Tenders of Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle
Tenders of Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle
Sorry!
No Active
Tenders of Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle
foundCheck archived
Tenders of Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle
Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle Tender
Germany
Public tender Vob/a floor covering work Measure: Conversion of the former registry in building B, administration building of the Wetterau district, Europaplatz, 61169 Friedberg Start 43rd week of 2024: Demolition of baseboards and floor coverings Implementation ... Multi-floor covering work Measure: Conversion of the former registry in building B, administration building of the Wetterau district, Europaplatz, 61169 Friedberg Start 43rd week of 2024: Demolition of baseboards and floor coverings Implementation of floor covering work Expected 10th - 11th week of 2025 Floor covering work for the conversion of the former registry on the 3rd floor into two meeting rooms with a tea kitchen and technical rooms. The work is part of a conversion measure on an office floor of the district administration in Friedberg. The Wetterau district intends to arrange 2 meeting rooms, a tea kitchen and a copy room in this area after the former registry on the 3rd floor has moved out. An existing office space will also be enlarged. Please refer to the list of services and the attached planning documents for the exact scope. The meeting rooms are to be used for meetings and conferences for 20-24 people each and will be equipped with modern presentation technology. The rooms will have air conditioning and a ventilation system. In the copy room and the adjacent IT room, one ventilation unit per meeting room will be installed for the conversion area. Air conditioning will be provided by wall-mounted air conditioning units. The existing building structure in the conversion area consists of load-bearing walls (masonry, reinforced concrete), reinforced concrete ceilings above the 2nd floor and a reinforced concrete ceiling above the 3rd floor. There are a total of 5 round reinforced concrete columns with reinforced concrete beams above them, which support the ceiling above the 3rd floor. There is a floating screed on the reinforced concrete ceiling above the 2nd floor. The construction work is purely interior work. No interventions will be made in the load-bearing structure. The new construction will be carried out using drywall (walls, acoustic ceilings), interior doors as soundproofing and, depending on requirements, as fire protection doors. A fire protection concept and a ventilation application were drawn up for the construction work.
Closing Date17 Sep 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle Tender
Civil And Construction
Germany
Public tender Vob/a drywall, painting and wallpapering work Measure: Conversion of former registry, 3rd floor, administration building B, Europaplatz, 61169 Friedberg drywall work 120 m² suspended acoustic ceilings 28 m² suspended ... More drywall, painting and wallpapering work Measure: Conversion of former Registry, 3rd floor, administration building B, Europaplatz, 61169 Friedberg Drywall work 120 m² Suspended acoustic ceilings 28 m² Suspended plasterboard ceilings 135 m² Wall protection panels 10 m² Painting and wallpapering work: Demolition of glass fiber wallpaper 110 m² Painting fleece 270 m² Wall coating with latex emulsion paint 275 m² Ceiling coating 250 m² Painting of radiators (30 m²) and pipes (15m) Colored expansion joints 750m Incl. all preparatory and ancillary work according to Lv. The work is part of a renovation project on an office floor of the district administration in Friedberg. The Wetterau district intends to arrange 2 meeting rooms, a tea kitchen and a copy room in this area after the former registry on the 3rd floor moves out. An existing office space will also be enlarged. The meeting rooms will be used for meetings and conferences for 20-24 people each and will be equipped with modern presentation technology. The rooms will have air conditioning and a ventilation system. In the copy room and the adjacent computer room, one ventilation unit will be installed per meeting room for the conversion area. Air conditioning will be provided by wall-mounted air conditioning units. The existing building structure in the conversion area consists of load-bearing walls (masonry, reinforced concrete), reinforced concrete ceilings above the 2nd floor and a reinforced concrete ceiling above the 3rd floor. In total, there are 5 round reinforced concrete columns with reinforced concrete beams above them, which support the ceiling above the 3rd floor. A floating screed is present on the reinforced concrete ceiling above the 2nd floor. The construction work is purely interior work. No interventions will be made in the load-bearing structure. The new extension will be carried out using drywall construction (walls, acoustic ceilings), interior doors as soundproofing and, depending on requirements, as fire protection doors. A fire protection concept and a ventilation application were drawn up for the construction project. Execution time: Start 45th week 2024 Approx. 4th week 2025 Painting and wallpapering work completed 8th week 2025
