Tenders of Offizielle Bezeichnung
Tenders of Offizielle Bezeichnung
Offizielle Bezeichnung Tender
Civil And Construction...+1Civil Works Others
Germany
Contract notice - general guideline, standard regulation open procedure (construction work) Weserstrasse 28-30_windows_roller shutters Window and roller shutter work Weserstrasse 28-30_windows_roller shutters This is a new building by Wohnbau Gießen GmbH with 40 residential units and 2 commercial units. ... Mehrweserstrasse 28-30_windows_roller shutters Window and roller shutter work Weserstrasse 28-30_windows_roller shutters This is a new building by Wohnbau Gießen GmbH with 40 residential units and 2 commercial units. Window work Eg Roller shutter and sun protection work Eg Window work 1st-3rd floor Roller shutter and sun protection work 1st-3rd floor
Closing Date19 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice – Sector Directive, standard regulation Negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Framework agreement for emergency response services for boiler technology and piping. Call-off order for emergency response services for boiler technology and piping. It is intended to award the services to up to 3 bidders. De ... Multi-framework agreement for emergency response services for boiler technology and piping. Call-off order for emergency response services for boiler technology and piping. It is intended to award the services to up to 3 bidders. The best bidder will receive a contract worth 50% of the budget, the 2nd bidder will receive 30% of the budget and the 3rd bidder will receive 20% of the budget Framework agreement for emergency response services for boiler technology and piping. Call-off order for emergency response services for boiler technology and piping. It is intended to award the services to up to 3 bidders. The best bidder receives a contract worth 50% of the budget, the 2nd bidder receives 30% of the budget and the 3rd bidder receives 20% of the budget
Closing Date17 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+3Civil Works Others, Consultancy Services, Civil And Architectural Services
Germany
Contract notice – general guidelines, standard rules for negotiated procedures with prior publication of a call for competition/negotiated procedures (services) New center of Breckenheim, Wiesbaden; planning of buildings and interiors, phases 1-9 New center of Breckenheim, Wiesbaden; planning of buildings and interiors, phases 1-9 New center of Breckenheim, Wiesbaden; ... MoreNew center of Breckenheim, Wiesbaden; planning of buildings and interiors, phases 1-9 New center of Breckenheim, Wiesbaden; planning of buildings and interiors, phases 1-9 New center of Breckenheim, Wiesbaden; planning of buildings and interiors, phases 1-9 Initial situation The local administration and the old school grounds in Wiesbaden-Breckenheim are to be put to new use as part of the "new center of Breckenheim". The Protestant community center from the 1970s is being converted into a multifunctional center. Office space for the local administration and storage space for the church community will be created on the hillside floor. The upper floor with its hall will largely be retained and will be used as an event space for the church, town and clubs. The aim is sustainable, shared use that meets the needs of both the church and the town. Further information can be found in the task description. Subject of the service to be commissioned Object planning of buildings and interior spaces in accordance with Hoai 2013, as amended in 2021, Part 3, Section 1, § 33-37, service phases 1-9 basic services. Further detailed information about the services to be commissioned can be found in this task and service description and the associated annexes (appendix 02a). Other planning services are not the subject of this tendering procedure. The basic services will be remunerated on the basis of Hoai 2013, as amended in 2021. It is permissible to fall below the minimum rates or exceed the maximum rates. These are to be stated as a percentage and explained in the cover letter if necessary. It is planned to award the execution work to individual trades. Options There will be a staged call for services (options), subject to the committee resolutions on the further implementation of the project and the decision of the contracting authority in the further course of the project: Stage I: Lph 1-3, Stage II: Lph 4, Stage III: Lph 5-9 If the contract is awarded in this tendering procedure, the following services will be called up first: Stage I: Lph 1-3 The contractor undertakes to provide the further services if no more than 6 months have passed since the completion of the last transferred service and the client has announced the transfer in good time, i.e. at least 4 weeks in advance. The order for the further stages or sections is made in writing. The contractor has no right to call up individual and/or all stages and cannot derive any further claims (e.g. for damages or an increase in fees) from non-calling up. Project dates: Start of service provision: Approx. April 2025 - Start of planning and preparation of cost calculations, political decision-making and building permit application, Expected start of construction: 2025 Expected completion: 2026/2027
Closing Date14 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice – General guideline, standard regulation Open procedure (construction work) Bk Iv Ventilation installations at the Waldau campus Bk Iv Ventilation installations at the Waldau campus Bk Iv Ventilation installations at the Waldau campus Bk Iv Ventilation installations at the Waldau campus
