Medicine Tenders
Medicine Tenders
Municipality Of Tiaong, Quezon Tender
Civil And Construction...+1Civil Works Others
Philippines
Closing Date17 Feb 2025
Tender AmountPHP 23.5 Million (USD 406.3 K)
Details: Description A.1.1 Construction Of Field Office For The Engineer Quantity: 1.00 L.s. Materials 1/4 X 4 X 8 Marine Plywood 19 Pc. Good Lumber 299 Bd.ft. Corrugated Roofing, Gauge 26 19.32 Sq.m. 2" X 4" Door Hinges 4 Pc. 2" X 3" Window Hinges 8 Pc. Portland Cement 32 Bag Gravel 3/4 2 Cu.m. Sand 1.5 Cu.m. Reinforcing Steel Bar Grade 40 112.65 Kg. Chb Ordinary 4" 153 Pcs. Fascia Board (1/2 X 12" Marine Plywood) 17.6 L.m. Ridge Roll 7.2 L.m. 20 Watts Flourescent Lf 2 Set Duplex Convenience Outlet 2 Set Three Gang Switch 1 Set Panel Board & Cabinet 1 Set #16 G.i. Tie Wires 2 Kgs. Miscellaneous (forms, Cwn, Bolts, Electrical Wires Etc.) 1 Lot Labor 1 Construction Foreman 5 Days 1 Skilled Laborer 5 Days 5 Laborer 5 Days 605 Project Signboard Quantity : 5.76 Sq.m. Materials Tarpaulin 1 Pcs. Ordinary Plywood 4' X 8' X 1/2" 2 Pcs. Cocolumber 2" X 3" X 12' 5 Pcs. Assorted Common Nail 1 Kgs. Labor 1 Carpenter 0.50 Day 1 Laborer 0.50 Day Spl-i Construction Safety And Health Quantity : 1.00 - Materials Safety Helmet 45.00 Pcs. Hand Gloves 45.00 Pcs. Safety Shoes 45.00 Pcs. Miscellaneous Items 1.00 Lot (medicine, Medicine Cabinet, Water, First-aid Kit) B.9 Mobilization / Demobilization Quantity: 1.00 L.s. Equipment Low Bed Trailer (1% Of Civil Works) 1 L.s 100 Clearing And Grubbing Quantity: 1.00 L.s Equipments 1 Dump Truck 16.00 Hr 1 Bulldozer 16.00 Hr Minor Tools (10% Of Labor Cost) Labor 1 Construction Foreman 2.00 Days 3 Laborer 2.00 Days 100(3)a1 Individual Removal Of Trees (150 - 300mm Dia., Small) Quantity: 5.00 Each Materials Rope, 1" Ø - 5 Uses 20.00 M Equipments 1 Backhoe (0.80 Cu.m.) 2.00 Hr 1 Dump Truck (12 Yd3) 1.00 Hr 1 Chain Saw 1.00 Hr Minor Tools (10% Of Labor Cost) Labor 1 Construction Foreman 1.00 Days 1 Skilled Laborer 1.00 Days 3 Laborer 1.00 Days 102 Surplus Common Excavation Quantity: 490.80 Cu.m Equipments 2 Dump Truck 9.00 Hr 1 Bulldozer 9.00 Hr 1 Payloader (1.50 Cu.m.) 9.00 Hr 1 Payloader (1.50 Cu.m.) At Disposal Site 3.00 Hr Minor Tools (10% Of Labor Cost) Labor 1 Construction Foreman 2.00 Days 2 Laborer 2.00 Days 104(2)a Embankment From Borrow Quantity: 2,454.00 Cu.m Materials Common Borrow (w/ 25% Shrinkage Factor) 3,067.50 Cu.m Equipments 1 Road Grader 50.00 Hr 1 Road Roller 50.00 Hr 1 Water Truck 12.00 Hr Labor 1 Construction Foreman 7.00 Days 2 Laborer 7.00 Days 105 Subgrade Preparation Quantity : 5,726.00 Sq.m. Equipment 1 Road Grader 20.00 Hr 1 Road Roller 20.00 Hr 1 Water Truck 5.00 Hr 1 Construction Foreman 3.00 Days 3 Laborer 3.00 Days 200 Aggregate Subbase Course Quantity : 1,043.00 Cu.m. Materials: Aggregate Subbase Course (15% Shrinkage Factor) 1,200.00 Cu.m. Equipment: 1 Road Grader 21.00 Hr 1 Road Roller 21.00 Hr 1 Water Truck 6.00 Hr Labor 1 Construction Foreman 3.00 Days 2 Laborer 3.00 Days 201 Aggregate Base Course Quantity: 1,043.00 Cu.m. Materials Aggregate Base Course (15% Shrinkage Factor) 1,200.00 Cu.m. Equipments 1 Road Grader 21.00 Hr 1 Road Roller 21.00 Hr 1 Water Truck 6.00 Hr Labor 1 Construction Foreman 3.00 Days 2 Laborer 