Housekeeping Tenders

Housekeeping Tenders

DEPARTMENT OF EDUCATION GENERAL SANTOS CITY Tender

Healthcare and Medicine
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 7.3 Million (USD 126.5 K)
Details: Description Invitation To Bid Project No: 005 – 2025 1. The Department Of Education Through The Fy 2024 Gaa Intends To Apply The Sum Of Seven Million Three Hundred Thirty-eight Thousand Five Hundred Seven And 00/100 (7,338,507.00) Being The Approved Budget For The Contract (abc) Described Below For The Procurement Of Assistive Devices, Equipment, Supplies And Materials For Inclusive Learning Resource Centers. Bids Received In Excess Of Abc Shall Be Automatically Rejected At The Bid Opening. Unit Description Qty Cost Abc (vat Inclusive) 1 Lot Procurement Of Assistive Devices, Equipment, Supplies And Materials For Inclusive Learning Resource Centers 1 1 Unit Learners'/clients' Chart Materials A4 Size 8-1/4 X 11-3/4 Inches Or 210 X 297 Mm Or 29.7 X 21 Cm Laminated Full Color High Quality Print Photopaper 10 70.00 700.00 2 Set Anatomical Model-human Torso Model Size: 1/2 Life Size Material: Pvc, Includes: Stand 1 62,918.00 62,918.00 3 Unit Blood Pressure-blood Pressure Monitor Type: Upper-arm Monitor Type: Digital Cuff Size: 32cm Dimension (w X H X D): 145 X 466 X 145mm Weight: 250g Power Supply: Battery Type: Li-polymer Smart App Availability: Yes, Automatic Shut Off: Wi-fi: No 5 6,560.00 32,800.00 4 Unit Stethoscope: Dual Tube Stethoscope Weight: 185g, Length: 80cm Product Material: Polymer Diaphragm, Listener Material: High-density Stainless Steel Product Composition: Eartip, Ear Hooks, Leaf Spring, Hose Heads, Diaphragms 2 1,380.00 2,760.00 5 Piece Tape Measure-material: Pvc It Has Centimeter Scale On Reverse Side Which Is Up To 300cm Large, Easy To Read Marking Measures Up To 120 Inches 10 300.00 3,000.00 6 Piece Hand Dynamometer - Hand Dynamometer Type: Electronic Counting Gripper Function: Comprehensive Fitness Exercise Material: Abs Size: 15cm/5.90""x10.5cm/4.13""x2cm/0.79"" 10 1,900.00 19,000.00 7 Packs Ice Massage Caps- Size: 2 Count (pack Of 1) Measuring 2.9” In Diameter, The Ice Cup Massager Holder Also Fits Comfortably In The Hand. Material: Polyethylene 10 700.00 7,000.00 8 Unit Balance Board- Balance Board Type: Rocker Board Dimensions: 32.28 X 11.81 X 0.59 Inches Weight Capacity: 100 Kg Material: Beech Wood Anti-skid Feature: Not Specified 5 3,700.00 18,500.00 9 Unit Treatment Table- Top Shelf With Guard Rail And Formica Material. Down Shelf, Material Plain Sheet. Mounted On 4 Swivel Caster Rubber Wheels 2″ With 2 Pieces Lock. Size: Lxwxh (28″x20″x34.5″) Painted White 1 17,400.00 17,400.00 10 Unit Exercise Steps-aerobic Step Board 69 X 28 X 15cm. Dimension: 69 X 28 X 15cm Length: 27" Width: 10.5" Adjustable Height Up To 10cm To 15cm. Offers A Secure, Nonslip Surface For Your Workout Routine, Nonskid, Feet Provide Stability & Protect Floors. 5 1,934.00 9,670.00 11 Pair Pediatric Examination Gowns- Assorted For Kids And Adult Pediatric Examination Gowns Opening: Full Open Back. Style: Child Size Color: Jellybean Print. Made With High Quality, 100% Cotton Comfortable, Durable, Washable, And Reusable Hook And Loop Closures At Neck And Mid-back. 10 700.00 7,000.00 12 Piece Towels- Material: High Quality 100% Cotton Terry. 500gm2. Size: 90 X 180cm. 20 300.00 6,000.00 13 Piece Bed Sheets- Material: Cotton + Polyester, Packaging Content: 2 Pcs Pillowcase, 1 Pc Fitted Sheet, Single Size:36"*75"+7.8", Pillowcase Size: 18'*28", Garterized Corners 20 2,000.00 40,000.00 14 Piece Pillows- Pillows, Plain White, Soft Pillow, Size:18x28 Inches 10 900.00 9,000.00 15 Piece Pillowcase- Length: 50 Cm (20 ") Pillowcase Quantity: 1 Piece Width: 80 Cm (31 ") 100 % Polyester 20 180.00 3,600.00 16 Piece Blankets- Length: 160 Cm White Sheet Soft Texture, High Quality Fabric Size: 52 X 90 Inch 20 450.00 9,000.00 17 Unit Step Stools - Step Stools Double Steel Caravan Step. Rubber Non- Slip Steps. Leg Distance Front To Back 65 Cm. Width 42 Cm. Top Step Height 38 Cm. Bottom Step 20 Cm. 5 3,600.00 18,000.00 18 Unit Therapist Stools On Wheels-adjustable Height Of 19 - 24". It Comes With A 3" Hi-density Cushion With Multi-layered Padding, And A 14" Seat Diameter. Built With 5 Casters Made Of Plastic Easy To Clean. Color: Black 5 4,950.00 24,750.00 19 Piece Kinesiology Tape-ultra-strong And Sticky-hypoallergenic Adhesive Water Resistant. 97% Cotton, 3% Nylon. 180% Stretch For Full Range Of Motion Latex And Zinc Free Sticks 2-7 Days 5-10 Applications Per Roll Each Is 2""x 16.4"" (5cmx5cm) 20 2,100.00 42,000.00 20 Set Splinting Materials - Rescue Padded Board Splint. 6 Paddes Wood Splint (different Sizes) Sizes: 35"", 25"" And 15". Velcro Straps Color: Blue. 20 4,200.00 84,000.00 21 Unit Paraffin Bath- Large Opening Design: Inner Pot Allows For Hands, Feet, And Elbows To Be Dipped Into The Melted Wax. Alloy Heating Pot Melts Paraffin Wax Blocks In 0.5 Hours. Adjustable Heating Ranges From 86-158°f. Timer: Settable From 1 To 99 Minutes. (free Installation) 2 32,340.00 64,680.00 22 Set Dumbbells Sets- Weight: 37kg Type: Medical Rehabilitation Equipment Total 18 Dumbbells 1 Lb / Piece, 2 Pieces 2 Lbs / Piece, 4 Pieces 3 Lbs / Piece, 4 Pieces 4 Lbs / Piece, 4 Pieces 5 Lbs / Piece, 4 Pieces 3 25,000.00 75,000.00 23 Set Goniometers- Protractor Goniometer With 360 Degrees Coverage To Measure Joint And Compare The Changes In Joint Angles Material: Clear Plastic 3 Goniometer: 12-inch, 8 Inch And 6 Inch 3 600.00 1,800.00 24 Set Reflex Hammer-features: Pointed Babinski-style Tip Zinc Alloy Comfortable Handle Grip Control, Hammer For High Elastic Pvc Rubber Material: Zinc Alloy + Pvc; Color: Black Package Size: 27*11*3.5cm/10.6*4.3*1.3-inch Package Weight: 140g/4.9oz. 1 8,100.00 8,100.00 25 Piece Thermometer - Body Temperature Measurement: 34.0-42.9°c / 93.2-109.2°f. Material: Abs Plastic. Accuracy: (+/-)0.2°c. Auto-shutdown Time: About 18s Power Supply: 2 * 1.5v Aaa Batteries (not Included). 1 Year Warranty 5 1,600.00 8,000.00 26 Unit Multiple Mode Electrical Stimulator-1 Second Measuring Time. 3 Color Backlight Fever Reminders Auto Shut Off At 18 Seconds Store 50 Sets Of Data. Body Temperature Measurement: 34.0-42.9°c / 93.2-109.2°f. 3 9,884.00 29,652.00 27 Piece Foam Rolls- Material: Expanded Polypropylene Foam Item Weight: 0.42 Pounds Size: 18 Inches 3 4,000.00 12,000.00 28 Piece Mobilization Belts And Devices- Size 8 Feet Specific Uses For Product. Use For Legs, Hips, Arms, Back, Whole Body - High-quality Nylon Mobilization Belt Features A Plastic Side-release Buckle And Is Designed For Durability And Patient Safety. 5 2,850.00 14,250.00 29 Piece Gait Belt-1x Transfer Gait Belt Measurement Length: 60 Inches Width: 2 Inches 5 1,458.00 7,290.00 30 Set Theraband -4 Resistance Levels, Including Yellow, Red, Green, And Blue Supplied In Lay Flat Length Of 8", 12" And 18" Latex Rubber Weight Level: Yellow: 3 Lbs-4.3 Lbs Red: 3.7 Lbs-5.5 Lbs Green: 4.6 Lbs-6.7 Lbs Blue: 5.8 Lbs-8.6 Lbs 5 10,100.00 50,500.00 31 Piece Wedge Bolsters- A Firm And Breathable Bed Wedge Pillow Stays Cool, And Its Measurements Are 25″l X 25″w X 12″h Inches. / Breathable & Washable Cover / Designed To Provide Higher Body Support. 5 6,998.00 34,990.00 32 Piece Round Bolsters-weight:0-0.5 Kg Shape:column Feature:memory Filling:microfiber Material:100% Fiber Size:8" X 36" Color:white - Ideal For Hugging, Cylindrical Pillow, Great For Side Sleepers. 5 4,800.00 24,000.00 33 Piece Core Peak Bolsters- An All-purpose Positioning Aid • Provides Support Under The Legs, Arms, Feet, And Other Areas Of The Body. Fits Standard Treatment Tables • 18" In Length With At Least 6" In Diameter. 5 9,006.00 45,030.00 34 Piece Round Bolsters-weight:0-0.5 Kg Shape:column Feature:memory Filling:microfiber Material:100% Fiber Size:8" X 36" Color:white - Ideal For Hugging, Cylindrical Pillow, Great For Side Sleepers. 5 1,500.00 7,500.00 35 Piece Core Peak Bolsters- An All-purpose Positioning Aid • Provides Support Under The Legs, Arms, Feet, And Other Areas Of The Body. Fits Standard Treatment Tables • 18" In Length With At Least 6" In Diameter. 4 1,100.00 4,400.00 36 Piece Walking Cane-adjustable Aluminum Cane With Wooden Handle, Anodized Finish And Rubber Tip. The Tube Has A Spring Lock Pin For Adjusting Handle Height From 58-94 Cm. 5 1,320.00 6,600.00 37 Piece Quad Cane -stable Structure, Thickened Stainless Steel Material. Abs Non-slip Handle, Ergonomic Design, Comfortable Grip. Spring Button For Easy Height Adjustment. Firm Lock Hoops To Stabilize The Body. 4 2,740.00 10,960.00 38 Piece Wheelchair - Front Wheel Size: 6 Inches Expanded Size: 82 * 58 * 87cmseat Depth: 38cmrear Wheel Size: 16 Inches Back Height: 42cmfolded Size: 70 * 25 * 72cmhandrail Spacing: 55cmseat Width: 45cmnet Weight: 11kgnet Weight Of All Aluminum Alloy Frame: 11kg 10 5,600.00 56,000.00 39 Piece Pediatric Walker- Height-adjustable Frame Sizes. 360-degree Swivel Front Casters For Versatile And Flexible Mobility. Foot-operating Locking Mechanism On Front Casters. Rubber Tire Design 5 13,200.00 66,000.00 40 Set Communication Boards. Measures 9"x7.5". Binder Comes With 5 Different Colorful 10 Mil Poly Dividers, 3 Hard Strips (hook) Attached On Each Side To Hold 30 Cards. Each Card Measures 1.5 X 1.5. Inch Mounted With 1/2-inch Soft Dot (loop), And Round Corner Cut. 10 6,172.00 61,720.00 41 Set Dry Erase Sleeves. Reusable Dry Erase Pockets. Colors: Blue, Pink, Yellow, Red, Green, Purple. Size: 25.5*35.5cm(1pcs). Quantity: 12pcs Package Including: 6 X Dry Erase Pockets 6 Pens 10 796.00 7,960.00 42 Set Wind Up Toys. Category: Clockwork Engineering Road Roller Material: Plastic Size: 9.9*6.5*5.3(cm) Color: Three-color Random Hair Ages: 3+ 10 440.00 4,400.00 43 Set Wordless Picture Books. A Wordless Book About Dealing With Big Emotions Like Fear, Grief, Loss, Sadness, And Anger Hardcover | 36 Pages Product Dimension: Approx. W1cm X L22.2cm X H22.2cm Product Weight: Approx. .28kg 10 1,998.00 19,980.00 44 Piece File Folders. (black Or White) Model: Minimum Of 100 Pages Capacity Size: 310*235mm Suitable For School And Office Supply 10 280.00 2,800.00 45 Set Articulation Cards. Genre: Children's Learning & Education Sub-genre: Society & Culture Label: Scholastic Teaching Resources Language: English Publisher: Scholastic Teaching Resources 10 3,913.00 39,130.00 46 Set Basic Vocabulary Board. Each Unit Comes With: Flashcards Smash Mat Trace And Color Cut And Glue Flipbook Black And White Versions Of All Activities 10 10,150.00 101,500.00 47 Set Phonics Phones. Specifications - Each Pack Includes Two Durable Whisper Phones, One In Vibrant Blue And One In Eye-catching Red. 10 536.00 5,360.00 48 Piece Taekwondo Mats. Thickened 1 Meter X 1 Meter X 2 Cm Interlocking Mats. Color Blue. 30 1,750.00 52,500.00 49 Set Vestibular Balls- (3 Pieces) Material: Synthetic Material Size: 55.0 / 65.0 / 75.0 Cm. Weight: 1100.0 / 1400.0 / 1700.0 G. Color: Violet / Blue / Black 3 6,200.00 18,600.00 50 Unit Monkey Bar With Platform For Swing- Materials: 7/8-inch Plywood 3.5’x2, Washable Mat, 1/2-inch Braided Ropes, Stainless Steel Carabiners Dimensions: 47 X 27.5 Inches; Maximum Rope Length - 7 Feet, Weight Limit: 100 Kilos (free Installation) 1 42,000.00 42,000.00 51 Set Trampoline With Handrails 40-inch Jumping Surface Area, Handrail Adjusts From 28.5"" To 36.5""h 16lbs. Holds Up To 300 Lbs 2 11,580.00 23,160.00 52 Unit Tumble Barrels-inside Diameter: 18"-24”, Outside Diameter: 24", Weight: 250lbs. (free Installation) 1 40,695.00 40,695.00 53 Set Wall Bars- 6-hole Design Pull Up Bar. The Maximum Weight Is 200kg. Solid Steel Bar With Black Powder Coating To Prevent Rust And Corrosion And Prolong Service Life, With Soft Cushions. 2 2,598.00 5,196.00 54 Set Adl Board - 6 Colors, 6 Different Dressing Skills Training. A Quiet Skill Book Made Of Cardboard And Non- Woven Fabric. Suitable For Children 2-7 Years Old. Package Dimensions: 11.73 X 9.76 X 2.28 Inches Item Weight: 1.28 Pounds" 10 494.00 4,940.00 55 Unit Pediatric Walker - 360-degree Swivel Front Casters For Versatile And Flexible Mobility. Total Height: 75-90cm Side Wheel Width: 70cm. Front And Rear Track Width: 75cm. Left And Right Wheel Track: 40cm Suitable Height: 85-120cm. Weight: About 12kg 4 17,998.00 71,992.00 56 Set Assessment Tool Set Of Assessment Tools For Behavioral, Psychological, Intellectual, Motor, Socio- Emotional (1 Copies Per Set) Like: Ravens Progressive Matrices Tests, Goodenough-draw A Person Test 2 48,000.00 96,000.00 57 Set Assessment Tool Set Of Assessment Tools For Behavioral, Psychological, Intellectual, Motor, Socio- Emotional (1 Copies Per Set) Like: Wechsler Intelligence Scales For Children (wisc-v) 2 48,000.00 96,000.00 58 Pcs Reading Stand - High-grade Steel (iron). Color: Black. Dimensions: 26 Cm X 21 Cm X 16 Cm (folded) Adjustability: Multiple Notches For Adjustable Height And Angle. 1 Rotary Page Clip To Hold Pages Securely. 10 1,050.00 10,500.00 59 Unit Braille Translator- Supports Translation Of Print (word, Html, Daisy And Others) To Braille For Over 130 Languages. Drives All Major Braille Embossers. (with 6 Months Warranty) 1 136,800.00 136,800.00 60 Unit Laptop 15.5" – 17" Monitor, Processor: Between 2.0- 2.8ghz 512gb Ssd, 8gb Ram (3 Mos. Warranty) 36 39,000.00 1,404,000.00 61 Cord Hdmi Cord 5 Meters 5 600.00 3,000.00 62 Cord Hdmi Cord 10 Meters 5 900.00 4,500.00 63 Set Connector Cord. Cord With Male Plug To Connect From Cellphone/ Laptop To Sound Systems Microphone Port. 5 500.00 2,500.00 64 Unit Augmentative Communication Systems. Package Dimensions 9.13 X 3.03 X 1.1 Inches Batteries 2 Aaa Batteries Required. (included) Preprogrammed Commands Wide Variety- Travel Bag- Aac Device 10 3,702.00 37,020.00 65 Unit Call Lights. Receiver Working Voltage: 110-260v Transmitter Battery: 12v 23a Alkaline Battery Working Distance: 1000 Feet In Open Area. [packing List]. 3 Receivers 2 Transmitters. 2 X Double-sided Tape. 1 X User Manual. 2 X 12v 23a Batteries. 10 1,536.00 15,360.00 66 Unit External Hard Drive. 1tb External Hard Drive Usb 3.0 5 3,500.00 17,500.00 67 Unit Audio Voice Recorder. Built-in 375mah Battery, Specification: Recording Time: 512kbps, 32gb: About 144 Hours. Storage Media: Tf Card, 32gb, Battery Capacity: 375mah, Package Size: 15.2x7.8x3.7cm/5.9x3x1.4in, Package Weight: 135g – 140g/4.7oz 10 2,674.00 26,740.00 68 Unit Portable Reading Camera -macro Focus Range 10 Cm Shooting Modes Easy, Macro, Automatic Exposure Control Type Automatic Color; White Video Capture Resolution; 1080p, 2448p 5 10,260.00 51,300.00 69 Unit Laser Printer. Computer Printers Using Powder - Based For Swell Paper. 2 20,000.00 40,000.00 70 Unit 3 In Printer - Print, Scan, Copy, Fax With Adf, Flatbed Color Image Scanner, A4, Ltr, 8.5 X 13’, Folio 9 19,080.00 171,720.00 71 Unit Projector -5,000 Ansi Lumens (standard). Wxga 1,280 X 800) Dlp Type Projector. With Built-in Speaker X 16,000 Hours (standard), 10,000 Hours (eco), 15,000 Hours (extreme Eco) Lamp Life Wireless Projection Hdmi Cable, Bag 2 Years Warranty" 1 25,000.00 25,000.00 72 Unit Projection Screen. Specs: 120 Inch Projector Screen With Tripod Stand Home Outdoor Screens Cinema Portable 1 6,490.00 6,490.00 73 Pcs Calculator. Basic Calculator Big Calculator. Office Supplies. Dimension: 160.4x164.5x44.2mm. Color White. Dual Power Supply. Aaa Battery With Solar Panel. Inner Concave Buttons. 5 500.00 2,500.00 74 Unit Touch Screen Tv – Not Less Than 55" Android Tv (free Installation) 1-year Service Warranty 1 61,000.00 61,000.00 75 Pcs Cork Bulletin Board (20x30cm Cork Board With Black Wooden Frame) 1 430.00 430.00 76 Pcs Convertible Drawing And Drafting Table (manual Lift Dimension W-7.75 X D 24x H22" To 31.5") 3 8,400.00 25,200.00 77 Pcs Table. Desk Painting Easel (wooden Easel Stand For Painting 1.75m Complimentary Screws Firm And Strong) 5 454.00 2,270.00 78 Pcs Gauze Bandage (sterile Gauze Bandage 3x10 Per Box) 2 300.00 600.00 79 Pcs Povidine-iodine 120ml (antiseptic Wound Solution) 5 250.00 1,250.00 80 Pcs Artist Taboret (35 ½" H X 17 ½" W X 14 ½" D+9/cm X 44cm X 37 Cm 1 26,784.00 26,784.00 81 Pcs Medicine Cabinet Large. Dimension: 29 X16.5x16 Cm 2 1,500.00 3,000.00 82 Pcs Sewing Machine (zigzagger) Power:90w, Rated Voltage:220v, Number Of Stiches:23, Automatic Winding. Presser Foot Pressure Adjustable (free Installation) 1 25,000.00 25,000.00 83 Pcs Sewing Machine (electric) (portable Sewing Machine With 23 Stitches (free Installation) 2 15,000.00 30,000.00 84 Pcs Tailors’ Scissors (10") Heavy Duty 5 1,500.00 7,500.00 85 Pcs Glue Gun (20w High Temperature) 5 111.00 555.00 86 Pcs Acrylic Color (set 12 Pc X 12 Ml) 5 368.00 1,840.00 87 Pcs Scissors, 5" Blunted Scissors, Plastic Handle. 5 112.00 560.00 88 Pcs Cutters. Snap Off Blade Knife Blade, Refill 9 Mm 5 13.00 65.00 89 Pcs Watercolors (50 Color Solid Watercolors Tin Box (202'82'33mm) 5 441.00 2,205.00 90 Pcs Art Paper (assorted Colors, Short Size) 5 270.00 1,350.00 91 Pcs Paint Brushes (12 Pcs Fine Detail Paint Brush) 5 246.00 1,230.00 92 Pcs Yarn (yarn Hand Knitting And Crochet Single Color (5 Colors) 5 30.00 150.00 93 Pcs Glue (1 Bottle 240g) 5 126.00 630.00 94 Pcs Colored Pencils (colored Pencils 12/set) 5 190.00 950.00 95 Pcs Colored Pens (fine Line Colored Marker 24 Colors In Pvc Bag) 5 90.00 450.00 96 Pcs Sewing Pins (sewing Pins 40 Pcs/set0 5 10.00 50.00 97 Pcs Sewing Needles(hand) (sewing Needles Big And Small) 5 18.00 90.00 98 Pcs Rotary Cutter (45mm) 5 169.00 845.00 99 Pcs Tape Measure (body Tape Measuring Ruler Tailoring) 5 16.00 80.00 100 Pcs Crochet Hooks (100 Pcs Crochet Hook) 5 286.00 1,430.00 101 Pcs Knitting Needles (2 Pcs/set (35cm) Knitting Sweater Stick Needle Bamboo Sweater Needle Knitting Scarf Tool) 5 144.00 720.00 102 Pcs Crochet Thread (thread Yarn 175 M) 5 46.00 230.00 103 Pcs Sewing Thread (polyester 1000 M) 5 42.00 210.00 104 Pcs Painting Easel. Studio/ (90/150 Cm Easel Wooden Standard Painting Display) 5 569.00 2,845.00 105 Pcs Manual Pencil Sharpener (one -hole Sharpener Tub) 5 68.00 340.00 106 Pcs Doll Mannequin. Whole Body With Stand Decor Body Dress Full Body Display 5 411.00 2,055.00 107 Pcs Transparent Edge T- Square (hand Tool Inch Metric Ruler 6") 5 535.00 2,675.00 108 Pcs Wood Carving Set. Carpentry Tools (professional 12/set Manual Wood Carving) 5 1,670.00 8,350.00 109 Pcs Staple Gun. (gun Tacker/ Staple Gun Length-18cm Width -12cm H-3cm, Color- Silver Head T50) 5 226.00 1,130.00 110 Pcs Slope Sink. (single Bowl Stainless Steel Kitchen Sink Box 15" Single Bowl Kitchen Sink Sus 304) 5 21,892.00 109,460.00 111 Pcs Roofing Square. Dual Marking Right Angle Picture Framing Carpenter Ruler (wadlow Stainless Steel Angle Ruler Aluminum Alloy Body Heavy Duty Tool) 5 216.00 1,080.00 112 Pcs Professional Compound Mitre Box & Saw (mitre Box And Box Saw Set 12 Inch) Miter Box Will Handle Stock 7 1/4" High, 8" Wide At 90°, And 5" Wide At 45°. The Saw Can Be Set At Any Angle And Has Automatic Stops For 90°, 45°, And For 5, 6, 8 And 12-sided Frames. 1 1,510.00 1,510.00 113 Pcs Drawing Lamp (metal Adjustable Arm Work Desk Lamp) 5 373.00 1,865.00 114 Pcs Chisel Rack For Wood Carving (professional 12-piece Wood Carving Chisel Set With Black Case Sharp Hand Tools For Beginners) 5 1,299.00 6,495.00 115 Pcs Corner Clamp (90-degree Single Swing Jaw Corer Clamp 68 Mm) 5 258.00 1,290.00 116 Pcs Decorative Realistic Artificial Fruits (realistic Artificial Fruit Such As Apples, Orange, Lemon, Pineapple And Banana) 5 293.00 1,465.00 117 Pcs Geometric Shapes Set (wooden Montessori Learning Geometric Building Blocks) 5 1,176.00 5,880.00 118 Pcs Geometric Designer Templates (multi -functional Geometric Ruler) 5 118.00 590.00 119 Pcs Stack Rack (toy Origami Rack Shelves) 5 1,477.00 7,385.00 120 Pcs Picture Frame And Miter Clamp (90 Degree Right Angle Clip Picture Frame) 5 710.00 3,550.00 121 Pcs Heat Gun (heat Gun With Accessories 2000 W) 5 1,725.00 8,625.00 122 Pcs Tape Dispenser (tape Dispenser 1") 5 114.00 570.00 123 Pcs Multi- Function Three - Hole Puncher (multi-dimensional 3 -hole Puncher) 5 4,176.00 20,880.00 124 Pcs Metric Scale (technical Triangular Scale. Set Of 45, 90 Degrees) 5 68.00 340.00 125 Pcs Steel Tape Measure (tape Measure 8m/20) 5 470.00 2,350.00 126 Pcs Heavy Duty Circular Saw (7-¼" 1600w) 5 4,104.00 20,520.00 127 Pcs Abrasive Disc Cutter Machine (ssc22 14-inch Cut Off Saw Machine 2200w) 5 7,577.00 37,885.00 128 Pcs Manual Canvas Pliers (industry Line Combination Plier Insulated Pliers) 5 416.00 2,080.00 129 Pcs Jet-bow Beam Compass Drawing Set. The Set Includes 6" Speed Compass With Inter-changeable Pen, Pencil, Divider Parts, And Replaceable Needle Points. 4½" Bow Compass With Inter-changeable Pen, Pencil, And Divider Parts. 5 1,169.00 5,845.00 130 Pcs Human Head Model(2 Pack 17" Foam Head Female Wig Head 5 4,791.00 23,955.00 131 Pcs Screw Drivers Set( 9 Pcs Multi-purpose Magnetic Screwdriver Set 5 226.00 1,130.00 132 Pcs Pliers. Pliers And Grip Set (premium 4 Pcs Insulated Pliers Set) 5 2,904.00 14,520.00 133 Pcs Artist Stool With Wheels (stainless Steel Stool Bar) 5 1,991.00 9,955.00 134 Pcs Screen Print Squeegee (curved Aluminum Handle Squeegee 75) 5 308.00 1,540.00 135 Pcs Mixing Paint Palette (paint Mixing Palette 10 Well Plastic) 5 45.00 225.00 136 Pcs Carving Chisels For Wood (wood Chisel 4 Pcs/set) 5 798.00 3,990.00 137 Pcs Files Set For Wood Carving, Craft Metal, And Glass Stone (10-piece Needle File Set For Jewelries) 5 191.00 955.00 138 Pcs Heavy Duty Multi- Purpose Bench Vise (8") Mounted On A Steel Platform. 2 15,000.00 30,000.00 139 Pcs Anvil (15 Kg) With Steel Mounting Platform 2 12,000.00 24,000.00 140 Unit Electric Angle Grinder. Heavy Duty 4" 1000w Professional Power Tools Grinders Variable-speed 3 2,500.00 7,500.00 141 Box Cutting Disc For Steel. Ultra-thin Cutting Disc 4 (25pcs) For Stainless 5 2,000.00 10,000.00 142 Pcs Cutting Discs For Masonry. 4”-inch Professional Diamond Cutting Disc Continuous Eco For Tile / Ceramic 20 300.00 6,000.00 143 Set Drill Bits.3-12mm Multifunctional Triangle Glass Metal Drill Bit Set Diamond Ceramic Tile Concrete Brick Wood Punching Hole Drill Bits 5 500.00 2,500.00 144 Set Drill Bits. 13pc Cobalt High Speed Steel Twist Drill Bit Set 1.5mm-6.5mm For Drilling Metal Wood Stainless Steel 5 500.00 2,500.00 145 Set Drill Bits For Wood. 7pc X Long Wood Drill Bit Set 4mm 5mm 6mm 7mm 8mm 10mm 12mm X 300mm Brad Point Auger Drill Bits Wood 5 500.00 2,500.00 146 Set Electric Wood Power Planer. Wood Planer For Woodworking. 1200 Watts. 1300 Rpm. 50 Hz. 80mm Wide. With Accessories. With Warranty 3 3,000.00 9,000.00 147 Unit Impact Drill 13mm Hammer Electric Drill Heavy Duty 220v Household Power Tools Industrial Screwdriver. 7.5 Amp Copper Motor, 700w, 3300rpm. With Warranty 3 3,000.00 9,000.00 148 Box Welding Rod Special N-6013 (2.5) (3/32 X 13”) 10kg Per Box 4 2,500.00 10,000.00 149 Unit Electric Welding Machine. Portable Igbt Inverter Welding Machine (dc Inverter Welding) With Accessories. With 3 Mos. Warranty 3 5,000.00 15,000.00 150 Pcs Welding Protective Suite (genuine Whole Leader Welding Apron) 5 2,362.00 11,810.00 151 Pcs Welding Hood Cape (standard Size) 5 311.00 1,555.00 152 Pcs Welding Gloves 5 186.00 930.00 153 Pcs Welding Protective Visor Glasses, Standard 5 420.00 2,100.00 154 Pcs Welding Mask (welding Helmet Auto Darkening Adjustable) 5 465.60 2,328.00 155 Pcs Hard Hat (heavy Duty Safety Helmet With Chin Strap) 5 291.00 1,455.00 156 Pcs Compact Electric Kilns (quick Fire A Kiln Controller) 2 39,305.00 78,610.00 157 Pcs Heat Press Transfer Machine (multi-function Heat Press Machine Flatbed: 30 Cm X 38 Cm) 2 11,808.00 23,616.00 158 Pcs Hammer For Carpentry. Claw Hammer /16oz 5 300.00 1,500.00 159 Set Hacksaw Frame With Blade For Metal 12" 300mm Heavy Duty 5 350.00 1,750.00 160 Pcs Wooden Hand Saw. 18" High Quality Metal Blade With Plastic And Rubber Handle 5 350.00 1,750.00 161 Pcs Steel Measuring Tape. Fluorescerous Tape 10m Portable Self Lock Tape Measure Meter Tape Tools 5 350.00 1,750.00 162 Pcs Tri Square. High Quality Metal Frame 12" With Clear Markings 5 750.00 3,750.00 163 Pcs Level Bar. Aluminum Level Bar With Magnet Heavy Duty 80cm 2 2,000.00 4,000.00 164 Pcs Plumb Bob / Hulog. With String 350g 5 250.00 1,250.00 165 Set Rachet. Combination Wrench Steel Chrome Vanadium 8-24mm (per Piece) 5 500.00 2,500.00 166 Set Ratchet Wrench. 12pcs 1/2 1/4-inch Drive Ratchet Wrench Cr-v Socket Kits Mechanic Spanner Car Motorcycle Repair Tool 5 700.00 3,500.00 167 Pcs Adjustable Wrench. Industrial Adjustable Wrench (12") 300mm Made Of High-quality Steel. 5 350.00 1,750.00 168 Set Back Wrench. Set Of Heavy-duty Double Ring Spanner Wrench (metric 28mm - 32mm) Cr-v 5 500.00 2,500.00 169 Set Combination Wrench Tool Set 16pcs (8-32mm Professional Dual Purpose 5 700.00 3,500.00 170 Set Magnetic Screwdriver Set Professional Cushion Grip 5 Flat Head And 4 Phillips Tips Screwdriver Non-slip 5 1,000.00 5,000.00 171 Set Allen Wrench. Short Arm Hex Allen Key Set With Carbon Steel Material. (1.5 To 6 Mm 7 Pcs Set) 5 100.00 500.00 172 Set Heavy Duty Pliers. 8"standard Pliers Cutter Longnose Combinations 8"pliers 5 500.00 2,500.00 173 Pcs Water Pipe Wrench 18” Liyabe Tubo Yabe Hand Tools 5 500.00 2,500.00 174 Set Chisel For Wood. 90 Mm Wooden Handle. 12pcs Professional Manual Wood Carving Hand Chisel Carving Tool Set, 8mm-14 Mm High Quality Steel Blade. 5 900.00 4,500.00 175 Set Wood Planer Set -katam. Locally Manufactured 8 Inches 2 500.00 1,000.00 176 Pcs Rubber Mallet (16 Oz) 5 258.00 1,290.00 177 Pcs Ball Peen Hammer (½ Lb. (80 Oz) 5 376.00 1,880.00 178 Pcs Cutting Mat 6680412 5 268.00 1,340.00 179 Pcs Heavy Duty Extension Wire (10-meter Wire: 162 C, Plug: 15a, 25 V, Maximum Wattage:3750 W., At Least 4 Outlets) 5 900.00 4,500.00 180 Set Microphone With 5-meter Cord, Anti-interference, Anti-whistling. 2 1,500.00 3,000.00 181 Pcs Portable Sound System With Microphone ( Active Portable Trolley Speaker , 600w Max Power, Bluetooth + Tws, Usb & Sd Playback, Fm Radio, Line-in & Line -out, 2 Guitar Input, 2 Wired Mic Input, 180 Channels, Mic Priority, High Quality Lead Acid 12ah Battery, 12 Dc Input, Dimensions: (l) 36.5cm (w) 40 Cm (h) 67.5 Cm, 2 Fee Wireless Mic) 2 20,000.00 40,000.00 182 Pcs Camera Flash. 92 Ft./28 M) 2 13,800.00 27,600.00 183 Pcs Camera Lens (18-200mm F/3.5-5.6 Lens 2 40,336.00 80,672.00 184 Pcs Camera Tripod (aluminum Tripod Digital Camera Tripod Mobile Phone Selfie Stands) 2 2,500.00 5,000.00 185 Pcs Studio Lights (soft Light) 4 10,200.00 40,800.00 186 Hdmi Cord. Hdmi Male To Male Cable Hd104 10110 10 Meter. 4k/60hz 2 1,500.00 3,000.00 187 Hdmi Cord. 5 Meters. Two-color Injection Plug Double Shielded Cable Body. Hdmi2.0 Version. Resolution: 0.75m-3m Support 4k 60hz; 5m Support 4k 30hz Only. Awg:30awg (0.75m-5m) 5 600.00 3,000.00 188 Pcs Soft Box Stand And Reflector Holder (50x70 Cm Soft Box Lighting Kit) 2 442.00 884.00 189 Pcs Monolights (200 W) 2 3,931.00 7,862.00 190 Pcs Reflector With Holder (holder /arm Stand Kit) 2 2,891.00 5,782.00 191 Pcs Boom Light Stand And Reflector Holder (420 Lb. Light Boom Stand With Weight Bag Up To 5kg Maximum Lead Capacity) 3 5,508.00 16,524.00 192 Pcs Background (4.22 M Background Paper 1.36 X 10m) 3 1,438.00 4,314.00 193 Pcs Display Panel Board (display Parallel Board) 1 14,290.00 14,290.00 194 Pcs Offline Mini Compressor (air Compressor Kwv550 9l Oil Less 3 4,558.00 13,674.00 195 Pcs Styrofoam Cutter (electric Foam Cutter Hot Wire Pen Portable) 5 238.00 1,190.00 196 Pcs Potter's Wheel/ Electric Potter's Wheel / Cutter (220 Volts Pottery Wheel) 1 6,228.00 6,228.00 197 Pcs Fire Blanket (with Pvc Pouch 1.2m X 1.2 M) 3 624.00 1,872.00 198 Pcs Smoke Detector X-sense Xs01 Mini Smoke Detector- Stand Alone 3 1,799.00 5,397.00 199 Pcs Disposal Bins (trash Bins 75 L) 3 1,804.00 5,412.00 200 Pcs Dressing Mirror (whole Body Mirror With 4 Wheels Height 5ft. Width 14 Inches) 1 1,500.00 1,500.00 201 Pcs Dish Towels (10 Pc. Per Set 25 Cm X 25 Cm Microfiber Super Absorbent) 10 993.00 9,930.00 202 Pcs Steamer. 3 Layer Steamer 32cm Stainless Steel Cooking Pots Cookware Steam High Quality 3 1,156.00 3,468.00 203 Pcs Soap Dish (dual Soap Case With Cover & Handle- Bathroom Soap Dish / Soap Case) 50 70.00 3,500.00 204 Pcs Detergent (detergent Powder Set 6 Kilos-i Kilo X 6 Pouches) 50 288.00 14,400.00 205 Pcs Hand Soap (liquid Hand Soap Antibac 1 Gallon) 50 216.00 10,800.00 206 Pcs Pots (extra Size #4 (26cm Diameter 16 Cm In Height) 20 673.00 13,460.00 207 Pcs Pans (nonstick) 5 194.00 970.00 208 Pcs Toilet Paper Holder (wall Mounted Bathroom Toilet Paper Holder Tissue) 2 238.00 476.00 209 Pcs Dipper (plastic Dipper L 11" X W 36"x H 41" 2 15.00 30.00 210 Pcs Pail (utility Pail With Metal Handle 10l/26x27 Cm) 2 111.00 222.00 211 Pcs Trash Can (with Plastic Swing Lid L-27 Cm, W- 17.5cm, H- 40.5 Cm) 2 260.00 520.00 212 Pcs Toothbrush (extra Clean Toothbrush 5 Pk -soft) 20 182.00 3,640.00 213 Pcs Hairbrush (natural Wood Hairbrush Comb) 20 120.00 2,400.00 214 Pcs Comb (1 Dozen Suklay 3-hole X Sz-28 Big) 20 90.00 1,800.00 215 Pcs Toothpaste (red 100 Ml) 20 60.00 1,200.00 216 Pcs Plastic Tumbler 20 300.00 6,000.00 217 Pcs Razor (twin Blade Disposable Razors) 20 120.00 2,400.00 218 Pcs Nail Clipper (stainless Nail Clippers H-8 Cm Wt-0.046 Kg) 20 100.00 2,000.00 219 Pcs Nail File (12 Pcs Red Nail File (medium) 20 50.00 1,000.00 220 Pcs Deodorant (roll On 50 Ml Bottle) 20 150.00 3,000.00 221 Pcs Face Towel (basic Face Towel - Free Size) 20 100.00 2,000.00 222 Pcs Feminine Napkin (silk Floss 12 Pcs) 200 50.00 10,000.00 223 Pcs Dust Catcher With Broom (2n1 Broom Dustpan Set Windproof Floor Sweeper With Broom) 5 170.00 850.00 224 Pcs Feather Duster (soft Magic Feather Duster Long Size And Colorful Colors (plastic) 5 150.00 750.00 225 Pcs Wash Rags (round Rags) 5 30.00 150.00 226 Pcs Floor Map (magic Spin Mop With Bucket 360° Rotating Floor Cleaning Plastic Liner) 5 264.00 1,320.00 227 Pcs Garbage Can (super Convenient Mini Flip Lid Trash Can (plastic) 10 150.00 1,500.00 228 Pcs Sponge (high Density Double-sided Dishwashing Sponge 7x10x3 Cm) 10 30.00 300.00 229 Pcs Spray Bottle (garden Sprayer Capacity: 500ml) 10 170.00 1,700.00 230 Pcs Table Napkin (1 Ply 40s Sheets Folded) 10 21.00 210.00 231 Pcs Place Mat (table Placemat Pvc Anti-slip Placemat Washable Durable Kitchen S:30x45cm) 10 25.00 250.00 232 Dozen Plates (12 Pcs Plates 8-inch Melamine White) 6 358.00 2,148.00 233 Set Drinking Glass (drinking Glass 10 Oz Tall Clear Tumblers Set Of 6 L=5.5cm H-12 Cm) 6 510.00 3,060.00 234 Pcs Pitcher (durable Crystal-clear Glass 1.5l) 6 258.00 1,548.00 235 Pcs Bowl (serving Bowls, Clear Glass 20 Cm Diameter) 6 72.00 432.00 236 Pcs Water Dispenser. Hot And Cold Water/drinking Household Multifunctional Top Loading. Stainless Steel Casing Color White. Dimension: 85x29x29 Cm. Large Bottom Locker. 