Closing Date26 Sep 2024
Tender AmountNA
Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle Tender
Civil And Construction...+1Civil Works Others
Germany
Public tender Vob/a for the demolition disposal / remediation of pollutants in the gymnastics hall including the floor slab and the caretaker's house including the basement on the property of the Geschwister-scholl-school in Nidatal, Geschwister-scho ... More demolition disposal / remediation of pollutants in the gymnastics hall including the floor slab and the caretaker's house including the basement on the property of the Geschwister-scholl-school in Nidatal, Geschwister-scholl-strasse 26, 61194 Niddatal- Assenheim. The construction work is being carried out while school is in session! Therefore, special care and consideration must be taken of school organizational issues. In the first phase, the caretaker's house will be dismantled because the area of the house is needed for another construction project. The gymnastics hall is to be demolished afterwards. The caretaker's house is a two-story flat-roofed building with a basement and was built in the 1960s using solid construction methods. The gymnastics hall is a single-storey building that was constructed in the 1960s using solid construction. It is directly connected to the adjacent gymnasium by the extension. The excavation pits created by the demolition are to be refilled with suitable material and compacted. The opening created in the outer wall of the adjacent gymnasium is to be closed again. The renovation is being carried out in close coordination with the construction management. For more information, see the tender documents. 1. Demolition of the caretaker's house 2. Demolition of the gymnastics hall The excavation pits created by the demolition are to be refilled with suitable material and compacted. The opening created in the outer wall of the adjacent gymnasium is to be closed again. The renovation is being carried out in close coordination with the construction management. Demolition and dismantling work as well as the resulting demolition materials are to be separated in accordance with the applicable waste management guidelines and disposed of professionally and correctly. Uncontaminated mineral building materials are to be used after being processed accordingly for backfilling. The exact description can be found in the Lv.
Closing Date16 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Wetteraukreis Zentrale Vergabestelle Tender
Civil And Construction...+1Civil Works Others
Germany
Public tender Vob/a General building description The Saalburg School in Bad Vilbel is an all-day primary school. It is housed in two buildings. The construction work is being carried out on the new building, which consists of a ... More general building description The Saalburg School in Bad Vilbel is an all-day primary school. It is housed in two buildings. The construction work is being carried out on the new building, which consists of a 2-storey structure with offset shed roofs. The addition of a barrier-free elevator is planned for the building. The elevator, with a platform size or an internal cabin dimension of approx. 1.10 x 1.40 m, is to be placed next to the main entrance of the building and in front of the existing external wall. Trade description: Metal construction work Quantities: Quantity Unit Static proof 1,000 Psch Construction drawings 1,000 Psch Aluminium door element, thermally insulated 1,000 St Execution period: Construction expected 23rd week 2025 - 24th week 2025 Measurements/work planning/production etc. must be carried out in advance! Quantities: Quantity Unit Static proof 1,000 Psch Construction drawings 1,000 Psch Aluminium door element, thermally insulated 1,000 St
Closing Date30 Jan 2025
Tender AmountRefer Documents
Wetteraukreis Central Awarding Authority Tender
Germany
Public tender Vob/a Replacement of listed windows, joint model school, main building, Augustinergasse 10, 61169 Friedberg/Hessen The construction project involves the replacement of windows in the main building of the joint model school in Friedberg. The building is a 3-storey school building built between 1838 and 1840 that is a listed building (individual monument). The building is in the city centre of Friedberg, on the edge of the old town. The building is on a slope with the basement protruding from the ground on three sides. The building borders on public traffic routes on two sides. One long side and one gable side. The windows in the building are 4-wing box windows with wooden bars. The 4-wing windows on the inside do not have bars. The windows on the second floor are lower than the windows on the ground floor and the first floor. The windows in the basement are also smaller and are not box windows. All windows are to be removed and replaced with new windows, without intermediate windows, in accordance with the requirements of the monument protection and based on the submission of a sample window. The sample window has already been installed and can also be inspected in advance. Dates Execution period: Start of execution: 12 days after award of contract (expected award of contract in week 46 of 2024) End of execution: week 10 of 2025
Closing Date24 Sep 2024
Tender AmountRefer Documents