3.00 Days 206 Polymer-based Chemical Soil Additive Quantity: 699.00 Lit Materials Polymer (rt20 Dynamic Liquid Soil Stabilizer) 734.00 Lit Equipments 1 Water Truck 20.00 Hr Labor 1 Construction Foreman 12.00 Days 2 Laborer 12.00 Days 311(1)b1 Portland Cement Concrete Pavement (unreinforced) - 0.20 M Thick, 14 Days Quantity: 4,090.00 Sq.m Materials Reinforcing Steel Bar (grade 40) 1,596.00 Kg. Curing Compound 1,187.00 Lit. Asphalt Sealant 490.80 Lit. Steel Forms, 200mm Width 1,882.00 M Ready Mix Concrete 3500psi @14 Days 818.00 Cu.m. Concrete Saw (diamond Blade 14") 1.00 Pc Pipe Sleeve, 1"1/2 Dia. 35.00 M Grease/tar 23.00 Lit. Labor 1 Construction Foreman 10.00 Days 4 Skilled Worker 10.00 Days 12 Laborer 10.00 Days Equipments 2 Concrete Vibrator 55.00 Hr 1 Concrete Screeder (5.5 Hp) 55.00 Hr 1 Concrete Saw, Blade Ø 14" (7.5 Hp) 55.00 Hr 1 Bar Cutter, Single Phase, 25 Mm. 6.00 Hr 1 Joint Sealer Machine 6.00 Hr 0 Minor Tools (5% Of Labor Cost) 404(1)a Reinforcing Steel Quantity: 1,400.00 Kg Materials Reinforcing Steel Bar, Grade 40 (with 5% Wastage) 1,470.00 Kg Tie Wire (2% Of Rsb) 30.00 Kg Equipments 1 Bar Cutter 4.00 Hr 1 Bar Bender 4.00 Hr Minor Tools ( 10% Of Labor Cost) Labor 1 Construction Foreman 1.00 Days 2 Skilled Worker 1.00 Days 8 Laborer 1.00 Days 500(1)a1 Pipe Culverts (610 Mm Dia., Class Ii, Rcpc) Quantity: 96.00 L.m Materials Portland Cement 75.00 Bag Sand 5.00 Cu.m R.c. Pipes (610 Mm Dia.) 96.00 Pc Sand Bedding 9.00 Cu.m. Equipments 1 Backhoe 22.00 Hr 1 Plate Compactor 22.00 Hr Minor Tools ( 10% Of Labor Cost) Labor 1 Construction Foreman 6.00 Days 2 Skilled Worker 6.00 Days 4 Laborer 6.00 Days 505(2) Grouted Riprap Quantity: 884.00 Cu.m. Materials Cement 2,652.00 Bag Sand 221.00 Cu.m Weep Holes 265.00 L.m Filter Cloth 13.00 Sq.m Boulders 928.00 Cu.m. Miscellaneous (1% Of Materials) Equipments 3 One Bagger Mixer 228 Hr 1 Water Truck 36 Hr Minor Tools ( 10% Of Labor Cost) Labor 1 Construction Foreman 31 Days 12 Skilled Worker 31 Days 18 Laborer 31 Days
Corazon Locsin Montelibano Memorial Regional Hospital doh R6 Tender
Healthcare and Medicine
Philippines
Closing Date19 Feb 2025
Tender AmountPHP 289.6 K (USD 4.9 K)
Description: Various Drugs And Medicines (anti-infective Drugs) (p.r.#2025-01-0038) , Drugs And Medicines ,corazon Locsin Montelibano Memorial Regional Hospital-doh R6
Municipality Of Tiaong, Quezon Tender
Civil And Construction...+1Civil Works Others
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 18.6 Million (USD 321.6 K)
Details: Description A.1.1 Construction Of Field Office For The Engineer Quantity: 1.00 L.s. Materials 1/4 X 4 X 8 Marine Plywood 19 Pc. Good Lumber 299 Bd.ft. Corrugated Roofing, Gauge 26 19.32 Sq.m. 2" X 4" Door Hinges 4 Pc. 2" X 3" Window Hinges 8 Pc. Portland Cement 32 Bag Gravel 3/4 2 Cu.m. Sand 1.5 Cu.m. Reinforcing Steel Bar Grade 40 112.65 Kg. Chb Ordinary 4" 153 Pcs. Fascia Board (1/2 X 12" Marine Plywood) 17.6 L.m. Ridge Roll 7.2 L.m. 20 Watts Flourescent Lf 2 Set Duplex Convenience Outlet 2 Set Three Gang Switch 1 Set Panel Board & Cabinet 1 Set #16 G.i. Tie Wires 2 Kgs. Miscellaneous (forms, Cwn, Bolts, Electrical Wires Etc.) 1 Lot Labor 1 Construction Foreman 5 Days 1 Skilled Laborer 5 Days 5 Laborer 5 