Tenders of Offizielle Bezeichnung Gemeinde Sulzbach Taunus
Tenders of Offizielle Bezeichnung Gemeinde Sulzbach Taunus
Offizielle Bezeichnung Gemeinde Sulzbach Taunus Tender
Germany
Public tender VOB/A expansion of the streets at Klippelgarten and "Klosterhofstrasse in Sulzbach (Taunus) including flood protection wall, drinking water supply and sewer channel 2. 3. 2. 30. Soil excavation, trench channel, T ... Further expansion of the streets at Klippelgarten and "Klosterhofstrasse in Sulzbach (Taunus) including flood protection wall, drinking water supply and sewer channel 2. 3. 2. 30. Soil excavation, trench channel, depth up to 4.00 m 530 m³ 2. 3. 2. 180. Removal, recycling of excavated soil, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 VOB 2012), 1150 tonnes 2. 3. 2. 190. Allowance for excavation Bm-f3 recycling/disposal, 1150 tonnes. 2. 3. 2. 150. Install filling material, embedding pipes Dn 1600, 200 m³ 2. 3. 3. 60. Reinforced concrete pipes Dn 1600, 37.50 m 2. 3. 3. 100. Throttle shaft 1 piece 2. 3. 3. 110. Connection to union collector, slip shaft 1 piece 2. 3. 3. 120. Alpheus throttle device, delivery and installation 1 piece 2. 4. 1. 10. Soil excavation, trench channel, depth up to 4.00 m, 900 m³ 2. 4. 1. 30. Coarse chipping, grain size 0/45-0/63, 100 m³ 2. 4. 1. 40. Trench shoring, 1350 M² 2. 4. 1. 170. Install filling material, embedding pipes Dn 300-600, 210 M³ 2. 4. 1. 190. Backfilling canal trench Material: Stone earth 'up to 3.00 M 450 M³ 2. 4. 1. 200. Removal, recycling of excavated soil, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 Vob 2012) 1550 To. 2. 4. 1. 210. Allowance for excavation Bm-f3 recycling/disposal 1550 To. 2. 4. 2. 10. Pp - sewer pipe Dn/od 315, 90 M 2. 4. 2. 30. Pp - sewer pipe Dn/od 400, 115 M 2. 4. 2. 50. Pp - sewer pipe Dn/od 500, 50 M Shaft structures Dn 1000, 8 sewer house connections, 21 drinking water pipes 3. 3. 1. 20. Soil excavation, trench for drinking water supply, depth up to 1.75 m, 415 m³ 3. 3. 1. 120. Pipeline zone, 185 m³ 3. 3. 1. 130. Backfilling of drinking water trench, with materials to be delivered from the supplier, 150 m³ 3. 3. 1. 220. Removal, recycling Excavated soil, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 Vob 2012), 700 tons 3. 3. 1. 230. Allowance for excavation Bm-f3 recycling/disposal, 700 tons. 3. 4. 1. 30. Pe 100 - pipe Dn 100, 370 M 3. 4. 1. 110. Ductile fittings, 350 Kg 3. 5. 1. 10. Pe-100 pressure pipe Da 40 / earthworks, 80 M 3. 5. 1. 20. Pe-100 pressure pipe Da 63 / earthworks, 20 M 3. 5. 1. 30. Removal, recycling of excavated soil, uncontaminated, homogeneous range B2 - B4 (bkl. 2-5 Vob 2012), 230 To. 3. 5. 1. 40. Allowance for excavation Bm-f3 recycling/disposal, 230 To. 3. 5. 1. 120. Valve drilling fitting for Da 125 Pehd, 19 pieces 3. 5. 1. 150. Water meter shaft delivery, installation 1 meter, 10 pieces 3. 5. 1. 