Led Tenders

Led Tenders

Batangas State University Tender

Publishing and Printing
Corrigendum : Closing Date Modified
Philippines
Closing Date10 Jan 2025
Tender AmountPHP 458.5 K (USD 7.9 K)
Details: Description Republic Of The Philippines Batangas State University Batangas City Request For Quotation "procurement Of Semi-expandable Ict Equipment For Various Offices " 1. The Batangas State University (batstate U) Through The Bids And Awards Committee Invites Interested Firms/supplier To Submit Quotation For The Project "procurement Of Semi-expandable Ict Equipment For Various Offices " With An Approved Budget For The Contract (abc) Four Hundred Fifty-eight Thousand Five Hundred Pesos Only (php 458,500.00). Quotation Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening. Item No. Qty Description Total 1 4 Unit All In One Printer Functions : Print, Scan, Copy Memory: 128mb Display: 1 Line Lcd Interface: Hi-speed Usb 2.0 Wired/wireless Network: Wireless Lan Print Speed (laser Comparable): Up To 17ipm (mono) And 16.5ipm (colour) Print Speed (fast Mode): Up To 30ppm (mono) And 26ppm (colour) Print Resolution: Up To 1200 X 6000 Dpi 2-sided Print: Automatic (up To A4/ltr) Direct Wireless Connection: Wi-fi Direct Maximum Copy Size: A4 Copy Speed (laser Comparable): Up To 13ipm (mono) And 10.5ipm (colour) Copy Speed (fcot): Up To 10.5 Sec (mono) And 21 Sec (colour) Copy Resolution (colour): Print Max. 1200 X 2400 Dpi; Scan Max. 1200 X 600 Dpi Maximum Scan Size: Up To A4 Scan Resolution: Optical: Up To 1200 X 2400 Dpi; Adf: Up To 1200 X 600 Dpi) Scan Speed: From 3.35 Sec/4.38 Sec (a4 Size, 100 X 100 Dpi) Paper Input (standard Type): Up To 150 Sheets (80g/m2) Paper Output: Up To 50 Sheets (up To A4) Paper Handling Sizes: A4, Ltr, Exe, A5, A6, Photo 4" X 6", Indexcard 5" X 8", C5 Envelope, Com-10, Dl Envelope, Monarch 57,600.00 2 1 Unit All-in-one Color Ink Tank Printer Function: Multi-function (print, Scan & Copy) Output Color: Color Print Technology: Inkjet Print Speed: Black - 8.8ppm; Color - 5ppm Number Of Nozzles: Total 1,472 Nozzles Resolution: 4800 X 1200dpi (max.) Paper Size: A4, A5, B5, Letter, Legal, 4 X 6 Inch, 5 X 7 Inch, 8x 10 Inch, Envelopes (dl, Com10), Square (5 X 5 Inch), Business Card. Custom: (width 55 – 215.9mm, Length 89 – 676mm) Paper Type: Plain Paper, High Resolution Paper, Photo Paper Plus Glossy Ii, Photo Paper Plus Semigloss, Matte Photo Paper, Envelope, Glossy Photo Paper, Photo Sticker Paper Weight: Plain Paper: 64 – 105g/m2, Canon Specialty Paper 275g/m2; Photo Paper Plus Glossy Ii (pp-201). Input Capacity: 100 Sheets Input Tray Output Capacity: 50 Sheets Output Tray Duplex Printing: Manual (driver Support Provided) Scanner Type: Flatbed Scanning Speed: 19s Scan Resolution: 600 X 1 200dpi Scan Paper Size: A4, Letter 10,700.00 Page 1 Of 5 Item No. Qty Description Total Multiple Copy: 1 – 20 Pages Copy Speed: 3.5ppm Connectivity: 1 Hi-speed Usb 2.0, Wi-fi Display: 1.2 Inch Segment Lcd Display Wireless: Yes, Ieee 802.11n / Ieee 802.11g / Ieee 802.11b Ink Tank: Yes Power: Input Voltage: Ac 100 – 240v; 50 / 60hz; Power Consumption: 11w (1.2w Standby) Ink Bottle: Gi-790 Black (6,000) Pages, Gi-790 Cyan, Magenta, Yellow (7,000) Pages 3 3 Unit All-in-one Ink Tank Printer Printer Type: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Printer Language: Esc/p-r, Esc/p Raster Nozzle Configuration: 180 X 1 Nozzles Black, 59 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 5760 X 1440 Dpi Automatic 2-sided Printing: No Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 69 Sec Per Photo (border) / 90 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 33.0 Ppm / 15.0 Ppm*2 Iso 24734, A4 Simplex (black / Colour): Up To 10.0 Ipm / 5.0 Ipm*2 First Page Out Time From Ready Mode (black / Colour): Approx. 10 Sec / 16 Sec*2 Maximum Copies From Standalone: 20 Copies Maximum Copy Resolution: 600 X 600 Dpi Maximum Copy Size: A4, Letter Iso 29183, A4 Simplex (black / Colour): Up To 7.0 Ipm / 1.7 Ipm Scanner Type: Flatbed Colour Image Scanner Sensor Type: Cis Optical Resolution: 600 X 1200 Dpi Maximum Scan Area: 216 X 297 Mm Scanner Bit Depth (colour): 48-bit Input, 24-bit Output Scanner Bit Depth (grayscale): 16-bit Input, 8-bit Output Scanner Bit Depth (black & White): 16-bit Input, 1-bit Output Flatbed (black / Colour): 200dpi: Up To 11 Sec / Up To 32 Sec Number Of Paper Trays: 1 Standard Paper Input Capacity: Up To 100 Sheets Of Plain Paper (80 G/m2); Up To 20 Sheets Of Premium Glossy Photo Paper Output Capacity: Up To 30 Sheets Of Plain Paper (80 G/m2); Up To 20 Sheets Of Premium Glossy Photo Paper Maximum Paper Size: 215.9 X 1200 Mm Paper Sizes: Legal (8.5 X 14"), Indian-legal (215 X 345 Mm), 8.5 X 13", Letter, A4, 16k (195 X 270 Mm), B5, A5, B6, A6, Hagaki (100 X 148 Mm), 5 X 7", 5 X 8", 4 X 6", Envelopes: #10, Dl, C6 Print Margin: 0 Mm Top, Left, Right, Bottom Via Custom Settings In Printer Driver*3 Operating System Compatibility: Windows Xp / Xp Professional / Vista / 7 / 8 / 8.1 / 10 Windows Server 2003 / 2008 / 2012 / 2016 / 2019 Mac Os X 10.6.8 Or Later Usb: Usb 2.0 Printer Software: Epson Scansmart 28,800.00 4 5 Unit Color Document Scanner Specifications Scanner: 249,500.00 Page 2 Of 5 Item No. Qty