Hvac Tenders

Hvac Tenders

PUBLIC BUILDINGS SERVICE USA Tender

Real Estate Service
United States
Closing Date8 Feb 2025
Tender AmountRefer Documents 
Details: This Advertisement Is Hereby Incorporated Into The Rlp 25-reg04 By Way Of Reference As An Rlp Attachment. u.s. Government Seeks To Lease The Following Office Space Through The Automated Advanced Acquisition Program (aaap): city: Saint Petersburg state: Florida delineated Area: north: Ulmerton Rd (hwy 688) west: Roosevelt Blvd N (hwy 686), 28th St N. south: Gandy Blvd N (hwy 694) (hwy 92) (st Rd 600) east: Tampa Bay Shoreline (eastern City Limits Of St. Petersburg) minimum Aboa Square Feet: 3,200 maximum Aboa Square Feet: 3,520 space Type: Office And Related Space lease Term: 10 Years, 8 Years Firm offerors Are Encouraged To Submit Rates For All Terms Available In The Aaap For Consideration Against Future Gsa Requirements. amortization Term: 8 Years For Both Tenant Improvementsand Building Specific Amortized Capital. Type 5 Years For A 10/5 Lease. Type 8 Years For A 17/15, 15/13, Or 10/8 Lease Term. agency Unique Requirements twenty-one (21) Non Reserved Surface Or Structure Parking Spaces Within ¼ Mile Of The Building. the Space Shall Be Of Contiguous Office Space In A Professional And Aesthetically Pleasing Building. space Shall Be Located 1) In An Office, Research, Technology, Or Business Park That Is Modern In Design With A Campus-like Atmosphere; Or 2) Space Offered Shall Be In A Quality Building Of Sound And Substantial Construction, Either A New, Modernized Building, Or One That Has Undergone Restoration Or Rehabilitation For The Intended Use. agency Employees Regularly Work Beyond Normal Business Including Weeknights And Weekends, Therefore Access To The Agency’s Space And The Building Systems That Service It, Must Be Accessible 24 Hours/7 Days A Week. daytime Janitorial (cleaning) Required. secure Server Room With 24/7 Hvac location Should Not Be Adjacent To Overpasses, Bridges, Elevated Ramps Or Railroad Tracks. adequate Eating Facilities Shall Be Located Within ¼ Mile Walkable Distance Of The Building. Other Employee Services, Such As Retail Shops, Cleaners, And Banks, And Childcare Facilities Shall Be Located Within ¼ Mile Walkable Distance Of The Building. Amenities Must Be Existing, Or Offeror Must Demonstrate To The Government’s Reasonable Satisfaction That Such Amenities Will Exist By The Government’s Required Occupancy Date. space Shall Not Be Co-located With Offices With The Federal Bureau Of Investigation (fbi), Bureau Of Alcohol, Tobacco And Firearms (atf), Immigration And Customs Enforcement (ice), Drug Enforcement Agency (dea) Or Customs And Border Protection (cbp). Streets And Public Walkways Shall Be Well Maintained. proximity To Gun Stores, Pawn Shops, Adult Entertainment Clubs, Liquor Stores, Medical (or Otherwise) Marijuana Distributors Or Methadone Clinics Are Precluded Within A Walkable ¼ Mile Of The Proposed Location. spaces Shall Not Be Located In An Industrial Zoned Area. spaces Shall Not Be Co‐located With A Fitness Gym Where Sounds From The Facility Cause Disturbance Of Offered Space. natural Daylight Shall Be Accessible Within The Building Space Design. space Will Not Be Considered Where Any Living Quarters Are Located Within The Building. offered Space Shall Not Be Located In The 1-percent-annual Chance (formally 100-year) Flood Plain Or Wetland Unless The Government Has Determined It To Be The Only Practicable Alternative. agency Tenant Improvement Allowance: total Allowance For Alternate Location $53.65 total Allowance For Incumbent Location $18.29 important Notes check The Attachments And Links Section Of This Notice For Possible, Additional Project-specific Requirements Or Modifications To The Rlp. offerors Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By Federal Acquisition Regulation (far). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b offerors Are Advised That All Shell Work Associated With Delivering The Tenant Improvements Are At The Lessor’s Cost. Please Refer To Section 3(construction Standards And Shell Components)and Specifically To Paragraph 3.07(building Shell Requirements)of Theaaap Rlp Attachment #2 Titled "lease Contract" (gsaform L100_aaap ) For More Detail. Tenant Improvement Components Are Detailed Under Section 5 Of The Aaap Rlp Attachment#2 Titled "lease Contract" (gsaform L100_aaap) . it Is Highly Recommended That Offerors Start The Sam Registration Process Directly Following The Offer Submission. Refer To Rlp Clause 3.06. (if Applicable) The Government Intends To Award A Lease To An Offeror Of A Building That Is In Compliance With Seismic Standards. Section 2.03 Of The Request For Lease Proposals (rlp) Outlines Compliance Activities Required For All Leases In Moderate Or High Seismic Zones. To Determine If Your Property Lies In A Moderate Or High Zone, Please Reference The Map And Documents On Our Website. how To Offer the Automated Advanced Acquisition Program (aaap), Located At Https://leasing.gsa.gov/, Will Enable Interested Parties To Offer Space For Lease To The Federal Government In Response To The Fy25 Aaap Rlp. In Addition, The Government Will Use Its Aaap To Satisfy The Above Space Requirement. offerors Must Go To The Aaap Website, Select The “register To Offer Space” Link And Follow The Instructions To Register. Instructional Guides And Video Tutorials Are Offered On The Aaap Homepage And In The “help” Tab On The Aaap Website. Once Registered, Interested Parties May Enter Offers During Any “open Period”. For Technical Assistance With Aaap, Email Leasing@gsa.gov. the Open Period Is The 1st Through The 7th Of Each Month, Ending At 7:30 P.m. (et) Unless Otherwise Stated By The Government And Unless The 7th Falls On A Weekend Or Federal Holiday. If The 7th Falls On A Weekend Or Federal Holiday, The Open Period Will End At 7:30 Pm (et) On The Next Business Day. Refer To Aaap Rlp Paragraph 3.02 For More Details On The Offer Submission Process. The Government Reserves The Right To Allow For Multiple Open Periods Prior To Selecting An Offer For Award To Meet This Specific Space Requirement. Offers Cannot Be Submitted During The Closed Period And Will Not Be Considered For Projects Executed During That Time Period. lease Award Will Be Made To The Lowest Price, Technically Acceptable Offer, Without Negotiations, Based Upon The Requirements In This Advertisement And In The Rlp Requirements Package Found On The Aaap Website. During An Open Period, Offerors Will Be Permitted To Submit New Offers Or Modify Existing Offers. Offerors Can Draft An Offer At Any Time; However, You Can Only Submit An Offer During The Open Period. the Offered Space Must Comply With The Requirements In This Advertisement And The Rlp And Must Meet Federal Government, State, And Local Jurisdiction Requirements, Including Requirements For Fire And Life Safety, Security, Accessibility, Seismic, Energy, And Sustainability Standards In Accordance With The Terms Of The Lease. The Lease And All Documents That Constitute The Lease Package Can Be Found At Https://leasing.gsa.gov/leasing/s/aaap-portalhome. if You Have Previously Submitted An Offer In Fy 2024, The Aaap Application Has A Copy Feature Which Will Allow Existing Offers To Be Copied Over To The Fy 2025 Rlp In Order To Avoid Having To Re-enter All Of The Data Manually. Please Be Sure To Review Fy25 Aaap Rlp Package And Each Page Within The Aaap Application Prior To Submitting Your Offer As Some Of The Questions Have Changed. You Must Re-enter Your Space And Rates On The ‘space And Rates’ Tab In The Aaap. Your Previous Offered Space Will Not Be Copied.

PUBLIC BUILDINGS SERVICE USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents 
Details: 47pb0024r0049amendment 007 amendment 7 Will Attach Three Documents. Attachment 127 Is The Updated Rfi Spreadsheet. Look Specifically At The Last Tab Dated 12/17/2024 For Responses To Various Offeror's Questions.attachment 128 Will Replace Attachment 26 A.0 Sow Cmc Houlton Lpoe Final 2024 08 02 And Is Titled As "128. A.0 Sow Cmc Houlton Lpoe Final Revised 2024 12 17." Note That The Cover Page Incorrectly Still Shows The Previous Date Of August 2, 2024. Attachment 129 Will Replace Attachment 77. Exhibit D 2325-gsa-houlton Me Lpoe_design Options By Specifically Updating Page 2 And Page 3 In Item 77. It Will Be Added As Attachment 129. Exhibit D 2325-gsa-houlton Me Lpoe_design Options. As A Reminder, Amendment 6 Stated Which Attachments Were Deleted (78 Through 94) As Those Are The Updated Files That May Have Been Duplicated. We Are Not Be Reloading Any Of Those Files That Replaced The Deleted Files. 47pb0024r0049amendment 006 the Contracting Officer Has Approved An Extension To January 16, 2025, 2:00 Pm Est For Receipt Of Proposals. The Following Changes Have Been Made: Attachments 78 Through 94 Have Been Deleted In Their Entirety And Replaced With Updated Attachments From The Final Concept Development Documents. The Following Attachments Were Updated And Numbered 99 Through 102; 104 Through 108a; 110 Through 123; And 125 Through 129.specifically, Attachment 126. Houlton Lpoe Cmc Rfi Tracker Sheet Is Updated Through December 6, 2024 Only As Shown Under The Last Tab Of That Document.access To These Documents Will Be Contained Through The Google Drive: Houlton Cmc Secure Documents That May Have Been Granted To Offerors If Already Requested. If You Have Not Completed A Form B And Cbp Nda Form, Please Do So Access Can Be Provided To These Documents. if You Have Any Problems With Access, Please Contact Paul Murphy At Paul.murphy@gsa.gov. 47pb0024r0049amendment 005 the Contracting Officer Has Approved An Extension To December 12, 2024, 2:00 Pm Est For Receipt Of Proposals.additionally, Attachment 99. Houlton Lpoe Cmc Rfi Tracker Sheet 2024 11 22 Is Provided As The Government Response To Additional Comments/question By An Offeror And Hereby Shared With All Offeror's. 47pb0024r0049amendment 004 the Contracting Officer Has Approved An Extension To December 5, 2024, 2:00 Pm Est For Receipt Of Proposals. 47pb0024r0049amendment 003 added Attachments 33. A.7 Gsa P-100 2021 With 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix V10 cmc 2021, 58. Gsa Program Development Study 100% Pds Report 2021 02 08 (559), And 69. Roof Moisture Analysis Report houlton 2020 06 23 (22) Did Not Get Posted On 10/04/2024. They Are Added Under Amendment 0003. additionally, Attachment 98. Rfi Site Visit Tracker Is Provided As The Government Response To Rfi By Offerors. 47pb0024r0049amendment 002 added Attachment 72 Final Houlton Pre-proposal Meeting Presentation 2024 10 10. A Courtesy Copy Was Sent Via Email To People That Were On The Invitation List Even If They Did Not Attend The Individual Meetings. It It Attached Here So All Contractors, Whether They Requested Attendance Or Not, Will Know Of The Discussions. added Clarifying Price Proposal Language Below: under Volume Ii - Price Proposal - Part 3 - Price Proposal "other Than Certified Cost And Pricing Data" Documentation. Uniformate Ii Classification Framework. under Volume Ii - Price Proposal (1) Contents · Price Proposal On Sf-1442 (signed) â Solicitation, Offor, And Award. The Price Proposal Shall Consist Of The Sf-1442 And The Agreement. Indicate The Total Contract Price From The Completed Contract Price Form In Block 17 Of The Sf 1442, Which Must Be Fully Executed By The Offeror. · A Completed Contract Price Form Included As Part Of The Sf-1442 And In Section Ii Of The Agreement. · Other Than Certified Cost And Pricing Dataâ Documentation. Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). note: The Price Proposal Must Be Separately Bound From The Phase Ii Technical Proposal. iv.l. Requiring Certified Cost Or Pricing Data [15.403-4] iv.l.a. Far 52.215-20 Requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021), Alternate Iv (oct 2010) (a) Submission Of Certified Cost Or Pricing Data Is Not Required. (b) Provide Data Described Below: Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). added Attachment 75 Presolicitation In Sam 2024 08 27. added Attachment 76 Pre-proposal Site Visit Attendance Sheet 2024 10 17 added Attachments 77 - 94 Provide Additional Design Information As Requested. 77 Exhibit D_2325-gsa-houlton Me Lpoe_design Options; 78 Exhibit D.1_lpoe Houlton Concept Development Design Package; 79 Exhibit E_ Lpoe Houlton Concept Development Calculation Package; 80 Exhibit E.1_mpbroof Structure; 81 Exhibit F_mep Basis Of Design Narrative; 82 Exhibit G_mep Concept Development Design Alternates; 83 Exhibit G.1 Mepfp Equipment; 84 Exhibit H_houlton Lpoe_facade Options & Ira Lec Materials_concept Development Memo; 85 Exhibit J Houlton Leed Nc Scorecard; 86 Exhibit J.1_gsa Sustainable Buildings_checklist; 87 Exhibit J.2_conceptdevelopmentenergyanalysisnarrative; 88 Exhibit U_(cui) Houlton Me Dbt_msr_fsl; 89 Exhibit V_houlton Lpoe Pre-renovation Rbm Survey Report 2024-06-25; 90 exhibit X_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 91 Exhibit Y_flood Level Diagram From 2024-07-02_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 92 Exhibit Z_(cui) Passwords; 93 Exhibit Aa_national Operational Excellence Checklists_concept Development; And 94 Exhibit Bb_houlton Me Lpope_concept Development Specifications Table Of Contents. several Required A Completed Form B Under Attachment 5 And A Completed Cbp Nda Authorization Letter Signed For Access. If You Have Alreadysubmitted These To The Contracting Officer Prior To October 24, 2024, Just Email Again For Access. note: The Facade - Precast Panels And Terracotta Rainscreen - Colors Will Be Selected In The Next Phase By The Architecture Engineering (ae) Design Firm Marvel Architectures. Additionally, Hvac - Vrf, The A/e Will Select The Vendor That Meets Most Of The Gsa Requirements (hvac And Controls). added Attachment 95 Ira Program Construction Solicitation Desk Guide - Dated October 1, 2024. This Is A Revision of Any Previous Construction Solicitation Desk Guide That Provides Guidance For Ira-funded Construction Projects that Contain Low Embodied Carbon (lec) Materials, Including Pre-solicitation, Solicitation, And Agreement Guidance, evaluation Factor Requirements, Review And Approval Requirements, And Post-award Requirements. It Also Includes standard Scope Of Work Language For Actions Related To The Construction Project (design Services, Cma, And Cxp services) For Lec Materials, High Performance Green Buildings, And Emerging And Sustainable Technology Projects. added Attachment 96 Houlton Lpoe Cmc Rfi Tracker Sheet 2024 10 23 - Conference Rfis Containing Questions asked By Offeror's And Official Government Responses For The Pre-proposal Conference Only. added Attachment 97 Solicitation Document L - Uniformat Ii - Level 3 Detail Reference Guide Reference Above In pricing Information Area. 47pb0024r0049amendment 001 the Following Changes Were Made Effective On 10/08/2024: a. Replaced 5. Form B - Request For Construction Documents 2024 10 04 With 5. Form B - Request For Construction Documents 2024 10 08 And Unlocked It. b. Replaced6. Cbp Non-disclosure Agreement Form 2024 10 04 With6. Cbp Non-disclosure Agreement Form 2024 10 08 And Unlocked It. c. Replaced 7. Pre-proposal Conference R1 2024 10 04 With 7. Pre-proposal Conference R1 2024 10 08 Which Provides The Following Clarification: 1. Thepre-proposal Conferencewill Be Held Virtually Onoctober 10, 2024 At 10:00 Am. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 18, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About October 25, 2024. d. Replaced 8. Pre-proposal Site Visit R1 2024 10 04 With Attachment - 8. Pre-proposal Site Visit R1 2024 10 08 Which Provides The Following Clarification: 1. The Site Visitwill Be Held Onoctober 17, 2024 At 1:00 Pm. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 25, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About November 1, 2024. e. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. f. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement Casb Ds-1 Omb Form Number 0348-0051 a. The Corrected Proposal Due Date Is Thursday, November 21, 2024. this Is A Construction Manager As Constructor (cmc) / Construction Manager As Risk (cmar) Services For U.s. Customs And Border Protection (cbp) Land Port Of Entry (lpoe) At Houlton, Maine. The Cmc/cmar Services Is For The Facilities Repair And Alterations Project And Includes Requirements For Design Phase Services And Construction Phase Services. design Phase Services Will Be Awarded On A Firm-fixed Price Basis. Construction Phase Services Will Be Awarded With A Guaranteed Maximum Price (gmp). This Project Is Part Of The Bipartisan Infrastructure Law (bil) And Is Also Targeted For Inflation Reduction Act (ira) Funding. this Solicitation Sets Forth Requirements For Proposals For A Contract To Construct The Project Described In The Solicitation Documents. Proposals Conforming To The Solicitation Requirements Will Be Evaluated In Accordance With The Method Of Award Set Forth Herein. the Government Will Award The Contract To The Selected Offeror, Subject To The Conditions Set Forth Herein. the Offeror's Proposal Submitted In Response To This Solicitation Shall Constitute A Firm Offer. No Contract Shall Be Formed Unless And Until The Contracting Officer Has Countersigned The Sf 1442 Submitted By An Offeror And Delivered Back To The Contractor, A Copy Of The Sf 1442 With Original Signatures Together With The Agreement Reflecting The Offeror's Proposed Prices. offers Providing Less Than One Hundred And Twenty (120) Calendar Days For Government Acceptance After The Date Offers Are Due Will Not Be Considered And Will Be Rejected. the Magnitude Of Construction Is Estimated Within The Range Of $22,000,000 And $32,000,000. Offeror's Are Cautioned That Price Proposals Exceeding This Range May Be Determined Ineligible For Award Based On Budgetary Limitations. This Range Does Include Potential Inflation Reduction Act (ira Funding). price Proposal Exceeding This Range May Be Eligible To Have Their Technical And Price Proposal Evaluated Unless The Contracting Officerdetermines That The Number Of Proposals That Would Otherwise Be In The Competitive Range Exceeds The Number At Which An Efficient Competition Can Be Conducted. The Contracting Officer May Limit The Number Of Proposals In The Competitive Range To The Greatest Number That Will Permit An Efficient Competition Among The Most Highly Rated Proposals. technical And Price Proposals Must Be Clearly Labeled And Must Be Sent As Separate Attachments So They Can Be Evaluated Separately. Failure To Do So Will Determine The Offeror's Submission As Non-responsive And Will Be Eliminated. The Contracting Officer And/or Contracts Specialist Will Not Be Responsible To Separate Any Technical Document That Contains Pricing Information. this Solicitation Is Not Set Aside For Small Business, However, Both Small And Large Businesses Are Encouraged To Participate. Offeror's Must Ensure That Sam.gov Shows That The Offeror Has North American Industry Classification System (naics) Code 236220 (commercial And Institutional Building Construction) And Meets The Small Business Size Standard Is $39.5 Million Average Annual Receipts. It Is The Responsibility Of The Offeror To Ensure This Information Is Updated At The Time Of Submission Of Their Proposal. see The "a. Presolicitation In Sam 2024 08 27" For Additional Details. Changes To The Presolicitation Include:the Solicitation Posting Date Has Changed From September 26, 2024 To October 3, 2024.the Proposal Submission Date Has Changed From November 26, 2024, 2:00 Pm Est To November 11, 2024, 2:00 Pm Est. for Access To Public Building Services (pbs) General Services Administration (gsa) Documents, See "b. Form B - Request For Construction Documents 2024 08 07" That Must Be Completed In Its Entirety And Signed.failure To Complete This Document In A Timely Manner Does Not Warrant Any Request For An Extension To The Proposal Due Date. The Document Must Be Sent To Paul.murphy@gsa.govbefore Access To These Pbs/gsa Documents Are Provided. additionally, The Department Of Homeland Security, U.s. Customs And Border Protection, Facilities Management And Engineering Field Operations, Facilities Program Management Office, Non-disclosure Agreement. See "6. Cbp Non-disclosure Agreement Form 2024 10 04" That Must Be Completed In Its Entirety And Signed. This Document Must Be Sent To Lawrence.a.comiskey@cbp.dhs.gov And A Copy Sent To Paul.murphy@gsa.gov Before Access To Cbp Documents Are Provided. a Pre-proposal Conference Is Scheduled For Thursday, October 10, 2024, At 10:00 Pm Est. A Letter Is Attached To This Solicitation "7. Pre-proposal Conference 2024 10 04". a Pre-proposal Site Visit Is Scheduled Forthursday, October 17, 2024, At 01:00 Pm Est.a Letter Is Attached To This Solicitation "8. Pre-proposal Site Visit 2024 10 04". there Are 71 Attachments To This Solicitation.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Civil Works Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Description: Project Labor Agreements (pla S) Survey And Request For Contractor Capability Statement Package this Is A Sources Sought Notice For Market Research Only. no Award Will Be Made From This Sources Sought Notice. this Sources Sought Notice (ssn) Is For Market Research Purposes In Accordance With Federal Acquisition Regulation (far) Part 10 And Far 15.201(e), To Determine The Availability And Technical Capabilities Of Qualified Sources. It Does Not Constitute A Solicitation And Is Not To Be Considered As A Commitment By The Government. All Firms Responding To This Notice Are Advised That Their Response To This Notice Is Not A Request That Will Be Considered For Contract Award. All Interested Parties Will Be Required To Respond To The Resultant Solicitation Separately From Their Response To This Notice. jefferson Barracks National Cemetery, sylvan Springs, Phase 1a Expansion project Scope the U.s. Department Of Veterans Affairs (va) Seeks Expressions Of Interest For A Construction Contract At Jefferson Barracks National Cemetery, Sylvan Springs, Phase 1a Expansion With The Use Of A Project Labor Agreement (pla). The North American Industry Classification System (naics) Of 237990 (other Heavy And Civil Engineering Construction) With The Size Standard Of $45.0 Million. The Approximate Project Duration Will Be 912 Calendar Days From The Notice To Proceed. The Estimated Magnitude For This Project Is Between $50,000,000 And $100,000,000. Va Is Considering Conducting This Acquisition As A Best Value With Tradeoffs In Accordance With Far Part 15, Contracting By Negotiation. project Description: the Purpose Of This Phase 1a Expansion Project For Jefferson Barracks National Cemetery Is To Enable The Existing National Cemetery To Continue To Provide Burial Services For Eligible Veterans In Missouri. Jefferson Barracks National Cemetery Is Located Near St. Louis, Missouri. the National Cemetery Administration (nca) Contracted This 33.6-acre Cemetery Expansion Project To Increase Burial Capacity Of Jefferson Barracks National Cemetery (jbnc) To Serve Veterans In The St. Louis Area. This Cemetery Expansion Project Identified On New Land. The Proposed Development Will Provide Continued Service To An Estimated Fiscal Year (fy) 2024 Veteran Population Of Approximately 208,000 Within A 75-mile Service Area. This Proposed Development Will Provide An Additional 15 Years Of Continued Burial Service To A Veteran Population Who Has Been Served By This National Cemetery Since 1827. this Project Will Provide For An Additional 15-year Inventory Of The More Efficient Casketed, Double-depth, Pre-placed Crypts Before Depletion Of The Current Inventory, And Extend The Full Range Of Burial Options Until Fy 2044, As Well As Provide Several Nominal Cemetery Operational And Infrastructure Improvements Within The Older Cemetery Grounds. this Project Will Provide For The Following Elements And Features: base Bid General Construction: the Base Bid Work Of This Contract Includes Phased Requirements. These Phases Are Referred To As Eto And Remainder Of The Work. The Eto Shall Be Completed Within The Established Time Frame Indicated In The Contract. Completion Of The Eto Work Will Follow Procedures Like Those For Final Completion And Acceptance, With The Facilities Within The Eto Being Completed And Turned Over To The Cemetery For Use To Begin Operation Of The Cemetery While The Remaining Work Is Completed. Eto Shall Be Completed And Accepted By Nca For Operation Within 252 Calendar Days From Notice To Proceed. While The Work Of The Eto Is Being Performed, Work For The Remainder Of The Project Can Also Be Performed. work Of The Contract Includes Site Demolition, General Construction, Relocation And Installation Of New Site Utilities, Installation Of Pre-placed Burial Crypts, Columbarium Niches, Roadway Improvements, New Roads, Walks, Grading, Drainage, Site Furnishings, Landscaping And Irrigation Necessary Removal Of Existing Structures And Construction And Certain Other Items And All Other Work Necessary To Construct The Project. The Contractor Shall Obtain State/local Construction Permitting As Required And Conduct All Protected Habitat Preservation, Wetlands, And Mitigation Efforts As Required To Meet Governing Body Mandates. By The End Of The Performance Period All Work Shall Be Satisfactorily Completed And Ready For Custody, Transfer, And Acceptance By Nca. All Punch List Items Shall Be Satisfactorily Addressed, All Commissioning Completed, And All Training Accomplished. replace And Upgrade Carpeting And Painted Finishes In The Administration/ Pic Building. Replace Select Electrical Service Panels In Maintenance Buildings 3001, 3002, And 3003. interment Areas: casketed Remains: a) Approximately 18,500 Pre-placed Crypt Full Casket Gravesites b) Approximately 2,100 Traditional Casket Gravesites cremated Remains: a) Approximately 10,900 In-ground Cremation b) Approximately 5,000 Columbarium Niches base Bid Furnish Pre-placed Crypts: procure, Manufacture, Deliver, Off-load And Store Furnish And Deliver To The Site All Pre-placed Crypts. additive Items Subject To Budget Adequacy: additive #1 Maintenance Yard: install Maintenance Storage Yard And Associated Site Work, Including But Not Limited To Pavements, Curbs, Drainage, Fencing And Gates, Signage, Landscaping, And Irrigation. additive #2 Storage Building: install Maintenance Material Storage Building Including But Not Limited To Sitework, Pavements, Curbing, Concrete Foundations, Concrete Walls, Structural Steel, And Standing Seam Metal Roofing. additive #3 Satellite Maintenance Building: install Satellite Maintenance Building And Associated Site Work Including But Not Limited To Sitework, Utilities, Concrete Foundations, Concrete Slab, Engineered Metal Building, Hvac System, Concrete Masonry Walls, Metal Wall Panels, Standing Seam Metal Roof, Doors, Windows, Interior Finishes, Landscaping, Irrigation, Signage And All Other Work Necessary To Construct The Building. additive #4 Demolish/replace Committal Shelter #4: demolish And Replace Committal Shelter #4(in Main Cemetery) Along With Associate Sitework, Concrete Foundations, Concrete Piers, Curbs, Paving, Standing Seam Metal Roof, Landscaping, Irrigation, Site Furniture And Signage. --- End Of Project Scope --- project Labor Agreement (pla): a Pla Is Defined As A Pre-hire Collective Bargaining Agreement With One Or More Labor Organizations That Establishes The Terms And Conditions Of Employment For A Specific Construction Project And Is An Agreement Described In 29 U.s.c. 158(f). federal Acquisition Regulation (far) 22.503 Policy: (a) Project Labor Agreement (pla) Is A Tool That Agencies May Use To Promote Economy And Efficiency In Federal Procurement. Pursuant To Executive Order 13502, Agencies Are Encouraged To Consider Requiring The Use Of Project Labor Agreements In Connection With Large-scale Construction Projects. (b) An Agency May, If Appropriate, Require That Every Contractor And Subcontractor Engaged In Construction On The Project Agree, For That Project, To Negotiate Or Become A Party To A Project Labor Agreement With One Or More Labor Organizations If The Agency Decides That The Use Of Project Labor Agreements Will- (1) Advance The Federal Government's Interest In Achieving Economy And Efficiency In Federal Procurement, Producing Labor-management Stability, And Ensuring Compliance With Laws And Regulations Governing Safety And Health, Equal Employment Opportunity, Labor And Employment Standards, And Other Matters; And (2) Be Consistent With Law. (c) Agencies May Also Consider The Following Factors In Deciding Whether The Use Of A Project Labor Agreement Is Appropriate For The Construction Project: (1) The Project Will Require Multiple Construction Contractors And/or Subcontractors Employing Workers In Multiple Crafts Or Trades. (2) There Is A Shortage Of Skilled Labor In The Region In Which The Construction Project Will Be Sited. (3) Completion Of The Project Will Require An Extended Period Of Time. (4) Project Labor Agreements Have Been Used On Comparable Projects Undertaken By Federal, State, Municipal, Or Private Entities In The Geographic Area Of The Project. (5) A Project Labor Agreement Will Promote The Agency S Long Term Program Interests, Such As Facilitating The Training Of A Skilled Workforce To Meet The Agency S Future Construction Needs. (6) Any Other