cladding 10.00 Pc B. 1" Wood Screw Consumables (5% Of Material Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1200.00 Air Conditioning System Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1 I.s. 1.00 I.s. Air Conditioning System Direct Cost: A. Materials: 4.00 Units Floor Mounted Airconditioner ,power Supply 230v/3ph/60hz, Refrigerant R410a, Cooling Capacity 52,000 Kj/hr,system Power Input 5,500w, Eer 9.5kj/w-hr 7.00 Lot Inverter Split Type Aircon, Wall Mounted , 1 Hp,cooling Capacity 12,555 Kj/hr,system Power Input 230 V, 60hz, Eer 6.4 Kj/w-hr Consumables (1% Of Material Cost) B. Manpower: Number Of Hours 24.00 1.00 A. Construction Foreman 24.00 1.00 B. Skilled Laborer 24.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1400.00 Cast Metal Letters Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Cast Metal Letters Direct Cost: A. Materials: 1.00 Lot A. Lighted Cast Metal Letters (argao Pavilion) B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1500.00 Furnitures And Fixtures Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Furnitures And Fixtures Direct Cost: A. Materials: 1.00 Pcs A. Office Chair 1.00 Pcs B. Office Table 1.00 Unit C. Vip Lounge Sofa- Height Including Back Cushions: 83 Cm (32 5/8 "), Backrest Height: 68 Cm (26 3/4 "),width: 241 Cm (94 7/8 "),depth: 98 Cm (38 5/8 "),height Under Furniture: 6 Cm (2 3/8 ") 18.00 Set E. Single Bed With Mattress Can Vary In Size, But Typically Measure 36 In X 75 In (91 Cm X 190 Cm). 200.00 Pcs F. Aluminum Banquet Chair -w:450mm D:600mm Seating H: 480mm Total H: 930mm Weight: 5.9 Kg 4.00 Unit G. 1 X - Clients Chair, Black Vinyl/black Frame- 17.5"w X 20.25"d X 34"h (44.5 X 51.4 X 86.4 Cm) 6.00 Unit H. Modern And Contracted Bedroom 2 Doors Furniture Metal Wardrobe (w 2000mm,h 1200mm X D 500mm) 1.00 Set I.modern Luxury Office Furniture Meeting Room Conference Meeting Table With 10 Chairs B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date10 Mar 2025
Tender AmountPHP 12.8 Million (USD 220.7 K)

Adela Serra Ty Memorial Medical Center Tender

Healthcare and Medicine
location
Philippines
Details: Description 1 Patient/cardiac Monitor With Central Monitoring Purpose Of Use: A Patient Monitor Is An Electronic Medical Device That Consists Of One Of More Monitoring Sensors, A Processing Component(s), And A Screen Display (also Called A "monitor") That Provide And Record For Medical Professionals A Patient's Medical Vital Signs (body Temperature, Blood Pressure, Pulse Rate And Respiratory Rate) Or Measurements Of The Activity Of Various Body Organs Such As Ecg Monitors, Anesthesia Monitors, Or Ekg Monitors. Department: Surgery Technical Characteristics Patient Monitor Specs: Large, Full-color Touchscreen Display (15" - 17" Or Larger), Offering With A Resolution Of 800x600 Pixels Or Better. With Intuitive Touch Controls. Provides Real-time Data Visualization For Critical Parameters With Easy-to-read Graphics And Customizable Settings. - Rechargeable Lithium Battery With A Minimum Of 100-130 Minutes Operating Time And A Charging Time Of <10 Hours." - Alarm Indicator- Multi-level Alarm System With Auditory And Visual Signals, Customizable Alarm Thresholds - St-segment Measurement Stores 128 Groups Of Arrythmia Data (8-second Ecg Waveform) - Stores At Least 168 Hours Of Trend Data, Customizable Storage Intervals. - Standard Configuration: Ecg, Hr, Resp, Nibp, Sp02, (2x) Temp, Lithium Battery - 12-lead Ecg, Recorder Compact And Portable Design, With Customizable Dimensions (company Offer) According To Brand Specifications. - Weight: Less Than 6 Kg - Power Supply: Power Voltage Ac 100-240v 50/60 Hz - Power Input <85va - Safety Class: Category I - An Optional Built-in Thermal Dot Array Recorder With Customizable Paper Speed And Trace Configuration - System Output: Ethernet Network Standard Rj45 Socket, Rf Wireless Lan: 433mhz Or Better, 10mw (option), Nurse Call Output, Analog Output (ecg Or Ibp), Defibrillator Option, Video Output Option - Alarm: 3 Level (low, Med, High), Indication: Auditory & Visual, Set Up: Default And Custom, Silence: All Alarms Can Be Silenced, Volume: 0-45~ 80-85~db Measured At 1 Meter - Trend: Store And Review 168 Hr. Trend Data And Maps Or Its Equivalent Supports A Wide Range Of Physiological Parameters, With Flexibility To Select From Ecg, Hr, Spo2, Nibp, Temp, Co2, Rr, Ibp, St, Etc. - Cycle Intervals Of Trend Storage 1sec, 5sec, 10sec, 1min, 2min, 3min, 4 Min, 5min, 10min, 15min, 20min, 30min - Store & Reviewing: Ecg (30 Minutes), Alarm: 1800 Groups Alarm Events Reviewing - Nibp: 1000 Groups Nibp Measurement; Arrythmia: 128 Groups Date (8-second Ecg Waveforms) - Environment: Working Temp (0-5~+40c) - Transportation And Storage Temperature: 20~+55 °c - Relative Humidity: Working <85% - Transportation And Storage: <93% - Atmospheric Pressure: Working 860~1060 Hpa - Transportation And Storage: 500~1060 Hpa - Ecg Measurement With Support For 3, 5, And 12 Leads, Hr Range Of 10-15-300 Bpm, With Accurate St Segment Analysis And Customizable Gain Settings - Lead Selection: I, Ii, Iii, Avr, Avf, V1~v6 (option) - Gain: Auto, 0.25x, 0.5x. 1.0x, 2.0x, 4.0x Insulation Breakdown Voltage: 4000vac 56/60hz (optional) - Sweep Speed 12.5mm/s, 25mm/s, 50mm/s - Hr Range: 10-15~300-350 Bpm - Hr Accuracy +1% Or +-bpm Whichever Is Greater - St Segment: Measurement Range (2.0mv~2.0mv), Resolution 0.01 Mv - Resp: Impedance Variation Method Between Ra-la (r-f), Measurement Range: 0~120-150rpm, Accuracy +-2rpm, Gain X1, X2, X4, Sweep Speed 6.25mm/s, 12. 5mm.s, 25mm/s - Temp: Measurement Range (25.0-50.0 C), Unit: Celsius Or Fahrenheit, Accuracy (+-0.1 To +-1c) Exclusive Of Probe), Connecting Cable: Compatible With Ysi-400 Or Its Equivalent - Sp02: Measurement Range (0~100.0) - Accuracy: At70~100%,+-2% -pr Range 25-30~250 Bpm - Pr Accuracy +-1% Or +1 1-2 Bpm, Whichever Is Greater - Nibp: Automatic Oscillometry Technique, - Range: Neonate (10~135 Mmhg), Accuracy Static +-2% Or +-3-+-5% Mmhg, Whichever Is Greater, Unit: Mmhg, Kpa, Pulse Rate Range: 40~240 Bpm, Intervals For Auto Measurement: 1,2,3,4,5,10,15,20,30,45,60,90; Minutes 2. 4. Hrs. Connectors - 1 Ac Power Connector - 1 Rj45 Network Connector - 1 Or 2 Usb 2.0 Connectors - 1 Vga Output Connector - 1 Multifunctional Output Connector (output Ecg, Nurse Call, And Defib. Synch. Signals) Standard Accessories: - 12-lead Ecg Snap Connector Cable, Nibp Adult Cuff, With Tube And Connector, Ecg Electrode Disposable (10), Nellcor Sp02 Sensor, Finger Probe, Reusable With Cable, Temperature Probe For Skin Reusable, Lithium Battery, Recording Paper, User Manual Wall Bracket In Patient Monitor Per Unit Patient Monitor Wall Mount Workstation Hospital Bracket 180-360-degree Rotation With A Basket For Patient Monitor Accessories Central Monitoring System Wired - Centralized Monitoring System That Supports Remote Surveillance For Up To 30 Patients, With Customizable Display Options And Support For High-definition Viewing - Easily Adjust Which Patients Are Viewed On Each Display And The Acuity Of Their Monitoring With Highly Customizable Views - 1 Unit At Least 50 50-inch Smart Tv With Stand And Wall Brackets - 1-unit Branded Computer System With At Least I5-i7 Processor With 32gb Of Ram And A Dedicated Video Card. At Least 4gb Gddr5, 24 24-inch Monitor, And Other Accessories Needed - 1-unit Wireless Lan Adapter - 1-unit 16ports Gigabit Switch - 1-unit 2kva Ups With Avr - Sterilization Process For Accessories Chemical Sterilization - Noncorrosive Chemical/disinfectant Or Its Equivalent Consumables/reagents - 100 Rolls Of Thermal Paper - 20 Packs Of Electrodes 100’s Spare Parts Per Unit - 5pcs Spo2 Wrap Sensor Neonate - 20pcs Nibp Cuff With Bladder Neonate - 1 Pc Extra Nibp Tubing - 2 Patient Ecg Cables - 1 Pc Temperature Probe Sensor - (2) Two Sets Of Spare Fuses Per Unit (if Non-resettable Fuses Are Used). - 1 Pc Spare Ecg Patient Cable Per Unit With Electrodes - Spare Spo2 Sensor Reusable 2 Pcs Newborn - 3 Pcs Spare Nibp Bladder With Cuff - 1 Pack Of Disposable Ecg Electrodes Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning - Supplier To Perform Installation, Safety, And Operation Checks Before Handover - Supplier Should Shoulder All Electrical And Data Wiring - Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation - Electrical, Cable Wiring, And Other Consumables Should Be Shouldered By Supplier Training End Users & Biomedical/engineers O For Bio-medical: Offsite 6 Biomed Technician Comprehensive Offsite Training Theoretical And Advance Troubleshooting Training Of Users In Operation, Basic And Advanced Maintenance Including Fares, Accommodation, And Meals On-site Training And Orientation For Machine Handling And Operation Upon Installation. - Training Of Users In Operation And Basic Maintenance, And Calibration Shall Be Provided - Supplier To Issue Certificate Of Training - Advanced Maintenance Tasks Required Shall Be Documented." User Care - Unit Layout To Enable Easy Cleaning And Sterilization Of All Surfaces. Warranty And Maintenance - 3 Years Warranty Of Service With Quarterly Visit - 3 Years Warranty Of Parts - Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period - 10 Years Availability Of Parts And Maintenance, And Services - Maintenance Tasks: Every Quarterly Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu) 2 Operating Table Electric & Hydraulic Type Features And Benefits: All Purpose Operating Table With Electrohydraulic Drive And Doubled Mechanohydraulic Drive Combined With Additional Accessories Sets Allows Full Range Of Surgery Operations Double Drive Secures High Reliability And Pauseless Performance In Case On Emergency Technical Specifications - Leg Section Adjustment - Manual Or Gas Spring (acceptable Both) - Remote Control - (basic Remote) - Additional Remote Control – Optional - Stainless Steel Column Casing - Operating Position Activated By Pedal - Optional (preferably Remote Or Button) - Stainless Steel Base Cover - Or Equivalent Coated Finish - Mechanically Bending Dorsal Section - Manual Or Motorized Acceptable - Head Section Adjustment - Manual Or Gas Spring Operated - Dorsal Tilt - Remote Or Manual Adjustment - Emergency Button - Optional But Preferred - Mechanohydraulic Drive - Electric-hydraulic Or Full Electric Acceptable - Safe Working Load - Minimum 200–250kg - Weight - Max 270kg (standard) - Longitudinal Table Top Shift - Minimum 300mm (preferably Remote Controlled) Accessories Per Unit - Traction Device Arm – Optional - Extension Arm (pair) – Optional - Pelvic Support – Standard - Lower Limb Support (pair) – Standard - Imaging Arm Board (1 Pc) – Standard (radiolucent Preferred) - Standard Armboard (1 Pair) – Standard - Anesthesia Screen With Clamp – Standard Standard Accessories (required) - Standard Armboard With Pad - Anesthesia Screen L-type - Imaging Arm Board (radiolucent If Possible) - Clamp For Accessories - Chest & Waist Support Optional Orthopedic Accessories - Traction Device Set - Carbon Fiber Knee Rest - Direct Traction Hook - Accessory Cart For Traction 1 Unit Ups With Avr At Least 2000va Up Sterilization Process For Accessories - Chemical Sterilization- Non Corrosive Chemical / Disinfectant" - Consumables / Reagents Warranty And Maintenance Warranty: 3 Years Warranty Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period Requirements For Commissioning - Supplier To Perform Installation, Safety And Operation Checks Before Handover - Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation Manufacturer / Supplier Should Have Iso Certificate For Quality Standard. Electrical Safety Conforms To Standards For Electrical Safety Conforms To Iec-61010" Documentation Documentation Requirements - User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) - Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. - List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. - List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance - Certificate Of Calibration And Inspection To Be Provided. - List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost - Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided 3 Ecg Machine With Trolley Technical Characteristics Main Features - 12-lead Ecg Acquisition: Simultaneous 12-lead Acquisition For Comprehensive Cardiac Assessment. - Ai Interpretation: Utilizes Advanced Algorithms (e.g., Prague, Dxl) For Automated Interpretation, Enhancing Diagnostic Accuracy. - Diagnostic Display: High-resolution Color Touchscreen Display For Clear Visualization Of Ecg Waveforms. - Remote Control: Allows Remote Operation For Convenience And Infection Control. - Export To His: Seamless Integration With Hospital Information Systems For Efficient Data Management. - Barcode Reader: Facilitates Quick Patient Identification And Data Entry. - Battery Capacity: Sufficient Battery Life To Support Multiple Ecg Tests Before Recharging. - Examination Memory Capacity: Stores A Substantial Number Of Ecg Records For Easy Retrieval. Technical Parameters - Display: Touchscreen Interface For Intuitive Operation. - Keyboard: Combined Alphanumeric Keyboard And Touchscreen For Flexible Data Entry. - Battery Indicator: Audible And Visual Indicators For Low Battery Alerts. - Loose Lead Detection: Automatic Detection Of Disconnected Leads To Ensure Accurate Readings. - Paper Specifications: - Paper Size: Standard Size Compatible With Thermal Printers. - Paper Width: Typically, 210 Mm For Standard Ecg Paper. - Paper Type: Thermal-sensitive Paper For Clear, Long-lasting Prints. - Perforated Paper Dimensions: Standard Dimensions For Easy Handling. - Printer Resolution: Y-axis: 200 Dpi; X-axis: 500 Dpi For High-quality Prints. - Print Speed: Adjustable Speeds: 5, 10, 25, 50 Mm/s To Suit Clinical Needs. - Sensitivity Settings: Selectable: 2.5, 5, 10, 20 Mm/mv For Optimal Waveform Representation. - Lead Configuration: Standard Leads: I, Ii, Iii, Avr, Avl, Avf, V1–v6; Electrode Set: R, L, F, N, C1–c6. - Auto Mode Printing: Multiple Formats: 3, 4, 6, 12, 3x4+1, Etc., For Versatile Reporting. - Manual Mode Printing: Options: 3, 4, 6, 12 Leads For Customized Reports. - Long Mode Recording: Extended Recording Times: 1–10 Minutes For Detailed Analysis. - Record Length: - Auto Mode: Adjustable From 10 To 80 Seconds. - Long Mode: Up To 10 Minutes For Comprehensive Data Capture. - Saved Records: Stores Up To 100 Ten-second Ecg Recordings For Quick Access. Filters: - Adaptive Auto Filter: Automatically Adjusts To Minimize Artifacts. - Mains Filter: 50/60 Hz To Reduce Electrical Interference. - Muscle Filter: Selectable: 25, 35 Hz To Filter Out Muscle Noise. - Baseline Filter: Options: 3.2, 1.5, 0.6, 0.3, 0.1 Seconds For Baseline Correction. - Detection Capabilities: Includes Arrhythmia Detection, Pacemaker Detection, And Lead-off Detection. - User Profiles: Supports Unlimited User Profiles For Personalized Settings. Accessories Per Unit Standard Accessories: - 12-lead Patient Ecg Cable For Resting Ecg. - Reusable Chest Electrodes (suction Ball-type). - Extremity Clamps Reusable Electrodes. - Ecg Bag For Storage And Transport. Consumables: - Conductive Gel (2 Bottles). - Thermal Paper Rolls (5 Rolls). - Electrodes For Adults, Neonates, And Children. Spare Parts: - Spare Fuses (2 Sets). - Rechargeable Batteries. - Ecg Patient Cable With At Least 6 Leads. Other Components: - Transport Trolley With Lockable Casters. - Ups With Avr (at Least 1500va). - Adaptor If Needed. With Workstation - 1 Unit 24" Monitor - 1 Unit System Unit - Minimum 8-16 Processor (cpu) - Hdd: 1tb Or More - Memory: 16gb To 32gb Or More - Motherboard: Branded Ddr5 - Video Card: 4-8gb - Built-in Reporting Module (licensed Dicom Viewer) - 1 Unit Ups 2kva For Workstation - 1 Unit L-shape Table For Workstation - 1 Units Executive Table - 1-unit Dual Channel Speaker Software And Free License - Fully Assembled And Ready-to-install Ecg Machine. - Built-in Reporting Module (licensed Dicom Viewer). - No Expiration On Software License. Physical/chemical Characteristics - Mobility: Wheeled Trolley For Easy Transport. - Portability: Compact Design For Space-saving Storage. - Connection: Preferably Wired Patient Cable Connections For Reliability. Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning - Supplier To Perform Installation, Safety, And Operation Checks Before Handover - Supplier Should Shoulder All Electrical And Data Wiring - Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation - Electrical, Cable Wiring, And Other Consumables Should Be Shouldered By Supplier Warranty And Maintenance • 3 Years Warranty Of Service With Semi-annual Visit • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period 10 Years Availability Of Parts And Maintenance, And Services Maintenance Tasks: Every Semi-annual Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu) 4 Vital Sign Monitor "purpose Of Use; Vital Signs Monitor Is Available In Configurations With Your Choice Of Spo2, Nibp And Temperature. The Portable Monitor Has Multi-parameter Functionality Suited For Out-patient Care And Doctor's Offices." Department: Hospital Main Features - Quick Temp Technology: Measures Body Temperature In Approx. 10–15 Seconds - 5.7 To 6.0-inch High-resolution Lcd Or Tft Color Display (640×480 Resolution Or Higher) - Flexible Configuration: Supports Ecg (if Applicable), Spo₂, Nibp, Pulse Rate, And Temperature - Portable Design, Lightweight (3–5 Kg) - Built-in Rechargeable Lithium-ion Battery With At Least 8–10 Hours Of Continuous Operation - Trend Table Display: Real-time Display With Data Trend Review For Minimum 8 Hours - Nurse Call Function With Programmable Alarm Limits - Bi-directional Communication With Central Station (wired Or Wireless Network Capability) - Suitable For Adult, Pediatric, And Neonatal Use - Optional Recorder With 48 Mm Width Printing Capability Technical Specifications Parameter Specification - Display 5.7–6.0-inch Lcd / Tft, Color Screen (640×480 Or Better) - Dimensions (l×w×h) Approx. 