Description Total Scanner Type: Sheet-fed, 1-pass, Duplex Color Scanner Optical Resolution:600 Dpi Maximum Resolution:1200 Dpi Interpolated Monochrome Bit Depth:1-bitoutput Resolution:50 To 1200 Dpi Effective Pixels:5100 X 9300 Light Source:3-color Rgb Led Scanning Speed:letter Size: 45 Ppm/70 Ipm: 300 Dpi Black-and-white, Color, Gray Automatic Document Feeder: Capacity:100 Sheets Document Sizes: Paper Size Minimum: 2" X 2" Paper Size Maximum: 8.5" X 240" At 200 Dpi, 8.5" X 215" At 300 Dpi Daily Duty Cycle: 5,000 Sheets Paper Weight: 27 –413 G/m2 Consumables: Roller Assembly Kit: 200,000 Pages General: Operating Systems: Windows® 10 Windows 8/8.1 Windows 7 Mac Os X® 10.9.8 – Macos® 10.12.x Software Requires Internet Connection For Download And Installation. Temperature: Operating: 41 ° To 95 °f (5 ° To 35 °c) Storage: -13 ° To 140 °f (-25 ° To 60 °c) Humidity: Operating: 10 – 80% (no Condensation) Dimensions: Product Only: 11.7" X 7.7" X 12.5" Product In Package: 14.5" X 9.9" X 11.5" Weight: Product Only: 8.1 Lb. Product In Package: 10.6 Lb. 5 4 Unit Computer Speaker Dimensions Height: 110 Mm Width: 90 Mm Depth: 88 Mm Weight: .25 Kg Technical Specifications Total Watt (rms): 1.2w 3.5 Mm Input: 1 Usb Cable For Power: 1 Controls Power And Volume Controls On Right Speaker 3,000.00 6 3 Unit Computer Web Camera Resolution: Full Hd 1080p, 1920*1080 Pixels Lens Type: Full Hd Glass Lens Viewing Angle: 70 Degrees Focus Type: Fixed Focus Focus Range: 60cm And Beyond Built-in Mic.: Digital Hd Mic. Output Format: Mjpeg Frame Rate: 30fps Usb: Usb 2.0 System Requirements Compatible With: Windows 7 /8 / 8.1 / 10 Or Later Works In Usb Video Device Class (uvc) Mode: Mac Os 10.10 Or Later 3,900.00 Page 3 Of 5 Item No. Qty Description Total Linux Os 2.6 Or Later Chrome Os 6.0 Or Later Android V6.0 Or Later Compatible With Social And Video Calling Software Of The Above System 7 1 Unit Dot Matrix Printer Print Method: Impact Dot Matrix Print Direction: Bi-direction With Logic Seeking Number Of Pins In Head: 9 Pins Print Speed: High Speed Draft: (10 / 12 / 15 Cpi): 347 / 357 / 390 Cps (condensed, 17 / 20 Cpi): 383 / 298 Cps Draft: (10 / 12 / 15 Cpi): 260 / 312 / 223 Cps (condensed, 17 / 20 Cpi): 222 / 260 Cps (emphasized, 10 Cpi): 130 Cps Nlq: (10 / 12 / 15 / 17 / 20 Cpi): 65 / 78 / 55 / 47 / 56 Cps Reliability: Printhead Life: Approx. 400 Million Strokes/wire Mean Print Volume Between Failure (mvbf): Approx. 20 Million Lines (except Print Head) Mean Time Between Failure (mtbf): Approx. 10,000 Poh (25% Duty) Print Characteristics: Character Sets: Italic Table, Pc437 (us Standard Europe), Pc850 (multilingual), Pc860 (portugese), Pc861 (icelandic), Pc863 (canadian French), Pc865 (nordic), Abicomp, Brascii, Roman 8, Iso Latin 1, Pc 858, Iso 8859-15 Paper Path: Manual Insertion: Rear In, Top Out Push Tractor: Rear In, Top Out Paper Media: Cut Sheet (single Sheet): Length: 100 ~ 364mm (3.9 ~ 14.3") Width: 100 ~ 257mm (3.9 ~ 10.1") Thickness: 0.065 ~ 0.14mm (0.0025 ~ 0.0055") Cut Sheet (multi-part Forms): Length: 100 ~ 364mm (3.9 ~ 14.3") Width: 100 ~ 257mm (3.9 ~ 10.1") Thickness: 0.12 ~ 0.39mm (0.0047 ~ 0.015") (total) Continuous Paper (single Sheet / Multi-part): Length: 101.6 ~ 558.8mm (4.0 ~ 22.0") Width: 101.6 ~ 254.0mm 4.0 ~ 10.0") Thickness: 0.065 ~ 0.39mm (0.0025 ~ 0.015") (total) Envelope (no.6): 14,000.00 Page 4 Of 5 Item No. Qty Description Total Length: 92mm (3.6") Width: 165mm (6.5") Thickness: 0.16 ~ 0.52mm (0.0063 ~ 0,0205") (total) Envelope (no.10): Length: 105mm (4.1") Width: 241mm (9.5") Thickness: 0.16 ~ 0.52mm (0.0063 ~ 0.0205") (total) Roll Paper: Width: 216mm (8.5") Thickness: 0.07 ~ 0.09mm (0.0028 ~ 0.0035") Supported Os And Applications: Supported Os: Microsoft® Windows® 2000 / Xp / Vista / 7 / 8 / 8.1 / 10 8 6 Piece External Hard Drive Connection Interface: Usb 3.0 Capacity: 1tb Storage Media: 2.5" Hdd 19,200.00 9 1 Unit Monitor 34 Inches” Wqhd (3440x1440) High Resolution 21:9 Ultra Wide Display 121% Srgb 144hz High Refresh Rate Immersive 1500r Curvature 144hz Curved Monitor 20,000.00 10 14 Piece Ssd Form Factor 2.5? Capacity 1 Tb Interface Sata Iii Dimensions (l X W X H) 0.28? X 3.96? X 2.75? Sequential Read Performance 535mb/s Sequential Write Performance 450mb/s" 51,800.00 Note: Kindly Indicate The Brand On Your Quotation. 2. Philgeps Registration Certificate And Other Business Permits Shall Be Attached Upon Submission Of The Quotation. 3. The Quotation Must Be Submitted (can Also Be Send Thru Fax And Email At The Contact Details Listed Below) Or To The Rizal Avenue Extension, Batangas City And Shall Be Received By The Committee On Or Before 5:00 Pm Of January 10, 2025. E-mail : Procurement.central.external@g.batstate-u.edu.ph 4. The Bsu Reserves The Right To Reject Any Or All Quotations And/or Proposals And Waive Any Formalities/informalities Therein And To Accept Such Bids It May Consider As Most Advantageous To The Agency And To The Government. Batstate U Neither Assumes Any Obligation For Whatsoever Losses That May Be Incurred In The Preparation Of Bids, Nor Does It Guarantee That An Award Will Be Made. Mr. Jonas Erik L Ebora Assistant Director, Procurement Rizal Avenue Extension, Batangas City 980-0385 Loc. 1230