Factors That The Agency Decides Are Appropriate. see Far Provision: 52.222-33 Notice Of Requirement For Project Labor Agreement And Far Clause 52.222-34 Project Labor Agreement For Further Details. project Labor Agreement (pla) Questionnaire (please Respond To The Questions Below) 1. Is Your Company Familiar With Project Labor Agreement (pla) And Its Use On Construction Projects? yes/no comments: 2. Would Your Company Likely Submit A Proposal For The Va Construction Solicitation That Requires The Use Of A Pla? yes/no comments: 3. If Va Requires A Pla, Would Your Proposed Construction Cost Likely To Increase Or Decrease And What Is The Likely Percentage Of Cost Increase Or Decrease? comments: 4. Does The Va Requirement To Use Of A Pla On A Construction Project Restrict Competition? yes/no comments: 5. Do You Expect Subcontractor Resistance Should Va Requires The Use Of A Pla On This Construction Solicitation? yes/no comments: 6. Do You Have Additional Comments Regarding The Use Of A Pla For This Project? yes/no comments: --- End Of Pla Questionnaire --- contractor Capability Statement Package: firms Interested In Submitting Their Capabilities For This Project Must Include The Following Information Compiled Into A Contractor Capability Statement Package: cover Letter/introduction That Includes Company Name, Address, System For Award Management Database At Https://www.sam.gov/portal/sam Sam.gov Unique Entity Id Numbers, Point Of Contact With Phone Number And E-mail Address. business Size Determination. State Your Firm S Socioeconomic Type And Business Size: Such As (service-disabled Small Business, Veteran Owned Small Business, Small Business, Woman Owned Small Business, Large Business, Etc.). if Identifying As A Service-disabled Veteran-owned Small Business (sdvosb) Firm (or Jv), Veteran Owned Small Business Firm (vosb) (or Jv), You Must Be Registered In The U.s. Small Business Administration Veterans Small Business Certification (vetcert) Database At: Https://veterans.certify.sba.gov. Provide Evidence Of Certification. bonding Capacity: provide A Letter From Your Surety, On Surety Letterhead That Affirms Your Company S Bonding Capacity To Furnish A Bid Bond, Payment Bond, And Performance Bond For A Project Between $50 - $100 Million. contractor Capability Statement Shall Include, But Not Be Limited, To The Following: corporate Experience: provide Projects In The Past Five (5) Years That Are Valued At Approximately $30m Or Greater In Construction Costs, And demonstrate Your Company S Experience Constructing Or Managing The Construction Of Projects That Match The Following Characteristics: a. Va/nca National Cemetery Projects. (if No National Cemetery Experiences Provide Projects Similar Such As Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres). b. State/local/private Cemetery Projects. c. Projects Requiring The Construction Of Multiple Features Typical To A National Cemetery Such As Pre-cast, Placed Crypts; Columbaria Niches, Memorial Walls, Cast Or Natural Stone Columbarium Caps, Cast Or Natural Stone Veneers, Turf (sod) Placement And Maintenance, Tree And Shrub Placement And Maintenance, Irrigation Systems With Mainlines Exceeding 4-inch In Diameter, Irrigation Central Control Systems, Roadways, Wetlands/environmental Remediation Or Restoration. d. Building Construction, Building Remodel, Mass/fine Grading & Excavation, Site Utilities, Paving, New Golf Courses Or Expansions, Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres. describe Your Experience With As Many Of The Elements Of Construction Identified, Below, As You Can: i. Mass/fine Grading & Excavation Site Utilities prefer To See Projects Involving Earth Work And Grading For Cemeteries, Parks, Or Site Development Projects Of At Least 10 Acres. ii. Site Utilities demonstrate Experience With Storm Water Management Systems And Site Drainage For Flat Sites. demonstrate Experience With Potable Water Distribution From A Well, Or Municipal Source. demonstrate Experience With Sanitary Waste Systems, Both Powts & Municipal. iii. Paving paving Projects May Include Private & Local Asphalt Roads; Concrete Curb & Gutter, Asphalt Parking Lots, And Concrete Sidewalk, On Site Development Projects Of At Least 10 Acres. experience In Missouri Or Similar Climates Is Preferred, But Not Required. iv. Landscaping landscaping Projects Involving Planting And Lawn Installation For Cemeteries, Parks, Golf Courses Or Other Site Development Projects Of At Least 10 Acres In Climates Similar To St. Louis, Missouri. v. Irrigation irrigation System Installation For Cemetery, Park, Golf Course, Or Other Types Of Development Sites Of At Least 10 Acres. Include Experience With Irrigation Ponds, Wells, Pumping Systems If You Have It. vi. Precast Concrete Burial Components demonstrate Experience With Successful Fabrication And Installation Of Precast Crypt And Precast Columbarium, If You Have It. vii. Phasing And Continuity Of Operations demonstrate Experience With Best Practices To Successfully Complete Phased Site Work At An Occupied And Functioning Facility In A Way To Minimize Noise And Dust And Minimize Detrimental Effects On Cemetery Operations. current Project List: provide A Detailed List Of Ongoing Contracts & Projects. The Description Shall Include: project Type award Amount award Date estimated Completion Date ---- End Of Contractor Capability Statement Package --- please Submit Your Comments To The Pla Questionnaire And The Contractor Capability Statement Package Via Email To Joshua Gibson, Contracting Officer, At Joshua.gibson2@va.gov, No Later Than 3:00 Pm Et On January 6, 2025, In The Subject Line State Jefferson Barracks National Cemetery, Phase 1a Expansion And [company Name]". Note That This Mailbox Will Only Accept E-mails Of 15mb In Size Or Smaller, So You May Break Your Submission Into Multiple Emails If Needed. All Information Concerning This Requirement, When It Proceeds To Solicitation, Will Be Posted Only On The Federal Business Opportunities Website (https://sam.gov). --- End Of Sources Sought Notice ---

DEFENSE LOGISTICS AGENCY USA Tender

Energy, Oil and Gas
Corrigendum : Closing Date Modified
United States
Closing Date10 Feb 2025
Tender AmountRefer Documents 
Details: Defense Logistics Agency - Energy Anticipates Issuing A Request For Proposal (rfp) Within The Next 60 To 90 Days For Goco And Related Alongside Aircraft Refueling Services At Naval Air Station (nas) Whiting Field. the Contractor Must Execute The Management, Operation, Maintenance, Repair, Product Quality Surveillance, Inventory/accounting Controls, Security, Safety, And Environmental Protection Of The Assets, Properties And Performance Duties As Identified In The Performance Work Statement (pws). The Contractor Must Utilize Best Industry Directives, Regulations, And Instructions, In Accordance With Dod, Federal, Navy, State, And Local References And Laws Identified In Appendix C Of The Pws, Along With The References Listed Within Each Individual Subject Reference. the Contractor Must Receive, Maintain, Store, Sample, Test, Internally Transfer, And Issue Petroleum Products Throughout Nas Whiting Field, By Utilizing Infrastructure Property, Incidental Equipment, And Contractor-furnished Equipment. The Contractor Must Be Responsible For All Fuel-servicing Operations And Safeguarding Facilities, Equipment, And Fuel Products Under Its Control During Normal And Adverse Conditions. the Contractor Supports Various Locations Within Nas Whiting Field, Which Includes Two Active Outlying Fields (olf Site X About 18 Miles Northwest) And (olf Spencer Field About 14 Miles Southwest), To Support The Pilot Training Program With Cold And Hot Aircraft Refueling Operations, Along With An Automated Ground Fuel Service Station. Other Locations Include Air Installations Compatible Use Zones (aicuz) Bases Or Naval Out Lying Fields Choctaw, Holly, Santa Rosa, Pace, Brewton, Harold, Wolf, And Evergreen. The Pws Establishes The Contractor’s Responsibility To Manage, Maintain, And Operate Incidental Fuel Facilities, And Mobile Servicing Equipment Required And Necessary To Support The Facilities, Equipment, Vehicles, And Assigned Aircraft. the Contractor Must Issue, Defuel, And Provide Off-station Fuel Services To Aircraft And Support Equipment By Mobile Fuel Servicing Vehicles And Fixed Direct Refueling Systems. Aircraft Fuel Services Must Comply With Naval Air (navair) 00-80t-109, Aircraft Refueling Naval Air Training And Operating Procedures Standardization (natops) Manual, Navair 00-80t-124, Airfield Operations Manual, And All Other Applicable Military, Federal, And Commercial Policies Regarding The Performance Of Aircraft Fuel Servicing Operations. The Contractor Shall Provide And Management And Supervisory Staff And Labor To Accomplish All Services As Identified In The Pws And All Related Contract Clauses. the Contractor's Staffing Shall Be Flexible And Fully Capable Of Meeting The Demands Of Aircraft Fuel Services, Ground Fuel Services, Bulk Storage Operations, And General Management And Administrative Functions. the Contractor Shall Ensure That Personnel Assigned To All Tasks Have The Requisite Knowledge And Skills To Meet The Performance Standards For Those Tasks And Comply With All Applicable Federal And State Laws, Regulations And Code. dla Energy Will Follow Source Selection Procedures Utilizing Lowest Price Technically Acceptable (lpta) Process In Accordance With Far 15.101-1 For This Acquisition. the Expected Performance Period Is December 1, 2025 - November 30, 2029 (four Years) With A Five-year Option Period From December 1, 2029 - November 30, 2034. a Pre-proposal Conference Will Be Conducted After The Solicitation Is Issued. Date And Time Of The Conference Will Be Provided At A Later Time. this Acquisition Will Be Set-aside For 100% Small Business Participation. The Naics Code Is 493190 And The Threshold For Small Businesses Is $36.5 Million In Annual Receipts. All Responsible Offerors May Submit An Offer For Consideration. the Contractor Shall Ensure That All Buildings, Structures, And Facilities Are Kept Clean And Sanitary. The Contractor Shall Sweep, Mop, And Wax Floors, Wash Windows, And Walls Of Occupied Buildings Or Office Spaces So As To Present A Clean, Sanitary, And Orderly Appearance. Food Storage And Preparation Areas Shall Be Maintained In An Orderly And Sanitary Condition. Clothing Locker And Change Areas Shall Be Kept Orderly And Clothing Hung Or Kept In Lockers. Areas Immediately Around Buildings For Which The Contractor Is Responsible Shall Be Kept Free Of Debris. the Contractor Shall Not Allow Fire Hazards, Such As Oily Rags, Loose Paper, And Trash To Accumulate In Or Around Buildings Or Within The Facilities. Requests For Pest And Rodent Control Shall Be Forwarded To The Cor. The Requirement For Building/structure Maintenance Shall Be Documented And Forwarded To The Cor. The Contractor Shall Not Alter Any Structure Or Allow It To Be Altered Without Explicit Written Approval By Dla Energy. Maintenance Of Fire Alarm Systems Is Provided By Base Public Works. Maintenance Of Eye Wash Stations If Plumbed Are The Responsibility Of The Base And If Portable The Responsibility Of The Contractor. The Contractor Is Responsible For The Monthly Testing Of The Eye Wash Stations And Emergency Showers. The Maintenance Of All Hvac Systems Is The Responsibility Of The Base. the Contractor Shall Establish A Smoking Policy That Prohibits Smoking In Other Than Government Designated Areas. The Contractor Shall Provide Signs To Be Posted At The Entrance To Work Areas That Read, "no Smoking Except In Designated Areas." The Contractor Shall Also Designate A Smoking Area And Provide Signs That Read, "designated Smoking Area." the Contractor Shall Be Responsible For The Pick-up Of All Trash And Debris Within And Around Fuel Areas Under Its Controlled, And Shall Dispose Of All Such Trash And Debris In Navy-furnished Containers/dumpsters. The Navy Will Dispose Of The Trash And Debris Placed Within Navy Provided Dumpsters. grounds Maintenance, Grass Cutting And Vegetation Control Is Provided By Federal Prisoners But Contractor Is Ultimately Response For Satisfactory Upkeep. Grass, Weeds, And Brush, Except Ornamental Trees And Shrubs, Within The Areas Defined Herein Shall Be Maintained So As To Maintain A Neat Appearance. At No Time Should Vegetation Present A Fire Or Safety Hazard. All Vegetation Within Contractor Controlled Areas, On/under Fence Lines, And In The Security Zone Outside The Fence Line Of The Bulk Storage Refueler Parking Area, Shall Be Maintained With The Prescribed Limits. Bulk Vegetation And Waste Accumulated During Mowing, Removal, And Control Operations Shall Be Disposed Of By The Contractor. Grass Cutting Includes A 5 Foot Clearance Area Outside Of The Fence Line. Pesticide And Weed Control Is Provided By A Base Contractor. all Roads, Paved Surfaces, Curbing, And Sidewalks Within Contracted Fuel Management Areas Shall Be Monitored Continuously. The Contractor Shall Inspect All Fences, To Include Signs And Markings, Gates And Automatic Gate Openers, Of Fuel Management Compounds. exterior Lighting, Security Lighting, And Exterior Building Lights Will Be Monitored On A Continuous Basis. The Contractor Shall Continuously Monitor Other Facilities, Equipment, And Utilities, I.e., Fire Hydrants, Afff Systems, Storm Drains, Exterior Water Systems, Power Poles, Lines And Transformers, And Exterior Telephones Within Fuel Management Areas. the Contractor Shall Visually Inspect And Measure The Contents Of The Oil/water Separators Iaw Installation, State And Federal Regulations. Gauge Readings And Noted Discrepancies Shall Be Reported To The Cor. Oil/water Separator Systems Are Managed And Maintained By The Installation Public Works Department. interested Parties Should Submit Information To The Following Areas In Their Capability Statements: 1. Company Profile. 2. Capability Of Providing Qualified And Experienced Personnel, With Appropriate Clearances, If Required. 3. Past Performance. 4. Do You Anticipate Any Type Of Teaming Arrangement For This Requirement? If Yes, Please Address What Kind Of Arrangement And What Percentage Of Work, Types(s) Of Service Would You Perform. 5. Does Your Company Have Experience With Service Contract Act Of 1965 Covered Contracts? Does Your Company Have Experience With Collective Bargaining Agreements (cbas)? Please Explain Any Experience Your Company Has Had With Labor Unions. 6. What Realistic Phase-in Period Would You Require To Commence Performance With Personnel, Equipment, And Materials? capability Statements Can Be Submitted To Sean.turner@dla.mil. Ensure Sources Sought #spe60325rxxxx Is In The Subject Line.

