Interior Tenders

Interior Tenders

Indian Bank Tender

Civil And Construction...+1Building Construction
India
Closing Soon3 Feb 2025
Tender AmountRefer Documents 
Description: Notice Inviting Quotation For Interior Work For Mcb Namakkal Branch -tiruppur Zone

U S COAST GUARD USA Tender

Machinery and Tools
United States
Closing Soon6 Feb 2025
Tender AmountRefer Documents 
Details: General Requirements   1. Scope     1.1 Intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.     2. References     coast Guard Drawings     none.     coast Guard Publications   surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements     other References     none.   3. Requirements     3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.     3.2 Period Of Performance. The Period Of Performance For This Work Is 24mar2025-05may2025   3.3 Location. The Contractor Must Perform The Work While The Uscgc Waesche Is Alongside The Pier At U.s. Coast Guard Base Alameda, Coast Guard Island, Alameda Ca 94501. 58310_mla_1124_418 item 1: Folding Boom Cranes, Biennial Maintenance, Perform 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Inspect, Perform Maintenance, And Test Folding Boom Cranes Listed In Table 1. table 1 – List Of Folding Boom Cranes crane location manufacturer / Model Number coast Guard Tech Pub crane No. 2 main Deck, Port Side, Aft Of Frame 95 appleton Marine Inc. / Fb90-28 7903 crane No. 4 main Deck, Port Side, Aft Of Frame 90 appleton Marine Inc. / Fb90-28 7903 crane No. 3 main Deck, Stbd Side appleton Marine Inc. / Fb90-28 7903 1.2 Government-furnished Property. mti item Description nsn/pn qty estimated Cost ($/unit) y *cb-oth Mark Iv (coast Guard Drawing 26b-cb-iv-801-001) n/a 1 Ea. n/a y *long Range Interceptor Ii (lri-ii) Cutter Boat (coast Guard Drawing 35-lri-ii-801-001) n/a 1 Ea. n/a 2. References coast Guard Drawings coast Guard Drawing 26b-cb-iv-801-001, Rev -, Booklet Of General Plans coast Guard Drawing 35-lri-ii-801-001, Rev -, General Arrangement coast Guard Drawing 418a-wmsl 801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes coast Guard Drawing 750-wmsl-583-508, Rev -, Installations Iwo Aft Folding Cranes coast Guard Fleet Drawing Fl-1702-11, Rev -, Inspection Of Sheaves coast Guard Publications coast Guard Technical Publication (tp) 7903, Swbs 583, Oct 2021, Aft Boat Handling System –model Fb90-28 surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 5000 (sflc Std Spec 5000), 2022, Auxiliary Machine Systems surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References the Society For Protective Coatings (sspc) Surface Preparation Specification No.11 (sspc-sp 11), 2020, Power Tool Cleaning To Bare Metal 3. Requirements 3.1 General. 3.1.1 Cir. The Contractor Must Submit A Cir For The Inspections Listed In The Following Paragraph(s): 3.3 Inspect And Repair Task Particulars (task #1, #2, #3 And #7) 3.1.2 Tech Rep. The Contractor Must Provide The Services Of A Qualified Technical Representative Who Is Familiar With The Folding Boom Cranes, Appleton Marine Inc. Model Fb90-28, To Accomplish The Following On Site: advise On Manufacturer's Proprietary Information Pertinent To The System. ensure Compliance With Manufacturer's Procedures And Standards During Inspections, Repairs, Calibration And Testing. 3.1.2.1 Ensure The Tech Rep Has Experience With The System/equipment Stated Above And Demonstrated On Their Résumé. 3.1.2.2 Submit The Name And Résumé Of The Tech Rep With The Contractors Bid. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.3.1 Protection Of Fine Surfaces. The Contractor Must Protect All Fine Surfaces In Accordance With Sflc Std. Spec 5000. 3.1.3.2 Hydraulic System Contamination Protection. The Contractor Must Maintain Existing Hydraulic Cleanliness In Accordance With Sflc Std. Spec 5000. 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: piping electrical Cables note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. 