Stalowowolski Centre of Joint Services Tender

Works
Civil And Construction...+1Civil Works Others
Poland
Closing Date8 Jan 2025
Tender AmountRefer Documents 
Details: Title: Budowa Nowych Przystanków Autobusowych Wraz Z Zatokami W Nowych Lokalizacjach W Ciągu Drogi Al. Jana Pawła Ii W Stalowej Woli Realizowana W Ramach Dofinansowania Polskiej Agencji Rozwoju Przedsiębiorczości W Ramach Programu Fundusze Europejskie Dla Polski Wschodniej 2021 – 2027, Priorytet Fepw.03 Zrównoważona Mobilność Miejska, Działanie Fepw.03.01 Zrównoważona Mobilność Miejska description: 1.przedmiotem Zamówienia Jest: „budowa Nowych Przystanków Autobusowych Wraz Z Zatokami W Nowych Lokalizacjach W Ciągu Drogi Al. Jana Pawła Ii W Stalowej Woli” Zadanie Polega Na Przebudowie Drogi Publicznej Al. Jana Pawła Ii W Zakresie Budowy Zatok Autobusowych Na Wysokości Budynków Nr 2a I 18f Wraz Z Niezbędną Infrastrukturą Towarzyszącą I Obejmuję M.in.: -budowę Zatok Postojowych Dla Autobusów; -budowę Utwardzeń Z Kostki Betonowej -budowa Wiat Autobusowych O Charakterze Zielonych Przystanków Z Elementami Małej Architektury (wiata Z Dachem Typu Lekkiego Oraz Z Zamontowanymi Panelami Fotowoltaicznymi – Co Najmniej 1 Szt.); -przebudowę Chodnika I Ciągu Rowerowego; -przebudowę Istniejących Sieci I Urządzeń Energetycznych Kolidujących Z Inwestycją. Przedmiot Zamówienia Zawiera W Szczególności: A) Opracowanie Dokumentacji Projektowej Zgodne Z Załączonymi Pfu Oraz Obowiązującymi Przepisami Prawa, B) Uzyskanie Wszelkich Niezbędnych Uzgodnień, Decyzji I Opinii Oraz Pozyskanie Decyzji Zezwalającej Na Wykonanie Robót, C) Opracowanie I Zatwierdzenie Projektu Stałej Organizacji Ruchu, D) Wybudowanie Obiektu Zgodnie Z Założeniami, Programem Funkcjonalno-użytkowym, Opracowanym Projektem Oraz Decyzją Zezwalającej Na Wykonanie Robót, E) Uzyskanie Wszelkich Pozwoleń, Decyzji I Dokumentów Koniecznych Dla Zamawiającego Do Złożenia Wniosku O Pozwolenie Na Użytkowanie Wykonanych Obiektów, F) Realizację Zadania Zgodnie Z Zasadą Dnsh W Rozumieniu Art. 17 Rozporządzenia (ue) Nr 2020/852. Etap I - Opracowanie Kompletnej Dokumentacji Projektowej Wraz Ze Wszelkimi Uzgodnieniami I Uzyskaniem Decyzji Zezwalające Na Wykonanie Robót (w Przypadku Zrid - Opatrzonej W Rygor Natychmiastowej Wykonalności) - Z Zastrzeżeniem, Że Cena Za Realizację Etapu I (wartość Prac Projektowych) Nie Może Być Wyższa Niż 20% Ceny Brutto Za Wykonanie Robót Budowlanych Przewidzianych W Ramach Realizacji Etapu Ii. Etap Ii - Wykonanie Robót Budowlanych I Uzyskanie Ostatecznego Pozwolenia Na Użytkowanie Zgodnie Z Zatwierdzonym Przez Zamawiającego Projektem. Opis Wiaty Przystankowej: 1. Wymiary Wiaty: • Długość Wiaty: Min. 700 Cm (mierzona Jak Rzut Zadaszenia Na Podłoże Dostępne Dla Pasażerów); • Głębokość Wiaty: Min. 180 Cm (mierzona Jak Rzut Zadaszenia Na Podłoże Dostępne Dla Pasażerów). 2. Konstrukcja Wiaty: Aluminiowa, Profile O Przekroju Prostokątnym Min. 10 Cm, Malowana Proszkowo (kolor Do Uzgodnienia Z Zamawiającym), Klasa Antykorozyjności- C4; 3. Ściany Wiaty (najazdowa, Wyjazdowa I Tylna) Wykonane Ze Szkła Bezpiecznego Hartowanego, Laminowanego O Łącznej Grubości Minimum 10mm. 4. Dach W Formie Modułów Fotowoltaicznych Typu Szkło-szkło O Łącznej Grubości Minimum 12mm. Rozmieszczenie Ogniw Równomierne Na Całej Powierzchni Dachu. Dolne Szkło Modułu Z Właściwościami Przeciwsłonecznymi. Wymiary Modułów Solarnych Dostosowane Do Wymiarów Wiaty. Moc Modułów Należy Dobrać Do Mocy I Pojemności Magazynów Energii By Umożliwić Zasilanie Oświetlenia Przystanku Energią Fotowoltaiczną Przez Minimum 36 Godzin. Konstrukcja Dachu Powinna Zapewnić Swobodne Odprowadzenie Wód Opadowych Do Części Zielonej. 5. Wyposażenie Wiaty: • Ławka W Formie W Pełni Zabudowanej Aluminiowej „skrzyni” Z Deskami Z Drewna Na Powierzchni Siedziska. Długość Ławki I Jej Umiejscowienie W Wiacie Powinno Umożliwiać Schronienie W Wiacie Osobom Poruszającym Się Na Wózku Inwalidzkim Oraz Dostęp Do Gabloty Z Rozkładem Jazdy. • Gablota Na Rozkłady Jazdy O Wymiarach Minimum: Szer. 1250 Mm X Wys. 660 Mm, Umożliwiająca Szybką Wymianę Rozkładu Jazdy, Zabezpieczona Zamkiem Zintegrowanym Z Konstrukcją Gabloty (ilość Kluczy Do Uzgodnienia Z Zamawiającym). Gablota Powinna Być Umiejscowiona Nad Aluminiową Skrzynią Rozdzielczą, Szkło Gabloty Musi Stanowić Szkło Bezpieczne, Hartowane O Grubości Minimum 4mm. Zawartość Gabloty Podświetlana Umożliwiająca Swobodny Odczyt Informacji Pasażerskich Porą Nocną. • Gablota Reklamowa O Wymiarach 1800x1200 Mm, Zabezpieczona Zamkiem Zintegrowanym Z Konstrukcją Gabloty (ilość Kluczy Do Uzgodnienia Z Zamawiającym). Szkło Gabloty Musi Stanowić Szkło Bezpieczne, Hartowane O Grubości Minimum 4mm. Zawartość Gabloty Podświetlana Umożliwiająca Swobodny Odczyt Informacji Porą Nocną. Gablota Powinna Nie Ograniczać Możliwości Schronienia Się Pod Wiatą Osobom Poruszającym Się Na Wózku Inwalidzkim. • Znak Przystanku/ Nazwa Przystanku. 6. Opis Ścian: • Ściana Najazdowa Powinna Nie Ograniczać Widoczności Nadjeżdżającego Autobusu. • Ściana Wyjazdowa Z Podświetlanym Grawerem Podpowierzchniowym – Herb Miasta Stalowa Wola. • Ściana Tylna Typu „zielonej Ściany”. Za Ścianą Wiaty Będą Znajdowały Się Linki Stalowe Z Pnącą Się Roślinnością Zimozieloną Sięgającą Do Elementów Konstrukcyjnych Dachu. Na Ścianie Tylnej Przewidziano Gablotę Na Rozkład Jazdy, Gablotę Reklamową Oraz Aluminiową Skrzynię Rozdzielczą Zlokalizowaną Pod Wyznaczonym Miejscem Na Gablotę Informacyjną. 7. Oświetlenie Wiaty Z Instalacji Fotowoltaicznej Z Magazynem Energii. Zasilanie Oświetlenia Z Możliwością Automatycznego Przełączania (magazyn Energii/zasilanie Zewnętrzne 230v). Oświetlenie Wiaty Energooszczędne Typu Led. Wiata Wyposażona W Zegar Astronomiczny Oraz Czujnik Ruchu, Na Podstawie Których Będzie Uruchomiało Się Oświetlenie Wiaty. Wszelkie Urządzenia Elektryczne Wraz Z Rozdzielnią Zlokalizowane W Aluminiowej Skrzyni – Rozdzielni Energetycznej Wiaty. Skrzynia Zabezpieczona Dedykowanym Zamkiem, Stanowi Miejsce Niedostępne Dla Użytkowników Wiaty. Bank Energii Zlokalizowany W Miejscu Zabezpieczonym, Niedostępnym Dla Użytkowników Wiaty W Przestrzeni Wewnątrz Aluminiowej Skrzyni Rozdzielczej Lub Przestrzeni Wewnątrz Aluminiowej Ławki.

