North America Tenders
North America Tenders
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date11 Feb 2025
Tender AmountRefer Documents
15--panel,structural,ai- And Similar Replacement Parts
DEPT OF THE ARMY USA Tender
Machinery and Tools
United States
Closing Date18 Feb 2025
Tender AmountRefer Documents
West Coast Hopper Maintenance Dredging 2025
INDIAN HEALTH SERVICE USA Tender
Energy, Oil and Gas
United States
Closing Date26 Dec 2025
Tender AmountRefer Documents
Bfsu Utility - Natural Gas Services
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date10 Feb 2025
Tender AmountRefer Documents
Contact Information|4|n7m3.12|eay|7176053233|jamie.kershaw@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|combo-invoice & Receiving Report||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule|n/a|n/a|n/a|n/a|n/a|n/a||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (jan 2025)|13|335999|600||||||||||||
type Of Contract (apr 1984)|1|firm-fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
offerors Shall Submit Proposals Via Neco Or Email Only. Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For A Buy. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
- Unit Price:__________ Firm
- Total Price:__________ Firm
- Procurement Turnaround Time (ptat) :__________
- Awardee Cage: __________
- Inspection & Acceptance Cage, If Not At Source:__________
- Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________
important Traceability Notice: If You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide A Letter/official Email From The Oem Confirming Your Company Is Authorized An Authorized Distributor Of Their Items.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Power Supply .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Power Supply Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No. ;7y193 H351680-3 60642 2307000-2 ;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
DEFENSE LOGISTICS AGENCY USA Tender
Others...+1Electrical and Electronics
United States
Closing Soon31 Jan 2025
Tender AmountRefer Documents
Nsn 1560-01-576-3458, Windshield Panel,ai, Wsdc: 04f, Aircraft, Stratofortress B-52
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date28 Feb 2025
Tender AmountRefer Documents
Contact Information|4|n744.4|cfa|email Only|james.e.lewis5@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
production Lot Testing|1||
inspection And Acceptance - Short Version|8|||||||||
desired And Required Time Of Delivery (june 1997)|29|0001|217|365 Days|||||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|receiving Report And Invoice Combo|na|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--contractor Testing (sep 1989)|10|1|0001|30|tbd|james Lewis - James.e.lewis5@navy.mil|tbd|0001|tbd|||
limitations On Pass-through Charges (jun 2020)|1||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334511|1350||||||||||||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7||||||||
type Of Contract (apr 1984)|1|ffp|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1||
the Following Clauses Are Hereby Removed:
wsstermlz10
wsstermmz01
52.247-47
252.215-7008
52.219-13
52.219-6
the Following Clauses Are Hereby Added:
52.247-50
small Business Set Aside Updated To Not Set Aside To A Small Business.
updated Fill-ins For Clause 52.209-3 (see Below)
due Date Extended To 28 Feb 2025.
\
1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposalconstitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
3. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility.
4. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas).provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
5. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
6. This Solicitation Requires First Article Testing (fat). See Far 52.209-3 First Article Approval - Contractor Testing For More Details.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Guidance Cable Asse .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.3 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;dd254 Is Required Iaw 6935198 Para 3.2.1.2 Navsea Drawing 5759651.;
drawing Data=2505827 |10001| K|fn |d|0001 | K|49998|0069956
drawing Data=5205453 |53711| P| |d|0001 | P|49998|0016807
drawing Data=5727490 |53711| Y|fn |d|0001 | Y|49998|0345813
drawing Data=5893799 |53711| E|fn |d|0001 | E|49998|0260362
drawing Data=5894122 |53711| C|fn |d|0001 | C|49998|0264830
drawing Data=6370406 |53711| F|fn |d|0001 | F|49998|0105125
drawing Data=6657093 |53711| A|fn |d|0001 | A|49998|0071141
drawing Data=6935198 |53711| C|doc|d|0001 | C|49998|1039605
drawing Data=7052639 |53711| J|fn |d|0001 | J|49998|0125199
drawing Data=7052720 |53711| G|fn |d|0001 | G|49998|0227151
drawing Data=7052721 |53711| E|fn |d|0001 | E|49998|0265449
drawing Data=7052721 |53711| D|pl |d|0001 | D|49998|0009074
drawing Data=7053298 |53711| C|fn |d|0001 | C|49998|0077683
drawing Data=7053299 |53711| C|fn |d|0001 | C|49998|0077695
drawing Data=7053300 |53711| C|fn |d|0001 | C|49998|0076948
drawing Data=7053321 |53711| B|fn |d|0001 | B|49998|0108937
drawing Data=7561442 |53711| B| |d|0001 | B|49998|0081451
drawing Data=757994 |10001| N|fn |d|0001 | N|49998|0058376
drawing Data=758023 |10001| H|fn |d|0001 | H|49998|0140618
document Ref Data=mil-std-129 | | |p |041029|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
document Ref Data=mil-std-973 | | | |950113|a| |03|
3. Requirements
3.1 Design, Manufacture, And Performance - Except As Modified Herein,
the Guidance Cable Asse Furnished Under This Contract/purchase Order Shall Meet The
design, Manufacture, And Performance Requirements Specified On Drawing ;7052721;
cage ;53711
0f1x1
63127;
.
