Tenders of Offizielle Bezeichnung Wetteraukreis Fs 1 5 1 Zentrale Vergabestelle
Tenders of Offizielle Bezeichnung Wetteraukreis Fs 1 5 1 Zentrale Vergabestelle
Offizielle Bezeichnung Wetteraukreis FS 1 5 1 Zentrale Vergabestelle Tender
Civil And Construction...+1Building Construction
Germany
Closing Date5 Dec 2024
Tender AmountRefer Documents
Public tender VOB/A carpentry work (fittings and cladding) as part of the new construction of a 3.5-stream primary school and a single-field sports hall in 61118 Bad Vilbel General building description: The district committee of the Wetterau district is planning to build the new 3.5-stream "new Bad Vilbel primary school" with a school building and a single-field sports hall on the property at "Fraunhofer Strasse 19 / Johannes-Gutenberg-Strasse 15". The construction project is divided into the sub-areas of the school building and the single-field sports hall. The two building sections (sub-projects) are each planned to be free-standing, but are connected underground via a non-accessible media tunnel. The sports hall is supplied with energy via the school building. The four-storey school building (2nd floor, 1st floor, ground floor, basement) and the partially two-storey sports hall are planned as solid constructions mainly in reinforced concrete, the basement of the school and the floor slab of the sports hall as a Wu construction. The roofs will be designed as flat pitched roofs with extensive greening and a full-surface PV system. In the area of the future schoolyard, the construction of a geothermal system with underlying subgrade drainage is planned. The rest of the schoolyard area will have an area equipped with various play equipment, an outdoor classroom and a small playing field. A compact transformer station will be built in the eastern part of the property. A rainwater retention facility is planned under the teachers' parking lot, which is also located there. In the area of the Johannes-Gutenberg-Straße access road, a waste enclosure with an attached room for storing garden tools is planned. The building shell is insulated all around and equipped with a ventilated facade. Highly thermally insulated window and exterior door elements are used. In addition, highly innovative building technology with sustainable technical systems is used. For example, geothermal energy is used in combination with a heat pump. Parts of the school building will have a heating and cooling ceiling, and the roof areas will be completely covered with PV modules. Location: Bad Vilbel, Flur 21, Flurstück 256/4, Fraunhofer Straße 19 / Johannes-gutenberg-straße 15 Performance characteristics: Wall cladding HPL solid core panels, directly mounted on wall: approx. 135 sqm Wall cladding HPL solid core panels, with substructure: approx. 8 sqm Carpenter installation Food distribution approx. 10.50 x 3.00m: 1 piece Roller shutter Food distribution: 1 piece Dates Execution period: Start of work: February 2025 Technical processing, expected 06. Kw 2025 (03.02.2025) (after receipt of the request by the client (§ 5 paragraph 2 sentence 2 Vob/b)) Completion: 20. Kw 2025 (16.05.2025), 86 working days after start of work