Manpower Tenders

Manpower Tenders

City Of Danao Tender

Others
Philippines
Details: Description Description Republic Of The Philippines Danao City Bids And Awards Committee Invitation To Apply For Eligibility And To Bid Production Staff For Danao City Contingent For The Sinulog Festival 2025 Of The City Government Of Danao The Local Government Of Danao City, Through The Tourism Office Intends To Apply The Sum Of Php7,000,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Production Staff For Danao City Contingent For The Sinulog Festival 2025 Of The City Government Of Danao. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. The City Government Of Danao Now Invites Sealed Bids From Eligible Bidders To Participate In The Public Bidding Of Production Staff For Danao City Contingent For The Sinulog Festival 2025, As Follows; Seq. Qty. Item Description Estimated Unit Cost Estimated Cost A. Props Structural And Pros Design This Includes Structural Materials (angle Bar, Wheels, 1 Plywoods, Welding Rod, Welding Wires & Etc, Including The Andas Making Materials B. Artistic Team Artistic Choreographer 1 Pax Head Choreographer 1 Pax Head Dance Masters 2 Pax Dance Masters 4 Pax Consultants 2 Pax Music Director 1 Pax C. Visual Team/laborers/rentals Head Artist (including Assistants) 4 Pax Welders, Carpenters 6 Pax D. Instrumentalists/music Ensemble Drum & Bugle Corp 1 Orchestra 1 Choir And Soloist 1 E. Lighting Design Technicians And Assistants Labor 1 F. Video And Graphics Design Official Graphic Artist 1 Video Support 1 G. Lights For The Costumes And Props Costume 100 Props 100 H. Costume, Make Up And Official Shirt Dancers Costume 100 Shoes 200 Make Up 150 Official Tshirt 500 Dramatist 30 I. Festival Queen Costume 1 Hair And Make Up Artist And Handlers -all Exposures 1 Festival Queen Allowance – Meals & Transpo J. Confetti Confetti Showers Used The End Part Of Dance 1 Presentation Php7,000,000.00 Delivery Of The Goods Is Ten (10) Days Upon Request/after Receipt Of Notice To Proceed. The Description Of An Eligible Bidders Is One Who Have Submitted The Following Requirements: Eligibility Requirements With Letter Of Intent To Bid To Be Submitted On December 23, 2024 – January 03, 2025 At 2:00 P.m. (note: All These Documents Should Be In A Separate Envelope.) 1. Dti Business Name Registration Or Sec Registration 2. Tax Clearance 3. Business Permit 4. Certificate Of Registration – Bir Form 2303 5. Authority Of Signatory (duly Notarized) If (single Proprietorship) / Secretary Certificate –should Be Notarized 6. Omnibus Sworn Statement Duly Notarized 7. Valid Joint Venture Agreement (if Applicable) 8. Articles Of Partnership Of Incorporation (if Applicable) 9. On-going And Awarded Contracts 10. Single Largest Completed Similar Contracts 11. Copies Of End-users Acceptance Letter For Completed Contracts (if Any) 12. Specification Of Whether Or Not The Prospective Bidder Is A Manufacturer, Supplier Of Distributor 13. Audited Financial Statement And Income Tax Return 14. Nfcc Duly Notarized Or Credit Line At Least 10% Of The Abc 15. Philgeps Organization Number 16. Philgeps Certificate 17. Danao City Mayors Permit To Bid Pre-bid Conference On December 23, 2024 At 1:30 In The Afternoon At The Bids And Awards Committee Office. Submission And Receipts Of Bids On January 06, 2025 At 1:30 In The Afternoon At The Bids And Awards Committee Office. Technical Envelope: 1.) Bid Security - 2% Cash/cashier's Check/manger's Check/letter Of Credit/bank Draft/guarantee (based On Abc) 5% Gsis Bond (based On The Abc) / Bid Securing Declaration 2.) Authority Of The Signatory Duly Notarized If (single Proprietorship) / Secretary Certificate If Corp. 3.) Production / Delivery Schedule 4.) Manpower Requirements 5.) After-sales/parts, If Applicable. 6.) Technical Specification Of The Products. 7.) Commitment To Extend A Credit Line / Nfcc At Least 10% Of The Abc Duly Notarized. 8.) Omnibus Sworn Statement Duly Notarized Financial Envelope: 1.) Bid Prices In The Bill Of Quantities In The Prescribed Bid Form. 2.) The Recurring And The Maintenance Costs, If Applicable. Instructions To Bidders: 1.) For Winning Bidders, Performance Security Shall Be Required To Guarantee The Faithful Performance Upon Signing The Contracts It Maybe 5% Of The Contract Prices On A Form Of Cash/manager's Check Or 30% Gsis Bond. 2.) Retention In The Amount Equivalent To At Least 10% Of Every Progress Payment Made Or Special Bank Guarantee Equivalent To At Least 10% Of The Total Contract Price. The Said Amount Shall Be Released Only After The Lapse Of The Warranty Period, 3 Months In Case Of Supplies And 1 Year In The Case Of Purchase Of Equipment. 3.) All Particulars Relative To Pre-qualifications, Biddings, Evaluation Of Bids And Awards Of Contracts Shall Be Governed By The Provision Of Ra 9184 And Other Rules Regulation As Maybe Applicable. 4.) The City Government Reserves The Right To Reject Any/or All Bids, To Waive Any Defect, Informalities Therein And To Award To The Bidders Upon Evaluation By The Bids And Awards Committee (bac) The Bid That Are More Advantageous To The City. 5.) 5% Value Added Tax (vat) Withheld Of The Contract Price. 1% Creditable Income Tax Of Contract Price. 6.) Bidders Should Fill-up All Items; Otherwise In Case Their Quotation Is Incomplete They Are Automatically Disqualified. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using As Specified In The Implementing Rules And Regulations Part ! (irr-a) Of Republic Act No. 9184 (r.a. 9184), Otherwise Known As The Government Procurement Reform Act, And Is Restricted To Organization With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belongings To Citizen Of The Philippines, As Specified In Republic Act 5183 (r.a. 5183). Only Bids From Bidders Who Pass The Eligibility Check Will Be Opened. The Process For The Eligibility Check Is Described In Section Ii Of The Bidding Documents, Itb. The Bidder With The Lowest Calculated Bid (lcb) Shall Advance To The Post-qualification Stage In Order To Finally Determine Who’s Responsiveness To The Technical And Financial Requirements Of The Project. The Contract Shall Then Be Awarded To The Lowest Calculated And Responsive Bidder (lcrb) Who Was Determined As Such During The Post-qualification Procedure. Very Truly Yours, Catherine M. Enriquez Bac Secretariat Approved: Rosette B. Villaflor Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 7 Million (USD 120.7 K)

