DEPT OF THE AIR FORCE USA Tender
Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents
Details: The 764 Ess Contracting Squadron At Ramstein Afb, Germany Is Issuing This Sources Sought To Conduct Initial Market Research Efforts In Support Of The Reprocurement Of Bos Services. Information Submitted Will Be Used To Identify Capable, Experienced And Resourced Service Providers Experienced In Delivering The Services Discussed In Detail Below. Additionally, The Information Collected Will Guide The Development Of New Contract Language, Work Statements, Required Reporting, Performance Standards And Product Segmentation Strategies disclaimer: In Accordance With Far 15.201(e) And Far 52.215-3, Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. This Rfi Does Not Commit The Government To Contract For Any Supply Or Service And Your Response To This Opportunity Will Not Be Used As A Proposal. No Entitlement To Payment Of Direct Or Indirect Costs, Or Charges To The Government Will Arise Because Of A Contractor's Response. naics Code: 561210 – Facilities Support Services the Government Anticipates That North American Industry Classification System (naics) Code 561210, With A Small Business Size Standard Of $41.5m Will Apply; However, No Set-aside Determination Has Been Made By The Government At This Time. The Government Is Interested In Responses From All Businesses To Include Large Business, Small Business, Small Disadvantaged Businesses, 8(a)s, Service-disabled Veteran-owned Small Businesses, Hub Zone Businesses, And Women-owned Small Businesses. The Government Requests That Interested Parties Respond To This Notice And Identify Their Business Size Status Under The Identified Naics Code. customer/mission: Hq Usafe-afafrica, Headquartered At Ramstein Air Base, Germany, Is A Major Command (majcom) Of The United States Air Force (usaf). It Is Also The Air Component For Two Department Of Defense (dod) Unified Combatant Commands -- Useucom, Which Serves The U.s. Component Of The North Atlantic Treaty Organization (nato), And Usafricom, Which Oversees Security Cooperation Programs That Assist African Nations In Building Their Own Security Capacity. The Commander Of Usafe-afafrica Is Responsible For Delivering Full-spectrum Options To Each Of The Combatant Commanders; Leading And Supporting Joint, Coalition, Nato, And Warfighting Headquarters Operations; And Promoting Regional Stability Through Focused Theater Engagement. As Part Of This Mission, Usafe-afafrica Trains And Equips Usaf Units And Maintains Combat-ready Wings Based From Great Britain To Turkyie In Support Of Useucom. Usafe-afafrica Plans, Conducts, Controls, Coordinates And Supports Air And Space Operations In Europe And Parts Of Asia And Africa To Achieve U.s. National And Nato Objectives. The Command's Inventory Of Aircraft Is Ready To Perform Close Air Support, Air Interdiction, Air Defense, In-flight Refueling, Long-range Transport And Support Of Maritime Operations. As The Air Component Of Usafricom, Usafe-afafrica Protects And Defends The National Security Interests Of The United States By Strengthening The Defense Capabilities Of African States And Regional Organizations And, When Directed, Conducts Military Operations, To Deter And Defeat Transnational Threats And To Provide A Security Environment Conducive To Good Governance And Development. background: For Over 25 Years, The Usaf Has Relied On A Single-service Provider To Perform Critical Facilities/installation Maintenance And Mission Support Functions For Dod And Usaf Installations In Turkiye And Spain. Base Operating Support (bos) Services For Installations In Turkyie And In Spain Are And Have Historically Been Under A Single Contract And Pws. This Acquisition Strategy Is Administratively Burdensome And Overly Complex. For The Uabos Follow On Reprocurement, The Government Will Re-examine This Acquisition Strategy And The Contract Structures Historically Used. The Government Seeks Responses From Industry Partners That Can Fullfill The Requirements In Total, And Also Seek Responses From Industry Partners, Including Local Vendors In Turkyie And Spain, That Can Support Portions Of The Requirement. currently, Services Under The Uabos Contract Include Requirements That Fall Into The Following Categories: usaf Civil Engineer Related Services program Management/strategic Planning/resource & Optimization/maintenance Of Real Property Records engineering Design operations And Maintenance Of Facilities, Airfields, Utility And Sanitation Systems, Fresh-water Systems, Electrical Distribution And Hvac Systems, Equipment And Electronics Maintenance airfield Lighting And Maintenance Of Fuel Distribution And Grounding Systems custodial Services refuse Collection And Disposal pest/vector Control grounds Maintenance/ Street And Airfield Sweeping fire And Emergency Services Including Structural And Aviation Crash Rescue force Support Services full Food Service/dining Hall Operations maintenance And Operation (m&o) Of Recreational Facilities Including Gyms, Libraries, Gold Courses, Bowling Centers, Lodging Services, Managing Intramural And Sports Programs us Postal Service Operations usaf Logistics Support Services distribution Of Goods And Personnel transportation Services, Shuttle Bus And Taxi Services, Fleet Transportation vehicle Maintenance, Maintenance, Vehicle And Special Equipment Operations And Maintenance, Us Air Aircraft Supply Chain Services, Warehouse And Storage Operations, Base Supply Accountability Functions, Management, Storage And Distribution Of Ppe operations, Management And Maintenance Of War Reserve Material transient Alert Services tool Control, Fod Management And Airfield Operations management, Maintenance And Operations Of Aerospace Ground Equipment cryogenics, Non-destructive Inspection, Acft Crash Recovery communications/it Support operate, Maintain, Manage Computer Informational Systems safety, Occupational Health, Industrial Hygiene & Ambulance Services medical Maintenance Operations Maintenance Services purpose/response Format: The Government Is Currently Reviewing Various Aspects Of Prior Acquisition Strategies. We Are Seeking Submissions From Vendors That Can Provide All The Services Outlined Above And From Vendors Capable Of Providing Discreet Areas Of The Current Requirement. Local Vendors In Both Spain And Türkiye Are Encouraged To Respond And Identify Which Discreet Services They Are Capable And Experienced In Providing. for Firms Capable Of Providing All Services, We Are Seeking Input From Service Providers Experienced In Performing Contracts In An Overseas/oconus Environment And Capable Of Managing A Functionally Diverse, Predominately Local National Workforce Providing The Services Described Above. interested Sources Should Complete The Information Shown Below *there Are No Page Limits* And Email The Responses To Ms. Shannon Kennedy-butler, Contracting Officer And Mr. John Mclaurin Contracting Officer. The Contracting Officers Are The Only Government Authorized Points Of Contact For This Sources Sought; All Correspondence Must Be Directed Only To Them 1. Company Information a. Name, Cage Code And Duns Code For The Company Business Size. Please Identify Any Applicable Socio-economic Status. b. Are You A Subsidiary Of A Larger/parent Business? (name If Applicable) c. How Many Employees Do You Have, Including Any Subsidiaries? d. Capability Information/history In The Industry/market To Which You Are Responding e. Point Of Contact, Phone, And E-mail For Individual Responsible For Finalizing Time, Duration And Digital Forum Requirements. 2. Matrix Document: The Government Has Attached A Sources Sought Matrix Spreadsheet With A Series Of Questions The Government Seeks Industry Input To. Industry’s Responses To This Sources Sought Shall Include Responses To The Attached Matrix.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents
Details: Synopsis: introduction: in Accordance With Federal Acquisition Regulation (far) 10.002(b)(2), This Sources Sought Notice Is For Market Research And Information Purposes Only At This Time And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs (va). the Department Of Veterans Affairs, Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Is Conducting A Market Survey And Is Seeking Potential Sources For The Ehrm Infrastructure Upgrades At The Fayetteville Va Medical Center Located In Fayetteville, Ar. project Description: this Project Will Replace The Entire Information Technology (it) Infrastructure On Campus, Including But Not Limited To, New Telecommunication Rooms, Fiber Optics (interior And Exterior), Building A New Stand-alone Data Center, Re-cabling All Telecommunications Cabling With Cat6a, And Supporting Electrical And Hvac Infrastructure. procurement Information:
the Proposed Project Will Be A Competitive, Firm-fixed-price Contract Utilizing The Design-bid-build Approach (final Specifications And Drawings Will Be Provided). The Anticipated Solicitation Will Be Issued Either As A Request For Proposal (rfp) In Accordance With Far Part 15, Considering Technical And Price Factors Or As An Invitation For Bid (ifb) In Accordance With Far Part 14, Considering Price Only. The Results And Analysis Of The Market Research Will Finalize The Determination Of The Procurement Method. The Type Of Socio-economic Set-aside, If Any, Will Depend Upon The Responses To This Notice And Any Other Information Gathered During The Market Research Process. this Project Is Planned For Advertising In Mid To Late-march 2025. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $20,000,000.00 And $50,000,000.00 (note That The Vaar Magnitude Of Construction Is Closer To The Lower End Of This Range). The North American Industry Classification System (naics) Code 236220 (size Standard $45.0 Million) Applies To This Procurement. The Duration Of The Project Is Currently Estimated At 365 Calendar Days From The Issuance Of A Notice To Proceed. The Services For This Project Will Include Providing All Construction Related Services Such As: Providing Labor, Materials And Equipment Required To Complete The Project As Per Contract Documents Prepared By An Independent Architect-engineer Firm. capability Statement:
respondents Shall Provide A General Capabilities Statement To Include The Following Information: section 1: Provide Company Name, Duns Number And Unique Entity Identifier (uei), Company Address, Point-of-contact Name, Phone Number And Email. section 2: Provide Company Business Size Based On Naics Code 236220. Also, Provide Business Type (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-owned Small Business, Hub Zone Small Business, Etc.). section 3: Provide A Statement Of Interest In The Project. section 4: Provide The Prime Contractor S Available Bonding Capacity In The Form Of A Letter Of Intent From Your Bonding Company With This Submission. *please Ensure That The Individual Bonding Capacity Is In Line With The Vaar Magnitude Of Construction Listed Above. section 5: Provide The Type Of Work Your Company Has Performed In The Past In Support Of The Same Or Similar Requirement. This Section Is Important As It Will Help To Determine The Type Of Socio-economic Set-aside, If Any. Please Provide The Following In Your Response: no More Than Three (3) Contracts That Your Company Has Performed Within The Last Seven (7) Years That Are Of Comparable Size, Complexity, And Scope To This Requirement. Include The Project Name, Project Owner And Contact Information As This Person May Be Contacted For Further Information, Project Scope, Project Size (example: Square Footage), Building Use (example: Medical Facility, Office Building, Etc.), Project Dollar Value, Start And Completion Dates. provide Specific Examples That Relate Aspects Of Previous Projects To The Proposed Project. Describe Specific Technical Skills And Key Personnel Your Company Possess To Perform The Requirements Described Under Description Of Work.
describe Your Self-performed** Effort (as Either A Prime Or Subcontractor). Describe Self-performed Work In Terms Of Dollar Value And Description. **self-performed Means Work Performed By The Offeror Themselves, Not Work Performed By Another Company For Them For Any Of The Project Examples Provided.