3 3,000.00 9,000.00 237 Pcs Electric Hand Drier (free Installation) 1 5,000.00 5,000.00 238 Pcs Water Pail. (utility Pail With Metal Handle 10l Color: Red/ Blue L-27cm, W-27cm, H-26 Cm 6 335.00 2,010.00 239 Bot Dish Washing Liquid. Kalamansi Lemon Antibac Hygiene 780ml Bottle 10 350.00 3,500.00 240 Pack Laundry Powder Soap. 5 Kg Supra Clean, Natural Scent 10 600.00 6,000.00 241 Pcs Laundry Bar Soap (scrubber Bar 125g) 120 18.00 2,160.00 242 Pcs Clothesline (1 Pc Nonslip Clothesline 35 M) 20 10.80 216.00 243 Pcs Clothes Pin (laundry Clothes Pins Spring Clips 24 Pcs Plastic) 20 48.00 960.00 244 Pcs Wash Basin (laundry Basin 23 Inch) 10 504.00 5,040.00 245 Pcs Laundry Bag Set (4 Pcs/set Laundry Washing Bag- 1 Pc M(30cmx40cm) 1pc L (40cmx50cm) 1pc Xl (50x60 Cm) 10 150.00 1,500.00 246 Pcs Ironing Board (ironing Board With Stand Portable 43"iron Board (70cm To 86 Cm) 5 1,300.00 6,500.00 247 Pcs Flat Iron (non-stick Teflon Saleplate Spray Function Ht & Width 251x170x120mm 5 870.00 4,350.00 248 Pcs Mono Bock Chair, Standard Size. White. Load Capacity 200kg. 20 600.00 12,000.00 249 Pcs Curtain Rod (steel +anti-rust Coating, Adjustable Size: Large 120 Inches) 10 1,200.00 12,000.00 250 Pcs Curtain (1pc 5x7 Ft. Window Curtain With 8-hole Grommet Rings For Bedroom And Living Room) 10 714.00 7,140.00 251 Dozen Hangers (12 Pcs. Plastic Hanger) 2 150.00 300.00 252 Pcs Washing Machine. 7.0 Kg Digital Inverter Fully Automatic Top Load Washing Machine (water Level: 5, Gross Weight: 31kg, Net Weight: 27 Kg Gross Dimension: (wxhxd)=580x890x600mm Net Dimension: (wxhxd)= 540x857x568mm) 2 20,000.00 40,000.00 253 Pcs Vacuum Cleaner (heavy Duty Gas 12-25 Pl Wet And Dry Vacuum Cleaner/ Extractor With Power Socket System 1,250 W Weight-9kg, Max Input Power- 1,250 W, Max Vacuum Power-200 Mbar) 5 11,547.00 57,735.00 254 Pcs Socks (cotton Socks Unisex High Street Socks Sixe:38-44 2 50.00 100.00 255 Pcs Dress (sleeve Ruffle Hem Plain Elegant) 1 500.00 500.00 256 Pcs Slippers (sizes 10, Flipflop Brand Light Weight And Durable 2 132.00 264.00 257 Pcs Mattress (for Single Size Bed Size Polyester 3.5 Inch Thick 6 4,440.00 26,640.00 258 Bed Foam (for Single Bed, 3 Inches Thick) 3 3,500.00 10,500.00 259 Pcs Pillows (foam Pillow 4x12x20) 3 426.00 1,278.00 260 Pcs Bedsheets (cotton Full Garterize 3n1 Bed Sheets, L-60in Ww-75in (for Single Bed Size) 3 300.00 900.00 261 Pcs Alarm Clock (3-inch Retro Mute Quartz Bell Alarm Clock Movement Bedside With Night Light And Loud Alarm) 1 450.00 450.00 262 Pcs Handheld Rechargeable Pool Vacuum. • Strong Built-in 4v 2ah Ni-mh Rechargeable Batteries • Suitable For Use With All Purespas And Above Ground Pools Up To 18 Feet Or 5.49 Meters In Diameter • 0.21 Gal (0.8 Liters) Quick Release Transparent Debris Container • 12 Gal/min. (45 Liters/minute) Water Suction For Efficient Debris Collection • 94 Inches (2.39m) Lightweight Telescoping Aluminum Pole • Two Interchangeable Brush Heads • Automatic Shut-off Feature When Vacuum Is Not Submerged In Water • Ipx8 Waterproof Switch For Added Protection • 5-6 Hour Charge Time / 50 Minutes Maximum Running Time • Usb Charging Cable Included For Convenient Recharging (plug Not Included) 3 9,998.00 29,994.00 263 Pcs Swimming Pool Leaf Skimmer. Purpose: Used For Cleaning Swimming Pool And Salvaging Pool Water Garbage. Material: Pp Plastic. Size: 420*280*30mm/16.54*11.02*1.18". 5 376.00 1,880.00 264 Pcs Pack Of 300 Pcs Chlorine Tablet For Swimming Pool. Adjustable Chlorine Dispenser 8 Inchin Combination With Mont, 3-inch Chlorine Tablets Adjust The Water Flow Rate And Hereby The Amount Of Chlorine Dissolved In Your Pool Package Included:1*chlorine Dispenser +300pcs Pool Cleaning Tablet Or 300pcs Pool Cleaning Tablet 20 500.00 10,000.00 265 Pcs Adaptive Swim Life Jacket For Disabled. Keeps The User’s Face Out Of The Water. Stops The Tension Of The Neck. Upright Position. Back Support. Therapist Hands Free! Double Harness Distributes Tension’s Adjustment. Possibility To Add The Harness Pad (or “cuissard” In French) No Latex. 5 11,000.00 55,000.00 266 Pcs Bakery Display Rack (estante). Made Of Glass And Aluminum Frame. 4 Layer Of Glass (transparent) Or Acrylic With Partition. Rubber Wheels With Lock. At Least 2ftx 5ftx 4 Ft 2 40,000.00 80,000.00 267 Pcs Bread Rack. Made Of 12 Mm Steel. 24"x5ftx5ft. Can Hold Up To 10 Trays (lagayan Ng Plantsa Ng Tinapay) 2 10,000.00 20,000.00 268 Pcs Cookery Cabinets (made With Carbon Steel 5 Layers, Size: H: 144cm, W: 55cm) 3 3,621.00 10,863.00 269 Set Housekeeping Cart. Multi-functional Movable Cleaning Cart Housekeeping Property Cleaning Tool Cart Special Trolley. Standard For Housekeeping Work. 5 5,000.00 25,000.00 270 Set Shopping Cart Utility Cart Trolley Grocery Cart For Warehouse Garden Supermarket 5 6,000.00 30,000.00 271 Pcs Kitchen Carts (2 Layer Stainless Steel Carts With Two Brake Wheels; Size: 400mm X 500mm X 860mm) 2 3,019.00 6,038.00 272 Pcs Weighing Scale Digital. Display Mode: Led/lcd+light. Weighing Range :40kg. Accuracy: 2g. Product Size: 35x33x14cm 3 Lcd Display On The Operator’s Side Of The Scale As Well As 3 Lcd Display On The Customer’s Side. Minimum Capacity Is 2g. Maximum Capacity Is 40kg Power Source: Built In Rechargeable Battery With Usb Cable Battery Powered Or Connect Usb Cable. Battery Powered Or Connect Usb Cable To Use Weight Platform/tray Material Is Stainless Steel. 4 7,000.00 28,000.00 273 Pcs Measuring Cup. Measuring Cup Sizes: 1 Cup (250ml). 1/2 Cup (125ml). 1/4 Cup (60ml); 1/8 Cup (30ml). Materials. Plastic (abs) 6 500.00 3,000.00 274 Pcs Measuring Spoon 1tbsp 15ml 1/2tbsp 7.5ml Ltsp 5ml 1/2tsp 2.5mlmaterial: Stainless Steel+pp Packing: Pp Bag 6 400.00 2,400.00 275 Pcs Measuring Urn - Glass, Capacity: 100 Ml. (with 10 Ml Increments), Metric And English System Of Measurement; With Handle And Spout, Clear, Non- Porous, Tempered Glass 6 450.00 2,700.00 276 Pcs Wire Whisk - Length: 30 Cm (12 ") Material Stainless Steel 6 320.00 1,920.00 277 Pcs Chef's Knife (stainless Steel) 33cm X 4.5cm X 2cm 6 750.00 4,500.00 278 Pcs Boning Knife (stainless Steel) 24.4cm X 1.9cm X 1.7cm 6 492.00 2,952.00 279 Pcs Oysters Knife (stainless Steel) 15.5com X 6.5cm X 3cm 6 187.00 1,122.00 280 Pcs Cleaver Knife (stainless Steel) 7 Inches Or 2.5mm 6 1,074.00 6,444.00 281 Pcs Tenderizer (pin Tenderizer) Stainless Steel Diameter: 5cm, Height: 19cm 6 119.00 714.00 282 Pcs Tenderizer Mallet. (tenderizer) Stainless Steel 12.6 Inches X 11.5x4cm 6 240.00 1,440.00 283 Pcs Skimmer, Fine (stainless Steel) 7.3cm X 5cm X 21.5cm 6 160.00 960.00 284 Pcs Wire Skimmer, Small (stainless Steel) Handle: 14; Radius: 14 6 105.00 630.00 285 Pcs Skimmers, Spider (stainless Steel) Handle: 14; Radius: 20 6 115.00 690.00 286 Pcs Strainer, Small, Fine (stainless Steel) Diameter:14cm; Length: 29cm; Depth: 5.5cm 6 160.00 960.00 287 Pcs Colander Strainer (stainless Steel) 48cm X 20cm X 12cm 6 298.00 1,788.00 288 Pcs Siever, Small (stainless Steel) 14 Cm 6 188.00 1,128.00 289 Pcs Strainer, Medium, Fine (stainless Steel) Diameter:16cm; Length: 30.5cm; Depth: 5.9cm 6 180.00 1,080.00 290 Pcs Turner (stainless) Dimension: 34.5 X 9.8 X 4.4 Cm 6 280.00 1,680.00 291 Pcs Spatula (silicon) 27.2 X 5.5 X 1.5cm 6 169.00 1,014.00 292 Pcs Wooden Spoon (made With Beech Wood 10cm X 34cm X 2cm) 6 244.00 1,464.00 293 Pcs Parisienne Scoop (stainless Steel Blade With Plastic Handle) Scoop Diameter: 30mm And 27mm; Total Length: 170mm 6 216.00 1,296.00 294 Pcs Fruit Juicer, Standard Type 6 1,500.00 9,000.00 295 Pcs Zester (stainless Steel) Length: 30cm/11.81 Inches 8 268.00 2,144.00 296 Pcs Piping Bag (disposable Bag Size: 24.5cm X 17cm 8 208.00 1,664.00 297 Pcs Pastry Tubes (stainless Steel) 3cm X 3cm X 6.1cm 8 142.00 1,136.00 298 Pcs Strainer, Chinois, Small (stainless Steel) 16cm Handle: 5.5inches 8 198.00 1,584.00 299 Pcs Filling Funnel (stainless Steel) Upper Diameter: 10.5cm, Lower Diameter: 3.7cm, Height: 4.5cm 4 212.00 848.00 300 Pcs Measuring Spoon (1set: 1tbsp, 1/2tbsp, 1tsp, 1/2tsp, 1/3tsp, 1/4tsp) 6 245.00 1,470.00 301 Pcs Tongs (stainless Steel) 9 Inches 10 110.00 1,100.00 302 Pcs Tongs (stainless Steel) 12 Inches 8 179.00 1,432.00 303 Pcs Ice Cream Scoop (stainless Steel) Diameter: 4.5cm, Length: 18cm 6 208.00 1,248.00 304 Pcs Cheese Cloth (made From Cotton) 101 X 270cm 10 223.00 2,230.00 305 Pcs Serving Spoon (heavy-duty Stainless Steel) Length: 22.5cm; Width: 6cm 24 102.00 2,448.00 306 Pcs Pepper And Salt Grinder (made With Stainless Steel, Glass And Ceramic) Approx. 19x6.5cm 6 296.00 1,776.00 307 Pcs Core Seed Remover (stainless Steel; Approx: 1.4x21.5cm) 8 229.00 1,832.00 308 Pcs Wire Whisk, Small (stainless Steel+plastic Handle; 8 Inches) 8 180.00 1,440.00 309 Pcs Wire Whisk, Medium (stainless Steel+plastic Handle; 10.2 Inches) 8 189.00 1,512.00 310 Pcs Wire Whisk, Heavy Duty (stainless Steel+plastic Handle; 14 Inches) 2 258.00 516.00 311 Pcs Can Opener (stainless Steel Blade; Length: 17cm High) 1 370.00 370.00 312 Pcs Muti-purpose Kitchen Scissors/ Shears (scissors Length: 21.5cm; Blade Length: 10cm; Handle Length: 11.5cm; Handle Width: 9.5cm; Blade Thickness: 0.4cm Weight: 200grams) 8 368.00 2,944.00 313 Pcs Soup Ladle, 4 Oz (stainless Steel; Size: 7.5cm X 30 Cm) 8 124.00 992.00 314 Pcs Soup Ladle, 6 Oz (stainless Steel; Size: 7.5cm X 30 Cm) 8 194.00 1,552.00 315 Pcs Soup Ladle, 8 Oz (stainless Steel And Wooden Handle: 10 X 51 Cm) 3 290.00 870.00 316 Pcs Soup Ladle, 12 Oz (stainless Steel And Wooden Handle: 15 X 51 Cm) 2 360.00 720.00 317 Pcs Kitchen Spoon (stainless Steel; Size: 8cmx6.5cmx21cm) 8 86.00 688.00 318 Pcs Kitchen Spoon, Slotted (material: Plastic; Size: 7x3x43cm) 8 289.00 2,312.00 319 Pcs Kitchen Fork (stainless Steel; Size: 7cmx4cmx21cm) 4 72.00 288.00 320 Pcs Carving Fork (stainless Steel; Size: 13 Inches Long) 3 162.00 486.00 321 Pcs Digital Kitchen Thermometer (cooking/food Temperature; Size 34mm X 270mm) 2 486.00 972.00 322 Pcs Muti-function Vegetable Fruit Peeler Slicer Cutter Chopper (material: Abs + Stainless Steel) 2 429.00 858.00 323 Pcs Stock Pot, Big (with Glass Cover; Size: 34.5 X 27.9 Cm X 16.6 Cm) 2 798.00 1,596.00 324 Pcs Frying Pan, Small (scratch Resistant And Non-stick; Size: 20cm) 4 233.00 932.00 325 Pcs Frying Pan, Medium (scratch Resistant And Non-stick; Size: 24cm) 4 380.00 1,520.00 326 Pcs Frying Pan, Large (scratch Resistant And Non-stick; Size: 28cm) 2 578.00 1,156.00 327 Pcs Colander, Small (stainless Steel; Size: 24cm X 22cm) 3 204.00 612.00 328 Pcs Colander, Medium (stainless Steel; Size: 28cm X 22cm) 2 298.00 596.00 329 Pcs Cutting Board (material: Bamboo; Size: 34x24x1.8cm/750g) 4 209.00 836.00 330 Pcs Heavy Duty Electric Grill Machine 2 10,000.00 20,000.00 331 Pcs Portable And Foldable Charcoal Barbeque Grill 25"x30"x27" 2 2,000.00 4,000.00 332 Unit Cotton Candy Machine, Power 950 Watts, Speed 3600 Rpm, Pre Heating Time 1 To 3 Minutes, 515 Mm Diameter Stainless Drum. 1 5,000.00 5,000.00 333 Pcs Fish Poacher, Medium (stainless Steel With Tempered Glass Cover; Size: 24cm X 38.7cm X 10cm) 1 983.00 983.00 334 Pcs Casserole, Small (stainless Steel: 2.1 Liter; Size: 12cm X 15cm) 6 599.00 3,594.00 335 Pcs Casserole, Medium (stainless Steel: 3.9 Liter; Size: 12.5cm X 20cm) 4 689.00 2,756.00 336 Pcs Wok, Small (nonstick Carbon Steel; Size: 32cm) 4 389.00 1,556.00 337 Pcs Wok, Medium (nonstick Carbon Steel; Size: 36cm) 1 401.00 401.00 338 Pcs Double Boiler, Medium (stainless Steel; Size: 27x14x6cm) 1 389.00 389.00 339 Pcs Paella (heavy Duty Carbon Steel; Size 25cm) 8 581.00 4,648.00 340 Pcs Glass Rack (plastic-coated Metal; Capacity: 24pcs Glass; Dimension: L:52cm; W: 36cm; H:8cm) 2 461.00 922.00 341 Pcs Soup Cup Rack (2 Layered Rack; Size: 35 X 25 X 28cm) 3 899.00 2,697.00 342 Pcs Plate Rack (stainless Steel; Size: 30cmx22.8cmx12.9cm) 2 492.00 984.00 343 Pcs Baking Tray, Small (stainless Steel; Size Details: 23cm X 17cm) 8 258.00 2,064.00 344 Pcs Utility Tray (stainless Steel: Stain Resistant; Size: 45cm X 35cm X 4.8cm) 12 189.00 2,268.00 345 Pcs Roasting Pan (stainless Steel; Size: 31.5 X 24.5 X 2.5 Cm) 4 378.00 1,512.00 346 Pcs Dish Towels (highly Absorbent Cloth With 3pcs Per Pack) 8 98.00 784.00 347 Pcs Cooler, 2.5ft X 2.5 Ft X 3ft Plastic, With Good Insulation 1 3,000.00 3,000.00 348 Pcs Plastic Silverware Or Real Silverware (stainless Steel; 18pcs Utensils Set Includes: 6 Dinner Fork, 6 Dinner Spoons And 6 Dinner Teaspoons) 2 415.00 830.00 349 Pcs Glasses. Dining Glasses (6pcs. Thick Clear Glass: W: 3inches And H: 4inches) 6 265.00 1,590.00 350 Pcs Teacups (ceramic White; Capacity: 250ml) 2 188.00 376.00 351 Pcs Small Plate / Saucers (ceramic With Size: 6 Inches And 6pcs Per Set) 6 140.00 840.00 352 Pcs Cabinet Dish Organizer (2 Layered Metal Dish; Size:41.5cm X 30cm X 47cm) 1 2,499.00 2,499.00 353 Pcs Sponge And Soap Holder For Kitchen (stainless Steel) 18x 10 X 9cm 3 418.00 1,254.00 354 Pcs 11-piece Pots/pans (stainless Steel) 1 5,158.00 5,158.00 355 Pcs Silicone Kitchenware Set. Composed Of Slotted Spoon 12". Soup Ladle 12". Solid Turner 12". Tongs 10". Whisk 9.5". Basting Brush 10.8". Pasta Server 12.5". Round Spatula 12". Spoon 12.5" Spatula 12.6" And Utensils Holder. 6 647.50 3,885.00 356 Pcs Rotary Eggbeater (stainless Steel) 31cm /12.2", W:9.5cm/3.74" 2 340.00 680.00 357 Pcs Dough Scraper (stainless Steel) 16x12x2cm 3 178.00 534.00 358 Pcs Gas Range And Oven (1 Turbo, 1 Large And 2 Medium Burners) 33x42x39.5, (49 Liters ) 1 46,162.00 46,162.00 359 Pcs Refrigerator (7 Cubic Feet, Stainless Look) Two Door Direct Cool 1 15,717.00 15,717.00 360 Pcs Kitchen Cupboards (7 Doors, 3 Drawers) 120x 40x90 Cm 2 13,198.00 26,396.00 361 Pcs Cooking Brush (silicone) Heat Resistant 3 82.00 246.00 362 Pcs Blender. (9 In1 Food Processor, Good For Chopping, Slicing,grating,shredding, Whisking)18x18x38cm 3 3,742.00 11,226.00 363 Pcs Mechanical Microwave Oven (countertop,20 Liters) 700w - 1200w 3 5,075.00 15,225.00 364 Pcs Kitchen Scale Food (manual) 5 Kilogram 2 252.00 504.00 365 Pcs Measuring Spoons (stainless Steel, 6pcs Heavy Duty) 3 258.00 774.00 366 Pcs Measuring Cups (12 Pieces, Bpa -free Plastic Long Lasting Used) Large And Medium Cups 3 2,208.00 6,624.00 367 Pcs Kitchen Shears (stainless Steel) 9 Inches/ 225mm 3 357.00 1,071.00 368 Pcs Potato Masher With Soft Grip Handle (stainless Steel) 9.5x27x8cm 3 357.00 1,071.00 369 Pcs Medium Graters (stainless Steel) 18/8 3 430.00 1,290.00 370 Pcs Funnel (stainless Steel) 22x14.5cm 3 715.00 2,145.00 371 Pcs Can Opener (automatic) 16.3x 1.5cm 3 698.00 2,094.00 372 Pcs Cast Iron Pots And Pans (ceramic, Non-stick) 21.85x 13.19x12.80inch 3 7,180.00 21,540.00 373 Pcs Gas Stove. 2 Burner Built In Gas Stove ( Stainless Steel) 73x41x9cm With Hose And Safety Regulator. 5 3,640.00 18,200.00 374 Pcs Lpg Tank 11kg 6 5,000.00 30,000.00 375 Unit Electric Stove. Stainless Frame. Multifunctional Induction Cooker Inverter Electric Stove Heavy Duty Energy-saving 3500w 220v. All Copper Heating Coil. Five Speed Power Adjustment. Explosion Proof. With Digital Display Panel. 5 2,500.00 12,500.00 376 Pcs Double Broiler Steamer (stainless Steel) 30 Cm Diameter 3 2,730.00 8,190.00 377 Pcs Kitchen Knife Set (stainless Steel And Poly Propylene Plastic Handle) 15x7.5x34cm 3 840.00 2,520.00 378 Pcs Meat Slicer (electric Machine Stainless Steel) 418x 293x 325mm 3 2,494.00 7,482.00 379 Pcs Bread Toaster (stainless Steel Top Plate) 25x 14.6x16.8cm 3 1,059.00 3,177.00 380 Pcs Cookie Press (stainless Steel With 13 Disc And 8 Icing Tips 25x 14.5cm 3 462.00 1,386.00 381 Pcs Cake Decorating Kit. Piping Tips Set ( Stainless Steel, Multicolor) 3 279.00 837.00 382 Pcs Serving Bread Tray (stainless Steel) 45cmx2.8cm 6 1,229.00 7,374.00 383 Pcs Hot Plate Single Electric Stove (1000 W) 8.8x8.8x1.4 Inch 2 583.00 1,166.00 384 Pcs Electric Oven. Height (cm): 32.5. Highlights. Width (cm): 37.5. Warranty: 1 Year Warranty On Electrical Parts And Lifetime Free Service. Net Weight (kg): 7.3. Capacity: 2.8 Liters Length (cm): 49. Gross Weight (kg): 8.2. 5 11,000.00 55,000.00 385 Pcs Oven. Four Plates Oven For Bread (stainless Steel) 530x595x570mm. Lpg Type 1 48,924.00 48,924.00 386 Pcs Bread Plates (stainless Steel) 40x 60cm 20 1,027.00 20,540.00 387 Pcs Bread Rack (stainless Steel)15 Layers 40x60cm Heavy Duty 1 20,000.00 20,000.00 388 Pcs Electric Burger Griddle. Large Size Heavy Duty. Size: 73cmx52cmx10cm. Bigger Waster Oil Container. Stainless Steel, Solid Gritty. Food Grade Material. 2 11,475.00 22,950.00 389 Pcs Food Warmer Display Cabinet. Commercial Food Heater Glass Display Cabinet Heavy-duty Curved Deli Cabinet With Lighting. Constant Temperature Heating Display Counter Ideal For Fried Chicken Burger And Cooked Food. Size: Red+3 Compartments: 96x45x60cm. Rated Power: 300w. Rated Voltage: 220v.number Of Internal Layers: Three. Layers. Temperature Range: 30-80°c. Product Weight: 18kg. Built-in Energy-saving Warm Color Lamp, Improve The Display Effect 2 9,125.00 18,250.00 390 Pcs Frying Pan (non-stick, 28 Cm) 3 1,690.00 5,070.00 391 Pcs Measuring Spoon. 1tbsp 15ml. 1/2tbsp 7.5ml. Ltsp 5ml. 1/2tsp 2.5mlmaterial: Stainless Steel+pp. Packing: Pp Bag. 3 400.00 1,200.00 392 Pcs Measuring Cups (12 Pieces, Bpa -free Plastic Long Lasting Used) Large And Medium Cups 3 2,209.00 6,627.00 393 Pcs Measuring Urn. Glass, Capacity: 100 Ml. (with 10 Ml Increments), Metric And English System Of Measurement; With Handle And Spout, Clear, Non- Porous, Tempered Glass 3 450.00 1,350.00 394 Pcs Mixing Bowl: 30 Cm L30xw27.5xh11.4 Cm Thickness: 0.04 Cm. Material: Stainless Steel 12 900.00 10,800.00 395 Pcs Baking Sheet 11x15 Inches 011 Thickness Heavy Duty Aluminum 10 360.00 3,600.00 396 Pcs Wire Whisk Length: 30 Cm (12 ") Material Stainless Steel 5 320.00 1,600.00 397 Pcs Muffin Pan Non-stick Muffin Pan Dimension: 26.5x35x3cm Capacity: 12 Cup Color: Black Non-stick Surface For Easy Release And Quick Cleanup Dishwasher Safe Ideal For Baking Muffins, Cupcakes, And More Nonstick Coating Helps Ensure Effortless Food Release 5 700.00 3,500.00 398 Set Measuring Spoon 1tbsp 15ml 1/2tbsp 7.5ml Ltsp 5ml 1/2tsp 2.5mlmaterial: Stainless Steel+pp Packing: Pp Bag 6 400.00 2,400.00 399 Set Measuring Cups (12 Pieces, Bpa -free Plastic Long Lasting Used) Large And Medium Cups 6 2,209.00 13,254.00 400 Pcs Measuring Urn Glass, Capacity: 100 Ml. (with 10 Ml Increments), Metric And English System Of Measurement; With Handle And Spout, Clear, Non- Porous, Tempered Glass 6 490.00 2,940.00 401 Pcs Mixing Bowl 30 Cm L30xw27.5xh11.4 Cm Thickness: 0.04 Cm Material Stainless Steel 6 900.00 5,400.00 402 Pcs Baking Sheet 11x15 Inches 011 Thickness Heavy Duty Aluminum 10 360.00 3,600.00 403 Pcs Wire Whisk Length: 30 Cm (12 ") Material Stainless Steel 5 320.00 1,600.00 404 Pcs Electric Stove, 1000 Watts, 12" Diameter, Stainless Steel. With Safety Regulator And Power Indicator. 6 1,500.00 9,000.00 405 Pcs Weighing Scale, Digital "display Mode: Led/lcd+light Weighing Range :40kg Accuracy: 2g Product Size : 35x33x14cm 3 Lcd Display On The Operator’s Side Of The Scale As Well As 3 Lcd Display On The Customer’s Side Minimum Capacity Is 2g. Maximum Capacity Is 40kg Power Source: Built In Rechargeable Battery With Usb Cable Battery Powered Or Connect Usb Cable. Battery Powered Or Connect Usb Cable To Use Weight Platform/tray Material Is Stainless Steel." 4 7,500.00 30,000.00 406 Pcs Scraper(rubber) 30cm X11cmx6.8cm 5 130.00 650.00 407 Pcs Hand Mixer (stainless Steel Bowl) 270x165x290mm, 2.8 Liters Capacity 5 1,755.00 8,775.00 408 Pcs Revolving Cake Stand (aluminum) 12 Inches 5 850.00 4,250.00 409 Pcs Electric Stand Mixer 5.5 Liter(1.9kg) With Bowl And 3 Whisk 6 Speed Setting Dough, Rotating Bowl, Speed Control 3 11,500.00 34,500.00 410 Pcs Rolling Pin Stainless Steel Pressing Stick Pizza Dough Non-stick Dough Roller, (29.5 Cm) 6 300.00 1,800.00 411 Pcs Dough Roller Pin, Wooden. 29.5cm Non-stick Silicone Rolling Pin Pastry Baking Decorating Tool 6 300.00 1,800.00 412 Set Deep Fryer Dimensions (w X H X D) 477 X 318 X 235 Weight 3.81kg Body Material Stainless Steel Color Silver Technical Details Power Consumption 2000w Volume 4l Features Temperature Control Yes 6 7,200.00 43,200.00 413 Pcs Ice Crusher Machine. Electric Stainless Steel Heavy Duty Portable Automatic Rotated Speed: 1500rpm Power:250 Size: 275x190x210mm Capacity: 2 Liter 2 3,900.00 7,800.00 414 Pcs Chest Freezer (inverter) Dual Function Technology (freeze Or Chiller) Solid Top With Glass Cover Inside Digital Temperature Control W/ Lcd Display Dimension: 85:112:70cm 1 28,535.00 28,535.00 415 Set Electric Takoyaki Machine And Double Pan 56 Holes Stainless Steel Size: 437x 435x180mm 6 2,600.00 15,600.00 416 Pcs Waffle Iron Pan 4 Interchangeable Plates 750 Watts 6 1,800.00 10,800.00 417 Pcs Revolving Cake Stand. Nonslip Top And Base. Diameter: 23.5 Cm. Height 14cm. Material: Food Grade Pp. 6 1,076.00 6,456.00 418 Pcs Stainless 4-gas Burner, 55l Gas Oven Hybrid Electric And Lpg 1 40,000.00 40,000.00 419 Pcs Electric Kettle 1.5l 3 900.00 2,700.00 420 Pcs Stand-up Kitchen Mixer-standard (4 Liters Stainless Steel Bowl With Cover) Tilting Mixing Arm. Accessories: Beater, Dough Hook, Whisk. 12 Speed Setting. 2 10,000.00 20,000.00 421 Pcs Hand Mixer. Powerful 180w Motor And 7 Speeds Including Turbo Setting Made Of Stainless-steel Abs. Multifunctional With Chrome Accessories: X2 Beaters, X2 Dough Hooks 5 2,500.00 12,500.00 422 Unit Rice Cooker Standard 2l Home Multifunctional Home Cooking 220v. Fast Cooking, Keep Warm Function, Non-stick Coating, Stainless Steel Cover. Input Voltage. 220v. Power Consumption 400w. Volume Capacity 2l Dimension (l X W X H) 215*215*215 3 2,500.00 7,500.00 423 Unit Electric Rice Cooker 10l 2 5,000.00 10,000.00 424 Pcs Blender 1.5 Liter 5 700.00 3,500.00 425 Pcs Pressure Cooker 3.5 Liter 2 1,200.00 2,400.00 426 Pcs Gas Stove Rack. Plain Sheet With Steel Frame. With Cooking Platform At The Top. Kitchen Heavy Duty Gas Tank Holder Kitchen Organizer Stainless. Made Of Carbon Steel 45cmx45cmx90cm. Made Of Carbon Steel Color Black With Partition For 11kg Gasul Tank And For Cooking Materials. 4 5,500.00 22,000.00 427 Pcs Chef's Knife, 8" Stainless Steel 6 350.00 2,100.00 428 Pcs Bread Knife, 8" Stainless Steel 6 350.00 2,100.00 429 Pcs Clever Knife/ Butcher Knife To Chop Bones 20 Cm Blade, 31 Cm From Tip To Handle 6 350.00 2,100.00 430 Pcs Kitchen Scissors 9" Stainless Steel 6 350.00 2,100.00 431 Pcs Utility Knife 61mmx19mm 6 350.00 2,100.00 432 Pcs Boning Knife, 8" Japanese High Carbon Steel 6 350.00 2,100.00 433 Pcs Paring Knife 4" German Stainless Steel 6 350.00 2,100.00 434 Pcs Stainless Peeler For Vegetables 15cmx6cm 6 80.00 480.00 435 Pcs White Cutting Board (for Bread And Pastry) 25.5cmx34cm, Plastic 6 460.00 2,760.00 436 Pcs Green Cutting Board (for Fruits And Vege)25.5cmx34cm, Plastic 6 460.00 2,760.00 437 Pcs Red Cutting Board (raw Meat)25.5cmx34cm, Plastic 6 460.00 2,760.00 438 Pcs Blue Cutting Board (raw Fish)25.5cmx34cm, Plastic 6 460.00 2,760.00 439 Pcs Yellow Cutting Board (cooked Meat) 25.5cmx34cm, Plastic 6 460.00 2,760.00 440 Pcs Brown Cutting Board (raw Crops) 25.5cmx34cm, Plastic 6 460.00 2,760.00 441 Pcs Weighing Scale (dial/analog. 25kg) 1 400.00 400.00 442 Pcs Digital Kitchen Scale 3kg/0.1g And 500g/0.1g 3 690.00 2,070.00 443 Pcs Measuring Cups (1 Set) 6 95.00 570.00 444 Pcs Plastic Measuring Pitcher Jug With Measurement(set) Maximum Of 1 Liter 6 126.00 756.00 445 Pcs Measuring Spoon, Plastic (set) 6 60.00 360.00 446 Pcs Deep Fry Thermometer, Deed Fried Pot Thermometer Oil Temperature Gauge 6 320.00 1,920.00 447 Pcs Meat Thermometer, Brifit Waterproof Kitchen Meat Thermometer, Foldable Digital Instant Read Food Thermometer 6 400.00 2,400.00 448 Pcs Oven Thermometer 6 389.00 2,334.00 449 Pcs Tenderizer, Wooden Circular-50mm Diameter, 3cm Spikes, 190mm Long (flashlight Design) 6 280.00 1,680.00 450 Pcs Skimmer, Fine Mesh Strainer Oil-frying Filter 7cm Diameter, 32 Long 5 80.00 400.00 451 Pcs Wire Skimmer 18cm Diameter, Stainless Steel 5 80.00 400.00 452 Pcs Strainer, Stainless Steel Multi-purpose Food Strainer, Fine Mesh Long Handle 20cm Diameter X 28cm (fine) 5 109.00 545.00 453 Pcs Siever 17.5x12x11.5cm, Stainless Steel Mesh Stainer 6 68.00 408.00 454 Pcs Strainer Medium 20cm Diameter X 28cm (fine) 6 90.00 540.00 455 Pcs Strainer Large 25cm Diameter X 30cm Long, Stainless Steel 6 120.00 720.00 456 Pcs Wooden Turner, Wooden Sandok Kitchen Spatula Spoon Turner Cooking, 3" Width Of Sandok, 10" Long 6 65.00 390.00 457 Pcs Wooden Spatula 9cm Sandok, 34 Cm Long 6 65.00 390.00 458 Pcs Parisienne Spoon, Double-ended Headed Fruit Ice-cream Ball 6 50.00 300.00 459 Pcs Wooden Ladle/spoon 6cm Pang Sandok 30 Cm Long 6 120.00 720.00 460 Pcs Zester, Four-sided Stainless-steel Grater 9-inch Kitchen Multipurpose Grater For Parmesan Cheese, Ginger Vegetables 6 79.00 474.00 461 Pcs Reusable Piping Bags. 26 Pcs/set Silicone Pastry Bag Tips Kitchen Diy Icing Piping Cream 24 73.00 1,752.00 462 Pcs Stainless Funnel Small 4.5cm Opening Diameter, 3.7cm Height, 0.6cm Tube Diameter 6 60.00 360.00 463 Pcs Stainless Funnel Small 5.5cm Opening Diameter, 5cm Height, 0.9cm Tube Diameter 6 70.00 420.00 464 Pcs Stainless Funnel Small 7.5cm Opening Diameter, 6.7cm Height, 1.2cm Tube Diameter 6 60.00 360.00 465 Pcs 8" Tongs 6 89.00 534.00 466 Pcs 12" Tongs 6 120.00 720.00 467 Pcs Pepper Mill, 5-inch Wooden Peeper Grinder 6 60.00 360.00 468 Pcs Salt Mill 5-inch Wooden Salt Grinder 6 60.00 360.00 469 Pcs Wire Whisks 12 Inches 6 80.00 480.00 470 Pcs Wire Whisks 8 Inches 6 89.00 534.00 471 Pcs Can Opener 6 120.00 720.00 472 Pcs Bottle Opener 6 79.00 474.00 473 Pcs Soup Ladle 3oz 6 140.00 840.00 474 Pcs Soup Ladle 6oz 6 160.00 960.00 475 Pcs Soup Ladle 8oz 6 160.00 960.00 476 Pcs Soup Ladle 12oz 6 180.00 1,080.00 477 Pcs Stock Pot, 30cm High Quality Stainless Steel 10 1,500.00 15,000.00 478 Pcs Stock Pot 24cm High Quality Stainless Steel 10 999.00 9,990.00 479 Pcs Frying Pan 22cm Marble Frypan 10 500.00 5,000.00 480 Pcs Frying Pan 28cm Marble Frypan 48.2x28x5.7cm 10 600.00 6,000.00 481 Pcs Casserole 18 Cm Aluminum, Double Handle, Rust Free 10 250.00 2,500.00 482 Pcs Casserole 20 Cm Aluminum, Double Handle, Rust Free 10 300.00 3,000.00 483 Pcs Casserole 28 Cm Aluminum, Double Handle, Rust Free 10 600.00 6,000.00 484 Pcs Wok 40 Cm Chinese Nonstick Wok Pan 10 500.00 5,000.00 485 Pcs Double Broiler 28 Cm Stainless Steel Two-layer Double Soup Steamed Dual Purpose 10 280.00 2,800.00 486 Pcs Glass Rack. 25-compartment Gray Full-size Glass Rack With 2 Blue Extenders 2 2,500.00 5,000.00 487 Pcs Plate Rack. Microwire 24 Compartment Catering Plate Rack For Plates Up To 11" - Wash, Store, Transport 3 3,000.00 9,000.00 488 Pcs Baking Tray 15"x17" 5 180.00 900.00 489 Pcs Roasting Tray 15"x17'' 5 180.00 900.00 490 Pcs Braising Pan 32cm Stainless Steel Nonstick Pan 5 350.00 1,750.00 491 Pcs Hanging Cabinet With Glass, Std. 2.5'x 3' X 5ft (free Installation) 3 10,000.00 30,000.00 492 Pcs Floor Mops (broom Type) Using Cotton Absorbent Strips 10 180.00 1,800.00 493 Pcs Broom (walis Tambo) 10 80.00 800.00 494 Pcs Dustpan (plastic) 11"x10" Pan, 24" Handle 10 120.00 1,200.00 495 Pcs Garbage Bin (4 Gals.) 10 300.00 3,000.00 496 Pcs Paper Towel Dispenser 10 200.00 2,000.00 497 Pcs First Aid Cabinet, Plastic Box 30cmx12cmx30co With Transparent Cover (free Installation) 2 1,500.00 3,000.00 498 Pcs Fire Extinguisher 3lbs Abc Dry Chemical Refillable (free Installation) 4 2,000.00 8,000.00 499 Pcs Mixing Bowl Small, Stainless Steel Mixing Bowl 20cm 12 80.00 960.00 500 Pcs Mixing Bowl Medium, Stainless Steel Mixing Bowl 30cm 12 130.00 1,560.00 501 Pcs Stainless Steel Basin, 45 Cm Diameter 5 180.00 900.00 502 Pcs Stainless Steel Basin, 38 Cm Diameter 5 120.00 600.00 503 Pcs Baking/ Pastry Brush, Heat Resistant, Standard Size 10 35.00 350.00 504 Pcs Plastic Containers, Microwavable Round Canister, Food Storage Container (400 Ml) 40 20.00 800.00 505 Pcs Multipurpose Plastic Pail 2.5 Gallons Capacity 4 120.00 480.00 506 Pcs Food Grade Silicone High Temperature Resistant Baking Mat Oven Baking (to Match Baking Pan), Browns Silicone Baking Oven Mat Liner, Non-stick For Pastry Cookies Dough 12 90.00 1,080.00 507 Pcs Non-slip Doormat 75x45 Cm Rubber 18 500.00 9,000.00 508 Pcs White Hand Towels Hanging Kitchen Hand Dry 20cmx30cm 12 30.00 360.00 509 Pcs Potholder, Basahan Bilog 6 Inches Diameter 12 15.00 180.00 510 Pcs Round Cake Molder 4, 6, 8 Inches Set 5 161.00 805.00 511 Pcs Square Cake Molder 9, 11, 13 Inches Set 5 160.00 800.00 512 Pcs Baguette Bake Mold Pan 34.5 Cmx 24cm (6cm Molder) Nonstick 10 399.00 3,990.00 513 Pcs Meat Processing Machine (meat Grinder Manual) 1 5,000.00 5,000.00 514 Set Stainless Icing Tip (set-12pcs) Cake Decorating Kit Stainless. Icing Piping Nozzles Pastry Tips Cake. 10 499.00 4,990.00 515 Pcs Cupcake Molder Tray Of 6 12 Holes Baking Pan Muffin Cup Cake 10 89.00 890.00 516 Pcs Large Wooden Turner For Large Oven. Kitchen Turner Flat Spatula Scraper, Acacia Wood 10.5 Inches Long And 2.75 Inches Turner 3 200.00 600.00 517 Pcs Dressing Mirror (whole Body Mirror With 4 Wheels Height 5ft. Width 14 Inches) 1 1,500.00 1,500.00 518 Set Dish Towels (10 Pc. Per Set 25 Cm X 25 Cm Microfiber Super Absorbent) 5 993.00 4,965.00 519 Pcs Soap Dish (dual Soap Case With Cover & Handle- Bathroom Soap Dish / Soap Case) 50 70.00 3,500.00 520 Pcs Detergent (detergent Powder Set 6 Kilos-i Kilo X 6 Pouches) 50 288.00 14,400.00 521 Pcs Hand Soap (liquid Hand Soap Antibac 1 Gallon) 10 216.00 2,160.00 522 Pcs Pots (extra Size #4 (26cm Diameter 16 Cm In Height) 20 673.20 13,464.00 523 Pcs Pans (nonstick 12") 5 195.00 975.00 524 Pcs Toilet Paper Holder (wall Mounted Bathroom Toilet Paper Holder Tissue) 2 238.00 476.00 525 Pcs Dipper (plastic Dipper L 11" X W 36"x H 41" 5 100.00 500.00 526 Pcs Pail (utility Pail With Metal Handle 10l/26x27 Cm) 8 250.00 2,000.00 527 Pcs Trash Can (with Plastic Swing Lid L-27, W- 17., H- 40.5 Cm) 5 350.00 1,750.00 528 Pcs Toothbrush (extra Clean Toothbrush 5 Pk -soft) 20 182.40 3,648.00 529 Pcs Hairbrush (natural Wood Hairbrush Comb) 20 120.00 2,400.00 530 Pcs Comb (1 Dozen Suklay 3-hole X Sz-28 Big) 20 90.00 1,800.00 531 Pcs Toothpaste (red 100 Ml) 20 58.20 1,164.00 532 Pcs Plastic Tumbler 20 300.00 6,000.00 533 Pcs Razor (twin Blade Disposable Razors) 20 120.00 2,400.00 534 Pcs Nail Clipper (stainless Nail Clippers H-8 Cm Wt-0.046 Kg) 20 84.00 1,680.00 535 Pcs Nail File (12 Pcs Red Nail File (medium) 20 50.00 1,000.00 536 Pcs Deodorant (roll On 50 Ml Bottle) 20 150.00 3,000.00 537 Pcs Face Towel (basic Face Towel - Free Size) 20 110.00 2,200.00 538 Pcs Feminine Napkin (silk Floss 12 Pcs) 50 45.00 2,250.00 539 Pcs Dust Catcher With Broom (2n1 Broom Dustpan Set Windproof Floor Sweeper With Broom) 10 350.00 3,500.00 540 Pcs Feather Duster (soft Magic Feather Duster Long Size And Colorful Colors (plastic) 10 110.00 1,100.00 541 Pcs Wash Rags (round Rags) 10 30.00 300.00 542 Pcs Floor Mop (magic Spin Mop With Bucket 360° Rotating Floor Cleaning Plastic Liner) 10 900.00 9,000.00 543 Pcs Garbage Can (super Convenient Mini Flip Lid Trash Can (plastic) 10 150.00 1,500.00 544 Pcs Sponge (high Density Double-sided Dishwashing Sponge 7x10x3 Cm) 10 118.00 1,180.00 545 Pcs Spray Bottle (garden Sprayer Capacity: 500ml) 10 155.00 1,550.00 546 Pcs Table Napkin (1 Ply 40s Sheets Folded) 10 50.00 500.00 547 Pcs Place Mat (table Placemat Pvc Anti-slip Placemat Washable Durable Kitchen S:30x45cm) 10 50.00 500.00 548 Set Plates (12 Pcs Plates 8-inch Melamine White) 3 634.00 1,902.00 549 Set Drinking Glass (drinking Glass 10 Oz Tall Clear Tumblers Set Of 6 L=5.5cm H-12 Cm) 1 718.00 718.00 550 Pcs Pitcher (durable Crystal-clear Glass 1.5 L) 2 300.00 600.00 551 Pcs Bowl (serving Bowls, Clear Glass 20 Cm) 2 130.00 260.00 552 Pcs Water Pail (utility Pail With Metal Handle 10l Color: Red/ Blue L-27cm, W-27cm, H-26 Cm 4 350.00 1,400.00 553 Pcs Laundry Bar Soap (scrubber Bar 125g) 120 20.00 2,400.00 554 Pcs Clothesline (1 Pc Nonslip Clothesline 35 M) 20 140.00 2,800.00 555 Pcs Clothes Pin (laundry Clothes Pins Spring Clips 24 Pcs Plastic) 20 100.00 2,000.00 556 Pcs Wash Basin Plastic (laundry Basin 23 Inch) 5 250.00 1,250.00 557 Pcs Laundry Bag Set (4 Pcs/set Laundry Washing Bag- 1 Pc M(30cmx40cm) 1pc L (40cmx50cm) 1pc Xl (50x60 Cm) 10 200.00 2,000.00 558 Pcs Ironing Board (ironing Board With Stand Portable 36"iron Board (70cm To 86 Cm) 5 1,600.00 8,000.00 559 Pcs Flat Iron (non-stick Teflon Saleplate Spray Function Ht &width 251x170x120mm 5 1,000.00 5,000.00 560 Pcs Pants. Standard Slacks Medium Size 3 1,000.00 3,000.00 561 Pcs Polo. Public School Uniform Type. Medium Size 3 500.00 1,500.00 562 Pcs Blouse. Public School Uniform Type. Medium Size 3 500.00 1,500.00 563 Pcs Skirt. Commonly Used In Public School Type. Medium 3 600.00 1,800.00 564 Pcs Long Sleeves. Cotton, Medium Size 3 1,000.00 3,000.00 565 Pcs T-shirt With Collar. Cotton, Medium Size 3 800.00 2,400.00 566 Pcs T-shirt Without Collar. Cotton, Medium Size 3 500.00 1,500.00 567 Pcs Maong Pants. Medium Size, Female Cut, Medium 3 1,000.00 3,000.00 568 Pcs Maong Pants. Medium Size, Female Cut, Medium 3 1,000.00 3,000.00 569 Pcs Maleta. 