VIVEA Tender

Education And Training Services
France
Details: The Vivea Alsace Territorial Committee wants the implementation of a new training offer aimed at developing the skills of operating managers so that they can consolidate the profitability of their business and their income. The development of agricultural businesses takes place in a changing context whose repercussions can impact their economic balance, their profitability and the income levels of farm managers. Whether the consequences are immediate or in the longer term, the strategic approach and management of companies must make it possible to optimize the production tool by taking into account economic factors (markets, consumption, distribution circuits), environmental factors. (Climate Change, Access to Resources, Impacts of Agricultural Practices), Social (Societal Expectations, Labor Force and Employment Management) and Political (Common Agricultural Policy, National Sector Plans, etc.). Market developments (soybeans for example) can call into question the economics of a company, requiring anticipation of a change in the supply chain, possible investments in skills, equipment and manpower. Such developments in existing systems require good control of production factors and knowledge of balance points.
Closing Date31 Jan 2025
Tender AmountRefer Documents 

Board Of Investments Makati City Metro Manila Tender

Software and IT Solutions
Philippines
Details: Description About The Procuring Entity The Board Of Investments (boi) Is An Attached Agency Of The Department Of Trade And Industry (dti) That Is The National Government Agency Responsible For The Promotion Of Investments- Both Foreign And Domestic. It Is Governed By Executive Order No. 226, Also Known As The Omnibus Investments Code Of 1987, And The Recently Approved R.a. 11534 Or The Create Law. The Boi Seeks To Attract Quality Investments That Will Encourage Technological Innovations And Provide Support For Industries To Seize The Opportunities And Challenges Of Global Demands And Competition. The Agency Envisions Itself As A Global Industry Promotion Agency By 2028 Guided By The Core Values Of Integrity, Excellence, Teamwork And Passion For Knowledge. Its Mission Is To Provide Investors With Opportunities For Investments, Comprehensive Business Support Services And Fair Predictable And Consistent Industry Policies. The Current State Of The Economy Due To The On-going Pandemic Makes It More Imperative For Boi To Continuously Aim For Work Excellence, As It Is An Agency, Which Is At The Forefront Of Enticing Investments Into The Country. 2. Project Overview/objectives The Fas-itd Is Committed To Enhancing Operational Efficiency, Ensuring High Availability Of Critical Applications, And Optimizing Costs Through Modern Technological Solutions. Procuring A 3-year Cloud Service Subscription Will Transform Boi’s It Infrastructure, Allowing Seamless Scalability, Robust Data Security, And Continuous Service Delivery. With Cloud-based Solutions, Our Operations Will Achieve Greater Agility To Adapt To Ever-changing Demands, While Reducing The Risk Of System Outages And Costly On-premises Hardware Maintenance. The Cloud Will Provide State-of-the-art Tools And Resources, Helping Boi To Meet Its Strategic Goals And Uphold The Service Delivery Commitments Without Disruption. This Investment Will Not Only Streamline The Itd Operations But Will Also Position Boi As A Forward-thinking Organization That Leverages Technology To Improve Productivity And Collaboration. By Utilizing To The Cloud Technology, Boi Will Experience Significant Cost Savings Through Efficient Resource Allocation And On-demand Services, Eliminating Unnecessary Expenditures Associated With Outdated Infrastructure. Furthermore, Enhanced Data Redundancy And Built-in Disaster Recovery Features Will Safeguard Boi’s Critical Data And Ensure High Availability, Thereby Protecting Boi's Reputation And Stakeholder Trust. This Strategic Move Aligns With Our Vision Of Providing Sustainable And Innovative Services To Our Partners And Clients. 3. Contract Period The Contract Period Shall Cover Thirty-six (36) Months Upon Acceptance Of Boi Applications And Databases In The Winning Bidder Cloud Web Hosting Platform Solution. 4. Technical Requirements And Scope Of Work The Web Hosting Service And Standard Web Hosting Support Service Provider Shall 4.1 Supply And Deliver The Required Services Stipulated In The Purchase Request 4.2 Provide Technical Support For All Problems Pertaining To Web Hosting Services 4.3 The Cloud Service Provider Through Its Local Counterpart Technical Support Will Be Responsible For Provisioning The Required Cloud Platform, Services, And Associated Licenses With The Following Specifications To Ensure Compatibility With Boi Continuous Services Follow: Service Feature Requirements Traffic Management Capability To Control The Distribution Of Traffic Across Application Endpoint. Continuous Monitoring Of Endpoint Health And Status Data Management Sql Database, Data Storage, Import/export Capabilities, And File Services, Must Support Ms Sql Server 2007 And Up Ip Requirement Provide Public Ip Resources To Communicate With Other Cloud Resources, On-premise Networks, And The Internet Security Inclusion Of A Unified Security Management Platform That Includes Security Health Monitoring Of Cloud Workloads, And Security Threat Blocking Through Access And Application Control Privacy Must Adhere To The Data Privacy Act Of 2012 (ra 10173), Must Offer Continuous Security Health Monitoring For The Entire Cloud Environment Scalable Resources Provide The Capability To Increase/decrease Resources As Needed To Support Any Periods Of Unpredictable Resource Usage. Scalable Resources Must Include Bandwidth, Servers, Storage, And Database Instances Vendor Support Virtual Machine Availability And Connectivity Must Be At Least 99% Up All The