Tenders of Inter Municipal Contracting Authority Of The Fulda District On Behalf Of The City Of Hunfeld
Tenders of Inter Municipal Contracting Authority Of The Fulda District On Behalf Of The City Of Hunfeld
Inter municipal Contracting Authority Of The Fulda District On Behalf Of The City Of Hunfeld Tender
Civil And Construction...+1Civil Works Others
Germany
Public tender Vob/a Magistrat of the city of Hünfeld, new salt storage hall - shell construction (earthwork/masonry/concrete work) The city of Hünfeld is planning to build a new salt storage hall on a plot of land of around 8,880 m² on the Breitzbach ... MoreMagistrat of the city of Hünfeld, new salt storage hall - shell construction (earthwork/masonry/concrete work) The city of Hünfeld is planning to build a new salt storage hall on a plot of land of around 8,880 m² on the Breitzbacherweg, west of the industrial area on the outskirts of Hünfeld. The existing buildings have already been demolished, the plot of land has been prepared and is available for the construction work. Planned construction method: - Construction: The new building will be constructed as a reinforced concrete building. - Structure: The structure above will be realized using timber construction. - Facade: The outer walls will have a floor cover formwork. - Roof: Covering with fiber cement-bonded panels (color coordinated with the design regulations), roof pitch 15°. The southwest area is designed as a pent roof. - Use: The northeast, covered area serves as a one-sided open storage area and a driveway. At the rear, bulk material storage areas are integrated into the site, which also function as a retaining wall. Dimensions: - Main building: approx. 20.30 MX 14.90 m - Covered area: approx. 14.90 MX 12.00 m Construction site and development: - The client provides a free construction site with no contaminated land. - The building plot is connected to construction water and construction power. - An area of approx. 250 m² within the building plot is available free of charge for the construction site setup. Special notes: - During the construction work, the existing vegetation (hedges, bushes, trees) will be cut back or removed as necessary. Unaffected vegetation must be protected during the construction period. - The demolition of the previous buildings and the disposal of the contaminated waste have already been completed.
Closing Date4 Feb 2025
Tender AmountRefer Documents