Closing Date14 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - General guideline, standard regulation Open procedure (construction work) Contaminant remediation-sbs Contaminant remediation Steinbergschule Contaminant remediation The old building of the Steinbergschule is being renovated. The known contaminant-containing materials and components, such as ... Multi-contaminant remediation-sbs Contaminant remediation Steinbergschule Contaminant remediation The old building of the Steinbergschule is being renovated. The known contaminant-containing materials and components, such as PCB-containing joint compounds or asbestos-containing fillers, asbestos cement products and old mineral wool products will be dismantled. In addition, partition walls, floors, doors and windows will be removed. Construction will start 12 days after call-off. Expected call-off in the 13th week of 2025. Expected duration: approx. 3 months
Closing Date17 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+1Excavation
Germany
Contract notice - general guideline, standard regulation negotiated procedure with prior publication of a call for competition / negotiated procedure (services) Structural planning For this project, an office is sought that will take on the structural planning services in accordance with Sections 49 -52 Hoai 2021 (lph 2-6) IV with Appendix 14 as well as special services. Structural ... Multi-structural planning For this project, an office is sought that will take on the structural planning services in accordance with Sections 49 -52 Hoai 2021 (lph 2-6) IV with Appendix 14 as well as special services. Structural planning The project includes the construction of a new administration building for Hessen3c on the state-owned property in Wiesbaden. The use to be accommodated is an administration building with high security requirements. The state requirement to be accommodated amounts to a total of around 33,700 m² BGF including a 2-storey underground car park. The use of the planned new building is spread over six full floors above ground and a 7th storey in the north-eastern part of the building. The two basement floors of the new building, which extend almost to the property boundary, serve as an underground car park and building services. In order to access the upper floors from one another and to ensure evacuation, a total of four stairwell cores are planned. A flexible axis grid of 1.35 m was chosen for the administration building. The new building is planned to be constructed using reinforced concrete and is intended to demonstrate innovative approaches to sustainability in terms of building services. The requirements to be met from the guidelines and guidelines of the Federal Office for Information Security (BSI) result in special quality demands for the entire building. The schedule includes the following key points: Start of planning = December 29, 2025 Start of construction = October 8, 2029 Completion = September 3, 2032 Start of commissioning phase = July 12, 2032 Handover date to users = February 18, 2033
Closing Date17 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - General guideline, standard regulation Open procedure (supplies) Tender for electricity street lighting for the city of Eschborn Supply of electricity street lighting for the city of Eschborn, green electricity, delivery from April 1st, 2025 to December 31st, 2026, approx. 968 MWh/year Tender for st ... Additional tender for electricity street lighting for the city of Eschborn Supply of electricity street lighting for the city of Eschborn, green electricity, delivery from April 1st, 2025 to December 31st, 2026, approx. 968 MWh/year Tender for electricity street lighting for the city of Eschborn Supply of electricity street lighting for the city of Eschborn, green electricity, delivery from April 1st, 2025 to December 31st, 2026, approx. 968 MWh/year
Closing Soon10 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - general guideline, standard regulation, open procedure (construction work) A.0435.120513_jlu Gi Sem1_building automation Building automation (din 18 386); A.0435.120513_jlu Gi Sem1_building automation The control technology for the sanitation, heating, ventilation, refrigeration and smoke extraction systems trades in the new building is carried out via a new infrastructure to be constructed with a total of 11 automation focal points (asp). There are two ASPs on each floor, to which all field devices and operating devices on the respective floor are connected. The components of the ventilation systems on the 4th floor are all connected to the two ASP on the 4th floor. Proprietary control systems from the ventilation system manufacturer are not used. An additional automation center for the smoke extraction systems is set up on the 4th floor. All consumption meters (including those from the electrical trade) are to be connected via M-bus. The control of the entire building is connected to the existing building management system on the campus of the Justus Liebig University in Giessen (made by Sauter). Control and room operation of seminar rooms/project rooms: Time programs are provided in the higher-level building automation system that enable decentralized control of the individual seminar rooms. The rooms can also be ventilated using time programs. The room air properties are monitored continuously, even outside of the preset operating times, so that the specified room conditions can be regulated. The recirculation cooling cassettes in a seminar room are controlled as a group. Control buttons are provided for control. The connection of the seminar building to the higher-level BMS can only be carried out together with the "msr inventory".