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
3.5 Security Clearance Required - This Contract/purchase Order Requires The Contractor To Have A Government Security Clearance In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
3.6 Production Lot Approval (contractor Testing) - Production Lot Test And Approval Is Required.
3.7 First Article Approval (contractor Testing) - First Article Test (fat) And Approval Is Required.
3.8 ;cage 0f1x1 Is Waived From Fa Since They Have Produced Dwg 7052721 With In The Last 5 Years. There Are No Significant Change To Fa Requirements.;
3.9 Serialization - The Supplier Shall Mark A Serial Number On Each Guidance Cable Asse In Accordance With ;iaw 7052721 Rev "e" Note 14.;
. Actual Serial Numbers Will Be Assigned ;apply A Government Serial Number To Each Unitmanufactured. Serial Number Shall Be Obtainedfrom Commander, Naval Undersea Warfare Centerdivision Newport, Newport, Ri 02841-1708.nuwc_npt_serialnumbers@navy.mil.;
.
;quality Assurance Provisions (qaps)
i.articles To Be Furnished Hereunder Must Be Manufactured, Tested And Inspectedin Accordance With Drawing Numbers Listed Below And All Details And Specifications Referenced Therein.
this Qap Applies To The Following Cable:
53711-7052721- Cable Assembly, 5w5 (1355-01-481-8700)
the 5w5 Umbilical/torpedo Interface Cable Assembly (53711-7052721) Is An Assembly Of Multiconductor Cable With Attached Connectors And Appropriate Protective Jacketing Within The Cable Housing (53711-7052720). Key Supporting Documents
53711-6935198 - Torpedo Mk 48 Adcap Modifications Critical Item Performance Specification 5w5 Cable Assembly, 20 May 2003, Revision C
this Specification Establishes The Requirements For The Manufacture And Acceptance Of The 5w5 Cable Assembly, Naval Sea Systems Command (navsea) Drawing 7052721.
53711-5759651 - (c) Pressure Tests (u)
ref: 6935198 Para 3.2.1.2: The 5w5 Cable Assembly Shall Withstand An External Hydrostatic Pressure Of The Proof Pressure Value Of Navsea Drawing 5759651 For Five (5) +1/-0 Minutes Without Exhibiting Signs Of Damage Or Leakage. For Preproduction And Periodic
quality Conformance Tests, The 5w5 Cable Assembly Shall Meet This Requirement Ten (10) Consecutive Times.
53711-5893799 - Cable Assembly, 5w5 Umbilical/torpedo Interface, Wiringdiagram
this Is The Wiring Diagram For The 5w5 Cable Assembly.
53711-5894122 - Cable Assembly, 5w5 Umbilical/torpedo Interface, Cabling Diagram This Is The Cabling Diagram For The 5w5 Cable Assembly.
ii.cable Acquisition Requirements Are Specified In Section 6.2 Of 53711-6935198- Torpedo Mk 48 Adcap Critical Item Product Fabrication Specification For 5w5cable Assembly 20 May 2003, Revision C:
6.2 Ordering Data - Procurement Documents Should Specify The Following:
a.title, Specification Number, Revision Letter, Date Of The Revision Of This Specification.
b.exceptions To This Specification, Applicable Drawings, Or Other Referenced Documents.
c.desired Completeness And Availability Of Test Data, Including Data Cards.
d.type And Degree Of Contractor Quality Assurance Systems Required.
e.whether Or Not The Test Samples Required Are Included In The Number Of 5w5 Cable Assemblies Ordered.
f.activities Designated By The Government To Perform The Preproduction And Periodic Production Monitoring Tests Per Figures 3 And 4. (currently The Government Is Designating The Contractor To Perform The Tests. Government Would Like To Be Notified When Testing
will Be Performed In Case They Wantto Have Government Witness The Tests.)
g.level Of Preservation And Packaging.
h.method Of Shipment.
iii. Reference Documents N
a
iv. Quality/inspection Requirements A. During The Performance Of This Contract, The Contractor/supplier Mustmaintain A Quality Management System In Accordance With As9100/iso-9001 Or Equivalent.
due To The Critical Application Of This Part, It Is Recommended That Themajor Characteristics And Key Features Of The Part, Identified Below, Beemphasized When Communicating With The Contractor/supplier.
b.all Quality Assurance Operations Performed By The Supplier Will Besubjected To Government Verification At Any Time. Verification Will Consistof (a) Tests, (b) Surveillance Of The Supplier's Operations, (c) Analysis,(d) Process Inspection, And (e) Product
inspection. Failure Of The Supplierto Promptly Correct Deficiencies Discovered By The Supplier Or Of Which Thesupplier Is Notified Shall Be Cause For Suspension Of Product Acceptanceuntil Corrective Action Has Been Made Or Until Conformance To The
prescribedcriteria Has Been Demonstrated.