200–250 Mm (l) × 240 Mm (h) × 180–190 Mm (d) - Weight 3–5 Kg - Power Input 100–240 Vac, 50/60 Hz, ≤ 70 Va - Battery Type Lithium-ion, 14.8v Dc, ≥ 4400 Mah - Battery Run Time ≥ 8 Hours Continuous Monitoring - Charging Time < 6 Hours - Recorder Optional, 48 Mm Print Width Communication Ports Usb, Optional Lan/wifi (if Available) Internal Storage Stores Minimum Of 12,000 Groups Of Nibp Data Monitoring Parameters - Ecg (if Applicable): Standard 3/5 Lead Ecg Waveform With Alarm And Trend Storage - Spo₂: With At Least 2-year Sensor Warranty, High-accuracy Digital Processing - Nibp: Auto/manual/continuous Modes, Adjustable Intervals - Temperature: Quick-response, Digital Sensor (ear Probe Or Skin) - Pulse Rate: Derived From Spo₂ Or Nibp Functionality And Features - Real-time Waveform Display (spo₂, Ecg, Respiration If Applicable) - Audible And Visual Alarms For All Parameters With Adjustable Limits - Touchscreen/touchpad Interface (if Available) - Storage Of Patient Data For Trend Review - Supports Adult, Pediatric, And Neonatal Profiles Standard Accessories (per Unit) - 1 × Adult Nibp Cuff (washable) - 1 × Pediatric Nibp Cuff (washable) - 1 × Neonatal Nibp Cuff (washable) - 1 × Adult Spo₂ Sensor - 1 × Pediatric Spo₂ Sensor - 1 × Neonatal Spo₂ Sensor - 1 × Ecg Cable (if Applicable) - 1 × Thermometer Probe Or Sensor - 1 × Set Of Ear Thermometer Tips (20 Boxes Of 10 Pcs/box) Other Components (per Unit) - 1 × Transport Trolley With Basket - 1 × Ups With Avr (at Least 1000va) - 1 × Extension Wire, 5 Meters (standard Outlet Type) - 1 × Free Software & License (lifetime Use) - 1 × Adaptor If Required For Operation Notes Must Comply With Relevant Medical Safety Standards (e.g., Iec 60601) After-sales Support Must Be Available Locally Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Supplier Should Shoulder All Electrical And Data Wiring *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation *** Electrical, Cable Wiring, And Other Consumables Should Be Shouldered By Supplier Warranty And Maintenance • 3 Years Warranty Of Service With Semi-annual Visit • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period 10 Years Availability Of Parts And Maintenance, And Services Maintenance Tasks: Every Semi-annual Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu) 5 Infusion Syringe Pump Specification(s): Users Friendly - Compact And Light Weight Design For Easy Carrying And Mounting - One Hand Operation” And Intuitive Keypad - Long Runtime Battery, For Emergency And Transfer, And Saves Electrical Sockets General Features - Compact And Lightweight Design For Easy Carrying And Mounting (max Weight: ≤1.8kg) - One-hand Operation And Intuitive Keypad/touch Interface - Supports Multiple Syringe Sizes: 5ml, 10ml, 20ml, 30ml, 50/60ml - Automatic Syringe Size Recognition - Preset Support For At Least 8 Syringe Brands (e.g., Bd, B. Braun, Terumo) - Self-test System With Auto-calibration - Long-life Rechargeable Lithium Battery, At Least 6 Hours @ 5ml/h, Optional Up To 12 Hours - Suitable For Adult, Pediatric, And Neonatal Patients - Includes Handle And Pole Clamp For Vertical Or Optional Horizontal Mounting - Built-in Alarm System With 8 Levels Adjustable Volume - Titration, Pause, And Keypad Lock Functions For Secure Operation - Includes History/event Memory: Minimum 1500 Events - Support For Nurse Call, Rs232, Wi-fi (optional), Dc Input, And Ambulance Use (en-1789 Compliant) Infusion Modes & Parameters Modes: Rate Mode, Time Mode, Body Weight Mode - Flow Rate Range: ▪ 5ml Syringe: 0.1–150 Ml/h ▪ 10ml Syringe: 0.1–300 Ml/h ▪ 20ml Syringe: 0.1–600 Ml/h ▪ 30ml Syringe: 0.1–900 Ml/h ▪ 50/60ml Syringe: 0.1–1500 Ml/h - Bolus/purge Rate: Up To 1500 Ml/h (based On Syringe Size) - Accuracy: ▪ Flow ≥1 Ml/h: ≤ ±2% ▪ Flow <1 Ml/h: ≤ ±3% - Kvo Rate: Adjustable, 0.1–5.0 Ml/h - Vtbi (volume To Be Infused): 0.1–9999 Ml (increment: 0.1 Ml) - Accumulated Volume: 0.1–9999 Ml Display & Interface - 3.0” Lcd Screen Or Better, Monochrome Or Color - Resolution: At Least 240 × 128 Pixels - Clear Real-time Flow Data And Pressure Display - Display Alarm History And Last Configuration Alarms & Safety Audible And Visual Alarms For: ▪ Vtbi Done / Near Done ▪ Kvo Finished ▪ Syringe Empty / Near Empty / Disengaged ▪ Occlusion (low/medium/high Sensitivity Selectable) ▪ Low Battery / Ac Disconnected ▪ System Errors Or Abnormalities Occlusion Pressure Levels: ▪ Low: ~300±75 Mmhg ▪ Medium: ~525±75 Mmhg ▪ High: ~900±135 Mmhg - Anti-bolus Protection - Safety Classification: Cf, Class I, Ip Grade ≥ Ip24 Connectivity & Expansion - Docking Station Support (optional Or Included) - Rs232 Port, Wi-fi (optional) - Supports Communication With Hospital His/cis (optional) - Optional Drug Library With At Least 200 Drugs - Multi-language Support (minimum 5 Languages Including English) Power Supply - Input: 100–240v Ac, 50/60hz - Battery: Rechargeable Lithium-ion - Runtime: At Least 6 Hours @ 5ml/h - Charging Time: <5 Hours Environmental Conditions - Operating Temp: 0–40°c - Storage Temp: -40–70°c Humidity: ▪ Operating: 15–95% ▪ Storage: 10–95% Atmospheric Pressure: ▪ Operating: 57–106 Kpa ▪ Storage: 50–106 Kpa Standard Accessories Per Unit - 1 × Power Adapter - 1 × Pole Clamp - 1 × Operator’s Manual - 1 × Rechargeable Battery (pre-installed) Optional: Transport Trolley After-sales Support Must Be Available Locally Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Supplier Should Shoulder All Electrical And Data Wiring *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation *** Electrical, Cable Wiring, And Other Consumables Should Be Shouldered By Supplier Warranty And Maintenance • 3 Years Warranty Of Service With Semi-annual Visit • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period 10 Years Availability Of Parts And Maintenance, And Services Maintenance Tasks: Every Semi-annual Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu 6 Stretcher Hydraulic Type Department: Hospital Features - Load Capacity: Minimum 250 Kg (550 Lbs) - Full-length X-ray Translucent Platform For Imaging Compatibility - Hydraulic Actuators With Protective Dust Cover - Backrest Adjustable Via Gas Spring Assist - Knee Gatch Adjustable Via Manual Stowable Crank - Collapsible Side Rails For Patient Transfer And Access - Side Rails Lock Securely In Upright Position For Patient Safety - Integrated Storage Compartment At Base For E-cylinder Oxygen Tanks And Personal Belongings - Dual Brake Pedals Located At Both Head And Foot Sections - 200 Mm (8”) Swivel Castors With Central Locking System - Retractable 125 Mm (5”) Fifth Wheel For Enhanced Maneuverability - Dual Side-mounted Foot-operated Hydraulic Control Pedals - Supplied With Removable, Telescoping Iv Pole - Built-in Ergonomic Push Handles, Foldable For Storage - Equipped With Shock-absorbing Roller Bumpers - Designed For Use In Emergency Rooms, Recovery, Pre-operative, And Post-operative Areas Technical Specifications - Functions: Backrest, Knee Rest, Height Adjustment, Trendelenburg, Reverse Trendelenburg - Overall Dimensions (l × W × H): 2130 × 820 × 590 Mm (84” × 32” × 23”) - Height Adjustment Range: 590 Mm – 910 Mm (23” – 36”) - Backrest Adjustment Range: 0° – 80° - Footrest Adjustment Range: 0° – 35° - Trendelenburg Angle: 0° – 15° - Reverse Trendelenburg Angle: 0° – 15° - Castor Diameter: 200 Mm (8”) - Maximum Load Capacity: 250 Kg (550 Lbs) Optional / Included Accessories - Telescoping Iv Pole - Oxygen Tank Holder - Mattress (waterproof, Fire-retardant, Anti-bacterial – Optional/specify Separately) Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation Warranty And Maintenance • 3 Years Warranty Of Service With Annual Visit • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period - 10 Years Availability Of Parts And Maintenance, And Services Maintenance Tasks: Every Annual Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu 7 Laryngoscope, Adult Purpose Of Use; A Laryngoscopy Is A Procedure Healthcare Providers Use To Examine Your Larynx (voice Box). This Is Performed With A Laryngoscope, A Thin Tube With A Light, Lens And A Video Camera That Helps Providers Look Closely At Your Larynx. Construction & Features - Cylindrical, Single-piece Handle With Anti-slip Ribbed Design, Diameter ≥15 Mm - Handle Supports Interchangeable Blades Of Various Sizes (macintosh And/or Miller) - Integrated On/off Switch On Handle - Handle Constructed From Non-ferrous, Corrosion-resistant Material - Handle Sealed To Resist Liquid Ingress (splash-proof) - Equipped With White Led Light Source - Uses Fiber Optic Technology To Transmit Light To Blade Tip - Stud-contact System Compatible With Iso 7376 (green System) - Blades Are Made Of High-quality Stainless Steel, Fully Autoclavable - Designed For Reusable Use In Clinical And Operating Room Settings Technical Characteristics - Handles (may Include Any Of The Following): Medium Handle: Compatible With Macintosh Blade Sizes 00–5 - Penlite Handle: Miller Size 4 - Overall Length: 205 Mm - Inside Base To Tip: 183 Mm - Stubby Handle: Miller Size 3 - Overall Length: 195 Mm - Inside Base To Tip: 173 Mm - Blades: Minimum Of 2 Stainless Steel Blades Included (macintosh And/or Miller) - Must Be Autoclavable At ≥134°c Sterilization Standard Accessories (included Per Unit) - 1 Pc Spare White Led Bulb Per Blade - 1 Set Rechargeable Battery (c Or D Format) And Charger Consumables (included Per Unit) - 1 Pc Spare White Led Bulb Per Blade - 2 Sets C Or D Size Batteries Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation Warranty And Maintenance • 3 Years Warranty Of Service • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period - 10 Years Availability Of Parts And Maintenance, And Services Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu 8 Laryngoscope, Pedia Purpose Of Use: A Laryngoscopy Is A Procedure Healthcare Providers Use To Examine Your Larynx (voice Box). This Is Performed With A Laryngoscope, A Thin Tube With A Light, Lens And A Video Camera That Helps Providers Look Closely At Your Larynx. Features And Materials - Cylindrical Handle, Single-piece, Ribbed Design, Diameter >15 Mm - Handle Must Accept Interchangeable Blades Of Various Sizes (macintosh And Miller) - Equipped With Robust On/off Switch - Made From Non-ferrous Metal, Sealed Against Ingress Of Fluids - Integrated Led Light Source (white Light) - Fiber Optic Light Transmission From Handle To Blade Tip - Uses Stud-contact System, Compliant With Iso 7376 (green Standard) - Blades Must Be High-grade Stainless Steel And Autoclavable Blade Types And Dimensions Miller Blade Lengths (straight Type): Size Length 00 45 Mm 0 55 Mm 1 80 Mm 2 130 Mm 3 170 Mm 4 180 Mm Macintosh Blade Lengths (curved Type): Size Length 0 80 Mm 1 92 Mm 2 116 Mm 3 135 Mm Handle Compatibility - Handle Type Compatible Blade Sizes - Medium Macintosh Sizes 0–4 - Penlite Miller Sizes 0–6 - Stubby Miller Sizes 0–3 Accessories (per Unit) - 3 Pcs Spare White Led Bulbs Per Blade - 1 Set Rechargeable Battery (c Or D Size) - 4 Battery Chargers (compatible With Included Battery Format) Sterilization & Reuse - All Blades And Handles Must Be Autoclavable At ≥134°c - Reusable Components Must Withstand Routine Clinical Sterilization Cycles Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation Warranty And Maintenance • 3 Years Warranty Of Service • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period - 10 Years Availability Of Parts And Maintenance, And Services Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu 9 Mechanical Bed (4 Cranks) Specification: Frame & Structure - Bed Frame: Heavy-duty Mild Steel (ms), Treated With Electrophoresis And Powder Coating For Corrosion Resistance - Platform: Ms Perforated Platform With Ventilation Holes For Airflow - Head & Footboards: Detachable With Easy Lock, Made Of Abs Or Stainless-steel Laminated Panels - Side Rails: Collapsible Metal Or Aluminum Alloy, Minimum Of 2 Pieces - Cranks: 4 Pieces (manual Chrome-plated Or Electric Motorized System) - Castors: 125 Mm Diameter, Four Pieces, With Central Brake System - Corner Bumpers: Shock-absorbing Bumper Castors On All 4 Corners - Manual Cpr Release: Available On Both Sides (for Models With Electric Systems) Adjustable Functions - Backrest Adjustment: 0° To ≥75° - Knee Section Adjustment: 0° To ≥40° - Height Range (high–low): 520–750 Mm (manual Or Motorized) - Trendelenburg Position: 0° To ≥12° Reverse Trendelenburg Position: 0° To ≥12° - Safe Working Load: Minimum 225 Kg (495 Lbs) Dimensions - Overall Size (l X W X H): Approx. 2160 X 1100 X 520 Mm - Lying Surface: Minimum 2000 X 900 Mm Standard Accessories (included Per Unit) - Head & Foot Boards: 2 Pieces - Side Rails: 2 Pieces - Crank Handles Or Motor System: 4 Cranks Or Equivalent Motorized Functions - Mattress Platform Panels: 4 Ms Ventilated Boards - Castors: 4 Heavy-duty Medical Castors With Locking System - Iv Pole: 1-piece, Adjustable Height, Telescopic - Iv Pole Holders: 4 Pieces - Drainage Bag Holders: 2 Pieces Materials & Durability - All Materials Must Be Antimicrobial-coated Or Easy To Clean And Disinfect - Autoclavable Or Wipe-disinfectant Compatible Materials Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation Warranty And Maintenance • 3 Years Warranty Of Service • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period - 10 Years Availability Of Parts And Maintenance, And Services Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu 10 Defibrillator Machine 4 In 1 Specifications: Simple To Use: Speed Up Response Times Even Further With Easy-to Use Controls And Intuitive Features Key Functions & Features - Manual Defibrillation With Biphasic Waveform And Energy Selection From 1 To 360 Joules - Synchronized Cardioversion For Atrial Fibrillation Asynchronous Mode For Ventricular Fibrillation - Aed Mode With Automatic Rhythm Analysis And Voice/text Guidance - Non-invasive Pacing: Fixed And Demand Mode, Adjustable Rate And Output - Patient Monitoring: Ecg (3/5 Leads), Nibp, Spo2, Etco₂, Respiration - Quick Boot Time: Power-on In ≤2 Seconds - Fast Charging: 200j In ≤3 Seconds; 360j In ≤7 Seconds - Rapid Ecg Recovery: ≤2.5 Seconds’ Post-shock - Data Storage: - 24h Ecg Waveform - 72h Trend Analysis - 1000 Events / 100 Patient Profiles - Voice Recording (180 Minutes) - Export Via Usb - Shock Delivery: Via Paddles Or Adhesive Electrode Pads (adult And Pediatric) - Adult/pediatric Mode Switching: With Automatic Parameter Adjustment - User Interface: Manual Defibrillation In 1-2-3 Steps (select Energy, Charge, Shock) Display - Type: Tft Color Lcd - Size: At Least 7 Inches - Resolution: Minimum 800 × 480 Pixels - Waveform Display: At Least 3 Channels Simultaneously - Wave Viewing Time: Max 16 Seconds (ecg) Defibrillator Specification - Waveform: Biphasic Truncated Exponential, Impedance Compensated - Output Energy (manual Mode): 1–360 Joules - Charge Time: ≤3 Seconds To 200j ≤7 Seconds To 360j - Ecg Recovery: ≤2.5 Seconds - Shock Delivery: Via Paddles Or Pads - Patient Impedance Range: 25 To 300 Ohm - Aed Mode: - Energy: 100–360j, User Configurable - Compliant With Aami Df-80 And Aha 2015 Guidelines - Cpr Mode: 1-channel Ecg Monitoring With Voice Guidance - Synchronized Cardioversion Delay: ≤60 Ms From R-wave Non-invasive Pacing - Waveform: Monophasic - Pacing Mode: Demand / Fixed - Rate: 30 To 210 Ppm - Output: 0 To 200 Ma - Pulse Width: 20 / 40 Ms - 4:1 Mode: Available For Rhythm Assessment Patient Monitoring - Ecg Monitoring - Leads: 3-lead Or 5-lead - Heart Rate Range: Adult: 15–300 Bpm Pediatric/neonate: 15–350 Bpm - Spo₂ (pulse Oximetry) - Range: 0 To 100% - Pr Range: 20 To 300 Bpm - Nibp Modes: Manual, Auto, Stat - Range: 0 To 300 Mmhg - Default Cuff Pressure: - Adult: 160±5 Mmhg - Pediatric: 140±5 Mmhg - Neonate: 90±5 Mmhg Etco₂ - Range: 0–150 Mmhg - Awrr Range: 0–150 Rpm - Respiration - Method: Trans-thoracic Impedance - Range: 0–200 Rpm Power Supply - Ac Input: 100–240v~, 50/60hz - Battery: Rechargeable Lithium-ion, ≥5600mah - Battery Operation: - ≥2.5 Hrs Monitoring - ≥100 Shocks - ≥2 Hrs Pacing - Charging Time: 90% In ≤3 Hrs 100% In ≤4 Hrs (power Off) Connectivity & Data - Wi-fi (2.4g / 5g) - Data Export Via Usb - Dicom / Hl7 Worklist Compatible - Ihe Protocol Support For Integration With Hospital Systems Physical & Safety - Ip Rating: At Least Ip44 (dust/water Resistant) - Drop Test: Withstands Drop From 0.75 M - Weight: Portable / Compact (<6.5 Kg Typical) - Mounting: Compatible With Wall Mounts, Trolleys, Or Bed Rails Standard Accessories - External Paddles (adult And Pediatric) - Multifunction Defib Pads (adult And Pediatric) - Ecg Cable (5-lead) - Spo₂ Cable And Sensor - Nibp Cuff Sets (adult, Pediatric, Neonatal) - Co₂ Module (if Included) - Bed Rail Hook - Integrated Trolley With Basket - 3kva Ups (medical Grade) Consumables (per Unit) - 2 Packs Ecg Electrodes (100 Pcs Each) - 2 Bottles Ultrasound Gel Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** For Bio-medical: 2 Biomed Technician Comprehensive Offsite Training Theoretical And Advance Troubleshooting Training Of Users In Operation, Basic And Advanced Maintenance Including Fares, Accommodation, And Meals *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Supplier Should Shoulder All Electrical And Data Wiring *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation *** Electrical, Cable Wiring, And Other Consumables Should Be Shouldered By Supplier Warranty And Maintenance • 3 Years Warranty Of Service With Semi-annual Visit • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period 10 Years Availability Of Parts And Maintenance, And Services Maintenance Tasks: Every Semi-annual Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu 11 Operating Light (dual Head Light With Camera And Monitor Purpose Of Use: Mobile Led Portable Surgical Light Consists Of The Light Source And Light Frame. It Is Expected To Be Used For Surgical Auxiliary Illumination. Not Limited By The Surgical Site, Easy To Move. General Features And Benefits: - Dual-head Configuration For Full Surgical Field Coverage - Mobile Or Ceiling-mounted System (configurable) - Integrated Hd Camera And Monitor For Video Documentation And Remote Viewing - Smooth And Flexible Arm Movement For Easy Positioning And Secure Fixation - Bright, Shadow-free Illumination Of Surgical Area - Natural Color Rendering With High Contrast For Detailed Wound Visualization - Multi-stage Focusing System For Adjustable Field Diameter - Adjustable Brightness With At Least 10 Levels Integrated Battery Backup With Up To 5 Hours Of Operation During Power Failure - Long-life, Energy-efficient Led Bulbs With Minimal Heat Output - Easy To Clean And Disinfect Surfaces For Optimal Hygiene - Low Maintenance And Energy Cost Design Technical Specifications - Configuration: Dual-head With Integrated Full Hd Camera And Monitor - Mounting Type: Mobile, Ceiling, Or Wall-mounted (as Required) - Light Source: High-efficiency Led - Power Supply: 230v Ac, 50/60hz - Battery Backup: Built-in Battery, Minimum 5 Hours Of Backup - Color Rendering Index (cri): ≥96 - Illumination Intensity At 1m: Adjustable From 100,000 Lux To 300,000 Lux - Color Temperature: Fixed Or Adjustable; Average 4,500 K - Led Lifetime: ≥50,000 Hours - Focusing: 4-stage Manual Or Motorized Focusing System - Brightness Control: 10-step Or Stepless Dimming Control - Camera Resolution: Full Hd (minimum 1080p, 60 Fps) - Monitor Size: Minimum 21 Inches, Full Hd Or Better - Camera Functions: Zoom, Pan, And Record; Optional Wireless Or Wired Video Streaming - Control Panel: Digital Touch Or Membrane Type - Noise Level: ≤40 Db Physical / Chemical Characteristics - Material: Medical-grade Aluminum Or Plastic Casing With Antimicrobial Coating - Surface: Smooth, Non-porous, Autoclavable Where Applicable - Cooling System: Passive Or Active Cooling To Avoid Overheating - Ups Requirement: 1 Unit – Ups 2kva (included) - Avr Requirement: 1 Unit – Avr 2kva (included) Accessories And Components (per Unit) - Integrated Full Hd Camera (with Zoom/focus Functions) - Full Hd Monitor With Adjustable Mounting Arm - Bed Rail Hook Or Ceiling Attachment System - 2 Pcs Spare Fuses - 1 Pc Ups 2kva - 1 Pc Avr 2kva - Wall Bracket Or Mobile Trolley (depending On Model) - Sterilizable Handles And Camera Cover - User Manual And Warranty Certificate Consumables / Spare Parts (per Unit) 2 Sets Of Spare Fuses Sterile Camera Lens Covers Sterile Handle Covers Optional: Remote Control For Camera Adjustment Replacement Led Modules (if Applicable) Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** For Bio-medical: 2 Biomed Technician Comprehensive Offsite Training Theoretical And Advance Troubleshooting Training Of Users In Operation, Basic And Advanced Maintenance Including Fares, Accommodation, And Meals *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Supplier Should Shoulder All Electrical And Data Wiring *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation *** Electrical, Cable Wiring, And Other Consumables Should Be Shouldered By Supplier Warranty And Maintenance • 3 Years Warranty Of Service With Semi-annual Visit • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period - 10 Years Availability Of Parts And Maintenance, And Services Maintenance Tasks: Every Semi-annual Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu 12 Infusion Pump Purpose Of Use: The Need For Additional Infusion Pump In Surgical Intensive Care Unit Since The Area Only Have 5 Existing Infusion Pumps Used By The Ward And Icu As Well. An Infusion Pump Is A Medical Device That Delivers Fluids Such As Nutrients And Medications, Into A Patient's Body In Controlled Amounts." General Features - Microprocessor-controlled Infusion Pump - High-accuracy And Continuous Infusion - For Adult, Pediatric, And Neonatal Use - Equipped With Anti-bolus, Occlusion Detection, And Air-in-line Detection - Multiple Infusion Modes (rate, Time, Body Weight, Loading Dose, Sequential) - Drug Library With Dose Error Reduction System (ders) - Adjustable Kvo (keep Vein Open) And Bolus Settings - Led Or Lcd Screen (min. 3.5” Color Display) Infusion Parameters - Flow Rate Range: 0.1 – 2000 Ml/h (increment: 0.01 Ml/h) - Vtbi (volume To Be Infused): 0.1 – 9999.99 Ml - Bolus Rate: 0.1 – 2000 Ml/h - Kvo Rate: 0.1 – 5 Ml/h - Air Bubble Detection: 6-level Sensitivity (min. 20 Μl) - Occlusion Pressure Levels: Adjustable From 75 To 975 Mmhg (max Pressure Up To 1170 Mmhg) - Infusion Accuracy: ±5% With Standard Infusion Sets Safety Features - Intelligent Occlusion Management With Visual Pressure Graph - Air-in-line Detection With Auto-stop - Alarm System (visual + Audible) For Occlusion, Air Bubble, Empty Iv, End Infusion, And Battery Low - Automatic Anti-bolus Release - Event History Storage: Minimum 1000 Infusion Events - Nurse Call And Rs232 Interface (optional) Display And Interface - Display Type: Color Lcd (min. 480 X 272 Pixels) - Control: Soft-touch Buttons Or Dial-type Selector - Status Indicators: For Running, Bolus, Kvo, Pause, Standby, And Alarm Modes - Language: English (configurable) Power And Battery - Power Supply: Ac 100–240v, 50/60hz - Battery Type: Rechargeable Lithium Battery - Battery Capacity: ≥ 4 Hours Continuous Operation At 25 Ml/h - Charging Time: ≤ 6 Hours From Low Battery To Full Accessories And Compatibility - Compatible With Iso 8536-4 Infusion Sets (3.0–4.5 Mm Diameter) - Drop Sensor And Drip Rate Mode (10–60 Drops/ml) - Wall Mount Clamp Or Pole Clamp (included) - Power Cord, User Manual, And Starter Pack Of Infusion Sets Optional Features (preferred But Not Required) - Integration With Patient Monitor Via Data Port - Support For External Usb/sd Card Data Export - Drug Library (min. 50 Programmable Drugs) Training, Installation And Utilisation Pre-installation Requirements Requirements For Commissioning *** For Bio-medical: 3 Biomed Technician Comprehensive Offsite Training Theoretical And Advance Troubleshooting Training Of Users In Operation, Basic And Advanced Maintenance Including Fares, Accommodation, And Meals *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Supplier Should Shoulder All Electrical And Data Wiring *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of Installation *** Electrical, Cable Wiring, And Other Consumables Should Be Shouldered By Supplier Warranty And Maintenance • 3 Years Warranty Of Service With Semi-annual Visit • 3 Years Warranty Of Parts • Maximum Of Two Working Days Response Time For Every Technical Service Call Within The Warranty Period - 10 Years Availability Of Parts And Maintenance, And Services Maintenance Tasks: Every Semi-annual Preventive Maintenance Documentation Documentation Requirements *** User, Technical, And Maintenance Manuals To Be Supplied In English Language (3 Copies Each) *** Supplier To Describe Any Materials Contained In The Device That Are Classified As Hazardous Under Local Regulations. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. *** List To Be Provided Of Equipment And Procedures Required For Local Calibration And Routine Maintenance *** Certificate Of Calibration And Inspection To Be Provided. *** List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost *** Contact Details Of The Manufacturer, Supplier, And Local Service Agent To Be Provided Decommissioning Estimated Life Span: 10 Years Life Span Safety And Standards Risk Classification Class B (ghtf Rule 10); Class Ii; Class Ii International Standards Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada, And Eu
Closing Date3 Jun 2025
Tender AmountPHP 11 Million (USD 189.6 K)

Province Of South Cotabato Tender

Electronics Equipment...+2Machinery and Tools, Electrical and Electronics
location
Philippines
Details: Description Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 30 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 25 - 0089 February 11, 2025 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than February 20, 2025 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Quotation By Lot Item No. Item & Description Qty. Unit Of Total Cost Issue Unit Cost 1 Job Order , Labor And Materials For The Repair, Installation And Replacement Lot Of Various Defective Parts Of Ambulance Vehicle Toyota Hi-ace With Plate No. 1201-488845 (property No. 480025) Description Of Work: • Replacement Of Wiper Blade, Rear Shock Absorber, Front Shock Absorber, 12v Blinker Assy, Atf Oil, Coolant And Brake Fluid • Installation Of Car Tint, Cabinet Holder, Oxygen Holder And Front Bumper Materials: • 1 Set Wiper Blade • 1 Set Rear Shock Absorber • 1 Set Front Shock Absorber • 1 Set 12v Blinker Assy • 4 L Atf Oil • 12 L Coolant • 3 L Brake Fluid • 1 Unit Car Tint • 1 Unit Front Bumper • 1 L ½’’ Stainless Steel 1 2 Job Order , Labor And Materials For The Replacement Of Wiper Blade, Clutch Lot Set And Release Concentric Cylinder Assy Of Service Vehicle Mitsubishi Strada With Plate No. B4j265 (property No. 410217) Labor: • Replacement Of Wiper Blade, Clutch Set And Release Concentric Cylinder Assy Materials Needed: • 1 Set Wiper Blade • 1 Set Clutch Set (disc And Pressure Plate) • 1 Unit Release Concentric Cylinder Assy 1 3 Job Order , Labor And Materials For The Replacement Of Wiper Blade, General Lot Overhauling And Reconditioning Of Garbage Dump Truck With Plate No. 1226-106460 (property No. 480011) Labor: • Replacement Of Wiper Blade • General Overhauling And Reconditioning 1 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-shainalyn; Pr.no.25 - 0110a Page 1 Of 7 Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 30 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 25 - 0089 February 11, 2025 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than February 20, 2025 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Quotation By Lot Item No. Item & Description Qty. Unit Of Total Cost Issue Unit Cost Materials Needed: • 1 Set Wiper Blade • 1 Set Overhauling Gasket • 1 Set Piston Assy • 1 Set Piston Ring Std • 1 Set Liner Std • 1 Set Main Bearing Std • 1 Set Connecting Rod Bearing Std • 1 Set T-washer • 2 Pcs Radiator Hose (upper/lower) • 1 Pc Air Filter • 1 Pc Alternator Hose (pressure Line) • 1 Pc Alternator Hose (return) • 4 Pcs Injector Nozzle Kit • 1 Pc Clutch Disc Assy • 1 Pc Release Bearing • 1 Pc Pilot Bearing • 2 Pcs Engine Support • 2 Pcs Transmission Support • 1 Set Alternator Belt • 1 Pc Water Pump Assy 4 Job Order , Labor And Materials For The Repair And Replacement Of Various Lot Defective Parts Of Ambulance Vehicle Toyota Hi-ace With Plate No. Yb 3001 (property No. Tf001) Labor: • Replacement Of Brake Pad, Brake Shoe, Clutch Master Assy, Wiper Blade And Floor Matting Materials Needed: • 2 Sets Brake Pad • 2 Sets Brake Shoe • 1 Set Clutch Master Assy • 1 Set Wiper Blade • 4 Mtrs Floor Matting 1 5 Job Order , Labor And Materials For The Replacement Of Wiper Blade And Lot Installation Of Various Parts Of Service Vehicle Isuzu Dmax With Plate No. D3h559 (property No. 411057) 1 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-shainalyn; Pr.no.25 - 0110a Page 2 Of 7 Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 30 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 25 - 0089 February 11, 2025 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than February 20, 2025 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Quotation By Lot Item No. Item & Description Qty. Unit Of Total Cost Issue Unit Cost Labor: • Installation Of Rain Visor, Seat Cover, Back Rest And Steering Wheel Cover • Replacement Of Wiper Blade Materials Needed: • 1 Set Rain Visor • 1 Set Seat Cover (black Leather) • 1 Pc Back Rest • 1 Pc Steering Wheel Cover (leather) • 1 Set Wiper Blade 6 Job Order , Labor And Materials For The Repair And Replacement Of Various Lot Defective Parts Of Service Vehicle Toyota 2l 4x2 Pick-up With Plate No. Sgl 795 (property No. 410124) Labor: • Replacement Of Cross Joint, Center Bearing, Tail Light, Wiper Blade, Starter Magnetic Switch And Auxiliary Fan Materials Needed: • 3 Pcs Cross Joint • 1 Pc Center Bearing • 1 Set Tail Light • 1 Set Wiper Blade • 1 Pc Starter Magnetic Switch • 2 Pcs 12v Auxiliary Fan 1 7 Job Order , Labor And Materials For The Transmission Overhauling, Installation Lot Of Floor Matting And Replacement Of Various Defective Parts Of Service Vehicle Toyota Hilux With Plate No. Sfm 912 (property No. 411063) Labor: • Transmission Overhauling • Installation Of Floor Matting • Replacement Hydrovac W/ Brake Master Assy, Rear Wheel Cylinder Brake, Front Brake Caliper Kit, Brake Caliper Piston Assy (l/r), Clutch Master Assy, Clutch Booster Assy, Door Lock Remote System, Wiper Blade, Front Hood Lock Kit, Power Window Motor Assy, Aircon Vent Duct, Door Rubber Seal & Rear Camper Shield Sealant 1 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-shainalyn; Pr.no.25 - 0110a Page 3 Of 7 Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 30 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 25 - 0089 February 11, 2025 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than February 20, 2025 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Quotation By Lot Item No. Item & Description Qty. Unit Of Total Cost Issue Unit Cost Materials Needed: • 1 Pc Main Drive Bearing • 1 Pc Rear Main Drive Bearing • 1 Pc Center Bearing • 2 Pcs Counter Gear Bearing • 1 Pc Oil Seal (front Main Drive) • 1 Pc Oil Seal (rear Main Drive) • 2 Pcs Alpha Grey • 1 Pc Transfer Case Oil Seal • 4 Pcs Bearing (transfer Case 4x4) • 1 Pc Center Oil Seal (4x4) • 2 Gal Gear Oil • 4 M Spaghetti Matting (grey) • 1 Set Hydrovac W/ Brake Master Assy • 2 Pcs Rear Wheel Cylinder Brake • 1 Set Front Brake Caliper Kit • 1 Set Brake Caliper Piston Assy (l/r) • 1 Pc Clutch Master Assy • 1 Pc Clutch Booster Assy • 1 Unit Door Lock Remote System • 1 Set Wiper Blade • 1 Set Front Hood Lock Kit • 1 Pc Power Window Motor Assy • 1 Set Aircon Vent Duct • 1 Set Door Rubber Seal • 1 Unit Rear Camper Shield Sealant 8 Job Order , Labor And Materials For The Installation Of Seat Cover And Floor Lot Matting And Replacement Of Various Defective Parts Of Ambulance Vehicle Nissan Nv350 With Plate No. F21950 (property No. 480020) Labor: • Replacement Of Wiper Blade, Wiper Washer Sensor And Coolant • Installation Of Seat Cover And Floor Matting Materials Needed: • 1 Set Wiper Blade • 1 Pc Wiper Washer Sensor • 1 L Coolant • 1 Set Seat Cover (black Leather) 1 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-shainalyn; Pr.no.25 - 0110a Page 4 Of 7 Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 30 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 25 - 0089 February 11, 2025 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than February 20, 2025 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Quotation By Lot Item No. Item & Description Qty. Unit Of Total Cost Issue Unit Cost • 1 M Floor Matting 9 Job Order , Labor And Materials For The Replacement Of Wiper Blade, Seat Lot Cover And Brake Shoe Assy Of Service Vehicle Toyota Commuter With Plate No. S2q150 (property No. 410199) Labor: • Replacement Of Wiper Blade, Seat Cover And Brake Shoe Assy Materials Needed: • 1 Set Wiper Blade • 1 Set Seat Cover (black Leather) • 1 Set Brake Shoe Assy 1 10 Job Order , Labor And Materials For The Repair Of Ambulance Stretcher, Lot Replacement Of Wiper Blade And Coolant And Installation Of Floor Matting Of Ambulance Vehicle Toyota Tourer With Plate No. P5w274 (property No. 480027) Labor: • Repair Of Ambulance Stretcher • Replacement Of Wiper Blade And Coolant • Installation Of Floor Matting Materials Needed: • 1 Set Wiper Blade • 1 L Coolant • 1 Set Floor Matting • 1 M Stainless Steel 1 Total Abc: P 613,850.00 X-x-x Page 6 Follows X-x-x Note: For The Use Of Scph. Total Amount Of Bid: Source Of Fund: 2025-scph-5-02-13-060-mmoe-25-01-10555 Approved Budget: P 613,850.00 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-shainalyn; Pr.no.25 - 0110a Page 5 Of 7 Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within As Schedule Upon Receipt Of The Notice To Proceed Note: Date: Svp 25 - 0089 February 11, 2025 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than February 20, 2025 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Quotation By Lot Item No. Item & Description Qty. Unit Of Total Cost Issue Unit Cost 11 Job Order , Labor And Materials For The First Change Oil (month Of March) Lot Of The Following Vehicle: Service Vehicle Toyota Commuter With Plate No. S2q150 (property No. 410199): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 1 Pc Fuel Filter Service Vehicle Isuzu Dmax With Plate No. D3h559 (property No. 411057): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 2 Pcs Fuel Filter Service Vehicle Toyota 2l 4x2 Pick-up With Plate No. Sgl 795 (property No. 410124): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 1 Pc Fuel Filter Ambulance Vehicle Toyota Hi-ace With Plate No. 1201-488845 (property No. 480025): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 1 Pc Fuel Filter 1 12 Job Order , Labor And Materials For The Second Change Oil (month Of June) Lot Of The Following Vehicle: Service Vehicle Toyota Commuter With Plate No. S2q150 (property No. 410199): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 1 Pc Fuel Filter Service Vehicle Isuzu Dmax With Plate No. D3h559 (property No. 411057): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 2 Pcs Fuel Filter Service Vehicle Toyota 2l 4x2 Pick-up With Plate No. Sgl 795 (property No. 410124): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 1 Pc Fuel Filter Ambulance Vehicle Toyota Hi-ace With Plate No. 1201-488845 (property No. 480025): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 1 Pc Fuel Filter 1 13 Job Order , Labor And Materials For The Third Change Oil (month Of Lot September) Of The Following Vehicle: Service Vehicle Isuzu Dmax With Plate No. D3h559 (property No. 411057): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 2 Pcs Fuel Filter 1 14 Job Order , Labor And Materials For The Fourth Change Oil (month Of Lot December) Of The Following Vehicle: Service Vehicle Isuzu Dmax With Plate No. D3h559 (property No. 411057): Materials: 8 Liters Synthetic Diesel Engine Oil, 1 Pc Oil Filter, 2 Pcs Fuel Filter 1 Total Abc: P 86,560.00 X-x-x Page 7 Follows X-x-x Note: For The Use Of Scph. Total Amount Of Bid: Source Of Fund: 2025-scph-5-02-13-060-mmoe-25-01-10555 Approved Budget: P 86,560.00 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-shainalyn; Pr.no.25 - 0110a Page 6 Of 7 Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 10 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 25 - 0089 February 11, 2025 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than February 20, 2025 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Quotation By Lot Item No. Item & Description Qty. Unit Of Total Cost Issue Unit Cost 15 Tire , 215/70 R15c, Tubeless 12 Pcs 16 Tire , 265/60 R18, Tubeless 4 Pcs 17 Tire , 205/70 R15c, Tubeless 4 Pcs 18 Tire , 235/70 R16, Tubeless 4 Pcs Total Abc: P 171,600.00 X-x-x Nothing Follows X-x-x All Tires Are Free Of Installation And Wheel Balancing -item No. 15 For Service Vehicle Toyota Pick-up With Plate No. Sgl 795 (property No. 410124), Ambulance Vehicle Toyota Commuter With Plate No. Yb3001 (property No. Tf001) & Ambulance Vehicle Nissan Nv350 With Plate No. F21950 (property No. 480020) -item No. 16 For Service Vehicle Isuzu D-max With Plate No. D3h559 (property No. 411057) -item No. 17 For Ambulance Vehicle Toyota Commuter With Plate No. 1201-488845 (property No. 480025) -item No. 18 For Service Vehicle Toyota Hilux With Plate No. Sfm 912 (property No. 411063) Note: For The Use Of Scph. Total Amount Of Bid: Source Of Fund: 2025-scph-5-02-13-060-mmoe-25-01-10555 Approved Budget: P 171,600.00 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-shainalyn; Pr.no.25 - 0110a Page 7 Of 7
