Municipality Of Argao, Cebu Tender
Municipality Of Argao, Cebu Tender
Costs
Summary
Supply Of Labor, Materials & Equipment For The Proposed Renovation Of Sb Office Of The Municipality Of Argao , Construction Projects ,municipality Of Argao, Cebu
Description
Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 4.00 1.00 A. Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: 1.00 Lot Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 1282.00 Man-days A. Safety Helmet 1282.00 Man-days B. Safety Shoes 1282.00 Man-days C. Working Gloves 1282.00 Man-days D. Eye Goggles B. Manpower: Number Of Days 7.00 1.00 A. Safety Practitioner/officer (part Time) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 101.00 Removal Of Existing Structures Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1 L.s. 1.00 L.s. Removal Of Existing Structures Direct Cost: B. Manpower: Number Of Hours 20.00 1.00 A. Construction Foreman 20.00 3.00 B.unskilled Laborer C. Equipment And Water: Number Of Hours A. Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Ceiling Quantity 72.02 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 72.02 M2 4.5mm Fiber Cement Board On Metal Frame Ceiling Direct Cost: A. Materials: 0.37 Pc A. 4.5mm Fiber Cement Board Plywood 1.13 Pc B.metal Furring 3m Length 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1)a 19.05 Mm Marine Plywood (cabinets And File Storage) Quantity 60.45 M2 Dpwh Standard Output Per Hour (oph)= 1.489 M2 M2 60.45 M2 19.05 Mm Marine Plywood (cabinets And File Storage) Direct Cost: A. Materials: 0.37 Pc A. 3/4" Marine Plywood 1.13 Pc "b. Good Lumber (2"x2") 0.36 Pc C. Assorted Nails D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(2) 4.5mm Fiber Cement Board On Drywall Partition Quantity 106.36 M2 Dpwh Standard Output Per Hour (oph)= 0.776m2 M2 106.36 M2 4.5mm Fiber Cement Board On Drywall Partition Direct Cost: A. Materials: 0.73 Pc A. 4.5mm Fiber Cement Board 1.18 Pc B. Metal Studs 3 M Length 117.00 Pc C. Rivets 4.00 Pc D. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1008.00 Aluminum Glass Window ( Fixed Type ) Quantity 4.40 M2 Dpwh Standard Output Per Hour (oph)= 0.36 M2 4.40 M2 Aluminum Glass Window ( Fixed Type ) Direct Cost: A. Materials: 1.00 M2 A.aluminum Glass (fixed Type) B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (1) Frames (jambs, Sill, Head, Transoms And Mullions Quantity 3.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 3.00 Set Frames (jambs, Sill, Head, Transoms And Mullions Direct Cost: A. Materials: 1.00 Set A.jambs, Sill, Head, Transoms And Mullion B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 2.00 1.00 A. Construction Foreman 2.00 1.00 B. Skilled Laborer 2.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)a Hollow Core Flush Door Quantity 5.67 M2 Dpwh Standard Output Per Hour (oph)= 0.32 M2 5.67 M2 Hollow Core Flush Door Direct Cost: A. Materials: 1.00 M2 A.hollow Core Flush Door B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.00 I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 5.00 Length A. Pvc Pipe Poly 3/4 25.00 Length B. Pvc Pipe Poly 1/2 5.00 Pcs C. Pvc Square Box Poly 5x5 100.00 Pcs D. Flexible Connector 1/2 24.00 Pcs E. Utility Box 2x4 20.00 Pcs F. Junction Box 4x4 0.00 Pcs G. 3/4 Ø Entrance Cap 10.00 Pcs H. Electrical Tape 3m Big I. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.76 1.00 A. Construction Foreman 47.76 1.00 B. Skilled Laborer 47.76 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 60.00 M A. Thhn Wire Stranded # 6 1.00 Box B.thhn Wire Stranded # 10 2.00 Box C. Thhn Wire Stranded # 12 2.00 Set D. Flush Type Single-gang Switch 1.00 Set E. Flush Type Two-gang Switch 4.00 Set F. Flush Type Three-gang Switch 15.00 Set G. Flush Type Outlet 3 Gang Universal H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 20.78 1.00 A. Construction Foreman 20.78 1.00 B. Skilled Laborer 20.78 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 I.s. Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Pcs A. Panel Board Bolt On Type 8 Holes 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 3.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 27.00 Units A. Led Downlight 13w B. Manpower: Number Of Hours 12.00 1.00 A. Construction Foreman 12.00 1.00 B. Skilled Laborer 12.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)a Painting Works (masonry Painting) Quantity 306.15 M2 Dpwh Standard Output Per Hour (oph)= 2.1 M2 306.15 M2 Painting Works (masonry Painting) Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)b Painting Works (wood Painting) Quantity 60.45 M2 Dpwh Standard Output Per Hour (oph)= 1.89 M2 M2 60.45 M2 Painting Works (wood Painting) Direct Cost: A. Materials: 0.05 Gal A. Glazzing Putty 0.04 Gal B. Flat Wall Enamel 0.04 Gal C. Enamel Quick Dry 0.25 I D. Paint Thinner 0.01 Pint E. Tinting Color (optional) F. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) A.1 Furnitures And Fixtures Quantity 1.00 Lot Dpwh Standard Output Per Hour (oph)= 1 Lot 1.00 Lot Furnitures And Fixtures Direct Cost: A. Materials: 1.00 Lot A. Custom-made Information Desk 7.00 Set B. Client Chair 6.00 Set C. Curtain Blinds 1.00 Set D. Couch 12.00 Set E. Wall Cladding (flutted Panel) 1.00 Set F. Sink G. Consumables (5% Of Materials Cost) B. Manpower: C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Contact
Tender Id
00bc5484-6e71-37de-b5aa-ddfd1e80a83fTender No
12084611Tender Authority
Municipality Of Argao, Cebu ViewPurchaser Address
-Website
http://notices.philgeps.gov.ph