3.3 Inspect And Repair Task Particulars. The Contractor With Tech Rep Support Must Perform Tasks Listed In Table 2 In Accordance With Sflc Std Spec 5000 And Tp 7903. See Applicable Drawings And Tech Pub In Section 2 For Technical Information And Installation Details. table 2 – Task List additional Requirements # task Type qty component Or Assembly appendix And Para. From Sflc Std Spec 5000 other tech Pub 7903 1 operate And Inspect 3 folding Boom Crane 3.2.1 submit A Cir. Document The Existing Software Program/version. note: There Is An Issue While Running Cranes #2 And #4 In Tandem (with A Load In Remote). While Hoisting, The Operator Receives Indication Crane #4 Is Overloading. Users Must Override To Operate The Cranes In Tandem. The Contractor Will Need To Conduct This “operate And Inspect” Task Under Load To Troubleshoot This Issue. 2 operate And Inspect 1 chest Pack (chest Pack Controls And Junction Boxes) 3.2.1 submit A Cir. note: There Is One Chest Pack. It Should Be Rotated Between All Three Cranes. 3 operate And Inspect 1 control Console 3.2.1 submit A Cir. 4 service & Inspect & groom & Lubricate 3 crane Assembly 3.2.2 perform All Preventive Maintenance Actions As Indicated On Table 4-1 Of Cg Tp 7903, Regardless Of Specified Interval. Inspect Hydraulic Hoses For Leaks, Abrasions, Swelling And Defects. Inspect Entire Folding Crane Assembly For Signs Of Leakage, Cracks, Structural Damage And Deformations. Submit A Cfr. note 1: Only Check The Torque Of 25% Of The Turntable Bearing Mounting Bolts (4-3.18.1) – Include A Diagram Of The Bolts That Were Checked In The Cfr For This Section. note 2: Take Off Removable Hose Sleeves And Hose Fitting Tape For Inspection, If Applicable. Reinstall Hose Sleeves And Fitting Tape Upon Completion Of Inspection 5 service And Inspect 3 cranes (mechanical/hydraulic) 3.2.2 inspect Swing Drives, Swing Motor, Swing Manifold, Hydraulic Swivel, Slew Bearing, Slew Bearing Gear, Slew Bearing Bolts, Slew Bearing Wear Inspection, Main Control Manifold, Wire Rope, Elr Manifold, Heel Pins, Jib Pins, Telescope Cylinders, Slide Pads, Jib And Luffing Cylinders, Sheaves, Crane Block Assembly, 10 Ton Hook, Snatch Block, Winch, Constant Tension System, Overhaul Ball. Fasteners, Submit A Cfr. 6 partially Preserve 3 folding Boom Crane Assembly 3.2.4, 3.2.4.3.2, 3.2.4.4, And 3.2.4.5.1 7 hydraulic Lube Oil Analysis 3 hydraulic System c2.1.3.1 submit A Cir. 8 service And Inspect 1 hydraulic Power Unit (hpu) 3.2.2 inspect Prime Mover/link Motor, Hpu Pumps, Hpu Reservoir, Hpu Tank Heaters, Oil Cooler, Hpu Manifold And Hoses. Hpu Temperature Transmitter, Hpu Display, Hpu Controls, Joysticks And Control Cabinet In Accordance With Tp 7903. 9 system Relief Valves, Switches And Indicators 1 hydraulic System in Accordance With Tp 7903, Verify Set Points, Adjustment And Calibration On: pump Compensator Relief Valve system Relief Valve. winch Limit Adjustment. load Monitor Indicators crane Position Indicators submit A Cfr. 10 disassemble And Inspect 1 hydraulic Oil Heat Exchanger 3.2.3 disassemble To The Minimum Extent Necessary To Clean The Heat Exchanger. 11 service And Inspect 2 hydraulic System crane Motor A And B 3.2.2 perform Insulation Resistance Test In Accordance With Ansi/easa Ar 100-2020.and Section 3 Of Tp 7903 Submit A Cfr. 12 service And Inspect 3 cranes (electrical) 3.2.2 inspect Load Pin, Boom Angle Transducer, Jib Angle Transducer, Swing Angle Encoder, Length Transducer, Turret Enclosure, Flood Lights And Electrical Cables 13 operational And Weight Test 3 folding Boom Crane Assembly perform In Accordance With Paragraph 3.5 Of This Work Item. 14 fabricate And Install 3 label Plate b2.9 name Plate Must Also Include Additional Information Of Dynamic Load Test, Brake Test And Wll Weights. 