Closing Date20 Feb 2025
Tender AmountPHP 872 K (USD 14.9 K)

Municipality Of Argao, Cebu Tender

Manpower Supply
location
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1 Ls 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days D. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 14.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees B. Manpower: C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 43.41 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 43.41 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 39.57 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 39.57 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 3.81 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 3.81 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (footing, Slab On Fill)" Quantity 15.03 M3 Dpwh Standard Output Per Day (opd)= 0.357 M3 15.03 M3 " Structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 2.56 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.56 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (columns)" Quantity 5.42 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 5.42 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 3.90 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.90 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 "structural Concrete (suspended Slab)" Quantity 2.09 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.09 M3 " Structural Concrete (suspended Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 3,947.39 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 3947.39 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 56.65 M2 Dpwh Standard Output Per Day (opd)= 3.24 M2 56.65 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 188.21 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 188.21 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1016(1)a Waterproofing Cement Base Quantity 12.54 M2 Dpwh Standard Output Per Day (opd)= 1.875 M2 12.54 M2 Waterproofing Cement Base Direct Cost: A. Materials: 1.05 M2 A. Cement-based Waterproofing B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 507.84 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 507.84 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 200.46 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 200.46 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 48.00 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 48.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 54.76 M Dpwh Standard Output Per Day (opd)= 10.00 M 54.76 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 7.76 M Dpwh Standard Output Per Day (opd)= 11.80 M 7.76 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 50.00 M2 Dpwh Standard Output Per Day (opd)= 5.56 M2 50.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 200.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 1.00 Set D. Single-gang Switch 4.00 Set E. Two-gang Switch 2.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 7.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 3.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 1.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 1.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 6.00 Pcs H. Pvc Coupling (50mm D) 2.00 Pcs I. Pvc Coupling3 (101mm D) 1.00 Pcs J. Pvc P-trap W/ Plug & Sealing Rings (50mm) 1.00 Pcs K. Pvc P-trap W/ Plug & Sealing Rings (101mm) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 10.00 1.00 A. Construction Foreman 10.00 1.00 B. Skilled Laborer 10.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 8.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 9.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 5.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 5.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 5.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 58.55 M2 Dpwh Standard Output Per Day (opd)= 2.00 M2 58.55 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date20 Feb 2025
Tender AmountPHP 1.4 Million (USD 25.7 K)

City Of Malabon Tender

Healthcare and Medicine
location
Philippines
Details: Description Procurement Of Various Equipments For The Enhancement Of Medical Services Of Ospital Ng Malabon 1. The City Government Of Malabon, Through The Malasakit Fund Intends To Apply The Sum Of Thirty Million Pesos Only (p 30,00,000.00), Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Procurement Of Various Equipments For The Enhancement Of Medical Services Of Ospital Ng Malabon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Malabon Now Invites Bids From Eligible Bidders For Procurement Of Various Equipments For The Enhancement Of Medical Services Of Ospital Ng Malabon. Delivery Of Goods Is Required Within The Period Specified Under Section Vi. Schedule Of Requirements. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (r.a. 9184), Otherwise Known As The “government Procurement Reform Act,” And Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To R.a. 5183 And Subject To Commonwealth Act 138. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Secretariat And Inspect The Bidding Documents At The Address Given Below From December 19 – January 8, 2025; 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee In The Amount Of Twenty Five Thousand Pesos (p 25, 000. 00). 6. The City Government Of Malabon Will Hold A Pre-bid Conference On December 27, 2024 (friday); 2:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. 7. Bids Must Be Delivered To The Address Below On Or Before January 8, 2025 (wednesday); 12:00 N.n. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms Set In The Amount Stated In Itb Clause 18. 8. Bid Opening Shall Be On January 8, 2025 (wednesday); 2:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 9. The City Government Of Malabon Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information Please Refer To: (originally Signed) Florlinda Ayroso Head- Bac Secretariat (originally Signed) Mr. Alexander T. Rosete Chairperson - Bids And Awards Committee 1 Unit Automated Identification/anticrobial Sensitivity Testing Machine Weight: 15/30/60 75 Kg/105 Lbs Electrical Power Requirements: • 110/120 Vac (50-60 Hz) • 220/240 Vac (50-60 Hz) Heat Dissipated: 1025 Btu/hr (nominal) Environmental Requirements: • Operating Ambient Temperature Range: 15 Degrees Celsius To 30 Degree Celsius (59 Degree F-86 Degree F) • Operating Humidity Range: 20% To 80% Relative Humidity, Non-condensing Altitude: Up To 2000 Meters Note: Should Be Compatible With Bact/alert Culture Machine 1 Unit Gel Card Laboratory Centrifuge And Incubator For Crossmatching Laboratory Centrifuge Microprocessor Controlled Touch Panel Digital Display Dc Brushless Low-noise Motor Shock Absorber For Reducing Vibration Damping And Automatic Balance Technical Specification: Model: Invitrocent Ref 00710 Max Speed:4000rpm Max Rcf: 1640 X G Max Capacity: 24 Invitrogel Cards Speed Accuracy: + 50rpm. Time Setting Range: 1~99 Min. Power Supply: ~22ov + 10% 60hz 5a Noise: < 65db (a) Dimension: (wxdxh) 370mmx432mmx260mm Package Dimension 570mmx425mmx305mm Weight: Gw; 16.5 Kg; Nw: 15kg Environment Requirements Temperature: 10°c~35°c Laboratory Incubator Microprocessor-controlled High-performance Incubator Accommodates Up To 24 Gel Cards Technical Data: Model: Invitrotherm; Ref0097020 Power Supply: Ac220v+ 50hs-60hz Fuse: 250v 3a 5x20 Temperature Range 35°c ~50°c Accuracy Of The Temperature < + 0.5 Heating Time: (from 20°c To 37°c Min Timing Range 1sec~99min 59sec Display Accuracy: 0.1°c Ambient Temperature: 5°c~30°c Dimensions (wxdxh): 280mm X 380mm X 115mm Weight 6.0kg 1 Unit Immuno-analyzer Throughout: Up To 180 Tests/hour, Measurement Principle: Micron Super Paramagnetic Particles Platform With Alkaline Phosphatase (alp) Labeled Reagents And Amppd Substrate Sample Assembly: Sample Feeder: Continuous Sample Loading And Offloading, Sample Positions: 50, Sample Probe: Steel Probe, Liquid Level Detection, Cl;ot Detection, Horizontal And Vertical Collision Protection, Sample Volume: 10-200ul, With Increment Of 1ul Reagents Assembly: Reagent Disk: 15 Reagent Positions, Continuous Loading, Real-tome Mixing For Magnetic Particles, Cooling System: 2-8'c, Reagent Pack: 50 Tests/pack, 100 Tests/pack, Reagent Scanning:built-in/external Bar Code Reader, Reagent Probe:steel Probe, Liquid Level Detection, Clot Detection, Horizontal And Vertical Collision Protection, Reagent Volume: 10-200ul, With Increment Of 1ul Substrate System: Substrate Bottle: 300/500 Tests Per Bottle, Bottom Piercing, Substrate Loading"patients Who Fail To Arrive For A Scheduled Appointment Will No Longer Receive The Free Thyroid Check-up.: Capable Of Continuous Loading During Testing, Substrate Heating: Constant Heating, Aspiration Volume: 200ul Magnetic Separation Unit: Separation Assembly: 3-phase Magnetic Separation, Temperature: Accuracy: 37+0.3'c Measurement And Reaction System: Detection Mode: Photon Counting, Signal Detector: Photom Multiple (pmt) Photo Counter, Pmt Calibration: Led Reference Module, Incubation Positions: 82, Temperature: Accuracy:37+0.3'c, Mixing Unit: Non-touch Vortexer Mixing Cuvette Loading And Waste Collection: 1 Unit Abg Machine Throughout: Results In 1 Minute After Sample Aspiration Sample Volume:140jul Quality Control: 3 Or 5 Levels Qc, External Electronic Simulator Display: 7-inch Color Lcd Display, 800*480 Interface: 4 X Usb 2.0 Host, 1 X Rs232, Wlan Input Device: Touch Screen And Bar Code Scanner Power Supply: 100-240vac, 50/60hz Battery: 500mah Rechargeable Lithium-ion Battery, 50 Samples Continuous Testing Dimensions (w*h*d): 283*153*310 Mm Weight: 3.65 Kg Operation Environment: 10 C-31 C; %rh: 25%-80%; 70-106.6 Kpa 1 Unit Bpap Machine Ipap/epap: 4-40cm H20/4-25cm H20 • Ventilation Modes: Capap, S, S/t, Pc, T • Target Tidal Volume: 200-1500ml • Breath Rate: 0-40bpm • With Good Humidification System • Alarms For: Patient Disconnection, Apnea, Low Minute Ventilation, Low Tidal Volume, And High Respiratory Rate • Monitoring For: Pressure, Tidal Volume, Minute Ventilation, Respiration Rate, Leak • Filters: Foam And Optional Ultra-fine Filters • Data Management: Encore Pro2 And Direct View Software Compatible With Oximetry Module, Advanced Detection Of Residual Respiratory Events (apnea/hypopapnea Index, Obstructed Airway Apnea, Clear Airway Apnea, Hypoapnea, Periodic Breathing, Large Leak And Snore) 1 Unit Cpap Machine The Res Med Air Sense™ 11 Auto Set With Humid Air Automatically Adjusts Pressure Levels Based On Your Breathing Patterns Throughout The Night. A Crisp, Color Lcd Touchscreen Lets You Customize The Device’s Settings And View Sleep Data. The Machine Includes An Integrated, Heated Humidifier And Climate Line Air Heated Tubing. Chose Between The Standard Humid Air™ Model (tubing Not Included) Or Humid Air™ Model With Climate Line Air™ 11 Tube Included. Temperature And Humidity Can Be Manually Adjusted Or Set For Automatic Climate Control “for Him” And “for Her” Algorithms Are Available Auto-ramp Up To 45 Minutes In 5-minute Increments Climate Line Air Tubing* Included For Automatic Climate Control (not Included With Standard Model) Personal My Air Assistant Guides You Through Device Installation And Therapy Acclimation Care Check-in Feature Provides Coaching And Troubleshooting For New Users Dimensions: 3.72” X 10.71” X 5.45” Weight: 2.3 Lbs. Sound Level: 27 Dba 1 Unit Mechanical Ventilator Modes Available: Vc-ac, Pc-ac, Vc-simv, Pc-simv Pip: 20-70 Cm Of H 2 O (adjustable In Steps Of 1) Peep: 0-20 Cm Of H 2 O (adjustable In Steps Of 1) Inspiratory: Expiratory Ratio (i:e): 1:0.3 - 1:4 (adjustable In Any Ratio) Respiratory Rate (bpm): 10 – 40 Breaths Per Minute In Increments Of 2 Tidal Volume: 150 Ml – 800 Ml In Steps Of 50 Unique On-graph Incentive To Show Current Best Values • Test Quality Advisory Messages And Quality Report • Fully Compliant To Ats/ers 2005 Guidelines • Available With Both Disposable Or Reusable Turbine Flow Meter • Elegant And Robust Carrying Case 2 Units Cardiac Monitor Introduction: Multi Parameter Patient Monitor For High-end Specialist – 12.1”(10.4”) High Resolution(800×600) With Maximum 9 Wave Forms – Standard Configuration: Ecg, Spo2, Nibp, Resp, 2temp, 2ibp – 6 Kinds Of Virtual Screen – 3ch Ecg : Full 7 Ecg & St Segment Analysis (lead I, Ii, Iii, Avr, Avl, Avf, V) – 12ch Ecg : Full 12 Ecg & St Segment Analysis (lead I, Ii, Iii, Avr, Avl, Avf, V1, V2, V3, V4, V5, V6) – 13 Arrhythmia Analysis & Pacemaker Detection – 7days Tabular And Graphic Trend Data Save Multi High-end Functions: – Drug Dose Calculation, Ecg Recall, Mini Trend, Ico, Color Change, Nibp Stat, Nibp Venous Stat, Oxy-crg, Patient Information, Temp Td – Touch Screen (option) – Easy S/w Upgrade Using Sd Card (max 2gbyte) – Durable And Light Long Li-ion Battery Operation (std 1pack: 2hr, 2pack: 4hr) – Lan And Wireless Lan – Variable And World Best Etco2 Module – Oridion’s Microstream Etco2 – Respronics’s Mainstream (c5), Sidestream (loflo) – Hrv, Apg Detection – 12.1″(10.4″) High Resolution(800×600) – Provides Clear Visibility From Long Distance And Any Angle – Maximum 9 Wave Forms – Supreme Standard Configuration And Extensionability – Standard: Ecg, Spo2, Nibp, Respiration, 2temp, 2ibp – Optional: Standard + 4temp, 4ibp, Ico, Etco2, 12ch Ekg, Touch Screen, 3ch Printer – Small Size But Large Virtual Screen – 12.1” Monitor Provides 72.6”(12.1” X 6) View Effect By Using 6 Virtual Screens. – 10.4” Monitor Provides 62.4”(10.4” X 6) View Effect By Using 6 Virtual Screens. – Perfect 3ch Ecg (std.) And 12ch Ekg(opt.) Will Make You Ecg Analysis Specialist. – Livegraphy Waveform By Votem’s Digital Filter Technology – 3ch Ecg (std.) Displays Full 7 Ecg Waves & St Segment Analysis (lead I, Ii, Iii, Avr, Avl, Avf, V) 2 Units Incubator Standard Features: ●servo Control Mode: Air Temperature, Skin Temperature; ● Parameter Displaying: Set Temperature,air Temperature, Skin Temperature, Internal Humidity, Heat Power Rate; ● Audible & Visual Alarms: Power Failure, Sensor Failure, Higher & Lower Temp, Air & Skin Temperature Override,fan Failure, System Failure; ● >37℃preset Mode: Power Failure Reset Memory, Alarm Silence, Keypad Lock, Self-test Function; ● Hood With Dual Slope; 6 Hand-ports; ● Rs-232 Output Connector (use For Network System); ●iv Poles; ●protective Guard Rail; ●storage Cabinets. Specification Of Hood: Mattress To Hood: 450 Mm Observation Side Of Hood: Two Incline Operate Port: 6 (2 Iris Ports) Tubing Grommets: 4 Front Access Panel: 826×310 Mm Technical Specifications: Power Requirement ≤400va Temperature Control Mode: Air And Skin Servo Control Air Temp Control Range: 20℃~37℃ Temperature Override Mode To: 20℃~39℃ Skin Temp Control Range: 30℃~37℃ Temperature Override Mode To: 30℃~38℃ Temperature Fluctuation: ≤0.5℃ Mattress Temperature Uniformity: ≤0.8℃ Temperature Rise Time: ≤45 Min Noise Level Within Hood Environment: ≤55d Alarms Power Failure Alarm Fan Failure Alarm Sensor Failure Alarm High Air Temperature Alarm: +3.0℃ Low Air Temperature Alarm: -3.0℃ High Skin Teperature Alarm: +1.0℃ Low Skin Temperature Alarm: -1.0℃ Over Air Temperature Alarm: ≤38.0℃; ≤40.0℃ Over Skin Temperature Alarm: ≤38.0℃; ≤39.0℃ System Failure Alarm Alarm Silence Function Operational Condition 2 Units Infant Warmer Temperature Control Range: 25°c-37°c Temperature Override Mode To 38°c Temperature Sensor Accuracy: <0.3°c Mattress Surface Temperature Uniformity: <2.0°c Temperature Rise Time: <45mins Heat Output Indicate: 0-100% In 10% Radiant Box Horizon Angle Adjust Range 0-90° Adjustable In Step-less Bed Tilt Adjustment: Continues Adjustable In +10° 2 Units Bilirubin Light/photo-therapy Machine Device Classification Type Of Protection Against Electric Shock Class I Degree Of Protection Against Ingress Of Liquids And Particulate Matter (iec 60601-1) Ipx0 Mode Of Operation Continuous Classification In Accordance With Eu Directive 93/42/eec Iia Umdns Code/gmdn Code 13-037/35239 Physical Attributes Bililux Photo Therapy Light Length ≤39 Cm (15.4 In) Width ≤19 Cm (7.5 In) With Quick-connect Plug Height ≤8 Cm (3.1 In) Weight (without Options/accessories) ≥1.2 Kg (2.7 Lb) Bililux Spring Arm Length, Spring Arm Fully Folded ≤61 Cm (24 In) Length, Spring Arm Fully Extended ≤106 Cm (41.7 In) Weight (without Options/accessories) ≤1.5 Kg (3.3 Lb) Bililux Trolley (with Spring Arm) Height (trolley At Lowest Position And Spring Arm Fully Folded) ≤132 Cm (52 In) Height (trolley At Highest Position, Lower Arm Fully Extended, And Upper Arm At 45° Angle) ≤213 Cm (83.9 In) Weight (without Options/accessories) ≤14.9 Kg (32.8 Lb) Total Mass Including Safe Working Load 18.1 Kg (39.9 Lb) 2 Units Portable Or Light Kl04l-iii Vertical4-reflector Luminescence Shadowless Lamp Kl04l-iii Luminescence Shadowless Lamp Adopts Light Source From Different Positions For Focus To Eliminate Shadows Of Different Parts Of Medical Workers Vertical Mobile Setup With Braking Device Is Not Limited By The Space Of Surgical Room And Is Safe And Reliable In Use Illumination: > 50,000lx (at 1m Distance) Color Temperature: 4000k+500k Mains Voltage: Ac220v+10%50hz Bulb Voltage: Ac24v Bulb Power Input Power: 120va 1 Unit Orthopedic Instrument Set Contents: 77 Pieces With Tray • 1 Pc. Knife Handle #3 • 2 Pcs. Knife Handle #4 • 1 Pc. Mayo Dissecting Scissor Straight 5 1/2″ (14cm) • 1 Pc. Mayo Dissecting Scissor Curved 5 1/2″ (14cm) • 1 Pc. Mayo Dissecting Scissor Straight 6 3/4″ (14cm) • 1 Pc. Mayo Dissecting Scissor Curved 6 3/4″ (14cm) • 1 Pc. Metzenbaum Scissor Curved 7″ (17.8cm) • 1 Pc. Esmarch Bandage And Cast Shears 8″ (20.3cm) • 1 Pc. Tissue Forcep 6″ (15.2cm) 1x2t • 1 Pc. Tissue Forcep 6″ (15.2cm) 4x5t • 2 Pcs. Adson Tissue Forceps 4 3/4″ (12.1cm) 1x2t • 6 Pcs. Crile Forcep 6 1/4″ (15.9cm) Curved • 4 Pcs. Rochester Ochsner Forcep Straight 8″ (20.3cm) • 6 Pcs. Backhaus Towel Clamp 5 1/4″ (13.3cm) • 1 Pc. Mayo Hegar Needle Holder 8″ • 1 Pc. Crile Wood Needle Holder 6″ • 1 Set Us Army Retractor 8 1/2″ Set Of 2 Pcs. • 1 Pc. Israel Retractor 9″ (22.9cm) 4 Prong Blunt • 1 Pc. Volkman Retractor 8 3/4″ (922.2cm) 4 Prong Sharp • 2 Pcs. Volkman Retractor 8″ (20.3cm) X 3/4″ (19cm) 4 Prong Blunt • 1 Pc. Bennett Bone Elevator 9 1/2″ (24.1cm) Small • 1 