Tenders of H Meenkyr N Seurakunta

Tenders of H Meenkyr N Seurakunta

H Meenkyr N Seurakunta Tender

Finland
Closing Date2 Sep 2024
Tender AmountRefer Documents 
Refurbishment of benches as shown in the documents. Removing the benches intact and transporting them away. The benches must be removed when the main contract begins. Two (2) weeks have been reserved for them. The furniture contractor is responsible for the storage of the benches in the heated warehouse throughout the construction site. Re-installation of benches Two (2) Months Before Handing over the Contract to the Customer. The exact schedule will be agreed upon in cooperation with the main contractor.

H Meenkyr N Seurakunta Tender

Finland
Closing Date2 Sep 2024
Tender AmountRefer Documents 
The construction project includes repairs to the bottom of the Hämeenkyrö Church and changes to the church hall. Contractors are required to familiarize themselves with the construction site on site before submitting a bid. Subject of repair work Hämeenkyrö Church Completed in 1782. The site is a log-framed, clapboard-covered, cruciform long church, which mainly represents Neoclassicism. The old church ground is surrounded by a stone wall and spruce fence, whose stone gates date from 1816. The church has a natural stone foundation wall and a steep, machine-seamed tin roof. The bottom is crawling, although very shallow in many places. Only the Länsikasakaran point has standing height. In the upper part of the church, there is an attic space, which must be passed through from the bell tower to the Sakast point. In the wooden structures of Yläpohja you can see fire damage caused by a fire in the 1940s. Carbonized log structures were later reinforced with new wooden structures. The church has an east-west layout and its bell tower is located in the western corner of the building. In addition to the main hall, the church has short transepts with leaves and an organ loft. Parven's current three-fingered organ was built by the Kangasala Organ Factory in 1942. During its history, the church has undergone many changes of varying scale, and the various spaces have been modified to meet the needs of each era. For example, Sakasti has been moved from the northern pillar to the Addition Built Behind the Shell.

H Meenkyr N Seurakunta Tender

Finland
Closing Date2 Sep 2024
Tender AmountRefer Documents 
The scope of work for the geothermal contract is to lay the pipes to the sump well. The main contractor is responsible for the construction of the collector well for geothermal pipes. The well should be ready by the end of May 2025. See In addition, HVAC plans.