it Is Requested That Interested Contractors Submit A Response (electronic Submission) Of No More Than Nine (8) Single Sided Pages, Single-spaced, 12-point Font Minimum That Addresses The Above Information (this Is Inclusive Of The Pla Questionnaire). This Response Must Be Submitted As A Single Application-generated (not Scanned) Pdf Document That Is Less Than Or Equal To 4mb In Size. Please Note That Hard Copies Will Not Be Accepted. Please Also Include A Cover Page, Which Includes, At A Minimum: The Company S Name, Address, Dun & Bradstreet Number, Unique Entity Identifier (if Available), Socio-economic Status, Point-of-contact Name, Phone Number, And E-mail Address. Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response. Submissions (responses) Shall Be Submitted Via Email To The Primary And Secondary Points Of Contact Listed Below By 27 January, 2025 At 3:00 Pm Et. No Phone Calls Will Be Accepted. the Capabilities Statement Submitted In Response To This Sources Sought Shall Not Be Considered To Be A Bid Or Proposal. This Notice Is For Information And Planning Purposes Only And Is Neither To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. No Evaluation Letters And/or Results Will Be Issued To The Respondents. After Completing Its Analyses, The Government Will Determine Whether To Limit Competition Among The Small Business Categories Listed Above Or Proceed With Full And Open Competition As Other Than Small Business. at This Time No Solicitation Exists; Therefore, Please Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released It Will Be Synopsized In Contract Opportunities At Https://sam.gov/. It Is The Potential Offeror's Responsibility To Monitor This Site For The Release Of Any Solicitation Or Synopsis. contracting Office Address: vha Program Contracting Activity Central (vha-pcac)
6100 Oak Tree Blvd. Suite 300
independence, Oh 44131 primary Point Of Contact:
mario Hairston
contract Specialist
mario.hairston@va.gov secondary Point Of Contact:
scott Elias
contracting Officer
scott.elias@va.gov project Labor Agreement (pla) Questionnaire
(please Respond To The Questions Below) 1. Is Your Company Familiar With Project Labor Agreement (pla) And Its Use On Construction Projects? yes/no comments: 2. Would Your Company Likely Submit A Proposal For The Va Construction Solicitation That Requires The Use Of A Pla? yes/no comments: 3. If Va Requires A Pla, Would Your Proposed Construction Cost Likely To Increase Or Decrease And What Is The Likely Percentage Of Cost Increase Or Decrease? comments: 4. Does The Va Requirement To Use Of A Pla On A Construction Project Restrict Competition? yes/no comments: 5. Do You Expect Subcontractor Resistance Should Va Requires The Use Of A Pla On This Construction Solicitation? yes/no comments: 6. Do You Have Additional Comments Regarding The Use Of A Pla For This Project? comments: --- End Of Pla Questionnaire ---
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+1Building Construction
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents
Details: Introduction
network Contracting Office 1 (nco 1), Supporting Va New England Healthcare System (visn 1) And The Va Boston Healthcare System (hcs) Is Seeking Potential Sources For An Upcoming Requirement As Described In The Attached Statement Of Work For The Project; Upgrade Visn 1 Laundry Building 45. This Notice Is Not A Request For Proposals. This Notice Is A Market Research Tool And Has Not Been Set-aside For Any Small Business Category, However The Notice Is Issued To Determine Appropriate Set-aside Categories. Responses To This Notice, In Conjunction With Other Government Market Research Resources, Will Be Used By The Contracting Officer To Determine The Applicable Socio-economic Set-aside For The Procurement.
the Purpose Of This Notice Is To Determine If There Are Qualified Sdvosbs Or Vosbs, Wosbs, And Small Businesses That Have The Experience With This Type Of Work And If Such Firms Are Interested In This Procurement. Once The Appropriate Set-aside Is Determined, A Separate Public Announcement Requesting Bids Or Proposals Will Be Publicized On Sam.gov Contract Opportunities In Accordance With 40 U.s. Code § 1101 And Far 36.601. The Solicitation Is Estimated To Be Released In March 2025.
general Project Description, Magnitude, And Naics
the Va Boston Hcs In Brockton, Ma, Requires A Contractor To All Labor, Equipment, Materials And Supervision For The Renovation And Improvements Of The Visn 1 Laundry, Building 45 For Veterans Affairs Medical Center, Brockton, Massachusetts In Accordance With Contract Documents. the Renovation Includes Selective Demolition Of All Existing Mechanical, Electrical And Plumbing (mep) Systems, Selective Demolition Of Existing Finishes, Doors, Structural Slab, And Other Existing Items. The Renovation Also Includes The Construction Of Structural Improvements, Doors, Electrical Systems, Hvac Systems, Plumbing Systems, Start-up Of Previously Installed Elevator By Renovating Associated Electrical And Mechanical Components, And Interior And Exterior Finishes. In Addition To The Renovation, The Improvements To Building 45 Include Ensuring Exterior Envelop Around Doors, Windows, And Stair Towers Along With Any Penetrations Are Sealed Properly. Moreover, Renovation Includes Construction Of A Service Platform And Stairs For Dedicated Emergency Generator System. The Focus Of The Project Is To Provide Structural Slab Repairs And Replacement To Sustain Required Laundry Equipment Loads And Vibrations.
this Project Also Requires Specialized Personnel, With Specified Experience, To Assist In The Cqc System Manager For The Following Areas, As Applicable: Electrical, Mechanical, Civil, Structural, Environmental, Architectural, Materials Technician Submittals Clerk, Commissioning Agent/leed Specialist, And Low Voltage Systems. These Individuals Or Specified Technical Companies Are Directly Employed By The General Contractor And Cannot Be Employed By A Supplier Or Subcontractor On This Project; Be Responsible To The Cqc System Manager; Be Physically Present At The Construction Site During Work On The Specialized Personnel S Areas Of Responsibility; Have The Necessary Education Or Experience In Accordance With The Experience Matrix Listed Herein. These Individuals Can Perform Other Duties But Need To Be Allowed Sufficient Time To Perform The Specialized Personnel S Assigned Quality Controls Duties As Described In The Cqc Plan. A Single Person Can Cover More Than One Area Provided That The Single Person Is Qualified To Perform Qc Activities In Each Designated And That Workload Allows. experience Matrix
area qualifications
civil
graduate Civil Engineer Or Construction Manager With 2 Years Experience In The Type Of Work Being Performed On This Project Or Technician With 5 Years Related Experience.
mechanical
graduate Mechanical Engineer With 2 Years Experience Or Construction Professional With 5 Years Of Experience Supervising Mechanical Features Of Work In The Field With A Construction Company.
electrical
graduate Electrical Engineer With 2 Years Related Experience Or Construction Professional With 5 Years Of Experience Supervising Electrical Features Of Work In The Field With A Construction Company.
structural
graduate Civil Engineer (with Structural Track Or Focus), Structural Engineer, Or Construction Manager With 2 Years Experience Or Construction Professional With 5 Years Experience Supervising Structural Features Of Work In The Field With A Construction Company.
architectural
graduate Architect With 2 Years Experience Or Construction Professional With 5 Years Of Related Experience.
environmental
graduate Environmental Engineer With 3 Years Experience.
submittals
submittal Clerk With 1 Year Experience.
concrete, Pavement, And Soils
materials Technician With 2 Years Experience For The Appropriate Area.
testing, Adjusting, And Balancing (tab)
specialist Must Be A Member Of Aabc Or An Experienced Technician Of The Firm Certified By The Nebb.
design Quality Control Manager
registered Architect Or Professional Engineer the Estimated Magnitude Of This Construction Project Is Between $5,000,000.00 And $10,000,000.00. This Information Is Provided Per Vaar 836.204. The Naics Code Is 236220 And The Small Business Size Standard Is $45 Million. Interested Parties Should Indicate Their Interest To Kyle Kiepke No Later Than 4:00 Pm Est Friday, January 17, 2025, Via Email At Kyle.kiepke@va.gov.
information Sought
a) Sam Unique Entity Id (uei) b) Bonding Capability; Per Contract And Aggregate. Provide Amount Of Aggregate Bonding Currently Available (i.e., Amount Not Committed). c) Experience. Submission Of A Maximum Of Three (3) Recent And Relevant Examples Of Completed Or Substantially Completed (eighty Percent (80%)) Projects Between $5,000,000.00 And $10,000,000.00, Of Similar Scope To The Upgrade Visn 1 Laundry Building 45 Project. relevant Experience Shall Include Repair And Strengthening Of Existing Heavy Load-bearing Reinforced Concrete Structural Elements (such As Beams, Columns, Slabs, And Foundations) And Structural Framing In Already Completed Building, Cast In Place Concrete (to Include Footing, Pier And Foundation Installation), Reinforced Cmu Wall Installation, Concrete Beam Enlargement, Epoxy Injection Crack Repair, Slab Repair, Underside Slab Repair, And All Other Work Similar In Scope. Recent Is Defined As Completed Within The Last Five (5) Years. submission Instructions interested Firms Shall Hold Active Sam Registration. Visit Www.sam.gov To Register In This Database. sdvosb Or Vosb Firms Shall Be Certified By Veterans Small Business Certification (vetcert) (veterans Small Business Certification (sba.gov).
all Information Must Be Submitted In Sufficient Detail For A Decision To Be Made. Failure To Submit All Information Requested In Addition To The Below Form May Result In A Contractor Not Being Considered As An Interested Concern. If Adequate Interest Is Not Received By 4:00 Pm Est On December 1, 2024, This Action May Not Be Set-aside For Sdvosbs, Vosbs, Wosbs, Or Small Business Firms. Interested Firms Must Reply Via E-mail To Kyle.kiepke@va.gov With The Subject Attention: 36c24125r0008 - Upgrade Visn 1 Laundry Building 45 . disclaimer this Sources Sought Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Request That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Notice.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Closing Date28 Jan 2025
Tender AmountRefer Documents
Description: Sources Sought Notice sources Sought Notice page 6 Of 6
sources Sought Notice
*= Required Field
sources Sought Notice page 1 Of 6
this Request For Information Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. this Is A Request For Information (rfi)/sources Sought Notice (ss), This Is Not A Request For Quotes (rfq) Or Request For Proposals (rfp). No Formal Solicitation Document Exists At This Present Time. This Is Not A Solicitation Announcement. The Purpose Of This Sources Sought Notice Naics 339113 - Surgical Appliance And Supplies Manufacturing Psc 6530 Hospital Furniture, Equipment, Utensils, And Supplies Naic Size Standard Of 800 Employees For The Beckley Vamc. responses To This Sources Sought Notice Will Be Utilized By The Government To Make Appropriate Acquisition Decisions. After Review Of The Responses To This Sources Sought Notice, A Solicitation Announcement May Or May Not Be Published In Sewp, Fedbizopps (fbo) Or Gsa Ebuy. requested Information responses To This Sources Sought Notice Shall Also Include: Company Name, Address, Point Of Contact, If Applicable Contract Number, Product Brochures, Place Of Manufacturer, Naic/psc Codes, Sam Uei Number, And Business Size. If Vendor Is Interested And Capable, And Can Provide The Required Product/service, Please Provide The Requested Information For Questions 1-15 As Indicated Below: is This Service/product Priced On Vendor S Gsa/sewp/fss/nac/sac Contract? Yes/no
if Yes, Provide Vendor Government Contract Number Or Leave Blank?
is This Service/product Open Market Pricing? Yes/no
is Open Market Priced Online? Yes/no
provide Vendor S Business Size Status And Representations Naic And Psc Code?
does Vendor Have Capability, Product, And Interest For Brand Name Patient Lift System End Item Product Requirement? Yes/no
does Vendor Have Capability, Product, And Interest Of An Equal Patient Lift System End Item Product? Yes/ No
if Equal Product End Item; Provide Equal Product Name/model/ Product Brochure/ Specification Sheet/warranty/life Expectancy/maintenance Requirements Information. where Is Brand Name End Item Patient Lift System Product Place Of Manufacturer,- Complete Table Below?
where Is Equal End Item Patient Lift System Product Place Of Manufacturer- Complete Table Below?
is Interested Vendor Lg/sb/sdvosb/vosb (which Bs) Manufacturer Or (which Bs) Authorized Distributor Of An Equal Domestic Patient Lift System End Item Product?
is Interested Vendor Lg/sb/sdvosb/vosb (which Bs) Manufacturer Or (which Bs) Authorized Distributor Of Brand Name A Domestic Patient Lift System End Item Product?
is Interested Vendor Lg/sb/sdvosb/vosb (which Bs) Manufacturer Or (which Bs) Authorized Distributor Of Nondomestic Patient Lift System Brand Name End Item Product?
is Interested Vendor Lg/sb/sdvosb/vosb (which Bs) Manufacturer Or (which Bs) Authorized Distributor Of Nondomestic Patient Lift System Equal End Item Product?
provide 2024 Signed Copy Authorized Distributor Letter If Vendor Is Not The Manufacturer. sow
general Information
brand Name Sow Patient Lift System Install/deinstall Or Equal Purchase And Authorized Installer Requirement minium Technical Requirement 2.7.1. Fixed Ceiling Lift
2.7.1.1. Manual Traverse 2.7.1.2. Lift Motor: 24 Volt
2.7.1.3. Lift Capacity At Least 600 Lbs
2.7.1.4. Unit Weight Max 45 Pounds 2.7.1.5. The Patient Lift Unit Must Be Able To Collect And Report The Following Data At Each Lcd Display Unit:
2.7.1.5.1. Lift Life Total Count
2.7.1.5.2. Total Number Of Load Weighing More Than 330lbs
2.7.1.5.3. Number Of Lifts In The Last 7 (seven) Days
2.7.1.5.4. Average Number Of Lifts Per Week
2.7.1.6. The Patient Lift Unit Must Also Be Able To Report The Following Additional Safety / Maintenance Data Via Usb Connection To A Laptop / Tablet:
2.7.1.6.1. Lifting Strap Life Total Count
2.7.1.6.2. Critically Low Battery Life Count 2.7.1.6.3. The Total Number Of Weightings
2.7.1.6.4. Total Lifting Time
2.7.1.7. Software Transfer Data Must Operate With Va Existing It Infrastructure. (laptop / Tablet Usb/cord Connection Solution). 2.7.1.8. Wi-fi Compatibility Will Not Be Required In Any Patient Ceiling Lift.