Pc. Bennett Bone Elevator 9 1/2″ (24.1cm) Large • 6 Pcs. Allis Tissue Forcep 6″ (15.2cm) 4x5t • Pc. Frazier Ferguson Suction Tube Fr-8 (2.6mm) • 1 Pc. Frazier Ferguson Suction Tube Fr-12 (4mm) • 1 Pc. Beyer Rongeur 7″ (17.8cm) Curved • 2 Pcs. Schnidt Tonsil Forcep 7 1/2″ (19.1cm) • 1 Pc. Ruskin Bone Cutting Forcep 7 1/2″ (19.2cm) Angled • 1 Pc. Stile-luer Rongeur 8 3/4″ (22.2cm) Curved • 2 Pcs. Kern Bone Holding Forcep 7″ (22.9cm) • 1 Pc. Lane Bone Holding Forcep 13″ (33cm) W/ Ratchet • 1 Pc. Lowman Bone Clamp 4 1/2″ (12.7cm) • 1 Pc. Lowman Bone Clamp 7 1/4″ (20.3cm) • 2 Pcs. Bone Hook 9″ (22.9cm) Sharp • 1 Pc. Miltex Mallet 11 (27.9cm) 16oz (454g) • 1 Pc. Bone File 9 ¾’ 3 Units Infusion Pump Delivery Rate: 1-1000ml/h.01-999.9ml/h Delivery Limit Range: 01-9999ml Pumping Mechanism: Linear Peristaltic Finger Accuracy: + 5 (ml/h Control Mode/with Approved Iv Set) K.v.o Rate: 1ml/h-10ml/h (adjustable) Purge Rate: 1-1000ml/h (adjustable) Bolus: 1-1000ml, 1-9999ml (adjustable) Dimension: 100x190x250 (mm)/weight:3.5kg) Power: Ac110-230v, 50/60hz Or Dc9, 6v, Dc24v (1a) Battery Type: N-cd (standard)/ni-mi+ (option) Operating Time: 4 Hours (at 125ml/h) 1 Unit 2d Echo Bed 19”-38” Height Range Meets The Americans With Disabilities Act (ada) Low Height Requirement Of 17”-19” For Patient Transfer, While Ensuring Ergonomic Standing Posture For Staff • Optional Battery Operation • Dual Rapid Release Drop Sections Provide Unhindered Access To The Patient • 65° Fowler Positioning Increases Comfort Of/for Patients With Shortness Of Breath • +/- 15° Trendelenburg Helps Restore Patient’s Blood Pressure • Improved Features: New Handrail Design, Improved Single Pedal Braking System, Foley Bag Hook, Hand Control Storage, Battery Operation 1 Unit X-ray Tube Varian Rad-14, 0.6-1.2 Focal Spot, Diamond Housing X Ray Tube - 89011n 3 Units Examining Table • Examination And Treatment Table, Hamilton Type, With Drawer And Compartment Door, Upholstered Three Section Top, Provided With Stirrup And Sliding Foot Stool. • Size: 58 Inc. X 20 Inc. X 34 Inc. 3 Units Transfer Stretcher Bed Technical Specifications Frame: Powder Coated Steel Or Better Backraise Inclination: Atleast 0 To 35 Degrees Has Adjustable Height Side Guard: Made Of Abs Plastic Or Better Castor Wheels: Manufacturer's Standard Max Load: At Least 150kg Weight: Manufacturer's Standard Dimensions: L X W X H = 2000mm X 700mm X 700mm, ± 100mm On Each Dimension Accessories: -has Oxygen Cylinder Holder -has Iv Pole Holder Located In 4 Different Positions -with One Iv Pole 1 Unit Vein Scanner Technical Specifications • Type: Light Weight, Mobile • For Obese/bloated, Neonate, Pedia, Elder And Dark Skin Patients • Display: Dlp Display Or Better • Infrared Wavelength: At Least 850nm • Image Resolution: At Least 856*480 Pixels • Visible Vein Size: ≥1 Mm Or Better • Penetration Depth: ≤8 Mm • Optimal Imaging Distance: At Least 15 ~ 25cm • Mode: Basic, Inverse And Enhanced • Imaging Color: Single Color And Mixed Colors • Image Sizes: Has Small, Medium And Large Sizes • Brightness: Adjustable To Low, Medium And High • Power Supply: 220v, 50/60hz • Battery Type: Rechargable Lithium Battery At Least 3000mah • Battery Capacity: At Least 2 Hours Fully Charged • Dimension: Manufacturer's Standard • Net Weight: Manufacturer's Standard • Accessories: - Battery And Charger - Charging Cord - Trolley With 5 Castor Wheels 1 Unit Newborn Hearing Test Machine Specifications: • Display: At Least 42.7mm X 33.4mm Or 1.7 In X 1.3in • Resolution: At Least 160x128 • Dimension: Manufacturer's Standard • Weight: Manufacturer's Standard • Warm-up Time <5s Or Shorter • Boot-up Time: 1min Or Shorter • Mode Of Operation: Continous • Connectors - Oae: Hdmi Connector For Connection To The Micro Probe - Usb: Micro Usb • Data Interface - Pc Connection: Micro Usb - Printing: Wireless Connection • User Feedback - Accoustic: Integrated Speaker - Visual: Color Display Oled - User Interface: Oled Display To Provide User Information And Progress Of Measurement • Battery - Type: Rechargeable Thium-ion Np 120 Or Better - Capacity: 1700 Mah Or Better - Expected Life Time: 3 Years Or Better - Battery Life: 15 Hours On Time • Memory: At Least 500 Test Dpoae • Stimulus - Frequency Range: 1500 Hz To 12 Hz - Frequency Accuracy: <1% - Nominal Frequency: F2 - F2/f1 Ratio: 1.2 - Level Range: 40db Spl To 70db Spl - Level Accuracy: ± 1.5db Or Better - Default Level (l1/l2): 65db / 55db Spl With In Ear Calibration - Transducer: Oae - Recording - Probe Fit Check: Low Frequency Level Loss - Display: Snr Bars Or Line Diagram With Oae And Noise Level Per Frequency - Pass Criteria - Snr Criteria: 6db - Frequency For Pass: 3 Transducer • Oae Probe • Microphone: - 20 Db Spl At 2 Khz (1 Hz Bandwith) • System Noise: - 13 Db Spl At 1 Khz (1 Hz Bandwith) • Cable Length: At Least 110 Cm Or 43in • Connector: Hdmi Or Better Printer • Print Mode: Thermal Dot Matrix Print • Printing Width: At Least 48 Mm (1.9in) • Resolution: 8 Dots/mm (203 Dots Per In (dpi)) • Dots Per Line: At Least 384 Dots Accessories And Inclusions • Battery Pack: 2 - Cell Li-ion Battery Pack 7.4 V -1500 Mah • Eartips: Box Of Eartips • Set Of Probe Tubes Standard Certifications • Device Certification From Nhsrc • Device Certification From Fda 1 Unit Automated External Defibrillator (aed) • Two-button Operation: On/off, Discharge (shock Button) • Voice Prompts: Voice Command That Gives Instruction To The User In Operating The Device • Automatically Evaluates Patient Impedance For Proper Pad Contact. • Automatically Analyses Patient Condition For Shockable Or Non-shockable Rhythms • Patient Ecg Can Be Acquired Through Defibrillator Pads • Energy Output Accuracy: ± 15% • Pulse Shape: Biphasic • Charge Time: Maximum Of 15 Seconds • Battery Capacity: Capable Of Providing At Least 200 Discharges At Maximum Energy • Replaceable Battery • Visible And Audible Indicators: - Low Battery - Pad Skin Contact/disconnection - Aed Status • Defibrillator Pads: Self-adhesive, Disposable And Non-polarized - At Least Ten (10) Pairs For Adult - At Least Ten (10) Pairs For Pedia
Closing Date8 Jan 2025
Tender AmountPHP 30 Million (USD 515.3 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Machinery and Tools
location
United States
Details: This Is A Sources Sought Announcement Only And Not A Request For Quotes, Bids, Or Proposals. This Request Is Solely For The Purpose Of Conducting Market Research To Enhance The Department Of Veterans Affairs (va), Network Contracting Office 16 (nco 16) Understanding Of The Market Offered Products, Services, And Capabilities. Your Responses To The Sources Sought Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible. the Va, Nco 16 Is Seeking To Identify Potential Qualified Vendors Capable Of Fulfilling The Services Outlined In The Statement Of Work (sow). This Requirement Is For The Fayetteville Va Medical Center Located At 1100 North College Avenue, Fayetteville, Ar 72703-1944. item description quantity unit Of Measure 0001 cooling Tower 2 Repairs In Accordance With The Sow 1 Jb the North American Industry Classification Code (naics) Is 811310, Commercial And Industrial Machinery And Equipment (except Automotive And Electronic) Repair And Maintenance With A Size Standard Of $12.5 Million. Prior To Issuing A Solicitation, And Pursuant To The Veterans First Contracting Program, The Va Is Trying To Ascertain If There Are Any Qualified Service Disabled Veteran Owned Small Businesses (sdvosb) Or Veteran Owned Small Businesses (vosb) With The Capability Of Fulfilling The Requirement. Respondents Are Not Limited To Sdvosb/vosb Concerns; The Government Seeks To Identify All Potentially Interested Sources. all Responsible Vendors And Interested Parties Please Respond To This Sources Sought Announcement If You Have The Capability Of Fulfilling This Requirement. Responses To This Sources Sought Shall Include The Following Information: 1. Your Company Name, Address, Contact Person Name, Phone Number, E-mail address(s), Uei Number, Number Of Employees, And Company Website If Available. 2. If You Are An Gsa/fss Contract Holder Are The Referenced Services/repairs Available On Your Schedule/contract? Provide Your Company Gsa/fss Contract Number And Contract Expiration Date, If Applicable. 3. Is Your Company A Contract Holder On Any Other Federal Contract? Are The Referenced Services/repairs Available On That Federal Contract? If So, Please Provide The Contract Number. 4. Socio-economic Status Of Business Such As But Not Limited To (sdvosb/vosb, 8(a), Hub Zone, Women Owned Small Business, Small Disadvantaged Business, Or Small Business Hub Zone Business, Large Business, Etc.). 5. Is Your Company Considered Small Under The Naics Code Identified In This Sources Sought Announcement? interested Vendors Are Reminded That In Accordance With Far Subpart 4.12, Offerors And Quoters Are Required To Complete Electronic Annual Representations And Certifications In System For Award Management (sam) Accessed Via Https://www.sam.gov As A Part Of Required Registration (see Far 4.1102 - Policy). all Registrants Are Required To Review And Update The Representations And Certifications Submitted To Sam As Necessary, But At Least Annually, To Ensure They Are Kept Current, Accurate, And Complete. The Representations And Certifications Are Effective Until One Year From Date Of Submission Or Update To Sam. this Notice Shall Not Be Construed As A Commitment By The Government To Ultimately Award A Contract, Nor Does It Restrict The Government To A Particular Acquisition Approach. All Information Submitted In Response To This Announcement Is Voluntary; The Government Will Not Pay For Information Requested Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. All Information Submitted In Response To This Sources Sought Notice Become Property Of The Government. interested Vendors Should Submit An Email To Marcos.madrazo-jones@va.gov. All Responses Must Be Received In Writing No Later Than 5:00 Pm Cst On April 07, 2025. Questions Or Inquiries Will Not Be Answered Or Acknowledged, And No Feedback Or Evaluations Will Be Provided. No Solicitation Document Is Available At This Time. This Notice Is To Acquire Information Only; Therefore Your Response Will Not Be Considered For A Contract Award. Vendors Interested In Providing An Offer Will Have To Respond To A Solicitation Announcement That Shall Be Published Separately. statement Of Work (sow) contractor Must Furnish All Management, Supervision, Labor, Material, Equipment, Tools, Supplies, Consumables, Parts, And Related Services, In Accordance With The Sow To Perform Repairs On Cooling Tower 2. Contractor Must Verify Existing And New Dimensions, Locations, And Quantities To Complete This Project Located On The Fayetteville Va Medical Center, 1100 N. College Avenue, Fayetteville, Ar 72703. the Authorized Government Representative (agr) Will Be Responsible For Technical Monitoring Of The Contractor's Performance And Deliveries. The Agr And The Contractor's Representative Shall Work Together To Ensure That All Contractual Requirements Are Being Met. The Authorized Government Representative For This Requirement Is: kenneth W. Wright (479) 313-5089 kenneth.wright8@va.gov general Requirements: any Provision Or Partial Provision Of The Contract, Including But Not Limited To, Drawings And Specifications That Is Not Consistent With This Sow Will Be Null And Void Only To The Extent Of The Inconsistency. All Other Provisions Or Partial Provisions Of The Contract, Including But Not Limited To, Drawings And Specifications, Must Remain In Full Force And Effect. information Security: The Certification And Accreditation (c&a) Does Not Apply, A Security Accreditation Package Is Not Required. contractor Must Have The Following Requirements Completed Within Ten (10) Business Days Of Contract Award: osha 10 And 30 Certifications: Submit As A Minimum Osha 10 Certification To The Agr For Every Contractor Employee That Will Be Working On The Medical Center Property. Osha 10 Cards Are To Always Remain On The Employee S Person. contractor Point Of Contract (poc): Notify The Agr In Writing Of The Name, Phone Number, Email Address Of The Contractor Appointed Poc. the Designated Individual Must Have Full Authority To Act For The Contractor On All Matters Relating To Work Performance, To Receive, Accept And Sign For Any Notices, Inspection Reports And All Other Correspondence On Behalf Of The Contractor From The Agr And/or Contracting Officer (co). this Individual Must Oversee The Contractor S Worksite Operations And Ensure All Work Is Performed In Accordance With All Contract Requirements Including Scheduling, Quality, And Safety. This Individual Must Be Always Available When Contract Work Is In Progress, And Shall Respond To The Work Site As Directed By The Agr. the Contractor Or Their Designated Poc Must Return Phone Calls Or Text(s) To The Agr Within 1 Hour Of Contact And Must Return Emails From The Agr Within 24 Hours Of Contact. period Of Performance (pop): One Hundred Twenty (120) Calendar Days. work Site Access: Contractor Must Provide A Written Schedule For Contract Work To The Agr Within 10 Days Of Award For Review And Approval. Work Will Not Commence Work Without Written Approval From The Agr. regular Business Hours: Site Work Must Be Scheduled During Regular Business Hours, 0700 To 1500 Hours, Monday Through Friday (excluding The Following Federal Holidays - New Year S Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, And Christmas Day). outside Regular Business Hours: Work Must Be Scheduled During 1600 To 0600 Hours, Monday Through Friday, Saturday And Sunday (excluding The Following Federal Holidays - New Year S Day, Inauguration Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day And Christmas Day) And Must Not Commence Without Prior Agr Written Approval At No Additional Expense To The Government. this Project Must Be Turn-key In Accordance With This Sow, Drawings, And Specifications To Be Complete And Working System(s). the Medical Center Must Continue To Operate During The Contract Pop, Including But Not Limited To, The Mechanical And Electrical Systems. contractor S Work Must Be Conducted With The Least Amount Of Disruption To The Medical Center Facility. prior To The Start Of Job Site Activities, Together The Contractor And Agr Must Conduct A Site Survey To Identify And Review Specific Work And Differing Site Conditions. warranty: Contractor Must Guarantee Workmanship For A Period Of One (1) Year After Agr Written Acceptance Of Work. contractor Must Furnish A Minimum One (1) Year Parts And Labor Warranty On Equipment, Components, And Materials Furnished Plus Any Manufacturer S Warranty Greater Than One (1) Year. emergency Service: Contractor Emergency Service Must Be Available 24 Hours Per Day. Contractor Must Respond On-site To Emergency Service Calls Within Two (2) Hours Of Notification. Contractor Must Have The Issue(s) Corrected Or A Plan In Place (awaiting Parts) Within Four (4) Hours Of Arrival At Job Site. Any Temporary Repairs Must Have Prior Written Approval By The Chief, Engineering Service Or Their Designated Representative. qualifications Of Contractor: contractor Must Possess A Class A Hvac Contractor License And A State Of Arkansas Electrical Contractor License. contractor Must Be Proficient In The Operation And Programing Of The Alerton Building Management System. No Medical Center Support Will Be Provided. requirements For Quote: the Contractor Shall Submit The Following Documents With Proposal For Technical Evaluation By The Agr: provide Submittals For All Hardware And Materials Required For The Complete Replacement Of Fill, Hot Water Basins, Fill Tube, Nozzles, As Well As Paint And Galvanized Coatings. provide A Work Breakdown Structure And Schedule. provide Quality Assurance Plan. provide A Safety Plan. provide A Job Safety Analysis. scope Of Work: contractor Except As Noted Otherwise Must Provide All Materials, Equipment, And Labor To Complete The Following Repairs For Marley Cooling Tower Number 2, Model Nc8305. All Labor, Parts And Materials Must Comply With The Original Manufacturer S Specifications. Contractor Is Responsible To Verify The Cooling Tower Model And Serial Numbers And To Ensure All Parts And Materials Are Ordered As Required By The Tower Manufacturer. provide New Fill Material, Cover Plates, All Mounting Hardware For Both Cells Of Cooling Tower 2, And Galvanized Fill Support Tube, Fill Tube Supports, And Deflectors. remove And Dispose Of All Existing Fill Material, Cover Plates, Mounting Hardware And Galvanized Fill Support Tube, Fill Tube Supports, And Deflectors. clean Exposed Areas Of The Tower And Hardware Removing All Dirt, Scale, And Corrosion. repair All Damaged Areas Found To Include Corrosion To Match Original Construction. reapply Any Protective Paint Or Galvanized Coating To Match Original Manufacturer S Specification. all Cleaning And Repair Work Is To Be Inspected By The Agr Or Their Designated Representative Prior To Reassembly. Work Will Not Progress Without Acceptance Of All Cleaning And Repairs By The Agr. install New Fill Material, Cover Plates, Mounting Hardware And Galvanized Fill Support Tube, Full Tube Supports, And Deflectors. provide New Hot Water Basins, Hot Water Basin Covers, Sealer, Crossflow Nozzles, And Hardware. remove Existing Hot Water Basins, Hot Water Basin Covers, Sealer, Hardware, Crossflow Nozzles, Covers And Hardware. clean Exposed Areas Of The Tower And Hardware Removing All Dirt, Scale, And Corrosion. repair All Damaged Areas Found To Include Corrosion To Match Original Construction. reapply Any Protective Paint Or Galvanized Coating To Match Original Manufacturer S Specification. all Cleaning And Repair Work Is To Be Inspected By The Agr Or Their Designated Representative Prior To Reassembly. Work Will Not Progress Without Acceptance Of Cleaning And Repairs By The Agr. install New Hot Water Basins, Hot Water Basin Covers, Sealer, Hardware, Crossflow Nozzles, And Hardware. provide New Basin Heating Element, Mounting Kit And Seals. remove And Dispose Of Existing Basin Heating Element, Mounting Hardware And Seals. clean The Area To Remove Dirt, Scale, And Corrosion. repair All Corrosion Damage With Fresh Sheet Metal And Surface Treatment (paint/galvanized Coatings) That Meet Or Exceed Original Manufacturers Specifications. install New Basin Heating Element, Mounting Hardware And Seal. test New Basin Heating Element