7kg Hand Carry Luggage Travel Bag. 360 Universal Wheels. Divided Internal Space. 57 Liters Capacity. 40 X 57 X25 Cm Dimension. 3 1,500.00 4,500.00 570 Pcs Chef’s Hat. Chef Cap For Men Women Chef Head Cap Breathable Hat Fast Food Restaurant Coffee Shop Work Wear. Large Size. Black 20 250.00 5,000.00 571 Chef’s Hat. Chef Cap For Men Women Chef Head Cap Breathable Hat Fast Food Restaurant Coffee Shop Work Wear. Medium Size. White 20 250.00 5,000.00 572 Pcs Chef’s Hat. Chef Cap For Men Women Chef Head Cap Breathable Hat Fast Food Restaurant Coffee Shop Work Wear. Small Size. White 20 250.00 5,000.00 573 Pcs Chef’s Apron. Black Apron With 2 Large Pockets Adjustable Apron Halter Neck Unisex Dirt And Stain Resistant. Large 20 450.00 9,000.00 574 Pcs Chef’s Apron. Black Apron With 2 Large Pockets Adjustable Apron Halter Neck Unisex Dirt And Stain Resistant. Medium 20 450.00 9,000.00 575 Pcs Chef’s Apron. Black Apron With 2 Large Pockets Adjustable Apron Halter Neck Unisex Dirt And Stain Resistant. Small 20 450.00 9,000.00 576 Pcs Hair Net. Unisex Hair Net Cap Hair Mesh Weaving Wig Cap Hair Styling Tools Nylon Hair Nets Hollow Out High. Black 300 30.00 9,000.00 577 Dozen Hangers (12 Pcs. Plastic Hanger) 1 181.00 181.00 578 Pcs Wash Basin. Aluminum 32" Diameter. 6 1,500.00 9,000.00 579 Pcs Washing Machine. 7.0 Kg Digital Inverter Fully Automatic Top Load Washing Machine (water Level: 5, Gross Weight: 31kg, Net Weight: 27 Kg Gross Dimension: (wxhxd) 580x890x600mm Net Dimension: (wxhxd)= 540x857x568mm) 3 25,000.00 75,000.00 580 Pcs Vacuum Cleaner (heavy Duty Gas 12-25 Pl Wet And Dry Vacuum Cleaner/ Extractor With Power Socket System 1,250 W Weight-9kg, Max Input Power- 1,250 W, Max Vacuum Power-200 Mbar) 2 12,000.00 24,000.00 581 Pcs Socks (cotton Socks Unisex High Street Socks Sixe:38-44 5 200.00 1,000.00 582 Pcs Dress (sleeve Ruffle Hem Plain Elegant Red Small, Medium, Large) 3 500.00 1,500.00 583 Pcs Slippers (sizes 7-10, Flipflop Brand Light Weight And Durable 5 150.00 750.00 584 Pcs Mattress For Single Bed (30x75 Single Size Polyester 3.5 Inch Thick) 5 4,440.00 22,200.00 585 Pcs Pillows (foam Pillow 4x12"x20") 5 426.00 2,130.00 586 Pcs Bedsheets (cotton Full Garterize 3n1 Bed Sheets, For Single Bed Size) 5 1,100.00 5,500.00 587 Pcs Alarm Clock (stopwatch, Digital Timer) 5 850.00 4,250.00 588 Pcs Goalball, Standard Size And Weight, Blue 2 20,000.00 40,000.00 589 Pcs Basketball, Standard Size 2 2,000.00 4,000.00 590 Pcs Soccer Ball, Standard Size 2 1,500.00 3,000.00 591 Set Bocce Balls, 100mm Diameter, 4 Balls Colored Red, 4 Balls Colored Green, With Palena Ball Color White. Set With Bag. 2 20,000.00 40,000.00 592 Piece White Cane For Adults- Foldable Aluminum With White Anodized Finish And Plastic Tip. The Tube Has A Spring Lock Pin For Adjusting Handle Height From 58-94 Cm. 10 1,500.00 15,000.00 593 Piece White Cane For Kids- Foldable Aluminum With White Anodized Finish. The Tube Has A Spring Lock Pin For Adjusting Handle Height From 58-94 Cm. 10 1,150.00 11,500.00 594 Set Chess Board For Blind. Plastic Pieces With Special Markings, Board With Pattern To Distinguish White And Black Squares With Slots To Hold The Pieces. At Least 12"x24" Plastic Board. 4 5,000.00 20,000.00 595 Set Scrabble Board For Blind. Made Of Plastic With Special Markings On Tiles And Board. At Least 18"x18" Board. 5 4,000.00 20,000.00 596 Set Dolch Basic Sight Words. (bitay Max). Printed On White Tarpaulin 2 Ftx 3 Ft Binded With Two Wooden Sticks. With String (sabitan). Words At Least 2" Height Black, Arial Font Style. 5 1,500.00 7,500.00 597 Pcs Meter Stick, 100cm Stainless Steel Ruler 5 500.00 2,500.00 598 Box Braille Paper. White Fanfold Tractor-feed Braille Transcribing Paper: 8.5 X 11 Inches, 3-hole And 19-hole Punch. Dimensions:10.1 × 11.5 × 5.4 Inches. 1000 Sheets 7 10,000.00 70,000.00 599 Box Braille Paper. 11.5"x 8.5". 1000 Sheets 5 7,000.00 35,000.00 600 Box Swell-touch Paper 11 X 11.5-in- 100 Sheets 1 10,000.00 10,000.00 601 Unit Braille Machine, Standard. With Leather Cover. With Warranty On Parts. 2 49,500.00 99,000.00 602 Pcs Braille Slate. 27 Lines, 30 Cells Per Row, Black 25 1,000.00 25,000.00 603 Pcs Braille Contraction Pamphlet. Unified Contraction Pamphlet 4"x6". 25 600.00 15,000.00 604 Pcs Contraction Pamphlet. Nemeth Code. 4"x6". 25 600.00 15,000.00 605 Pcs Cranmer Abacus 25 650.00 16,250.00 606 Pcs Braille Stylus. Round Or Y Shape 25 200.00 5,000.00 607 Set Geometric Measurement. Set Of Protractor, Ruler And Triangles Made Of Plastic With Embossed Marking For The Blind, Standard Size. 24 1,000.00 24,000.00 Delivery Terms: Within 30 Days Drop Off Points: General Santos City Sped Integrated School – Quezon Avenue, Brgy. West, Gsc (ilrc) Payment Terms: Payment To The Service Provider Shall Be Made Through Philippine Veterans Bank Lddap-ada / Mds. In The Case Of Accounts Maintained In Other Bank, Bank Transfer Fees Shall Be Chargeable Against The Creditor’s Account. ***nothing Follows*** Grand Total 7,338,507.00 2. The Deped Now Invites A Bid For The Above Procurement Project. Bidders Must Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project With An Amount Of At Least 50% Of The Abc To Be Bid For Non-expendable And 25% Of The Abc For Expendable. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, I.e., In Section Ii, Instructions To Bidders. Bids Received That Exceed The Abc Per Lot Shall Be Rejected At Bid Opening. The Department Of Education, Division Of General Santos City Division Through Its Bids And Awards Committee (bac) Now Invites Bids For The Herein-mentioned Goods. Delivery Of The Goods Is Required On The Expected Delivery Date(s) Stated Herein. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. A Complete Set Of Bidding Documents In Soft Copy Only May Be Purchased At Deped-division Of General Santos City Bac Secretariat, Located At Tiongson St., Lagao, General Santos City Upon Submission Of A Letter Of Intent, And Payment In Cash On A Non-refundable Fee By Interested Bidders To The Deped Division Cashier. Only Bidders Who Purchased The Bidding Documents Provided Below Shall Be Allowed To Submit Bid/bids Not Later Than The Scheduled Receipt And Opening Of Bids. Bidding Document Price Lot Number Price Lot No. 1 P 10,000.00 5. It May Be Viewed Or Downloaded After Payment From The Website Of The Philippine Government Electronic Procurement System (philgeps), Www.philgeps.gov.ph. The Schedule And Venue Of The Procuring Activities Are As Follows: Activity Date And Time Venue Pre-bid Conference February 19, 2025 2:00 P.m. (wednesday) Sds Conference And Online Via Google Meet Issuance Of Bidding Documents Until March 5, 2025 9:00 A.m (wednesday) To Be Sent To Bidder’s Email Address After Payment Of The Bidding Documents Receipt And Opening Of Bids March 5, 2025 10:00 A.m. (wednesday) Division Office/google Meet Prospective Bidders Are Strongly Encouraged To Order Or Download The Electronic Copy Of The Bidding Documents From The Philgeps Website: Www.philgeps.gov.ph, For Them To Be Included In The Document Request List Of The Project. The Pre-bid Conference Is Open To All Interested Parties Who May Have Or Have Not Bought The Bidding Documents. 6. Bids Must Be Physically Delivered To The Address And On The Date And Time Stated Herein. Submission Of Digital Copy Of The Bidding Documents Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. A Valid Bid Securing Declaration Must Accompany The Bid(s) In Lieu Of Bid Security. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Opening Of Bids At The Address, Date And Stated Herein. Late Bids Shall Not Be Accepted. 7. The Deped-division Of General Santos City Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Not Award The Contract(s), Or Annul The Bidding Process Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Ofelia S. Panes Michael Jhon A. Del Sol Administrative Officer Iv (records) Administrative Assistant Ii Bac Secretariat Head Bac Secretariat Member Email: Ofelia.panes@deped.gov.ph Email: Bac.depedgensan@deped.gov.ph Cell No. 09692673871 Cell No. 09278865516 Approved By: Mervie Y. Seblos, Cese Oic – Assistant Schools Division Superintendent Bac Chairperson Bacsec/mds

FOOD AND DRUG ADMINISTRATION USA Tender

Chemical Products
United States
Closing Date12 Feb 2025
Tender AmountRefer Documents 
Details: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. The Government Reserves The Right To Award An Order Without Discussions If The Contracting Officer Determines That The Initial Offer Is Providing The Best Value And Discussions Are Not Necessary. solicitation Number 75f40125q00028 Is Issued As A Request For Quotation (rfq) Using Far Part 13 Procedures. the Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-02, Dated 01/03/2025. the Associated Naics Code Is 333914 And The Small Business Size Standard Is 1000 Employees. ******************************************************************** statement Of Work (sow): 1.0 Description Of Work 1.1 Background Information: the U.s. Food And Drug Administration’s Los Angeles District Office And Pacific Southwest Food And Feed Laboratory, Herein Referred To As Fda Irvine, Is An Fda Owned Facility Located In Irvine, Ca. Replacement Of End-of-life, Obsolete Vacuum Pump System. The Existing System Is Nearly 23 Years Old, Does Not Have Replacement Parts Available On The Market For Repair, And Represents A Single-point Failure Risk To The Facility's Vacuum System. Therefore, This Critical System Requires Replacement. 1.2 Purpose And Scope Of Work the Purpose Is To Provide A New Vacuum System Replacement And Installation At Fda Irvine. tasks: The Following Tasks Will Need To Be Provided But Are Not Limit To: Demo And Removal Of Existing Laboratory Vacuum System, Provide And Install Laboratory Vacuum System To Match Existing Technology. (current Model: Dekker Vmx0152ma2-00-ds, Minimum Salient Characteristics: Laboratory Vacuum System Model Aes-vmx0153ma2-45-ds. Piping Into And Out Are In Good Condition Without Any Visible Issues, Size Varies From 2” To 3”. Two Single Stage 10 Hp Liquid Ring Vacuum Pump Skids. Capacity Each Vacuum Pump (2 Pumps) 23.3 Scfm @ 25”hgvac. The Existing Voltage Going To The Vacuum Pump Is 460v, At A Minimum Upgrade The Disconnect Due To Its Age) coordinate And Schedule Delivery, Logistics, Preparation Of Site, And Installation Of Laboratory Vacuum System provide Energy, Water And Emissions (if Any) Cost Savings furnish And Install Bms Controls update Engineering And O&m Documentation startup And Testing 1.3 Period Of Performance: Tbd provide A Schedule With Timelines To Include Ordering Of All Parts, Shipping Timeframe, Preparation Of Site, And Install, And Inspection. the Work Shall Proceed Promptly Upon Execution Of The Resultant Contract And Only After The Issuance Of The Notice To Proceed (ntp) By The Government For The Activities Indicated. the Actual Performance Of The Work And Delivery Of The Required Documents Shall Be In Accordance With The Approved Project Schedule And Shall Be Completed Within 222 Calendar Days Of The Ntp Unless Otherwise Agreed Upon By The Project Officer (po) And Contracting Officer (co). 1.4 Place Of Performance u.s Food And Drug Administration Los Angeles District Office, Pacific Southwest Food And Feed Laboratory., Address: 19701 Fairchild Basement Level, Room B301, Irvine, Ca 92612. 2.0 Specific Requirements: the Contractor Shall Perform All Services Described In This Scope Of Services In Accordance With Applicable Requirements And Provisions Set Forth In This Statement Of Work. The Contractor Will Be Responsible For Relocating Any Electrical, Mechanical, Or Structural Building System Components Necessary To Perform This Work. If So, This Will Be Noted In This Scope Of Work And Such Work May Only Be Performed After Approval From Fda. The Contractor Shall Provide All Necessary Supervision, Labor, Material, Insurance, Training, And Equipment To: contractor Shall Provide Any Necessary Survey, Study, Or Technical Expert Services To Understand The Existing Conditions Of The Vacuum System At Fda Irvine. Contractor Shall Provide New Equipment With Matching Capacity, Or Better. The Necessary Constraints Shall Include, But Not Limited To, Vacuum Pump Hp And Tank Capacity. Contractor Shall Provide Equipment Cutsheet Submittals To Fda For Review And Approval Before Procurement Of Material. Contractor Shall Ensure N+1 Redundancy Integrated Into New System For Resilient Facility Operation. contractor Shall Assess And Provide Repairs Or Additions To Any Housekeeping Pad Intended To Support New Equipment, As Needed. Contractor Shall Provide New Control Panel, Field Located In An Accessible Area Near The Vacuum System. Control Panel Shall Be Integrated With Existing Building Automation System (bas) And Include Alarms Both To Bas And Readout Local To The Panel. Contractor Shall Utilize Power Feed To Existing Vacuum System. Contractor Shall Provide Independent Isolations Valves And Disconnect Means To Permit Service Of Each Vacuum Pump While Maintaining The System’s Operation. Contractor Shall Keep Equipment Shutdowns To A Minimum And Schedule/coordinate All Shutdowns With Fda While Providing Adequate Notice. Contractor Shall Provide Temporary Utilities For Any Shutdown Lasting Longer Than Three (3) Calendar Days. Weekend Shutdowns Are Preferred. Contractor Shall Provide All Inspection And Testing, Except Where Required By Code, Specification, Or Detailed Elsewhere In The Requirements Of This Document. familiarization Training On New System. 3.0 General Requirements: the Contractor Shall: adhere To Project Management Responsibilities As Defined Herein. appoint A Project Manager Who Shall Be The Government’s Primary Point Of Contact And Provide All Necessary Project Representation For The Successful Accomplishment Of The Said Work. the Project Manager Shall Be Thoroughly Familiar With All Requirements And Schedules. The Project Manager Shall Be Identified In The Firm’s Proposal Prior To Contract Award. coordinate All Project Related Activities Including Documentation Through The Project Officer (po) For Approval Unless Otherwise Denoted. bring Any Questions And/or Industry Specification Additions To The Attention Of The Po For Direction. perform All Work In A Skillful And Workmanlike Manner As Deemed Applicable To This Project. provide Appropriate Communication And Coordination Efforts With The Facility Department And The Po To Avoid Disruption Of Facility Operations While Performing Contract Work Such As Meetings, Proposed Phasing Plans, Outage Notifications, Etc. (where Applicable). obtain Necessary Badges Per Fda Policies And Guidelines (if Applicable). Fda Binding Process Is To Be Anticipated Of 1 Month. All Badging Must Be Completed Prior To Start Of On-site Construction. (for This Requirement The Contractor Shall Be Escorted) provide (to The Po) A List Of Possible Employees And Sub-contractors Who May Require Access To The Fda Premises Per The Project Being Administered. provide Utility Outage Notifications Per Facility Department Requirements (if Applicable). perform All Necessary Measurements And Sizing Associated With The Work Assigned. confirm Existing Conditions Of Work Assigned. perform All Associated Project Work In Accordance With Fda; Executive Orders, Energy Policy Act (epact), Energy Independence And Security Act (eisa), Sustainable Design And Federal Regulations; Local City, County, And State Building Codes And Regulations; National Electrical Code (nec), American Society Of Mechanical Engineers (asme), National Fire Protection Association (nfpa), Occupational Safety And Health Administration (osha), Underwriters Laboratories (ul), American National Standards Institute (ansi), And Institute Of Electrical And Electronics Engineers (ieee) Rules And Regulations And Standards; And All Other Applicable Industry Standards. restore All Affected Areas Back To Pre-project Conditions Or Better By The Completion Of The Specified Project Including Necessary Patching, Repairing And/or Replacing. provide All Necessary Drawings, Documentation, And Literature For All Recommended Items Where Applicable. provide All Labor And Equipment Necessary To Accomplish The Above Specified Tasks. assume All Risk And Shall Be Liable For Any Damages To Persons Or Property Caused By The Contractor. be Solely Responsible For The Quality Of His/her Work. Deficiencies And Omissions Shall Be Corrected Prior To Government Acceptance Of Work. be Responsible For Removing Construction And Demolition Debris Daily From Site. The Contractor Shall Provide The Dumpster For The Debris. 5.0 Government Furnished Material And Resources: 5.1 The Government Shall Provide, But Are Not Limited To, The Following Items: site Utility Drawings (upon Request-pdf) point(s) Of Contact At The Fda Site (kickoff Meeting) photographs Of Work-site Conditions And Others As Needed irvine Lab Specification Report Volume 2 (section 15486) (upon Request-pdf) 6.0 Submittals: 6.1 General: Under The Resultant Contract, Unless Otherwise Denoted, The Contractor Shall Provide All Services Necessary To Perform The Following Activities As Related To Completing The Fda Irvine Vacuum Replacement Mentioned Above: project Kick-off Meeting project Schedule (with Earned Value And Loaded Dollar Values) plan Of Action (plan Shall Include Names Of Team Members And Pm – And Phone/email) point-of-contact, Project Manager, Safety And Hazardous Material Plan progress Meetings, Meeting Minutes For Review And Approval By Po (within Five Business Days), 6.2 Deliverables: The Contractor Shall Provide All Deliverables In Accordance With The Project Schedule And Fda Policy Guidelines, And Compliant With Section 508 Requirements. 6.2.1 Physical Deliverables (format): The Documentation Process Shall Be Compiled And Provided Per The Following Submission Requirements Unless Otherwise Denoted: two (2) Copies Of The Operations And Maintenance (o&m) Manuals Shall Be Provided Physically In Binders And Electronically Per Compact Disc And Digital Versatile Disc (cd/dvds) (if Applicable). non-stick, Locking Slant D-style, Three Ring View Binders, 8 1/2x 11 Inches. title, Fda Logo, Contract And Project Number, Submission % (if Applicable), Etc. Shall Be Located On The Front Cover And Spine Of Binder(s). cd/dvds Shall Contain Electronic Copies Of Any Reports, Calculations, Modeling(s), Drawings, Videos, Photos And O&m Manuals Per Final Submission. Cd/dvds Shall Have Printed Labels. cd/dvds Shall Be Placed In Cd/dvd Page Holders With Slaps (like Avery 75263 Or Avery 73721) When Associated With A Binder. Avery 75263 For Multiple Discs And Avery 73721 For A Single Disc. three (3) Signed Copies Of All Warranties Shall Be Provided In Binders And Electronically Per Cd/dvds. Warranty Start Date Shall Begin No Earlier Than The Date Of Installation Acceptance. one (1) Equipment Submission. four (4) Physical Copies Of As-built Marked-up Drawings, Documentation, Etc. For Review And Discussion. Also, Provide Electronic Copies Of The Drawings, Etc. All Electronic Drawings Shall Be Provided In Portable Document Format (pdf) And Computer-aided Design (cad). Deliverables Are To Be Submitted To The Cor And/or Po, Unless Otherwise Stated. four (4) Copies Of Final Drawings Shall Be Provided In Pdf And Cad. *************************************************************************** government Holidays a. The Government Hereby Provides Notification That Government Personnel Observe The Listed Days As Holidays: (1) New Year's Day (7) Labor Day (2) Martin Luther King's Birthday (8) Columbus Day (3) President’s Day (9) Veterans' Day (4) Memorial Day (5) Juneteenth Day (10) Thanksgiving Day (6) Independence Day (11) Christmas Day b. In Addition To The Days Designated As Holidays, The Government Observes The Following Days: (1) Any Other Day Designated By Federal Statute (2) Any Other Day Designated By Executive Order (3) Any Other Day Designated By The President’s Proclamation c. When Any Such Day Falls On A Saturday, The Following Monday Is Observed. Except For Designated Around-the-clock Or Emergency Operations, Contractor Personnel Will Not Be Able To Perform On-site Under This Contract With Fda On Holidays Set Forth Above. The Contractor Will Not Charge Any Holiday As Direct Charge To The Award. d. It Is Understood And Agreed Between The Government And The Contractor That Observance Of Such Days By Government Personnel Shall Not Otherwise Be A Reason For An Additional Period Of Performance, Or Entitlement Of Compensation Except As Set Forth Within The Award. e. Nothing In This Abrogates The Rights And Responsibilities Of The Parties Relating To Stop Work. applicable Provisions And Clauses: far 52.252‐2 Solicitation Provisions Incorporated By Reference (feb 1998) this Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/far And .https://www.acquisition.gov/hhsar far Provisions: far 52.212-1, Instructions To Offerors—commercial Products And Commercial Services (sept 2023) far 52.212-2, Evaluation—commercial Products And Commercial Services (fill In Evaluation Criteria) (nov 2021) far 52.212-3, Offeror Representations And Certifications—commercial Products And Commercial Services(may 2024) hhsar Provisions: hhsar 352.239-73, Electronic And Information Technology Accessibility Notice.(dec 2015) far Clauses: by Reference far 52.212-4, Contract Terms And Conditions—commercial Products And Commercial Services (nov 2023) by Full Text far 52.212-5contract Terms And Conditions Required To Implement Statutes Or Executive Orders—commercial Products And Commercial Services.(jan 2025) (a)the Contractorshallcomply With The Following Federalacquisitionregulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: (1)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements(jan 2017)(section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (3)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (4)52.209-10, Prohibition Oncontractingwith Inverted Domestic Corporations(nov 2015). (5)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023)(31 U.s.c. 3903and10 U.s.c. 3801). (6)52.233-3, Protest After Award(aug 1996)(31u.s.c.3553). (7)52.233-4, Applicable Law For Breach Of Contractclaim(oct 2004)(public Laws 108-77 And 108-78 ( 19u.s.c.3805note)). (b)the Contractorshallcomply With The Far Clauses In This Paragraph (b) That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: _x_(1)52.203-6, Restrictions On Subcontractor Sales To The Government(jun 2020),withalternatei(nov 2021)(41u.s.c.4704 And10 U.s.c. 4655). _x_(2)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509)). __(3)52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009(jun 2010)(section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) _x_(4)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far3.900(a). _x_(5)52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020)(pub. L. 109-282) (31u.s.c.6101note). __(6)[reserved]. _x_(7)52.204-14, Service Contract Reporting Requirements(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(8)52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). _x_(9)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). __(10)52.204-28, Federalacquisitionsupply Chain Security Act Orders—federal Supply Schedules, Governmentwideacquisitioncontracts, And Multi-agency Contracts.(dec 2023)(pub. L. 115–390, Title Ii). __(11)(i)52.204-30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). __(ii)alternatei(dec 2023)of52.204-30. _x_(12)52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed Fordebarment.(nov 2021)(31u.s.c.6101note). __(13)52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters(oct 2018)(41u.s.c.2313). __(14)[reserved]. __(15)52.219-3, Notice Ofhubzoneset-aside Or Sole-source Award (oct 2022) (15u.s.c.657a). __(16)52.219-4, Notice Of Price Evaluation Preference Forhubzonesmall Business Concerns (oct 2022) (if Theofferorelects To Waive The Preference, Itshallso Indicate In Itsoffer) (15u.s.c.657a). __(17)[reserved] _x_(18)(i)52.219-6, Notice Of Total Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-6. __(19)(i)52.219-7, Notice Of Partial Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-7. _x_(20)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2) And (3)). __(21)(i)52.219-9, Small Business Subcontracting Plan (sep 2023) (15u.s.c.637(d)(4)). __(ii)alternatei(nov 2016)of52.219-9. __(iii)alternateii(nov 2016)of52.219-9. __(iv)alternateiii(jun 2020)of52.219-9. __(v)alternateiv (sep 2023) Of52.219-9. __(22)(i)52.219-13, Notice Of Set-aside Of Orders(mar 2020)(15u.s.c.644(r)). __(ii)alternatei(mar 2020)of52.219-13. _x_(23)52.219-14, Limitations On Subcontracting (oct 2022) (15u.s.c.657s). __(24)52.219-16, Liquidated Damages—subcontracting Plan(sep 2021)(15u.s.c.637(d)(4)(f)(i)). __(25)52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15u.s.c.657f). _x_(26)(i)52.219-28, Post Award Small Business Program Rerepresentation (feb 2024) (15u.s.c.632(a)(2)). __(ii)alternatei(mar 2020)of52.219-28. __(27)52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantagedwomen-owned Small Business Concerns(oct 2022) (15u.s.c.637(m)). __(28)52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15u.s.c.637(m)). __(29)52.219-32, Orders Issued Directly Under Small Business Reserves(mar 20x20)(15u.s.c.644(r)). _x_(30)52.219-33, Nonmanufacturer Rule(sep 2021)(15 U.s.c. 637(a)(17)). _x_(31)52.222-3, Convict Labor(jun 2003)(e.o.11755). __(32)52.222-19, Child Labor-cooperation With Authorities And Remedies(feb 2024). _x_(33)52.222-21, Prohibition Of Segregated Facilities(apr 2015). _x_(34)(i)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). __(ii)alternatei(feb 1999)of52.222-26. _x_(35)(i)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). __(ii)alternatei(jul 2014)of52.222-35. _x_(36)(i)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). __(ii)alternatei(jul 2014)of52.222-36. _x_(37)52.222-37, Employment Reports On Veterans (jun 2020) (38u.s.c.4212). _x_(38)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). _x_(39)(i)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78 And E.o. 13627). __(ii)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78 And E.o. 13627). __(40)52.222-54, Employment Eligibility Verification(may2022)(executive Order 12989). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items Or Certain Other Types Ofcommercial Productsorcommercial Servicesas Prescribed In Far22.1803.) __(41)(i)52.223-9, Estimate Of Percentage Ofrecovered Materialcontent For Epa–designated Items (may2008) ( 42u.s.c.6962(c)(3)(a)(ii)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(ii)alternatei(may2008)of52.223-9(42u.s.c.6962(i)(2)(c)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(42)52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons(may2024)(42 U.s.c. 7671,et Seq.). __(43)52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners(may2024)(42 U.s.c. 7671,et Seq.). _x_(44)52.223-20, Aerosols(may2024)(42 U.s.c. 7671,et Seq.). _x_(45)52.223-21, Foams(may2024)(42 U.s.c. 7671,et Seq.). _x_(46)52.223-23,sustainable Products And Services(may2024)(e.o. 14057,7 U.s.c. 8102,42 U.s.c. 6962,42 U.s.c. 8259b, And42 U.s.c. 7671l). __(47)(i)52.224-3privacy Training(jan 2017)(5 U.s.c. 552a). __(ii)alternatei(jan 2017)of52.224-3. _x_(48)(i)52.225-1, Buy American-supplies(oct 2022)(41u.s.c.chapter83). __(ii)alternatei(oct 2022)of52.225-1. __(49)(i)52.225-3, Buy American-free Trade Agreements-israeli Trade Act(nov 2023)(19 U.s.c. 3301 Note,19 U.s.c. 2112 Note,19 U.s.c. 3805 Note,19 U.s.c. 4001 Note,19 U.s.c. Chapter 29(sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. __(ii)alternatei [reserved]. __(iii)alternateii(jan 2025)of52.225-3. __(iv)alternateiii(feb 2024)of52.225-3. __(v)alternateiv (oct 2022) Of52.225-3. __(50)52.225-5, Trade Agreements(nov 2023)(19u.s.c.2501,et Seq.,19u.s.c.3301note). x__(51)52.225-13, Restrictions On Certain Foreign Purchases(feb 2021)(e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). __(52)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016) (section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). __(53)52.226-4, Notice Of Disaster Oremergencyarea Set-aside (nov 2007) (42u.s.c.5150). __(54)52.226-5, Restrictions On Subcontracting Outside Disaster Oremergencyarea(nov 2007)(42u.s.c.5150). _x_(55)52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving(may2024)(e.o. 13513). __(56)52.229-12, Tax On Certain Foreignprocurements(feb 2021). __(57)52.232-29, Terms For Financing Of Purchases Ofcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). __(58)52.232-30, Installment Payments Forcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). _x_(59)52.232-33, Payment Byelectronic Funds Transfer-system For Award Management(oct2018)(31u.s.c.3332). __(60)52.232-34, Payment Byelectronic Funds Transfer-other Thansystem For Award Management(jul 2013) (31u.s.c.3332). __(61)52.232-36, Payment By Third Party(may2014)(31u.s.c.3332). __(62)52.239-1, Privacy Or Security Safeguards(aug 1996)(5u.s.c.552a). __(63)52.240-1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act-covered Foreign Entities(nov 2024)(sections 1821-1826, Pub. L. 118-31,41 U.s.c. 3901note Prec.). __(64)52.242-5, Payments Tosmall Business Subcontractors(jan 2017)(15u.s.c.637(d)(13)). __(65)(i)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and 10u.s.c.2631). __(ii)alternatei(apr 2003)of52.247-64. __(iii)alternateii(nov 2021)of52.247-64. (c)the Contractorshallcomply With The Far Clauses In This Paragraph (c), Applicable Tocommercial Services, That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: _x_(1)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). __(2)52.222-42, Statement Of Equivalent Rates For Federal Hires(may2014)(29u.s.c.206 And 41u.s.c.chapter67). __(3)52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year Andoptioncontracts)(aug 2018)(29u.s.c.206 And 41u.s.c.chapter67). __(4)52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may2014) (29u.s.c.206and 41u.s.c.chapter67). __(5)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). __(6)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). __(7)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). __(8)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). __(9)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42u.s.c.1792). __(10)52.247-69, Reporting Requirement For U.s.-flag Air Carriers Regarding Training To Prevent Human Trafficking(jan 2025)(49 U.s.c. 40118(g)). (d)comptroller General Examination Of Record. The Contractorshallcomply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of Thesimplified Acquisition Threshold, As Defined In Far2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At52.215-2, Audit And Records-negotiation. (1)the Comptroller General Of Theunited States, Or An Authorized Representative Of The Comptroller General,shallhave Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2)the Contractorshallmake Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminatedshallbe Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Ofclaimsarising Under Or Relating To This Contractshallbe Made Available Until Such Appeals, Litigation, Orclaimsare Finally Resolved. (3)as Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1)notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract Forcommercial Productsor Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Downshallbe As Required By The Clause- (i)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509). (ii)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712). (iii)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (v)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (vi)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (vii)(a)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). (b)alternatei(dec 2023)of 52.204–30. (viii)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2)and (3)), In All Subcontracts Thatofferfurther Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far19.702(a) On The Date Of Subcontract Award, The Subcontractormustinclude52.219-8in Lower Tier Subcontracts Thatoffersubcontracting Opportunities. (ix)52.222-21, Prohibition Of Segregated Facilities(apr 2015). (x)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). (xi)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). (xii)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). (xiii)52.222-37, Employment Reports On Veterans(jun 2020)(38u.s.c.4212). (xiv)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause52.222-40. (xv)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). (xvi)(a)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78 And E.o 13627). (b)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78ande.o.13627). (xvii)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). (xviii)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). (xix)52.222-54, Employment Eligibility Verification(may2022)(e.o. 12989). (xx)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). (xxi)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). (xxii)(a)52.224-3, Privacy Training (jan 2017) (5u.s.c.552a). (b)alternatei(jan 2017)of52.224-3. (xxiii)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016)(section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations(jun 2020)(42u.s.c.1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause52.226-6. (xxv)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023) (31 U.s.c. 3903and10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of52.232-40. (xxvi)52.240-1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act-covered Foreign Entities(nov 2024)(sections 1821-1826, Pub. L. 118-31,41 U.s.c. 3901note Prec.). (xxvii)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and 10u.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause52.247-64. (2)while Not Required, The Contractormayinclude In Its Subcontracts Forcommercial Productsandcommercial Servicesa Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. (end Of Clause) hhsar Clauses: hhsar 352.203-70, Anti-lobbying (dec 2015) hhsar 352.222-70, Contractor Cooperation In Equal Employment Opportunity Investigations (dec 2015) hhsar 352.239-74, Electronic And Information Technology Accessibility additional Clauses: far 52.204-7, System For Award Management far 52.204-13, System For Award Management Maintenance far 52.204-24, Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment instructions To Offerors: addendum To Far 52.212-1 Instructions To Offeror-commercial Items: proposal Submission Format: ***quotes Shall Be In 2 Volumes: 1 Technical And 2 Price. The Volumes Shall Be Separate And Complete. The Volumes Shall Be Separate And Complete, So That Evaluation Of One May Be Accomplished Independently Of, And Concurrently With, The Evaluation Of The Other. No Pricing Information Shall Be Provided In Volume 1.*** the Total Number Of Pages For The Technical Quote Shall Not Exceed Ten (10) Pages, Using 1” Margins, Single Spaced, Font Type Time New Roman, And A Font Size Of 12. ***the Solicitation Does Not Commit The Government To Pay Any Cost For The Preparation And Submission Of A Quote Or Proposal. It Is Also Advised That The Contracting Officer (co) Is The Only Individual Who Can Legally Commit And Obligate The Government To The Expenditure Of Public Funds In Connection With The Proposed Acquisition.*** the Contractor Shall Indicate At A Minimum Salient Characteristics Have Been Met To Be Considered Responsive For This Requirement. The Contractor Shall Demonstrate How The Requested Items Or Services, “meet” Or “do No Meet” The Salient/functional Characteristics And Specifications Listed Here-below. The Contractor Shall Annotate Each Salient/functional Characteristics And Specifications With The Following: Meets (if It Meets The Specification) Or Does Not Meet (if It Fails To Meet The Specification). 1.grey Market Or Refurbished Products Will Not Be Accepted. 2. The Vendor Shall Indicate If Non-domestic Items Are Included In The Quote. 3. The Vendor Shall Provide All, Of The Items/services Listed Or None. 4. The Vendor Shall Meet All Technical/salient/functional, Operational Characteristics And Specifications Listed, And If Not The Manufacturer, Shall Be Able To Provide The Required Service With Oem Certified Technicians And Parts Or Show Proof That They Are An Authorized Third Party Reseller/provider. 5. Be Advised That Fda Does Not Accept Documents Which Contain The Use Of Macros. When Submitting Documents Via Email, Do Not Include .exe, Mso, Or Any Other Executable File Types That Could Potentially Trigger Email Security Protections (i.e. Email Blocks, Quarantine). Document Submissions Required Throughout The Award Period(s) Shall Not Have Macro Enabled Functionality And Any Document Delivered Having That Functionality Will Be Deemed Delinquent, If Not Corrected Prior To The Due Date. addendum Paragraph (b): the Quoter Shall Submit A Written Accessibility Conformance Report (acr) For Each Item Not In Compliance With 508 Standards Identified In Clause 352.239-74, Describing How The Item(s) Will Fully Address The Accessibility Requirements Outlined In The Solicitation; And A Description Of The Evaluation Methods The Offeror Will Use To Validate For Conformance To The Revised 508 Standards. The Acr Should Be Based On The Voluntary Product Accessibility Template Version 2.0 (ms Word) Provided By The Industry Technology Industry Council (itic). the Offeror Or Applicant Shall Submit All Electronic Documents For Microsoft Office Suite Products Without The Use Of “macros”. When Submitting Proposals Via Email, Do Not Include .exe, .mso, Or Any Other Executable File Types That Could Potentially Trigger Email Security Protections (i.e. Email Blocks, Quarantine). If The Offeror Or Applicant Submits Documents That Contain Macros, Macro Referenced Files, And/or Executable Files, The Government Will Not Be Able To View Or Open Such Documents And The Submission Will Be Considered Non-responsive To The Solicitation. No Additional Time Will Be Given To An Offeror Or Applicant To Correct The Document Submission And The Government Will Not Inform The Offeror Or Applicant That Their Submission Is Non-responsive Prior To Award. It Is The Offeror’s Or Applicant’s Responsibility To Ensure All Electronic Documents Are Submitted Without The Use Of Macros. technical Acceptability: Will Be Determined By Review Of Information Submitted By The Offeror Which Must Provide Sufficient Technical Information Necessary For The Government To Determine That The Offered Items, Components, And Services Meet Or Exceed The Technical Requirements Identified Above. Offerors Shall Specifically Address The Performance Specifications And Support Same With Submitted Technical Specifications, Descriptive Material, Literature, Brochures, Scientific Publications Where Proposed Solution Has Been Used For Same Or Similar Purposes, And Other Information Which Demonstrates The Capability Of The Offered Solution At Meeting Or Exceeding The Stated Needs Of The Fda. the Contractor Shall Provide Place Of Product Manufacture Or Service Performance And Any Other Applicable Information To Enable Review And Analysis Pertaining To The Buy American Statute And Requirements Relating To Made In America In The Event Of Nonavailability Waiver Request Through The Miao Digital Waiver Portal Is Needed. price: Provide Detailed Price Quote For Each Item/component Proposed To Meet The Schedule Of Items. Include The Firm’s Unique Entity Id (sam) Number With Quote. the Government Is Not Responsible For Locating Or Securing Any Information Which Is Not Identified In The Proposal However The Government Reserves The Right To Obtain Information For Use In The Evaluation From Any And All Sources Including Sources Outside Of The Government. quotes Must Include: Pricing For Each Line Item, Delivery Schedule, Technical Specifications Of The Offered Product. ************************************************************************************* mandatory Site Visit: Offerors Are Required To Attend At No Cost To The Government. a Mandatory Site Visit Is To Inspect The Current Site Where The Vacuum Pump And Preexisting Conditions Are Located. The Site Visit Is Located At: u.s Food And Drug Administration Los Angeles District Office pacific Southwest Food And Feed Laboratory 19701 Fairchild Road irvine, Ca 92612 date: January 29, 2025, start Time: 9:15 Am Pacific Time offeror Must Electronically Provide No Later Than Friday, January 23, 2025, At 10:00am Eastern Time (et), The Company Name And Attendees Names To The Contracting Officer. Each Attendee Must Possess And Present A Valid Government Issued Identification To Enter The Site. Allow 2 Hours For The Site Visit. Failure To Attend The Site Visit Will Result In The Offeror Considered Nonresponsive To The Combined Synopsis Solicitation. during The Site Visit, Offerors Shall Have An Opportunity To Inspect The Site And Ask Questions. All Questions And Answers Will Be Documented And Provided To All Offerors As An Amendment To The Combined Synopsis Solicitation. The Government Will Maintain A Record Of All Attendees, Including Names, And Affiliations. please See The Attached Combined Synopsis Solicitation Document In Full Text.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Housekeeping Services
United States
Closing Date13 Feb 2025
Tender AmountUSD 128.6 K 
This is an estimated amount, exact amount may vary.
Details: Please Refer To Attached Amendment - Vendor Q&a36c24425q0230 0001 section A: Description This Is A Combined Synopsis/solicitation For Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, In Conjunction With Far Part 13 As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. This Solicitation Is Issued As An Rfq, Number 36c24425q0230. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-02 Effective 01/03/2025. The Complete Text Of Any Of The Clauses And Provisions May Be Accessed In Full Text At Far | Acquisition.gov. This Solicitation Is Being Competed On A Full And Open Competitive Basis. The Government Reserves The Right To Make Split Awards As A Result Of This Solicitation. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 812332 Industrial Launders, With A Small Business Size Standard Of $47 Million. The Fsc/psc Is S209 - Housekeeping Laundry/drycleaning. Complete Instructions For Submitting A Response To This Solicitation And Applicable Provisions And Clauses Are Found In 36c24425q0230. All Offerors Are Advised To Pay Careful Attention To The Quote Submission Instructions As There Are Very Specific Instructions As What Is Required To Be Provided. The Contract Period Of Performance (pop) Is Anticipated To Be 03/24/2025 Through 03/23/2030. Should Issuance Of The Award Occur On A Different Date, The Performance Period Will Be Adjusted Accordingly. Any Award Resulting From This Solicitation Will Be Issued On A Standard Form 1449. Note: To Receive An Award Resulting From This Solicitation, Offerors Must Be Registered In The System For Award Management (sam) Database. Registration May Be Done Online At: Www.acquisition.gov Or Www.sam.gov. Section B: Statement Of Work The Pittsburgh, Pa Contracting Office Is Seeking Uniform Rental, Alteration And Laundering Services To Support The Wilkes Barre Va Medical Center, Located At 1111 East End Blvd., Wilkes Barre, Pa 18711. See Attached Statement Of Work (sow) For Complete Details. Section C: Price Schedule All Interested Companies Shall Provide Quotations For The Following: Supplies/services Quantities Listed Are Estimates. While Week Is The Unit Of Measure In This Combined Synopsis, Vendors May Price The Work In Other Industry-wide Acceptable Units, Such As Lbs. Line Item Description Quantity Unit Of Measure Unit Price Total Price 0001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 1 52 Wk 1001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 2 52 Wk 2001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 3 52 Wk 3001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 4 52 Wk 4001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 5 52 Wk Place Of Performance: Wilkes Barre Va Medical Center 1111 East End Blvd. Wilkes Barre, Pa 18711 Section D: Evaluation Of Quotations The Government Will Select The Quote That Represents The Best Benefit To The Government At A Price That Can Be Determined Reasonable. Specific Information To Be Included In Quotes Is Detailed Below In Instructions To Offerors Commercial Items . Following Receipt Of Quotes, The Government Will Perform A Comparative Evaluation Of The Services Quoted In Accordance With Far 13.106-2(b)(3). The Government Will Compare Quotes To One Another To Select The Quote That Best Benefits The Government By Fulfilling The Requirement. Additional Information Pertaining To Comparative Evaluation Is Below: What Comparative Evaluation Is: It Is The Direct Comparison Of One Quotation/offer With Another In A Uniform And Fair Manner To Determine Which Quote/offer Provides The Government What It Needs, Where And When, As Identified In The Rfq It Is An Assessment Of Which Response Is The Best As A Whole Once One Quotation/offer Is Found Acceptable, It Is Compared Side By Side To The Remaining Ones, And The Best One Is Chosen What Comparative Evaluation Is Not: It Does Not Individually Evaluate Quote/offers Against Specified Evaluation Factors It Does Not Assign A Rating Using A Color, Numerical, Or Other Rating Methodology Although The Process Is Not Prohibited, It Does Not Require Additional Evaluation To Determine If Minimal Advantage Is Worth A Minimal Or Normal Price Difference It Is Not A Low Price Technically Acceptable (lpta) Or Trade-off Process Contractors May Submit More Than One Quote; However, Contractors Are Strongly Encouraged To Submit Their Best Technical Solutions And Prices In Response To This Request For Quote. All Quotes Must Be Submitted By The Deadline To Be Considered For Evaluation. The Government Reserves The Right To Not Select Any Quotes For Award. Additionally, The Government Reserves The Right To Cancel This Solicitation At Any Time Without Making Award. The Contractor Is Responsible For All Quote Preparation Costs, Which, Under No Circumstances, Will Be Paid Or Otherwise Provided For By The Government. Once The Government Determines There Is/are A Contractor(s) That Can Provide A Service That Meet(s) The Requirements Of This Request For Quote, The Government Reserves The Right To Communicate With Only Those Contractors Quoting The Best-suited Service To Address Any Remaining Issues. The Contracting Officer Will Evaluate Technical Capability, Price, And Past Performance. Section E: Clauses And Provisions The Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. The Following Solicitation Provisions Apply To This Acquisition: Far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services (sep 2023) Addendum To Far 52.212-1 Instructions To Offerors Commercial Products And Commercial Services Offeror Must Ensure That Proposal Is Submitted Timely To Ensure Delivery And Receipt By The Due Date And Time Identified Herein. Offer Shall Be Submitted Electronically Via Email, To Stephanie.mcfadden@va.gov. In Addition To The Requirements Of Far 52.212-1, Offeror Shall: (a) Complete Provision 52.212-3. Note: An Offeror Needs Only To Complete Paragraph If The Offeror Has Completed The Annual Representations And Certifications Electronically In The System For Award Management Database. Otherwise, Complete Paragraphs (c) Through (o) As Applicable. (b) Offeror Shall Submit A Capability Statement Demonstrating Their Technical Capability And Ability To Meet The Full Scope (all Elements) Of The Statement Of Work. (c) Offeror Shall Submit At Least One Similarly Scoped/relevant Past Performance Reference, Including Both The Reference Information And Details Of The Work Performance; Past Performance Information Shall Be Recent And Relevant Work. Offerors May Submit More Than One Past Performance Reference; Doing So Further Demonstrates The Offeror S Ability To Perform The Work. The Contracting Officer May Also Utilize All Available Records (e.g. Ppiprs And Fapiis) As Well. A Determination Of Contractor Responsibility Will Be Conducted. Provisions That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Following Provisions Are Incorporated Into 52.212-1 As An Addendum To This Solicitation: 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998) This Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/browse/index/far Https://www.va.gov/oal/library/vaar/ (end Of Provision) Far Number Title Date 52.204-7 System For Award Management Nov 2024 52.204-16 Commercial And Government Entity Code Reporting Aug 2020 52.229-11 Tax On Certain Foreign Procurements Notice And Representation Jun 2020 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) The Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument In Paragraph (c)(1) In The Provision At 52.204 26, Covered Telecommunications Equipment Or Services Representation, Or In Paragraph (v)(2)(i) Of The Provision At 52.212 3, Offeror Representations And Certifications Commercial Products And Commercial Services. The Offeror Shall Not Complete The Representation In Paragraph (d)(2) Of This Provision If The Offeror Has Represented That It Does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services In Paragraph (c)(2) Of The Provision At 52.204 26, Or In Paragraph (v)(2)(ii) Of The Provision At 52.212 3. Definitions. As Used In This Provision Backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential Component Have The Meanings Provided In The Clause 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services. (d) Representations. The Offeror Represents That (1) It [ ] Will, [ ] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds Will In Paragraph (d)(1) Of This Section; And (2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds Does In Paragraph (d)(2) Of This Section. (e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded Will In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded Does In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (end Of Provision) 52.204-26 Covered Telecommunications Equipment Or Services Representation (oct 2020) (a) Definitions. As Used In This Provision, Covered Telecommunications Equipment Or Services And Reasonable Inquiry Have The Meaning Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services . (c) Representations. (1) The Offeror Represents That It [ ] Does, [ ] Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument. (2) After Conducting A Reasonable Inquiry For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. (end Of Provision) 52.204-29 Federal Acquisition Supply Chain Security Act Orders Representation And Disclosures (dec 2023) (a) Definitions. As Used In This Provision, Covered Article, Fascsa Order, Intelligence Community, National Security System, Reasonable Inquiry, Sensitive Compartmented Information, Sensitive Compartmented Information System, And Source Have The Meaning Provided In The Clause 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (b) Prohibition. Contractors Are Prohibited From Providing Or Using As Part Of The Performance Of The Contract Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Prohibition Is Set Out In An Applicable Federal Acquisition Supply Chain Security Act (fascsa) Order, As Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (c) Procedures. (1) The Offeror Shall Search For The Phrase Fascsa Order In The System For Award Management (sam)(https://www.sam.gov) For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If There Is An Applicable Fascsa Order Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (2) The Offeror Shall Review The Solicitation For Any Fascsa Orders That Are Not In Sam, But Are Effective And Do Apply To The Solicitation And Resultant Contract (see Far 4.2303(c)(2)). (3) Fascsa Orders Issued After The Date Of Solicitation Do Not Apply Unless Added By An Amendment To The Solicitation. (d) Representation. By Submission Of This Offer, The Offeror Represents That It Has Conducted A Reasonable Inquiry, And That The Offeror Does Not Propose To Provide Or Use In Response To This Solicitation Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Prohibited By An Applicable Fascsa Order In Effect On The Date The Solicitation Was Issued, Except As Waived By The Solicitation, Or As Disclosed In Paragraph (e). (e) Disclosures. The Purpose For This Disclosure Is So The Government May Decide Whether To Issue A Waiver. For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Subject To An Applicable Fascsa Order, And The Offeror Is Unable To Represent Compliance, Then The Offeror Shall Provide The Following Information As Part Of The Offer: (1) Name Of The Product Or Service Provided To The Government; (2) Name Of The Covered Article Or Source Subject To A Fascsa Order; (3) If Applicable, Name Of The Vendor, Including The Commercial And Government Entity Code And Unique Entity Identifier (if Known), That Supplied The Covered Article Or The Product Or Service To The Offeror; (4) Brand; (5) Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); (6) Item Description; (7) Reason Why The Applicable Covered Article Or The Product Or Service Is Being Provided Or Used; (f) Executive Agency Review Of Disclosures. The Contracting Officer Will Review Disclosures Provided In Paragraph (e) To Determine If Any Waiver May Be Sought. A Contracting Officer May Choose Not To Pursue A Waiver For Covered Articles Or Sources Otherwise Subject To A Fascsa Order And May Instead Make An Award To An Offeror That Does Not Require A Waiver. (end Of Provision) 52.216-1 Type Of Contract (apr 1984) The Government Contemplates Award Of A Firm-fixed-price, Indefinite Quantity Contract Resulting From This Solicitation. (end Of Provision) (end Of Addendum To 52.212-1) 52.212-2 Evaluation Commercial Products And Commercial Services (nov 2021) (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers: 1) Technical Capability 2) Past Performance 3) Price (b) Evaluation Approach. The Government Will Evaluate Quotations Using The Comparative Evaluation Process Outlined In Far 13.106-2 (b) (3), Where Quotations Will Be Compared To One Another To Determine Which Provides The Best Benefit To The Government. The Government Reserves The Right To Consider A Quotation Other Than The Lowest Price That Provides Additional Benefit(s). Quotations May Exceed Minimum Requirements Of The Solicitation. The Government Reserves The Right To Select A Quotation That Provides Benefit To The Government That Exceeds The Minimum Requirements Of The Solicitation But Is Not Required To Do So. Each Response Must Meet The Minimum Requirements Of The Solicitation. The Government Is Not Requesting Or Accepting Alternate Quotations. The Evaluation Will Consider The Following: 1) Technical Capability: The Quotation Will Be Evaluated To The Extent To Which It Can Meet And/or Exceed The Government S Requirements As Outlined In The Solicitation And Based On The Information Requested In The Instructions To Quoters Section Of The Solicitation. Please Provide An Explanation Of Your Firm S Ability To Meet And/or Exceed The Technical Aspects Of This Solicitation. 2) Past Performance: Offerors Shall Provide At Least One Relevant Past Performance Reference. The Past Performance Evaluation Will Assess The Relative Risks Associated With A Quoter S Likelihood Of Success In Fulfilling The Solicitation S Requirements As Indicated By The Quoter S Record Of Past Performance. The Past Performance Evaluation May Be Based On The Contracting Officer S Knowledge Of And Previous Experience With The Supply Or Service Being Acquired; Customer Surveys, And Past Performance Questionnaire Replies; Contractor Performance Assessment Reporting System (cpars) At Http://www.cpars.gov/; Or Any Other Reasonable Basis. 