2.7.1.9. Requires Emergency Stop Function
2.7.1.10. Requires Emergency Lowering Capability
2.7.1.11. Requires Manual Lowering Capability
2.7.1.12. Rails Must Provide Continuous In-rail Charging
2.7.1.13. Lifts Must Be Safe For Bathroom Use
2.7.1.14. Requires Integrated Compatible Scale Module
2.7.1.15. Requires Lowest Position To Reach The Floor
minimum Technical Requirement 2.7.2. Bariatric Ceiling Lift 2.7.2.1. Manual Traverse 2.7.2.2. Lift Motor: 24 Volt
2.7.2.3. Lift Capacity At Least 1000 Lbs
2.7.2.4. Unit Weight Max 45 Pounds 2.7.2.5. The Patient Lift Unit Must Be Able To Collect And Report The Following Data At Each Lcd Display Unit:
2.7.2.5.1. Lifts Total Count
2.7.2.5.2. Total Number Of Load Weighing More Than 330lbs
2.7.2.5.3. Total Count Of Lifts In The Last Seven Days
2.7.2.5.4. Average Count Of Lifts Per Week
2.7.2.6. The Patient Lift Unit Must Also Be Able To Report The Following Additional Safety / Maintenance Data Via Usb Connection To A Laptop / Tablet:
2.7.2.6.1. Lifting Strap Life
2.7.2.6.2. Critically Low Battery Life Count 2.7.2.6.3. The Total Weightings Count
2.7.2.6.4. Total Lifting Time/hours
2.7.2.7. Software Transfer Data Must Operate With Va Existing It Infrastructure. (laptop / Tablet/cord/ Usb Connection Solution). 2.7.2.8. Wi-fi Compatibility Will Not Be Required In Any Patient Ceiling Lift.
2.7.2.9. Requires Emergency Stop Function
2.7.2.10. Requires Emergency Lowering Capability
2.7.2.11. Requires Manual Lowering Capability
2.7.2.12. Rails Must Provide Continuous In-rail Charging
2.7.2.13. Lifts Must Be Safe For Bathroom Use
2.7.2.14. Must Include Integrated Scale 2.7.2.15. Must Be Able To Reach The Floor In Its Lowest Position
2.7.3. Accessories / Supplies
2.7.3.1. Disposable Slings One Of Each Size (m, L, Xl, Bariatric, Repositioning, Limb) For Each Installed Lift.
2.7.3.2. Reusable Slings (m-8 Qty, L-8 Qty, Repositioning-22 Qty)
2.7.3.3. Tracks/rails For Each Lift
2.8.1.1.1. Phased Installation/destination Delivery Throughout The Hospital To Minimize Patient Impact. Vendor To Coordinate With Cor For Room Downtimes And Access. 2.8.1.2. Travel Cost And Time
2.8.1.3. Inspection Of Existing Rails And Correction Of Any Deficiencies 2.8.1.4. Provide Structural Support Calculations For Each Room/lift System
2.8.1.5. Ceiling Lift Installation And Certification
2.8.1.5.1. To Be Completed In Accordance With Va Installation Or Relocation Checklist For Ceiling Mounted Patient Lifts (attached)
2.8.1.6. Vendor Must Follow All Vha Infection Control Risk Assessment (icra) And Vha Pre-construction Risk Assessment (pcra) Protocols. 2.8.1.6.1. This Will Include But Will Not Be Limited To: 2.8.1.6.1.1. Hepa Filters, Hvac Isolation, Block Off/seal Air Vents, And Sticky Mats At The Entrance Of Work Site
2.8.1.6.1.2. Specific Requirements To Be Determined Post-award On A Room By Room Basis. 2.8.1.7. Vendor Is Responsible For All Incidental Drywall Repairs, Repainting Of Walls That Is Required To Install Structural Supports
2.8.1.8. Vendor Is Responsible For Running Additional Electrical Lines As Necessary. 2.8.1.9. Va Electricians Will Handle Lock Out Tag Out Procedures For Any Existing Lines. 2.8.1.10. Vendor Is Responsible For Deinstall For Existing Equipment Removal Of Existing Lift Systems, Tracks, And Etcc That Is Being Replaced On 6 Floors.
2.8.1.11. Vendor Shall Destination Deliver All Equipment And Track Equipment To The Beckley Vamc When The (1st-6th Floors) Sites Are Ready For Installation.
2.8.1.12. Vendor Is Responsible To Track And Manage Equipment Until It Is Fully Operational And Installed.
2.8.1.16. The Vendor Shall Remove All Related Shipping Debris And Packing From The Va Facility. 2.8.1.17. Vendor Delivery Shall Be Completed With Cor Approval Between 8:00 A.m. And 3:30 P.m. Monday Friday. All Federal Holidays Are Excluded. 2.8.1.18. Vendor Delivered Materials To Job In Manufacturer's Must Be In Original Sealed Containers With Po Number On The Outside Of Box.
2.8.1.19. Vendor Is Responsible For Package Damage Or Deterioration During Shipment, Handling, Storage, And Until Fully Operational Installation. 2.8.1.20. Vendor Is Responsible To Store Products In Dry Condition Inside Enclosed Facilities Until Ready For Delivery And Install. line Itemâ no.
country Of Origin
â
â
â
â
â
â notes all Capability Statements And Responses Rfi Questions In This Sources Sought Notice Shall Be Submitted Via Email Stephanie.henderson3@va.gov Telephone, Fax, Or Any Other Form Of Communication Inquiries Will Not Be Reviewed Or Accepted In Response To This Sources Sought Notice. Responses To This Sources Sought Notice Must Be Received No Later Than 1/28/25 At 1:00 P.m. (eastern Standard Time). This Sources Sought Notice Is To Assist The Va In Determines Sources Only. A Solicitation Is Not Currently Available. If A Solicitation Is Issued, It May Or May Not Be Announced At A Later Date, And All Interested Parties Shall Respond To That Solicitation Announcement Separately From The Responses To This Sources Sought Notice. disclaimer this Request For Information (rfi) Is Issued For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Rfi That Is Marked A Proprietary Will Be Handled Accordingly In Accordance With (iaw) Federal Acquisition Regulation (far) 15.201(e), Rfis May Be Used When The Government Does Not Presently Intend To Award A Contract, But Wants To Obtain Price, Delivery, Other Market Information, Or Capabilities For Planning Purposes. Responses To These Notices Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Incurred Associated With Responding To This Rfi. end Of Notice
DEPT OF THE ARMY USA Tender
Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
United States
Closing Date14 Jan 2025
Tender AmountRefer Documents
Details: The Nevada Air National Guard, 152nd Mission Support Group Contracting Office 1776 National Guard Way Reno Nv 89502 Is Issuing This Sources Sought Synopsis As A Means Of Conducting Market Research To Identify Potential Sources Having An Interest And Industry Technologies Available To Support/provide Professional Artchitect-engineering Services (title I) Necessary To Develop A New Design For The Construction Of The Fuel Cell Hangar At The Nevada Air National Guard Base, Reno, Nv. the Result Of This Market Research Will Contribute To Determining The Method Of Procurement, If A Requirement Materializes. Based On The Responses To This Sources Sought Notice/market Research, This Requirement May Be Set-aside For Small Businesses (in Full Or In Part) Or Procured Through Full And Open Competition. Multiple Awards May Be Made. All Small Business Set-aside Categories Will Be Considered. Telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Submissions. disclaimer this Sources Sought Is For Informational Purposes Only. This Is Not A Request For Proposal (rfp) To Be Submitted. It Does Not Constitute A Solicitation And Shall Not Be Construed As A Commitment By The Government. Responses In Any Form Are Not Offers And The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. No Funds Are Available To Pay For Preparation Of Responses To This Announcement. Any Information Submitted By Respondents To This Technical Description Is Strictly Voluntary. objectives Of The Sources Sought understand The Level Of Interest And Availability Of Potential Vendors That Could Provide The Requested Design Solution. identify Issues, Roadblocks, And Barriers To Successful Solution Implementations. obtain Vendor Feedback On If The Vendor Will Utilize Any Subcontractors Or Teaming Arrangements. identify If A Total Solution Can Be Provided Via Open Market Contractors. provision Of Other Benefits Of Leveraging A Turnkey Solution. comments Regarding Any Ambiguities Or Needed Clarifications Of The Draft Technical Specifications. obtain Vendor Feedback On Any Other Pre-existing Contracts That Might Meet This Need. program Background the Fuel Cell Hangar Was Designed In 1997 And Was Constructed In 1999 To Support C-130 Aircraft Maintenance Operations. Since 1997, The Authorized Square Footage (sf) For A C-130 Fuel Cell Hangar Has Increased Due To Safety Requirements, Maintenance Procedures, And Airframe Size. Per Current Ufc, The Buffer Zone Around The Aircraft Nose And Wingtip Is 15 Feet. Currently, The Clearanace At The Nose Is 9 Feet While The Clearance In Front Of The Engines Are 10 Feet To The Nearest Structure. The Fuel Cell Hangar Primarily Supports Two Aircraft Maintenance Functions, Maintenance Dock, And Corrosion Control. The Fuel Cell Maintenance Dock Currently Operates At 83% Of The Authorized Sf. To 1-1-691, Requires Aircraft Be Washed Every 180 Days And At Completion Of An Isochronal Inspection (iso). Aircraft Washing Is Crucial For Nevada’s Aircraft Due To The Fire-retardant Chemical That Is Utilized As Part Of The Modular Airborne Fire Fighting System (maffs). Insufficient Sf In The Maintenance Dock Doesn’t Allow For Ground Cleaning Equipment To Transition Around The Aircraft Without Placing The Main Hangar Door In The Open Position. During The Winter Months, The Open Hangar Door Allows For Freezing Rain And Snow To Deposit On The Maintenance Dock Floor Creating A Safety Hazard And An Extremely Cold Work Environment. Corrosion Control Operates At 55% Of The Authorized Sf. This Sf Shortfall Forces Equipment And Aircraft Parts Be Stored In The Paint And Media Blasting Preparation Area. Equipment And Parts Are Constantly Relocated Outside Of The Facility, Or Placed On The Maintenance Dock Floor To Allow Access To The Preparation Area. Additionally, The Primary Media Blasting Room Is Currently Inoperable Due To A Risk Assessment Code (rac) For Improper “dirty/clean” Transition Zones Per Ufc 4-211-02. All Media Blasting Is Currently Performed In Smaller Self-contained Blasting Cabinets. The Blasting Cabinets Only Accommodate Smaller Parts And Require Additional Operating Space For Parts Handling And Circulation. required Capabilities the Government Requires Designs For The Construction Of A New Fuel Cell/corrosion Control Facility Utilizing Conventional Design And Construction Methods To Accommodate The Mission Of The 152nd Aircraft Maintenance Group. Facilities Will Be Designed As Permanent Construction In Accordance With The Dod Unified Facilities Criteria (ufc) 1-200-01, General Building Requirements And Ufc 1-200-02, High Performance And Sustainable Building Requirements. Provide Reinforced Concrete Foundation And Floor Slab With Steel Framed Walls And Roof Structure. Include Fire Suppression, Hvac And Electrical Distribution. Exterior Work Includes Pavements, Utilities, Drainage, And Communication Support. Air Conditioning 12 Tons.the A-e Is Responsible For Determining What Disciplines And Skill Sets Are Required For Accomplishing The Work And Form A Team Accordingly. The A-e Will Need To Work Extensively To Ensure Understanding And Compliance With All Federal, State, And Local Codes, Criteria, And Permitting Requirements. The A-e Must Accomplish The Required Services And Furnish To The Government Reports And Other Data Together With Supporting Material Developed During The Period Of Performance As Set Forth Herein. The A-e Must Provide Services To The Government During Solicitation And Construction Of The Project As They Pertain To Correcting Ambiguities, Errors, Deficiencies, And Omissions In The Design. special Requirements any Resulting Contract Shall Be Compliant With The Specialty Metals Restriction Of The Berry Amendment (10 U.s.c. 2533a And 2533b) In Accordance With Dfars Clauses 252.225-7008 And 252.225-7009. eligibility the Applicable Naics Code For This Requirement Is 541330 With A Small Business Size Standard Of $25.5m. Large And Small Businesses Interest Is Being Requested. The Product Service Code (psc) Is C211. submission Details interested Businesses Should Submit A Brief Capabilities Statement Package (no More Than Ten 8.5 X 11 Inch Pages, Font No Smaller Than 10 Point) Demonstrating Ability To Provide The Products/systems Listed In This Technical Description. Documentation Should Be In Bullet Format. No Phone Or Email Solicitations With Regards To The Status Of The Rfp Will Be Accepted Prior To Its Release. your Response To This Sources Sought, Including Any Capabilities Statement, Shall Be Electronically Submitted To The Contracting Officer, Alex Norris, In Either Microsoft Word Or Portable Document Format (pdf), Via Email Alex.norris@us.af.mil No Later Than 1:00 P.m. Pdt On 14 January 2025 And Reference This Synopsis Number In Subject Line Of E-mail And On All Enclosed Documents. Information And Materials Submitted In Response To This Request Will Not Be Returned. Do Not Submit Classified Material. if Your Organization Has The Potential Capacity To Provide The Required Products/systems, Please Provide The Following Information: 1) Organization Name, Address, Primary Points Of Contact (pocs) And Their Email Address, Fax, Web Site Address, Telephone Number, And Type Of Ownership For The Organization; And 2) Tailored Capability Statements Addressing The Requirements Of This Notice, With Appropriate Documentation Supporting Claims Of Organizational And Staff Capability. If Significant Subcontracting Or Teaming Is Anticipated In Order To Deliver Technical Capability, Organizations Should Address The Administrative And Management Structure Of Such Arrangements. all Data Received In Response To This Sources Sought That Is Marked Or Designated As Corporate Or Proprietary Will Be Fully Protected From Any Release Outside The Government.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Civil Works Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents
Description: Project Labor Agreements (pla S) Survey And Request For Contractor Capability Statement Package this Is A Sources Sought Notice For Market Research Only. no Award Will Be Made From This Sources Sought Notice. this Sources Sought Notice (ssn) Is For Market Research Purposes In Accordance With Federal Acquisition Regulation (far) Part 10 And Far 15.201(e), To Determine The Availability And Technical Capabilities Of Qualified Sources. It Does Not Constitute A Solicitation And Is Not To Be Considered As A Commitment By The Government. All Firms Responding To This Notice Are Advised That Their Response To This Notice Is Not A Request That Will Be Considered For Contract Award. All Interested Parties Will Be Required To Respond To The Resultant Solicitation Separately From Their Response To This Notice. jefferson Barracks National Cemetery,
sylvan Springs, Phase 1a Expansion project Scope the U.s. Department Of Veterans Affairs (va) Seeks Expressions Of Interest For A Construction Contract At Jefferson Barracks National Cemetery, Sylvan Springs, Phase 1a Expansion With The Use Of A Project Labor Agreement (pla). The North American Industry Classification System (naics) Of 237990 (other Heavy And Civil Engineering Construction) With The Size Standard Of $45.0 Million. The Approximate Project Duration Will Be 912 Calendar Days From The Notice To Proceed. The Estimated Magnitude For This Project Is Between $50,000,000 And $100,000,000. Va Is Considering Conducting This Acquisition As A Best Value With Tradeoffs In Accordance With Far Part 15, Contracting By Negotiation. project Description:
the Purpose Of This Phase 1a Expansion Project For Jefferson Barracks National Cemetery Is To Enable The Existing National Cemetery To Continue To Provide Burial Services For Eligible Veterans In Missouri. Jefferson Barracks National Cemetery Is Located Near St. Louis, Missouri. the National Cemetery Administration (nca) Contracted This 33.6-acre Cemetery Expansion Project To Increase Burial Capacity Of Jefferson Barracks National Cemetery (jbnc) To Serve Veterans In The St. Louis Area. This Cemetery Expansion Project Identified On New Land. The Proposed Development Will Provide Continued Service To An Estimated Fiscal Year (fy) 2024 Veteran Population Of Approximately 208,000 Within A 75-mile Service Area. This Proposed Development Will Provide An Additional 15 Years Of Continued Burial Service To A Veteran Population Who Has Been Served By This National Cemetery Since 1827. this Project Will Provide For An Additional 15-year Inventory Of The More Efficient Casketed, Double-depth, Pre-placed Crypts Before Depletion Of The Current Inventory, And Extend The Full Range Of Burial Options Until Fy 2044, As Well As Provide Several Nominal Cemetery Operational And Infrastructure Improvements Within The Older Cemetery Grounds. this Project Will Provide For The Following Elements And Features: base Bid General Construction: the Base Bid Work Of This Contract Includes Phased Requirements. These Phases Are Referred To As Eto And Remainder Of The Work. The Eto Shall Be Completed Within The Established Time Frame Indicated In The Contract. Completion Of The Eto Work Will Follow Procedures Like Those For Final Completion And Acceptance, With The Facilities Within The Eto Being Completed And Turned Over To The Cemetery For Use To Begin Operation Of The Cemetery While The Remaining Work Is Completed. Eto Shall Be Completed And Accepted By Nca For Operation Within 252 Calendar Days From Notice To Proceed. While The Work Of The Eto Is Being Performed, Work For The Remainder Of The Project Can Also Be Performed. work Of The Contract Includes Site Demolition, General Construction, Relocation And Installation Of New Site Utilities, Installation Of Pre-placed Burial Crypts, Columbarium Niches, Roadway Improvements, New Roads, Walks, Grading, Drainage, Site Furnishings, Landscaping And Irrigation Necessary Removal Of Existing Structures And Construction And Certain Other Items And All Other Work Necessary To Construct The Project. The Contractor Shall Obtain State/local Construction Permitting As Required And Conduct All Protected Habitat Preservation, Wetlands, And Mitigation Efforts As Required To Meet Governing Body Mandates. By The End Of The Performance Period All Work Shall Be Satisfactorily Completed And Ready For Custody, Transfer, And Acceptance By Nca. All Punch List Items Shall Be Satisfactorily Addressed, All Commissioning Completed, And All Training Accomplished. replace And Upgrade Carpeting And Painted Finishes In The Administration/ Pic Building. Replace Select Electrical Service Panels In Maintenance Buildings 3001, 3002, And 3003. interment Areas: casketed Remains: a) Approximately 18,500 Pre-placed Crypt Full Casket Gravesites
b) Approximately 2,100 Traditional Casket Gravesites cremated Remains: a) Approximately 10,900 In-ground Cremation
b) Approximately 5,000 Columbarium Niches base Bid Furnish Pre-placed Crypts: procure, Manufacture, Deliver, Off-load And Store Furnish And Deliver To The Site All Pre-placed Crypts. additive Items Subject To Budget Adequacy: additive #1 Maintenance Yard: install Maintenance Storage Yard And Associated Site Work, Including But Not Limited To Pavements, Curbs, Drainage, Fencing And Gates, Signage, Landscaping, And Irrigation. additive #2 Storage Building: install Maintenance Material Storage Building Including But Not Limited To Sitework, Pavements, Curbing, Concrete Foundations, Concrete Walls, Structural Steel, And Standing Seam Metal Roofing. additive #3 Satellite Maintenance Building: install Satellite Maintenance Building And Associated Site Work Including But Not Limited To Sitework, Utilities, Concrete Foundations, Concrete Slab, Engineered Metal Building, Hvac System, Concrete Masonry Walls, Metal Wall Panels, Standing Seam Metal Roof, Doors, Windows, Interior Finishes, Landscaping, Irrigation, Signage And All Other Work Necessary To Construct The Building. additive #4 Demolish/replace Committal Shelter #4: demolish And Replace Committal Shelter #4(in Main Cemetery) Along With Associate Sitework, Concrete Foundations, Concrete Piers, Curbs, Paving, Standing Seam Metal Roof, Landscaping, Irrigation, Site Furniture And Signage. --- End Of Project Scope --- project Labor Agreement (pla): a Pla Is Defined As A Pre-hire Collective Bargaining Agreement With One Or More Labor Organizations That Establishes The Terms And Conditions Of Employment For A Specific Construction Project And Is An Agreement Described In 29 U.s.c. 158(f). federal Acquisition Regulation (far) 22.503 Policy: (a) Project Labor Agreement (pla) Is A Tool That Agencies May Use To Promote Economy And Efficiency In Federal Procurement. Pursuant To Executive Order 13502, Agencies Are Encouraged To Consider Requiring The Use Of Project Labor Agreements In Connection With Large-scale Construction Projects. (b) An Agency May, If Appropriate, Require That Every Contractor And Subcontractor Engaged In Construction On The Project Agree, For That Project, To Negotiate Or Become A Party To A Project Labor Agreement With One Or More Labor Organizations If The Agency Decides That The Use Of Project Labor Agreements Will- (1) Advance The Federal Government's Interest In Achieving Economy And Efficiency In Federal Procurement, Producing Labor-management Stability, And Ensuring Compliance With Laws And Regulations Governing Safety And Health, Equal Employment Opportunity, Labor And Employment Standards, And Other Matters; And (2) Be Consistent With Law. (c) Agencies May Also Consider The Following Factors In Deciding Whether The Use Of A Project Labor Agreement Is Appropriate For The Construction Project:
(1) The Project Will Require Multiple Construction Contractors And/or Subcontractors Employing Workers In Multiple Crafts Or Trades.
(2) There Is A Shortage Of Skilled Labor In The Region In Which The Construction Project Will Be Sited.
(3) Completion Of The Project Will Require An Extended Period Of Time.
(4) Project Labor Agreements Have Been Used On Comparable Projects Undertaken By Federal, State, Municipal, Or Private Entities In The Geographic Area Of The Project.
(5) A Project Labor Agreement Will Promote The Agency S Long Term Program Interests, Such As Facilitating The Training Of A Skilled Workforce To Meet The Agency S Future Construction Needs.
(6) Any Other Factors That The Agency Decides Are Appropriate.
see Far Provision: 52.222-33 Notice Of Requirement For Project Labor Agreement And Far Clause 52.222-34 Project Labor Agreement For Further Details. project Labor Agreement (pla) Questionnaire
(please Respond To The Questions Below) 1. Is Your Company Familiar With Project Labor Agreement (pla) And Its Use On Construction Projects? yes/no comments: 2. Would Your Company Likely Submit A Proposal For The Va Construction Solicitation That Requires The Use Of A Pla? yes/no comments: 3. If Va Requires A Pla, Would Your Proposed Construction Cost Likely To Increase Or Decrease And What Is The Likely Percentage Of Cost Increase Or Decrease? comments: 4. Does The Va Requirement To Use Of A Pla On A Construction Project Restrict Competition? yes/no comments: 5. Do You Expect Subcontractor Resistance Should Va Requires The Use Of A Pla On This Construction Solicitation? yes/no comments: 6. Do You Have Additional Comments Regarding The Use Of A Pla For This Project?
yes/no comments:
--- End Of Pla Questionnaire --- contractor Capability Statement Package:
firms Interested In Submitting Their Capabilities For This Project Must Include The Following Information Compiled Into A Contractor Capability Statement Package: cover Letter/introduction That Includes Company Name, Address, System For Award Management Database At Https://www.sam.gov/portal/sam Sam.gov Unique Entity Id Numbers, Point Of Contact With Phone Number And E-mail Address. business Size Determination. State Your Firm S Socioeconomic Type And Business Size: Such As (service-disabled Small Business, Veteran Owned Small Business, Small Business, Woman Owned Small Business, Large Business, Etc.). if Identifying As A Service-disabled Veteran-owned Small Business (sdvosb) Firm (or Jv), Veteran Owned Small Business Firm (vosb) (or Jv), You Must Be Registered In The U.s. Small Business Administration Veterans Small Business Certification (vetcert) Database At: Https://veterans.certify.sba.gov. Provide Evidence Of Certification. bonding Capacity: provide A Letter From Your Surety, On Surety Letterhead That Affirms Your Company S Bonding Capacity To Furnish A Bid Bond, Payment Bond, And Performance Bond For A Project Between $50 - $100 Million. contractor Capability Statement Shall Include, But Not Be Limited, To The Following: corporate Experience: provide Projects In The Past Five (5) Years That Are Valued At Approximately $30m Or Greater In Construction Costs, And
demonstrate Your Company S Experience Constructing Or Managing The Construction Of Projects That Match The Following Characteristics: a. Va/nca National Cemetery Projects. (if No National Cemetery Experiences Provide Projects Similar Such As Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres). b. State/local/private Cemetery Projects.