And Verify Proper Operation. perform Any Adjustments To Building Management System As Required. provide New And Replace All Water Line Seals Opened During Execution Of The Project. No Seals Are To Be Reused. test Cooling Tower To Ensure Proper Operation Under A Full Load. perform Any Adjustments To Building Management System As Required. perform Any Adjustments To The Ac Plant Condensing Water System To Ensure Proper Water Flow. contractor Access And Activities: safety: Contractor S Highest Priority Must Be Safety. Contractor Work Must Be In Accordance With Federal, State, Local Osha Codes, Regulations, Latest Edition Of Nec, Latest Edition Of Nfpa 70e, And 01 35 26 Safety Requirements Specification. Contractor Must Furnish And Use Required Safety Items, Including But Not Limited To, Safety Signage, Cones, Barricades, And Must Furnish And Wear Required Personal Protective Equipment (ppe). infection Control: Contractor Must Be Responsible To Develop A Phasing And Infection Control Risk Assessment (icra) That Incorporates Requirements Of Specifications 01 00 00 General Requirements To Meet Requirements Of The Medical Center And Medical Center Icra. site Supervision: Contractor Must Submit Written Qualifications Of Proposed Site Superintendent(s) To The Agr For Consideration. Contractor Must Furnish Superintendent(s) With Written Agr Approval To Continuously Supervise On Site Contract Activities. Contractor Superintendent(s) Must Not Engage In Any Direct Trades Labor. security: Contractor Must Coordinate With Va Police And Agr To Comply With The Medical Center Security Management Program, Including But Not Limited To, Obtain Onsite Access Permission By The Va Police, Be Identified By Contractor And Project, And Restricted From Unauthorized Access. badging: While On Medical Center Property, Contractor Must Wear A Visible Medical Center Issued Identity Badge. Contractor Can Be Subject To Inspection Of Personal Effects When Entering Or Leaving The Project Site And Medical Center Property. Contractor Site Superintendent Must Escort Contractor Employees To Engineering Shop (building 37) To Obtain Badge(s). Contractor Must Maintain A Badge Log With Employee Names, Badge Id Numbers, Start Date(s), Departure Date(s), Id Lost Date(s), And Id Return Date(s). Contractor Must Update Badge Log And Furnish To The Agr Weekly Or As Directed In Writing By Agr. Contractor Must Report Lost Badge(s) Immediately To The Agr And Document On Badge Log. contractor Must Return Badge(s) Immediately On Day Of Departure Of Employee From Project To Agr And Document On Badge Log. Contractor Must Return Remaining Badge(s) At Project Closeout To Agr. Contractor Must Reimburse The Government A $100.00 Fee For Each Lost Or Unreturned Badge. key Access: Contractor Site Superintendent May Check Out A Key To Access Mechanical And Electrical Rooms As Project Requires. Contractor Site Superintendent Must Check Out And Return A Key At Engineering (building 37) Daily And The Key Must Not Leave Medical Center Property. Contractor Site Superintendent Must Notify The Agr When A Key Is Lost. Contractor Must Reimburse The Government A $3,500.00 Fee For Each Lost Or Unreturned Key(s). utilities: Contractor Must Not Leave Unattended Out-of-service Any Utility, Fire Protection, Life Safety System, Or Security System Without Written Permission Of The Agr. If A Utility, Fire Protection, Life Safety System Or Security System Is Not Functional At The End Of A Work Period Without Written Permission Of The Agr, Then The Contractor Must Restore The System(s) To Working Order Prior To Leaving The Job Site Or Must Furnish An Around-the-clock Watch Subject To Agr Written Approval Until The System Is Functional. If The Contractor Fails To Do So, The Contractor Must Reimburse The Government A Fee Equal To The Amount Of Costs Incurred By The Government To Furnish Around-the-clock Watch And/or Repair The System(s). parking: Contractor On-site Parking Is Limited To Availability Of Designated Contractor Parking. Contractor Must Have Prior Agr Written Approval Of On-site Contractor Parking. vehicles And Construction Equipment: Contractors Key(s) To Unattended Vehicle(s) And Construction Equipment Must Be Removed And Vehicle(s) Locked. unloading And Loading: Contractor Must Unload And Load Materials, Including But Not Limited To, Equipment, Tools, Supplies, Parts, And Construction Debris At The Loading Dock. Contractor Must Not Leave Vehicle(s) Or Construction Equipment Unattended At The Loading Dock. no Materials, Including But Not Limited To, Equipment, Tools, Supplies, Parts, And Construction Debris Are Permitted Through The Front Entry. elevators: Contractor Must Use Agr Designated Elevators And Must Protect Elevator Cabs, Including But Not Limited To, Cab Interior Components And Controls During Contractor Use. Contractor Must Not Exceed Elevator Weight Limits. Agr Designated Elevator(s) May Not Be Immediately Available To The Contractor. The Contractor Must Account For This, And Contractor Must Be Flexible In The Project Schedule Without Additional Cost To The Government. storage And Staging: Contractor Storage And Staging Is Limited To Availability Of Designated On-site Contractor Storage And Staging. Contractor Must Submit A Written Request For Storage Or Staging To The Agr For Consideration A Minimum Of Seven (7) Business Days Prior To The Storage Or Staging. Contractor Must Have Prior Agr Written Approval Of On-site Contractor Storage And Staging. Contractor Must Relocate Or Remove On-site Storage And Staging, Including But Not Limited To, Contractor S Office Trailer(s), Dumpster(s), Storage Container(s) And Construction Materials A Maximum Of Seven (7) Business Days After Written Notification By The Agr Without Additional Expense To The Government. equipment And Tools: Contractor Must Furnish Construction Equipment And Power And Hand Tools, Including But Not Limited To, Ladders, Scaffolds, Lifts, Backhoes, And Forklifts To Complete Contractor S Work. radios And Mobile Devices: Contractor Must Use Mobile Devices At Low Volume Or Outside. Contractor Must Not Carry On Conversations In Hallways Or Near Any Patient Areas. Am/fm Radios And Other Media Producing Devices Must Not Be Used On Medical Center Property. noise: Contractor Must Coordinate And Schedule With Agr Noise Making Activities. Contractor Must Submit To The Agr A Written Request For Consideration And Written Approval A Minimum Of Seven (7) Business Days Prior To Activity. Contractor Must Have Agr Written Approval To Proceed. dust Proofing And Cleaning: Contractor Must Cover Furnishings And Equipment With White Plastic, Fire Retardant Polyethylene, Antistatic, Minimum 6 Mil Thickness, Imprinted With Fire Retardant Labeling Or Clean Drop Cloth. Contractor Must Furnish Hepa Vacuum Cleaner(s), Cleaning Tools, And Tacky Mats At Job Site Entrances. Contractor Must Not Use Broom(s). fire Alarm: Contractor Must Coordinate And Schedule Fire Alarm Interruption Activity With Agr. Contractor Must Submit To The Agr For Consideration And Written Approval A Minimum Of Seven (7) Business Days Prior To Activity. Contractor Must Have Agr Written Approval To Proceed Three Business Days Prior To Activity. Contractor Must Submit Written Fire Watch Plan To Agr For Consideration No Later Than (nlt) Ten (10) Calendar Days After Notice To Proceed (ntp). contractor Must Be Responsible For Fire Watch In The Areas Where Fire/smoke Detection Coverage Is Removed Or Disabled. Contractor Must Be Responsible To Coordinate Fire Or Smoke Detection With The Agr For The Removal And Restoration Of Fire Protection Coverage. After Regular Business Hours Or Designated Hours, Supervision Of The Fire Alarm Panel Is Required At The Contractor S Expense. The Contractor Must Be Responsible For Completion And Submission Of A Written Fire Alarm Bypass Request. The Contractors Written Request Must Be Submitted For Agr Approval And If Approved By Agr, Then The Agr Must Furnish A Written Approval To Proceed Three (3) Business Days In Advance Of Any Proposed Work Activity. If The Fire Alarm System Requires Any Deactivation, Then It Must Be Reactivated The Same Day Before The Contractor Leaves The Job Site To Ensure That The Fire Alarm System Is Functional. If The Fire Alarm System Is Not Functional, Then The Contractor Must Restore The Fire Alarm System To Working Order Prior To Leaving The Site Or Must Furnish An Around-the-clock Fire Watch Until The Fire Alarm System Is Functional. The Contractor Must Be Liable For Any Costs Incurred By The Government To Furnish The Fire Watch And/or To Repair The Fire Alarm System. hot Work: Contractor Must Perform And Safeguard Hot Work Operations In Accordance With Osha 1910 Subpart Q, Nfpa 241, And Nfpa 51b. Contractor Must Coordinate And Schedule With Agr Hot Work Operations. Hot Work Operation Is Defined As Operations Including, But Not Limited To, Open Flame, Producing Heat And/or Sparks, Burning, Welding, Processes Such As Arc Welding, Oxy-fuel Gas Welding, Open-flame Soldering, Brazing, Thermal Spraying, Cutting, Oxygen Cutting, Arc Cutting, Chipping, Grinding, Heat Treating, Sand Blasting, Torch-applied Roofing, Chemical Welding, Thawing Pipe, And Light Horizontal Welding, Or An Operation That Is Capable Of Initiating Fires Or Explosions. Contractor Must Obtain Hot Work Permit From Agr Prior To Activity. fire And Smoke Barrier Penetration: Contractor Must Perform, Maintain, And Safeguard The Integrity Of Smoke And Fire Barriers In Accordance With Nfpa 101, Nfpa 80, And Nfpa 90a. Contractor Penetrations In Barriers Must Be Repaired In An Approved Manner (filled With The Designated And Agr Approved Flame-retardant Filler). energized Circuit Work: Contractor Must Perform, Maintain, And Safeguard The Integrity Of The Medical Center Electrical Systems And Must Follow Procedures Around Energized Equipment In Accordance With Nfpa 70e Standards Including Proper Ppe. Contractor Must Coordinate And Schedule Energized Circuit Work With Agr. Contractor Must Submit To The Agr A Written Request For Consideration And Written Approval A Minimum Of Seven (7) Business Days Prior To Activity. Medical Center Electrician Or Electrical Engineer Must Monitor Work. Contractor Must Use Safety Equipment To Include But Not Be Limited To, 12 Calorie Arc Flash Suits With Hoods And 5kv Gloves. No Exits Will Be Blocked. Personnel Without Proper Ppe Must Be Prohibited Within The Working Area Around Live Electrical Panels With The Cover Removed. Contractor Must Have Agr Written Approval To Proceed Three (3) Business Days Prior To Activity. utility Interruption: Contractor Must Coordinate And Schedule With Agr. Contractor Must Submit To The Agr A Written Request For Consideration And Written Approval A Minimum Of Seven (7) Business Days Prior To Activity. Work Must Be Planned In Advance To Give As Much Time As Possible To Schedule A Utility Interruption. There May Be Times When A Utility Interruption Request Is Denied Because Of Insufficient Lead-time Or Interference With Ongoing Medical Center Activities And Must Be Rescheduled At No Additional Cost To The Government. Contractor Must Have Agr Written Approval To Proceed Three (3) Business Days Prior To Activity. disposal: Contractor Must Coordinate And Schedule With Agr. Contractor Must Have Agr Written Approval To Proceed Three (3) Business Days Prior To Activity. Contractor Must Submit A Written Request To Dispose Of Any Government Owned Materials, Equipment, Or Property In Advance To The Agr For Agr Written Approval. Contractor Must Remove And Properly Dispose Construction Debris, Materials, Equipment, And Substances From This Project And The Medical Center Property Daily Into The Contractor Supplied Containers. Contractor Must Coordinate Disposal Container Location With Agr Contingent Upon Available Space And Any Future Agr Directed Relocation(s) Must Be At No Additional Cost To The Government. Construction Debris Created From The Project Must Not Be Disposed Of In Medical Center Dumpsters Or On Medical Center Property. Disposal Of Construction Debris, Materials, Equipment, And Substances From The Project Must Be In Accordance With Applicable Federal, State, And Local Laws, Rules, And Regulations. The Contractor Must Ensure And Furnish Appropriate Documentation To The Agr That All Hazardous Waste Handlers, Haulers, And Disposal Facilities Are Properly Licensed. The Contractor Must Furnish Shipping Manifest And Documentation Of Disposal Of Construction Debris, Materials, Equipment, And Substances From The Project Prior To Final Payment. fumes: Contractor Must Coordinate And Schedule With Agr. Contractor Must Submit To The Agr A Written Request For Consideration And Written Approval A Minimum Of Seven (7) Business Days Prior To Activity. The Contractor Must Schedule Fume Producing Work Activities, Including But Not Limited To, Painting Or Heat Produced Fumes After Regular Business Hours. Contractor Must Be Responsible For Ventilation Necessary To Exhaust And Prevent Fumes From Entering Adjoining Areas, Outside Air Intake Ductwork, And Re-entering The Medical Center Healthcare Facilities At No Additional Cost To The Government. Contractor Must Have Agr Written Approval To Proceed Three (3) Business Days Prior To Activity. photography: Contractor Must Coordinate And Schedule With Agr. Contractor Must Be Escorted By Medical Center Personnel To Take Job Site Related Photos. Contractor Must Not Photograph Any Patients, Personnel, Visitors, And Others On Medical Center Property. other Requirements: structural Members Must Not Be Cut Or Altered, Without Prior Co Written Authorization. contractor Must Make Every Reasonable Effort To Protect Medical Center Property From Damage. contractor Must Furnish Adequate Protection For Medical Center Property Before Any Repair Activities Occur. Contractor Moved Items Must Be Put Back By The Contractor To Original Locations And Conditions As Work Is Completed At No Additional Cost To The Government. anything Remaining In Place That Is Damaged Or Defaced By The Contractor Must Be Restored By The Contractor To The Pre-existing Damaged Or Defaced Condition At No Additional Cost To The Government. contractor Must Coordinate Work Of Different Trades So That Interference Between Mechanical, Electrical, Architectural, And Structural Work Including Existing Services Must Be Avoided And Within Limits Indicated The Required Space For Operation, Repair, Removal, Maintenance, And Testing Of Equipment. Utilities, Including But Not Limited To, Conduit, Ducts, And Pipes Must Be Arranged To Ceiling Slab, Walls, And Columns To Take Up A Minimum Footprint Of Space. Conduit, Ducts, Pipes, And Equipment Must Not Interfere With Intended Use Of Eyebolts And Other Lifting Devices. contractor Must Locate Existing Utilities In Area Of Work. Contractor Must Furnish Adequate Means Of Support And Protection To Utilities That Remain In Place. Any Property, Including But Not Limited To, Electrical, Natural Gas, Medical Gas, Communication And Utility Lines, Landscaping, Walkways, Roads, And Curbs Damaged By Contractor Must Be Repaired Or Replaced At No Additional Cost To The Government. Government Property, Including But Not Limited To, Walls, Ceilings, Floors, Furniture, Must Be Protected From Damage At No Additional Cost To The Government. Areas Must Be Cleaned After Coring, Sawing, And Other Construction Activities By The Contractor At No Additional Cost To The Government. no Unauthorized Contractor Work To Be Initiated Without The Prior Written Approval Of The Co. The Co Must Approve Any Request, Or Proposal For Changes In Project Scope Or Additional Requirements, In Writing Prior To The Contractor Proceeding With Any Work. Any Contractor Changes Without Prior Written Approval By The Co, Must Be Done At The Contractor S Risk And At The Contractor S Expense. Contractors Must Visit The Job Site And Visit The Facility In Order To Determine The Nature And Location Of The Work To Be Performed In General And The Local Conditions Which Can Affect The Work. Failure To Do So Must Not Relieve The Contractor Of Responsibility For Estimating The Difficulty Or Cost To Perform The Work. Contractor Must Comply With Applicable Federal, State, Local Laws, Codes, Regulations, And Ordinances. contractor Must Obtain Permits And Licenses Required By Federal, State, Local Law, Code, Regulation, And Ordinance(s) At No Additional Cost To The Government. contract Changes/modifications: the Co Is The Only Person Authorized To Approve Changes Or Modify Any Of The Requirements Of This Contract. The Contractor Shall Communicate With The Agr On All Matters Pertaining To Contract Administration And Technical Direction. Only The Co Is Authorized To Make Commitments Or Issue Changes That Shall Affect Price, Quantity, Or Quality Of Performance Of This Contract. (end Of Statement Of Work)
Closing Date7 Apr 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Software and IT Solutions
location
United States