Days 605 Project Signboard Quantity : 5.76 Sq.m. Materials Tarpaulin 1 Pcs. Ordinary Plywood 4' X 8' X 1/2" 2 Pcs. Cocolumber 2" X 3" X 12' 5 Pcs. Assorted Common Nail 1 Kgs. Labor 1 Carpenter 0.5 Day 1 Laborer 0.5 Day Spl-i Construction Safety And Health Quantity : 1.00 - Materials Safety Helmet 35.00 Pcs. Hand Gloves 35.00 Pcs. Safety Shoes 35.00 Pcs. Miscellaneous Items 1.00 Lot (medicine, Medicine Cabinet, Water, First-aid Kit) B.9 Mobilization / Demobilization Quantity: 1.00 L.s. Equipment Low Bed Trailer (1% Of Civil Works) 1 L.s 100 Clearing And Grubbing Quantity: 1.00 L.s Equipments 1 Payloader 16.00 Hr 2 Dump Truck 16.00 Hr 1 Bulldozer 16.00 Hr 1 Construction Foreman 4.00 Days 2 Laborer 4.00 Days 104(2)a Embankment From Borrow (common Soil) Quantity : 613.00 Cu.m Materials Common Borrow (w/ 25% Shrinkage Factor) 766.25 Cu.m Equipments 1 Road Grader 14.00 Hr 1 Road Roller 14.00 Hr 1 Water Truck 4.00 Hr Labor 1 Construction Foreman 3.00 Days 2 Laborer 3.00 Days 105 Subgrade Preparation Quantity : 8,575.00 Sq.m. Equipments 1 Road Grader 32.00 Hr 1 Road Roller 32.00 Hr 1 Water Truck 10.00 Hr 1 Construction Foreman 4.00 Days 3 Laborer 4.00 Days 201 Aggregate Base Course Quantity: 1,562.00 Cu.m. Materials Aggregate Base Course (15% Shrinkage Factor) 1,797.00 Cu.m. Equipments 1 Road Grader 34.00 Hr 1 Road Roller 34.00 Hr 1 Water Truck 10.00 Hr Labor 1 Construction Foreman 6.00 Days 2 Laborer 6.00 Days 206 Polymer-based Chemical Soil Additive Quantity: 435.00 Lit Materials Polymer (rt20 Dynamic Liquid Soil Stabilizer) 457.00 Lit Equipments 1 Water Truck 12.00 Hr Labor 1 Construction Foreman 8.00 Days 2 Laborer 8.00 Days 311 Portland Cement Concrete Pavement (unreinforced) - 0.20 M Thick, 14 Days Quantity : 6,125.00 Sq.m Materials Reinforcing Steel Bar (grade 40) 2,389.00 Kg. Curing Compound 1,777.00 Lit. Asphalt Sealant 735.00 Lit. Steel Forms, 200mm Width 2,818.00 M Ready Mix Concrete 3500psi @14 Days 1,225.00 Cu.m. Concrete Saw (diamond Blade 14") 1.00 Pc Pipe Sleeve, 1"1/2 Dia. 53.00 M Grease/tar 34.00 Lit. Labor 1 Construction Foreman 17.00 Days 4 Skilled Worker 17.00 Days 12 Laborer 17.00 Days Equipments 2 Concrete Vibrator 77.00 Hr 1 Concrete Screeder (5.5 Hp) 77.00 Hr 1 Concrete Saw, Blade Ø 14" (7.5 Hp) 77.00 Hr 1 Bar Cutter, Single Phase, 25 Mm. 8.00 Hr 1 Joint Sealer Machine 8.00 Hr 0 Minor Tools (5% Of Labor Cost)
MUNICIPALITY OF ISABEL, LEYTE Tender
Healthcare and Medicine
Philippines
Closing Date19 Feb 2025
Tender AmountPHP 1.5 Million (USD 25.8 K)
Description: Procurement Of Various Medical & Medicine Supplies To Be Used At Isabel Emergency Hospital , Medical Supplies And Laboratory Instrument ,municipality Of Isabel, Leyte
Institute Of Child & Mother Health Tender
Healthcare and Medicine
Bangladesh
Closing Date17 Feb 2025
Tender AmountRefer Documents
Description: Icmh/2024-25/msr-1a Procurement Of Anesthetic Medicine For The F.y 2024-2025 At Institute Of Child & Mother Health, Matuail, Dhaka.
Province Of Agusan Del Sur Tender
Healthcare and Medicine
Philippines
Closing Date19 Feb 2025
Tender AmountPHP 2 Million (USD 35.6 K)
Description: Procurement Of Drugs And Medicines , Drugs And Medicines ,province Of Agusan Del Sur
1391-1400 of 2948 active Tenders