Construction of a Combined Sewerage System Together with the Reconstruction of the Waterworks in ul. 15 Sierpnia in the Białołęka District of the Capital City of Warsaw.
Replacement of the L Ca 1496 M water supply network using the trenchless method (static cracking) together with the replacement and switching of water connections in the Wola District of Warsaw.
Replacement of the L Ca 1409 M Water Supply Network Using the Trenchless Method (Static Cracking) Together with the Switching of Water Connections and Replacement of Infrastructure in Warsaw in the Praga Południe/Wawer District