3) Price: The Government Will Evaluate The Price By Adding The Total Of All Line-item Prices. The Total Evaluated Price Will Be That Sum. (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. The Following Contract Clauses Apply To This Acquisition: Far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (nov 2023) Addendum To Far 52.212-4 Contract Terms And Conditions Commercial Products And Commercial Services Clauses That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Following Clauses Are Incorporated Into 52.212-4 As An Addendum To This Contract: 52.252-2 Clauses Incorporated By Reference (feb 1998) This Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/browse/index/far Https://www.va.gov/oal/library/vaar/ (end Of Clause) Far Number Title Date 52.204-13 System For Award Management Maintenance Oct 2018 52.204-18 Commercial And Government Entity Code Maintenance Aug 2020 52.223-2 Reporting Of Biobased Products Under Service And Construction Contracts May 2024 52.237-3 Continuity Of Services Jan 1991 52.216-18 Ordering (aug 2020) (a) Any Supplies And Services To Be Furnished Under This Contract Shall Be Ordered By Issuance Of Delivery Orders Or Task Orders By The Individuals Or Activities Designated In The Schedule. Such Orders May Be Issued From 03/24/2025 Through 03/23/2030. (b) All Delivery Orders Or Task Orders Are Subject To The Terms And Conditions Of This Contract. In The Event Of Conflict Between A Delivery Order Or Task Order And This Contract, The Contract Shall Control. (c) A Delivery Order Or Task Order Is Considered "issued" When (1) If Sent By Mail (includes Transmittal By U.s. Mail Or Private Delivery Service), The Government Deposits The Order In The Mail; (2) If Sent By Fax, The Government Transmits The Order To The Contractor S Fax Number; Or (3) If Sent Electronically, The Government Either (i) Posts A Copy Of The Delivery Order Or Task Order To A Government Document Access System, And Notice Is Sent To The Contractor; Or (ii) Distributes The Delivery Order Or Task Order Via Email To The Contractor S Email Address. (d) Orders May Be Issued By Methods Other Than Those Enumerated In This Clause Only If Authorized In The Contract. (end Of Clause) 52.216-19 Order Limitations (oct 1995) (a) Minimum Order. When The Government Requires Supplies Or Services Covered By This Contract In An Amount Of Less Than $2,500.00, The Government Is Not Obligated To Purchase, Nor Is The Contractor Obligated To Furnish, Those Supplies Or Services Under The Contract. (b) Maximum Order. The Contractor Is Not Obligated To Honor (1) Any Order For A Single Item In Excess Of To Be Determined At Award; (2) Any Order For A Combination Of Items In Excess Of To Be Determined At Award; Or (3) A Series Of Orders From The Same Ordering Office Within 10 Days That Together Call For Quantities Exceeding The Limitation In Paragraph (b)(1) Or (2) Of This Section. (c) If This Is A Requirements Contract (i.e., Includes The Requirements Clause At Subsection 52.216-21 Of The Federal Acquisition Regulation (far)), The Government Is Not Required To Order A Part Of Any One Requirement From The Contractor If That Requirement Exceeds The Maximum-order Limitations In Paragraph (b) Of This Section. (d) Notwithstanding Paragraphs (b) And (c) Of This Section, The Contractor Shall Honor Any Order Exceeding The Maximum Order Limitations In Paragraph (b), Unless That Order (or Orders) Is Returned To The Ordering Office Within 5 Days After Issuance, With Written Notice Stating The Contractor's Intent Not To Ship The Item (or Items) Called For And The Reasons. Upon Receiving This Notice, The Government May Acquire The Supplies Or Services From Another Source. (end Of Clause) 52.216-21 Requirements (oct 1995) (a) This Is A Requirements Contract For The Supplies Or Services Specified, And Effective For The Period Stated, In The Schedule. The Quantities Of Supplies Or Services Specified In The Schedule Are Estimates Only And Are Not Purchased By This Contract. Except As This Contract May Otherwise Provide, If The Government's Requirements Do Not Result In Orders In The Quantities Described As "estimated" Or "maximum" In The Schedule, That Fact Shall Not Constitute The Basis For An Equitable Price Adjustment. (b) Delivery Or Performance Shall Be Made Only As Authorized By Orders Issued In Accordance With The Ordering Clause. Subject To Any Limitations In The Order Limitations Clause Or Elsewhere In This Contract, The Contractor Shall Furnish To The Government All Supplies Or Services Specified In The Schedule And Called For By Orders Issued In Accordance With The Ordering Clause. The Government May Issue Orders Requiring Delivery To Multiple Destinations Or Performance At Multiple Locations. (c) Except As This Contract Otherwise Provides, The Government Shall Order From The Contractor All The Supplies Or Services Specified In The Schedule That Are Required To Be Purchased By The Government Activity Or Activities Specified In The Schedule. (d) The Government Is Not Required To Purchase From The Contractor Requirements In Excess Of Any Limit On Total Orders Under This Contract. (e) If The Government Urgently Requires Delivery Of Any Quantity Of An Item Before The Earliest Date That Delivery May Be Specified Under This Contract, And If The Contractor Will Not Accept An Order Providing For The Accelerated Delivery, The Government May Acquire The Urgently Required Goods Or Services From Another Source. (f) Any Order Issued During The Effective Period Of This Contract And Not Completed Within That Period Shall Be Completed By The Contractor Within The Time Specified In The Order. The Contract Shall Govern The Contractor's And Government's Rights And Obligations With Respect To That Order To The Same Extent As If The Order Were Completed During The Contract's Effective Period; Provided, That The Contractor Shall Not Be Required To Make Any Deliveries Under This Contract After 03/23/2030. (end Of Clause) 52.216-22 Indefinite Quantity (oct 1995) (a) This Is An Indefinite-quantity Contract For The Supplies Or Services Specified, And Effective For The Period Stated, In The Schedule. The Quantities Of Supplies And Services Specified In The Schedule Are Estimates Only And Are Not Purchased By This Contract. (b) Delivery Or Performance Shall Be Made Only As Authorized By Orders Issued In Accordance With The Ordering Clause. The Contractor Shall Furnish To The Government, When And If Ordered, The Supplies Or Services Specified In The Schedule Up To And Including The Quantity Designated In The Schedule As The "maximum." The Government Shall Order At Least The Quantity Of Supplies Or Services Designated In The Schedule As The "minimum." (c) Except For Any Limitations On Quantities In The Order Limitations Clause Or In The Schedule, There Is No Limit On The Number Of Orders That May Be Issued. The Government May Issue Orders Requiring Delivery To Multiple Destinations Or Performance At Multiple Locations. (d) Any Order Issued During The Effective Period Of This Contract And Not Completed Within That Period Shall Be Completed By The Contractor Within The Time Specified In The Order. The Contract Shall Govern The Contractor's And Government's Rights And Obligations With Respect To That Order To The Same Extent As If The Order Were Completed During The Contract's Effective Period; Provided, That The Contractor Shall Not Be Required To Make Any Deliveries Under This Contract After 03/23/2030. (end Of Clause) Vaar 852.203-70 Commercial Advertising (may 2018) The Contractor Shall Not Make Reference In Its Commercial Advertising To Department Of Veterans Affairs Contracts In A Manner That States Or Implies The Department Of Veterans Affairs Approves Or Endorses The Contractor S Products Or Services Or Considers The Contractor S Products Or Services Superior To Other Products Or Services. (end Of Clause) Vaar 852.232-72 Electronic Submission Of Payment Requests (nov 2018) (a) Definitions. As Used In This Clause (1) Contract Financing Payment Has The Meaning Given In Far 32.001; (2) Designated Agency Office Means The Office Designated By The Purchase Order, Agreement, Or Contract To First Receive And Review Invoices. This Office Can Be Contractually Designated As The Receiving Entity. This Office May Be Different From The Office Issuing The Payment; (3) Electronic Form Means An Automated System Transmitting Information Electronically According To The Accepted Electronic Data Transmission Methods And Formats Identified In Paragraph (c) Of This Clause. Facsimile, Email, And Scanned Documents Are Not Acceptable Electronic Forms For Submission Of Payment Requests; (4) Invoice Payment Has The Meaning Given In Far 32.001; And (5) Payment Request Means Any Request For Contract Financing Payment Or Invoice Payment Submitted By The Contractor Under This Contract. (b) Electronic Payment Requests. Except As Provided In Paragraph (e) Of This Clause, The Contractor Shall Submit Payment Requests In Electronic Form. Purchases Paid With A Government-wide Commercial Purchase Card Are Considered To Be An Electronic Transaction For Purposes Of This Rule, And Therefore No Additional Electronic Invoice Submission Is Required. (c) Data Transmission. A Contractor Must Ensure That The Data Transmission Method And Format Are Through One Of The Following: (1) Va S Electronic Invoice Presentment And Payment System At The Current Website Address Provided In The Contract. (2) Any System That Conforms To The X12 Electronic Data Interchange (edi) Formats Established By The Accredited Standards Center (asc) And Chartered By The American National Standards Institute (ansi). (d) Invoice Requirements. Invoices Shall Comply With Far 32.905. (e) Exceptions. If, Based On One Of The Circumstances In This Paragraph (e), The Contracting Officer Directs That Payment Requests Be Made By Mail, The Contractor Shall Submit Payment Requests By Mail Through The United States Postal Service To The Designated Agency Office. Submission Of Payment Requests By Mail May Be Required For (1) Awards Made To Foreign Vendors For Work Performed Outside The United States; (2) Classified Contracts Or Purchases When Electronic Submission And Processing Of Payment Requests Could Compromise The Safeguarding Of Classified Or Privacy Information; (3) Contracts Awarded By Contracting Officers In The Conduct Of Emergency Operations, Such As Responses To National Emergencies; (4) Solicitations Or Contracts In Which The Designated Agency Office Is A Va Entity Other Than The Va Financial Services Center In Austin, Texas; Or (5) Solicitations Or Contracts In Which The Va Designated Agency Office Does Not Have Electronic Invoicing Capability As Described Above. (end Of Clause) Vaar 852.242-71 Administrative Contracting Officer (oct 2020) The Contracting Officer Reserves The Right To Designate An Administrative Contracting Officer (aco) For The Purpose Of Performing Certain Tasks/duties In The Administration Of The Contract. Such Designation Will Be In Writing Through An Aco Letter Of Delegation And Will Identify The Responsibilities And Limitations Of The Aco. A Copy Of The Aco Letter Of Delegation Will Be Furnished To The Contractor. (end Of Clause) (end Of Addendum To 52.212-4) 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (nov 2024) (a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: (1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2) 52.204 23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115 91). (3) 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115 232). (4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015). (5) 52.232 40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). (6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553). (7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805 Note)). (b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: [] (1) 52.203 6, Restrictions On Subcontractor Sales To The Government (jun 2020), With Alternate I (nov 2021) (41 U.s.c. 4704 And 10 U.s.c. 4655). [] (2) 52.203 13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). [] (3) 52.203 15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009 (jun 2010) (section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) [x] (4) 52.203 17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community See Far 3.900(a). [x] (5) 52.204 10, Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub. L. 109 282) (31 U.s.c. 6101 Note). [] (6) [reserved] [] (7) 52.204 14, Service Contract Reporting Requirements (oct 2016) (pub. L. 111 117, Section 743 Of Div. C). [] (8) 52.204 15, Service Contract Reporting Requirements For Indefinite-delivery Contracts (oct 2016) (pub. L. 111 117, Section 743 Of Div. C). [x] (9) 52.204 27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117 328). [] (10) 52.204 28, Federal Acquisition Supply Chain Security Act Orders Federal Supply Schedules, Governmentwide Acquisition Contracts, And Multi-agency Contracts. (dec 2023) (pub. L. 115 390, Title Ii). [x] (11)(i) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (dec 2023) (pub. L. 115 390, Title Ii). [] (ii) Alternate I (dec 2023) Of 52.204 30. [x] (12) 52.209 6, Protecting The Government S Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment. (nov 2021) (31 U.s.c. 6101 Note). [] (13) 52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018) (41 U.s.c. 2313). [] (14) [reserved] [] (15) 52.219 3, Notice Of Hubzone Set-aside Or Sole-source Award (oct 2022) (15 U.s.c. 657a). [x] (16) 52.219 4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) (if The Offeror Elects To Waive The Preference, It Shall So Indicate In Its Offer) (15 U.s.c. 657a). [] (17) [reserved] [] (18)(i) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644). [] (ii) Alternate I (mar 2020) Of 52.219-6. [] (19)(i) 52.219-7, Notice Of Partial Small Business Set-aside (nov 2020) (15 U.s.c. 644). [] (ii) Alternate I (mar 2020) Of 52.219-7. [] (20) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)). [] (21)(i) 52.219 9, Small Business Subcontracting Plan (sep 2023) (15 U.s.c. 637(d)(4)). [] (ii) Alternate I (nov 2016) Of 52.219-9. [] (iii) Alternate Ii (nov 2016) Of 52.219-9. [] (iv) Alternate Iii (jun 2020) Of 52.219 9. [] (v) Alternate Iv (sep 2023) Of 52.219 9. [] (22)(i) 52.219-13, Notice Of Set-aside Of Orders (mar 2020) (15 U.s.c. 644(r)). [] (ii) Alternate I (mar 2020) Of 52.219-13. [] (23) 52.219 14, Limitations On Subcontracting (oct 2022) (15 U.s.c. 657s). [] (24) 52.219-16, Liquidated Damages Subcontracting Plan (sep 2021) (15 U.s.c. 637(d)(4)(f)(i)). [] (25) 52.219 27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15 U.s.c. 657f). [x] (26) (i) 52.219 28, Post-award Small Business Program Representation (feb 2024) (15 U.s.c. 632(a)(2)). [] (ii) Alternate I (mar 2020) Of 52.219 28. [] (27) 52.219 29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantaged Women-owned Small Business Concerns (oct 2022) (15 U.s.c. 637(m)). [] (28) 52.219 30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15 U.s.c. 637(m)). [] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (mar 2020) (15 U.s.c. 644(r)). [] (30) 52.219 33, Nonmanufacturer Rule (sep 2021) (15 U.s.c. 657s). [x] (31) 52.222-3, Convict Labor (jun 2003) (e.o. 11755). [] (32) 52.222 19, Child Labor Cooperation With Authorities And Remedies (feb 2024) (e.o. 13126). [x] (33) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). [x] (34)(i) 52.222 26, Equal Opportunity (sep 2016) (e.o. 11246). [] (ii) Alternate I (feb 1999) Of 52.222-26. [x] (35)(i) 52.222 35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). [] (ii) Alternate I (jul 2014) Of 52.222-35. [x] (36)(i) 52.222 36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). [] (ii) Alternate I (jul 2014) Of 52.222-36. [x] (37) 52.222 37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). [] (38) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). [x] (39)(i) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627). [] (ii) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). [x] (40) 52.222-54, Employment Eligibility Verification (may 2022). (e. O. 12989). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items Or Certain Other Types Of Commercial Products Or Commercial Services As Prescribed In Far 22.1803.) [] (41)(i) 52.223-9, Estimate Of Percentage Of Recovered Material Content For Epa-designated Items (may 2008) (42 U.s.c.6962(c)(3)(a)(ii)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.) [] (ii) Alternate I (may 2008) Of 52.223-9 (42 U.s.c. 6962(i)(2)(c)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.) [] (42) 52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons (may 2024) (42 U.s.c. 7671, Et Seq.). [] (43) 52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners (may 2024) (42 U.s.c. 7671, Et Seq.). [] (44) 52.223-20, Aerosols. (may 2024) (42 U.s.c. 7671, Et Seq.). [] (45) 52.223-21, Foams (may 2024). (42 U.s.c. 7671, Et Seq.). [x] (46) 52.223-23, Sustainable Products And Services (may 2024) (e.o. 14057, 7 U.s.c. 8102, 42 U.s.c. 6962, 42 U.s.c. 8259b, And 42 U.s.c. 7671i). [] (47)(i) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a). [] (ii) Alternate I (jan 2017) Of 52.224-3. [] (48)(i) 52.225-1, Buy American Supplies (oct 2022) (41 U.s.c. Chapter 83). [] (ii) Alternate I (oct 2022) Of 52.225-1. [x] (49)(i) 52.225-3, Buy American Free Trade Agreements Israeli Trade Act (nov 2023) (19 U.s.c. 3301 Note, 19 U.s.c. 2112 Note, 19 U.s.c. 3805 Note, 19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. [] (ii) Alternate I [reserved]. [] (iii) Alternate Ii (dec 2022) Of 52.225-3. [] (iv) Alternate Iii (feb 2024) Of 52.225-3. [] (v) Alternate Iv (oct 2022) Of 52.225-3. [] (50) 52.225 5, Trade Agreements (nov 2023) (19 U.s.c. 2501, Et Seq., 19 U.s.c. 3301 Note [x] (51) 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) (e.o.'s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). [] (52) 52.225 26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). [] (53) 52.226-4, Notice Of Disaster Or Emergency Area Set-aside (nov 2007) (42 U.s.c. 5150). [] (54) 52.226-5, Restrictions On Subcontracting Outside Disaster Or Emergency Area (nov 2007) (42 U.s.c. 5150). [x] (55) 52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024) (e.o. 13513) [x] (56) 52.229 12, Tax On Certain Foreign Procurements (feb 2021). [] (57) 52.232-29, Terms For Financing Of Purchases Of Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). [] (58) 52.232-30, Installment Payments For Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). [x] (59) 52.232-33, Payment By Electronic Funds Transfer System For Award Management (oct 2018) (31 U.s.c. 3332). [] (60) 52.232-34, Payment By Electronic Funds Transfer Other Than System For Award Management (jul 2013) (31 U.s.c. 3332). [] (61) 52.232-36, Payment By Third Party (may 2014) (31 U.s.c. 3332). [] (62) 52.239-1, Privacy Or Security Safeguards (aug 1996) (5 U.s.c. 552a). [x] (63) 52.240 1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act Covered Foreign Entities (nov 2024) (sections 1821 1826, Pub. L. 118 31, 41 U.s.c. 3901 Note Prec.). [] (64) 52.242-5, Payments To Small Business Subcontractors (jan 2017)(15 U.s.c. 637(d)(13)). [] (65)(i) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). [] (ii) Alternate I (apr 2003) Of 52.247-64. [] (iii) Alternate Ii (nov 2021) Of 52.247-64. (c) The Contractor Shall Comply With The Far Clauses In This Paragraph (c), Applicable To Commercial Services, That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: [x] (1) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67). [x] (2) 52.222-42, Statement Of Equivalent Rates For Federal Hires (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). Employee Class Monetary Wage-fringe Benefits [x] (3) 52.222-43, Fair Labor Standards Act And Service Contract Labor Standards Price Adjustment (multiple Year And Option Contracts) (aug 2018) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). [] (4) 52.222-44, Fair Labor Standards Act And Service Contract Labor Standards Price Adjustment (may 2014) (29 U.s.c 206 And 41 U.s.c. Chapter 67). [] (5) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment Requirements (may 2014) (41 U.s.c. Chapter 67). [] (6) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services Requirements (may 2014) (41 U.s.c. Chapter 67). [x] (7) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). [x] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). [] (9) 52.226 6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). (d) Comptroller General Examination Of Record. The Contractor Shall Comply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of The Simplified Acquisition Threshold, As Defined In Far 2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At 52.215-2, Audit And Records Negotiation. (1) The Comptroller General Of The United States, Or An Authorized Representative Of The Comptroller General, Shall Have Access To And Right To Examine Any Of The Contractor's Directly Pertinent Records Involving Transactions Related To This Contract. (2) The Contractor Shall Make Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart 4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminated Shall Be Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Of Claims Arising Under Or Relating To This Contract Shall Be Made Available Until Such Appeals, Litigation, Or Claims Are Finally Resolved. (3) As Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1) Notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1) In A Subcontract For Commercial Products Or Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Down Shall Be As Required By The Clause (i) 52.203 13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). (ii) 52.203 17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712). (iii) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv) 52.204 23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115 91). (v) 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115 232). (vi) 52.204 27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117 328). (vii) (a) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (dec 2023) (pub. L. 115 390, Title Ii). (b) Alternate I (dec 2023) Of 52.204 30. (viii) 52.219 8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)), In All Subcontracts That Offer Further Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far 19.702(a) On The Date Of Subcontract Award, The Subcontractor Must Include 52.219 8 In Lower Tier Subcontracts That Offer Subcontracting Opportunities. (ix) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). (x) 52.222 26, Equal Opportunity (sep 2016) (e.o. 11246). (xi) 52.222 35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). (xii) 52.222 36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). (xiii) 52.222 37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). (xiv) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause 52.222-40. (xv) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67). (xvi)(a) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627). (b) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). (xvii) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment Requirements (may 2014) (41 U.s.c. Chapter 67). (xviii) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services Requirements (may 2014) (41 U.s.c. Chapter 67). (xix) 52.222-54, Employment Eligibility Verification (may 2022) (e. O. 12989). (xx) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). (xxi) 52.222-62 Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). (xxii)(a) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a). (b) Alternate I (jan 2017) Of 52.224-3. (xxiii) 52.225 26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv) 52.226 6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause 52.226-6. (xxv) 52.232 40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of 52.232 40. (xxvi) 52.240 1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act Covered Foreign Entities (nov 2024) (sections 1821 1826, Pub. L. 118 31, 41 U.s.c.3901 Note Prec.). (xxvii) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause 52.247-64. (2) While Not Required, The Contractor May Include In Its Subcontracts For Commercial Products And Commercial Services A Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. (end Of Clause) Section F: Additional Information Award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. The Following Are The Decision Factors: - Price - Technical Capability - Past Performance The Award Will Be Made To The Response Most Advantageous To The Government. Responses Should Contain Your Best Terms, Conditions. To Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." Or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" Quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. Questions Questions In Response To This Notice Shall Be Submitted Via Email Only To Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00pm, Et, Monday, January 27, 2025. Questions May Or May Not Result In An Extension Of The Solicitation. Sources Sought 36c24425q0230 Must Be Included In The Subject Line Of The Email. Due Date Submission Of Your Response Shall Be Submitted Via Email Only To Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00pm, Thursday, February 13, 2025. Sources Sought 36c24425q0230 Must Be Included In The Subject Line Of The Email. Late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). The Response Shall Demonstrate The Ability To Meet The Requirements In The Solicitation. Specifically, Through Past Performances Of Providing Uniform Rental, Repair And Laundering Services To The Va Or Other Government Agencies. Quotes Shall Clearly And Completely Address The Technical Elements Listed In The Sow. Responses To These Elements Will Form The Basis Of Determining The Technical Acceptability Of The Quote. A Quote May Be Considered Not Technically Acceptable If Inadequate Or Insufficient Information Is Submitted, Which May Exclude The Quote From Further Consideration. Government May Make Award Based On The Initial Quotes Received; Therefore, An Offeror Should Submit Its Best Pricing With Its Quote. Pricing Submitted In Offeror Quote Shall Be Listed As Five Separate Line Items: One For Each Ordering Period As Outlined In Sow. Offerors Are Hereby Advised That Any Offeror-imposed Terms And Conditions That Deviate From The Government S Material Terms And Conditions Established By The Solicitation May Render The Quote Unacceptable And, Therefore, Ineligible For Award. The Government Intends To Issue A Single Award Resulting From This Solicitation. Attachments

Don Emilio Del Valle Memorial Hospital Tender

Food Products
Philippines
Closing Date11 Mar 2025
Tender AmountPHP 15 Million (USD 261.5 K)
Details: Description Subject : Design And Build Of Dedvmh Nutrition And Dietetics Service Facilities Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives As Food Preparation Is Part Of The Critical Functions In Delivering Quality Healthcare Service, It Is Important That Its Site Be Given Adequate Repair And Renovation. The Objective Is To Repair And Expand The Existing Dietary Area Resulting To A More Spacious, Comfortable And Hygienic Station For Its End-users To Work Around. The Improvement Is Expected To Evoke A Less Stressful Environment And Increased Productivity Among Workers. The Design Must Also Conform To The Standards Of Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Existing Dietary Complex Expansion And Improvement - Into Nutrition And Dietetics Service Facilities Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions And Specification Of The Existing Dietary Area At Ground Floor. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To:  Review And Confirm The Submitted Design Documents.  Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule.  Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From New Foundation; Includes Slabs, Beams And Girders D) Architectural Works I) Exterior Walls – All Exterior Wall At Ground Floor Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits Including Ii) Cable Tray Iii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iv) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers V) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. Vi) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Provision Of Water Softener I) Electronics / Auxiliary Works - At Functional Areas: Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works - At Dietary: Lpg Pipelines 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). B. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. C. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. D. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. E. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category B “medium A” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To:  Low-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 2-storey Building.  Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 5 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 5 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 5 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Nutrition And Dietetics Service Facilities 5%-6% Of Abc Construction Of Dedvmh Nutrition And Dietetics Service Facilities 94%-95% Of Abc Total Abc Php 15,000,000.00 The Approved Budget For The Design-build Contract Is Fifteen Million Pesos (php 15,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital Nutrition And Dietetics Service Facilities. Detailed Architectural And Engineering Design Services Shall Not Seven Percent (7%) Of The Approved Budget Cost (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred Sixty (240) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 180 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons.  Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In:  Recognition And Avoidance Of Unsafe Conditions  Workplace Safety And Health Requirements  Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties.  Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency.  Plan Must Be In Writing For Employers With Greater Than 10 Employees  All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors:  Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling.  Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain  All Floors Shall Have Direct Access To Ramp  Both Stairs Are For Service And Emergency Use  External Window At Second Floor And Up Shall Be Of Awning Type.  Provision Of Electrical Room  Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.).  Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building.  Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair.  Exits Terminate Directly At Open Space To The Outside Of The Building. Ground Floor – Nutrition And Dietetics Service Facilities • Hospital Staff Dining Room - This Area Is Where Hospital Staff Diners Take Their Meals. - Planning Relationships: A. Close To Serving And Food Assembly Area B. Close To Dishwashing Area - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: F. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: G. Provide Air Conditioning System. • Cooking And Baking Area - This Area Is Dedicated For Cooking And Baking Food, With High Pressure Gas Piping System. Equipment And Accessory Checklist: • Hood, Exhaust • Drainage Key Furniture/fixture Checklist: • Counter, 900mm High • Stainless Steel Grade 304 Sink, Single Compartment With Drainboard; 350-400mm Deep • Stainless Steel Grade 304 Sink, Double Compartment With Drainboard; 350-400mm Deep • Shelves, Overhead • Drain, Trench Grating • Concealed Floor Drain - Planning Relationships: A. Adjacent To Staff Dining Room B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Thirteen (13) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Ground Fault Circuit Interrupter. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light And Two (2) Units For Exhaust Fan With Specifications Of 15a, 2p, And 240v, Single. - Standby/emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: G. Provide At Least Three (3) Units Smoke Detector. - Gas Piping System: H. Provide High Pressure Gas Piping System. - Equipment And Accessories: I. Provide Hood, Exhaust J. Provide Range With Oven K. Provide Range With Broiler - Air Conditioning System: L. Provide Air Conditioning System. • Food Preparation Area W/ Special Diet Preparation Area - This Area Is Where Food Service Workers Prepare Food Vegetables, Slice And Cut Meat And Fish, Segregate Food, Set-up And Assemble Cooked Food, Place Food Trays And Containers On Food Conveyors To Be Taken To Wards. This Is Also Where Dietitian Puts Tags On Prepared Trays For Pay Patients. This Also Includes Space For Special Diet Preparation Area Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304 • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stainless Steel Grade 304 Sink, Double Compartment, With Drainboard; 350-400mm Deep • Counter, Food Preparation; Stainless Steel Grade 304 • Counter, Tray Set-up; Stainless Steel Grade 304 • Shelves, Overhead • Drain, Trench Grating; Stainless Steel - Planning Relationships: A. Adjacent To Staff Dining B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Seven (7) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: G. Provide Air Conditioning System. • Blenderized And Tube Feeding Area - This Area Is Where Preparation Of Food And Equipment Needed For Blenderized And Tube Feeding. Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304, With Cabinets Above And Shelves Below • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stool, Adjustable Height • Concealed Floor Drain - Planning Relationships: A. Adjacent To Special Diet Preparation Area B. Close To Dietitian/nutritionist’s Office - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Three (3) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Three (3) Units Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System. • Serving And Food Assembly Area - This Area Is Where Food Service Workers Set Up And Assemble Cooked Food, And Place Food Trays And Containers On Food Conveyors To Be Taken To Wards. Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304 • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stool, Adjustable Height • Concealed Floor Drain - Planning Relationships: A. Adjacent To Staff Dining Room B. Close To Dietitian/nutritionist’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System. • Food Conveyor Parking - This Space Is For Transit Station For Food Tray Truck/conveyor. - Planning Relationships: A. Close To Dishwashing Area B. Adjacent To Food Assembly/tray Set-up Area - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: F. Provide One (1) Unit Orbit Fan. • Cold Storage - This Area Is For Storage Of Poultry, Meat And Dairy Products Procured, Food That Easily Spoils (egg, Vegetables, Fruits), And Of Leftover Cooked Food That Are Still Edible Equipment And Accessory Checklist: • Refrigerator, 20 Cu. Ft. • Freezer, 20 Cu. Ft. • Chiller, 20 Cu. Ft., Reach-in Key Furniture/fixture Checklist: • Table; Stainless Steel Grade 304; 750 X 1200mm • Concealed Floor Drain - Planning Relationships: A. Adjacent To Dry Storage Room B. Close To Receiving Area C. Adjacent To Dietitian’s Office - Lighting System: D. For General Illumination, Provide At Least 150 Lux. - Power System: E. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: G. Provide One (1) Unit Exhaust Fan. • Dry Storage - This Area Is For Storage Of Food Procured, Food Intended For The Next Two Meals, Of Excess Supplies For Future Use, And Of Food That Does Not Spoil Easily. Key Furniture/fixture Checklist: • Counter, Work • Shelves, 400 Mm Deep • Cabinet, Lockable - Planning Relationships: A. Adjacent To Cold Storage Room - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Three (3) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Parallel Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: E. Provide One (1) Unit Orbit Fan. • Storage For Utensils/silverware - This Area Is For Storage Of Kitchen Utensils And Silverware Key Furniture/fixture Checklist: • Shelves, Open, 600mm Deep - Planning Relationships: A. Close To Dietitian’s Office - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Two (2) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Ventilation System: D. Provide One (1) Unit Orbit Fan. • Delivery Receiving Area - This Area With Exhaust Fan Is Dedicated For Dietitian On Duty And Auditor Witness Weighing Of Food Delivered By Supplier, And Where Auditor Inspects And Checks Quality Of Food Items Purchased From The Market And Those Delivered By The Supplier. Key Furniture/fixture Checklist: • Counter, Stainless Steel • Sink, Single Compartment With Drainboard; 350-400mm Deep • Counter, Tiled • Shelves, Open • Concealed Floor Drain - Planning Relationships: A. Adjacent To Dietitian’s Office B. Close To Cold And Dry Storage Rooms - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Ventilation System: E. Provide At Least One (1) Unit Orbit Fan. • Dishwashing And Pots Washing Area - This Area Is For Washing Of Pots, Pans, Trays, Dishes And Other Kitchen Utensils, And Where Food Service Workers Perform Other Clean-up Activities. Equipment And Accessory Checklist: • Dishwashing Machine, Floor Unit • Wash Container, 380 Mm Dia. • Waste Bin With Black Lining Key Furniture/fixture Checklist: • Counter, Stainless Steel Grade 304 • Stainless Steel Sink Grade 304, Double Compartment With Drainboard • Grease Trap • Counter, With Upturned Edge • Shelves, Open • Table, Feeder, Stainless Steel 700 X 1200mm • Table, Work, Stainless Steel 700 X 2400mm • Concealed Floor Drain - Planning Relationships: A. Close To Food Preparation Area B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Parallel Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: F. Provide At Least Two (2) Units Orbit Fan. • Waste Holding Area - This Area Is For Food Service Workers Sort Garbage Accordingly, Pack Garbage And/or Place Sorted Garbage Into Proper Bins/container, And Where Garbage Generated For A Day Or Two Is Temporarily Stationed Prior To Being Collected For Transfer To The Waste Management Service. Equipment And Accessory Checklist: • Garbage Bin Containers • Faucet With Hose Bibb Key Furniture/fixture Checklist: • Floor Drain - Planning Relationships: A. Located In The Perimeter Of The Dietetics Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: E. Provide At Least One (1) Unit Orbit Fan. • Dietitian’s Office / Staff Office - This Room Area Is Where The Chief Dietitian Calls Meetings With Staff For The Preparation Of Monthly Menu, Where Chief Dietitian And Staffs Reads, Writes And Uses Telephone In His Work Station, Dietitian And Staff Receive Visitors, Dietitian And Staff Store, File And Retrieves Records. - Planning Relationships: A. Located In The Kitchen Where It Shall Give The Dietitian Extensive/elevated View Of Work Areas And Control Over Possible Pilferage Of Dietary Supplies And Equipment. - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Twelve (12) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System • Staff’s Dressing, Lockers, Toilet And Bath - This Room/space Is Equipped With Secure Lockers, Private Dressing Rooms, And Accessible Toilets And Showers To Support Hygiene And Comfort For Male And Female Staff. This Space, With Its Own Separate Staff Entrance, Allows For Efficient Staff Flow. - Planning Relationships: A. Close To Dishwashing Area B. Adjacent To Food Assembly/tray Set-up Area - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Storage/closet - This Area Is For Storing Cleaning Materials Such As Detergents, Disinfectants, Brushes, Mops, And Other Sanitation Tools Used In Dietary Operations. - Planning Relationships: A. Located Within Patients Dishwashing Area. - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Lpg Storage Area - This Area Is Well-ventilated Space Designed For The Safe Storage Of Lpg Tanks Used In Kitchen Operations. The Area Will Be Located Away From Open Flames, Heat Sources, And High-traffic Zones To Ensure Safety. It Will Feature Non-combustible Walls, A Fire Extinguisher, Proper Signage, And Adequate Lighting. The Space Will Also Include Provisions For Leak Detection, An Accessible Emergency Shut-off Valve, And Ground-level Storage To Prevent Accidental Tipping Of Lpg Tanks. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • All Gender / Pwd Toilet & Bath - This Area Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Accessible To All Staffs. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • Electrical Room - Located On The Ground Floor In The Staff Hallway, It Is Strategically Placed To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. - Power System: C. Provide At Least One (1) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Common Toilet With Sink (female And Male Toilet Cubicle) - This Area, Featuring Separate Female And Male Toilet Cubicles, Will Serve Both The Dietitians/staff Office And The Hospital Staff Dining Room. It Will Be Designed For Accessibility And Include Standard Fixtures, Such As Sinks, Mirrors, And Hand Dryers Or Paper Towel Dispensers. The Space Will Prioritize Hygiene And Ease Of Maintenance With Durable, Easy-to-clean Surfaces, Adequate Lighting, And Ventilation. - Planning Relationships: A. In Between Dietitians/staff Office And Hospital Staff Dining - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. Xiv. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards.  Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects  Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General  All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies.  Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans.  Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans.  Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters.  Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters.  Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans  The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans  All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details.  Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing.  Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing.  Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes.  Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings.  The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans.  Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01.  Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections  Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans  Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures.  Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections.  The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans  Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows  Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning With An 45 Deg. Opening Angle. 8. Details  Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design.  Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation.  Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles.  Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following:  Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line  Road Network And Curbs And Sidewalks  Parking Spaces  Reference Location Of Existing Trees  Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line  Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides:  The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments.  The Inner Zone Shall Include The Wards.  The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services.  The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers.  There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks.  In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation.  Covered Walkways Shall Be Provided For Access And Connection To All The Buildings.  Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans  The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised.  The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans.  Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements.  Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls  Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works.  Used Soundproofed Wall Materials For Areas With Indicated “soundproofed”. Walls With An Stc Rating Of At Least 45-50 Is Recommended. In Areas Where High Confidentiality Or Privacy Is Required (e.g., Patient Rooms, Doctor’s Offices Near Noisy Zones), Consider An Stc Rating Of 55-60.  Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing.  Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound.  Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission.  Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 3. Floors  If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design.  Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections.  The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern.  The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works  Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details.  If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details.  Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould.  Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation.  Non-cove Light Placement: Instead Of Cove Lighting, Use Flush-mounted Lighting Directly In The Ceiling With Sealed Housings That Prevent Dust Buildup. Fixtures Should Be Durable, Non-reflective, And Easy To Clean Without Requiring Special Maintenance Procedures. 5. Doors And Windows  Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal.  Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors.  Toilets And Other Wet Areas Shall Have Steel Doors.  Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers.  Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Aluminum Frames Of Glass Doors Shall Be Powder-coated.  Door Finish And Color Shall Be Approved First Before Application.  Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope.  All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines.  Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details.  All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details.  Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors  Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344.  Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall.  Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These.  Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories  Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor.  Electrical Light Switches Shall Be Located By The Knob Side Of The Door.  Electrical Switches And Outlets Shall Be Installed Plumb And Level.  Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers.  Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344.  A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies.  Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage.  Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works  The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details.  Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details.  Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details.  The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting  Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish.  Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint.  Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish.  Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish.  Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified.  Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following:  Gutter, Eaves, And Parapet  Ceiling - Covelight, Special Connections And Design, Mouldings, Valances  Stairs - Handrail, And Baluster Design  Ramps - Handrail Design And Floor Pattern  Doors, Windows And Gates - Grille Works,  Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counters  Special Carpentry Works, E.g. Partitions, Cabinetry  Building And Room Signages And Wayfinding Systems  All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet”  Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Cooking Area, Including Furniture And Equipment With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Hospital Staff Dining C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials  Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels.  Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles.  Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material.  Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified.  Aluminum T-runners Shall Be Powder Coated.  Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings.  Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards  Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances  Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xvi. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works  Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House.  The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa.  The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System  Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp);  For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System  For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant.  For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System  Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System  Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Specific Requirements  Provide Details Of The Following: 1. Grease Trap (for Dietary) 2. Provision Of Water Softener 3. Fiberglass Pressure Tank E. Summary Of Materials  Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings)  Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified)  Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp)  300mm Dia. And Above, Reinforced Concrete Pipe (rcdp)  Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb  Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover  Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888  Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified)  Floor Drains/deck Drains; Cast Iron Brass (bps Certified)  Gutter Drains; Cast Iron Dome Type Brass (bps Certified)  Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Trench Grating; Galvanized/stainless Steel Iron Grates  Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified)  Water Closet-tank Type Push Button Flush  Lavatory - (pedestal/counter Type) With C-spout Spray Faucet  Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet  Urinal-wall Hung Flush Valve Type  Plumbing Fixtures At Sterile Areas; A. Scrub-up Sink-ga#16 Stainless Steel (single/double Bowl) Compartment With Knee Operated And Or Censor Controlled Spay Faucet B. Surgical Soap Dispenser-ga#16 Stainless Steel Foot Operated C. Laboratory Sink-ga# 16 Stainless Steel Deep Seated Seamless Bowl Compartment With C-spout Spray Faucet F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvii. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System  The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse.  An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building.  Hazard Classification Shall Be Light Hazard Occupancy.  Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M.  Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing.  All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System.  Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller.  Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes.  Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System  The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System.  Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary.  Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations.  Split Type Air Conditioners Will Be Used At Areas With Larger Capacities.  Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure.  Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways).  Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient.  Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets.  Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Specific Requirements  Provide Details Of The Following: 1. Lpg Pipeline 2. Kitchenhood And Smokestack E. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xviii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances  Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System  Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System  Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System  Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System:  Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Master Or Cable Antenna Television  Fire Alarm System  Security System 5. Lightning Protection System  The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following:  Lighting Fixtures/luminaires  Panelboard And Circuit Breakers  Switchgear And Other Metering Devices  Electrical And Hospital Equipment  Installation And Termination Of Auxiliary And Other Special Devices And Equipment  Power And Telephone Handholes (as May Be Required)  Pedestal And Service Entrance To Bldg.  Grounding System Layout  Substation/power House And Electrical Room  Transformer And Generator Mounting  Others As May Be Required. C. Summary Of Materials  General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. 8. Sterile Areas/zones Lighting Specifications: A. Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. B. Lux Level: Aim For 300-500 Lux For General Sterile Areas; 1000 Lux Or More May Be Needed In Surgical Suites Or Examination Zones Or As Specified On Manual Of Technical Guidelines For Hospital Planning And Design (level 3)  Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied.  Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure.  Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40.  Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size.  Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building.  Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service.  Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality.  Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required.  Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Patient Wards, Work Areas, Etc.  Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xix. Design Parameters (green And Safe Health Facilities)  Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards.  Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety  Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government.  The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals.  In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities.  Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency  Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun.  Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain.  Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System.  Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials.  Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc.  Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible.  Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology.  Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals.  All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security.  Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms.  Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene  Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank  Use Of Waterless Urinals And Dual Flush Water Closets.  Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets.  Use Of Water-saving Shower Heads  For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act.  A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied.  Waterless Urinals Must Be Provided For Male Toilets.  There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility  Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability  Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint.  Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used.  Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability  Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop.  Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing.  Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality  Harvest Natural Daylight If Applicable.  Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained.  Use Of Acoustic Privacy Partitions Is Required.  Separate Entrances For Ambulances And Walk-in Patients.  In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia.  In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible.  Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45.  Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xx. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement  Contractor’s Temporary Facility And Lay Down Yard.  Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos  Material Testing (rsb, Chb, Concrete, Steel)  Safety Requirements (warning Signs, Hardhat, Etc.)  As Built Plan  Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work  Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction.  All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative  Soil Excavation And Soil Treatment  Restoration Of Any Damaged Properties During The Construction  Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor  Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers.  No Implementation Of The Project Without An Approved Plan And Other Related Documents.  Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules.  Shall Abide By The Medical Center Hospital House Rules  Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative  Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements  All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives.  Soil Investigation  Concrete Strength Testing  Reinforcing Bar Strength Testing  Concrete Masonry Unit (cmu) Testing  All Plumbing And Sanitary System  Automatic Fire Sprinkler System  Ventilation And Air Conditioning System  All Electrical System  And Other Tests That Necessary To Perform To Ensure The Quality Of The Project  All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives.  The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation.  No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative  Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Telephone System 2. Paging System 3. Lan System 4. Fire Alarm System 5. Security System Cctv 6. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.

South Eastern Railway - SER Tender

Services
Ireps
India
Closing Date21 Jan 2025
Tender AmountINR 24 Million (USD 277.9 K)
Tender Id: E-Dy-WW-Housekeeping-24-WAGONSHOP-KGP-MECHANICAL/SOUTH EASTERN RLY | Cleaning/up-keeping Of Shop Floors/offices/yard & Disposal Of Garbages/scrap For Poh Of Wagon At Wagon Repair Shop, Kharagpur

Don Emilio Del Valle Memorial Hospital Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date11 Mar 2025
Tender AmountPHP 65 Million (USD 1.1 Million)