PUBLIC BUILDINGS SERVICE USA Tender

Civil And Construction...+1Building Construction
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents 
Details: This Is A Sources Sought Notice. No Proposals Are Being Requested Or Will Be Accepted In Response To This Posting. If You Are Interested In Proposing On The General Scope Of Work Stated Below For A Design-build Project, Please Respond By Email Only To Krista.miller@gsa.gov. Please Provide Your Bonding Capacity, A Capability Statement, And Your Small Business And Small Business Socioeconomic Status, If Any. Please Include In Your Capability Statement Projects Which Your Firm Has Completed That Are Particularly Relevant To This Scope Of Work, Especially Involving Exterior Structural And Glazing Improvements, And/or Performed In Hawaii. general Statement Of Work Summary: the Prince Jonah Kuhio Kalaniana’ole (pjkk) Federal Building And Courthouse Is Located At 300 ala Moana Blvd., Honolulu, Within The Hawaii Capital District And On The Outskirts Of The Downtown central Business District. This Reinforced, Cast In Place Concrete With Concrete Masonry And Glass curtain Walls Is A Two-building Mid-century Modern Complex Originally Constructed In 1977. The illuminated Entry Pavilion Was Originally Designed By Gensler Sf And Constructed By Swinerton construction In January 2015. The Illuminated Entry Pavilion Design Was An Elegant, Iconic Aia award Winning Design That Unified Two Separate Entries Into A Single, Sky Lighted And Transparent entrance For The Pjkk Complex. The Single Portal/pavilion Simplified The Circulation For The Public and Created A Strong Sense Of Entry For Pjkk. on April 6, 2021 A Fire Occurred At The Entry Pavilion That Created Significant Damage. On January 24, 2022, Clifford Planning Architecture Completed A Fire Investigation Report That Stated “it Is probable The Entry Pavilion Fire Initiated Was A Result Of An Electrical Fault Within The Led Light Panel installed Adjacent To The Bottom Panel Of The South Wall Of The Entry Pavilion. Low Level Arcing Over a Period Of Time Was The Likely Source Of Heat For Ignition Of The Acrylic Panel Material” (see volume 4 – Fire Investigation). As Further Defined In The Fire Investigation Report, There Was Fire damage To Architectural Finishes And Structural Members. The Scope Of Work For The Entry Pavilion includes, But Is Not Limited To, Installing (2) Temporary Covered Entry Tunnels To The Existing United states Marshal Service (usms) And Federal Protection Services (fps) Security Check-point locations, Providing Code Compliant Construction Documents And Full Design Services That Adhere to The Original Gensler Design And Architectural Appearance Of The Original Entry Pavilion, While also Making The Necessary Design Changes To Address The Issues That Contributed To The Fire And smoke Damage As Further Defined In Volume 4 - Fire Investigation. The Design Should Also include Solutions For The Following Known Building Maintenance Issues: 1. The Original Design Led Panels Were Located Behind Heavy Glass Panels That Created issues For Regular Maintenance And Care. 2. The Original Designed Entry Door Operated On A Small Pin That Would Fail And Was Difficult to Replace. in Addition To The Scope Above, The Design And Construction Of The Courthouse Hardening Upgrades To The entry Pavilion And Ground Level Windows And Doors Facing Halekauwila Street And Ala Moana Boulevard are A Requirement For This Project. The Judiciary Had Previously Sought From Congress Supplemental appropriations To Fund Enhanced Security Measures To Protect Judges And The Judicial Process In Response to The Civil Unrest Following The Murder Of George Floyd And The January 6th Attack On The U.s. Capitol. the Judicial Conference Approved Funding To Begin Enhanced Security Measure Projects To Harden courthouses. initial Stakeholders From The General Services Administration (gsa), The Administrative Office Of The U.s. courts (ao), U.s Marshals Service (usms), And The Federal Protective Service (fps) Worked Together To analyze Potential Security Measures To Be Used In This Program. This Scope Of Work Covers The countermeasures For The Pjkk Courthouse In Honolulu, Hi: 1. Windows: Impact Resistant Window Glazing System At The Entry Pavilion And ground Level Courthouse Windows And Doors Facing Halekauwila Street And Ala moana Boulevard, Excluding Ground Level Windows Along The United States marshal Service Offices And Within The Confines Of The Exterior Secured Courtyard: ● Windows / Doors / Frames – Shall Meet A Minimum 15-minute Forced entry Resistance Per Astm F3038 Or Dept Of State (dos) sd-std.01.01 Rev G (amended) – Forced Entry Resistance Is The standard That Shall Apply. ● The Contractor Shall Install A New Shatter Break Resistance Riot Glazing system ● Contractor Is Responsible To Field Verify And Measure Each Opening. 2. Exterior Doors And Hardware (see Volume 2b_existing Pavilion Design drawings For Specific Locations): ● All Exterior Pavilion Entry Doors And Interior Courthouse Pavilion Vestibule doors Shall Be Equipped With Hardware And Controls To Engage electro-magnetic And/or Electro-mechanical Remote Locks. ● Remote Locks Shall Give The Ability For The Court Security Officers And The usms To Lock All Doors Immediately In Case Of An Emergency. ● Remote Lock Override Control Shall Run To The Main Usms / Cso Control room the Courthouse Hardening Upgrades Will Upgrade The Ground Level Courthouse Windows And doors And Replace All Window, Exterior Doors, And Hardware Included In The Original Gensler designed Pjkk Entry Pavilion. the Forced Entry Resistance Doors And Windows Shall Meet A Minimum 15 Minute Forced Entry resistance In Accordance With Astm Standard F3038-21, With The Following Exception. Astm standard F3038-21 Requires A Full Scale Test For Each Unique System Size And Configuration, however, If The Actual Overall System Dimensions Are Within 6” (both Height And Width Dimension) of Another Successfully Tested System Meeting The Requirements Of Astm Standard 3038-21, And the System Components Are Of Similar Size And Makeup, The Proposed System Shall Be Considered acceptable. Support Documentation Shall Be Provided Prior To Installation. the Construction Services Scope Of Work Includes Demolition Of The Remaining Pavilion Structure, build-out Of (2) Temporary Tunnels To Access The Existing Usms And Fps Security Check-points, the Build-out Of The New Entry Pavilion, Installation Of The Courthouse Hardening Window And Door upgrades, Including But Not Limited To Structural, Architectural Finishes, Lighting, Mechanical, electrical, Plumbing, Fire And Life Safety, And Data/cabling Infrastructure. the Federal Building And Courthouse Must Remain Fully Operational Throughout Design And construction. All Construction Work Related To This Project Shall Be Scheduled From 5:00 Pm To 7:00 am, After Normal Building Operation Hours To Minimize Disruptions To Building Occupants And To maintain Public Safety. Normal Building Operation Hours Are From 7:00 A.m. To 5:00 P.m. weekdays. the Project Delivery Method Is Design-build (db). the Db Contractor Shall Provide All Supervision, Labor, Materials, Equipment, And Testing Required to Accomplish The Design And Construction For The Pjkk Entry Pavilion And Courthouse Hardening project. design Services Shall Include, But Are Not Limited To, Design And Certification By A State Of Hawaii licensed Architect-engineer (a/e), Design Reviews, Weekly Progress Meetings, Design development, Construction Documents, Basis Of Design Documents, Site Investigation, Site measurements And Verification, Code Compliance, Reproduction Services, Consultant Coordination, contract Administration, Contract Close-out, Record Drawings And As-builts. construction Services Shall Include, But Are Not Limited To, Complete And Timely Submission Of security Clearance Applications For Workers (hspd-12 And Tenant Agency Review), Project schedule, Cost Estimating, 3-week Look Ahead Schedules, Demolition, Site Supervision, Drywall, mechanical, Electrical, Automatic Sprinkler System, Architectural Finishes, Submittal Samples, submittal Schedule, Hvac, System Balancing, Structural, Fire And Life Safety, Security Infrastructure, protocols For Utility Outages, Separation Of Utilities To Avoid Impacts To Occupied Areas, Temporary barricade Plan, Noise Mitigation, Clean Up After Work, Lead Weekly Meetings And Provide Minutes, file And Record Management, And All Other Work To Meet The Contract Requirements.

Bgis Pwgsc Rp1 Tender

Civil And Construction...+2Others, Building Construction
Canada
Closing Date5 Feb 2025
Tender AmountNA 
Details: The feasibility study must evaluate the implementation of universally accessible toilets that comply with the Cnb, the Csa-b651 standard and the Real Estate Management Directive. It includes the evaluation of the capacity of the toilets, the number required for each gender, as well as new accessible toilets. The report will propose options for each floor, with plans, cost estimates, and an analysis of the advantages and disadvantages. The study will also examine the capacity of the plumbing, HVAC and electrical networks, as well as the compliance of low-consumption water (watersense) equipment. If a shower is added, it must be accessible. The option of adapting drinking fountains to accessibility standards will also be considered.