3.3.1 Materials. The Contractor Must Provide All Parts (i.e. All Greases, Lubricating Oils, Hydraulic Fluid, Hydraulic Oil Filters, Tank Breather Elements And Other Miscellaneous Materials) And Materials Including, But Not Limited To, The Items Listed In Table 3 Below, To Conduct The Required Maintenance Actions Listed Above. table 3 – List Of Parts quantity part Number description source Of Supply 1 ymd-8861-r hpu Hydraulic Return Filter appleton Marine Inc. 1 ymd-10416 hpu Hydraulic Return Filter 2 ymd-12209-r pressure Filters (for Crane No.2 & 4) 1 ymd-12234-r (0280d005bh4hc) pressure Filters (for Crane No.3) 1 ymd-12234-r (0060d005bh4hc) pressure Filters (for Crane No.3) 3.3.2 Hose Inspection. The Contractor Must Visually Inspect The Condition Of All Flexible Hoses; Tp7903 Has A Comprehensive List Of Hoses And Their Locations. Submit A Cfr With The Following: hose Number hose Physical Condition service Life Dates (date For Required Hose Renewal; If Not Specified, Add Twelve Years To Installation Date) 3.3.2.1 If Not Present, The Contractor Must Provide New Hose Tags, In Accordance With Sflc Std Spec 5000, Paragraph C2.2.1.4. Ensure Tag Color Coding Of Black On Natural Or Black On White. Ensure That Tags Must Be Attached Using Materials That Will Not Damage Hose Assembly In Any Way Or Interfere With The Normal Flexing Motion Of The Hose. 3.3.2.2 The Contractor Must Stamp, Engrave, Or Etch The Following Information On Each Tag. Handwritten Information On Each Tag Is Not Acceptable. Utilize The Cutter’s Hose Log For Information As Necessary. hose Log Item Number (serial Number) hydrostatic Test Pressure (psi) hydrostatic Test Date (dd/mm/yy) service Life (replacement Date) Date (qtr "q"/fy) 3.4 Preservation Requirements. The Contractor Must Perform The Following Work To Accomplish The First Bulleted Requirement Of Sflc Std Spec 5000 (para 3.2.4.3.2). 3.4.1 All Other Requirements As Specified From Sflc Std Spec 5000 Regarding “partially Preserve” Remain Applicable. 3.4.2 In Addition To Partial Preservation, Abrade Entire Crane Surface And Provide Aesthetic Topcoat. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. note certain Water Weight Bags May Be Too Large To Fit Within The Notch. Ensure Test Weights Are Able To Fit Within The Notch To Accomplish All Testing. caution do Not Exceed The Working Load Limit (wll) Of The Cranes For Any Of The Tests Listed In Appendix A, Cg Tp 7903. Exceeding The Wll Could Result In Equipment Damage And/or Personnel Injury. 3.5 Operational And Weight Testing. The Contractor Must Perform The Appleton Marine Inc. “start-up And Overhaul Test Procedure”, Appendix A Of Cg Tp 7903 Items 1-10. Static Load Test (item 2.1) Is Not Required. Perform All Testing With Cutter At Or Near 0-degree Trim And 0-degrees List. Record And Provide All Testing Data Of Appendix A, Cg Tp 7903 Via A Cfr. Utilize Test Weights That Will Ensure The Boom Can Be Extended Horizontal In The Notch. 3.5.1 The Contractor Must Supply Weights And A Certified Dynamometer To Conduct Load Testing, Submit Cfr With Certification Details. Perform All Testing In The Presence Of The Coast Guard Inspector And The Tech Rep. 3.5.2 Upon Successful Completion Of The Load Testing, Operational Testing Must Be Performed Using The Various Gfp Small Boats In Accordance With The Test Procedure Detailed In Appendix A, Cg Tp 7903. 3.6 Bearing Wear Inspection. The Contractor Must Conduct A Bearing Wear Inspection Of The Turntable Bearing, For All Cranes In Table 1, In Accordance With Cg Tp 7903 Appendix B. Submit A Cfr With Test Results As Compared With The Baseline Measurements In Table 4. table 4 – Cgc Waesche Turntable Bearing Baseline (15july2018) 3.7 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 3.8 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Exterior And Interior Surfaces To Match Existing Adjacent Surfaces, In Accordance With Sflc Std Spec 6310. Abide By All Touch-up Requirements Outlined In Sflc Std Spec 6310. 4. Notes this Section Is Not Applicable To This Work Item.