Time Cloud Server Specification Service Type Custom Name Region Description Networking Application Gateway Sea Web Application Firewall V2 Tier, 730 Fixed Gateway Hours, 1 Compute Unit And 1000 Persistent Connections With 1 Mb/s Throughput, 5gb Data Transfer Networking Managed Jump Box Service For Secured Remote Access Sea 730 Hours, 5gb Outbound Data Transfer Storage Storage Account Sea Managed Risk, Premium Ssd, Lrs Redundancy, P30 Disk Type 1 Disk, Pay-as-you-go Storage Storage Account Sea Managed Risk, Premium Ssd, Lrs Redundancy, P20 Disk Type 1 Disk, Pay-as-you-go Storage Storage Account Sea Managed Risk, Premium Ssd, Lrs Redundancy, P10 Disk Type 1 Disk, Pay-as-you-go Networking Network Watcher Sea 1 Gb Network Logs Collected, 0 Checks For Network Diagnostics, 1 Connection Metrics, 1 Dns Or App Gateway Servers X 0 Gb Logs Ingested, 0 Gb Logs Collected For Traffic Analytics (standard Processing), 0 Gb Logs Collected For Traffic Analytics (accelerated Processing) Networking Ip Addresses Sea Standard (arm), 0 Static Ip Addresses X 730 Hours, 6 Public Ip Prefixes X 730 Hours Management And Governance Backup Sea Vms, 5 Instance(s) X 560 Gb, Lrs Redundancy, Moderate Average Daily Churn, 84gb Average Monthly Snapshot Usage Data Compute Virtual Machine Sea 1 Ds11 V2 (2 Vcpus, 14 Gb Ram) X 730 Hours (pay As You Go), Windows (license Included), Sql Standard (pay As You Go); 0 Managed Disks – S4; Inter Region Transfer Type, 5 Gb Outbound Data Transfer From Southeast Asia To East Asia Storage Storage Account Sea Block Blob Storage, General Purpose V1, Lrs Redundancy, 1,000 Gb Capacity - Pay As You Go, 10 X 10,000 Write Operations, 10 X 10,000 List And Create Container Operations, 10 X 10,000 Read Operations, 1 X 10,000 Other Operations. Storage Storage Account Sea Block Blob Storage, General Purpose V1, Lrs Redundancy, 1,000 Gb Capacity - Pay As You Go, 10 X 10,000 Write Operations, 10 X 10,000 List And Create Container Operations, 10 X 10,000 Read Operations, 1 X 10,000 Other Operations Storage Storage Account Sea Block Blob Storage, General Purpose V1, Lrs Redundancy, 1,000 Gb Capacity - Pay As You Go, 10 X 10,000 Write Operations, 10 X 10,000 List And Create Container Operations, 10 X 10,000 Read Operations, 1 X 10,000 Other Operations. Storage Storage Account Sea Block Blob Storage, General Purpose V1, Lrs Redundancy, 1,000 Gb Capacity - Pay As You Go, 10 X 10,000 Write Operations, 10 X 10,000 List And Create Container Operations, 10 X 10,000 Read Operations, 1 X 10,000 Other Operations. Compute Virtual Machine Sea Phpvm, 1 A3 (4cores, 7gb Ram) X 730 Hours, Windows (license Included) Os Only; 0 Managed Disks – S4; Inter Region Transfer Type, 5 Gb Outbound Data Transfer From Southeast Asia To East Asia Compute Virtual Machine Sea Engasjune2023, 1 Ds11 V2 (2 Vcpus, 14gb Ram) X 730 Hours, Windows (license Included) Networking Virtual Network Sea Southeast Asia (virtual Network 1): 100 Gb Outbound Data Transfer; Southeast Asia (virtual Network 2): 100 Gb Outbound Data Transfer Compute Virtual Machine Sea 1 D4as V5 (4 Vcpus, 16 Gb Ram) X 730 Hours (pay As You Go), Windows (license Included), Os Only; 0 Managed Disks – S4; Inter Region Transfer Type, 5 Gb Outbound Data Transfer From Southeast Asia To East Asia Networking Ddos Mitigation Service Sea Ip Protection, Protection For 2 Resources, X 730hours Security Defender For Cloud Sea Defender For Cloud By Resource: 0 Plan 1 Servers X 730 Hours, 4 Plan 2 Servers X 730 Hours, 0 Container Vcores X 730 Hours, 0 Additional Container Image Scans, 0 App Service Nodes X 730 Hours, 0 Sql Database Servers, 0 Sql Database Servers Outside X 730 Hours, 0 Mysql Instances, 0 Postgresql Instances, 0 Mariadb Instances X 730 Hours, Cosmos Db 0 X100 Ru/s X 730 Hours, 7 Storage Accounts X 730 Hours With 0 Million Total Overage Of Transactions Across Each Storage Account And 0 Gb Storage Scanned For Malware, 0 Key Vault(s), 0 Subscription(s) Standard Support Standard Support 4.4 Cloud Service Migration Provision The Successful Bidder For Our Cloud Services Contract Shall Be Responsible For A Comprehensive And Seamless Migration Of Our Existing Cloud Infrastructure To The New Cloud Platform. This Migration Is A Critical Component Of Our Cloud Services Strategy, And As Such, Comes With Specific Requirements And Expectations That Must Be Fully Met. The Migration Shall Encompass Our Entire Existing Cloud Infrastructure, Including All Virtual Machines, Associated Storage Volumes, Network Configurations, Security Groups, Access Controls, Backup Systems, Disaster Recovery Configurations, Operational Monitoring Tools, And All Current Application And Database Workloads. The Bidder Must Ensure A Holistic Approach That Leaves No Critical Component Behind, Maintaining The Integrity And Functionality Of Our Current Cloud Environment. All Migration-related Activities, Including Planning, Execution, Testing, Cut-over, And Post-migration Support, Are To Be Considered Part Of The Base Contract And Shall Not Incur Any Additional Charges. Subscription Inclusion:  Three (3) Years Standard Support On Web Hosting Services Cloud Platform As A Service  Three (3) Years Of Technical Support  Unlimited 24x7 Billing, Subscription, And Technical Support  Initial Response Time Based On The Agreed Upon Priority Level Priority Level Response Time Resolution Time Critical 2 Hours 1 Day High 4 Hours 2 Day Medium 6 Hours 4 Day Priority Level Description Priority Level Description Critical The System Error That Renders The Implemented Application System Inoperable Or Is Causing Serious Adverse Impact To The Boi’s Business Operations, And For Which No Alternative Or Workaround Is Available To The Boi High The System Error That Materially Affects And/or Impacts The Implemented Application System Performance Of One Or More Facilities, Or Functions, As Detailed In The Specifications, With The Consequence, That The Boi’s Business Can Be Performed But In A Restricted Or Inefficient Manner Medium System Error Does Not Significantly Affect Boi’s Current Day-to-day Business Activities, But The Performance Or Efficiency Of The Business Activity Can Be Improved If Such A Bug Were To Be Corrected. 