EllisDon Construction Services Inc Tender

Aerospace and Defence
Canada
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Details: Advanced Procurement Notice Future Fighter Capabilities Project (ffcp) Cfb Cold Lake, Ab (with Security Requirements) Purpose Of This Advanced Procurement Notice This Is Not A Bid Solicitation. This Is An Advanced Procurement Notice (apn) Of Potential Contracts With Anticipated Security Requirements To Provide Interested Contractors, Suppliers, And Vendors An Opportunity To Begin The Sponsorship Request Process For Potentially Obtaining The Required Security Clearance(s) That Are Anticipated. Note That There Is No Guarantee That These Contracts Will Proceed Or That Any Security Clearance(s) Will Be Granted Under The Sponsorship Process In A Timely Fashion Or Otherwise. Description Of The Project Ellisdon Construction Services Inc. (ellisdon) As The Design Builder, Along With Its Design Partner, Stantec Have Been Contracted To Provide Design Services And Constructability Oversight To Complete The Design Of The Royal Canadian Air Force (rcaf) Infrastructure That Will Support The Future Fighter Capability Project (ffcp). The Infrastructure Will Provide Shelter And A Working Environment Capable Of Supporting The Operation And Maintenance Of A Yet To Be Determined Advanced Fighter Aircraft. Design Has Progressed Significantly With Various Tender Packages Forthcoming Tentatively To Start In Q3 2024, With Project Construction Being Conditional On The Project Receiving Approval To Proceed From Dnd. details On Upcoming Projected Tender Packages To Follow Via Amendment. Prior To This, Ellisdon Is Seeking Interested Parties Consisting Of Trade Contractors, Vendors, And Suppliers To Ensure That They Have All Necessary Security Clearances In Place Prior To This As This Is A Requirement For This Project.    Description Of The Scope Of Works Project Construction Is Conditional On The Project Receiving Approval To Proceed From Dnd. Project Scope And Summary Are Noted Below. Contract Number:  71947 Title:  Modified Design Build Services For Fighter Squadron Facility Building Size: Approximately 555,000 Sf Anticipated Posting Date: q3 2024 Description: construction Of A New A Fighter Squadron Facility Consisting Of Two Fully Operational tactical Fighter Squadrons (tfs) And The Operational Training Unit (otu),  including But Not Limited to: Offices, Administrative Spaces, Mission Planning Rooms, Briefing / De-briefing Rooms, Meeting rooms, Classrooms, Auditorium, Speciality Training Rooms Including Simulators (sims) accommodations And Part-task Trainers Accommodations, Hangars, Maintenance Bay Facilities, specialty Aircraft Maintenance Labs, Shops And Storage, It Offices And Server Rooms, Building support Spaces, And Common Spaces. This Work Package Will Also Include The Construction Of Nearby Airfield Pavements, Apron And Taxiway Access Lane Edge Lighting, And Apron Flood Lighting consisting Of Concrete And Asphalt. Construction Of Infrastructure Will Encompass The Following Scopes Of Work. Scope Of Work, Using Masterformat Divisional Breakdown As A Reference, May Include, But Are Not Limited To: Masterformat Division             Scope Of Work 01 45 00                                 Surveying 01 45 00                                 Material Testing 01 45 00                                  Third Party Inspection (roof, Structural, Geotechnical) 01 52 00                                  Temporary Facilities (trailers, Toilets, Fencing, Waste Bins) 01 54 19                                  Tower Cranes 01 54 23                                  Scaffolding 02 41 19                                  Selective Demolition 03 11 00                                  Concrete Formwork 03 15 00                                  Concrete Accessories 03 20 00                                  Reinforcing Steel 03 30 00                                  Concrete Supply 03 35 00                                  Concrete Placing & Finishing 03 45 00                                  Precast Specialties 04 00 00                                  Masonry 05 10 00                                  Structural Steel 05 30 00                                  Metal Decking 05 50 00                                  Miscellaneous Steel 05 70 00                                  Ornamental (specialized) Metals 06 20 00                                  Millwork / Architectural Woodwork 07 10 00                                  Damp Proofing & Waterproofing 07 40 00                                  Metal Roofing, Cladding & Siding 07 50 00                                  Membrane Roofing 07 80 00                                  Firestopping & Fireproofing 07 90 00                                  Caulking 08 10 00                                  Openings – Doors, Frames & Hardware 08 33 00                                  Coiling Doors & Grilles 08 34 16                                  Hanger Doors 08 35 00                                  Folding Doors & Grilles 08 36 00                                  Overhead Doors 08 40 00                                  Aluminum Entrances, Storefronts & Curtain Wall 08 80 00                                  Glazing 08 87 00                                  Window Film 09 21 16                                  Gypsum Board Assemblies 09 51 14                                  Acoustic Panels 09 60 00                                  Flooring 09 66 00                                  Tiling 09 67 00                                  Fluid Applied Flooring 09 69 00                                  Access Flooring 09 90 00                                  Painting 10 11 00                                  Visual Display Boards 10 14 00                                  Signage 10 22 19                                  Demountable Partitions 10 26 00                                  Wall, Corner, Door Protection 10 28 00                                  Bathroom Accessories & Toilet Partitions 10 51 00                                  Lockers 10 75 00                                  Flagpoles 11 30 00                                  Appliances 11 61 00                                  Theater And Stage Equipment 11 66 00                                  Athletic Equipment 11 81 29                                  Fall Arrest Systems 11 98 00                                  Detention Equipment 12 00 00                                  Furnishings 12 20 00                                  Window Coverings 14 20 00                                  Elevator & Lifts 21 00 00                                  Fire Suppression 22 00 00                                  Mechanical – Plumbing 23 00 00                                  Mechanical – Heating, Ventilation And Air Conditioning (hvac) 25 00 00                                  Integrated Automation 26 00 00                                  Electrical 28 10 00                                  Access Control            31 00 00                                  Earthworks 31 60 00                                  Piling 32 10 00                                  Paving 32 16 00                                  Sidewalk Curb & Gutter 32 31 00                                  Fencing 32 90 00                                  Landscaping 33 00 00                                  Utilities & Underground 34 73 00                                  Airfield Construction - Apron 41 22 00                                  Overhead Cranes 48 16 00                                  Geothermal Energy Project Prequalification And Anticipated Security Requirements In Order To Be Eligible To Participate In The Upcoming Project Prequalification Process, The Interested Party Will Be Required To, Among Other Things, Actively Hold All Required Security Clearance(s) At The Time Of Closing. this Will Also Be Noted in All Upcoming Solicitation Tender Documents. As Of The Date Of Posting Of This Advance Procurement Notice, The Required Security Clearance(s) Are Anticipated To Be: * for Areas Established As Security And High Security Zones - A Valid And Active Facility Security Clearance (fsc) At The Level Of Secret Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc)   * For Areas Established As Public, Reception And Operations Zones - A Valid And Active Designated Organization Screening (dos) At The Level Of Reliability Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) Industrial Security Program (isp) Sponsorship Defence Construction Canada (dcc) Is Providing Interested Parties Early Access To The Security Clearance Application Process Through Sponsorship Under Its Industrial Security Program (isp). Accordingly, Interested Parties That Are Interested In Submitting Or Participating In A Proposal/bid For These Procurements That Fall Under This Program And That Do Not Actively Hold The Above Identified Security Clearance(s) Should Begin The Security Clearance Application Process By Applying Through Dcc’s Isp. To Begin The Security Clearance Sponsorship Process, Please Submit A Sponsorship Request Application To Dcc By Following The Steps Identified On Dcc’s Website At: Https://www.dcc-cdc.gc.ca/industry/security-requirements In Their Sponsorship Request Application To Dcc, Interested Parties Are Asked To Quote The Following Information, Among Other Things: * Contract Number As Referenced Above; And * Level Of Clearance Requested To Be Sponsored For. Sponsorship Process Timeline Sponsorship Timeline Is Currently As Follows: * Thirty (30) Calendar Days Prior To Planned Tender Closing, For Designated Organization Screening (dos); And * Sixty (60) Calendar Days Prior To Planned Solicitation/tender Closing, For Facility Security Clearance (fsc) At The Level Of Secret. Questions Any Questions Pertaining To The Isp Sponsorship Process Outlined In This Advanced Procurement Notice Can Be Addressed To: Telephone: (613) 998-8974 Email Address: Isp.sponsorship@dcc-cdc.gc.ca Any Questions, Exclusive Of Security Sponsorship, Relating To This Advanced Procurement Notice Can Be Addressed To: Scott Barabash, Cet, Gsc, Cec Senior Estimator Ellisdon Construction Services Inc. 780-444-3042 Sbarabash@ellisdon.com Disclaimer Dcc Nor Ellisdon Do Not Provide Any Assurances Or Guarantees That A Sponsorship Request Package Or A Security Clearance Application Forwarded To The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) On Behalf Of A Interested Party Will Be Successful Or Result In The Granting Of The Requested Security Clearance(s) By The Csp, Pwgsc, In A Timely Fashion. At All Times, The Processing Of A Sponsorship Request Package Or A Securiy Clearance Application Is Subject To The Respective Terms, Conditions, And Timelines Of Dcc's Isp Sponsorship Process And The Csp, Pwgsc's Security Clearance Granting Process. By Applying To Either Of The Aforementioned Processess, The Interested Party Accepts And Agrees To Bear Any Risks Associated With: (i) The Completeness Or Accuracy, Or Lack Thereof, Of Its Application Or Related Documents Submitted Under Or In Connection With Either Said Processes, And (ii) The Timeliness, Or Lack Thereof, Of Any Processing Or Granting Of Security Clearance(s) Under Or In Connection With Either Said Processes.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Electrical Cables And Wires...+1Electrical and Electronics
United States
Closing Date17 Feb 2025
Tender AmountRefer Documents 
Details: Synopsis: introduction: in Accordance With Federal Acquisition Regulation (far) 10.002(b)(2), This Sources Sought Notice Is For Market Research And Information Purposes Only At This Time And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs (va). the Department Of Veterans Affairs, Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Is Conducting A Market Survey And Is Seeking Potential Sources For The Ehrm Infrastructure Upgrades Construction Project At The Va Illiana Healthcare System (vaihcs) Located In Danville, Il. project Description: the Scope Of This Project Includes But Not Limited To The Following Infrastructure Improvements: Electrical (electrical Panel Upgrade, Power (normal, Emergency)), Bonding, Ups, Building Management System Interfaces, Assess For New And Upgrades To Existing Hvac, Reconfiguration, Expansion And Renovation Of Existing Space (demo, New Construction, Finishes), Renovation Of Existing Data Center (demo Wall, Remove Raised Floor, Relocate Server Cabinets, Install Bus Bar And Overhead Cable Management, Patch, Finish), Communication Infrastructure (new Data Outlets, Patch Panels, Upgrade To Cat 6a Cable) In Buildings As Necessary, Physical Security Upgrades, Assess And Upgrade Fiber Infrastructure Backbone Campus Wide Within Buildings And Between Buildings, Install Diversified Path To Datacenter For Wan, Hazardous Material Abatement. Project Building Locations Include: Buildings 14, 19, 22, 58, 60, 64, 98, 101, 102, 103, 104, 125, 128, 129, 130, 131, 132, 133, 140 And Site. procurement Information: the Proposed Project Will Be A Competitive, Firm-fixed-price Contract Utilizing The Design-bid-build Approach (final Specifications And Drawings Will Be Provided). The Anticipated Solicitation Will Be Issued Either As A Request For Proposal (rfp) In Accordance With Far Part 15, Considering Technical And Price Factors Or As An Invitation For Bid (ifb) In Accordance With Far Part 14, Considering Price Only. The Results And Analysis Of The Market Research Will Finalize The Determination Of The Procurement Method. The Type Of Socio-economic Set-aside, If Any, Will Depend Upon The Responses To This Notice And Any Other Information Gathered During The Market Research Process. this Project Is Planned For Advertising In Mid To Late-april 2025. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $20,000,000.00 And $50,000,000.00. The North American Industry Classification System (naics) Code 236220 (size Standard $45.0 Million) Applies To This Procurement. The Duration Of The Project Is Currently Estimated At 730 Calendar Days From The Issuance Of A Notice To Proceed. The Services For This Project Will Include Providing All Construction Related Services Such As: Providing Labor, Materials And Equipment Required To Complete The Project As Per Contract Documents Prepared By An Independent Architect-engineer Firm. capability Statement: respondents Shall Provide A General Capabilities Statement To Include The Following Information: section 1: Provide Company Name, Duns Number And Unique Entity Identifier (uei), Company Address, Point-of-contact Name, Phone Number And Email. section 2: Provide Company Business Size Based On Naics Code 236220. Also, Provide Business Type (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-owned Small Business, Hub Zone Small Business, Etc.). section 3: Provide A Statement Of Interest In The Project. section 4: Provide The Prime Contractor S Available Bonding Capacity In The Form Of A Letter Of Intent From Your Bonding Company With This Submission. *please Ensure That The Individual Bonding Capacity Is In Line With The Vaar Magnitude Of Construction Listed Above. section 5: Provide The Type Of Work Your Company Has Performed In The Past In Support Of The Same Or Similar Requirement. This Section Is Important As It Will Help To Determine The Type Of Socio-economic Set-aside, If Any. Please Provide The Following In Your Response: no More Than Three (3) Contracts That Your Company Has Performed Within The Last Seven (7) Years That Are Of Comparable Size, Complexity, And Scope To This Requirement. Include The Project Name, Project Owner And Contact Information As This Person May Be Contacted For Further Information, Project Scope, Project Size (example: Square Footage), Building Use (example: Medical Facility, Office Building, Etc.), Project Dollar Value, Start And Completion Dates. provide Specific Examples That Relate Aspects Of Previous Projects To The Proposed Project. Describe Specific Technical Skills And Key Personnel Your Company Possess To Perform The Requirements Described Under Description Of Work. describe Your Self-performed** Effort (as Either A Prime Or Subcontractor). Describe Self-performed Work In Terms Of Dollar Value And Description. **self-performed Means Work Performed By The Offeror Themselves, Not Work Performed By Another Company For Them For Any Of The Project Examples Provided. section 6: Project Labor Agreement (pla) - A Pla Is Defined As A Pre-hire Collective Bargaining Agreement With One Or More Labor Organizations That Establishes The Terms And Conditions Of Employment For A Specific Construction Project And Is An Agreement Described In 29 U.s.c. 158(f). The Pla Questionnaire Must Be Filled Out And Returned With The Sources Sought Response. The Questionnaire Can Be Found At The End Of This Document. federal Acquisition Regulation (far) 22.503 Policy: (a) Project Labor Agreement (pla) Is A Tool That Agencies May Use To Promote Economy And Efficiency In Federal Procurement. Pursuant To Executive Order 13502, Agencies Are Encouraged To Consider Requiring The Use Of Project Labor Agreements In Connection With Large-scale Construction Projects. (b) An Agency May, If Appropriate, Require That Every Contractor And Subcontractor Engaged In Construction On The Project Agree, For That Project, To Negotiate Or Become A Party To A Project Labor Agreement With One Or More Labor Organizations If The Agency Decides That The Use Of Project Labor Agreements Will- (1) Advance The Federal Government's Interest In Achieving Economy And Efficiency In Federal Procurement, Producing Labor-management Stability, And Ensuring Compliance With Laws And Regulations Governing Safety And Health, Equal Employment Opportunity, Labor And Employment Standards, And Other Matters; And (2) Be Consistent With Law. (c) Agencies May Also Consider The Following Factors In Deciding Whether The Use Of A Project Labor Agreement Is Appropriate For The Construction Project: (1) The Project Will Require Multiple Construction Contractors And/or Subcontractors Employing Workers In Multiple Crafts Or Trades. (2) There Is A Shortage Of Skilled Labor In The Region In Which The Construction Project Will Be Sited. (3) Completion Of The Project Will Require An Extended Period Of Time. (4) Project Labor Agreements Have Been Used On Comparable Projects Undertaken By Federal, State, Municipal, Or Private Entities In The Geographic Area Of The Project. (5) A Project Labor Agreement Will Promote The Agency S Long Term Program Interests, Such As Facilitating The Training Of A Skilled Workforce To Meet The Agency S Future Construction Needs. (6) Any Other Factors That The Agency Decides Are Appropriate. see Far Provision: 52.222-33 Notice Of Requirement For Project Labor Agreement And Far Clause 52.222-34 Project Labor Agreement For Further Details. it Is Requested That Interested Contractors Submit A Response (electronic Submission) Of No More Than Nine (9) Single Sided Pages, Single-spaced, 12-point Font Minimum That Addresses The Above Information (this Is Inclusive Of The Pla Questionnaire). This Response Must Be Submitted As A Single Application-generated (not Scanned) Pdf Document That Is Less Than Or Equal To 4mb In Size. Please Note That Hard Copies Will Not Be Accepted. Please Also Include A Cover Page, Which Includes, At A Minimum: The Company S Name, Address, Dun & Bradstreet Number, Unique Entity Identifier (if Available), Socio-economic Status, Point-of-contact Name, Phone Number, And E-mail Address. Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response. Submissions (responses) Shall Be Submitted Via Email To The Primary And Secondary Points Of Contact Listed Below By February 17, 2025 At 10:00 Am Et. No Phone Calls Will Be Accepted. the Capabilities Statement Submitted In Response To This Sources Sought Shall Not Be Considered To Be A Bid Or Proposal. This Notice Is For Information And Planning Purposes Only And Is Neither To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. No Evaluation Letters And/or Results Will Be Issued To The Respondents. After Completing Its Analyses, The Government Will Determine Whether To Limit Competition Among The Small Business Categories Listed Above Or Proceed With Full And Open Competition As Other Than Small Business. at This Time No Solicitation Exists; Therefore, Please Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released It Will Be Synopsized In Contract Opportunities At Https://sam.gov/. It Is The Potential Offeror's Responsibility To Monitor This Site For The Release Of Any Solicitation Or Synopsis. contracting Office Address: vha Program Contracting Activity Central (vha-pcac) 6100 Oak Tree Blvd. Suite 300 independence, Oh 44131 primary Point Of Contact: shardae Webb contract Specialist shardae.webb@va.gov secondary Point Of Contact: william Henkel contracting Officer william.henkel@va.gov project Labor Agreement (pla) Questionnaire (please Respond To The Questions Below) 1. Is Your Company Familiar With Project Labor Agreement (pla) And Its Use On Construction Projects? yes/no comments: 2. Would Your Company Likely Submit A Proposal For The Va Construction Solicitation That Requires The Use Of A Pla? yes/no comments: 3. If Va Requires A Pla, Would Your Proposed Construction Cost Likely To Increase Or Decrease And What Is The Likely Percentage Of Cost Increase Or Decrease? comments: 4. Does The Va Requirement To Use Of A Pla On A Construction Project Restrict Competition? yes/no comments: 5. Do You Expect Subcontractor Resistance Should Va Requires The Use Of A Pla On This Construction Solicitation? yes/no comments: 6. Do You Have Additional Comments Regarding The Use Of A Pla For This Project? comments: --- End Of Pla Questionnaire ---

National Institutes Of Health Tender

Others
United States
Closing Date24 Jan 2025
Tender AmountRefer Documents 
Description: This Is A Sources Sought Notice. This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. The Information Provided In This Notice Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. The Government Will Not Provide Debriefs On The Results Of This Research, But Feedback Regarding The Decision To Set Aside Or Not Set Aside The Procurement Will Be Accomplished Via Pre-solicitation Synopsis Or Solicitation For These Services, As Applicable. All Information Submitted Will Be Held In A Confidential Manner And Will Only Be Used For The Purpose Intended. Points Of Contact Listed May Be Contacted For The Purpose Of Verifying Performance. the Purpose Of This Notice Is To Obtain Information Regarding: (1) The Availability And Capability Of Qualified Business Sources; (2) Whether The Businesses Are Sba Certified Hubzone Small Businesses; Sba Certified 8(a) Small Businesses; Service- Disabled Veteran-owned Small Businesses; Woman-owned Small Businesses; Or Large Business And (3) The Respective Businesses Size Classification Relative To The North American Industry Classification System (naics) Code For The Proposed Acquisition. Your Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible. the Office Of Research Facilities (orf), The National Institutes Of Health (nih) Is Seeking Capabilities From All Categories Of Businesses For The Purpose Of Determining The Appropriate Level Of Competition And/or Small Business Subcontracting Goals For A New Requirement For An Indefinite Delivery Indefinite Quantity (idiq) Architect-engineer (ae) Multiple Award Task Order Contract (matoc) And A Blanket Purchase Agreement (bpa). the Ae Matoc Contract Has An Anticipated Composite Value Of $400m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Ae Matoc For The Future Professional Architect Engineering (ae) Services, As Well As Multiple Award Blanket Purchase Agreements For Other Professional Services Of An Architectural Or Engineering Nature Or Service Incidental There To (including Studies, Investigations, Surveying And Mapping, Tests, Evaluations, Consultations, Comprehensive Planning, Program Management, Conceptual Designs, Plans And Specifications,value Engineering,constructionphase Services, Soils Engineering, Drawing Reviews, Preparation Of Operating And Maintenance Manuals And Other Related Services) That Logically Or Justifiably Require Performance By Registered Architects Or Engineers Or Their Employees. All Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Small Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements. the Bpas Have An Estimated Composite Value Of $100m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Bpas For Future Other Professional Services Of An Architectural Or Engineering Nature. Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements. background: As Part Of The U.s. Public Health Service Under The Department Of Health And Human Services, Nih Is The Federal Government's Primary Biomedical Research Agency. The Nih Office Of Research Facilities (orf) Is The Steward Of Nih Facilities And Is Responsible For The Planning, Design, Construction, Acquisition, Maintenance, And Operation Of Nih Owned Facilities, Which Includes: 1) Nih Main Campus, Bethesda, Maryland 2) Nih Animal Center, Poolesville, Maryland 3) Fort Detrick Campus, Frederick, Maryland 4) Research Triangle Park, North Carolina 5) Rocky Mountain Laboratories (rml), Hamilton, Montana 6) Epidemiology & Clinical Research Branch, Phoenix, Arizona 7) Bayview Campus, Baltimore, Maryland 8) Rental Facilities Maintained By Nih description Of The Requirement: The Nih Anticipates Awarding Multiple Aematoc Awards Under A Single Solicitation Utilizing A Task Order Mechanism. Each Idiq Will Be Awarded For A Five (5) Year Performance Period With A Cumulative Maximum Not-to-exceed Dollar Amount Of $400m. the Nih Also Anticipates Awarding Multiple Bpas Under A Single Solicitation Utilizing A Call Order Mechanism. Each Bpa Will Be Awarded For A Five (5) Year Performance Period With An Estimated Dollar Amount Of $100m. the Nih Seeks Highly Qualified Credentialed Contractors With Capability To Perform The Ae Matoc And/or Bpas, Which Will Include Various Simultaneous Task Orders And/or Calls. The Selected Contractors Shall Exhibit Demonstrated Experience, Capability And Resources Enabling Them To Provide Specialized A/e Services, Commissioning Support Services, Cqm Services, And Other A/e Related Services Critical To Orf’s Success In Planning, Alteration, Renovation, And New Construction Of Nih Facilities And Associated Infrastructure For Projects Of Similar Size And Complexity With Comparable Clients, And Most Significantly With A Proven Track Record Of Performing Such Projects With A High Degree Of Customer Satisfaction. contractors Responding To This Notice To Perform The Contract As Small Business Joint Venture Shall Use The Procedure Described At The Small Business Administration (sba) Web Site. The Sba Url Is: Https://www.sba.gov/federal-contracting/contracting-assistance-programs/joint-ventures. Responding Contractors Shall Have Current Information With The System For Award Management (sam), At Www.sam.gov, And Must Not Be Excluded From Government Contract Award At The Time Of Submission. projects May Include, But Are Not Limited To The Following Areas: animal Care Facilities – To Include, But Not Limited To, Facilities For Housing, Care, And Use Of Animals In Experimental Testing, Research, And Training As Related To Biomedical Research. Animals Used At Nih For Research Include But Are Not Limited To Mammals Of All Sizes, Including Primates, And Aquatic Animals. biomedical Research Laboratory / Laboratory Facilities – To Include, But Not Limited To, General And Specialized Biomedical And Animal Research Laboratories, Laboratory Support Spaces, Laser Laboratory, And Electron Microscopes. Projects Related To Lab Facilities In This Contract Will Include General And Bio-safety Levels (bsl) -2, -3, And -4. health Care Facilities Or Hospitals – To Include, But Not Limited To, Patient Care Units, Outpatient Clinics, Intensive Care Units, Surgical Suites With Catheterization Laboratory, Radiology, Nuclear Medicine, And Mri Suites, Pharmacy, Rehabilitation, Transfusion Medicine, Cyclotron, Radiation Oncology, Medical Gas Services, Pediatrics, And Hospital Support Services. office / Public Space Facilities – To Include, But Not Limited To, Offices, Sensitive Compartmented Information Facilities (scif), Training Facilities, Conference Facilities (including Natcher Conference Center), Libraries (including The National Library Of Medicine), Child Development Centers, Residences And Lodging, Commercial Shops And Food Services, Wellness Centers And Gyms, Recreational Facilities, Facilities For Ancillary Services Such As Fire And Police, Parking Structures, And Exterior Improvements Such As Roadways, Sidewalks, And Landscaping. interior And Exterior Utility Infrastructure And Utility Generation Distribution Systems - The A/e Services Include The Design Of Interior & Exterior Utility Infrastructure And Systems For Office / Public Facilities; Animal Care Facilities; Bio-medical Research Laboratories; Healthcare /hospital Facilities; And General-purpose Facilities Such As Parking Structures And Warehouses. The Utility Interior & Exterior Infrastructure And Generation & Distribution Systems Include, But Are Not Limited, To The Following: mechanical, Electrical, And Plumbing Systems. high Voltage Electrical central Utility Plant (cup) hvac Systems To Include Specialized Filtering Requirements, Supply And Exhaust Systems And Associated Controls. steam/condensate, High Temperature Hot Water, Heating Hot Water, Chilled Water, Lab Water, High Purity Water, And Potable Water Systems. compressed Air, Medical Gas, Lab Vacuum, And Material Gas Systems. central Co2 Systems. central