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Paints and Enamels, Civil Works Others
United States
Closing Soon5 Feb 2025
Tender AmountRefer Documents 
Description: Interior/exterior Painting Of Garrison Buildings

Apartment S.R.O. Tender

Others...+1Electrical and Electronics
Czech Republic
Closing Date20 Feb 2025
Tender AmountRefer Documents 
Details: The subject of the public contract is the reconstruction of the electrical installation in common areas in order to bring the building into line with the current fire regulations and current electrical regulations and requirements. This involves changing the network from Tn-c to Tn-s. The entire existing electrical distribution will be replaced with new cables running under the plaster of the interior spaces, new switchboards will be installed, and in each switchboard, the neutral conductor Pen will be divided into a separate protective conductor Pe and a separate working conductor N. All apartment switchboards are designed to have a three-phase connection. Furthermore, autonomous fire detectors will be installed behind all entrance doors to the apartment units, and a home phone system will be added. The connection of the individual networks of the building will remain intact. The lights in the common areas (staircases and corridors) will be equipped with LED sources with motion sensors and the option of switching to permanent lighting. The work also includes checking and revising the existing lightning conductor.

Ministry Of The Interior Tender

Security and Emergency Services
France
Closing Date27 Feb 2025
Tender AmountRefer Documents 
Purchaser Name: Ministry Of The Interior | Renewal Maintenance of the Cra 30 Video Surveillance System