5. Product Support Requirement The Web Hosting Service Provider Shall 5.1 Continuously Use The Existing Boi Account 5.2 Provide Technical Support Covering The Following But Not Limited To • Unlimited 24x7 Technical Support • Online Incident Submission • Less Than 2 Hours Response Time Upon Receipt Of The Request From Boi. • Consulting Services On Related Support And Services, 5.3 Furnish To Boi Fas-itd The Monthly Data Usage/consumption Report 6. Trainings 6.1. Fundamental Training For Three (3) Dedicated Administrators On The Existing/proposed Cloud Solution 6.2. Advanced Administration Training For Three (3) Dedicated Administrators Of The Existing/proposed Cloud Solution 6.3. Security Operations And Incident Response Training For Four (4) On The Existing/proposed Cloud Solution 7. Qualifications Of The Service Provider The Service Provider Must Have The Necessary Eligibility, Experience, And Expertise In Providing The Service, With The Following Credentials: 6.1 Certificate Issued By The Manufacturer As Authorized Partner For 7 Years For The Proposed Cloud Solution. 6.2 At Least Five (5) Years Of Experience In Designing, Deploying, Managing, And Maintaining Cloud Projects. 6.3 At Least Three (3) Dedicated Manpower Experts That Are Certified Engineers Or Equivalent With Certifications Issued By Cloud Service Provider. During The Project Implementation, The Replacement Of Assigned Personnel Is Not Allowed. 6.4 Certification Issued By Certifying Partnership (indicating Contractor’s Experience And Capability Relative To Cloud Services, If Any). 6.5 The Supplier Must Have Completed Satisfactorily At Least (3) Projects Similar To The Proposed Cloud Solution. 6.6 Service Level Agreement (sla) 6.7 Non-disclosure Agreement (nda) 6.8 Platinum Philgeps Membership 8. Manpower Requirements 8.1. The Bidder Must Provide A Project Manager To Oversee The Project With Five (5) Years Of Experience. The Bidder Must Submit Documentary Proof Such As Project Management Training Certifications To Verify The Assigned Project Manager’s Credentials With Curriculum Vitae Or Resume. 8.2. Must Provide At Least Three (3) Locally Employed Certified Cloud Engineers As Project Team Members With Three (3) Years Of Experience, And Un-expired Certificates Of Accreditation From The Cloud Service Provider Of The Proposed Brand. 8.3. Must Submit A Photocopy Of The Valid Certification, Resume, And Company Id Of The Project Team Members And It Should Be Part Of The Bid Submission. 9. Warranty 8.1 Three (3) Years Warranty On Licenses And Specifications Of Cloud Platform. 8.2 Three (3) Years Technical Support: 8.2.1 24/7 Technical Support Services For Issues Affecting Critical Operations Of Cloud Services. 8.2.2 Monday-friday (8:00 A.m. To 5:00 P.m.) For Non-critical Technical Issues. 10. Security 10.1. The Cloud Service Provider Should Meet International Security Standards And Should Abide By All Relevant Philippine Laws And Industry Standards. 10.2. Data That Can Be Migrated To The Public Cloud Will Need To Meet Security Requirements For Accreditation And Be Verifiable By An Internationally Recognized Security Assurance Framework 10.3. Accepted International Security Standard Includes Iso/iec 27001 (information Security). Data Will Be Encrypted Using The Latest Industry-tested And Accepted Standards Algorithms, Encryption Requirements Should Be Aes (256 Bits And Higher) 10.4. Data Ownership – Boi Will Retain Full Control And Ownership Over Their Data. Service Contracts And Other Slas Shall Clearly Provide That Any Data Migrated To The Cloud Remains The Property Of Boi Regardless Of Who Owns, Manages Or Operates The Cloud. Boi Will Retain The Full Rights Of Data Access, Retrieval, Modification, And Deletion Regardless Of The Physical Location Of The Cloud Services, Including The Right To Approve, Deny, And Revoke Access By Third Parties. 10.5. Data Access – Access, Retrieval, Modifications, And Deletion Of Data Remain The Right Of The Boi And Will Be Reflected In The Relevant Contracts. 11. Mode Of Procurement Procurement Of A 3-year Cloud Service Solution For Enhanced Efficiency, High Availability, And Cost Optimization In Boi Operations Cloud Platform-as-a-service Shall Be Undertaken Through Competitive Bidding Pursuant To Ra No. 9184 And Its 2016 Revised Irr. 12. Approved Budget Cost A Budget Ceiling Of Eleven Million (php 11,000,000.00) Has Been Approved And Earmarked For The Procurement Of 3-year Cloud Service Solution For Enhanced Efficiency, High Availability, And Cost Optimization In Boi Operations, Including All Incidental Expenses For The Duration Of The Project. Prices Are In Php Peso And Are Vat Inclusive. 13. Source Of Funds The Budget Authorized For The Procurement Of 3-year Cloud Service Solution For Enhanced Efficiency, High Availability, And Cost Optimization In Boi Operations Shall Be Sourced From The 2025 Mooe, Pursuant To The Philippine General Appropriation Act Of 2025. 14. Payment All Services Rendered For This Project By The Service Provider Shall Be Paid Upfront And/or Agreed With The Payment Scheme By Boi. 15. Penalty In Case There Is A Delay In The Delivery, Configuration, And Migration Of The Cloud Services Where Boi Is Not At Fault, The Contracted Service Provider Shall Be Subject To Sanctions As Specified In The Contract To Be Signed By Both Parties Based On The Applicable Provisions Of The Procurement Law. 16. Reservation Clause The Board Of Investments (boi) Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. No. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders.
Closing Date8 Jan 2025
Tender AmountPHP 11 Million (USD 189.8 K)