c. Projects Requiring The Construction Of Multiple Features Typical To A National Cemetery Such As Pre-cast, Placed Crypts; Columbaria Niches, Memorial Walls, Cast Or Natural Stone Columbarium Caps, Cast Or Natural Stone Veneers, Turf (sod) Placement And Maintenance, Tree And Shrub Placement And Maintenance, Irrigation Systems With Mainlines Exceeding 4-inch In Diameter, Irrigation Central Control Systems, Roadways, Wetlands/environmental Remediation Or Restoration. d. Building Construction, Building Remodel, Mass/fine Grading & Excavation, Site Utilities, Paving, New Golf Courses Or Expansions, Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres. describe Your Experience With As Many Of The Elements Of Construction Identified, Below, As You Can:
i. Mass/fine Grading & Excavation Site Utilities
prefer To See Projects Involving Earth Work And Grading For Cemeteries, Parks, Or Site Development Projects Of At Least 10 Acres. ii. Site Utilities
demonstrate Experience With Storm Water Management Systems And Site Drainage For Flat Sites.
demonstrate Experience With Potable Water Distribution From A Well, Or Municipal Source.
demonstrate Experience With Sanitary Waste Systems, Both Powts & Municipal.
iii. Paving
paving Projects May Include Private & Local Asphalt Roads; Concrete Curb & Gutter, Asphalt Parking Lots, And Concrete Sidewalk, On Site Development Projects Of At Least 10 Acres. experience In Missouri Or Similar Climates Is Preferred, But Not Required.
iv. Landscaping
landscaping Projects Involving Planting And Lawn Installation For Cemeteries, Parks, Golf Courses Or Other Site Development Projects Of At Least 10 Acres In Climates Similar To St. Louis, Missouri. v. Irrigation
irrigation System Installation For Cemetery, Park, Golf Course, Or Other Types Of Development Sites Of At Least 10 Acres. Include Experience With Irrigation Ponds, Wells, Pumping Systems If You Have It.
vi. Precast Concrete Burial Components
demonstrate Experience With Successful Fabrication And Installation Of Precast Crypt And Precast Columbarium, If You Have It. vii. Phasing And Continuity Of Operations
demonstrate Experience With Best Practices To Successfully Complete Phased Site Work At An Occupied And Functioning Facility In A Way To Minimize Noise And Dust And Minimize Detrimental Effects On Cemetery Operations. current Project List: provide A Detailed List Of Ongoing Contracts & Projects. The Description Shall Include: project Type
award Amount
award Date estimated Completion Date
---- End Of Contractor Capability Statement Package --- please Submit Your Comments To The Pla Questionnaire And The Contractor Capability Statement Package Via Email To Joshua Gibson, Contracting Officer, At Joshua.gibson2@va.gov, No Later Than 3:00 Pm Et On January 6, 2025, In The Subject Line State Jefferson Barracks National Cemetery, Phase 1a Expansion And [company Name]". Note That This Mailbox Will Only Accept E-mails Of 15mb In Size Or Smaller, So You May Break Your Submission Into Multiple Emails If Needed. All Information Concerning This Requirement, When It Proceeds To Solicitation, Will Be Posted Only On The Federal Business Opportunities Website (https://sam.gov). --- End Of Sources Sought Notice ---
PUBLIC BUILDINGS SERVICE USA Tender
Others
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents
Details: 47pb0024r0049amendment 007 amendment 7 Will Attach Three Documents. Attachment 127 Is The Updated Rfi Spreadsheet. Look Specifically At The Last Tab Dated 12/17/2024 For Responses To Various Offeror's Questions.attachment 128 Will Replace Attachment 26 A.0 Sow Cmc Houlton Lpoe Final 2024 08 02 And Is Titled As "128. A.0 Sow Cmc Houlton Lpoe Final Revised 2024 12 17." Note That The Cover Page Incorrectly Still Shows The Previous Date Of August 2, 2024. Attachment 129 Will Replace Attachment 77. Exhibit D 2325-gsa-houlton Me Lpoe_design Options By Specifically Updating Page 2 And Page 3 In Item 77. It Will Be Added As Attachment 129. Exhibit D 2325-gsa-houlton Me Lpoe_design Options. As A Reminder, Amendment 6 Stated Which Attachments Were Deleted (78 Through 94) As Those Are The Updated Files That May Have Been Duplicated. We Are Not Be Reloading Any Of Those Files That Replaced The Deleted Files. 47pb0024r0049amendment 006 the Contracting Officer Has Approved An Extension To January 16, 2025, 2:00 Pm Est For Receipt Of Proposals. The Following Changes Have Been Made: Attachments 78 Through 94 Have Been Deleted In Their Entirety And Replaced With Updated Attachments From The Final Concept Development Documents. The Following Attachments Were Updated And Numbered 99 Through 102; 104 Through 108a; 110 Through 123; And 125 Through 129.specifically, Attachment 126. Houlton Lpoe Cmc Rfi Tracker Sheet Is Updated Through December 6, 2024 Only As Shown Under The Last Tab Of That Document.access To These Documents Will Be Contained Through The Google Drive: Houlton Cmc Secure Documents That May Have Been Granted To Offerors If Already Requested. If You Have Not Completed A Form B And Cbp Nda Form, Please Do So Access Can Be Provided To These Documents.
if You Have Any Problems With Access, Please Contact Paul Murphy At Paul.murphy@gsa.gov. 47pb0024r0049amendment 005 the Contracting Officer Has Approved An Extension To December 12, 2024, 2:00 Pm Est For Receipt Of Proposals.additionally, Attachment 99. Houlton Lpoe Cmc Rfi Tracker Sheet 2024 11 22 Is Provided As The Government Response To Additional Comments/question By An Offeror And Hereby Shared With All Offeror's. 47pb0024r0049amendment 004 the Contracting Officer Has Approved An Extension To December 5, 2024, 2:00 Pm Est For Receipt Of Proposals. 47pb0024r0049amendment 003 added Attachments 33. A.7 Gsa P-100 2021 With 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix V10
cmc 2021, 58. Gsa Program Development Study 100% Pds Report 2021 02 08 (559), And 69. Roof Moisture Analysis Report
houlton 2020 06 23 (22) Did Not Get Posted On 10/04/2024. They Are Added Under Amendment 0003. additionally, Attachment 98. Rfi Site Visit Tracker Is Provided As The Government Response To Rfi By Offerors. 47pb0024r0049amendment 002 added Attachment 72 Final Houlton Pre-proposal Meeting Presentation 2024 10 10. A Courtesy Copy Was Sent Via Email To People That Were On The Invitation List Even If They Did Not Attend The Individual Meetings. It It Attached Here So All Contractors, Whether They Requested Attendance Or Not, Will Know Of The Discussions. added Clarifying Price Proposal Language Below: under Volume Ii - Price Proposal - Part 3 - Price Proposal "other Than Certified Cost And Pricing Data" Documentation. Uniformate Ii Classification Framework. under Volume Ii - Price Proposal
(1) Contents
· Price Proposal On Sf-1442 (signed) â Solicitation, Offor, And Award. The Price Proposal Shall Consist Of The Sf-1442 And The Agreement. Indicate The Total Contract Price From The Completed Contract Price Form In Block 17 Of The Sf 1442, Which Must Be Fully Executed By The Offeror.
· A Completed Contract Price Form Included As Part Of The Sf-1442 And In Section Ii Of The Agreement.
· Other Than Certified Cost And Pricing Dataâ Documentation. Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). note: The Price Proposal Must Be Separately Bound From The Phase Ii Technical Proposal. iv.l. Requiring Certified Cost Or Pricing Data [15.403-4] iv.l.a. Far 52.215-20 Requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021), Alternate Iv (oct 2010)
(a) Submission Of Certified Cost Or Pricing Data Is Not Required.
(b) Provide Data Described Below: Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). added Attachment 75 Presolicitation In Sam 2024 08 27. added Attachment 76 Pre-proposal Site Visit Attendance Sheet 2024 10 17 added Attachments 77 - 94 Provide Additional Design Information As Requested.
77 Exhibit D_2325-gsa-houlton Me Lpoe_design Options; 78 Exhibit D.1_lpoe Houlton Concept Development Design Package; 79 Exhibit E_ Lpoe Houlton Concept Development Calculation Package; 80 Exhibit E.1_mpbroof Structure; 81 Exhibit F_mep Basis Of Design Narrative; 82 Exhibit G_mep Concept Development Design Alternates; 83 Exhibit G.1 Mepfp Equipment; 84 Exhibit H_houlton Lpoe_facade Options & Ira Lec Materials_concept Development Memo; 85 Exhibit J Houlton Leed Nc Scorecard; 86 Exhibit J.1_gsa Sustainable Buildings_checklist; 87 Exhibit J.2_conceptdevelopmentenergyanalysisnarrative; 88 Exhibit U_(cui) Houlton Me Dbt_msr_fsl; 89 Exhibit V_houlton Lpoe Pre-renovation Rbm Survey Report 2024-06-25; 90
exhibit X_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 91 Exhibit Y_flood Level Diagram From 2024-07-02_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 92 Exhibit Z_(cui) Passwords; 93 Exhibit Aa_national Operational Excellence Checklists_concept Development; And 94 Exhibit Bb_houlton Me Lpope_concept Development Specifications Table Of Contents. several Required A Completed Form B Under Attachment 5 And A Completed Cbp Nda Authorization Letter Signed For Access. If You Have Alreadysubmitted These To The Contracting Officer Prior To October 24, 2024, Just Email Again For Access. note: The Facade - Precast Panels And Terracotta Rainscreen - Colors Will Be Selected In The Next Phase By The Architecture Engineering (ae) Design Firm Marvel Architectures. Additionally, Hvac - Vrf, The A/e Will Select The Vendor That Meets Most Of The Gsa Requirements (hvac And Controls). added Attachment 95 Ira Program Construction Solicitation Desk Guide - Dated October 1, 2024. This Is A Revision
of Any Previous Construction Solicitation Desk Guide That Provides Guidance For Ira-funded Construction Projects
that Contain Low Embodied Carbon (lec) Materials, Including Pre-solicitation, Solicitation, And Agreement Guidance,
evaluation Factor Requirements, Review And Approval Requirements, And Post-award Requirements. It Also Includes
standard Scope Of Work Language For Actions Related To The Construction Project (design Services, Cma, And Cxp
services) For Lec Materials, High Performance Green Buildings, And Emerging And Sustainable Technology Projects. added Attachment 96 Houlton Lpoe Cmc Rfi Tracker Sheet 2024 10 23 - Conference Rfis Containing Questions
asked By Offeror's And Official Government Responses For The Pre-proposal Conference Only. added Attachment 97 Solicitation Document L - Uniformat Ii - Level 3 Detail Reference Guide Reference Above In
pricing Information Area. 47pb0024r0049amendment 001 the Following Changes Were Made Effective On 10/08/2024: a. Replaced 5. Form B - Request For Construction Documents 2024 10 04 With 5. Form B - Request For Construction Documents 2024 10 08 And Unlocked It. b. Replaced6. Cbp Non-disclosure Agreement Form 2024 10 04 With6. Cbp Non-disclosure Agreement Form 2024 10 08 And Unlocked It. c. Replaced 7. Pre-proposal Conference R1 2024 10 04 With 7. Pre-proposal Conference R1 2024 10 08 Which Provides The Following Clarification: 1. Thepre-proposal Conferencewill Be Held Virtually Onoctober 10, 2024 At 10:00 Am. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 18, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About October 25, 2024. d. Replaced 8. Pre-proposal Site Visit R1 2024 10 04 With Attachment - 8. Pre-proposal Site Visit R1 2024 10 08 Which Provides The Following Clarification: 1. The Site Visitwill Be Held Onoctober 17, 2024 At 1:00 Pm. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 25, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About November 1, 2024. e. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. f. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement Casb Ds-1 Omb Form Number 0348-0051 a. The Corrected Proposal Due Date Is Thursday, November 21, 2024. this Is A Construction Manager As Constructor (cmc) / Construction Manager As Risk (cmar) Services For U.s. Customs And Border Protection (cbp) Land Port Of Entry (lpoe) At Houlton, Maine. The Cmc/cmar Services Is For The Facilities Repair And Alterations Project And Includes Requirements For Design Phase Services And Construction Phase Services. design Phase Services Will Be Awarded On A Firm-fixed Price Basis. Construction Phase Services Will Be Awarded With A Guaranteed Maximum Price (gmp). This Project Is Part Of The Bipartisan Infrastructure Law (bil) And Is Also Targeted For Inflation Reduction Act (ira) Funding. this Solicitation Sets Forth Requirements For Proposals For A Contract To Construct The Project Described In The Solicitation Documents. Proposals Conforming To The Solicitation Requirements Will Be Evaluated In Accordance With The Method Of Award Set Forth Herein. the Government Will Award The Contract To The Selected Offeror, Subject To The Conditions Set Forth Herein. the Offeror's Proposal Submitted In Response To This Solicitation Shall Constitute A Firm Offer. No Contract Shall Be Formed Unless And Until The Contracting Officer Has Countersigned The Sf 1442 Submitted By An Offeror And Delivered Back To The Contractor, A Copy Of The Sf 1442 With Original Signatures Together With The Agreement Reflecting The Offeror's Proposed Prices. offers Providing Less Than One Hundred And Twenty (120) Calendar Days For Government Acceptance After The Date Offers Are Due Will Not Be Considered And Will Be Rejected. the Magnitude Of Construction Is Estimated Within The Range Of $22,000,000 And $32,000,000. Offeror's Are Cautioned That Price Proposals Exceeding This Range May Be Determined Ineligible For Award Based On Budgetary Limitations. This Range Does Include Potential Inflation Reduction Act (ira Funding). price Proposal Exceeding This Range May Be Eligible To Have Their Technical And Price Proposal Evaluated Unless The Contracting Officerdetermines That The Number Of Proposals That Would Otherwise Be In The Competitive Range Exceeds The Number At Which An Efficient Competition Can Be Conducted. The Contracting Officer May Limit The Number Of Proposals In The Competitive Range To The Greatest Number That Will Permit An Efficient Competition Among The Most Highly Rated Proposals. technical And Price Proposals Must Be Clearly Labeled And Must Be Sent As Separate Attachments So They Can Be Evaluated Separately. Failure To Do So Will Determine The Offeror's Submission As Non-responsive And Will Be Eliminated. The Contracting Officer And/or Contracts Specialist Will Not Be Responsible To Separate Any Technical Document That Contains Pricing Information. this Solicitation Is Not Set Aside For Small Business, However, Both Small And Large Businesses Are Encouraged To Participate. Offeror's Must Ensure That Sam.gov Shows That The Offeror Has North American Industry Classification System (naics) Code 236220 (commercial And Institutional Building Construction) And Meets The Small Business Size Standard Is $39.5 Million Average Annual Receipts. It Is The Responsibility Of The Offeror To Ensure This Information Is Updated At The Time Of Submission Of Their Proposal. see The "a. Presolicitation In Sam 2024 08 27" For Additional Details. Changes To The Presolicitation Include:the Solicitation Posting Date Has Changed From September 26, 2024 To October 3, 2024.the Proposal Submission Date Has Changed From November 26, 2024, 2:00 Pm Est To November 11, 2024, 2:00 Pm Est. for Access To Public Building Services (pbs) General Services Administration (gsa) Documents, See "b. Form B - Request For Construction Documents 2024 08 07" That Must Be Completed In Its Entirety And Signed.failure To Complete This Document In A Timely Manner Does Not Warrant Any Request For An Extension To The Proposal Due Date. The Document Must Be Sent To Paul.murphy@gsa.govbefore Access To These Pbs/gsa Documents Are Provided. additionally, The Department Of Homeland Security, U.s. Customs And Border Protection, Facilities Management And Engineering Field Operations, Facilities Program Management Office, Non-disclosure Agreement. See "6. Cbp Non-disclosure Agreement Form 2024 10 04" That Must Be Completed In Its Entirety And Signed. This Document Must Be Sent To Lawrence.a.comiskey@cbp.dhs.gov And A Copy Sent To Paul.murphy@gsa.gov Before Access To Cbp Documents Are Provided. a Pre-proposal Conference Is Scheduled For Thursday, October 10, 2024, At 10:00 Pm Est. A Letter Is Attached To This Solicitation "7. Pre-proposal Conference 2024 10 04". a Pre-proposal Site Visit Is Scheduled Forthursday, October 17, 2024, At 01:00 Pm Est.a Letter Is Attached To This Solicitation "8. Pre-proposal Site Visit 2024 10 04". there Are 71 Attachments To This Solicitation.
PUBLIC BUILDINGS SERVICE USA Tender
Civil And Construction...+1Building Construction
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents
Details: This Is A Sources Sought Notice. No Proposals Are Being Requested Or Will Be Accepted In Response To This Posting. If You Are Interested In Proposing On The General Scope Of Work Stated Below For A Design-build Project, Please Respond By Email Only To Krista.miller@gsa.gov. Please Provide Your Bonding Capacity, A Capability Statement, And Your Small Business And Small Business Socioeconomic Status, If Any. Please Include In Your Capability Statement Projects Which Your Firm Has Completed That Are Particularly Relevant To This Scope Of Work, Especially Involving Exterior Structural And Glazing Improvements, And/or Performed In Hawaii. general Statement Of Work Summary: the Prince Jonah Kuhio Kalaniana’ole (pjkk) Federal Building And Courthouse Is Located At 300
ala Moana Blvd., Honolulu, Within The Hawaii Capital District And On The Outskirts Of The Downtown
central Business District. This Reinforced, Cast In Place Concrete With Concrete Masonry And Glass
curtain Walls Is A Two-building Mid-century Modern Complex Originally Constructed In 1977. The
illuminated Entry Pavilion Was Originally Designed By Gensler Sf And Constructed By Swinerton
construction In January 2015. The Illuminated Entry Pavilion Design Was An Elegant, Iconic Aia
award Winning Design That Unified Two Separate Entries Into A Single, Sky Lighted And Transparent
entrance For The Pjkk Complex. The Single Portal/pavilion Simplified The Circulation For The Public
and Created A Strong Sense Of Entry For Pjkk. on April 6, 2021 A Fire Occurred At The Entry Pavilion That Created Significant Damage. On January
24, 2022, Clifford Planning Architecture Completed A Fire Investigation Report That Stated “it Is
probable The Entry Pavilion Fire Initiated Was A Result Of An Electrical Fault Within The Led Light Panel
installed Adjacent To The Bottom Panel Of The South Wall Of The Entry Pavilion. Low Level Arcing Over
a Period Of Time Was The Likely Source Of Heat For Ignition Of The Acrylic Panel Material” (see
volume 4 – Fire Investigation). As Further Defined In The Fire Investigation Report, There Was Fire
damage To Architectural Finishes And Structural Members. The Scope Of Work For The Entry Pavilion
includes, But Is Not Limited To, Installing (2) Temporary Covered Entry Tunnels To The Existing United
states Marshal Service (usms) And Federal Protection Services (fps) Security Check-point
locations, Providing Code Compliant Construction Documents And Full Design Services That Adhere
to The Original Gensler Design And Architectural Appearance Of The Original Entry Pavilion, While
also Making The Necessary Design Changes To Address The Issues That Contributed To The Fire And
smoke Damage As Further Defined In Volume 4 - Fire Investigation. The Design Should Also
include Solutions For The Following Known Building Maintenance Issues: 1. The Original Design Led Panels Were Located Behind Heavy Glass Panels That Created
issues For Regular Maintenance And Care. 2. The Original Designed Entry Door Operated On A Small Pin That Would Fail And Was Difficult
to Replace. in Addition To The Scope Above, The Design And Construction Of The Courthouse Hardening Upgrades To The
entry Pavilion And Ground Level Windows And Doors Facing Halekauwila Street And Ala Moana Boulevard
are A Requirement For This Project. The Judiciary Had Previously Sought From Congress Supplemental
appropriations To Fund Enhanced Security Measures To Protect Judges And The Judicial Process In Response
to The Civil Unrest Following The Murder Of George Floyd And The January 6th Attack On The U.s. Capitol.
the Judicial Conference Approved Funding To Begin Enhanced Security Measure Projects To Harden
courthouses. initial Stakeholders From The General Services Administration (gsa), The Administrative Office Of The U.s.
courts (ao), U.s Marshals Service (usms), And The Federal Protective Service (fps) Worked Together To
analyze Potential Security Measures To Be Used In This Program. This Scope Of Work Covers The
countermeasures For The Pjkk Courthouse In Honolulu, Hi: 1. Windows: Impact Resistant Window Glazing System At The Entry Pavilion And
ground Level Courthouse Windows And Doors Facing Halekauwila Street And Ala
moana Boulevard, Excluding Ground Level Windows Along The United States
marshal Service Offices And Within The Confines Of The Exterior Secured Courtyard:
● Windows / Doors / Frames – Shall Meet A Minimum 15-minute Forced
entry Resistance Per Astm F3038 Or Dept Of State (dos)
sd-std.01.01 Rev G (amended) – Forced Entry Resistance Is The
standard That Shall Apply.
● The Contractor Shall Install A New Shatter Break Resistance Riot Glazing
system
● Contractor Is Responsible To Field Verify And Measure Each Opening.
2. Exterior Doors And Hardware (see Volume 2b_existing Pavilion Design
drawings For Specific Locations):
● All Exterior Pavilion Entry Doors And Interior Courthouse Pavilion Vestibule
doors Shall Be Equipped With Hardware And Controls To Engage
electro-magnetic And/or Electro-mechanical Remote Locks.
● Remote Locks Shall Give The Ability For The Court Security Officers And The
usms To Lock All Doors Immediately In Case Of An Emergency.
● Remote Lock Override Control Shall Run To The Main Usms / Cso Control
room the Courthouse Hardening Upgrades Will Upgrade The Ground Level Courthouse Windows And
doors And Replace All Window, Exterior Doors, And Hardware Included In The Original Gensler
designed Pjkk Entry Pavilion. the Forced Entry Resistance Doors And Windows Shall Meet A Minimum 15 Minute Forced Entry
resistance In Accordance With Astm Standard F3038-21, With The Following Exception. Astm
standard F3038-21 Requires A Full Scale Test For Each Unique System Size And Configuration,
however, If The Actual Overall System Dimensions Are Within 6” (both Height And Width Dimension)
of Another Successfully Tested System Meeting The Requirements Of Astm Standard 3038-21, And
the System Components Are Of Similar Size And Makeup, The Proposed System Shall Be Considered
acceptable. Support Documentation Shall Be Provided Prior To Installation. the Construction Services Scope Of Work Includes Demolition Of The Remaining Pavilion Structure,
build-out Of (2) Temporary Tunnels To Access The Existing Usms And Fps Security Check-points,
the Build-out Of The New Entry Pavilion, Installation Of The Courthouse Hardening Window And Door
upgrades, Including But Not Limited To Structural, Architectural Finishes, Lighting, Mechanical,
electrical, Plumbing, Fire And Life Safety, And Data/cabling Infrastructure. the Federal Building And Courthouse Must Remain Fully Operational Throughout Design And
construction. All Construction Work Related To This Project Shall Be Scheduled From 5:00 Pm To 7:00
am, After Normal Building Operation Hours To Minimize Disruptions To Building Occupants And To
maintain Public Safety. Normal Building Operation Hours Are From 7:00 A.m. To 5:00 P.m.
weekdays. the Project Delivery Method Is Design-build (db).
the Db Contractor Shall Provide All Supervision, Labor, Materials, Equipment, And Testing Required
to Accomplish The Design And Construction For The Pjkk Entry Pavilion And Courthouse Hardening
project. design Services Shall Include, But Are Not Limited To, Design And Certification By A State Of Hawaii
licensed Architect-engineer (a/e), Design Reviews, Weekly Progress Meetings, Design
development, Construction Documents, Basis Of Design Documents, Site Investigation, Site
measurements And Verification, Code Compliance, Reproduction Services, Consultant Coordination,
contract Administration, Contract Close-out, Record Drawings And As-builts.
construction Services Shall Include, But Are Not Limited To, Complete And Timely Submission Of
security Clearance Applications For Workers (hspd-12 And Tenant Agency Review), Project
schedule, Cost Estimating, 3-week Look Ahead Schedules, Demolition, Site Supervision, Drywall,
mechanical, Electrical, Automatic Sprinkler System, Architectural Finishes, Submittal Samples,
submittal Schedule, Hvac, System Balancing, Structural, Fire And Life Safety, Security Infrastructure,
protocols For Utility Outages, Separation Of Utilities To Avoid Impacts To Occupied Areas, Temporary
barricade Plan, Noise Mitigation, Clean Up After Work, Lead Weekly Meetings And Provide Minutes,
file And Record Management, And All Other Work To Meet The Contract Requirements.