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION USA Tender

United States
Closing Date1 Jan 2025
Tender AmountRefer Documents 
Description: Sources Sought Special Notice 2024 nasa Ames Research Center (arc) Is Seeking Partners Interested In Developing Competitive Proposals In Response To Nasa Announcements Of Opportunity (aos), Broad Agency Announcements (baas), Missions Of Opportunities (moos) And Proposal Calls From Other Government Agencies. Arc Is Interested In Identifying Potential Partners That Can Perform Science Investigations, Conduct Research Activities, And Develop And Demonstrate New Technologies That Are Aligned With Nasa’s Goals. Information Is Also Sought Regarding Partners That, In Addition To Performing Substantial Research, Can Provide Flight Hardware (i.e., Spacecraft, Deployment Systems, Suborbital Systems, Ground Support Systems, Equipment, Or Instrumentation) Necessary To Implement Proposed Science Investigations, Research Activities Or Technology Demonstration Missions. nasa Often Competitively Selects Scientific Investigations, Technology Development And Demonstration Missions Through Solicitations Or Announcements Posted On Nspires Http://nspires.nasaprs.com/external. These Missions Are Typically Led By A Single Principal Investigator (pi), Principal Technologist (pt), Or Project Manager (pm). The Pi, Pt, Or Pm May Be From Government Or Non-government Institutions, Including Academic Institutions, Industry Or Nonprofit Entities, One Of Nasa’s Nine Field Centers, Nasa’s Jet Propulsion Laboratory (jpl), Other Federally Funded Research And Development Centers, Or Other U.s. Government Agencies. Mission Teams May Be Formed From Any Combination Of These Institutions Including International Partners. Arc May Respond To An Ao Or Other Proposal Calls In Either A Lead Or Supporting Role. arc Has A History Of Responding To A Wide Variety Of Nasa Aos Including: Planetary Exploration Aos From The Nasa New Frontiers Program (https://www.nasa.gov/planetarymissions/newfrontiers.html), The Nasa Discovery Program (https://science.nasa.gov/solar-system/programs/discovery), And The Nasa Simplex Program (https://soma.larc.nasa.gov/simplex/); Various Aos From The Nasa Explorers Program (https://explorers.gsfc.nasa.gov) Including Midex, Smex, And Missions Of Opportunity (moo); And Research Opportunities In Space And Earth Sciences (roses) Aos. Arc Anticipates Responding To Current And Future Aos In These And Other Areas As Well. a Full Description Of Current, Future, And Past Calls For Proposals From Smd, Stmd, Esdmd, Somd, And Armd At Nasa Headquarters Can Be Found At Http://nspires.nasaprs.com/external. Additional Information Is Available At Http://science.nasa.gov/researchers. this Synopsis/special Notice Is Posted Annually In Anticipation Of Upcoming Aos And May Have Subsequent Specific Updates As Arc Seeks Partners For Specific Proposal Opportunities. Arc Is Currently Considering Responding To Aos From Nasa's Science Mission Directorate (smd), Space Technology Mission Directorate (stmd), Space Operations Mission Directorate (somd), And Exploration Systems Development Mission Directorate (esdmd). current Nspires Aos To Which Arc May Be Interested In Responding To Are Listed Below By Nasa Mission Directorate. Arc Is Interested In Responding To Future Nspires Aos And Aos From Other Sources, Such As Nsf, Nih, And Others Within The Next Several Years. responses From Prospective Partners Are Encouraged Even If A Particular Solicitation Is Not On The List Below. Arc Typically Begins Many Of Its Efforts In Response To Planned Or Anticipated Future Aos 18 To 36 Months In Advance Of The Release Of The Draft Ao. science Mission Directorate research Opportunities In Space And Earth Sciences 2024 (roses): solicitation: Nnh24zda001n note: There Are A Number Of Independent Solicitations Under This Announcement. Of Particular Interest To Ames Are Those Associated With: Earth Sciences, Heliophysics, Astrophysics (e.g., Astrophysics Pioneers), Space Biology, Instruments (e.g., Life Detection), Payloads And Research Investigations On The Surface Of The Moon (prism), Planetary Instrument Concepts For The Advancement Of Solar System Observations (picasso), And Maturation Of Instruments For Solar System Exploration (matisse). forthcoming Release Of The New Frontiers 5 (nf5) Announcement Of Opportunity: solicitation: Nnh23zda006j (https://newfrontiers.larc.nasa.gov/nf5/) forthcoming Release Of Calls From The Mars Exploration Program “exploring Mars Together: A Plan For A Sustainable Future For Science At Mars” solicitation: Tbd note: The Future Plan Communicates Potential Competed Processes For Low-cost, Medium-class, And Competed Payload Missions To Mars. (http://go.nasa.gov/3lwgfyq) responders To This Notice Are Encouraged To Submit Questions To The Identified Poc In Writing. Pertinent Information From Questions And Answers Will Be Shared With All Interested Parties Without Disclosing The Identity Of The Sources Of The Questions. Responses To This Notice May Be Submitted At Any Time. However, Arc Reserves The Right To Complete Its Evaluation Of Responses In A Time Frame Necessary To Support Timely Submission Of An Arc Proposal To A Particular Opportunity. Arc May Hold Optional Oral Presentations, Meetings Or Written Exchanges Via Email With Potential Proposal Partners To Obtain Additional Information. Oral Presentations Will Have A Specified Period Of Time To Present And For Questions And Answers. responses To This Notice Will Not Be Returned. All Responders To This Notice Should Be Aware That Nasa Support Service Contractors May Have Access To Their Responses To This Notice And Subsequent Proposal Information. All Information Received In Response To This Notice That Is Marked ‘proprietary' Will Be Handled And Protected Accordingly. Nasa Support Service Contractors Are Obligated To Protect Third-party Proprietary Information. By Submitting A Response To This Notice, The Responder Is Deemed To Have Consented To Release Of Proprietary Information To Such Nasa Support Service Contractors. this Synopsis Is For Information And Planning Purposes And Is Not To Be Construed As A Commitment By The Government, Nor Will The Government Pay For Information Solicited. Submitted Responses Will Be Maintained For Possible Future Opportunities For 3 Years After Receipt. of The Current And Upcoming Nasa Ao Calls Described Above, Responders To This Notice Should Identify Which Announcement(s) Are Appropriate For Their Capabilities. However, Responses May Be Considered For Partnering For Any Of The Opportunities Listed Above, Or Other Future Opportunities. Additional Information May Be Requested To Determine Potential Partnering Relationships. Responses To This Sources Sought Notice Should Include Brief Summaries Of The Following Information As Relevant (responses Only Need To Address The Elements They Wish To Partner On): 1. Spacecraft Systems Including Bus And/or Subsystems: 1) Describe Spacecraft, Bus, And/or Subsystem Mission Element Capabilities The Responder Has To Offer. 