Department Of Agriculture Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-10 (pr No. Bt-25-infra-rice-39835-0008) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million One Hundred Thirty-eight Thousand Six Hundred Ten Pesos And 53/100 Only (p6,138,610.53) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. San Pablo, Tabon-tabon, Leyte.” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Eighteen (118) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. San Pablo, Tabon-tabon, Leyte P6,138,610.53 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 82.77 Cu.m. Structure Excavation 371 Cu.m. Embankment 8927.65 Kgs. Reinforcing Steel 130.12 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 587.78 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 61 Sets Aluminum Screen And Aluminum Glass Windows 1 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 13 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 118 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 50% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.1 Million (USD 105.9 K)

DEFENSE LOGISTICS AGENCY USA Tender

Transportation and Logistics
United States
Details: A. Summary Of Amendment 002 1. The Defense Logistics Agency (dla) Is Conducting A Commercial Solutions Opening (cso) Authorized By 10 U.s.c. § 3458 And Defense Federal Acquisition Regulation Supplement, Subpart 212.70, Defense Commercial Solutions Opening. Dla Intends To Solicit Solution Briefs In Response To The Addendum Areas Of Interest (aois), Which Dla May Change, Amend, Open, And Close From Time To Time At Dla’s Sole Discretion. Interested Offerors Are Encouraged To Frequently Check This Cso From New Or Revised Aois. Dla Intends To Keep This Cso Sp4701-24-s-c001 Open Until 11 March 2025; However, Dla Reserves The Right To Close This Cso At Any Time. 2. In Accordance With 10 U.s.c. § 3458(c)(2), Any Contract Or Agreement Dla May Award Under Pursuant To This Cso Shall Be Fixed-price. Dla Intends To Award Commercial Contracts In Accordance With Dfars 212.7002(b); However, Dla May, At Dla’s Discretion, To Award An Other Transaction Agreement In Accordance With 10 U.s.c. § 4022. 3. If You Have Any Questions Or Concerns, Please Contact: ms. Michelle Harrison agreements And Contracting Officer dla Dcso-p5 michelle.harrison@dla.mil 4. Dla Provides No Funding For Any Offer Submitted To This Cso. Dla Funding Is Only Possible After A Signed Contract. b. Background: Dla Is The Department Of Defense’s Logistics Combat Support Activity. Dla Provides Worldwide Logistical Support To The Military Services And Other Authorized Customers, Which May Include Civilian Organizations And Foreign Countries. Potential Offerors May Learn More About Dla At Htts://www.dla.mil. c. How To Submit A Solution Brief. prior To The Closing Date Of The Published Area Of Interest, Electronically Submit To The Person Identified In Paragraph A.3. Of This Cso An Unclassified Solution Brief, Utilizing The Solution Brief Template At Attachment 1. mark As Appropriate All Parts Of The Solution Brief Considered Proprietary. By Submitting A Solution Brief, The Offeror Agrees To Dfars 252.227-7016, Rights In Bid Or Proposal Information. the Solution Brief Must ‘stand Alone’. While The Solution Brief May Include References To Outside Materials, Links To Website, Etc., Dla Will Not And Can Not Consider Such Material. Similarly, Dla Will Not Consider Any Accompanying Slides, Sales Materials, Integrated Or Outside Videos, Or The Like Sent With The Solution Brief. Dla May Reject, Without Further Consideration, Solution Briefs Sent With Extraneous Materials. offerors May Submit Multiple Solution Briefs For Each Aoi. While Each Solution Brief May Reference Another Solution Brief, Dla Will Not And Can Not Consider That Referenced Solution Brief In Evaluating This Submitted Solution Brief. solution Briefs’ Prices And All Other Terms And Conditions Must Remain Valid For 180 Calendar Days From The Submission Date Of The Solution Brief. d. How Dla Will Make Any Awards. 1. Dla Will First Review Solution Briefs For Conformance With This Cso. Dla Will Return Solution Briefs Dla Finds Not In Conformance With This Cso. The Offeror May, If The Date And Time Stated In The Area Of Interest Has Not Passed, Re-submit A Revised Solution Brief. While Dla Intends To Complete This Review Diligently, Dla Is Under No Obligation To Complete This Review Soon Enough For An Offeror To Submit A Revised Solution Brief. Therefore, Offerors Should Submit Their Best, Conforming, Solution Briefs. 2. For Solution Briefs Both Received Before The Closing Time Of Cso And Aoi, And Also Conforming To The Cso, Dla Subject-matter Expert Technical Evaluators Will Evaluate The Solution Brief. First, Evaluators Will Evaluate Factor 1, Possibility Of Funding, And Rate The Solution Brief As Either “funding Possible” Or “funding Not Possible”. If Evaluated As “funding Not Possible,” Evaluators Will Not Evaluate The Solution Brief Further And Dla Will Notify The Offeror. If Evaluated As “funding Possible,” Evaluators Will Continue Their Evaluations Through The Remaining Factors, Assigning Each Remaining Factor One Of The Following Ratings: “exceptional,” “good,” “acceptable,” “marginal,” Or “unacceptable.” All Evaluation Factors Are Described Below. A. Factor 1: Possibility Of Funding. Does Funding Reasonably Exist To Fund