Details: This Is A Sources Sought Notice Only. This Is Not A Solicitation For Bids, Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Sources Sought Notice Is For Market Research To Obtain Information Regarding The Availability And Capability Of All Qualified Sources To Perform Or Provide A Potential Requirement. The Responses Received From Interested Vendor Will Assist The Government In Determining The Appropriate Acquisition Method. The Department Of Veterans Affairs (va), Network Contracting Office 16 (nco 16) Is Seeking To Identify Potential Qualified Vendors Capable Of Providing The Requirement. This Requirement Is For The Veterans Health Care System Of The Ozarks (vhso) At 1100 N. College Ave Fayetteville, Ar 72703. The North American Industry Classification Code (naics) Is 334512 (automatic Environmental Control Manufacturing For Residential, Commercial, And Appliance Use), And Psc Code 4120 (air Conditioning Equipment), With A Size Standard Of 650 Employees. Requested Responses: All Responsible Vendors And Interested Parties Please Respond To This Source Sought Announcement If You Can Fulfill The Requirements. Responses To This Source Sought Shall Include The Following Information: 1. Your Company Name, Address, Contact Person Name, Phone Number, Fax Number, E-mail Address(s), Uei Number, Number Of Employees, And Company Website If Available. 2. If You Are An Gsa/fss Contract Holder Are The Referenced Items Available On Your Schedule/contract? Provide Your Company Gsa/fss Contract Number And Contract Expiration Date, If Applicable. 3. If You Are A Nasa Sewp V Contract Holder Are The Referenced Items Available On Your Schedule/contract? Provide Your Company Nasa Sewp V Contract Number, Contract Group, And Contract Expiration Date, If Applicable. 4. Is Your Company A Contract Holder On Any Other Federal Contract? If So, Please Provide The Contract Number. 5. Socio-economic Status Of Business Such As But Not Limited To (service-disabled Veteran Owned Small Businesses (sdvosb) Or Veteran Owned Small Businesses (vosb) Sdvosb/vosb, 8(a), Hub Zone, Women Owned Small Business, Small Disadvantaged Business, Or Small Business Hub Zone Business, Large Business, Etc.). 6. Is Your Company Considered Small Under The Naics Code Identified In This Source Sought Announcement? 7. Is Your Company The Manufacturer, Distributor, Or An Equivalent For The Products Being Offered? If An Authorized Distributor Or Equivalent, Can You Provide Documentation From The Manufacturer Confirming Authorization To Provide The Referenced Items And/or Products Being Offered? If Not, Can You Provide Additional Information Shown Below. This Is To Confirm Compliance With The Non-manufacturer Rule In Accordance With Title 13 Cfr 121.406(b) Nonmanufacturers. Does Your Company Exceed 500 Employees? Is Your Company Primarily Engaged In The Retail Or Wholesale Trade And Normally Sells The Type Of Item Being Supplied? Does Your Company Take Ownership Or Possession Of The Item(s) With Its Personnel, Equipment, Or Facilities In A Manner Consistent With Industry Practice; And Will Supply The End Item Of A Small Business Manufacturer, Processor Or Producer Made In The United States Or Obtains A Waiver Of Such Requirement Pursuant To Title 13 Cfr 121.406 Paragraph (b)(5). 8. If Your Company Is A Large Business, Do You Have Any Designated Distributors? If So, Please Provide Their Company Name, Telephone, Point Of Contact And Size Status (if Available). 9. What Is The Manufacturing Country Of Origin Of The Items And/or Products Being Offered? 10. Delivery Timeframe The Government Would Like To Know The Standard Delivery Time Frame For A Requirement Like This. 11. Provide Warranty Information For The Items And/or Products Being Requested? 12. Vendors Are Requested To Submit Estimated Market Research Pricing With Their Responses. The Estimated Pricing Will Be Considered When Determining The Procurement Strategy For The Future Solicitation. (e.g., If Contracting Officer Determines That Capable Small Businesses Cannot Provide Fair And Reasonable Pricing, Then The Solicitation Will Not Be Set-aside). Please Note That If No Responses To This Notice Are Received, From Either Authorized Distributors Of The Cited Brand Name Nor From Manufacturers Marketing A Potentially Equivalent Brand (with Authorized Distributor Letter), Then This Action Will Be Sole Sourced To The Manufacturer. Contact Information And Response Due Date: Please Email All Responses To Caleb.parker@va.gov. Please Respond To This Source Sought Notice No Later Than 2:00 Pm Central 04-17-2025. Disclaimer: This Source Sought Is Issued Solely For Informational And Planning Purposes And Does Not Constitute A Solicitation. Responses To This Notice Are Not Offers And Cannot Be Accepted By The Department Of Veterans Affairs To Form A Binding Contract. Respondents Are Solely Responsible For All Expenses Associated With Responding To This Source Sought Notice. Statement Of Work (sow) Replace Building 4 Chiller Veterans Health Care System Of The Ozarks (vhso) Fayetteville, Arkansas Contractor Must Furnish All Management, Supervision, Labor, Material, Equipment, Tools, Supplies, Consumables, Parts, And Related Services, In Accordance With The Sow To Replace Existing Building 4 Air Cooled Chiller. Electronic Portable Document Format (.pdf) Copies Of Drawings And Specifications To This Work Will Be Furnished By Va Upon Contractor S Written Request To The Contracting Officer (co). Hard Copies Of Sow, Drawings, And Specifications Are The Contractor S Responsibility And Expense At No Additional Cost To The Government. Contractor Must Verify Existing And New Dimensions, Locations, And Quantities To Complete This Project Located On The Vhso Main Campus 1100 N. College Avenue, Fayetteville, Ar 72703. General Requirements: Any Provision Or Partial Provision Of The Contract, Including But Not Limited To, Drawings And Specifications That Is Not Consistent With This Sow Will Be Null And Void Only To The Extent Of The Inconsistency. All Other Provisions Or Partial Provisions Of The Contract, Including But Not Limited To, Drawings And Specifications, Must Remain In Full Force And Effect. Information Security: The Certification And Accreditation (c&a) Does Not Apply, A Security Accreditation Package Is Not Required. Contractor Must Have The Following Requirements Completed Within Ten (10) Business Days Of Contract Award: Osha 10 And 30 Certifications: Submit As A Minimum Osha 10 Certification To The Cor For Every Contractor Employee That Will Be Working On Vhso Property. Osha 10 Cards Are To Always Remain On The Employee S Person. Contractor Point Of Contract: Notify The Cor In Writing Of The Name, Phone Number, Email Address Of The Contractor Appointed Point Of Contact. The Designated Individual Must Have Full Authority To Act For The Contractor On All Matters Relating To Work Performance, To Receive, Accept And Sign For Any Notices, Inspection Reports And All Other Correspondence On Behalf Of The Contractor From The Cor And / Or Contracting Officer. This Individual Must Oversee The Contractor S Worksite Operations And Ensure All Work Is Performed In Accordance With All Contract Requirements Including Scheduling, Quality, And Safety. This Individual Must Be Always Available When Contract Work Is In Progress, And Must Respond To The Work Site As Directed By The Cor. The Contractor Or Their Designated Point Of Contact Must Return Phone Calls Or Text(s) To The Cor Within 1 Hour Of Contact And Must Return Emails From The Cor Within 24 Hours Of Contact. Period Of Performance: Fourteen (14) Calendar Days. Work Site Access: Contractor Must Perform All Work On A Weekend Starting On A Friday At 1700 Hours And Be Completed By Sunday At 1700 Hours. Cor Must Provide Final Dates That Work Will Be Performed. This Project Must Be Turn-key In Accordance With This Sow, Drawings, And Specifications To Be Complete And Working System(s). Vhso Facility Must Continue To Operate During The Contract Period Of Performance, Including But Not Limited To, The Mechanical And Electrical Systems. Vhso Operations Take Precedence Over Contractor Work At No Additional Cost To The Government. Contractor S Work Must Be Conducted With The Least Amount Of Disruption To The Vhso Facility. Contractor Must Provide All Submittals For Equipment And Materials With Proposal. Prior To The Start Of Job Site Activities, Together The Contractor And Cor Must Conduct A Site Survey To Identify And Review Specific Work And Differing Site Conditions. Contractor Materials, Equipment, Tools, Supplies, Consumables, And Parts Must Not Be Left Unattended Within A Common Work Area. When Working In Common Areas, There Must Be A Minimum Of Two (2) Contractor Employees Present To Ensure That Contractor Building Materials, Including But Not Limited To, Equipment, Tools, And Supplies Are Not Accessible To Others. Warranty: Contractor Must Guarantee Workmanship For A Period Of One (1) Year After Cor Written Acceptance Of Work. Contractor Must Furnish A Minimum Five (5) Years Parts Warranty On Equipment, Components, And Materials Furnished Plus Any Manufacturer S Warranty Greater Than One (1) Year. Emergency Service: Contractor Emergency Service Must Be Available 24 Hours Per Day. Contractor Must Respond On-site To Emergency Service Calls Within Two (2) Hours Of Notification. Contractor Must Have The Issue(s) Corrected Or A Plan In Place (awaiting Parts) Within Four (4) Hours Of Arrival At Job Site. Any Temporary Repairs Must Have Prior Written Approval By The Chief, Engineering Service Or Their Designated Representative. Qualifications Of Contractor: Contractor And/or Subcontractor Must Possess A State Issued Class A Hvac Contractor License And A State Issued Electrical Contractor License. Contractor And/or Subcontractor Must Have 5 Continuous Years Of Chiller Installation Experience In A Healthcare Environment Of The Same Size And Complexity As Vhso. Contractor And/or Subcontractor Shall Posses The Required Skills And Factory Support To Install, Operate, Program, And Update The Alerton Building Management System. No Vhso Support Will Be Provided. Scope Of Work: Contractor Must Ensure That All Work, Equipment, And Materials Are In Compliance With The 2023 Nfpa 70 National Electrical Code, 2021 International Mechanical Code, Va Electrical Design Manual, March 1, 2025; Va Hvac Design Manual, November 1, 2017 Rev. March 1, 2024; And Manufacturer S Recommendations. Contractor Must Provide All Materials, Equipment, Labor, Supervision, Permits, Licenses, And Services Required To Replace A Failed Air-cooled Chiller. Remove And Properly Dispose Of Existing Mcquay Chiller, Model Number Agz130dhhnn-er10, Serial Number Stnu130800201 And All Parts And Materials Not Required For Installation Of New Chiller Located Behind Building 4. Provide And Install A York Ylaa0120sj17xfb (or Equal), 150-ton, Air Cooled Chiller. Provide And Install All Piping, Valves, Fittings, Water Thermometers, Water Pressure Gauges, Pipe Insulation With Aluminum Cladding. Test All Devices Prior To Insulation And Ensure No Leaks Exist In System. Repair Any Deficiencies. Provide All Parts And Materials Required To Connect New Chiller To Existing Alerton Building Automation System (bas). Ensure That All Current Outputs And Controls Are Available On The New Installation. Update Graphics Per Cor Requirements On All Alerton User Interfaces To Include All Laptops To Reflect New Chiller And All Associated Sensors And Components. Update Programing As Required. Test The New Chiller Bas Installation Ensuring: The Chiller Can Be Operated Remotely At Alerton User Interfaces. Chiller Outputs Are Neatly Displayed In Interface Graphics And Are Calibrated And Tested To Be Accurate Per Alerton Recommendations. Provide Parts And Perform Repairs As Required. Provide All Parts And Materials To Connect The New Chiller And All Associated Components To The Electrical Switch Gear Located In The Basement Of Building 4. Test The New Chiller Electrical Service Ensuring Proper Operation And Provide Any Required Materials And Labor To Complete Any Required Repairs Or Upgrades. The Cor Or Their Designated Representative Must Observe All Testing. Commission The New Chiller Per The Manufacturer S Recommendations And In The Presence Of The Cor Or Their Designated Representative. Complete And Submit All Required Commissioning And Warranty Documentation To The Equipment Manufacturer And The Cor. Contractor Access And Activities: Records Management: Contractors Whose Employees Create, Work With, Or Otherwise Handle Federal Records, As Defined In Section B, Regardless Of The Medium In Which The Record Exists. Federal Record As Defined In 44 U.s.c. â§ 3301, Includes All Recorded Information, Regardless Of Form Or Characteristics, Made Or Received By A Federal Agency Under Federal Law Or In Connection With The Transaction Of Public Business And Preserved Or Appropriate For Preservation By That Agency Or Its Legitimate Successor As Evidence Of The Organization, Functions, Policies, Decisions, Procedures, Operations, Or Other Activities Of The United States Government Or Because Of The Informational Value Of Data In Them. The Term Federal Record: Includes U.s. Department Of Veterans Affairs (va) Records. Does Not Include Personal Materials. Applies To Records Created, Received, Or Maintained By Contractors Pursuant To Their Va Contract. May Include Deliverables And Documentation Associated With Deliverables. Contractor Must Comply With All Applicable Records Management Laws And Regulations, As Well As National Archives And Records Administration (nara) Records Policies, Including But Not Limited To The Federal Records Act (44 U.s.c. Chs. 21, 29, 31, 33), Nara Regulations At 36 Cfr Chapter Xii Subchapter B, And Those Policies Associated With The Safeguarding Of Records Covered By The Privacy Act Of 1974 (5 U.s.c. 552a). These Policies Include The Preservation Of All Records, Regardless Of Form Or Characteristics, Mode Of Transmission, Or State Of Completion. In Accordance With 36 Cfr 1222.32, All Data Created For Government Use And Delivered To, Or Falling Under The Legal Control Of, The Government Are Federal Records Subject To The Provisions Of 44 U.s.c. Chapters 21, 29, 31, And 33, The Freedom Of Information Act (foia) (5 U.s.c. 552), As Amended, And The Privacy Act Of 1974 (5 U.s.c. 552a), As Amended And Must Be Managed And Scheduled For Disposition Only As Permitted By Statute Or Regulation. In Accordance With 36 Cfr 1222.32, Contractor Must Maintain All Records Created For Government Use Or Created While Performing The Contract And/or Delivered To, Or Under The Legal Control Of The Government And Must Be Managed In Accordance With Federal Law. Electronic Records And Associated Metadata Must Be Accompanied By Sufficient Technical Documentation To Permit Understanding And Use Of The Records And Data. Va And Its Contractors Are Responsible For Preventing The Alienation Or Unauthorized Destruction Of Records, Including All Forms Of Mutilation. Records May Not Be Removed From The Legal Custody Of Va Or Destroyed Except For In Accordance With The Provisions Of The Agency Records Schedules And With The Written Concurrence Of The Head Of The Contracting Activity. Willful And Unlawful Destruction, Damage Or Alienation Of Federal Records Is Subject To The Fines And Penalties Imposed By 18 U.s.c. 2701. In The Event Of Any Unlawful Or Accidental Removal, Defacing, Alteration, Or Destruction Of Records, Contractor Must Report To Va. The Agency Must Report Promptly To Nara In Accordance With 36 Cfr 1230. The Contractor Must Immediately Notify The Appropriate Contracting Officer Upon Discovery Of Any Inadvertent Or Unauthorized Disclosures Of Information, Data, Documentary Materials, Records, Or Equipment. Disclosure Of Non-public Information Is Limited To Authorized Personnel With A Need-to-know As Described In The Contract. The Contractor Must Ensure That The Appropriate Personnel, Administrative, Technical, And Physical Safeguards Are Established To Ensure The Security And Confidentiality Of This Information, Data, Documentary Material, Records And/or Equipment Is Properly Protected. The Contractor Must Not Remove Material From Government Facilities Or Systems, Or Facilities Or Systems Operated Or Maintained On The Government S Behalf, Without The Express Written Permission Of The Head Of The Contracting Activity. When Information, Data, Documentary Material, Records And/or Equipment Is No Longer Required, It Must Be Returned To Va Control, Or The Contractor Must Hold It Until Otherwise Directed. Items Returned To The Government Must Be Hand Carried, Mailed, Emailed, Or Securely Electronically Transmitted To The Contracting Officer Or Address Prescribed In The Contract. Destruction Of Records Is Expressly Prohibited Unless In Accordance With Paragraph (4). The Contractor Is Required To Obtain The Contracting Officer's Approval Prior To Engaging In Any Contractual Relationship (sub-contractor) In Support Of This Contract Requiring The Disclosure Of Information, Documentary Material And/or Records Generated Under, Or Relating To, Contracts. The Contractor (and Any Sub-contractor) Is Required To Abide By Government And [agency] Guidance For Protecting Sensitive, Proprietary Information, Classified, And Controlled Unclassified Information. The Contractor Must Only Use Government It Equipment For Purposes Specifically Tied To Or Authorized By The Contract And In Accordance With Va Policy. The Contractor Must Not Create Or Maintain Any Records Containing Any Non-public Va Information That Are Not Specifically Tied To Or Authorized By The Contract. The Contractor Must Not Retain, Use, Sell, Or Disseminate Copies Of Any Deliverable That Contains Information Covered By The Privacy Act Of 1974 Or That Which Is Generally Protected From Public Disclosure By An Exemption To The Freedom Of Information Act. The Va Owns The Rights To All Data And Records Produced As Part Of This Contract. All Deliverables Under The Contract Are The Property Of The U.s. Government For Which Va Must Have Unlimited Rights To Use, Dispose Of, Or Disclose Such Data Contained Therein As It Determines To Be In The Public Interest. Any Contractor Rights In The Data Or Deliverables Must Be Identified As Required By Far 52.227-11 Through Far 52.227-20. Training. All Contractor Employees Assigned To This Contract Who Create, Work With, Or Otherwise Handle Records Are Required To Take Va Provided Records Management Training. The Contractor Is Responsible For Confirming Training Has Been Completed According To Agency Policies, Including Initial Training And Any Annual Or Refresher Training. The Contractor Must Incorporate The Substance Of This Clause, Its Terms And Requirements Including This Paragraph, In All Subcontracts Under This Contract, And Require Written Subcontractor Acknowledgment Of Same. Violation By A Subcontractor Of Any Provision Set Forth In This Clause Will Be Attributed To The Contractor. Safety: Contractor S Highest Priority Must Be Safety. Contractor Work Must Be In Accordance With Federal, State, Local Osha Codes, Regulations, Latest Edition Of Nec, Latest Edition Of Nfpa 70e, And 01 35 26 Safety Requirements Specification. Contractor Must Furnish And Use Required Safety Items, Including But Not Limited To, Safety Signage, Cones, Barricades, And Must Furnish And Wear Required Personal Protective Equipment (ppe). Infection Control: Contractor Must Be Responsible To Develop A Phasing And Infection Control Risk Assessment (icra) That Incorporates Requirements Of Specifications 01 00 00 General Requirements To Meet Requirements Of Vhso And Vhso Icra. Site Supervision: Contractor Must Submit Written Qualifications Of Proposed Site Superintendent(s) To The Co And Cor For Consideration. Contractor Must Furnish Superintendent(s) With Written Cor Approval To