Closing Soon4 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
Germany
Contract notice - general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) RV HKLS and MSR planning The aim of this negotiated procedure is the award of services for the specialist planning of technical equipment for plant groups 1 to 3 and 8 in accordance with Section 53 ff. Hoai 2021 for the execution of ... More RV HKLS and MSR planning The aim of this negotiated procedure is the award of services for the specialist planning of technical equipment for plant groups 1 to 3 and 8 in accordance with Section 53 ff. Hoai 2021 for the execution of modernization and conversion measures for the laboratory rooms in the various departments of the Paul Ehrlich Institute (PEI) and the Federal Environment Agency (UBA). A small part of the measures will be limited to repair and maintenance measures. The planning services include processing phases 2 and 3 as well as phases 5, 6, 7 and 8. The services will be awarded in the form of a framework agreement for a term of at least one year with the option of an annual extension to a total of four years, with a total of 12 measures expected. RV HKLS and MSR planning The Paul Ehrlich Institute (PEI) with its current location in Langen is an institution within the business area of the Federal Ministry of Health. It promotes the quality, effectiveness and safety of biomedical vaccines and medicines through research and testing._____ The institute consists of 9 buildings, most of which were planned between 1984 and 1987 and built from 1988 onwards. The buildings are connected to one another by corridors or covered walkways. House 1 is an administrative building with office use, houses 6 and 9 house central technical systems, workshops and offices, houses 2, 3, 4 and 5 mainly house offices and laboratories and houses 7 and 8 in particular laboratories and animal husbandry facilities. The buildings are constructed as solid structures with flat roofs, all walls are made of brickwork or concrete. Structurally, all buildings are built in a similar column grid. The individual rooms, hallway areas and central zones are arranged in this grid and extended to 3 m, 6 m, 9 m etc. depending on use. Houses 2 to 5 as well as 7 and 8 have a technical floor above each usable floor with escape balconies on the facade, and a technical floor with a room height of 2.30 m, which together form a fire protection unit. The so-called "ring canal", a canal structure in the basement that runs in a ring shape, also supplies the media to buildings 1 to 9 and connects them to one another._____ An access permit is required to enter the main building or the grounds. In addition, access to the laboratories with protection levels 1 to 3 requires instruction from the responsible staff. The entire company premises are fenced in and monitored._____ The expected measures mainly concern the conversion and modernization of laboratories in the Paul Ehrlich Institute. Existing laboratories and former offices must be converted into laboratory rooms and upgraded in accordance with new user requirements._____ The planning services may include processing Lph 2,3 and 5-8 as well as reviewing and checking the existing documents and creating existing plans._____ During implementation, coordinated consultation with the user and Lbih is essential, as the conversion must go hand in hand with the smooth operation of the building._____ A small part of the measures will be limited to repair and maintenance measures. These can be carried out both at the Paul Ehrlich Institute and at the Federal Environment Agency._____
Closing Date17 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+1Others
Germany
Contract notice – general guideline, standard regulation, open procedure (construction work) Steel construction and metalwork Steel construction and metalwork Steel construction and metalwork The new care building with a cafeteria and library is planned at the Theißtalschule, Lenzhahner Weg ... Multi-steel construction and metalwork Steel construction and metalwork Steel construction and metalwork The new care building with a cafeteria and library is planned at the Theißtalschule, Lenzhahner Weg 11 in 65527 Niedernhausen. The new building is being constructed as a free-standing building and is to be classified in building class 3, special building, partly as an assembly place (h-vstättr). It is a two-storey building within the meaning of the Hbo. The basement is being designed as a partial basement. Main trade: steel construction and metalwork The following work is to be carried out in detail: approx. 42 m steel canopy, 1 piece. Steel bridge, approx. 105 m external railings, approx. 30 m internal railings, 2 garage doors.
Closing Date17 Feb 2025
Tender AmountRefer Documents
271-280 of 394 active Tenders