The Proposed Solution? Solutions With Lower Prices Are Favored. B. Factor 2: Technical Feasibility. How Technically Feasible Is The Proposed Solution To An Aoi, Given The Present State Of The Technology And Science? Solutions With A Lower Technological Risk Profile Are Favored. C. Factor 3: Responsiveness. How Responsive Is The Proposed Solution To The Aoi? Solutions Responsive To The Problem Identified In The Aoi, Without Creating New Problems, Are Favored. D. Factor 4: Viability. How Viable Is The Proposed Solution Given Existing Organizational And Regulatory Environments? Solutions Compatible With Existing Dla, Dod, And Federal Policies, Processes, And Procedures, Are Favored. E. Factor 5: Desirability. How Desirable Is The Proposed Solution To The Eventual End-user? Solutions Easily Adaptable, Useful, And Implementable Are Favored. 3. After The Above Evaluation, The Technical Evaluators Will Then Decide Whether The Solution Proposed In The Solution Brief Merits Further Consideration. Note That While Solution Briefs Are Not Evaluated Against Other Solution Briefs, Dla Has Limited Funding And Acquisition Manpower And Thus Cannot Pursue All Otherwise Meritorious Solution Briefs. Dla Also Recognizes That Industry Resources In Pursing Business With Dla Are Limited. To The Extent Dla Must Select Between Highly Rated Solution Briefs To Pursue Further, Dla Will Aggregate The Factor 2 Through 5 Ratings Together Equally To Discern The Most Highly Rated Solution Briefs. If Further Discernment Is Necessary Amongst Highly Rated Solution Briefs, Dla Will Then Additionally Consider The Factor 2 Through 5 Ratings In Order Of Importance, With Factor 2 Being The Most Important, Factor 3 Being The Second Most Important, Factor 4 Being The Third Most Important, And Factor 5 Being The Fourth Most Important. And If Still Additional Discernment Is Necessary, Dla Will Then Consider The Price Proposed In The Solution Brief And Select For Further Consideration The Lowest Priced Solution Brief. 4. If The Technical Evaluators Decide A Proposed Solution Brief Merits Further Consideration, Technical Evaluators Will Decide Whether To Further Consider The Proposed Solution Via A Pitch, Full Proposal, Or Both. Technical Evaluators May Also Decide A Pitch Or Full Proposal, Or Both, Are Unnecessary, And Refer A Solution Brief For Negotiation Of A Possible Award As Described In Paragraph 5. A. Pitch: Dla Would Invite The Offeror To ‘pitch’ The Offeror’s Proposed Solution In A Presentation, Whether Via A Remote Meeting, A Face-to-face Meeting, Or Other Mutually Agreeable Means. Dla Will Advise The Offeror Of The Parameters Of The Pitch At That Time. Offerors May Propose Different Parameters; However, The Final Decision Rests With Dla, As Represented By The Person Noted In Paragraph A(3). During The Pitch, The Parties May Verbally Discuss The Proposed Solution. After The Pitch, Dla Will Decide Whether An Additional Pitch Is Desired, To Request A Full Proposal, Refer The Offeror To The Supporting Contracting Activity For Award Negotiations, Or To Terminate Further Consideration Of The Offer. B. Full Proposal: Dla Would Invite The Offeror To Submit A Full Proposal. Dla Will Advise The Offeror Of The Parameters Of The Full Proposal At That Time. Offerors May Propose Different Parameters; However, The Final Decision Rests With Dla. After Receipt Of The Full Proposal, Dla May Communicate With The Offeror About The Full Proposal, To Better Understand And Review It. After Reviewing The Full Proposal, Dla Will Decide Whether An Additional Or Revised Full Proposal Is Desired, To Request A ‘pitch’, Refer The Offeror To The Supporting Contracting Activity For Award Negotiations, Or To Terminate Further Consideration Of The Offer. 5. If The Technical Evaluators Refer An Offeror To The Supporting Contracting Activity For Award Negotiations, The Supporting Contracting Activity Will Open Negotiations With The Offeror. The Conduct Of Such Negotiations Are Within The Discretion Of The Cognizant Contracting Officer Or Agreement Officer, As The Case May Be, As Bounded By Applicable Law And Policy. Offerors Should Note That The Contracting Officer, Or Agreement Officer, Is Not Required To Award Any Contract And May Close Negotiations At Any Time At His Or Her Discretion. Offerors Should Further Note That Should Any In Negotiation Resulting In An Award, The Prices Awarded Must Be ‘fair And Reasonable’. e. Generally Applicable Information. 1. Dla Provides No Funds For Partaking In Any Process Described In This Cso. Any Funds Will Be Disbursed Only In Accordance With A Signed Contract Or Other Transaction Agreement. 2. Should Dla Award An Other Transaction Agreement Awarded Under This Cso, Dla May Later Award A Follow-on Production Contract Or Other Transaction Agreement Without Further Competition, In Accordance With 10 U.s.c. § 4022. 3. Note That Chapter 21 Of Title 41, United States Code, Applies To All Submitted Proposals And Any Awarded Contract, Whether Awarded Under The Far Or 10 U.s.c. § 4022. 4. Note That Dla Can Only Award To A Responsible Entity. Please See Far Part 9 For Further Information. attachments: 1) Dla Cso Sp4701-24-s-c001 Solution Brief Application (conformed Through Amendment 002) addendums: 1) Area Of Interest 01: Direct Vendor Delivery Tracking (dvdt)
Closing Date11 Mar 2025
Tender AmountRefer Documents 