Continuously Supervise On Site Contract Activities. Contractor Superintendent(s) Must Not Engage In Any Direct Trades Labor. Security: Contractor Must Coordinate With Va Police And Cor To Comply With The Vhso Security Management Program, Including But Not Limited To, Obtain Onsite Access Permission By The Va Police, Be Identified By Contractor And Project, And Restricted From Unauthorized Access. Badging: While On Campus, Contractor Must Wear A Visible Vhso Issued Identity Badge. Contractor Can Be Subject To Inspection Of Personal Effects When Entering Or Leaving The Project Site And Vhso Property. Contractor Site Superintendent Must Escort Contractor Employees To Engineering Shop (building 37) To Obtain Badge(s). Contractor Must Maintain A Badge Log With Employee Names, Badge Id Numbers, Start Date(s), Departure Date(s), Id Lost Date(s), And Id Return Date(s). Contractor Must Update Badge Log And Furnish To The Cor Weekly Or As Directed In Writing By Cor. Contractor Must Report Lost Badge(s) Immediately To The Cor And Document On Badge Log. Contractor Must Return Badge(s) Immediately On Day Of Departure Of Employee From Project To Cor And Document On Badge Log. Contractor Must Return Remaining Badge(s) At Project Closeout To Cor. Contractor Must Reimburse The Government A $100.00 Fee For Each Lost Or Unreturned Badge. Key Access: Contractor Site Superintendent May Check Out A Key To Access Mechanical And Electrical Rooms As Project Requires. Contractor Site Superintendent Must Check Out And Return A Key At Engineering (building 37) Daily And The Key Must Not Leave Vhso Property. Contractor Site Superintendent Must Notify The Cor When A Key Is Lost. Contractor Must Reimburse The Government A $3,500.00 Fee For Each Lost Or Unreturned Key(s). Utilities: Contractor Must Not Leave Unattended Out-of-service Any Utility, Fire Protection, Life Safety System, Or Security System Without Written Permission Of The Cor. If A Utility, Fire Protection, Life Safety System Or Security System Is Not Functional At The End Of A Work Period Without Written Permission Of The Cor, Then The Contractor Must Restore The System(s) To Working Order Prior To Leaving The Job Site Or Must Furnish An Around-the-clock Watch Subject To Cor Written Approval Until The System Is Functional. If The Contractor Fails To Do So, The Contractor Must Reimburse The Government A Fee Equal To The Amount Of Costs Incurred By The Government To Furnish Around-the-clock Watch And/or Repair The System(s). Parking: Contractor On-site Parking Is Limited To Availability Of Designated Contractor Parking. Contractor Must Have Prior Cor Written Approval Of On-site Contractor Parking. Vehicles And Construction Equipment: Contractors Key(s) To Unattended Vehicle(s) And Construction Equipment Must Be Removed And Vehicle(s) Locked. Unloading And Loading: Contractor Must Unload And Load Materials, Including But Not Limited To, Equipment, Tools, Supplies, Parts, And Construction Debris At The Loading Dock. Contractor Must Not Leave Vehicle(s) Or Construction Equipment Unattended At The Loading Dock. No Materials, Including But Not Limited To, Equipment, Tools, Supplies, Parts, And Construction Debris Are Permitted Through The Front Entry. Elevators: Contractor Must Use Cor Designated Elevators And Must Protect Elevator Cabs, Including But Not Limited To, Cab Interior Components And Controls During Contractor Use. Contractor Must Not Exceed Elevator Weight Limits. Cor Designated Elevator(s) May Not Be Immediately Available To The Contractor. The Contractor Must Account For This And Contractor Must Be Flexible In The Project Schedule Without Additional Cost To The Government. Storage And Staging: Contractor Storage And Staging Is Limited To Availability Of Designated On-site Contractor Storage And Staging. Contractor Must Submit A Written Request For Storage Or Staging To The Cor For Consideration A Minimum Of Seven (7) Business Days Prior To The Storage Or Staging. Contractor Must Have Prior Cor Written Approval Of On-site Contractor Storage And Staging. Contractor Must Relocate Or Remove On-site Storage And Staging, Including But Not Limited To, Contractor S Office Trailer(s), Dumpster(s), Storage Container(s) And Construction Materials A Maximum Of Seven (7) Business Days After Written Notification By The Cor Without Additional Expense To The Government. Equipment And Tools: Contractor Must Furnish Construction Equipment And Power And Hand Tools, Including But Not Limited To, Ladders, Scaffolds, Lifts, Backhoes, And Forklifts To Complete Contractor S Work. Radios And Mobile Devices: Contractor Must Use Mobile Devices At Low Volume Or Outside. Contractor Must Not Carry On Conversations In Hallways Or Near Any Patient Areas. Am/fm Radios And Other Media Producing Devices Must Not Be Used On Vhso Property. Hot Work: Contractor Must Perform And Safeguard Hot Work Operations In Accordance With Osha 1910 Subpart Q, Nfpa 241, And Nfpa 51b. Contractor Must Coordinate And Schedule With Cor Hot Work Operations. Hot Work Operation Is Defined As Operations Including, But Not Limited To, Open Flame, Producing Heat And/or Sparks, Burning, Welding, Processes Such As Arc Welding, Oxy-fuel Gas Welding, Open-flame Soldering, Brazing, Thermal Spraying, Cutting, Oxygen Cutting, Arc Cutting, Chipping, Grinding, Heat Treating, Sand Blasting, Torch-applied Roofing, Chemical Welding, Thawing Pipe, And Light Horizontal Welding, Or An Operation That Is Capable Of Initiating Fires Or Explosions. Contractor Must Obtain Hot Work Permit From Cor Prior To Activity. Energized Circuit Work: Contractor Must Perform, Maintain, And Safeguard The Integrity Of The Vhso Electrical Systems And Must Follow Procedures Around Energized Equipment In Accordance With Nfpa 70e Standards Including Proper Ppe. Contractor Must Coordinate And Schedule Energized Circuit Work With Cor. Contractor Must Submit To The Cor A Written Request For Consideration And Written Approval A Minimum Of Seven (7) Business Days Prior To Activity. Vhso Electrician Or Electrical Engineer Must Monitor Work. Contractor Must Use Safety Equipment To Include But Not Be Limited To, 12 Calorie Arc Flash Suits With Hoods And 5kv Gloves. No Exits Will Be Blocked. Personnel Without Proper Ppe Must Be Prohibited Within The Working Area Around Live Electrical Panels With The Cover Removed. Contractor Must Have Cor Written Approval To Proceed Three (3) Business Days Prior To Activity. Utility Interruption: Contractor Must Coordinate And Schedule With Cor. Contractor Must Submit To The Cor A Written Request For Consideration And Written Approval A Minimum Of Seven (7) Business Days Prior To Activity. Work Must Be Planned In Advance To Give As Much Time As Possible To Schedule A Utility Interruption. There May Be Times When A Utility Interruption Request Is Denied Because Of Insufficient Lead-time Or Interference With Ongoing Vhso Activities And Must Be Rescheduled At No Additional Cost To The Government. Contractor Must Have Cor Written Approval To Proceed Three (3) Business Days Prior To Activity. Disposal: Contractor Must Coordinate And Schedule With Cor. Contractor Must Have Cor Written Approval To Proceed Three (3) Business Days Prior To Activity. Contractor Must Submit A Written Request To Dispose Of Any Government Owned Materials, Equipment, Or Property In Advance To The Cor For Cor Written Approval. Contractor Must Remove And Properly Dispose Construction Debris, Materials, Equipment, And Substances From This Project And The Vhso Property Daily Into The Contractor Supplied Containers. Contractor Must Coordinate Disposal Container Location With Cor Contingent Upon Available Space And Any Future Cor Directed Relocation(s) Must Be At No Additional Cost To The Government. Construction Debris Created From The Project Must Not Be Disposed Of In Vhso Dumpsters Or On Vhso Property. Disposal Of Construction Debris, Materials, Equipment, And Substances From The Project Must Be In Accordance With Applicable Federal, State, And Local Laws, Rules, And Regulations. The Contractor Must Ensure And Furnish Appropriate Documentation To The Co And Cor That All Hazardous Waste Handlers, Haulers, And Disposal Facilities Are Properly Licensed. The Contractor Must Furnish Shipping Manifest And Documentation Of Disposal Of Construction Debris, Materials, Equipment, And Substances From The Project Prior To Final Payment.
Closing Date17 Apr 2025
Tender AmountRefer Documents 

Municipality Of Argao, Cebu Tender

Manpower Supply
location
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. B.7(2) Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 14.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances B. Manpower: - Building Permit Processing Fees C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 43.41 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 43.41 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 39.57 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 39.57 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 3.81 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 3.81 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: 1.05 M3 A. Plate Compactor (5 Hp) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (footing, Slab On Fill)" Quantity 15.03 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 15.03 M3 " Structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 2.56 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.56 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (columns)" Quantity 5.42 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 5.42 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 3.90 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.90 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 "structural Concrete (suspended Slab)" Quantity 2.09 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.09 M3 " Structural Concrete (suspended Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 3,947.39 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 3947.39 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 56.65 M2 Dpwh Standard Output Per Day (opd)= 3.24 M2 56.65 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 188.21 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 188.21 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1016(1)a Waterproofing Cement Base Quantity 12.54 M2 Dpwh Standard Output Per Day (opd)= 1.875 M2 12.54 M2 Waterproofing Cement Base Direct Cost: A. Materials: 1.05 M2 A. Cement-based Waterproofing B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 507.84 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 507.84 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purtins Quantity 200.46 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 200.46 Kg Structural Steel Purtins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 48.00 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 48.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 54.76 M Dpwh Standard Output Per Day (opd)= 10.00 M 54.76 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 7.76 M Dpwh Standard Output Per Day (opd)= 11.80 M 7.76 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 50.00 M2 Dpwh Standard Output Per Day (opd)= 50.00 M2 50.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 200.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 1.00 Set D. Single-gang Switch 4.00 Set E. Two-gang Switch 2.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 7.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 3.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 1.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 1.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 6.00 Pcs H. Pvc Coupling (50mm D) 2.00 Pcs I. Pvc Coupling3 (101mm D) 1.00 Pcs J. Pvc P-trap W/ Plug & Sealing Rings (50mm) 1.00 Pcs K. Pvc P-trap W/ Plug & Sealing Rings (101mm) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 10.00 1.00 A. Construction Foreman 10.00 1.00 B. Skilled Laborer 10.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 8.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 9.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 5.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 5.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 5.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 58.55 M2 Dpwh Standard Output Per Day (opd)= 2.00 M2 58.55 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date20 Feb 2025
Tender AmountPHP 1.4 Million (USD 25.7 K)

Municipality Of Argao, Cebu Tender

Manpower Supply
location
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 8.00 1.00 A. Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: 1.00 Lot Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days D. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 15.00 1.00 A. Safety Practitioner/officer (part Time) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 16.56 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 16.56 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 14.61 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 14.61 M3 Embankment From Structure Excavation Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 " Structural Concrete (footing, Slab On Fill)" Quantity 6.09 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 6.09 M3 "structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 " Structural Concrete (footing Tie Beam, Wall Footing)" Quantity 3.24 M3 Dpwh Standard Output Per Hour (oph)= 0.27 M3 3.24 M3 "structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 " Structural Concrete (columns)" Quantity 2.08 M3 Dpwh Standard Output Per Hour (oph)= 0.27 M3 2.08 M3 "structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 1.69 M3 Dpwh Standard Output Per Hour (oph)= 0.27 M3 1.69 M3 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 786.93 Kg Dpwh Standard Output Per Hour (oph)= 143.438 Kg 786.93 Kg "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 32.81 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 32.81 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 88.86 M2 Dpwh Standard Output Per Hour (oph)= 3.825 M2 88.86 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1027(1) Cement Plaster Finish Quantity 177.72 M2 Dpwh Standard Output Per Hour (oph)= 7.125 M2 177.72 M2 Cement Plaster Finish Direct Cost: A. Materials: 0.33 Bag A. Cement 0.03 Cu.m B. Sand B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 321.66 Kg Dpwh Standard Output Per Hour (oph)= 85 Kg 321.66 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 226.16 Kg Dpwh Standard Output Per Hour (oph)= 90.45 Kg 226.16 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)b Metal Structure Accessories (sagrods) Quantity 4.00 Pc Dpwh Standard Output Per Hour (oph)= 1 Pc 4.00 Pc Metal Structure Accessories (sagrods) Direct Cost: A. Materials: 1.00 Pc A. Sagrod With Nuts And Bolts 1.00 Pc B. 16 Mm Plain Round Bar With 16 Mm Turn Buckle B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 56.00 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 56.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 22.00 M Dpwh Standard Output Per Hour (oph)= 10 M 22.00 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 8.00 M Dpwh Standard Output Per Hour (oph)= 11.8 M 8.00 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Ceiling Quantity 56.00 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 56.00 M2 4.5mm Fiber Cement Board On Metal Frame Ceiling Direct Cost: A. Materials: 0.37 Pc "a. 4.5mm Fiber Cement Board Plywood" 1.13 Pc "b.metal Furring 3m Length" 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1009 (1)a Jalousie Window (glass) Quantity 5.76 M2 Dpwh Standard Output Per Hour (oph)= 0.27 M2 5.76 M2 Jalousie Window (glass) Direct Cost: A. Materials: 1.00 M2 A.jalousie Window (glass B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (1) Frames (jambs, Sill, Head, Transoms And Mullions Quantity 2.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 2.00 Set Frames (jambs, Sill, Head, Transoms And Mullions Direct Cost: A. Materials: 1.00 Set A.jambs, Sill, Head, Transoms And Mullion B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 2.00 1.00 A. Construction Foreman 2.00 1.00 B. Skilled Laborer 2.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)a Hollow Core Flush Door Quantity 3.78 M2 Dpwh Standard Output Per Hour (oph)= 0.32 M2 3.78 M2 Hollow Core Flush Door Direct Cost: A. Materials: 1.00 M2 A.hollow Core Flush Door B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= "1.00 " I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 2.00 Length A. Pvc Pipe Poly 3/4 20.00 Length B. Pvc Pipe Poly 1/2 2.00 Pcs C. Pvc Square Box Poly 5x5 30.00 Pcs D. Flexible Connector 1/2 5.00 Pcs E. Utility Box 2x4 10.00 Pcs F. Junction Box 4x4 2.00 Pcs G. 3/4 Ø Entrance Cap 4.00 Pcs H. Electrical Tape I. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 21.23 1.00 A. Construction Foreman 21.23 1.00 B. Skilled Laborer 21.23 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 70.00 M A. Thhn Wire Stranded # 8 1.00 Box B.thhn Wire Stranded # 12 40.00 M C. Thhn Wire Stranded # 10 1.00 Set D. Flush Type Single-gang Switch 0.00 Set E. Flush Type Two-gang Switch 1.00 Set F. Flush Type Three-gang Switch 3.00 Set G. Flush Type Outlet 3 Gang Universal H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 14.40 1.00 A. Construction Foreman 14.40 1.00 B. Skilled Laborer 14.40 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 I.s. Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Pcs A. Panel Board Bolt On Type 4 Holes 1.00 Pcs B. 60 Amp. Plug-in Breaker 1.00 Pcs B. 30 Amp. Plug-in Breaker 0.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 12.00 Units A. Led Downlight 9w B. Manpower: Number Of Hours 12.00 1.00 A. Construction Foreman 12.00 1.00 B. Skilled Laborer 12.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)a Painting Works (masonry Painting) Quantity 156.12 M2 Dpwh Standard Output Per Hour (oph)= 2.1 M2 156.12 M2 Painting Works (masonry Painting) Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1018.00 Unglazed Tiles Quantity 30.00 M2 Dpwh Standard Output Per Hour (oph)= 1 .95 M2 30.00 M2 Unglazed Tiles Direct Cost: A. Materials: 1.05 M2 A. Unglazed Tiles 0.33 Bag B. Cement 0.03 M3 C.sand 0.13 Bag D. Tile Grout B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date4 Mar 2025
Tender AmountPHP 989.8 K (USD 17 K)
5761-5770 of 5786 archived Tenders