Interior Tenders
Interior Tenders
U S COAST GUARD USA Tender
Plastic and Rubber
Corrigendum : Closing Date Modified
United States
Details: General Requirements
scope
intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.
references
coast Guard Drawings
coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans
coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only)
coast Guard Drawing 750-wmsl-100-013, Rev L, Unit 1210 Structure - Innerbottom To 1st Platform - Fr 10 To Fr 22 (asc100121)
coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001)
coast Guard Publications
surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements
surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes
surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures
other References
astm International (astm) D1330, 2015, Standard Specification For Rubber Sheet Gaskets
3. Requirements
3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.
3.2 Materials. The Contractor Must Obtain All Of The Materials Required To Complete This Job With The Exception Of The Government-furnished Property Shown In Paragraph 1.2 Of Work Item.
3.3. Period Of Performance. The Period Of Performance Window For This Work Starts On 09 April 2025 And Ends On 01 July 2025.
3.4. Location. The Contractor Must Perform The Work While The Uscgc Midgett (wmsl 757) Is Alongside The Pier On 400 Sand Island Pkwy Honolulu, Hi 96819-4326.
12316_1124_flt
rec_12136_flt_418’ Wmsl (cgc Midgett) (1124)
item 1: Tanks (ballast), Clean And Inspect
1. Scope
1.1 Intent. This Work Item Describes The Requirements For The Contractor To Clean And Inspect The Following Tank(s):
table 1 – List Of Tanks
type Of Structure
location
capacity - 95%
(gallons)
tank Content Disposal (gallons)
ballast Tank
5-16-1-w
14,438
760
1.2 Government-furnished Property.
none.
2. References
coast Guard Drawings
coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans
coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only)
coast Guard Drawing 750-wmsl-100-013, Rev L, Unit 1210 Structure - Innerbottom To 1st Platform - Fr 10 To Fr 22 (asc100121)
coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001)
coast Guard Publications
surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements
surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes
surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures
other References
astm International (astm) D1330, 2015, Standard Specification For Rubber Sheet Gaskets
3. Requirements
3.1 General.
3.1.1 Cir.
none.
3.1.2 Tech Rep.
none.
3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection).
3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following:
tlis
piping
residual Tank Contents/fluids
note
coast Guard Personnel Will Operate All Shipboard Machinery And Equipment.
3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr.
3.2.1 Perform An Initial Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed).
3.2.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed).
3.3 Tank Opening. The Contractor Must Remove The Tank Manhole Cover(s) And Ventilate The Confined Spaces In Accordance With Sflc Std Spec 0000, Paragraphs 3.3.1.1 And 3.3.1.2. The Contractor Must Provide Fall Protection To Cover Tank Manhole Cover When Opened For Ventilation/work.
3.4 Tank Content And Waste Disposal. The Contractor Must Dispose Of Residual Tank Contents Listed In Table 1 And Any Cleaning Fluids In Compliance With All Applicable Federal, State, And Local Laws, Ordinances And Regulations. Notify The Cor (in Writing) At Least 48 Hours Prior To Removal Of Wastes And Fluids. Document A Complete Chain Of Custody Record Of The Removed Tank Contents And Generated Wastes, From The Vessel To The Point Of Final Destination Or Delivery. Submit Chain Of Custody Record To The Cor Upon Completion Of Work.
3.5 Temporary Plugs. The Contractor Must Plug All Inlet And Outlet Piping In The Tank To Prevent Contaminants From Entering The Tank Or Piping System. Use Plugs With An Attached Lanyard, Ring Or Other System That Will Ensure Plugs Are Not Lost In The Pipe Openings.
3.5.1 Plug Log. The Contractor Must Keep A Written Record Of All Installed Plugs. Keep A Separate List For Each Tank. Maintain A Plug Accountability Log Posted Immediately Outside The Tank To Prevent Any Of The Installed Temporary Plugs From Being Lost Inside The Tank Or Left Behind Inside At Tank Closure. The Log Must Include The Type And Size Of Each Plug, Installation Date, And Removal Date. Submit This Log To The Cor After Completion Of Work Item Via A Cfr.
3.5.2 The Contractor Must Ensure That All Plugs Are Removed From Each Tank Upon Completion Of Work In The Tank.
3.6 Tank Cleaning. The Contractor Must Clean All Designated Tank Interior Surfaces Free Of All Foreign Materials, Such As Residual Water, Sediment, Sludge, Rust, Or Biological Growth, Taking Care Not To Damage The Coating System (if Applicable).