c. Quality Assurance Provisions For The Fabrication/assembly Of The Cables Are Specified In 53711-6935198.
cable Assembly Production Sampling
1. Preproduction Sampling - A Preproduction Sample Of Two (2) 5w5 Cable Assemblies Will Be Manufactured Using The Methods And Procedures Proposed For Production. The Sample Will Pass The Quality Conformance Tests As Specified In Figure 3 Prior To Submission To
an Activity Designated By The Procuring Agency To Determine Compliance With The Requirements Of The Specifications And Drawings. Further Production Of The 5w5 Cable Assembly By The Contractor Prior To The Approval Of The Contracting Agency Will Be At The
supplier's Risk. (currently The Government Is Designating The Contractor To Perform Inspection And Testing Required To Verify Compliance With Specifications And Drawings. Government Would Like To Be Notified When Inspection And Testing Will Be Performed In Case
they Want To Have Government Witness Present.)
preproduction Cable Assembly Testing Requirements:
preproduction Tests Conducted By The Contractor (figure 3):
performance Verification
low-pressure Leakage
hydrostatic Pressure (one Cycle)
electrical Performance
4. Quality Assurance
4.1 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.1.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize This If Desired.;
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
4.4 First Article Test/inspection (contractor) - The Contractor Shall Conduct ;iaw 6935198 Rev "c";
first Article Test/inspection On ;2;
unit(s) In Accordance With Requirements ;6935198 Para 3.2.1.2;
.
4.5 Production Lot Test (contractor) - The Contractor Shall Perform Production Lot Testing In Accordance With ;iaw 6935198 Para 4.2.1.1, 4.2.2.1, And 4.2.1.2
a Preproduction Sample Of Two (2) 5w5 Cable Assemblies Will Be Manufacturedusing The Methods And Procedures Proposed For Production.
from Each Production Lot Of 50 5w5 Cable Assembliesthat Have Passed Thequality Conformance Tests Asspecified In Figure 2, A Sample Of Two (2) 5w5 Cableassemblies Will Be Selected At Random By Thegovernment Inspector For Submission To An Activitydesignated By
the Procuring Agency To Determine Compliance With The Specifications And Drawings.;
.
4.6 Quality Conformance Inspection - The Contractor Is Responsible For Conducting A Quality Conformance Inspection In Accordance With ;iaw 6935198 Rev "c". 3.4.2; , Paragraph ;para 4.2.1.3; And Preparing An Inspection Report In Accordance With The Contract Data Requirements List, Dd Form 1423.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech. date Of First Submission=030 Dac
;certificates Of Quality Compliance For The Followingcable Assembly Requirements Shall Be Delivered Tothe Government Via Contract Data Requirements List (cdrl).
preproduction Sample Quality Conformance Inspection And Test Data.
production Quality Conformance Inspection And Test Data.
periodic Sample Quality Conformance Inspection And Test Data.
certificates Of Quality Compliance For The Followingsource Control And Vendor Item Controlled Cableassembly Components Shall Be Delivered To Thegovernment Via Contract Data Requirements List (cdrl).
connector, Receptacle, Electrical, Solder Type,solder Mounting, Bayonet Coupling (pn 7053321)contact Assy, #20 (pn 757994)power Cables 7053298-1/-2, 7053299-1/-2/-3,7053300-1/-2/-3.
copies Of The Certificate Of Quality Complianceshall Be Delivered To The Engineering Support Activity,nuwc Newport: Nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
richard.d.penfold2.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
recommend A Post Award Conference Be Conducted Withthe Contractor/supplier To Review The Item Keyfeatures. The Government Engineering Support Activity,nuwc Newport, Would Like To Participate In Theconference If One Is Scheduled.
; date Of First Submission=030 Dac
;isea Poc: James.c.ferguson1.civ@us.navy.mil
richard.d.penfold2.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
newport, Ri 02841-1708
phone: 401-832-4593
dsn: 432-4593
fax: 401-832-4194
e-mail: Patrick.faerber@navy.mil
;
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others...+2Civil And Construction, Civil Works Others
United States
Closing Soon7 Feb 2025
Tender AmountRefer Documents
S208--ground Maintenance | Follow On Base+4 | Start: 4/1/25
DEFENSE LOGISTICS AGENCY USA Tender
Others
United States
Closing Date14 Feb 2025
Tender AmountRefer Documents
4 Ea Nsn 6150000068694 3 Ea Nsn 6150000089526 5 Ea Nsn 6150010128417
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER USA Tender
Civil And Construction...+1Civil Works Others
United States
Closing Soon1 Feb 2025
Tender AmountRefer Documents
Usda / Nrcs Elsberry Plant Materials Center Greenhouse Renovation Project
DEPT OF THE AIR FORCE USA Tender
Software and IT Solutions
United States
Closing Date28 Feb 2025
Tender AmountRefer Documents
Follow On Idiq For Secondary Power Systems (sps) And Small Gas Turbine Engines (gte) Component Improvement Program (cip) - Oem Pw
9771-9780 of 10000 active Tenders