2) Identify Particularly Critical Or Challenging Areas That Have Been Overcome In Previous Work. 3) Identify Spacecraft, Bus, And/or Subsystem Relevance And Compliance To The Applicable Mission Class (class A, B, C, Or D) 4) Discuss Current Capabilities For Integration And Test (i&t) Flow Of The Spacecraft, Bus And/or Subsystem(s). 5) List The Skills Available To Support A Spacecraft Or Subsystem(s) Through All Mission Phases. 6) Identify Responder's Support Facilities For A Spacecraft And/or Subsystem(s) E.g., Fabrication, I&t, Storage, Etc. 7) Indicate The Resources (skills And Time) That Would Be Allocated To The Potential Proposal Development Phase. 2. Payload, Instrumentation Or Subsystems, Including Drill, Excavator/probe, And Sample Transfer Systems (one Or Multiple): 1) Address Payload, Instrumentation And/or Subsystem(s) Mission Element Capabilities The Responder Has To Offer. 2) Identify Particularly Critical Or Challenging Areas That Have Been Overcome In Previous Work. 3) Identify Payload, Instrumentation, And/or Subsystem Relevance And Compliance To The Applicable Mission Class (class A, B, C, Or D). 4) Discuss Current Capabilities For Integration And Test (i&t) Flow For The Payload(s), Instrumentation, Or Subsystem(s). 5) List The Skills Available To Support A Payload Through All Mission Phases. 6) Identify Responder's Support Facilities For Payload(s) E.g., Fabrication, I&t, Storage, Etc. 7) Indicate The Resources (skills And Time) That Would Be Allocated To The Potential Proposal Development Phase. 3. Payload Delivery Capability To Planetary Surfaces: 1) Describe The Planetary (moon, Mars, Etc.) Payload Delivery Capability For Entry, Descent, And Landing. 2) Describe The Payload Accommodation Aspects Of The Delivery Capability (e.g., Payload Mass, Volume, Power) And Any Relevant Performance Considerations, E.g., Dependence On Landing Altitude. 3) Indicate Any Special Aspects Of The Capability That Might Be Relevant To Nasa Missions. 4) Discuss Relevant Spacecraft Development And Operations Capabilities That The Proposer Has To Offer. 5) Discuss Current Capabilities For Integration And Testing Flow For The Spacecraft And Payload(s). 6) Identify Support Facilities (fabrication, I&t, Storage, Etc.) Available For Spacecraft And/or Payload(s). 7) List The Skills Available To Support The Delivery Capability Through All Mission Phases. 8) Indicate The Resources (skills And Time) That Would Be Allocated To A Potential Proposal Development Phase. 4. Scientific Concepts, Technology Demonstration Concepts Or Mission Architecture: 1) Provide A Research Topic Or Mission Concept Related To The Particular Solicitation Of Interest And Why The Topic Is Relevant To The Solicitation. 2) Provide An Overview Of The Mission Concept. 3) Identify Existing Or Proposed Partners, Their Role, The Role Of The Responder's Organization, And The Role Of Nasa Ames In The Proposed Mission. 4) Identify The Rough Order Of Magnitude (rom) Cost For The Mission Concept. 5) Address Mission Element Capabilities The Responder Has To Offer. 6) Indicate The Resources (skills And Time) That Would Be Allocated To The Potential Proposal Development Phase. 5. Integration With Launch Services: 1) Address Secondary Launch System Capabilities And Launch Dispensing Systems For The Spacecraft Systems The Responder Has To Offer. 2) Identify Particularly Critical Or Challenging Areas That Have Been Overcome In Previous Work. 3) Discuss Current Capabilities For Integration And Test (i&t). 4) Identify The Rough Order Of Magnitude (rom) Cost. 5) Identify Responder's Support Facilities For The Launch And Dispenser Integration. 6) Indicate The Resources (skills And Time) That Would Be Allocated To The Potential Proposal Development Phase. for The Purposes Of Determining Potential Partnership Opportunities, Arc Will Evaluate The Responses Received Based On Alignment With The Agency's Goals, Compliance With The Announcement Requirements, Feasibility And Suitability Of The Concept, And/or And Its Alignment And/or Complementary Nature With Ames' Interests And Capabilities. The Criteria For Consideration Are Listed Below: ability To Work As Part Of A Government-industry Team That May Include Other Industrial Partners, Academia, And/or International Partners. innovative Technical And Partnering Approaches That Could Be Used To Minimize Cost And/or Schedules Without Increasing Overall Mission Risk. history Of Delivering Spacecraft, Payloads, Or Instruments With Proven Technical And Cost Performance. Also, If Applicable, Depth Of Experience In Spacecraft Bus And/or Payload Management/development, Including But Not Limited To: Systems Engineering, Bus And/or Payload Fabrication And Test, Subcontract Management, Quality Management, Safety Management, Materials And Processes/contamination Control, Payload Integration And Test Support, Observatory Functional And Environmental Testing, Shipment To The Launch Site, Launch Vehicle Integration Support, Preparations For And The Conduct Of Launch And Early Orbit Checkout Operations, On-orbit Operation Support, And Sustaining Engineering Support Including Flight Software Maintenance. prior To Final Selection As A Partner, Respondents May Be Required To Provide Documentation Of Demonstrated Cost, Schedule And Technical Performance. in Order To Receive Consideration Respondents Must Submit A Brief Response That Includes The Information Requested In This Notice, Including Answers To The Relevant Questions Listed Above For Each Proposed Partnership. For Each Proposed Partnership The Response Should Specify The Type Of Partnership The Responder Is Interested Pursuing, Including Specific Opportunities If Known And Highlighting Work Performed. the Following Requirements For The Response Must Also Be Met: the Response Must Include: the Name, Physical Address, And Website Of The Company Or Organization a Company Point Of Contact (poc) Who Can Answer Questions From Nasa address, Email, And Phone Number Of The Company Poc the Response Must Not Exceed 10 Pages (arial Font Not Smaller Than 12-point) For Each Proposed Partnership. send Responses In Pdf Format By Email To Arc-sources-sought@mail.nasa.gov include The Synopsis Number And Company Name In Subject Line Of The Email Response. note: The Response Will Be Maintained For Three Years After Receipt. if Yours Is A Commercial Firm, Your Response Must Also Include: Size Of Business And Number Of Employees; Average Annual Revenue For Past 3 Years; Ownership - Large, Small, Small Disadvantaged, 8(a), Hubzone, And/or Woman-owned And Whether The Company Is U.s. Or Internationally-owned; Number Of Years In Business; And Affiliate Information: Parent Company (us Or International), And Joint Venture Potential Teaming Partners (prime Contractor If Potential Sub, Or Subcontractors If Potential Prime). this Notice Should Not Be Construed As A Solicitation; Therefore, Please Do Not Request A Copy Of A Solicitation. It Is The Responder's Responsibility To Monitor Fedbizopps For Any Changes To This Notice. pointof Contact new Opportunities Center, Arc-sources-sought@mail.nasa.gov