EllisDon Construction Services Inc Tender
Aerospace and Defence
Canada
Closing Date6 Jan 2025
Tender AmountRefer Documents
Details: Advanced Procurement Notice Future Fighter Capabilities Project (ffcp) Cfb Cold Lake, Ab (with Security Requirements) Purpose Of This Advanced Procurement Notice This Is Not A Bid Solicitation. This Is An Advanced Procurement Notice (apn) Of Potential Contracts With Anticipated Security Requirements To Provide Interested Contractors, Suppliers, And Vendors An Opportunity To Begin The Sponsorship Request Process For Potentially Obtaining The Required Security Clearance(s) That Are Anticipated. Note That There Is No Guarantee That These Contracts Will Proceed Or That Any Security Clearance(s) Will Be Granted Under The Sponsorship Process In A Timely Fashion Or Otherwise. Description Of The Project Ellisdon Construction Services Inc. (ellisdon) As The Design Builder, Along With Its Design Partner, Stantec Have Been Contracted To Provide Design Services And Constructability Oversight To Complete The Design Of The Royal Canadian Air Force (rcaf) Infrastructure That Will Support The Future Fighter Capability Project (ffcp). The Infrastructure Will Provide Shelter And A Working Environment Capable Of Supporting The Operation And Maintenance Of A Yet To Be Determined Advanced Fighter Aircraft. Design Has Progressed Significantly With Various Tender Packages Forthcoming Tentatively To Start In Q3 2024, With Project Construction Being Conditional On The Project Receiving Approval To Proceed From Dnd. details On Upcoming Projected Tender Packages To Follow Via Amendment. Prior To This, Ellisdon Is Seeking Interested Parties Consisting Of Trade Contractors, Vendors, And Suppliers To Ensure That They Have All Necessary Security Clearances In Place Prior To This As This Is A Requirement For This Project. Description Of The Scope Of Works Project Construction Is Conditional On The Project Receiving Approval To Proceed From Dnd. Project Scope And Summary Are Noted Below. Contract Number: 71947 Title: Modified Design Build Services For Fighter Squadron Facility Building Size: Approximately 555,000 Sf Anticipated Posting Date: q3 2024 Description: construction Of A New A Fighter Squadron Facility Consisting Of Two Fully Operational tactical Fighter Squadrons (tfs) And The Operational Training Unit (otu), including But Not Limited to: Offices, Administrative Spaces, Mission Planning Rooms, Briefing / De-briefing Rooms, Meeting rooms, Classrooms, Auditorium, Speciality Training Rooms Including Simulators (sims) accommodations And Part-task Trainers Accommodations, Hangars, Maintenance Bay Facilities, specialty Aircraft Maintenance Labs, Shops And Storage, It Offices And Server Rooms, Building support Spaces, And Common Spaces. This Work Package Will Also Include The Construction Of Nearby Airfield Pavements, Apron And Taxiway Access Lane Edge Lighting, And Apron Flood Lighting consisting Of Concrete And Asphalt. Construction Of Infrastructure Will Encompass The Following Scopes Of Work. Scope Of Work, Using Masterformat Divisional Breakdown As A Reference, May Include, But Are Not Limited To: Masterformat Division Scope Of Work 01 45 00 Surveying 01 45 00 Material Testing 01 45 00 Third Party Inspection (roof, Structural, Geotechnical) 01 52 00 Temporary Facilities (trailers, Toilets, Fencing, Waste Bins) 01 54 19 Tower Cranes 01 54 23 Scaffolding 02 41 19 Selective Demolition 03 11 00 Concrete Formwork 03 15 00 Concrete Accessories 03 20 00 Reinforcing Steel 03 30 00 Concrete Supply 03 35 00 Concrete Placing & Finishing 03 45 00 Precast Specialties 04 00 00 Masonry 05 10 00 Structural Steel 05 30 00 Metal Decking 05 50 00 Miscellaneous Steel 05 70 00 Ornamental (specialized) Metals 06 20 00 Millwork / Architectural Woodwork 07 10 00 Damp Proofing & Waterproofing 07 40 00 Metal Roofing, Cladding & Siding 07 50 00 Membrane Roofing 07 80 00 Firestopping & Fireproofing 07 90 00 Caulking 08 10 00 Openings – Doors, Frames & Hardware 08 33 00 Coiling Doors & Grilles 08 34 16 Hanger Doors 08 35 00 Folding Doors & Grilles 08 36 00 Overhead Doors 08 40 00 Aluminum Entrances, Storefronts & Curtain Wall 08 80 00 Glazing 08 87 00 Window Film 09 21 16 Gypsum Board Assemblies 09 51 14 Acoustic Panels 09 60 00 Flooring 09 66 00 Tiling 09 67 00 Fluid Applied Flooring 09 69 00 Access Flooring 09 90 00 Painting 10 11 00 Visual Display Boards 10 14 00 Signage 10 22 19 Demountable Partitions 10 26 00 Wall, Corner, Door Protection 10 28 00 Bathroom Accessories & Toilet Partitions 10 51 00 Lockers 10 75 00 Flagpoles 11 30 00 Appliances 11 61 00 Theater And Stage Equipment 11 66 00 Athletic Equipment 11 81 29 Fall Arrest Systems 11 98 00 Detention Equipment 12 00 00 Furnishings 12 20 00 Window Coverings 14 20 00 Elevator & Lifts 21 00 00 Fire Suppression 22 00 00 Mechanical – Plumbing 23 00 00 Mechanical – Heating, Ventilation And Air Conditioning (hvac) 25 00 00 Integrated Automation 26 00 00 Electrical 28 10 00 Access Control 31 00 00 Earthworks 31 60 00 Piling 32 10 00 Paving 32 16 00 Sidewalk Curb & Gutter 32 31 00 Fencing 32 90 00 Landscaping 33 00 00 Utilities & Underground 34 73 00 Airfield Construction - Apron 41 22 00 Overhead Cranes 48 16 00 Geothermal Energy Project Prequalification And Anticipated Security Requirements In Order To Be Eligible To Participate In The Upcoming Project Prequalification Process, The Interested Party Will Be Required To, Among Other Things, Actively Hold All Required Security Clearance(s) At The Time Of Closing. this Will Also Be Noted in All Upcoming Solicitation Tender Documents. As Of The Date Of Posting Of This Advance Procurement Notice, The Required Security Clearance(s) Are Anticipated To Be: * for Areas Established As Security And High Security Zones - A Valid And Active Facility Security Clearance (fsc) At The Level Of Secret Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) * For Areas Established As Public, Reception And Operations Zones - A Valid And Active Designated Organization Screening (dos) At The Level Of Reliability Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) Industrial Security Program (isp) Sponsorship Defence Construction Canada (dcc) Is Providing Interested Parties Early Access To The Security Clearance Application Process Through Sponsorship Under Its Industrial Security Program (isp). Accordingly, Interested Parties That Are Interested In Submitting Or Participating In A Proposal/bid For These Procurements That Fall Under This Program And That Do Not Actively Hold The Above Identified Security Clearance(s) Should Begin The Security Clearance Application Process By Applying Through Dcc’s Isp. To Begin The Security Clearance Sponsorship Process, Please Submit A Sponsorship Request Application To Dcc By Following The Steps Identified On Dcc’s Website At: Https://www.dcc-cdc.gc.ca/industry/security-requirements In Their Sponsorship Request Application To Dcc, Interested Parties Are Asked To Quote The Following Information, Among Other Things: * Contract Number As Referenced Above; And * Level Of Clearance Requested To Be Sponsored For. Sponsorship Process Timeline Sponsorship Timeline Is Currently As Follows: * Thirty (30) Calendar Days Prior To Planned Tender Closing, For Designated Organization Screening (dos); And * Sixty (60) Calendar Days Prior To Planned Solicitation/tender Closing, For Facility Security Clearance (fsc) At The Level Of Secret. Questions Any Questions Pertaining To The Isp Sponsorship Process Outlined In This Advanced Procurement Notice Can Be Addressed To: Telephone: (613) 998-8974 Email Address: Isp.sponsorship@dcc-cdc.gc.ca Any Questions, Exclusive Of Security Sponsorship, Relating To This Advanced Procurement Notice Can Be Addressed To: Scott Barabash, Cet, Gsc, Cec Senior Estimator Ellisdon Construction Services Inc. 780-444-3042 Sbarabash@ellisdon.com Disclaimer Dcc Nor Ellisdon Do Not Provide Any Assurances Or Guarantees That A Sponsorship Request Package Or A Security Clearance Application Forwarded To The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) On Behalf Of A Interested Party Will Be Successful Or Result In The Granting Of The Requested Security Clearance(s) By The Csp, Pwgsc, In A Timely Fashion. At All Times, The Processing Of A Sponsorship Request Package Or A Securiy Clearance Application Is Subject To The Respective Terms, Conditions, And Timelines Of Dcc's Isp Sponsorship Process And The Csp, Pwgsc's Security Clearance Granting Process. By Applying To Either Of The Aforementioned Processess, The Interested Party Accepts And Agrees To Bear Any Risks Associated With: (i) The Completeness Or Accuracy, Or Lack Thereof, Of Its Application Or Related Documents Submitted Under Or In Connection With Either Said Processes, And (ii) The Timeliness, Or Lack Thereof, Of Any Processing Or Granting Of Security Clearance(s) Under Or In Connection With Either Said Processes.
