Tenders of Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand wash basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand wash basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with piping made of PPs, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler piping for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date13 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with PPS pipes, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler pipes for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date31 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Others
Germany
Announcement of a purchaser profile for an intended restricted invitation to tender (construction work) Execution of construction work (ventilation-air conditioning trade) 410 Wastewater, water and gas systems Wastewater systems - New construction of a pipe network for condensate drainage from air conditioning units made of PVC-U, total pipe length approx. 35 m, nominal widths DN 25 to DN 50 - ... More410 Wastewater, water and gas systems Wastewater systems - New construction of a pipe network for condensate drainage from air conditioning units made of PVC-U, total pipe length approx. 35 m, nominal widths DN 25 to DN 50 - Outdoors with pipe heating, approx. 15 m - Free outlet on roof surface - 2 x fire protection partitions for PVC-U pipe 50 mm Water systems - No water systems are planned 420 Heat supply systems Heat generation systems - 1 x electric wall convector 1500 W as Frost protection heating in the technical room 430 Air-conditioning systems Ventilation systems - Radial exhaust air fan DN 100 with motorised control flap, slide-in volume flow controller - Air filter box EPM1 Ø100mm - Duct smoke detector - Ventilation duct for duct-bound air conditioning of the radome via a precision air conditioning cabinet made of steel, duct parts approx. 27 m², molded parts approx. 12 m² - Ventilation pipes for fresh air portion for radome air conditioning, approx. 6 m spiral-seam pipe Ø100 mm - Thermal insulation completely made of flexible elastomer foam 19 mm, approx. 40 m² - 2 pcs. ventilation grilles 500x400 mm for floor installation, 2 pcs. weather protection grilles Ø100 mm for facade Partial air conditioning systems - Precision air conditioning unit for radome air conditioning with high requirements for temperature accuracy and dehumidification, nominal cooling/heating output 10.7 Kw/7.5 Kw, heating electric, cooling via condenser - Two split air conditioning units each with nominal cooling/heating output 6.8/7.5 Kw as a redundancy circuit - Each outdoor unit with mounting system and heated condensate collection tray - Refrigerant piping made of copper pipe, total line length approx. 110 m, nominal widths Ad 10 mm to Ad 28 mm, including diffusion-tight thermal insulation, approx. 21 m plus sheet metal sheathing in the outdoor area - 6 shut-off valves nominal widths Ad 10 mm to Ad 28 mm - 6 pieces of fire protection partition for refrigerant lines
Closing Date5 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Others
Germany
Announcement of a purchaser profile for an intended restricted invitation to tender (construction work) painting, plastering and drywall work - pre-treatment and repair of cracks and plaster damage - overhaul painting of ceilings and walls including masking work and mobile scaffolding - dismantling and reassembly of acoustic panels - cleaning of concrete surfaces ... More - pre-treatment and repair of cracks and plaster damage - overhaul painting of ceilings and walls including masking work and mobile scaffolding - dismantling and reassembly of acoustic panels - cleaning of concrete surfaces, filling and applying overhaul painting - overhaul painting of radiators
Closing Date19 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Civil Works Others
Germany
Public tender Vob/a Demolition and dismantling work on traffic areas (DIN 18 328); Concrete work (DIN 18 331); Earthworks (DIN 18300); Cable line civil engineering work (DIN 18 322); Landscaping work (DIN 18 320); Low ... More Demolition and dismantling work on traffic areas (DIN 18 328); Concrete work (DIN 18 331); Earthworks (DIN 18300); Cable line civil engineering work (DIN 18 322); Landscaping work (DIN 18 320); Low and medium voltage systems up to 36 Kv (DIN 18 382); Cable line civil engineering work (DIN 18 322); On the US property in Wiesbaden-Hainerberg, the electrical infrastructure for an annual festival is to be created in the parking lot in front of the old Px: - Transformer station as a prefabricated concrete part on foundation level, equipped with: + 2 transformers each 1,250 kVA + medium-voltage switchgear (SF6-free) + low-voltage switchgear 5,000A + transfer measurement municipal utilities - Distribution station as a prefabricated concrete part on foundation level, equipped with: + low-voltage switchgear 5,000A with arc protection - 7 modular festival site distributors 630A with foundation - approx. 3,500m of underground cable as a single conductor - approx. 2,500m of underground cable - approx. 250m of cable trenches in paved area - approx. 75m of cable trenches in unpaved area - approx. 250 m of built-in cable trenches in paved area - breaking up and restoring road and path paving, - Traffic safety, - approx. 3,100 t disposal of excavated material, partially loaded. When calculating the costs, it must be taken into account that the precast concrete stations currently have a delivery time of approx. 12 months, so that the construction process must be adjusted after ordering so that the work is carried out continuously.