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n774.10|aeb|please Use Email|sherry.l.kaylor.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|334412|750 Emp|x|x|||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Sherry.l.kaylor.civ@us.navy.mil b. General Requirements: Mil-std Packaging, Government Source Inspection Required. c. All Freight Is Fob Origin. d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor?s Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. e. Only A Firm-fixed Price (ffp) Will Be Accepted. f. Must Adhere To Iuid Requirements Of Dfars 252.211-7003 g. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization. h. Your Quote Should Include The Following Information For Justification Purposes: - New Procurement Unit Price____________________ - Total Price _____________________ - Procurement Delivery Lead Time (ptat) _________________ Days - Award To Cage _______________ - Inspection & Acceptance Cage, If Not At Award To Cage _____________ - Cost Breakdown Requested, Including Profit Rate (if Feasible). - Quote Expiration Date _______________ (90 Days Minimum Is Requested). - Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq) i. Important Traceability Notice: if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;00614 Fp560 53711 7103867-1 96182 351-39193-001; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. ;notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Reprerepresented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.;

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n774.10|gwf|please Refer To Email|sherry.l.kaylor.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) ||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|333618|1,500 Emp|x|x|||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Sherry.l.kaylor.civ@us.navy.mil b. General Requirements: Mil-std Packaging, Government Source Inspection Required. c. All Freight Is Fob Origin. d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor?s Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. e. Only A Firm-fixed Price (ffp) Will Be Accepted. f. Must Adhere To Iuid Requirements Of Dfars 252.211-7003 g. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization. h. Your Quote Should Include The Following Information For Justification Purposes: - New Procurement Unit Price____________________ - Total Price _____________________ - Procurement Delivery Lead Time (ptat) _________________ Days - Award To Cage _______________ - Inspection & Acceptance Cage, If Not At Award To Cage _____________ - Cost Breakdown Requested, Including Profit Rate (if Feasible). - Quote Expiration Date _______________ (90 Days Minimum Is Requested). - Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq) i. Important Traceability Notice: if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Pump,cooling System . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Pump,cooling System Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;11083 10r1669; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.

Koleje Wielkopolskie Sp Z O O Tender

Electrical and Electronics...+1Electrical Works
Corrigendum : Closing Date Modified
Poland
Closing Date9 Jan 2025
Tender AmountRefer Documents 
"Sestawa Środków Antypiennych" (in Polish)

Koleje Wielkopolskie Sp Z O O Tender

Software and IT Solutions...+2Electrical and Electronics, Electrical Works
Poland
Closing Date8 Jan 2025
Tender AmountNA 
Insulator Flange Sleeve Nis103.00.01.1.26 Up to 36weh

Koleje Wielkopolskie Sp Z O O Tender

Others
Corrigendum : Closing Date Modified
Poland
Closing Date9 Jan 2025
Tender AmountRefer Documents 
Oleju Motul 3000 20w50 Mineralny

Koleje Wielkopolskie Sp Z O O Tender

Software and IT Solutions...+2Electrical and Electronics, Electrical Works
Poland
Closing Date8 Jan 2025
Tender AmountNA 
Weighing Valve I89033 Knorr-bremse For En57al/ Akw