National Institutes Of Health Tender
Others
United States
Closing Date24 Jan 2025
Tender AmountRefer Documents
Description: This Is A Sources Sought Notice. This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. The Information Provided In This Notice Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. The Government Will Not Provide Debriefs On The Results Of This Research, But Feedback Regarding The Decision To Set Aside Or Not Set Aside The Procurement Will Be Accomplished Via Pre-solicitation Synopsis Or Solicitation For These Services, As Applicable. All Information Submitted Will Be Held In A Confidential Manner And Will Only Be Used For The Purpose Intended. Points Of Contact Listed May Be Contacted For The Purpose Of Verifying Performance. the Purpose Of This Notice Is To Obtain Information Regarding: (1) The Availability And Capability Of Qualified Business Sources; (2) Whether The Businesses Are Sba Certified Hubzone Small Businesses; Sba Certified 8(a) Small Businesses; Service- Disabled Veteran-owned Small Businesses; Woman-owned Small Businesses; Or Large Business And (3) The Respective Businesses Size Classification Relative To The North American Industry Classification System (naics) Code For The Proposed Acquisition. Your Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible. the Office Of Research Facilities (orf), The National Institutes Of Health (nih) Is Seeking Capabilities From All Categories Of Businesses For The Purpose Of Determining The Appropriate Level Of Competition And/or Small Business Subcontracting Goals For A New Requirement For An Indefinite Delivery Indefinite Quantity (idiq) Architect-engineer (ae) Multiple Award Task Order Contract (matoc) And A Blanket Purchase Agreement (bpa). the Ae Matoc Contract Has An Anticipated Composite Value Of $400m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Ae Matoc For The Future Professional Architect Engineering (ae) Services, As Well As Multiple Award Blanket Purchase Agreements For Other Professional Services Of An Architectural Or Engineering Nature Or Service Incidental There To (including Studies, Investigations, Surveying And Mapping, Tests, Evaluations, Consultations, Comprehensive Planning, Program Management, Conceptual Designs, Plans And Specifications,value Engineering,constructionphase Services, Soils Engineering, Drawing Reviews, Preparation Of Operating And Maintenance Manuals And Other Related Services) That Logically Or Justifiably Require Performance By Registered Architects Or Engineers Or Their Employees. All Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Small Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements. the Bpas Have An Estimated Composite Value Of $100m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Bpas For Future Other Professional Services Of An Architectural Or Engineering Nature. Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements. background: As Part Of The U.s. Public Health Service Under The Department Of Health And Human Services, Nih Is The Federal Government's Primary Biomedical Research Agency. The Nih Office Of Research Facilities (orf) Is The Steward Of Nih Facilities And Is Responsible For The Planning, Design, Construction, Acquisition, Maintenance, And Operation Of Nih Owned Facilities, Which Includes: 1) Nih Main Campus, Bethesda, Maryland 2) Nih Animal Center, Poolesville, Maryland 3) Fort Detrick Campus, Frederick, Maryland 4) Research Triangle Park, North Carolina 5) Rocky Mountain Laboratories (rml), Hamilton, Montana 6) Epidemiology & Clinical Research Branch, Phoenix, Arizona 7) Bayview Campus, Baltimore, Maryland 8) Rental Facilities Maintained By Nih description Of The Requirement: The Nih Anticipates Awarding Multiple Aematoc Awards Under A Single Solicitation Utilizing A Task Order Mechanism. Each Idiq Will Be Awarded For A Five (5) Year Performance Period With A Cumulative Maximum Not-to-exceed Dollar Amount Of $400m. the Nih Also Anticipates Awarding Multiple Bpas Under A Single Solicitation Utilizing A Call Order Mechanism. Each Bpa Will Be Awarded For A Five (5) Year Performance Period With An Estimated Dollar Amount Of $100m. the Nih Seeks Highly Qualified Credentialed Contractors With Capability To Perform The Ae Matoc And/or Bpas, Which Will Include Various Simultaneous Task Orders And/or Calls. The Selected Contractors Shall Exhibit Demonstrated Experience, Capability And Resources Enabling Them To Provide Specialized A/e Services, Commissioning Support Services, Cqm Services, And Other A/e Related Services Critical To Orf’s Success In Planning, Alteration, Renovation, And New Construction Of Nih Facilities And Associated Infrastructure For Projects Of Similar Size And Complexity With Comparable Clients, And Most Significantly With A Proven Track Record Of Performing Such Projects With A High Degree Of Customer Satisfaction. contractors Responding To This Notice To Perform The Contract As Small Business Joint Venture Shall Use The Procedure Described At The Small Business Administration (sba) Web Site. The Sba Url Is: Https://www.sba.gov/federal-contracting/contracting-assistance-programs/joint-ventures. Responding Contractors Shall Have Current Information With The System For Award Management (sam), At Www.sam.gov, And Must Not Be Excluded From Government Contract Award At The Time Of Submission. projects May Include, But Are Not Limited To The Following Areas: animal Care Facilities – To Include, But Not Limited To, Facilities For Housing, Care, And Use Of Animals In Experimental Testing, Research, And Training As Related To Biomedical Research. Animals Used At Nih For Research Include But Are Not Limited To Mammals Of All Sizes, Including Primates, And Aquatic Animals. biomedical Research Laboratory / Laboratory Facilities – To Include, But Not Limited To, General And Specialized Biomedical And Animal Research Laboratories, Laboratory Support Spaces, Laser Laboratory, And Electron Microscopes. Projects Related To Lab Facilities In This Contract Will Include General And Bio-safety Levels (bsl) -2, -3, And -4. health Care Facilities Or Hospitals – To Include, But Not Limited To, Patient Care Units, Outpatient Clinics, Intensive Care Units, Surgical Suites With Catheterization Laboratory, Radiology, Nuclear Medicine, And Mri Suites, Pharmacy, Rehabilitation, Transfusion Medicine, Cyclotron, Radiation Oncology, Medical Gas Services, Pediatrics, And Hospital Support Services. office / Public Space Facilities – To Include, But Not Limited To, Offices, Sensitive Compartmented Information Facilities (scif), Training Facilities, Conference Facilities (including Natcher Conference Center), Libraries (including The National Library Of Medicine), Child Development Centers, Residences And Lodging, Commercial Shops And Food Services, Wellness Centers And Gyms, Recreational Facilities, Facilities For Ancillary Services Such As Fire And Police, Parking Structures, And Exterior Improvements Such As Roadways, Sidewalks, And Landscaping. interior And Exterior Utility Infrastructure And Utility Generation Distribution Systems - The A/e Services Include The Design Of Interior & Exterior Utility Infrastructure And Systems For Office / Public Facilities; Animal Care Facilities; Bio-medical Research Laboratories; Healthcare /hospital Facilities; And General-purpose Facilities Such As Parking Structures And Warehouses. The Utility Interior & Exterior Infrastructure And Generation & Distribution Systems Include, But Are Not Limited, To The Following: mechanical, Electrical, And Plumbing Systems. high Voltage Electrical central Utility Plant (cup) hvac Systems To Include Specialized Filtering Requirements, Supply And Exhaust Systems And Associated Controls. steam/condensate, High Temperature Hot Water, Heating Hot Water, Chilled Water, Lab Water, High Purity Water, And Potable Water Systems. compressed Air, Medical Gas, Lab Vacuum, And Material Gas Systems. central Co2 Systems. central Liquid Nitrogen Systems. fuel Oil Systems. storm Water And Sanitary Sewer Distribution Systems. wastewater Treatment Systems. electrical Substations. landscaping Irrigation Systems. commissioning commissioning, Qualification, And Validation (cqv) historical geotechnical elevator physical Security interior / Exterior Lighting telecommunications building Envelope roofing building Model Information (bim) net Zero Emissions this Idiq Shall Support Projects In Maryland, North Carolina, And The Montana Locations. maryland Facilities Include: nih Main Campus, Bethesda, Md nih Animal Center, Poolesville, Md fort Detrick Campus, Frederick, Md bayview Campus, Baltimore, Maryland rental / Leased Facilities Maintained By Nih it Is Anticipated That A Majority Of The Facilities Under This Idiq Will Be Located On The Nih Main Campus, Bethesda, Md, Followed By The Other Surrounding Areas. Therefore, The A/e Shall Maintain An Office Within Fifty (50) Miles Of The Baltimore - Washington, Dc Metropolitan Area For The Duration Of The Idiq Contract. research Triangle Park, North Carolina for Projects In North Carolina, The A/e Shall Plan To Maintain Local Presence Within Fifty (50) Miles Of The Nih Research Triangle Park Campus For The Duration Of The Project. rocky Mountain Laboratories (rml), Hamilton, Montana for Projects In Montana, The A/e Shall Plan To Maintain Local Presence Within One Hundred (100) Miles Of The Rocky Mountain Labs Campus For The Duration Of The Project. architect / Engineer Services the A/e Shall Furnish All Labor, Management, Investigations, Studies, Travel, Supplies, Equipment, And Materials To Perform The Required Services. The A/e Is Responsible For Determining What Disciplines And Skill Sets Are Required For Accomplishing The Work And Form A Team Accordingly. in General, Pre-design And Design Phase Services Will Include, But Not Limited To: field / Site Investigations, Inclusive Of Pre-tab Investigations planning And Coordination Drawings building Information Modeling (bim) (only If Applicable To The Task Order) sustainable Design program Of Requirements (pors) special Studies schematic Design design Development construction Documents (65%) construction Documents (95%) construction Documents (100%) rendered Perspectives Of Proposed Building Construction And Substantial Site Development construction Cost Estimate(s) construction Baseline Schedule geotechnical Investigations preparation Of Reports the A/e May Be Required To Provide Construction Phase And Other Services Including, But Not Limited To: construction Bidding And Negotiation Support construction Inspections / Site Representation construction Progress Meetings requests For Information (rfis) construction Submittal Reviews change Order Reviews / Support punch Lists inspection Of Stored Items construction Close-out Support Including As-builts; Record Documents; Non-compliance Notices; Operation And Maintenance (o&m) Manuals; Warranties; Product And Equipment Demonstrations And Training. a/e Record Documents commissioning Support Services commissioning Support Services (cx) Shall Perform, But Not Limited To, The Following Tasks: review Specifications And Drawings review Submittals develop Commissioning Scripts review O & M Manuals witness Testing Of Electrical And Mechanical Systems construction Quality Management (cqm) general Project Management - To Include, But Not Limited To, Provide Administration And Management Services To Assist The Contracting Officer’s Representative (cor) In The General Day-to-day Administration Of The Overall Project. project Governance preparation And Maintenance Of A Project Management Plan (pmp) assist In The Implementation Of The Project Governance Structure reviews And Document Management monthly Reports requests For Information (rfi) submittals financial Management budget/cost Control Monitoring And Management invoices / Application For Payment Review change Order Control Process And Management estimating Services scheduling Support – Regularly Review, Analyze, And Monitor The Dbb/dbcs Performance Schedule(s), Including, But Not Limited, To The Preliminary/baseline Schedule, Critical Path Method (cpm) Construction Schedules, And Fragnets, As Required. quality Construction Management, Reviews And Administration Assistance - Shall Include Inspections, Verifications, Details Audits And Evaluations Of Materials And Workmanship Necessary To Determine And Document The Quality Of Construction. The Cqm Contractor Shall Use Its Expertise And Knowledge Of Construction Practices, Means And Methods To Execute An Effective Quality Assurance Program. potential Sources Shall Complete And Submit The Attached Forms: sources Sought - Contractor Information Form 1.1 Complete The Sources Sought – Contractor Information Form if Applicable, Interested 8(a) Small Business Firms Shall State Their Current 8(a) Certification Data With The Small Business Administration if Applicable, Interested Hubzone Small Business Firms Responding Must Provide Proof Of Their Hubzone Certification Status. certificate Of Insurance 1.2 Interested Firms May Include A Capability Statement As An Attachment To The Sources Sought – Contractor Information Form. Capability Statement Shall Be No Longer Than Ten (10) Pages. Potential Sources’ Experience Shall Demonstrate And Document The Following The Capability Statement: naics Code(s) evidence Of The Ability To Work In Occupied Space. evidence Of The Ability To Work On Multiple Projects Simultaneously. evidence Of The Ability To Perform The Work Described In The Sources Sought – Project Data Form Section Below. self-performance Capability (contractor Shall Self-perform At Least 15% Of Each Task Order). building Information Modeling (bim) Capability. leed Capabilities. 2. Sources Sought – Project Data Form 2.1 Complete The Sources Sought – Project Data Form For No More Than Five (5) Example Projects Performed Within The Last Five (5) Years, Or In Progress, Which Best Demonstrates Your Firm’s Specialized Experience Providing A/e Services On Projects Of Similar Type, Size, And Complexity To The Nih Requirement, As Defined Below. Each Completed Sources Sought – Project Data Form Shall Not Exceed Three (3) Pages And Shall Contain At A Minimum The Following Types Of Project Experience: one (1) Utility Infrastructure / Utility Generation /distribution System Projects one (1) Biomedical Research Lab; And one (1) Healthcare / Hospital Project. [note - An Indefinite Delivery Indefinite Quantity (idiq) With Multiple Task Orders Is Not Considered A Project. Each Individual Task Order Executed Under An Idiq Contract Is Considered A Project.] 2.2 Project Experience Requirements: type - Specialization Category/facility Types Such As: interior & Exterior Utility Infrastructure And Utility Generation & Distribution Systems biomedical Research Laboratory Facilities health Care Facilities office/public Space Facilities animal Care Facilities 2. Complexity - Special Design/construction Considerations Such As: physical Security Requirements adjacencies To Occupied Space(s) Restrictions/ Limitations limited Access Restrictions vibration / Noise Limitations joint Commission (for Hospitals) Requirements (i.e. Special / Interim Life Safety Measures, Construction Risk Assessments) implementing Guiding Principles For Sustainable Federal Buildings And Leadership In Energy And Environmental Design (leed) Criteria special Mep Features - I.e. Designed For Infectious Or Immune Compromised Areas Within A Hospital Space. historic Preservation Requirements storm Water Management And Erosion & Sedimentation Control use Of Building Information Modeling (bim) net Zero Emission Requirements for All Patient Care Support Spaces: Compliance With The Facilities Guidelines Institute (fgi) For Healthcare Projects And Most Current Healthcare Facility “statement Of Conditions” (sco). nih Design Requirements Manual (drm) 3. Size - Contractors Shall Have The Experience, Capability, And Resources Necessary To Perform Simultaneous/concurrent Projects Of Varying Size (between $25,000 To $20,000,000) And Complexity, As Described Above. all Qualified Interested Firms Are Requested To Submit An Electronic Copy Of Their Completed Letter Of Interest, Qualification Statement, And Capability Statement (in One Combined Pdf Format), Via Email, To The Contracting Officers, Ms. Magan Miller At: Magan.miller@nih.gov And Ms. Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. The Submission Shall Be Received On Or Before By 12:00 Noon, Est On Friday, January 24, 2025. The Email Subject Line Shall Read: Sources Sought 2025 Matoc Qualification Statement For Architect / Engineer Services. Inquiries Shall Be Submitted Via E-mail To Magan Miller At: Magan.miller@nih.gov And Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. Electronic Mail Inquiries And Submissions Will Only Be Accepted.
491-500 of 511 archived Tenders