3.6.1 The Contractor Must Accomplish All Requirements Of Sflc Std Spec 6310, 3.1.6.4 (surface Contaminant Removal) To Achieve The Cleanliness Requirements Of Sspc-sp 1, Including A Low-pressure (maximum 5,000 Psi) Freshwater Wash Down Of The Surfaces.
3.6.2 Remove Cleaning Media And Residues Continuously From The Tank During The Washing Process. Remove Any Residual Wash Media And Wipe Up Residual Moisture With Clean Lint-free Cloths. Wipe The Interior Tank Structure Dry And Free Of All Cleaning Agents.
3.7 Inspection. The Contractor Must Visually Inspect All Tank Interior Surfaces, Including, But Not Limited To Bulkheads, Floor And Overhead Plating, Structural Members, Manhole Cover Surfaces, Fasteners And Gasket Seating Surfaces. Submit A Cir Including The Following, As Applicable:
tank Structural Condition.
condition Of Tank Coating, Including Dimensions, Percentage, Location, And Type Of Coating Failure.
tank Level Indicator (tli) And/or Float Switch Condition.
sounding/vent Tube And Striker Plate Condition.
suction And Discharge Piping Condition.
fastener Material And Condition.
zinc Anode Condition (remaining Percentage)
pit Measurements
ultrasonic Thickness (ut) Measurements
3.8 Pit Measurement. The Contractor Must Measure100pitswithin Each Tank/location Listed In Table 1, In Accordance With Sflc Std Spec 0740, Paragraph 3.13 (evaluation Of Pitting Corrosion). The Results Of These Measurements Must Be Included In The Inspection Report, Showing Where Pit Measurements Were Taken And The Depth Of The Pit.
3.9 Ultrasonic Thickness (ut) Measurement. The Contractor Must Take Ut Measurements In The Surrounding Area Of Any Pit Measuring Greater Than 25% Of Plate Thickness. Ut Measurements Must Be Taken In The Four Quadrants At An Equal-distant Radius From The Pit Center Until Full Plate Thickness Is Measured. For Bidding Purposes, Assume 200 Ut Measurements Per Tank Listed In Table 1. Ut Measurements Must Be Conducted In Accordance With Sflc Std Spec 0740, Appendix C, Using Coast Guard Drawings Listed In Section 2. The Results Of These Measurements (original Thickness, Measured Thickness, And Any Observed Cracks) And The Locations Where They Were Taken Must Be Included In The Inspection Report.
3.10 Substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Small Corrosions (i.e. Pits < 25% Or Corrosions < 25%). The Contractor Must Repair Small Pin Holes, Shallow Pitted Substrates (with Remaining Plate Thicknesses Over 75% Of Required Plate Thicknesses), And Fair Corroded Substrates (with Remaining Cross Sections Over 75% Of Required Cross Section Areas), After Removing Coating, In Accordance With Sflc Std Spec 6310 And Manufacturers’ Instructions.
procure 3 Kits Of Epoxy Fairing Compounds (e.g. Belzona 1111, 0.5 Gallon/5 Kg Kit Or Equivalent) To Conduct Repairs.
turn Over All Unused Kits To The Cor.
note
“substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Corrosions (i.e. Pits < 25% Or Corrosions < 25%)” Is A Supplement Barrier Intending To Help Delay Penetration.
3.11 Tank Closing. The Contractor Must Ensure That The Tank(s) Remain Open For Approximately 24 Hours After Completion Of Any Authorized Repair And Preservation Procedures. Notify The Cor At Least 48 Hours Prior To Closing The Tank(s). After Satisfactory Inspection By The Coast Guard Inspector And Completion Of All Authorized Repairs, Remove All Installed Temporary Plugs And Document Removal Via Signature On The Plug Log By The Coast Guard Inspector And Contractor Prior To Tank Closing. Close Tank Manhole Cover(s) Using New Gasket Material, Nuts, And Grommets In Accordance With Coast Guard Drawing 750-wmsl-167-001, In The Presence Of The Coast Guard Inspector. Chase Threads On Studs To Ensure Even Installation Of The Access Covers. Submit A Cfr With The Completed Plug Log.
note
coast Guard Personnel Will Operate All Shipboard Machinery And Equipment.
3.12 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr.
3.12.1 Perform A Post-work Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed).
3.12.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed).
3.13 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Surfaces, And All Manhole Cover External Surfaces To Match Existing Adjacent Surfaces In Accordance With Sflc Std Spec 6310, Paragraph 3.1.13 (touch-ups And Minor Coating Repairs). Do Not Paint Any Manhole Cover Fasteners.