Liquid Nitrogen Systems. fuel Oil Systems. storm Water And Sanitary Sewer Distribution Systems. wastewater Treatment Systems. electrical Substations. landscaping Irrigation Systems. commissioning commissioning, Qualification, And Validation (cqv) historical geotechnical elevator physical Security interior / Exterior Lighting telecommunications building Envelope roofing building Model Information (bim) net Zero Emissions this Idiq Shall Support Projects In Maryland, North Carolina, And The Montana Locations. maryland Facilities Include: nih Main Campus, Bethesda, Md nih Animal Center, Poolesville, Md fort Detrick Campus, Frederick, Md bayview Campus, Baltimore, Maryland rental / Leased Facilities Maintained By Nih it Is Anticipated That A Majority Of The Facilities Under This Idiq Will Be Located On The Nih Main Campus, Bethesda, Md, Followed By The Other Surrounding Areas. Therefore, The A/e Shall Maintain An Office Within Fifty (50) Miles Of The Baltimore - Washington, Dc Metropolitan Area For The Duration Of The Idiq Contract. research Triangle Park, North Carolina for Projects In North Carolina, The A/e Shall Plan To Maintain Local Presence Within Fifty (50) Miles Of The Nih Research Triangle Park Campus For The Duration Of The Project. rocky Mountain Laboratories (rml), Hamilton, Montana for Projects In Montana, The A/e Shall Plan To Maintain Local Presence Within One Hundred (100) Miles Of The Rocky Mountain Labs Campus For The Duration Of The Project. architect / Engineer Services the A/e Shall Furnish All Labor, Management, Investigations, Studies, Travel, Supplies, Equipment, And Materials To Perform The Required Services. The A/e Is Responsible For Determining What Disciplines And Skill Sets Are Required For Accomplishing The Work And Form A Team Accordingly. in General, Pre-design And Design Phase Services Will Include, But Not Limited To: field / Site Investigations, Inclusive Of Pre-tab Investigations planning And Coordination Drawings building Information Modeling (bim) (only If Applicable To The Task Order) sustainable Design program Of Requirements (pors) special Studies schematic Design design Development construction Documents (65%) construction Documents (95%) construction Documents (100%) rendered Perspectives Of Proposed Building Construction And Substantial Site Development construction Cost Estimate(s) construction Baseline Schedule geotechnical Investigations preparation Of Reports the A/e May Be Required To Provide Construction Phase And Other Services Including, But Not Limited To: construction Bidding And Negotiation Support construction Inspections / Site Representation construction Progress Meetings requests For Information (rfis) construction Submittal Reviews change Order Reviews / Support punch Lists inspection Of Stored Items construction Close-out Support Including As-builts; Record Documents; Non-compliance Notices; Operation And Maintenance (o&m) Manuals; Warranties; Product And Equipment Demonstrations And Training. a/e Record Documents commissioning Support Services commissioning Support Services (cx) Shall Perform, But Not Limited To, The Following Tasks: review Specifications And Drawings review Submittals develop Commissioning Scripts review O & M Manuals witness Testing Of Electrical And Mechanical Systems construction Quality Management (cqm) general Project Management - To Include, But Not Limited To, Provide Administration And Management Services To Assist The Contracting Officer’s Representative (cor) In The General Day-to-day Administration Of The Overall Project. project Governance preparation And Maintenance Of A Project Management Plan (pmp) assist In The Implementation Of The Project Governance Structure reviews And Document Management monthly Reports requests For Information (rfi) submittals financial Management budget/cost Control Monitoring And Management invoices / Application For Payment Review change Order Control Process And Management estimating Services scheduling Support – Regularly Review, Analyze, And Monitor The Dbb/dbcs Performance Schedule(s), Including, But Not Limited, To The Preliminary/baseline Schedule, Critical Path Method (cpm) Construction Schedules, And Fragnets, As Required. quality Construction Management, Reviews And Administration Assistance - Shall Include Inspections, Verifications, Details Audits And Evaluations Of Materials And Workmanship Necessary To Determine And Document The Quality Of Construction. The Cqm Contractor Shall Use Its Expertise And Knowledge Of Construction Practices, Means And Methods To Execute An Effective Quality Assurance Program. potential Sources Shall Complete And Submit The Attached Forms: sources Sought - Contractor Information Form 1.1 Complete The Sources Sought – Contractor Information Form if Applicable, Interested 8(a) Small Business Firms Shall State Their Current 8(a) Certification Data With The Small Business Administration if Applicable, Interested Hubzone Small Business Firms Responding Must Provide Proof Of Their Hubzone Certification Status. certificate Of Insurance 1.2 Interested Firms May Include A Capability Statement As An Attachment To The Sources Sought – Contractor Information Form. Capability Statement Shall Be No Longer Than Ten (10) Pages. Potential Sources’ Experience Shall Demonstrate And Document The Following The Capability Statement: naics Code(s) evidence Of The Ability To Work In Occupied Space. evidence Of The Ability To Work On Multiple Projects Simultaneously. evidence Of The Ability To Perform The Work Described In The Sources Sought – Project Data Form Section Below. self-performance Capability (contractor Shall Self-perform At Least 15% Of Each Task Order). building Information Modeling (bim) Capability. leed Capabilities. 2. Sources Sought – Project Data Form 2.1 Complete The Sources Sought – Project Data Form For No More Than Five (5) Example Projects Performed Within The Last Five (5) Years, Or In Progress, Which Best Demonstrates Your Firm’s Specialized Experience Providing A/e Services On Projects Of Similar Type, Size, And Complexity To The Nih Requirement, As Defined Below. Each Completed Sources Sought – Project Data Form Shall Not Exceed Three (3) Pages And Shall Contain At A Minimum The Following Types Of Project Experience: one (1) Utility Infrastructure / Utility Generation /distribution System Projects one (1) Biomedical Research Lab; And one (1) Healthcare / Hospital Project. [note - An Indefinite Delivery Indefinite Quantity (idiq) With Multiple Task Orders Is Not Considered A Project. Each Individual Task Order Executed Under An Idiq Contract Is Considered A Project.] 2.2 Project Experience Requirements: type - Specialization Category/facility Types Such As: interior & Exterior Utility Infrastructure And Utility Generation & Distribution Systems biomedical Research Laboratory Facilities health Care Facilities office/public Space Facilities animal Care Facilities 2. Complexity - Special Design/construction Considerations Such As: physical Security Requirements adjacencies To Occupied Space(s) Restrictions/ Limitations limited Access Restrictions vibration / Noise Limitations joint Commission (for Hospitals) Requirements (i.e. Special / Interim Life Safety Measures, Construction Risk Assessments) implementing Guiding Principles For Sustainable Federal Buildings And Leadership In Energy And Environmental Design (leed) Criteria special Mep Features - I.e. Designed For Infectious Or Immune Compromised Areas Within A Hospital Space. historic Preservation Requirements storm Water Management And Erosion & Sedimentation Control use Of Building Information Modeling (bim) net Zero Emission Requirements for All Patient Care Support Spaces: Compliance With The Facilities Guidelines Institute (fgi) For Healthcare Projects And Most Current Healthcare Facility “statement Of Conditions” (sco). nih Design Requirements Manual (drm) 3. Size - Contractors Shall Have The Experience, Capability, And Resources Necessary To Perform Simultaneous/concurrent Projects Of Varying Size (between $25,000 To $20,000,000) And Complexity, As Described Above. all Qualified Interested Firms Are Requested To Submit An Electronic Copy Of Their Completed Letter Of Interest, Qualification Statement, And Capability Statement (in One Combined Pdf Format), Via Email, To The Contracting Officers, Ms. Magan Miller At: Magan.miller@nih.gov And Ms. Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. The Submission Shall Be Received On Or Before By 12:00 Noon, Est On Friday, January 24, 2025. The Email Subject Line Shall Read: Sources Sought 2025 Matoc Qualification Statement For Architect / Engineer Services. Inquiries Shall Be Submitted Via E-mail To Magan Miller At: Magan.miller@nih.gov And Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. Electronic Mail Inquiries And Submissions Will Only Be Accepted.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Others
United States
Closing Date5 Feb 2025
Tender AmountRefer Documents 
Details: Presolicitation Notice presolicitation Notice presolicitation Notice *=required Field presolicitation Notice this Pre-solicitation Notice Is Not A Request For Proposal. All Information Needed To Submit Sf330 Documents Are Contained Herein. No Additional Solicitation Package Or Technical Information Will Be Issued. project: 534-23-106 Ae Upgrade Mechanical Systems Phase 2 work Location: Ralph H. Johnson Health Care System, Charleston, Sc estimated/target Completion Period: 360 Calendar Days After Award. construction Magnitude: Between $5,000,000 And $10,000,000 naics: 541310 Architectural Services small Business Standard: $12.5 Million set-aside: 100% Service-disabled Veteran-owned Small Business (sdvosb) site Visits Will Not Be Arranged During This Phase. the Anticipated Award Date Of The Proposed A-e Contract Is On Or Before September 01, 2025. sf 330 Date Of Receipt/due Date: Interested Firms Having The Capabilities To Perform This Work Must Submit One (1) Electronic Sf330 And Attachments If Any, No Later Than (nlt) 10:00 Am (est) February 5, 2025. project Overview: provide Professional Architect/engineer (a/e) Services Necessary For A Complete Design To Replace The Main Laboratories Air Handling Unit, Correct Hvac And Mechanical Systems Deficiencies, And Provide Compliant Temperature Control And Air Change Requirements By Areas As Defined In The Limits Of Work. Additional Scope Includes Assessment And Replacement Of Isolation Exhaust Systems And Steam-to-hot Water Heat Exchangers And Associated Pumps Located In Penthouse, Specialty Clinics, And Eye Specialty Clinic. The Project Will Include Temporary Hvac Considerations And Phasing To Enable Continued Operations. sdvosb Set-aside: this Requirement Is A 100% Set-aside For Service-disabled Veteran-owned Small Businesses Under The Authority Of 38 U.s.c. 8127(d). To Be Eligible For Award The Sdvosb You Must Be Considered Small Under The Relevant Naics Code. Sdvosb Contractors Must Be Verified And Viewable In Small Business Administration Veteran Small Business Certification (vetcert) Database Https://veterans.certify.sba.gov Prior To Submission And Prior To Award Of Contract With Vaar 804.1103-70. Status As A Qualified Sdvosb Concern Is Under The Authority Of 38 Cfr Part 74 In Accordance With The Va Acquisition Regulation (vaar) Part 819. Any Person, Persons, Or Business Entity Suspected Of Misrepresenting Itself For The Purpose Of Securing A Government Contract May Be Criminally Investigated And Prosecuted For Fraud Against The United States Of America. Parties Found Misrepresenting Their Status Also Risk Debarment From Further Government Contracts. Eligible Sdvosb Concerns Must Also Be Registered At The Following Websites: system For Award Management (sam): Https://www.sam.gov/ vets100/100a Report Must Be Complete: Http://www.dol.gov/vets/vets4212.htm important Notice: Prior To Submitting A Package Under This Sdvosb Set- Aside Solicitation; Offerors Must Apply For And Receive Verification From The Small Business Administration In Accordance With 38 Cfr Part 74 And Vaar 819.70 By Submission Of Documentation Of Veteran Status, Ownership, And Control Sufficient To Establish Appropriate Status. All Offerors Are Urged To Contact The Sba And Submit The Required Documents To Obtain Verification Of Their Sdvosb Status If They Have Not Already Done So. for A Service-disabled Veteran Owned Small Business (sdvosb) To Be Considered As A Prospective Contractor, The Firm, Including Joint Ventures, Must Be Verified And Registered In The Small Business Administration Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov) And Registered In The System For Award Management (sam) Database (www.sam.gov) At Time Of Submission Of Their Qualifications. Failure Of A Prospective Sdvosb To Be Verified By The Center For Veterans Enterprise (cve) At The Time The Sf 330 Is Submitted Shall Result In Elimination From Consideration. All Joint Ventures Must Be Cve Verified At Time Of Submission And Submit Agreements That Comply With 13cfr 125.15 Prior To Contract Award. sf 330 Selection Criteria: Evaluation Of Submission Requirements And Selection Criteria Are Provided Below And Listed In Relative Order Of Importance. note: Failure To Meet An Acceptable Submission Requirements For Each Criteria Will Result In The Entire Submission Being Denied For Further Evaluation. phase 1 Submission Requirements objective Scoring: Acceptable Submissions Meets All Submission Requirements Unacceptable Submission Fails To Meet At Least One Submission Requirement specialized Experience And Technical Competence In The Type Of Work Required. submission Requirements: sf 330 Information Shall Be Provided Per The Latest Format From The Gsa Library Located At Https://www.gsa.gov/forms-library/architect-engineer-qualifications. complete Using Blocks F. And H. Of The Sf330 Form. Complete Block F. For Each Relevant Project. Complete Block H. Summary Sheet For The Offeror And Each Key Consultant; Each Summary Sheet Shall Be Not More Than One (1) Page In Length. submit No More Than Five (5) Projects Similar To Required Work In The Solicitation From The Date The Solicitation Closes To Five (5) Years Prior; at Minimum, Three (3) Projects Must Be Construction Complete Or Construction Substantially (50%+) Complete; projects/data Submitted Shall Be Projects With Total Construction Costs Of $6,000,000 And Greater; projects May Include Federal, State, Or Local Government, As Well As Private Industry Projects. Offerors Are Responsible For Providing Project Description And Applicable Information In Sufficient Detail To Permit Evaluation Of Project Relevancy Versus These Minimum Requirements. past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Work, And Compliance With Performance Schedules. submission Requirements: complete A Summary Sheet Using Block H. Of The Sf 330 