INDIAN HEALTH SERVICE USA Tender

Civil And Construction...+1Building Construction
United States
Closing Date14 Feb 2025
Tender AmountRefer Documents 
Description: The Indian Health Service (ihs) Is Conducting A Sources Sought/request For Information As Outlined In Far 15.201(c)(3) To Gain Knowledge Of Interest, Capabilities, And Qualifications Of Firms Especially Small Businesses Including: Native American/indian-owned Businesses (indian Economic Enterprise (iee)), 8(a) Certified Small Businesses, Historically Underutilized Business Zones (hub-zone) Small Businesses, Women Owned Small Businesses, Service Disabled Veteran-owned Small Businesses (sdvosb), Small Disadvantaged Businesses (sdb), And Veteran Owned Small Businesses. interested Firms Are Requested To Reply To This Announcement With A Submittal As Described Below. Please Note That A Decision Not To Submit A Response To This Request For Information Will Not Preclude A Vendor From Participating In Any Future Solicitation. no Proposals Are Being Requested Or Accepted With This Rfi. This Is Not A Solicitation For Proposals. Respondents Will Not Be Notified Of The Results Of This Notice. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Notice Or Any Follow-up Information Requested. market Research Is Being Performed Pursuant To Federal Acquisition Regulation (far) Part 10 To Identify Businesses Capable Of Performing The Functions Described Herein. summary Of Scope the Contractor Shall Provide All Labor, Materials, Supplies, And Services To Design And Build Up To Four Projects For The Wagner Indian Health Service Clinic: flooring: Provide And Install Flooring Similar To Alto Wood Lrv Bavarian Oak, Model Wsa2026. The Contractor Shall Follow Installation Guidelines Of The Flooring Manufacturer. Install Vinyl Wall Base As Well. Install Tarkett Johnsonite 6” Vinyl Wall Base. Submit On Color. The Floor Covering And Base Shall Be Recommended For Use In A Health Care Facility. Coordinate With Facility On Any Phasing. exterior Improvements: painting: This Project Will Paint The Brick Exterior On The West Wing To Match The Brick Of The East Wing, Paint The Window And Door Frames A Dark Bronze Color To Match New Doors And Windows. Paint Facia. tuckpointing: Tuckpoint Brick Of Building That Is Needed. Not All Brick Is Needing Tuckpointing, But Same Small Areas Will, Roughly 1200 Square Feet. windows: Replace The Needed Existing Window Panes, With Fogging And No Longer Sealed, With Energy Efficient Glazed Windows. propane Fuel Tanks: Install: A New Propane System To Include Tanks, Vaporizer, Lines, And Leak Detection Shall Be Installed, Following Project Plans. The Boilers Shall Be Converted To Propane Usage. The Old Line Shall Properly Be Retired So That No Leaks Will Occur. plumbing: Repair The Two 4” Solder Copper Leaks On The Water Manifold That Were Found While rebuilding The Manifold. Plan With The Facility For A Water Shut-down, And Repair When Most Convenient For The Patient Care. in Accordance With Far 36.204, Disclosure Of The Magnitude Of Construction Projects, The Anticipated Project Magnitude Is Between $250,000.00 And $500,000.00 the Type Of Work To Be Performed Will Be Categorized Under Psc Code Y1da, Construction Of Hospitals And Infirmaries And Naics Code 236220, Commercial And Institutional Building Construction With A Size Standard Of $45 Million. responses - Submittal responses To This Notice Must Be Emailed To Thupten Tsering At Thupten.tsering@ihs.gov And Must Be Received No Later Than Published Due Date And Time. Responses Must Include: company Information: Company Name, Website, Physical Address, Sam Uei Code point Of Contact: Contact Name, Phone Number, And E-mail Address if A Solicitation Is Issued, Will Your Firm/company Be Submitting A Proposal? Indicate Yes Or No type Of Business: Native American-owned (iee/isbee), Sba Certified 8(a), Sba Certified Hub Zone, Service Disabled Veteran-owned Small Businesses (sdvosb), Women Owned Small Business (wosb), And/or Small Businesses (sb). For More Information On The Definitions Or Requirements For These Small Business Programs, Refer To Http://www.sba.gov. bond Capacity: Information On The Firm's Bonding Capability - Specifically Identify Single And Aggregate Bonding Capacities. experience Submission Requirements: Submit At Least Two (2) But No More Than Five (5) Projects Completed By Your Firm Within The Last Six (6) Years That Are Similar To The Work That Will Be Required Under This Project. Firms Shall Include The Following Information For Each Project: indicate Whether Prime Contractor Or Subcontractor For Each Project Submitted; dates Of Construction For Each Project Submitted; contract Value, Location, Completion Date, And Complexity Of Job For Each Project Submitted; indicate Whether The Project Is A Federal, State, Tribal Or Other For Each Project Submitted; And project References/agency Point Of Contact (telephone Number And Email Address) For Each Project Submitted. if The Entity Responding To This Sources Sought Is Submitting Experience Information From Any Entity That Does Not Match The Name, Cage Code, And/ Or Uei Exactly As Stated On The Submitting Entity’s Sam Record (e.g. Affiliates, Subsidiaries, Parent Companies, Sister Companies, Etc.) The Submission Shall Clearly Demonstrate How That Entity Will Have Meaningful Involvement In The Performance Of The Contract And Specifically Address Which Resources Would Be Committed To The Contract. Failure To Comply With This Requirement Or Failure To Adequately Demonstrate Meaningful Involvement And Commitment Of Resources On Behalf Of That Entity May Result In That Experience Information To Be Considered Not Relevant. along With The Project Experience Submission, The Following Questions Shall Be Answered In Your Firms’ Submission: how Is Your Company Structured To Handle Quality Control Of The Various Disciplines Of A Construction Project? (i.e., What Position(s) (full-time/part-time) Are Employed Under Your Company To Perform Qc?) does Your Company Primarily Handle The Construction Activities Related To Construction Management By The Prime Contractor And If So, What Are Those Activities? does Your Company Self-perform Any Of The Construction Disciplines, If So, What Are Those Disciplines? What Disciplines Does Your Company Anticipate Self-performing For This Specific Project? for Native American/indian Owned Businesses Only, The Contractor Shall Also Complete And Submit Attachment 1: Ihs Iee Representation Form (jan 2022). for Native American/indian Owned Businesses Only, The Contractor Shall Submit The Controlling Enterprise’s Department Of The Interior, Bureau Of Indian Affairs Certificate Of Degree Of Indian Blood Documentation. Please Note That There Shall Be No Personally Identifiable Information (pii), Such As Social Security Numbers, Included In The Documentation Submitted. Any Pii Shall Be Redacted Prior To Submission. all Information Received In Response To This Source Sought That Is Marked Proprietary Will Be Handled Accordingly. Documents And/or Information Other Than What Is Requested Will Not Be Reviewed. Information Submitted Beyond What Is Requested Will Not Be Considered. questions: questions Regarding This Sources Sought May Be Emailed To Thupten Tsering At Thupten.tsering@ihs.gov