U S COAST GUARD USA Tender

Machinery and Tools...+1Aerospace and Defence
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Details: The United States Coast Guard Surface Forces Logistics Center Has A Requirement To Open, Inspect, Report And Possible Overhaul Of The Below Item And Is Requesting Quotation: this Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format Outlined In Far Subpart 12.6, And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. solicitation Number 70z04025qty023 Is Issued As A Request For Quotation (rfq). This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2025-01, Dated Nov 2025. It Is Anticipated That A Competitive Price Purchase Order Shall Be Awarded Because Of This Synopsis/solicitation. All Responsible Sources May Submit A Quotation Which If Timely Received, Shall Be Considered By This Agency. this Acquisition Will Be Issued Under Naics 811310. nsn 2815-01-458-8747 cylinder Head 251 Plus Oem: Fairbanks Morse Defense Pn: 22200243 Qty: 29 Ea substitute Parts Are Not Acceptable. It Is Anticipated That A Non-competitive Sole Source Purchase Order Shall Be Awarded As A Result Of This Synopsis/solicitation. It Is The Government’s Belief That Only Fairbanks Morse Defense And/or Their Authorized Distributor Can Offer These Units. Concerns Having The Expertise And Required Capabilities To Provide This Item Are Invited To Submit Complete Information Discussing The Same Within Two (2) Calendar Days From The Day This Notice Posted. The Data Must Include Sufficient Detail To Allow The Coast Guard To Evaluate The Proposal Relative To The Requirements. The Information Submitted Must Include A Letter From The Oem Verifying The Offeror Is An Authorized Distributor Verifying The Oem Will Supply Genuine Oem Parts. open, Inspect, Report With Possible Repair In Accordance With The Overhaul Description And Oem Specs. inspection Cost $__________ Each (this Cost Will Be Paid If Items Are Beyond Economic Repair) firm Fixed Repair Price $___________ Each. these Parts Are Used For The U. S. Coast Guard Medium Endurance Product Line. Substitute Parts Or Part Numbers Are Not Acceptable. The Uscg Does Not Own The Rights To The Proprietary Data And Therefore Cannot Provide Drawings, Specifications, Or Schematics For These Parts. packing And Marking: all Item S Shall Be Individually Packaged And Marked Per Sections 3.9.2 And 3.9.3 Of Overhaul Description. packing. Material Shall He Packed In Containers Meeting Astm D-3951 and Shall Be Suitable For Shipment By Rail Or Motor Freight. The Contractor shall Package Items In Such A Manner As To Prevent Damage To The Equipment during Shipment. The Equipment Shall Be Packaged In Skid Mounted Shipping containers, Suitable For Handling With A Forklift. The Containers Shall Be suitable For Long Term Inside Storage In A Warehouse. Containers Shall Be assembled With Screws To Permit Ease Of Removal Of The Cover Or Lid From The base. The Cylinder Head 251 Plus shall Be Provided To Prevent Damage During Shipment. Protrusions, - projections, Corners, Sharp Edges, And Fragile Areas Shall He Cushioned As required To Protect The Equipment And To Prevent Rupture Of Heat Shrink-wrap materials. The Generator Hub Coupling On The Rotor Shall Be Supported To prevent Movement Of The Units During Transit. Fiber Boards Shall Be Inserted between The Rotor And The Stator With Yellow Tag Visible On The Coupling End saying To Remove At Installation. marking. Each Package Shall Be Marked. Shipping Container Shall Be stenciled With Black Enamel Paint With The Information As Laid Out Below. stencil Shall Be Applied To The Container On Two Opposite Sides In Upper Left corner. Markings Shall Be 3/4 Inch Minimum Height Black Characters On A white Painted Background. All Previous Markings And /or Quality Assurance decals Shall Be Removed From The Reusable Shipping Container Prior To The application Of Any New Markings. Marking Shall Consist Of The National Stock number (nsn), Item Name, Part Number, Contract Number And Delivery Order number, Shipping Weight, Quantity And Unit Of Issue, And The Words "u.s. coast Guard Sflc Material, "condition-a". The Following Is An Example: nsn: 2815-01-458-8747 item Name: Cylinder Head 251 Plus p/n: 22200243 shipping Weight: Xxxx Lbs (including Crate) government Contract No.: 70z080xxxxxxxxxxx (per Contract). words: Coast Guard Sflc Material Condition A, 1 Ea. delivery: delivery Is Required No Later Oct 04, 2025. Please Provide Your Proposed Delivery To Address Below. Deliveries Are To Be Made Monday Through Friday Between The Hours Of 7:00 Am To 1:00 Pm. delivery Shall Be F.o.b. Destination To: united States Coast Guard (sflc) receiving Room, Bldg. #88a 2401 Hawkins Point Road baltimore, Md 21226. estimated Delivery Date: _________________ inspection And Acceptance: F.o.b. Destination inspection And Acceptance Shall Take Place After Verification Of Preservation, Individual Packaging And Marking Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. the Provision At 52.212-1, Instructions To Offerors-commercial, Applies To This Acquisition. In Addition, The Following Language Applies To This Provision: multiple Awards Will Not Be Made. Vendor Shall Provide An All-or-nothing Quote For The Requirement Identified In (5) Above. award Will Be Made To The Lowest Price Offeror, That Is Deemed Technical Acceptable. the Contractor Shall Provide A Total Firm Fixed Price With Inspection Fee For All Necessary Equipment And Shipping Cost To Addresses Shown Under Delivery. vendor Must Be Registered At Https://www.sam.gov Prior To Quote Submittal. each Offeror’s Record In Fapiis Will Be Reviewed Prior To Award. Award Will Not Be Made To Any Offeror Who Has Any Adverse Financial Information Or Exclusions. offerors Shall Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (nov 2023), With Their Offer, If This Information Is Not Already Included In Https://www.sam.gov. the Clause At 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023), Applies To This Acquisition. far 52.212-5 Contract Terms And Conditions Required To Implement Statues Or Executive Orders-commercial Product And Commercial Services (dec 2023) the Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Laws Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Service: (1)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements(jan 2017)(section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (3)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (4)52.209-10, Prohibition Oncontractingwith Inverted Domestic Corporations(nov 2015). (5)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023)(31 U.s.c. 3903and10 U.s.c. 3801). (6)52.233-3, Protest After Award(aug 1996)(31u.s.c.3553). (7)52.233-4, Applicable Law For Breach Of Contractclaim(oct 2004)(public Laws 108-77 And 108-78 (19u.s.c.3805note)). (b)the Contractorshallcomply With The Far Clauses In This Paragraph (b) That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] __(1)52.203-6, Restrictions On Subcontractor Sales To The Government(jun 2020),withalternatei(nov 2021)(41u.s.c.4704and10 U.s.c. 4655). __(2)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509)). __(3)52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009(jun 2010)(section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) __(4)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far3.900(a). x(5)52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020)(pub. L. 109-282) (31u.s.c.6101note). __(6)[reserved]. __(7)52.204-14, Service Contract Reporting Requirements(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(8)52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(9)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (10)52.204–28, Federalacquisitionsupply Chain Security Act Orders—federal Supply Schedules, Governmentwideacquisitioncontracts, And Multi-agency Contracts.(dec 2023)(pub. L. 115–390, Title Ii). __(11)(i)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). __(ii)alternatei(dec 2023)of 52.204–30. x (12)52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed Fordebarment.(nov 2021)(31u.s.c.6101note). __(13)52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters(oct 2018)(41u.s.c.2313). __(14)[reserved]. __(15)52.219-3, Notice Ofhubzoneset-aside Or Sole-source Award (oct 2022) (15u.s.c.657a). __(16)52.219-4, Notice Of Price Evaluation Preference Forhubzonesmall Business Concerns (oct 2022) (if Theofferorelects To Waive The Preference, Itshallso Indicate In Itsoffer) (15u.s.c.657a). __(17)[reserved] x(18)(i)52.219-6, Notice Of Total Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-6. __(19)(i)52.219-7, Notice Of Partial Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-7. __(20)52.219-8, Utilization Of Small Business Concerns (sep 2023) (15u.s.c.637(d)(2)and (3)). __(21)(i)52.219-9, Small Business Subcontracting Plan (sep 2023) (15u.s.c.637(d)(4)). __(ii)alternatei(nov 2016)of52.219-9. __(iii)alternateii(nov 2016)of52.219-9. __(iv)alternateiii(jun 2020)of52.219-9. __(v)alternateiv (sep 2023) Of52.219-9. __(22)(i)52.219-13, Notice Of Set-aside Of Orders(mar 2020)(15u.s.c.644(r)). __(ii)alternatei(mar 2020)of52.219-13. __(23)52.219-14, Limitations On Subcontracting (oct 2022) (15u.s.c.637s). __(24)52.219-16, Liquidated Damages—subcontracting Plan(sep 2021)(15u.s.c.637(d)(4)(f)(i)). __(25)52.219-27, Notice Of Service-disabled Veteran-owned Small Business Set-aside (oct 2022) (15u.s.c.657f). __(26)(i)52.219-28, Post Award Small Business Program Rerepresentation (sep 2023)(15u.s.c.632(a)(2)). __(ii)alternatei(mar 2020)of52.219-28. __(27)52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantagedwomen-owned Small Business Concerns(oct 2022) (15u.s.c.637(m)). __(28)52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15u.s.c.637(m)). __(29)52.219-32, Orders Issued Directly Under Small Business Reserves(mar 2020)(15u.s.c.644(r)). __(30)52.219-33, Nonmanufacturer Rule(sep 2021)(15u.s.c. 637(a)(17)). x(31)52.222-3, Convict Labor(jun 2003)(e.o.11755). x(32)52.222-19, Child Labor-cooperation With Authorities And Remedies(nov 2023). x(33)52.222-21, Prohibition Of Segregated Facilities(apr 2015). x(34)(i)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). __(ii)alternatei(feb 1999)of52.222-26. __(35)(i)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). __(ii)alternatei(jul 2014)of52.222-35. x(36)(i)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). __(ii)alternatei(jul 2014)of52.222-36. __(37)52.222-37, Employment Reports On Veterans (jun 2020) (38u.s.c.4212). __(38)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). x(39)(i)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o. 13627). __(ii)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78and E.o. 13627). __(40)52.222-54, Employment Eligibility Verification(may2022)(executive Order 12989). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items Or Certain Other Types Ofcommercial Productsorcommercial Servicesas Prescribed In Far22.1803.) __(41)(i)52.223-9, Estimate Of Percentage Ofrecovered Materialcontent For Epa–designated Items (may2008) (42u.s.c.6962(c)(3)(a)(ii)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(ii)alternatei(may2008)of52.223-9(42u.s.c.6962(i)(2)(c)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(42)52.223-11,ozone-depleting Substancesandhigh Global Warming Potential Hydrofluorocarbons(jun 2016) (e.o. 13693). __(43)52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners(jun 2016)(e.o. 13693). __(44)(i)52.223-13,acquisitionof Epeat®-registered Imaging Equipment(jun 2014)(e.o.s 13423 And 13514). __(ii)alternatei(oct 2015)of52.223-13. __(45)(i)52.223-14,acquisitionof Epeat®-registered Televisions(jun 2014)(e.o.s 13423 And 13514). __(ii)alternatei (jun2014) Of52.223-14. __(46)52.223-15, Energy Efficiency In Energy-consumingproducts(may2020)(42u.s.c.8259b). __(47)(i)52.223-16,acquisitionof Epeat®-registered Personal Computerproducts(oct 2015)(e.o.s 13423 And 13514). __(ii)alternatei(jun 2014)of52.223-16. x(48)52.223-18, Encouraging Contractor Policies To Ban Text Messaging While Driving(jun 2020)(e.o. 13513). __(49)52.223-20, Aerosols(jun 2016)(e.o. 13693). __(50)52.223-21, Foams (jun2016) (e.o. 13693). __(51)(i)52.224-3privacy Training(jan 2017)(5 U.s.c. 552 A). __(ii)alternatei(jan 2017)of52.224-3. __(52)(i)52.225-1, Buy American-supplies(oct 2022)(41u.s.c.chapter83). __(ii)alternatei(oct 2022)of52.225-1. x(53)(i)52.225-3, Buy American-free Trade Agreements-israeli Trade Act(nov 2023)(19 U.s.c. 3301 Note,19 U.s.c. 2112 Note,19 U.s.c. 3805 Note,19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. __(ii)alternatei [reserved]. __(iii)alternateii(dec2022)of52.225-3. __(iv)alternateiii(nov 2023)of52.225-3. __(v)alternateiv (oct 2022) Of52.225-3. __(54)52.225-5, Trade Agreements(nov 2023)(19u.s.c.2501,et Seq.,19u.s.c.3301note). x(55)52.225-13, Restrictions On Certain Foreign Purchases(feb 2021)(e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). __(56)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016) (section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). __(57)52.226-4, Notice Of Disaster Oremergencyarea Set-aside (nov 2007) (42u.s.c.5150). __(58)52.226-5, Restrictions On Subcontracting Outside Disaster Oremergencyarea (nov2007) (42u.s.c.5150). __(59)52.229-12, Tax On Certain Foreignprocurements(feb 2021). __(60)52.232-29, Terms For Financing Of Purchases Ofcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). __(61)52.232-30, Installment Payments Forcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). x(62)52.232-33, Payment Byelectronic Funds Transfer-system For Award Management(oct2018)(31u.s.c.3332). __(63)52.232-34, Payment Byelectronic Funds Transfer-other Thansystem For Award Management(jul 2013) (31u.s.c.3332). __(64)52.232-36, Payment By Third Party(may2014)(31u.s.c.3332). __(65)52.239-1, Privacy Or Security Safeguards(aug 1996)(5u.s.c.552a). __(66)52.242-5, Payments Tosmall Business Subcontractors(jan 2017)(15u.s.c.637(d)(13)). __(67)(i)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). __(ii)alternatei(apr 2003)of52.247-64. __(iii)alternateii(nov 2021)of52.247-64. (c)the Contractorshallcomply With The Far Clauses In This Paragraph (c), Applicable Tocommercial Services, That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: (contracting Officercheck As Appropriate.] x(1)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). x(2)52.222-42, Statement Of Equivalent Rates For Federal Hires(may2014)(29u.s.c.206and41u.s.c.chapter67). __(3)52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year Andoptioncontracts)(aug 2018)(29u.s.c.206and41u.s.c.chapter67). __(4)52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may2014) (29u.s.c.206and41u.s.c.chapter67). __(5)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). __(6)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). __(7)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). __(8)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). __(9)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42u.s.c.1792). (d)comptroller General Examination Of Record. The Contractorshallcomply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of Thesimplified Acquisition Threshold, As Defined In Far2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At52.215-2, Audit And Records-negotiation. (1)the Comptroller General Of Theunited States, Or An Authorized Representative Of The Comptroller General,shallhave Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2)the Contractorshallmake Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminatedshallbe Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Ofclaimsarising Under Or Relating To This Contractshallbe Made Available Until Such Appeals, Litigation, Orclaimsare Finally Resolved. (3)as Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e) (1)notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract Forcommercial Productsor Commercial Services. Unless O (i)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509). (ii)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712). (iii)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kasperskylab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (v)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (vi)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (vii)(a)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). (b)alternatei(dec 2023)of 52.204–30. (viii)52.219-8, Utilization Of Small Business Concerns (sep 2023) (15u.s.c.637(d)(2)and (3)), In All Subcontracts Thatofferfurther Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far19.702(a) On The Date Of Subcontract Award, The Subcontractormustinclude52.219-8in Lower Tier Subcontracts Thatoffersubcontracting Opportunities. (ix)52.222-21, Prohibition Of Segregated Facilities(apr 2015). (x)52.222-26, Equal Opportunity(sep 2015)(e.o.11246). (xi)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). (xii)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). (xiii)52.222-37, Employment Reports On Veterans(jun 2020)(38u.s.c.4212). (xiv)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause52.222-40. (xv)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). (xvi)(a)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o 13627). (b)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78ande.o.13627). (xvii)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). (xviii)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). (xix)52.222-54, Employment Eligibility Verification(may2022)(e.o. 12989). (xx)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). (xxi)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). (xxii)(a)52.224-3, Privacy Training (jan 2017) (5u.s.c.552a). (b)alternatei(jan 2017)of52.224-3. (xxiii)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016)(section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations(jun 2020)(42u.s.c.1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause52.226-6. (xxv)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023) (31 U.s.c. 3903and10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of52.232-40. (xxvi)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause52.247-64. (2)while Not Required, The Contractormayinclude In Its Subcontracts Forcommercial Productsandcommercial Servicesa Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. 14. Electronic Submission Of Payment Requests (a) Definitions. As Used In These Instructions - (1) “payment Request” Means A Bill, Voucher, Invoice, Or Request For Contract Financing Payment With Associated Supporting Documentation. The Payment Request Must: Comply With The Requirements Identified In Far 32.905(b), “content Of Invoices” And The Applicable Payment Clause Included In This Contract. In Addition, Discount Offerings And Small Business Status If Available Shall Be Stated. If Travel Was Allowable And Approved, Components In Accordance With Far 31.205-46 Shall Be Provided. (b) The Contractor Shall Submit Payment Requests Electronically Using The Invoice Processing Platform (ipp). The Contractor Will Submit Payment Requests Using The Blank Form In Ipp. (c) Information Regarding Ipp, Including Ipp Customer Support Contact Information, Is Available At Www.ipp.gov Or Any Successor Site. (d) Ipp Enrollment Information Is At Https://www.uscg.mil/fincen/ipp/. additional Clauses hsar 3052.212-70contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items. as Prescribed In (hsar) 48 Cfr 3012.301, Insert The Following Clause: contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items (sep 2012) the Contractor Agrees To Comply With Any Provision Or Clause That Is Incorporated Herein By Reference To Implement Agency Policy Applicable To Acquisition Of Commercial Items Or Components. The Provision Or Clause In Effect Based On The Applicable Regulation Cited On The Date The Solicitation Is Issued Applies Unless Otherwise Stated Herein. The Following Provisions And Clauses Are Incorporated By Reference: [the Contracting Officer Should Either Check The Provisions And Clauses That Apply Or Delete The Provisions And Clauses That Do Not Apply From The List. The Contracting Officer May Add The Date Of The Provision Or Clause If Desired For Clarity.] (a)provisions. x 3052.247-72 F.o.b. Destination Only. (end Of Clause) 15. Defense Priorities And Allocations System (dpas) Ratings Are Not Applicable. 16. Quotes Are Due Not Later Than Jan 06, 2025, By 10:00 Am Eastern Daylight Savings Time (dst). 17. All Questions Regarding This Notice Shall Be Submitted In Writing Toyvette.r.johnson@uscg.mil No Later Than Jan 06, 2025. Email Proposed Price Quote To: Yvette.r.johnson@uscg.mil
9241-9250 of 10000 archived Tenders