Describing The Offeror S Past Performance. The Summary Sheet Shall Be Not More Than Two (2) Pages In Length. provide The Contractor Performance Assessment And Reporting System (cpars), Interim And Final Reports, For Each Submitted Federal Entity Project Under Specialized Experience Criteria, Above. If A Cpars Is Not Available, Provide A Ppq. if A Relevant Project Submitted Under Specialized Experience Criteria Does Not Have A Cpars Because It Is A Non-federal Entity Project, Provide A Past Performance Questionnaire (ppq). cpar And Ppq Reports Will Not Count Towards Page Limitations. professional Qualifications Necessary For Satisfactory Performance Of Required Services. submission Requirements: complete Using Block E. Of The Sf 330. Submit Personal Resumes And Relevant Information For Key And Responsible Personnel. Block E. Shall Be Not More Than One (1) Page In Length Per Individual. the Offeror Shall Have A Professional Engineer, Currently Registered In Any Us State Or Territory Of The United States, Knowledgeable In Their Registered Design Discipline, To Be The Lead Designer Responsible For Reviewing And Approving Design Submissions. the Offeror Shall Have A Professional Engineer, Qualified And Knowledgeable Of South Carolina State And Local Regulations, Be The Lead Designer Responsible For Reviewing And Approving Design Submissions And Facilitating Permit Documentation (depending On The Nature Of The Design I.e. Environmental, Hazardous Material Abatement, Stormwater, Etc.). key Personnel To Provide Qualifications To Meet This Criterion Include Principal(s), Project Manager(s), Key Consultants, Individuals Responsible For Implementation Of The Design Qa/qc Plan, Licensed Asbestos Inspector, Physical Security Specialist, Life Safety Specialist, And Other Individuals That Are Responsible Or Accountable For Design Submissions And Regulatory Compliance. physical Security Subject Matter Experts Shall Meet The Requirements Of Section 10.1.5 Of The Physical Security & Resiliency Design Manual. experience In Construction Period Services. submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Describes The Offeror S Performance Completing Construction Period Services (cps) For Construction For Each Submitted Project Under Specialized Experience Criteria, Above. Narrative Shall Be Not More Than Two (2) Pages In Length. capacity To Accomplish The Work In The Required Time. submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Describes The Offeror S Work Capacity. Narrative Shall Be Not More Than One (1) Page In Length. location In The General Geographical Area Of Charleston, Sc, And Knowledge Of The Locality Of The Ralph H. Johnson Va Facility: submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Describes The Offeror S Experience In The Charleston, Sc Geographical Area. Narrative Shall Be Not More Than One (1) Page In Length. the Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors: submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Discusses The Offeror S Approach. Narrative Shall Be Not More Than One (1) Page In Length. offerors Shall Complete And Submit The Following Statement In Block H. : I [signatory Authority], Of [offeror Company Or Joint Venture] Certify That The Team Proposed To Perform Under This Requirement Demonstrates The Capability Of 50% Sdvosb Performance In Compliance Of 48 Cfr 852.219-10 . phase 2 Evaluation Of Selection Criteria specialized Experience And Technical Competence In The Type Of Work Required. basis Of Evaluation: specialized Experience Pertains To The Types, Size, Volume, Budget, And Complexity Of Work Previously Or Currently Being Performed By The Offeror That Is Comparable To The Work Covered By This Solicitation. Specialized Experience May Also Include Unique Conditions, Considerations, Or Circumstances Encountered That Are Relevant To This Solicitation. specialized Experience Does Not Include Overseas Offices For Projects Outside The United States, Its Territories, Or Possessions; Nor Does It Include Subsidiaries That Are Not Normally Subject To Management Decisions, Accounting, And Policies, Or A Holding Or Parent Company Or An Incorporated Subsidiary That Operates Under A Firm Name Different From The Parent Company. technical Competence Includes Construction And Design Projects Similar In Project Scope, Size, Construction Features, Dollar Value, And Complexity Of That Listed In The Solicitation. Technical Competence Also Includes Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. similar Complexity Is Considered Projects Of An Operational, Construction, Or Design Likeness To The Work Covered In The Solicitation. specific Emphasis Of Experience And Technical Competence Shall Be Geared Towards Fire Protection, Seismic Design/retrofit, Physical Security Resilience And Design, Healthcare Design/planning, Building Automatic System Design, And Mechanical/electrical System Design. past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Work, And Compliance With Performance Schedules. basis Of Evaluation: past Performance Is A Measure Of The Degree To Which An Offeror Satisfied Its Customers Needs And Requirements And Compliance With Applicable Codes, Standards, Laws, And Regulations. The Evaluation Of Past Performance Will Include But Is Not Limited To: the Customer S Assessment Of The Offeror's Commitment To Customer Satisfaction; timely Delivery Of Quality Work; the Offeror's Record Of Conforming To Contract Requirements And Applicable Codes, Standards, Laws, And Regulations; successful Implementation Of A Quality Control Plan And Quality Control Procedures; addressing Design Errors/omissions Timely; adherence To Approved Schedules; And, history Of Timely And Professional Communication And Cooperative Behavior. include Information On Problems (errors/omissions) Found, How The Problems Were Corrected, And The Impacts To The Successful Completion Of The Project (time Delays, Cost Impacts, Design Modifications, Etc.). provide Information Supporting Favorable Cost Control, Quality Of Design Submissions, And Schedule Compliance. include A Discussion On The Offeror S Record Of Significant Claims For Improper Or Incomplete Design Services. higher Ratings May Be Given For Work Performed On Va Medical Center Campuses. adjectival Rating: offeror Risks Receiving A Lower Rating If Fewer Than Three (3) Ppqs Are Provided Or If The Ppqs Were Not Completed By Project Point Of Contact. failure To Demonstrate Proven Competence To Perform Projects With Similar Requirements To The Requirements Of The Solicitation May Be Considered Ineligible For Award. if No Cpars Or Ppqs Are Submitted Or Responses To Requests Were Not Provided, The Rating Shall Not Be Higher Than Satisfactory . professional Qualifications Necessary For Satisfactory Performance Of Required Services. basis Of Evaluation: evaluation Of Professional Qualifications Will Include But Is Not Limited To The Subjective Assessment Of The Offeror's Individual Resumes. the Offeror Shall Describe And/or Depict Which Projects And How Well Key Personnel Of The Design Team Have Worked Together. higher Ratings For This Criterion May Be Given When The Offeror's Specific Personnel Demonstrate Relevant Credentials, Such As Involvement And Degree Of Involvement In Professional Organizations, Research/publications, Code/standard Body Involvement, Etc. adjectival Scoring: offerors Unable To Demonstrate Professional Qualifications Necessary To Perform Designs May Be Considered Ineligible For Award. experience In Construction Period Services. basis Of Evaluation: experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates Shall Be Included As An Evaluation Criterion When Construction Period Services Is Included In The Statement Of Work For A-e Services. evaluation Of The Offeror S Knowledge, Skills, And Abilities To Complete Necessary Cps To Support Successful Project Completion. provide A Narrative Describing The Below Services, But Not Limited To: professional Field Inspections, Both Scheduled And Emergent; maintaining A Comprehensive Submittal Log Inclusive Of Material Data, Shop Drawings, Certifications, Etc.; review Of Construction Submittals For Design Conformance, Variance, And Applicable Code/standard Compliance; providing Timely And Complete Responses To Requests For Information; providing Supporting Documentation (statements Of Work, Cost Estimates, Technical Reports, Etc.) For Construction Modifications; providing Record Drawing Documentation; process For Correcting Design Errors/omissions Identified During Construction; And, other Requirements Defined Under Cps In The Statement Of Work. capacity To Accomplish The Work In The Required Time. basis Of Evaluation: identify The Offeror S Past, Present And Projected Future Workload, Including Va Contracts Over The Previous 12 Months. describe The Offeror S Capacity To Incorporate This Solicitation S Work While Meeting Prescribed Dates For Current Workload. Each Key Team Member To Include % Of Available Capacity To Take On New Projects. evaluation Of This Factor Will Be An Assessment Of The Offeror S Ability To Complete Design Documents Within The Period Of Performance And Meet Solicitation Requirements. data Is Acceptable In Tables Or Charts. capacity < 25% Shall Be Rated Not Greater Than Satisfactory. higher Ratings May Be Given For This Criterion When Information Provided Exceeds The Minimum Requirements. location In The General Geographical Area Of Charleston, Sc, And Knowledge Of The Locality Of The Ralph H. Johnson Va Facility: basis Of Evaluation: offerors Will Be Subjectively Evaluated Based On Their Knowledge (and The Knowledge Of Subcontractors) Of Unique Conditions Or Variables, Such As Familiarity Of Applicable Codes, Regulations, Construction Market & Labor Conditions, Geotechnical, Seismic, Weather, Environmental, Or Other Unique Considerations Found In Charleston, Sc And The Low Country Geographical Area. if Prior Experience In Charleston, Sc Is Minimal, Describe How The Design Team Plans To Obtain Specific Knowledge Of Local Conditions Or Project Features Required For A Compliant Design. data From Other Projects And Locations Are Acceptable To Highlight Knowledge Of The Charleston, Sc Geographical Area Or Areas Of Similar Nature. adjectival Scoring: offerors That Submit Relevant Projects Outside Of The Charleston, Sc Geographical Area May Be Given A Lower Rating Than Projects Within The Charleston, Sc Geographical Area. offerors That Demonstrate No Experience In The Geographical Area Shall Be Rated Not Higher Than Satisfactory . the Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors: basis Of Evaluation: offerors Shall Be Evaluated Based On Their Utilization Plans For Service-disabled Veteran-owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs), Or Other Types Of Small Businesses. offerors Shall Be Evaluated On The Expected Amount Of Work Versus Key Personnel To Verify The Above Signatory Statement. If Less Than 50% Of Work Is Estimated To Be Performed By The Prime Sdvosb, The Offeror May Be Given A Lower Rating. offerors Shall Submit Qualifications For Proposed Consultants Per Other Criteria In This Solicitation. selection Process: federal Acquisition Regulation (far) Part 36.6 (brooks Act) Selection Procedures Apply. The A-e Services Listed Herein Is Being Procured In Accordance With The Brooks Act (public Law 92-582) As Implemented In Federal Acquisition Regulation (far) 36.6 And Vaar 836.6. Pursuant To Far, The Firm Responding To This Requirement Must Be Permitted, By Law, To Practice The Professions Of Architecture Or Engineering And Meet All Required Qualifications For The State Of South Carolina. Firms Responding To This Announcement By Submitting A Qualifying Sf 330, Before The Closing Date And Time, Will Be Considered For Initial Selection Evaluation. Following Initial Evaluation Of The Sf330s Received Three Or More Firms That Are Considered The Most Highly Qualified To Provide The Type Of Services Required Will Be Selected For Interviews. Selected Firms Will Be Notified By Email Of Selection And Provided Further Instructions. selection And Evaluation Of Firms Shall Be Made Based On Sf 330 Submissions And Direct Responses To The Selection Criteria Identified Herein. Failure To Address All Selection Criteria Will Result In A Decreased Rating. evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, And Contracting Officer Knowledge Of Current Project Performance. Failure To Provide Requested Data, Accessible Points Of Contact Or Valid Phone Numbers Could Result In A Firm Being Removed From Consideration. firms That Design Or Prepare Specifications In Conjunction With This Contract Are Prohibited From Participating On Any Future Construction Contracts Based On Those Documents. All Projects Identified On The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. submission Criteria/requirements: The Sf 330 Form May Be Downloaded From Http://www.gsa.gov/portal/forms/type/sf. Completed Sf 330 S Shall Include The Primary Firms, Subcontractor Firms And Any Consultants Expected To Be Used On The Project. Do Not Submit Information Incorporating By Reference. Prospective Firms Shall Address All Selection Criteria Factors Within Their Submitted Sf330 Packages. email Capacity Is Limited To Five (5) To Seven (7) Megabytes (megs). the Following Format Shall Be Used: cover Page With Solicitation Number, Project Title table Of Contents sf 330 S copy Of Current A/e License copy Of Current Vetbiz.gov Sdvosb Certification uei Number cage Code tax Id Number the E Mail Address And Phone Number Of The Primary Point Of Contact. all Sf330 Submittals And Questions Must Be Sent Electronically To The Attention Of Jennifer Smith, Contract Specialist At Jennifer.smith19c497@va.gov. Please Provide Pre-solicitation Number, Project Number, Project Title, And Firm Name In Subject Line Of Email. When Submitting Sf330s, If More Than One Email Is Sent, Please Number Emails In Subjects As 1 Of N . Submittals Received After The Date And Time Identified On Page One (1) Will Not Be Considered. Firms Not Providing The Required Information May Be Negatively Evaluated. Facsimile Submittals Will Not Be Accepted. All Information Must Be Included In The Sf330. the Sf-330 Including Title Page, Table Of Contents, And Any Other Relevant Information Shall Be In A Common Font Size 12 Font, Single Spaced. The Package Shall Be Submitted As A Single Application-generated (not Scanned), Searchable Pdf Document. A Page Is Defined As Each Face Of An 8.5 X 11-inch Sheet Of Paper Containing Information. it Is The Offeror S Responsibility To Check The Sam.gov Contracting Business Opportunities Website At: Www.sam.gov For Any Revisions To This Announcement Prior To Submission Of Sf330s. attachments: see Attached Document: Ae Past Performance Questionnaire And Cover Letter.
861-870 of 888 archived Tenders