Closing Date7 Mar 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Others
Germany
Bekanntmachung Eines Beschafferprofils Für Eine Beabsichtigte Beschränkte Ausschreibung (bauleistung) Errichtung Einer Gaslöschanlage Im Rechenzentrum Für Das Rechenzentrum Wurde Eine Gaslöschanlage (ausführung Gemäß Vds Regelwerk) Auf Dem Prinzip Der Sauerstoffverdrängung Konzipiert. Folgende Zur Auswahl Stehenden Löschgase Sind Berücksichtigt: Sti ... Mehrfür Das Rechenzentrum Wurde Eine Gaslöschanlage (ausführung Gemäß Vds Regelwerk) Auf Dem Prinzip Der Sauerstoffverdrängung Konzipiert. Folgende Zur Auswahl Stehenden Löschgase Sind Berücksichtigt: Stickstoff (4 Flaschen Je 140l) Für Folgende Bereiche Ist Die Gaslöschanlage Geplant: Serverraum 1 Inkl. Doppelboden Serverraum 2 Inkl. Doppelboden
Closing Date14 May 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Others
Germany
Öffentliche Ausschreibung Vob/a Allgemeine Regelungen Für Bauarbeiten Jeder Art (din 18 299); Gas-, Wasser- Und Entwässerungsanlagen Innerhalb Von Gebäuden (din 18 381); Flaschenwaschanlage Und Tränkefüllstation, Einrichtungen Für L ... Mehrallgemeine Regelungen Für Bauarbeiten Jeder Art (din 18 299); Gas-, Wasser- Und Entwässerungsanlagen Innerhalb Von Gebäuden (din 18 381); Flaschenwaschanlage Und Tränkefüllstation, Einrichtungen Für Laborspüle; Ausstattung Tierhaltungsspülküche Das Land Hessen Und Die Justus-liebig-universität Gießen Beabsichtigen Die Errichtung Eines Forschungsneubaus, Dem Institute For Lung Health (ilh). Das Baufeld Befindet Sich In Der Schubertstraße 83 In Gießen. Gebäudeabmessungen Des Geplanten Neubaus L / B / H : Ca. 55,60 M / 31,60 M / 17,64 M Bgf: Ca. 6.101 M² Nf 1-7: Ca. 2.591,33 M² Davon Laborflächen: Ca. 1.498 M² Bri: Ca. 29.314,80 M³ Raumhöhe: Ug: 5,92 M Technikzentrale, 4,30 M Nebenräume / Eg Bis 2.og: 3,82 M Die Labornutzung Verteilt Sich Auf Vier Geschosse. Die Laborbereiche Erstrecken Sich Entlang Der Nordfassade Über Die Drei Obergeschosse, Basierend Auf Dem Ausbauraster Von 1,20 M. Der Laborbereich Gliedert Sich Mit Einem Achsmaß Von 3,60 Metern In Ein- Und Doppelachsige Labore Bei Einer Grundsätzlichen Labortiefe Von Ca. 6,00 Metern. Die Versorgung Der Labore Erfolgt Über Das Ebenerdig Zu Erreichende Kellergeschoss. Die Nutzung Des Gebäudes Umfasst Biologische Labore Bis Sicherheitsstufe S2 Nach Gentg/gentsv. In Einem Teilbereich Im Erdgeschoss Werden Auch Arbeiten Bis S2 Gemäß Gentsv Mit Luftübertragbaren Erregern Durchgeführt. Leistungen Zur Ausstattung Der Tierhaltungsspülküche Im Erdgeschoss: - Eine Käfig- Und Flaschenwaschanlage Zur Reinigung Der Utensilien Der Tierhaltung Von Ca. 1.600 Mäusen, - Eine Entleerstation Der Tränkeflaschen- Arbeitstisch Für Die Flaschenentleerung Mit Angrenzender - Füllstation Für Die Tränkeflaschen - Arbeitstisch Mit Becken Und Füllvorrichtung
Closing Date11 Jun 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Civil Works Others
Germany
Announcement of a purchaser profile for an intended restricted tender (construction work) shell construction work approx. 250 m wall slots with heating pipes, bricked up with Ks solid bricks, approx. 100 m wall slots / cavities, bricked up with Ks solid bricks, approx. 300 m wall slots / cavities, filled with mortar, approx. ... More approx. 250 m wall slots with heating pipes with Ks solid bricks, approx. 100 m wall slots / cavities with Ks solid bricks, approx. 300 m wall slots / cavities filled with mortar, approx. 100 wall openings in masonry and reinforced concrete, size 100.00-3,200.00m², wall thickness 25-75 cm, approx. 140 ceiling openings in reinforced concrete and Koenensche ceilings, approx. 5 openings in floor slab, approx. 15 m² interior wall made
Closing Date6 Jan 2025
Tender AmountRefer Documents
1-10 of 38 archived Tenders