Department Of Agriculture Tender

Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-08 (pr No. Bt-25-infra-rice-39835-0011) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million Four Hundred Thirty-five Thousand Six Hundred Sixteen Pesos And 19/100 Only (p6,435,616.19) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Consuegra, Leyte, Leyte.” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty (120) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Consuegra, Leyte, Leyte P6,435,616.19 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 91.24 Cu.m. Structure Excavation 376 Cu.m. Embankment 9255.19 Kgs. Reinforcing Steel 123.6 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 644.56 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 1 I.s. Plumbing 15.32 Sq.m. Ceramic Tiles 10.92 Sq.m. Carpentry And Joinery Works 3 Sets Steel Windows 61 Sets Aluminum Screen And Aluminum Glass Windows 4 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 15 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 120 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 70% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.4 Million (USD 111 K)

Department Of Agriculture Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-09 (pr No. Bt-25-infra-rice-39835-0010) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million Four Hundred Thirty-five Thousand Six Hundred Sixteen Pesos And 19/100 Only (p6,435,616.19) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Gapas, Sta. Fe, Leyte”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty (120) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Gapas, Sta. Fe, Leyte P6,435,616.19 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 91.24 Cu.m. Structure Excavation 376 Cu.m. Embankment 9255.19 Kgs. Reinforcing Steel 123.6 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 644.56 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 1 I.s. Plumbing 15.32 Sq.m. Ceramic Tiles 10.92 Sq.m. Carpentry And Joinery Works 3 Sets Steel Windows 61 Sets Aluminum Screen And Aluminum Glass Windows 4 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 15 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 120 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 70% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.4 Million (USD 111 K)

Department Of Agriculture Tender

Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-11 (pr No. Bt-25-infra-rice-39835-0012) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million Four Hundred Thirty-five Thousand Six Hundred Sixteen Pesos And 19/100 Only (p6,435,616.19) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Labor And Materials For The Construction Of Warehouse Located At Brgy. San Jose, Ormoc City.” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty (120) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Labor And Materials For The Construction Of Warehouse Located At Brgy. San Jose, Ormoc City. P6,435,616.19 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 91.24 Cu.m. Structure Excavation 376 Cu.m. Embankment 9255.19 Kgs. Reinforcing Steel 123.6 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 644.56 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 1 I.s. Plumbing 15.32 Sq.m. Ceramic Tiles 10.92 Sq.m. Carpentry And Joinery Works 3 Sets Steel Windows 61 Sets Aluminum Screen And Aluminum Glass Windows 4 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 15 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 120 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 50% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.4 Million (USD 111 K)

