Fire Extinguisher Tenders

Fire Extinguisher Tenders

Department Of Public Works And Highways - DPWH Tender

Manpower Supply
Philippines
Details: Description Part I Other General Requirements B.3(1) Permits And Clearances L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ B.5(1) Project Billboard/ Signboard Each 2.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ B.7(1) Occupational Safety And Health Program L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part I) Carried To Summary Php Part Ii Civil, Mechanical, Electrical And Sanitary/plumbing Works Part A Earthworks 800(2) Clearing And Grubbing L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 803(1)a Structure Excavation (common Soil) Cu.m. 140.49 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 804(1)a Embankment From Roadway/ Structure Excavation (common Soil) Cu.m. 104.68 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 804(2)a Embankment From Borrow (common Soil) Cu.m. 16.95 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 804(7) Gravel Fill Cu.m. 32.17 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part A) Carried To Summary Php Part B Plain And Reinforced Concrete Works 900(1)i Structural Concrete (class A, 28days) Cu.m. 134.39 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 902(1)a1 Reinforcing Steel (deformed)(grade 40) Kg. 24,434.77 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 903(2) Formworks And Falseworks Sq.m. 715.78 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part B) Carried To Summary Php Part C Finishings And Other Civil Works 1046(2)a1 Chb Non-load Bearing (including Reinforcing Steel)(100mm) Sq.m. 265.27 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1046(2)a2 Chb Non-load Bearing (including Reinforcing Steel)(150mm) Sq.m. 174.38 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1010(2)a Doors (flush) Sq.m. 12.73 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1004(2) Finishing Hardware L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1007(1)b Aluminum Framed Glass Door (swing Type) Sq.m. 24.51 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1008(1)a Aluminum Glass Windows (sliding Type) Sq.m. 29.20 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1008(1)c Aluminum Glass Windows (awning Type) Sq.m. 4.35 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1008(1)d Aluminum Glass Windows (fixed Type) Sq.m. 36.69 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1003(17) Carpentry And Joinery Works L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1051(1)a Railing L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1027(1) Cement Plaster Finish Sq.m. 810.25 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1016(1)a Waterproofing (cement-base) Sq.m. 112.13 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Sq.m. 234.44 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1003(11)a1 Fascia Board (12mm, Fiber Cement Board) M. 24.72 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1018(1) Glazed Tiles And Trims Sq.m. 51.59 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1018(2) Unglazed Tiles Sq.m. 286.95 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1032(1)a Painting Works (masonry/concrete) Sq.m. 1,179.94 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1032(1)b Painting Works (wood) Sq.m. 38.50 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1032(1)c Painting Works (steel) Sq.m. 252.63 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1014(1)a2 Pre-painted Metal Sheets (above 0.427mm, Corrugated, Long Span) Sq.m. 150.19 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1013(2)a Fabricated Metal Roofing Accessory (gauge 26 (0.551mm), Ridge/hip Rolls) L.m. 2.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1013(2)b Fabricated Metal Roofing Accessory (gauge 26 (0.551mm), Flashing) L.m. 57.46 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(7) Structural Steel L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(8)a Structural Steel (trusses) Kg. 2,355.42 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(8)b Structural Steel (purlins) Kg. 1,038.15 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)a Metal Structure Accessories (bolts) Kg. 59.99 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)d Metal Structure Accessories (steel Plates) Kg. 677.62 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)b Metal Structure Accessories (sagrods) Kg. 28.66 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)c Metal Structure Accessories (cross Bracing) Kg. 60.73 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(4)b Metal Structure Accessories (turnbuckle) Each 12.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1001(8) Sewer Line Works L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1001(9) Storm Drainage And Downspout L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1002(4) Plumbing Fixtures L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1002(24) Cold Water Lines L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1001(11) Septic Vault/tank (concrete, Chb) L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1001(6) Catch Basin L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part C) Carried To Summary Php Part D Electrical 1100(10) Conduits, Boxes & Fittings (conduit Works/conduit Rough-in) L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1101(33) Wires And Wiring Devices L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1102(1) Panelboard With Main & Branch Breakers L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1103(1) Lighting Fixtures L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part D) Carried To Summary Php Part E Mechanical 1102(16)a1 Generator (single Or Three Phase, Stand-by) L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1200(1) Ventilating Equipment L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1208(1) Fire Alarm System (including Fire Extinguisher) L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part E) Carried To Summary Php
Closing Date11 Mar 2025
Tender AmountPHP 9.9 Million (USD 171.1 K)