310. Drinking fountain Twb, 1 piece flood protection 04.03.03.1 Soil excavation construction pit, depth up to 2.50 m 800 M3 04.03.03.6 Soil, excavation pit backfill, choice of, 210 M3 04.03.04.1 Removal, recycling of soil excavation, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 Vob 2012), 650 T 04.03.04.2 Allowance for excavation Bm-f3 recycling/disposal, 650 T 04.04.01.1 Shoring for excavations, T up to 2.50 m, 600 m2 04.05.01.6 Open GW-section, pump output 20 l/s, 1500 h 04.07.01.5 Sb-prefabricated part made of C 35/45, 120 m3 04.07.01.6 Sb-prefabricated part made of C 35/45 Ramp access to allotments, 15 m3 04.07.01.8 Installing B500a / B500b reinforcing steel, 35 T 04.07.01.15 Wall plate, height 80 cm, width 99 cm, 20 pieces 04.07.01.16 Wall plate, height 105 cm, width 99 cm, 16 pieces Road construction 5. 2. 4. 40. Traffic area up to 60 cm removal / disposal Bm-0*, 1380 m² 5. 2. 4. 50. Traffic area up to 65 cm removal / disposal Bm-0*, 80 m² 5. 2. 4. 60. Traffic area up to 60 cm removal / disposal Bm-0*, 420 m² 5. 2. 4. 70. Allowance for interim soil storage for sampling according to Laga, 760 m³ 5. 2. 4. 80. Allowance for soil disposal, Bm-f3* / Avv 17 01 07, 1400 tonnes 5. 2. 4. 110. Allowance for disposal of tar-containing rubble up to 400 mg/kg / Avv 17 03 01*, 300 tonnes 5. 2. 6. Road drainage Road drain, 19 pieces 5. 2. 7. 20. "Create gravel base layer, Bk1.0 to Bk100*0/32, 1450 M² 5. 2. 7. 40. Frost protection layer D 26 cm roadway, 390 M² 5. 2. 8. 150. Drainage channel three-row, trough shape, B=0.50 M, 265 M 5. 2.10. 20. Paving from concrete blocks, St.100/200/100*mf, O.front., bedding 0/5*sz 22*joint 0/2, elbow joint, 1440 M² 5. 3. 3. 30. Remove traffic area up to 34 cm / Disposal Bm-0*, 405 M² 5. 3. 4. Street drainage 5. 3. 4. 30. Kg-pipes Dn 150 / Earthworks Up to 2.00 m average depth, 55 M 5. 3. 7. 20. Paving made of concrete blocks, manufacturer st. 100/200/100*mf, O.front., bedding 0/5*sz 22*joint 0/2, elbow connection, 515 M²
Closing Date16 Dec 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Gemeinde Sulzbach Taunus Tender
Others...+1Civil And Construction
Germany
Public tender VOB/A expansion of the streets at Klippelgarten and "Klosterhofstrasse in Sulzbach (Taunus) including flood protection wall, drinking water supply and sewer channel 2. 3. 2. 30. Soil excavation, trench channel, T ... Further expansion of the streets at Klippelgarten and "Klosterhofstrasse in Sulzbach (Taunus) including flood protection wall, drinking water supply and sewer channel 2. 3. 2. 30. Soil excavation, trench channel, depth up to 4.00 m 530 m³ 2. 3. 2. 180. Removal, recycling of excavated soil, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 VOB 2012), 1150 tonnes 2. 3. 2. 190. Allowance for excavation Bm-f3 recycling/disposal, 1150 tonnes. 2. 3. 2. 150. Install filling material, embedding pipes Dn 1600, 200 m³ 2. 3. 3. 60. Reinforced concrete pipes Dn 1600, 37.50 m 2. 3. 3. 100. Throttle shaft 1 piece 2. 3. 3. 110. Connection to union collector, slip shaft 1 piece 2. 3. 3. 120. Alpheus throttle device, delivery and installation 1 piece 2. 4. 1. 10. Soil excavation, trench channel, depth up to 4.00 m, 900 m³ 2. 4. 1. 30. Coarse chipping, grain size 0/45-0/63, 100 m³ 2. 4. 1. 40. Trench shoring, 1350 M² 2. 4. 1. 170. Install filling material, embedding pipes Dn 300-600, 210 M³ 2. 4. 1. 190. Backfilling canal trench Material: Stone earth 'up to 3.00 M 450 M³ 2. 4. 1. 200. Removal, recycling of excavated soil, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 Vob 2012) 1550 To. 2. 4. 1. 210. Allowance for excavation Bm-f3 recycling/disposal 1550 To. 2. 