Apartment S.R.O. Tender

Others...+1Electrical and Electronics
Czech Republic
Closing Date20 Feb 2025
Tender AmountRefer Documents 
Details: The subject of the public contract is the reconstruction of the electrical installation in common areas in order to bring the building into line with the current fire regulations and current electrical regulations and requirements. This involves changing the network from Tn-c to Tn-s. The entire existing electrical distribution will be replaced with new cables running under the plaster of the interior spaces, new switchboards will be installed, and in each switchboard, the neutral conductor Pen will be divided into a separate protective conductor Pe and a separate working conductor N. All apartment switchboards are designed to have a three-phase connection. Furthermore, autonomous fire detectors will be installed behind all entrance doors to the apartment units, and a home phone system will be added. The connection of the individual networks of the building will remain intact. The lights in the common areas (staircases and corridors) will be equipped with LED sources with motion sensors and the option of switching to permanent lighting. The work also includes checking and revising the existing lightning conductor.

Apartment S.R.O. Tender

Others...+1Electrical and Electronics
Czech Republic
Closing Date20 Feb 2025
Tender AmountRefer Documents 
Details: The subject of the public contract is the reconstruction of the electrical installation in common areas in order to bring the building into line with the current fire regulations and current electrical regulations and requirements. This involves changing the network from Tn-c to Tn-s. The entire existing electrical distribution will be replaced with new cables running under the plaster of the interior spaces, new switchboards will be installed, and in each switchboard, the neutral conductor Pen will be divided into a separate protective conductor Pe and a separate working conductor N. All apartment switchboards are designed to have a three-phase connection. Furthermore, autonomous fire detectors will be installed behind all entrance doors to the apartment units, and a home phone system will be added. The connection of the individual networks of the building will remain intact. The lights in the common areas (staircases and corridors) will be equipped with LED sources with motion sensors and the option of switching to permanent lighting. The work also includes checking and revising the existing lightning conductor.

State Bank Of India - SBI Tender

Civil And Construction...+1Building Construction
India
Closing Soon3 Feb 2025
Tender AmountRefer Documents 
Description: Sbi : Online Tender For Proposed Interior Works For New Kanagal Branch , Rbo Nalgonda ,ao Nalgonda

Local Self Government Department - LSGD Tender

Works
Civil And Construction...+1Building Construction
Eprocure
India
Closing Date10 Feb 2025
Tender AmountINR 57.6 Million (USD 666.7 K)
Description: Interior Works Of Tagore Centenary Hall, Thrissur Corporation, Thrissur-interior Works Of Tagore Centenary Hall, Thrissur Corporation
1-10 of 1632 active Tenders