Bagong Tanyag Elementary School Tender

Chemical Products
Philippines
Description: Refilling Of Fire Extinguishers , Fire Fighting & Rescue And Safety Equipment ,bagong Tanyag Elementary School
Closing Soon26 Feb 2025
Tender AmountPHP 56 K (USD 968)

Semizbai U Limited Liability Partnership Tender

Others
Kazakhstan
Description: Automatic Fire Extinguishing System
Closing Soon26 Feb 2025
Tender AmountKZT 9 Million (USD 18.1 K)

Semizbai U Limited Liability Partnership Tender

Others
Kazakhstan
Description: Fire Extinguisher Powder
Closing Soon26 Feb 2025
Tender AmountKZT 1.1 Million (USD 2.3 K)

DEFENSE LOGISTICS AGENCY USA Tender

Security and Emergency Services
United States
Description: Proposed Procurement For Nsn 4210015686245 Extinguisher,fire: line 0001 Qty 262 Ui Ea Deliver To: W1a8 Dla Dist San Joaquin By: 0079 Days Ado approved Source Is 338x5 2607393c1. the Solicitation Is An Rfq And Will Be Available At The Link Provided In This Notice. Hard Copies Of This Solicitation Are Not Available. Specifications, Plans, Or Drawings Are Not Available. all Responsible Sources May Submit A Quote Which, If Timely Received, Shall Be Considered. quotes Must Be Submitted Electronically.
Closing Date3 Mar 2025
Tender AmountRefer Documents 

Transnet Tender

Security and Emergency Services
South Africa
Description: Request For The Supply/provision Of A Maintenance Contract For The Servicing, Maintenance, And Inspection Of Fire Extinguishers Fire Hose Reels Fire Hoses Branches And Nozzles At Koedoespoort Over A 2-year Period Cib Grading 3sf Or Higher
Closing Date28 Feb 2025
Tender AmountRefer Documents 

National Police Commission Tender

Chemical Products
Philippines
Description: Refill Of Fire Extinguishers 2025 , Fire Fighting & Rescue And Safety Equipment ,national Police Commission
Closing Soon24 Feb 2025
Tender AmountPHP 27 K (USD 467)

BARANGAY PAMORANGON, DAET, CAMARINES NORTE Tender

Others
Philippines
Details: Description Republic Of The Philippines Province Of Camarines Norte Municipality Of Daet Barangay Pamorangon Project Design I-title: Procurement Of Bdrrm Equipments Ii. Project Description : Purchase Of Emergency Equipment’s As Part Of A Barangay Disaster Risk Reduction And Management Plan Iii- Date: February, 2024 Iv- Implementing Agency: Lgu Pamorangon V- Location: Purok 3, Barangay Pamorangon, Daet, Camarines Norte Viii-budgetary Requirements A.source Of Fund : 5% Calamity Fund B.budget Allocation: 141,901.00 C.expenses For Equipment Particular Qty. Unit Unit Cost Amount Spine Board With Strap And Belt 2 Pcs 5,800.00 11,600 Spine Board Strap 2 Set 1,200.00 2,400.00 Stretcher 1 Pc 4,800.00 4,800.00 C-collar 3 Pcs 880.00 2,640.00 T-bandage 20 Pcs 95.00 1,900.00 Head Immobilizer 2 Pcs 4,800.00 9,600.00 Rescue/utility Rope 50m 2 Roll 9,800.00 19,600.00 Hard Hat 15 Pcs 1,180.00 17,700.00 Life Jacket 10 Pcs 1,800.00 18,000.00 Outdoor Head Lamp 10 Pcs 550.00 5,500.00 Emergency Search Lamp/light 6 Pcs 2,500.00 15,000.00 Fire Extinguisher 10lbs 2 Pcs 5,000.00 10,000.00 Oxygen 10lbs/regulator 1 Pc 5,481.00 5,481.00 Generator Set (low Noise) 1 Pc 17,680.00 17,680.00 Total Cost 141,901.00
Closing Soon26 Feb 2025
Tender AmountPHP 141.9 K (USD 2.4 K)

Joint Stock Company National Company Kazakhstan Temir Zholy Tender

Others
Kazakhstan
Description: Fire Extinguisher Charging Services Ech-24
Closing Soon26 Feb 2025
Tender AmountKZT 186 K (USD 372)

AGUINALDO ELEMENTARY SCHOOL KAWIT, CAVITE Tender

Machinery and Tools
Philippines
Description: Refill Of Fire Extinguisher (red Tank) , Chemicals And Chemical Products ,aguinaldo Elementary School - Kawit, Cavite
Closing Soon24 Feb 2025
Tender AmountPHP 6.1 K (USD 105)
101-110 of 826 active Tenders