Details: Description Subject : Design And Build Of Dedvmh Ob Building Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives The Purpose Of This Project Is To Repair And Expand The Existing Ob Building To Provide Patients And Healthcare Workers With A More Spacious And Comfortable Area By Improving Its Ventilation, Air Conditioning, Lighting And Ensuring That The Size, Layout, And Functions Of The Structure Meet Their Diverse Healthcare Needs. The Design Must Also Conform To The Standards Of Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor B. Second Floor C. Third Floor (expansion) D. Roof Deck All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Delivery Complex - Ob-gyne Emergency Department - Neonatal Intensive Care Unit (nicu) - Chief Of Medical Professional Staff (cmps) Office - Ob-gyne Wards / Recovery Rooms - Conference Room / Training Rooms - Offices - Open Space For Mechanical Outdoor Units And Equipment Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions And Specification Of The Existing Ob-gyne Building. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To:  Review And Confirm The Submitted Design Documents.  Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule.  Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From Foundation Up To Roof Deck (entire Building); Includes Slabs, Beams And Girders Of Up To Roof Deck D) Architectural Works I) Exterior Walls – All Exterior Wall At From Ground Floor Up To Roof Deck Including Plastering Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits From Ground Floor To Roof Deck Including Cable Tray Ii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iii) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers Iv) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. V) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Drainage System I) Electronics / Auxiliary Works - At Functional Areas: Nurse Call Systems, Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). E. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category B “medium A” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To:  Medium-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 6-storey Building.  Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 15 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 10 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 10 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Ob Building (shall Not Exceed Php 3,500,000.00 Plus 6% Of Excess Of Php 50,000,000.00) 5%-6% Of Abc Construction Of Dedvmh Ob Building 94%-95% Of Abc Total Abc Php 65,000,000.00 The Approved Budget For The Design-build Contract Is Sixty-five Million Pesos (php 65,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital – Ob Building. Detailed Architectural And Engineering Design Services Shall Not Exceed Three Million Five Hundred Thousand Pesos (php 3,500,000.00) Plus Six Percent (6%) Of Excess Of Fifty Million Pesos (php 50,000.000.00) (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred Sixty (360) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 300 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons.  Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In:  Recognition And Avoidance Of Unsafe Conditions  Workplace Safety And Health Requirements  Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties.  Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency.  Plan Must Be In Writing For Employers With Greater Than 10 Employees  All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Geotechnical Investigation Five (5) Sets Duly Signed And Seal Soil Analysis And Investigation Report In Hard Bound (refer To Geotechnical Investigation Specification And Parameters) 1.2 Structural Analysis And Design Five (5) Sets Duly Signed And Seal Structural Analysis And Design Report In Hard Bound Including The Executable E-files (staad/etabs,etc.) Five (5) Sets Duly Signed And Seal Structural Specifications In Hard Bound (refer To Structural Analysis And Design Specification And Parameters) 1.3 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors:  Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling.  Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain  All Floors (except For Third Floor To Roof Deck) Shall Have Direct Access To Ramp  Both Stairs Are For Service And Emergency Use  External Window At Second Floor And Up Shall Be Of Awning Type.  Provision Of Electrical Room  Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.).  Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building.  Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair.  Exits Terminate Directly At Open Space To The Outside Of The Building. General / Common Areas • Staff’s Dressing, Lockers, Toilet And Bath - This Room/space Is Equipped With Secure Lockers, Private Dressing Rooms, And Accessible Toilets And Showers To Support Hygiene And Comfort For Male And Female Staff. This Space, With Its Own Separate Staff Entrance, Allows For Efficient Staff Flow And Infection Control, Particularly Important In Sensitive Areas Like The Delivery Complex And Nicu. - Planning Relationships: A. Adjacent To Staff’s Lounge B. Within The Delivery Complex And Nicu - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. • Staff’s Hallway - A Corridor Within The Delivery Complex And Nicu That Ensures A Minimum Clear Width Of 1.83 Meters To Facilitate Smooth, Unobstructed Movement Of Staff And Equipment, Enhancing Safety And Efficiency In High-traffic Medical Areas. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Auxiliary System: C. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: D. Provide At Least Six (6) Units Smoke Detector. • Patient’s Dressing/changing Rooms - Positioned Near The Entrance For Convenient Access, This Compact Room Accommodates Only One Bed Or Stretcher, Designed To Serve Both Ambulatory Patients And Those On Stretchers. With Separate Entrances To The Emergency Department And The Delivery Complex's Sterile Hallway, It Ensures Asepsis Despite Limited Space. - Planning Relationships: A. Next To Main Entrance B. Adjacent To Delivery Complex And Ob-gyne Emergency Department C. Close To Waiting Area And Comfort Room - Lighting System: D. For General Illumination, Provide At Least 250 Lux. - Power System: E. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: F. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: G. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (sterile-ground Floor, Delivery & Nicu Suite) - A Well-ventilated Passageway With Ambient Lighting And Centralized Air Conditioning, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (non-sterile-second Floor, Ob Wards/recovery Rooms) - A Well-ventilated Passageway With Ambient Lighting, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. • Staff’s Lounge - This Room/space Is Designed To Include A Comfort Room, A Counter With A Sink, Space For Dining Tables, And Resting Facilities. It Offers A Relaxing And Functional Space For Staff To Unwind, Eat, And Refresh During Their Shifts. - Planning Relationships: A. Next To Staff’s Main Entrance B. Adjacent To Staff’s Lockers. - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide At Least One (1) Unit Orbit Fan. • Janitor’s Closet - This Room/space Is Designed To Keep Cleaning Materials With Mop Sink And As Storage For Janitor’s Cleaning Tools. - Planning Relationships: A. One Janitor’s Closet Located Close To Delivery/operating Room B. One Janitor’s Closet Located To Staff’s Lockers And Lounge. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. • Wheeled Stretcher’s Area - This Room/space Is Located Near The Main Entrance, This Area Is Designed To Accommodate At Least Two (2) Bed Stretchers, Ensuring Easy Access And Quick Deployment For Patients Arriving Via Stretcher. It Is Strategically Placed For Efficient Patient Handling And Smooth Transitions To Other Areas Of The Facility. - Planning Relationships: A. Located At The Entrance Of Delivery & Nicu Suite/complex - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Power System: C. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • All Gender / Pwd Toilet - This Restroom Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Accessible To All Patients, Relatives And Visitors. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • Toilets/comfort Rooms - One Comfort Room For Both Male And Female Adult Ward While Separate Comfort Rooms For Stations, Offices And Service Rooms. - Planning Relationships: A. Equipped With Wall Mounted Intravenous (iv) Fluid Hook For Patient Rooms And Emergency Pull Chord With Corridor Lights Installed Above The Door. - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Access/exit Stairs - Stairs That Provide Essential Vertical Circulation For Movement Between Different Levels Of A Building, Typically Serving As Both An Access Point For Entry And An Exit For Egress. These Stairs Must Meet Safety Regulations, Including Proper Width, Handrails, Non-slip Treads, And Clear Signage For Easy Navigation. They Should Also Be Designed To Accommodate Emergency Evacuations And Ensure Accessibility Where Possible. - Planning Relationships: A. Exits Terminate Directly At An Open Space To The Outside Of The Building B. Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Access Ramps - Ramps Designed To Provide A Smooth, Accessible Pathway For Individuals With Mobility Challenges, Such As Wheelchair Users, To Enter Or Exit A Building. These Ramps Should Meet Accessibility Standards, Including Proper Slope (usually 1:12), Non-slip Surfaces, Handrails On Both Sides, And Clear Signage. They Are Essential For Ensuring Equal Access To All Areas Of A Building, In Compliance With Accessibility Laws Like The Amended Irr Of Bp 344. - Planning Relationships: A. A Ramp Shall Have A Minimum Clear Width Of 1.22 Meters (or 4 Feet) In One Direction (or 2.44 Meters Or 8 Feet In Two Opposite Directions). B. The Slope Of The Ramp Shall Not Be Steeper Than 1:12 Meters. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Electrical/auxiliary Room - Due To Limited Space, This Room Is Designed With A Bi-folding Door That Provides At Least 1.60 Meters Of Clear Opening Width. Located On The Ground Floor In The Staff Hallway, It Is Strategically Placed Away From Direct Patient Access To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. Ground Floor – Delivery Complex • Nurse Station W/ Sink, Inc. Supply Room And T&b - This Area Is Dedicated For The Nurses And Other Medical Staff Assigned To This Floor. It Shall House The Patient’s Charts, Patient’s Medications With Proper Compartmentalization, Nurse Call System Central Station, One Dedicated Comfort Room, Supply/medication Room And Ample Area For Doctors To Do Charting And Nurses’ Personal Belongings. This Station Should Be Located To Permit Visual Observation Of Patient (specifically Areas Such As Labor Room And High-risk Pregnancy Unit Room) And Movement Into The Suite. This Is Also Located Within The Sterile Area Of The Ob-gyne Complex, Is An Open Station, And Has Direct Access To The Hallways Common/centralized Air Conditioning. - Planning Relationships: A. Adjacent To Breastfeeding Room B. Close To Nicu, Ob-gyne Emergency Department - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least Two (2) Units Smoke Detector. - Security System: H. Provide At Least Two (2) Units Smoke Detector. Provide Closed – Circuit Television Cctv Shall Be Installed At The Lobby And Corridor Or Hallway Of This Floor With Central Monitor Located At The Reception Area And At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station. • Labor Room - This Area Is Dedicated For Maternity Patients To Be Monitored And Supervised During Labor And Delivery. Before Being Transferred To The Delivery Room, Patients Stay In The Labor Room For Assessment And Monitoring. Labor Rooms Should Have Adequate Lighting, Including Ambient Light And Focus Lights For Labor And Examination Tables. Labor Rooms Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. It Shall Also House One Dedicated Comfort Room And A Common Counter With Sink. - Planning Relationships: A. Adjacent To Delivery Room B. Close To Caesarian Delivery Room C. Close To Scrub-up And Sub-sterilizing Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning Unit System • Delivery Room - This Area Is Dedicated For Normal Spontaneous Delivery Services. It Shall Also House At Least Four (4) Delivery Beds And A Dedicated Newborn Resuscitation Area, A Place With A Flat Firm Surface And Heat Source, For Immediate Resuscitation And Stabilization Of Newborns Who Require Assistance At Birth. This Area Is Typically Equipped With Necessary Medical Equipment, Such As Oxygen, Suction Devices, And Other Resuscitation Tools, And Is Staffed By Trained Healthcare Professionals To Provide Emergency Care To Newborns In Critical Condition. The Delivery Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 750 Lux. - Power System: D. Provide At Least Five (5) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Outlet 15a, 2p, 240v, Single, Grounding Type, Tandem. Two (2) Units Ground Terminal, Duplex. Also, Allocate Two (2) Units Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Cesarian Delivery Room - This Area Is Specialized Operating Room Equipped For Performing Cesarean Sections, A Surgical Procedure Used To Deliver A Baby Through An Incision In The Mother's Abdomen And Uterus. This Room Is Designed To Accommodate The Surgical Team And Necessary Medical Equipment, Ensuring A Sterile Environment And Readiness For Any Complications That May Arise During The Delivery. It Is Typically Equipped With Operating Tables, Surgical Instruments, Anesthesia Equipment, And Monitoring Devices For Both The Mother And Baby. This Operating Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Operating Room (c-section), Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 1000 Lux. - Power System: D. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • High-risk Pregnancy Unit - This Area Is Dedicated To The Care And Management Of Pregnant Women Who Have Been Identified As Having A Higher Risk For Complications During Pregnancy, Labor, Or Delivery. The Unit Provides Close Observation And Interventions To Ensure The Health And Safety Of Both The Mother And The Baby, Offering Specialized Care For Conditions Such As Gestational Diabetes, Hypertension, Multiple Pregnancies, Or Other Medical Concerns. It Shall Also House One Dedicated Comfort Room Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Fourteen (14) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System  Master Or Cable Antenna Television - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Septic Lr/dr (labor Room/delivery Room) - This Room/space With Septic Cases Physically Separated From Regular Cases To Avoid Infection. This Room Is Equipped To Handle Sterile Procedures While Minimizing The Risk Of Cross-contamination, With Enhanced Infection Control Measures In Place. It Is Typically Isolated To Prevent The Spread Of Infections And May Include Specialized Equipment For Both Maternal And Neonatal Care To Address Potential Complications Arising From The Infection. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Scrub-up Area - This Room/space Where Preoperative Hand Washing Is Performed Located Outside Of The Delivery/operating Room Installed Either In A Recessed Wall Or Other Open Space But Shall Be Kept Away From Main Traffic Flow. This Shall Be Located Within The Sterile Zone Of The Delivery Complex, And Shall House 3-station Scrub Sink, With Gooseneck Spout & Foot Control, Sensor Type, And Provision For Hand-dryer. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Cesarian Delivery Room - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light And Hand Dyer. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Sub-sterilizing Room - This Room/space Where Medical Instruments And Equipment Are Cleaned And Partially Sterilized Before Being Sent To A Main Sterilization Area For Final Sterilization. This Room Typically Serves As An Intermediate Step In The Sterilization Process, Focusing On Decontaminating Items, Such As Surgical Instruments, To Reduce The Risk Of Infection. This Room Is Equipped With Sinks, Disinfectants, Ultrasonic Cleaners, And Possibly Other Equipment To Assist In The Preparation Of Items For Full Sterilization. It Should Be Accessible From The Delivery Room And Operating Room. Should Have A Utility Door That Provides Access Out From The Sterile Route, Ensuring A Controlled Flow Of Items Without Compromising The Sterile Environment. This Utility Door Should Lead To A Non-sterile Area, Allowing For The Safe And Efficient Movement Of Equipment And Materials, While Preventing Contamination From Entering The Sterile Zones. - Planning Relationships: A. Adjacent To Operating Room B. Adjacent To Scrub-up Area - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Three (3) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: G. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Sterile Instrument And Supply Storage - This Room/space Is Where Medical Supplies And Sterile Instruments Needed For Normal Spontaneous Delivery Are Kept. This Shall House A Counter With Sink And Drainboard, And Door With Vision Panel. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Clean-up Room - This Room/space Is Intended For The Sterilization Of Instruments In Accordance With Doh Guidelines On Cleaning, Disinfection, And Sterilization Of Reusable Medical Devices In Hospital Facilities In The Philippines (annex B Of Administrative Order No. 2012-0012). This Shall House Counter For Work, Sink With Double Compartment; Laundry; 350-400 Mm Deep. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide Least One (1) Orbit Fan. • Doctor’s On-call Room - This Room/space Is Where Doctors Can Rest And Recuperate While Being Available For Urgent Patient Needs Or Emergencies. It Shall 0house One Dedicated Toilet And Bath, Resting Facilities, And With Essential Features Such As Sound-proofing And Alert System That Notifies The Doctors Of Emergencies Or When They Are Needed Urgently. It Should Be Located In Close Proximity And Have Direct Access To The High-risk Pregnancy Unit, Septic Labor/delivery Room, Labor Room, And Nurse Station. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station C. Close To High-risk Pregnancy Unit, Septic Labor/delivery Room, And Labor Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Eight (8) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System Ground Floor – Ob-gyne Emergency Department • General Requirements - This Area Should Be Located In Ground Floor To Ensure Easy Access For Patients. It Shall Also Have Separate Entrance To The Emergency, And Corridors For Access By Patient Using Bed Or Stretcher And Equipment (2.44 Meters Or 8.00 Ft. Clear Width) And A Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. Of 4.00 Ft.). Due To Limited Space Available, This Whole Area Only House Small Independent Nurse Station With Counter And Sink, Observation Bay And Treatment Area With Sink Or Wall-hung Lavatory, Divided By Privacy Curtains/dividers, Equipment/supply Storage For Direct Access To Resuscitation Equipment, One Dedicated Comfort Rooms, And A Patient Dressing/changing Room With Separate Entrances To The Emergency Department And Onto Delivery Complex Sterile Hallway To Provide Asepsis. • Waiting Area - This Room/space Is Where Patients, Companions, And Visitors Can Wait Comfortably. However, This May Be Located Outside Of The Birthing Clinic If There Is No Sufficient Space Provided That There Should Be An Overhead Cover. The Waiting Area Can Also Be Situated Along A Corridor Provided That The Width Of Such Corridor Shall Not Decrease Lower Than 1.83 M In Width. It Should Be Well-ventilated And Equipped With Ample Lighting To Ensure A Comfortable And Inviting Environment For Patients And Visitors. This Shall Be In Close Proximity To Other Provided Common Areas Such As Comfort Rooms And Common Counter With Sink For Hygienic Activities. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide Least Two (2) Units Orbit Fan • Nurse Station With Sink - This Area Is Located To Permit Observation Of Patient And Control Access To Entrance, Waiting Area, And Treatment Area. This Area Should Also House A Working Table And A Separate Counter With Sink. - Planning Relationships: A. Located At Ob-gyne Emergency Department B. Close To Emergency Entrance C. Adjacent To Observation Bay And Examination/treatment Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Ground Fault Circuit Interrupter (gfci) Outlet. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Security System: I. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: J. Provide Air Conditioning System • Observation Bay - This Room/space Is Designated Area Where Patients Can Be Closely Monitored After Initial Assessment. This Space Only Houses One (1) Observation Bed Or Recliner Due To Insufficient Space Available. It Is Adjacent To Examination/treatment Room And Should Be Divided By Privacy Curtains/dividers, And Should Be In Close Proximity To Comfort Room Available. - Lighting System A. For General Illumination, Provide At Least 750 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Allocate One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System • Examination And Treatment Area - This Room/space Where Pre- And Post-natal Check-up Is Conducted, It Is Designated Area With Clear Visibility From The Nurse Station, Efficient Equipment Placement, And Dedicated Spaces For Examination And Treatment. It Is Adjacent To Observation Bay And Should Be Divided By Privacy Curtains/dividers. This Shall Have A Sink Or A Wall-hung Lavatory And Should Be In Close Proximity To Comfort Room Available. This Space Shall Also Accommodate One (1) Procedural Bed, Similar To The Examination Bed But With Extra Support For Patients Undergoing Treatments And Space For Equipment. The Bed Should Be Adaptable For Minor Procedures Like Suturing, Drainage, Or Stabilization For Transport. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Equipment/supply Storage Room - This Room/space Is Essential For Maintaining Organized, Accessible, And Sterile Storage Of Medical Supplies, Instruments, And Other Necessary Materials. Due To Limited Space, Set-up Must Be Optimized To Ensure Essential Supplies Are Organized And Accessible. This Shall Also Be Temperature/humidity Controlled To Preserve The Quality Of Stored Sensitive Items. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. Ground Floor – Neonatal Intensive Care Unit (nicu) • General Requirements - The Nicu, Located Adjacent To The Breastfeeding Room And On The Same Floor As The Delivery Complex, Should Be Designed To Maximize Limited Space. It Will Include An Independent Nurse Station With An Attached Comfort Room For Staff Convenience. The Layout Will Accommodate Supply Storage, With Vertical Solutions To Save Space, And Provide An Ample Area For Examination Table And Essential Equipment. Infection Control Measures Will Be In Place, Including Zoning For High-risk Cases, Handwashing Stations, And Access To Ppe. Nicu Shall Be Separate But Immediately Accessible From The Delivery Room/cesarian Operating Room. The Nicu Will Be Soundproofed To Minimize Noise And Create A Quiet, Conducive Environment For Neonates' Rest And Recovery. Due To Limited Space, The Nicu Will House Only Ten (10) Bassinets. The Design Will Focus On Maximizing Available Space While Ensuring Essential Equipment, Infection Control Measures, And Patient Comfort Are Maintained. This Shall Also Include A Viewing Glass Window For Family Members To Observe Their Newborns While Maintaining The Necessary Infection Control Protocols. This Window Will Be Strategically Positioned In A Way That Provides A Clear View Of The Ten (10) Bassinets And Ensures Privacy And Security. • Nurse Station W/ Sink, Including Supply Room And Toilet - The Nicu Design Will Include An Independent Nurse Station With A Sink For Hand Hygiene, Ensuring Staff Can Maintain Cleanliness And Efficiency While Monitoring Patients. It Will Also Feature A Separate Counter With A Sink And An Additional Counter Or Table For Work Tasks. Adjacent To The Nurse Station, A Comfort Room Will Provide Convenience For Staff During Long Shifts. The Layout Will Incorporate Supply Storage With Vertical Solutions To Optimize Space And Keep Essential Equipment Organized, Maximizing The Use Of Limited Space While Ensuring Facilities For Both Patient Care And Staff Comfort. - Planning Relationships: A. Adjacent To Breastfeeding Room - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: D. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: F. Provide At Least Two (2) Units Smoke Detector. - Security System: G. Provide Closed – Circuit Television Cctv At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Breastfeeding Room Including Sink And Toilet - This Room, Located Adjacent To The Nicu, Will Be Designed With Its Own Counter And Sink For Hygiene And Convenience. It Will Include A Comfort Room For The Mother's Use And Ample Seating Space For Comfortable Breastfeeding. Additionally, The Room Will Feature A Foldable Diaper Changing Station, Maximizing Space While Providing Necessary Facilities. This Layout Ensures A Private And Functional Space For Mothers To Care For Their Newborns While Maintaining Proximity To The Nicu. - Planning Relationships: A. Adjacent To Nurse Station And Nicu - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System Ground Floor – Cmps (chief Of Medical Professional Staff’s Office) • Chief Of Medical Professional Staff’s Office - The Chief Of Medical Professional Staff’s Office Will Be Strategically Located Close To The Delivery Complex And Will Be Soundproofed (such As High-density Acoustic Panels, Insulated Walls) To Ensure Privacy And A Quiet Environment. The Office Will Include A Toilet And Bath, Archive Area, With A Hidden Access Door Connecting To The Office For Discreet Access. It Will Also Feature A Secretary And Receiving Area, A Conference Room With An Attached Comfort Room, And A Pantry For Staff Convenience. The Archives Area Will Be Situated Nearby For Easy Access To Important Documents, Ensuring A Functional And Efficient Workspace While Maintaining Privacy And Comfort. The Chief Of Medical Professional Staff’s Office Will Include A Corner With A Full-length Window, Offering A Panoramic View Of The Hospital's Vicinity. This Design Feature Will Enhance Natural Light, Provide A Sense Of Openness, And Allow The Chief To Observe The Surrounding Area. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots For Cmps Office, Two (2) Units For Secretary’s Area, Two (2) Units For Receiving Area, Six (6) Units For Conference Room And Two (2) Units For Lounge/pantry. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light, For Cmps Office, Secretary’s And Receiving Area, And Conference Room. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide Three (3) Units Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Four (4) Units Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System Second Floor – Ob-gyne Wards / Recovery Rooms • Nurse Station With Sink, Including Supply Room, Medication Room, And Toilet - This Enclosed Area, Located On The Second Floor Intended For Wards, Recovery Rooms, And Other Service Rooms, Is Dedicated To Nurses And Medical Staff Assigned To This Floor. It Houses Patient Charts, Medications With Proper Compartmentalization, A Nurse Call System Central Station, A Dedicated Comfort Room, A Supply/medication Room, And Ample Space For Doctors To Do Charting And Nurses' Personal Belongings. The Station Allows For Visual Observation Of Key Patient Areas And Movement Into The Suite. It Is Centrally Located With Direct Access To The Common Hallways. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Security System: F. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Two (2) Private Rooms (1-bed Capacity) With Toilet And Bath - These Rooms Are Designed To Provide A Private, Comfortable Space For Patients, Each With A Single Bed, And Include An Attached Toilet And Bath For Patient Convenience And Privacy. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Semi-private Rooms (3-bed Capacity) With Shared Sink, Toilet And Bath - This Room Is Designed To Accommodate Three Patients, Offering A Semi-private Setting With A Shared Space For Comfort And Care. This Room Includes A One (1) Shared Sink, And Toilet And Bath. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Infirmary Room (1-bed Capacity) With Toilet And Bath - This Room Is Designed To Accommodate The Hospital Staff’s And/or Their Immediate Family Members. It Provides A Private Space With A Bed, Toilet, And Bath, Offering Comfort And Privacy While Supporting Basic Medical Needs During Their Stay. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Isolation Room (1-bed Capacity) With Sink, Ante Room, Toilet And Bath - This Room Is Designed To Accommodate A Single Patient In Isolation, Providing A Controlled Environment For Infectious Or High-risk Patients. It Includes A Bed, Ante Room With Sink Or Wall-hung Lavatory For Staff To Change And Prepare Before Entering, And An Attached Toilet And Bath For Patient Comfort And Hygiene. The Room Is Equipped To Prevent The Spread Of Infection, With Strict Access Control And Infection Control Measures In Place. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Teen Adolescent (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six Adolescent Patients, Featuring A Shared Sink, With Separate Shower And Toilet Facilities To Ensure Privacy And Hygiene. The Shared Sink Area Allows For Efficient Use Of Space While Maintaining Cleanliness, While The Separate Shower And Toilet Provide The Necessary Amenities For Patient Comfort And Convenience. The Design Creates A Supportive And Functional Environment For Young Patients, Offering Ease Of Access To Medical Care. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Gyne Ward (7-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Seven (7) Gynecological Patients. It Includes Shared Facilities Such As A Sink, Shower, And Toilet To Efficiently Serve The Needs Of Multiple Patients While Ensuring Hygiene And Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Ob Ward (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six (6) Obstetrics Patients, Featuring Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Help Optimize Space While Ensuring Patients Have Access To Essential Hygiene Facilities. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Ob Ward Extension (18-bed Capacity) With Shared Sink, Shower And Toilet - This Extension Is Designed To Accommodate Up To Eighteen (18) Obstetrics Patients, With Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Ensure Efficient Use Of Space While Providing Essential Hygiene Facilities For All Patients. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Eighteen (18) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Six (6) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Csb Care For Small Baby Room With Toilet - This Room Is Designed For Small Or Premature Babies, With Space For Four Beds, An Attached Toilet, Foldable Diaper Changing Station, And Resting Facilities For Caregivers. It Provides A Functional And Comfortable Environment For Both Babies And Families. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Hearing Screening Room - A Dedicated Space For Conducting Hearing Tests And Screenings, Typically For Newborns Or Young Children. The Room Is Equipped With Specialized Auditory Equipment And Soundproofing To Ensure Accurate Results. It Is Designed To Provide A Quiet, Controlled Environment For Hearing Assessments, With Comfortable Seating For Patients And Their Guardians. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Newborn Screening Room - The Room Is Equipped With The Necessary Medical Equipment For Blood Sampling, Physical Exams, And Diagnostic Tests. It Is Designed To Provide A Safe, Comfortable Environment For Newborns And Their Parents While Ensuring The Efficient And Accurate Collection Of Screening Samples. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Stock Room - A Storage Area For Medical Supplies And Equipment, Organized With Proper Shelving And Labeling For Easy Access And Inventory Control. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Department Chair’s Office Including Secretary And Receiving Area And Toilet - Located Adjacent To The Conference Room, This Office Includes A Work Room For The Chair, A Secretary And Receiving Area, And An Attached Toilet For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Conference Room - Located Adjacent To The Department Chair's Office, This Room Is Designed For Meetings And Presentations, Equipped With A Large Table, Seating, And Audiovisual Equipment For Effective Communication. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Doctor’s Quarters With Shared Shower And Toilet - Due To Limited Space, This Room Accommodates Two Beds, With Shared Shower And Toilet Facilities, Providing Comfort And Privacy For Doctors During Their Shifts Or On-call Duties. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Affiliates Lounge With Toilet And Bath - A Designated Space For Hospital Affiliates To Relax, Equipped With Comfortable Seating And An Attached Toilet And Bath For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System Third Floor – Conference / Training Room, Office Rooms • Conference/training Room With Male And Female Toilets - A Room For Meetings Or Training, Featuring Separate Male And Female Toilets For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Three (3) Units Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System • Office Room 1 (research And Petru) With Sink And Toilet - A Designated Office Space For Research And Petru Activities, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: G. Provide Air Conditioning System • Office Room 2 (qi/ps, Quality Improvement Patient Survey) With Sink And Toilet - A Dedicated Office For Quality Improvement And Patient Survey Activities, Featuring A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: F. Provide Air Conditioning System • Office Room 3 (osm, Office Of The Strategic Management) With Sink And Toilet - A Designated Office Space For The Office Of Strategic Management, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System Roof Deck – Open Area • Open Areas For Mechanical Outdoor Units And Equipment - Designated Roof Deck Spaces For Housing Mechanical Units And Equipment, Ensuring Proper Ventilation And Easy Access For Maintenance. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Xii. Geotechnical Investigation Specifications And Parameters A. Location Before The Conduct Of Sub-surface Soil Exploration Works, The Consultant/contractor Shall Coordinate With The Procuring Entity Technical Representative For Proper Coordination On The Location Of The Project. B. Scope Of Work The Consultant/contractor Shall Provide All The Labor, Instrument/equipment Materials And Supplies, Vehicles, Bunkhouses, Etc., Necessary To Perform Satisfactorily The Sub-surface Exploration Herein Required, Viz: 1. Field Works 2. Laboratory Testing 3. Soil Investigation And Preparation Of Report 4. Geotechnical Evaluation Report The Consultant/contractor Shall Be Held Solely Responsible For The Result Of This Boring/drilling Exploration And Other Activities Under This Terms Of Reference C. Detailed Exploration Requirements/specifications A. Field Works 1. Location And Number Three (3) Boreholes, At Different Location Shown On The Plan. 2. Depth Of Borings Twenty (20) Meters Depth Below Natural Ground Or Five (5) Meters In Bedrock/hard Strata. 3. Procedure In Sand, Clay And Silt Materials, The Boreholes Shall Be Advanced By The Wash Boring Method In Between Sampling Sections Using Side Discharged Chopping Bits. Whenever Necessary, N-size Casings Shall Be Utilized. The Washed Section Shall Be Cleaned Thoroughly Before Each Sampling Run Ensuring, However, That The Underlying Soil Is Not Disturbed. Sampling Shall Be Done At One Meter Interval From The River Bed To Hard Strata Using 5.0 Cm. Split Spoon Sampler. In A Soft Cohesive Layer, Undisturbed Samples Using Thin-walled Tube Samplers Shall Be Obtained Hydraulically. Core Drilling Shall Be Carried Out By A Diamond Rotary Drill Method In Gravelly Or Rock Formation. Core Samples Shall Be Undertaken Whenever Solid Formation Is Encountered. Cores Shall Be Placed In Core Boxes Arranged And Labeled In Accordance To Depth As Soon As These Are Extracted From The Boreholes. Drilling And Sampling Procedures Shall Comply In Accordance With Astm Standards. 4. Equipment A. Drilling Machine The Contractor Shall Utilize At Least Two (2) Drilling Machines And Set Them Up At The Project Site. The Drilling Machine Shall Be In Good Working Condition And Shall Be Of Such Capacity As To Maintain Satisfactory Progress Of Work. B. Bits The Contractor Shall Have An Ample Supply Of Different Types Of Bits To Adopt To Varying Conditions. Bottom Discharge And Stepped Bits Shall Also Be Available. C. Core Barrels Double Tube Swivel Type Core Barrels In Good Condition And Capable Of Obtaining Maximum Core Recovery Shall Be Used. D. Casing The Contractor Shall, At His Own Expense And Responsibility, Provide Casings As Required To Ensure The Stability Of The Borehole Walls. The Casing Shall Be At Least Of N-size And Shall Be In Good Condition. After A Hole Has Been Finished The Casings Shall Be Retrieved. 5. Handling And Core Of Samples The Contractor Shall Provide All The Materials, Equipment And Labor Necessary For Preserving Samples. B. Laboratory Testing The Preparation Of Samples For Testing Shall Be Made In Accordance With Aashto. The Following Tests Shall Be Made On Samples Obtained From Boring, Drilling. Standard Penetration Test The Test Shall Be Carried Out Through Ordinary Soil Encountered To The Depths Specified Above. Standard Penetration Test Shall Be Performed Using 5.0 Cm. (2.0 In.) Outside Diameter Split Spoon Sampler, Driven By A 63.6 Kg (140 Lbs.) Hammer Falling 76.0 Cm. (30 In.) At 1.50-meter Interval Or Closer If Necessary. Moisture-density Rotation This Test Method Determines The Relationship Between The Moisture Content And The Density Of Soils Compacted In A Mold. The Contractor Shall Conduct This Procedure According To Nd T 99 Or Nd T 180. Bearing Capacity Test The Test Method Covers Estimation Of The Bearing Capacity Of Soil In Place By Means Of Field Loading Tests. This Test Method Can Be Used As Part Of A Procedure For Soil Investigation For Foundation Design. It Gives Information On The Soil Only To A Depth Equal To About Two Diameters Of The Bearing Plate, And Takes Into Account Only Part Of The Effect Of Time. Sieve Analysis The Contractor Shall Conduct This Test In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Combines The Two Test Methods. Sieve Analyses Determine The Gradation Or Distribution Of Aggregate Particles Within A Given Sample In Order To Determine Compliance With Design And Production Standards. Accurate Determination Of Material Smaller Than No. 200 (75 Μm) Cannot Be Made With Aashto T 27 Alone. If Quantifying This Material Is Required, It Is Recommended That Aashto T 27 Be Used In Conjunction With Aashto T 11. Following Aashto T 11, The Sample Is Washed Through A No. 200 (75 Μm) Sieve. The Amount Of Material Passing This Sieve Is Determined By Comparing Dry Sample Masses Before And After The Washing Process. This Procedure Covers Sieve Analysis In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Includes Two Method Choices, A And B. Liquid Limit Liquid Limit Test Shall Be Performed On Material Passing The 0.425mm (#40) Sieve. Aashto T 89 & T 90 27. There Are Two Methods Approved By Aashto, Any Of The Two Methods Can Be Used By The Contractor. Blow Count Must Be Within 22-28 Blows. Liquid Limit Is A Calculation Based On Moisture Content And Number Of Blows To Closure. Soil Classification This Standard Classifies Soils From Any Geographic Location Into Categories Representing The Results Of Prescribed Laboratory Tests To Determine The Particle-size Characteristics, The Liquid Limit, And The Plasticity Index. There Should Be Assigned Group Name And Symbol(s) Along With The Descriptive Information. Practice D2488 Can Be Used To Describe A Soil To Aid In The Evaluation Of Its Significant Properties For Engineering Use. Engineering Behavior Of The Soils Must Be Seen. C. Soil Investigation And Preparation Of Report The Soil Investigation Report Must Be Done By An Accredited Geotechnical Engineer. D. Geotechnical And Evaluation Report The Contractor Shall Prepare The Geotechnical Report & Analysis In Three (3) Bound Copies In A Form And Substance To Be Submitted To Doh – Ro7, Osmeña Boulevard, Cebu City Within Fifteen (15) Calendar Days Upon Receipt Of The Notice To Proceed. The Final Report Shall Not Be Limited To The Following: A) Field Investigation And Methodology B) Borehole Drilling And Sampling C) Laboratory Testing D) Final Boring Logs (bl) E) Final Laboratory Tests Results (fltr) F) Borehole Location Plan G) Soil Profile Along Structures Showing Boring/drilling Logs H) Soil Liquefaction Investigation Report I) Soil Bearing Capacity J) Recommendation If Called For Such As Type Of Measure/structure Of Work E. Other Data To Be Submitted A. Boring Logs 1. Job, Boring, Hole Number, Date, Time, Boring/drilling, Foreman, Supervisor 2. Weather Condition 3. Depth Of Boring At Start Of Day 4. Water Level In Casing At Start Of Day 5. Method Of Penetration And Flushing System 6. Description Of Soil Strata Encountered 7. Depth Of Soil Boundaries 8. Size, Type And Depth Of Samples And Sample Number 9. Type And Depth Of In-situ Tests 10. Standard Penetration Tests Resistance, “n” Value 11. Recovery Ratios Of Samples 12. Detailed Notes On Boring/drilling Procedure, Casing Sizes And Resistance To Driving, Description Of Wash Water Or Spoil From Boring/drilling Tools 13. Depth Of Boring At End Of Day 14. Other Relevant Information Such Rqd, Percent Core Recovery, Angle Of Friction Etc. B. Photographs Photographs Showing The Borehole Drilling And Sampling At Each Proposed Sites Shall Be Taken By The Contractor And Incorporated In The Report. Photographs Shall Be Taken At Each Borehole Location Depicting The Following: 1. Equipment Used 2. Core Drilling Operation 3. Water Level Measurements 4. Performance Of Spt And Shelby Tube Sampling 5. All Cores In The Core Boxes, Spt And Shelby Tube Samples 6. Date Photographs Was Taken -end Of Geotechnical Investigation- Xiii. Structural Design And Analysis Specifications And Parameters A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards  Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances  Standards 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Dpwh Blue Book 4. American Concrete Institute (aci) 5. American Society For Testing Materials (astm) 6. American Welding Society (aws) B. Design Criteria Shall Be Submitted First To The Procuring Entity For Concurrence Of The Following Minimum Design Requirements: 1. Design Loads (dead Load, Live Load, Wind Load, Seismic Load And Analysis Procedure, Load Combinations) 2. Materials (concrete, Reinforcing Steel Bars, Structural Steels) 3. Foundation (allowable Foundation Pressure) 4. Design References C. Minimum Design Input File In Structural Software And Required Reports 1. Job Information 2. Joint Coordinates 3. Material Definition/specification 4. Member Property 5. Support Definition 6. Load Definition (seismic/dead/live/wind/load Combinations) 7. Analysis Procedure 8. Analysis Result 9. Load List 10. Support Reaction List 11. Design Results (footing/ Column/ Beam) 12. Load Diagrams 13. Structural Plans -end Of Structural Design And Analysis- Xiv. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards.  Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects  Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General  All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies.  Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans.  Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans.  Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters.  Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters.  Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans  The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans  All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details.  Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing.  Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing.  Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes.  Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings.  The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans.  Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01.  Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections  Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans  Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures.  Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections.  The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans  Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows  Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning With An 45 Deg. Opening Angle. 8. Details  Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design.  Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation.  Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles.  Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following:  Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line  Road Network And Curbs And Sidewalks  Parking Spaces  Reference Location Of Existing Trees  Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line  Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides:  The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments.  The Inner Zone Shall Include The Wards.  The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services.  The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers.  There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks.  In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation.  Covered Walkways Shall Be Provided For Access And Connection To All The Buildings.  Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans  The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised.  The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans.  Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements.  Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls  Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works.  Used Soundproofed Wall Materials For Areas With Indicated “soundproofed”. Walls With An Stc Rating Of At Least 45-50 Is Recommended. In Areas Where High Confidentiality Or Privacy Is Required (e.g., Patient Rooms, Doctor’s Offices Near Noisy Zones), Consider An Stc Rating Of 55-60.  Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing.  Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound.  Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission.  Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 3. Floors  For Sterile Areas, Delivery & Nicu Complex, Floor Finish Shall Be Roll-form Anti-static Anti-bacterial Homogeneous Vinyl With Welded Joints. It Shall Cove Upwards To The Sides Of The Wall Up To A Minimum Of 200mm. From The Floor.  If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design.  Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections.  The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern.  The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works  The Following Rooms Shall Have A Minimum Ceiling Height: A. Operating Room – 3000mm., To Accommodate The Ceiling-mounted Or Light B. Wards Of 4 Beds And Up – 3000mm., To Provide Better Natural Ventilation  Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details.  If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details.  Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould.  Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation.  Non-cove Light Placement: Instead Of Cove Lighting, Use Flush-mounted Lighting Directly In The Ceiling With Sealed Housings That Prevent Dust Buildup. Fixtures Should Be Durable, Non-reflective, And Easy To Clean Without Requiring Special Maintenance Procedures. 5. Doors And Windows  Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal.  Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors.  Toilets And Other Wet Areas Shall Have Steel Doors.  Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers.  Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Aluminum Frames Of Glass Doors Shall Be Powder-coated.  Door Finish And Color Shall Be Approved First Before Application.  Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope.  All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines.  Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details.  All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details.  Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors  Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344.  Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall.  Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These.  Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories  Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor.  Electrical Light Switches Shall Be Located By The Knob Side Of The Door.  Electrical Switches And Outlets Shall Be Installed Plumb And Level.  Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers.  Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344.  A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies.  Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage.  Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works  The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details.  Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details.  Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details.  The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting  Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish.  Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint.  Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish.  Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish.  Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified.  Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following:  Gutter, Eaves, And Parapet  Ceiling - Covelight, Special Connections And Design, Mouldings, Valances  Stairs - Handrail, And Baluster Design  Ramps - Handrail Design And Floor Pattern  Doors, Windows And Gates - Grille Works,  Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counter/nurse Station Counter  Special Carpentry Works, E.g. Partitions, Cabinetry  Building And Room Signages And Wayfinding Systems  All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet”  Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Private Wards, Including Bed Head Panel Fixtures And Outlets With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Nurse Station C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials  Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels.  Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles.  Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material.  Vinyl Floor Tiles For Sterile Areas Of Delivery & Nicu Suite Shall Be Homogenous And Not Less 3mm. Thick.  Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified.  Aluminum T-runners Shall Be Powder Coated.  Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings.  Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards  Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances  Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xvi. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works  Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House.  The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa.  The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System  Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp);  For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System  For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant.  For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System  Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System  Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Specific Requirements  Provide Details Of The Following: 1. Fiberglass Pressure Tank (80g Minimum Capacity With Shallow Well Jet Pump Of At Least 1.5 Or 2 Hp) Located At Roof Deck 2. Stainless Steel Storage Tanks, Grade 304 Located At Roof Deck E. Summary Of Materials  Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings)  Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified)  Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp)  300mm Dia. And Above, Reinforced Concrete Pipe (rcdp)  Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb  Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover  Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888  Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified)  Floor Drains/deck Drains; Cast Iron Brass (bps Certified)  Gutter Drains; Cast Iron Dome Type Brass (bps Certified)  Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Trench Grating; Galvanized/stainless Steel Iron Grates  Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified)  Water Closet-tank Type Push Button Flush  Lavatory - (pedestal/counter Type) With C-spout Spray Faucet  Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet  Urinal-wall Hung Flush Valve Type  Plumbing Fixtures At Sterile Areas; A. Scrub-up Sink-ga#16 Stainless Steel (single/double Bowl) Compartment With Knee Operated And Or Censor Controlled Spay Faucet B. Surgical Soap Dispenser-ga#16 Stainless Steel Foot Operated C. Laboratory Sink-ga# 16 Stainless Steel Deep Seated Seamless Bowl Compartment With C-spout Spray Faucet F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvii. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System  The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse.  An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building.  Hazard Classification Shall Be Light Hazard Occupancy.  Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M.  Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing.  All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System.  Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller.  Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes.  Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System  The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System.  Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary.  Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations.  Split Type Air Conditioners Will Be Used At Areas With Larger Capacities.  Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure.  Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways).  Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient.  Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets.  Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xviii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances  Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System  Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System  Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System  Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System:  Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Nurse Call System F. Master Or Cable Antenna Television  Fire Alarm System  Security System 5. Lightning Protection System  The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following:  Lighting Fixtures/luminaires  Panelboard And Circuit Breakers  Switchgear And Other Metering Devices  Electrical And Hospital Equipment  Installation And Termination Of Auxiliary And Other Special Devices And Equipment  Power And Telephone Handholes (as May Be Required)  Pedestal And Service Entrance To Bldg.  Grounding System Layout  Substation/power House And Electrical Room  Transformer And Generator Mounting  Others As May Be Required. C. Summary Of Materials  General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. 8. Sterile Areas/zones Lighting Specifications: A. Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. B. Lux Level: Aim For 300-500 Lux For General Sterile Areas; 1000 Lux Or More May Be Needed In Surgical Suites Or Examination Zones Or As Specified On Manual Of Technical Guidelines For Hospital Planning And Design (level 3)  Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied.  Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure.  Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40.  Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size.  Nurse Call System: 1. The Nurse Call System Shall Have The Following Control Panel, Bed Head Panel, Ancillary Call And Annunciating Equipment. 2. Wiring Shall Consist Of Data Cable And 24v Supply To Each Bed Head Unit. 3. Two Levels Of Call Will Be Provided By The System: Patient To Nurse. A Patient To Nurse Shall Be Actuated By Means Of The Wall-mounted Or Handset Mounted Call A) Push Button Of Bed Head Panel. B) Nurse To Nurse. Call Of Nurse To Nurse Shall Be Considered, As Emergency Call And Shall Be Instigated By Operation Of The Emergency Pull/push Switch Mounted On Call Units Of Bed Head Panel. C) Bedhead Panel Shall Be Of Different Type Depending On The Patient Bedroom Class And As May Be Required. Multiplexed Bedhead Panel Shall Be Available To Operate Sound Distribution System. D) Bathroom Shall Be Provided With Pull Cord Unit And Reset Unit. E) Room Indicator Lamp Shall Be Installed Above The Door Of Each Patient’s Bedroom Along The Corridor. F) Nurse Stations Shall Be Equipped With Indicator Unit To Provide Indication (audible And Visual) Of The Zone And Type Of Call. G) Emergency Indication Shall Be Included In Some Acute Areas But Arranged “for Staff Use Only” In The Event Of Urgent Assistance Being Required. H) The System Shall Be Of Solid State Switching With All Items Connected To Internal Printed Circuit Boards Readily Interchangeable For Maintenance Purpose.  Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building.  Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service.  Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality.  Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required.  Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Patient Wards, Work Areas, Nurse Station, Etc.  Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xix. Design Parameters (green And Safe Health Facilities)  Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards.  Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety  Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government.  The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals.  In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities.  Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency  Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun.  Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain.  Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System.  Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials.  Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc.  Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible.  Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology.  Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals.  All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security.  Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms.  Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene  Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank  Use Of Waterless Urinals And Dual Flush Water Closets.  Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets.  Use Of Water-saving Shower Heads  For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act.  A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied.  Waterless Urinals Must Be Provided For Male Toilets.  There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility  Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability  Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint.  Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used.  Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability  Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop.  Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing.  Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality  Harvest Natural Daylight If Applicable.  Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained.  Use Of Acoustic Privacy Partitions Is Required.  Separate Entrances For Ambulances And Walk-in Patients.  In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia.  In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible.  Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45.  Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xx. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement  Contractor’s Temporary Facility And Lay Down Yard.  Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos  Material Testing (rsb, Chb, Concrete, Steel)  Safety Requirements (warning Signs, Hardhat, Etc.)  As Built Plan  Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work  Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction.  All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative  Soil Excavation And Soil Treatment  Restoration Of Any Damaged Properties During The Construction  Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor  Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers.  No Implementation Of The Project Without An Approved Plan And Other Related Documents.  Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules.  Shall Abide By The Medical Center Hospital House Rules  Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative  Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements  All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives.  Soil Investigation  Concrete Strength Testing  Reinforcing Bar Strength Testing  Concrete Masonry Unit (cmu) Testing  All Plumbing And Sanitary System  Automatic Fire Sprinkler System  Ventilation And Air Conditioning System  All Electrical System  And Other Tests That Necessary To Perform To Ensure The Quality Of The Project  All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives.  The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation.  No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative  Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Nurse Call System 2. Telephone System 3. Paging System 4. Lan System 5. Fire Alarm System 6. Security System Cctv 7. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.
1431-1440 of 1436 archived Tenders