4. Notes
this Section Is Not Applicable To This Work Item
rdd/pop: 09apr25-01jul25
Closing Soon10 Mar 2025
Tender AmountRefer Documents
Public Works Department - PWD Tender
Works
Civil And Construction...+1Building Construction
Eprocure
Corrigendum : Closing Date Modified
India
Description: Deposit-kerala Kalamandalam-interior Works To Museum Of Performing Arts At Kerala Kalamandalam Cheruthuruthy In Thrissur District -composite Work
Closing Soon13 Mar 2025
Tender AmountINR 70.5 Million (USD 807.9 K)
Offizielle Bezeichnung Tender
Civil And Construction...+2Civil Works Others, Construction Material
Germany
Description: Contract notice - General guideline, standard regulation Open procedure (construction work) Drywall work Drywall work Drywall work Conversion and renovation of the Bad Camberg outdoor swimming pool: Main volumes of drywall work: - Suspended wooden slatted ceiling approx. 500 m² - Fleece 500 m² - Grid ceiling ... More drywall work Drywall work Drywall work Conversion and renovation of the Bad Camberg outdoor swimming pool: Main volumes of drywall work: - Suspended wooden slatted ceiling approx. 500 m² - Fleece 500 m² - Grid ceiling mineral fiber approx. 170 m² - Acoustic plaster ceiling approx. 70 m² - Plasterboard for suspended ceilings approx. 40 m² - approx. 15 inspection hatches - Single stud walls approx. 60 m² - Double stud walls approx. 10 m² - 50 MU/a steel profiles - Facing panels approx. 150 m² - Interior doors approx. 15 pieces
Closing Date24 Mar 2025
Tender AmountRefer Documents
Establishments And Organizations Of Higher Education, Research And Innovation Tender
Civil And Construction...+1Civil Works Others
France
Details: As part of its commitment to improving the quality of life of students, Crous Bretagne wishes to redevelop an area currently occupied by a former tennis court. This ambitious project provides for the creation of a sports hall, accompanied by exterior developments, with the aim of transforming this space into a dynamic place, meeting the current and future needs of users. Part of an innovative and sustainable approach, it aims to improve the visibility and impact of the site, particularly in relation to the metro station, while strengthening its attractiveness through the creation of a modern, functional space that is perfectly integrated into its environment. The Construction Operation Aims To Treat The Site As A Whole And To Intervene On: - The Architecture Of The Building: Originality Of The Design, Selected Materials - The Interior Facilities: 3 Distinct Areas Composed Of 1 Or 2 Padel Courts, A Room Dedicated To Cross Fit Activities, A 3x3 Basketball Court With Modular Stands For Transformation Into A Stage Space. - The Exterior Facilities: Integration Of The Site Into Its Immediate Environment, Creation Of An Attractive Living Space, Open To Students And Offering Spaces Adapted To Student Life.
Closing Date17 Mar 2025
Tender AmountRefer Documents
Chittagong Water Supply & Sewerage Authority Tender
Works
Telecommunication Services
Bangladesh
Description: Interior Works And Supply, Installation, Testing & Commissioning Of Digital Conference And Multimedia System For Cwasa Head Office Building
Closing Date16 Mar 2025
Tender AmountRefer Documents
National Conservatory of Arts and Crafts (CNAM) Tender
Civil And Construction...+2Others, Building Construction
France
Description: Supply and installation of interior blinds for the Conté site of the National Conservatory of Arts and Crafts (CNAM) in ParisThis consultation concerns the supply and installation of st
Closing Date7 Apr 2025
Tender AmountRefer Documents
Housing And Urban Development Department - HAUDD Tender
Services
Paints and Enamels
GEM
Corrigendum : Closing Date Modified
India
Description: CATEGORY: Professional Painting Service - wall metal cemented items;
wall painting interior exterior; walls barricades dustbins etc,
Barricades
Closing Soon8 Mar 2025
Tender AmountINR 1 Million (USD 11.4 K)
Jharkhand Urja Sancharan Nigam Limited - JUSNL Tender
Works
Civil And Construction...+1Civil Works Others
Eprocure
India
Description: Installation Of Cable Tray With Support Hanger In Main And Side Cable Trenches With Interior Renovation Of Cable Trenches At 132/33 Kv Gss, Golmuri
Closing Date17 Mar 2025
Tender AmountINR 3.2 Million (USD 37.5 K)
721-730 of 1732 active Tenders