4. 2. 10. Pp - sewer pipe Dn/od 315, 90 M 2. 4. 2. 30. Pp - sewer pipe Dn/od 400, 115 M 2. 4. 2. 50. Pp - sewer pipe Dn/od 500, 50 M Shaft structures Dn 1000, 8 sewer house connections, 21 drinking water pipes 3. 3. 1. 20. Soil excavation, trench for drinking water supply, depth up to 1.75 m, 415 m³ 3. 3. 1. 120. Pipeline zone, 185 m³ 3. 3. 1. 130. Backfilling of drinking water trench, with materials to be delivered from the supplier, 150 m³ 3. 3. 1. 220. Removal, recycling Excavated soil, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 Vob 2012), 700 tons 3. 3. 1. 230. Allowance for excavation Bm-f3 recycling/disposal, 700 tons. 3. 4. 1. 30. Pe 100 - pipe Dn 100, 370 M 3. 4. 1. 110. Ductile fittings, 350 Kg 3. 5. 1. 10. Pe-100 pressure pipe Da 40 / earthworks, 80 M 3. 5. 1. 20. Pe-100 pressure pipe Da 63 / earthworks, 20 M 3. 5. 1. 30. Removal, recycling of excavated soil, uncontaminated, homogeneous range B2 - B4 (bkl. 2-5 Vob 2012), 230 To. 3. 5. 1. 40. Allowance for excavation Bm-f3 recycling/disposal, 230 To. 3. 5. 1. 120. Valve drilling fitting for Da 125 Pehd, 19 pieces 3. 5. 1. 150. Water meter shaft delivery, installation 1 meter, 10 pieces 3. 5. 1. 310. Drinking fountain Twb, 1 piece flood protection 04.03.03.1 Soil excavation construction pit, depth up to 2.50 m 800 M3 04.03.03.6 Soil, excavation pit backfill, choice of, 210 M3 04.03.04.1 Removal, recycling of soil excavation, uncontaminated, homogeneous area B2 - B4 (bkl. 2-5 Vob 2012), 650 T 04.03.04.2 Allowance for excavation Bm-f3 recycling/disposal, 650 T 04.04.01.1 Shoring for excavations, T up to 2.50 m, 600 m2 04.05.01.6 Open GW-section, pump output 20 l/s, 1500 h 04.07.01.5 Sb-prefabricated part made of C 35/45, 120 m3 04.07.01.6 Sb-prefabricated part made of C 35/45 Ramp access to allotments, 15 m3 04.07.01.8 Installing B500a / B500b reinforcing steel, 35 T 04.07.01.15 Wall plate, height 80 cm, width 99 cm, 20 pieces 04.07.01.16 Wall plate, height 105 cm, width 99 cm, 16 pieces Road construction 5. 2. 4. 40. Traffic area up to 60 cm removal / disposal Bm-0*, 1380 m² 5. 2. 4. 50. Traffic area up to 65 cm removal / disposal Bm-0*, 80 m² 5. 2. 4. 60. Traffic area up to 60 cm removal / disposal Bm-0*, 420 m² 5. 2. 4. 70. Allowance for interim soil storage for sampling according to Laga, 760 m³ 5. 2. 4. 80. Allowance for soil disposal, Bm-f3* / Avv 17 01 07, 1400 tonnes 5. 2. 4. 110. Allowance for disposal of tar-containing rubble up to 400 mg/kg / Avv 17 03 01*, 300 tonnes 5. 2. 6. Road drainage Road drain, 19 pieces 5. 2. 7. 20. "Create gravel base layer, Bk1.0 to Bk100*0/32, 1450 M² 5. 2. 7. 40. Frost protection layer D 26 cm roadway, 390 M² 5. 2. 8. 150. Drainage channel three-row, trough shape, B=0.50 M, 265 M 5. 2.10. 20. Paving from concrete blocks, St.100/200/100*mf, O.front., bedding 0/5*sz 22*joint 0/2, elbow joint, 1440 M² 5. 3. 3. 30. Remove traffic area up to 34 cm / Disposal Bm-0*, 405 M² 5. 3. 4. Street drainage 5. 3. 4. 30. Kg-pipes Dn 150 / Earthworks Up to 2.00 m average depth, 55 M 5. 3. 7. 20. Paving made of concrete blocks, manufacturer st. 100/200/100*mf, O.front., bedding 0/5*sz 22*joint 0/2, elbow connection, 515 M²
Closing Date16 Dec 2024
Tender AmountRefer Documents