Department Of Agriculture Tender

Civil And Construction...+1Irrigation Work
Corrigendum : Closing Date Modified
Philippines
Details: Description Section I. Invitation To Bid Reference No.: Da8-infra-2025-05 (id No. Bt-25-infra-39835-0005) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice-2025 Current Fund Intends To Apply The Sum Of Six Million Nine Hundred Twenty-five Thousand Eight Hundred Forty-one Pesos And 69/100 Only (p6,925,841.69) Being The Approved Budget For The Contract (abc) To Payment For The “supply Labor And Materials For The Construction Of Casidman Solar Powered Irrigation System (spis) Located At Brgy. Casidman, Arteche, Eastern Samar” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty-four (124) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Unit Desription Estimated Total Cost Supply Labor And Materials For The Construction Of Casidman Solar Powered Irrigation System (spis) Located At Brgy. Casidman, Arteche, Eastern Samar Scope Of Work: 6,925,841.69 67.24 Cu.m. Levelling Course 9 Cu.m. Grouted Riprap 30 L.m2 6" Diameter Hdpe Pipe 87 L.m2 1" Diameter Galvanized Iron Pipes 56 L.m2 1.5" Diameter Galvanized Iron Pipes 6 L.m2 3" Diameter Galvanized Iron Pipes 1 L.s Doors And Frame 1 L.s Fabricated Metal Roofing Accessories 1 L.s Prepainted Metal Sheets (corrugated) 28 Sq.m. Cement Plaster Finish 28 Sq.m. Painting Works 68 Sq.m. Masonry Works 1 L.s Structural Steel Roof Framing 1 L.s Valves And Pipe Fittings 14.63 Cu.m. Concrete Class "a" ( W/ Forms ) 7.64 Cu.m. Concrete Class "a" ( W/o Forms ) 65.2 Cu.m. Concrete Class "b" ( W/ Forms ) 60.2 Cu.m. Concrete Class "b" ( W/o Forms ) 7 Sq.m. Clearing And Grubbing 341.9 Cu.m. Structure Excavation 188.1 Cu.m. Embankment Fill (from Structure Excavation) 15538 Kgs. Reinforcing Bars 1 Lot Provision Of Permanent Marker 2 Each Project Billboard/signboard 1 L.s Occupational Health And Safety Program 1 Lot Mobilization & Demobilization 1 L.s Construction Of Camp And Other Temporary Facilities 1 L.s Aluminum Solar Frames 1 Assem Lightning Arrester (including Accessories And Wires) 86 L.m2 3" Cyclone Wire 86 L.m2 2 Strands Barbed Wire 1 Assem Trashrack 48 Pc Solar Modules (including Wiring) Specification: Peak Power : 550 Watts, Minimum Cell Type: Monocrystalline Efficiency: At Least 21% Mechanical Performance 5400 Pa Positive Load, Minimum 2400 Pa Negative Load, Minimum Should Pass The Following International Electrotechnical Commission (iec) Or Tuv Certification Equivalent Iec 61215 (mechanical Load, Climate, And Electrical Test) Iec 61701 (salt Mist Corrosion Test) Iec 61730 (pv Module Safety) Potential Induced Degradation (pid) Resistance Manufactured In Iso 9001 Certified Factories 1 Set Pump Set (solar Pump And Inverter/controller With Wiring) Specification: 1. Solar Pump Built In Motor Power: 22000 Watts, Minimum Tota Dynamic Head (tdh): 17 Meters, Minimum Type: Submersible Pump Discharge, Cu.m Per Day: 1300 Cu.m Per Day, Minimum With Return Valve Material: Stainless Steel Insulation Class: F Enclosure Class: Iec 34-5 Iso 5199 2. Inverter/controller Power: 30000 Watts, Minimum With Dry Run Protection Frequency: Variable Protected Against Reverse Polarity,overload, And Overtemperature Integrated Mppt (maximum Power Point Tracking) Ac/dc Compatible Enclosure Class: Ip65 Accessories: Level Switch/float Switch Discharge Meter Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1 Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2 Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1 In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2 Submit Pert/cpm And S-curve 3 Construction Methods 4 Manpower Schedule 5 Major Equipment Schedule 6 Provide Contractor's All Risk Insurance (cari) 7 Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1 Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2 Complete The Construction Within 124 Calendar Days; 3 Provide Necessary Tools For The Satisfactory Completion Of The Project; 4 Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5 Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6 Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7 Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8 Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos 9 Attend Pre-construction Meeting. 10 In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11 Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12 Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1 At Least 30% Of The Physical Accomplishment; 2 At Least 50% Of The Physical Accomplishment; 3 At Least 75% Of The Physical Accomplishment, And; 4 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1 Advance Payment Bond By The Bidder 2 On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 10, 2024 To January 02, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 17, 2024, 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 02, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 02, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Landline No. (53)832-0834 Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date9 Jan 2025
Tender AmountPHP 6.9 Million (USD 119.5 K)

BARANGAY CABUNGA AN, TANAUAN, LEYTE Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description I. Project Billboard Ii. Occupational Health & Safety Program Iii. Removal Of Structure & Obstruction Iv. Formworks & Falseworks (scaffolding) V. Roofing, Fascia Board And Ceiling (outside Only) Vi. Painting Works 1. Barangay Cabunga-an, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Contractors, & Distributors Of Construction Materials For The Project: Repair Of Roofing (existing) 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than December 31, 2024: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 10:00 Am On December 31, 2024. 5. Barangay Cabunga-an, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Cabunga-an, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Reynan O. Leona Barangay Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i. Prescribed Forms)including The Required Enclosed Attachments. All Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items. Bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items. Bid/tenders Shall Be Written In Words As Well As In Figures, The Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof, The Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents, Including Annexes Shall Be Signed In Ink. The Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents, Specifications, Special Provisions If Any, And The Form Of Contract, And Fully Informs Himself As To Quality Of Materials. The Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenders For Any Expense Or Loss That May Occur In The Preparation Of Their Proposals, Nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To, And Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash, Certified Check, Cashier’s Check ,managers Check, Bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Cabunga-an, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond. Bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned. Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form, Shall Be Submitted In Two (2) Sealed Envelope Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders, And Must Be Addressed To; The Bac Chairman, Bids And Awards Committee(bac) And Or, Type Bac Chairman, Barangay Cabunga-an, Tanauan, Leyte. The Bidders Shall Mark The Two Envelopes; Do Not Open (date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st” Shall Contain The Following; 1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule; 4.manpower Requirements;5.after Sales Service/parts; If Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p92,672.59);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-a And Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope, Which Should Be Marked “2nd” Shall Contain The Following; 1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form; 2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid, But Shall Send Another Bid Equally Sealed, Properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac; In This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant, Either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself, Acts, Rules And Regulations Of The Republic Of The Philippines, Including Any Or All Local Ordinances Or Rules Or Regulations, Which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders. The Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules, And Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay’s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On December 31, 2024 At Exactly 10:00 Am At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Barangay Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted. Award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Barangay Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information; Or (c) Such Other Compelling Grounds As Determined During Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By The Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By: Hon. Reynan O. Leona Barangay Chairman
Closing Soon31 Dec 2024
Tender AmountPHP 92.6 K (USD 1.5 K)
1991-2000 of 2010 active Tenders