Fencing Tenders

Fencing Tenders

MUNICIPALITY OF NARVACAN, ILOCOS SUR Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Soon25 Nov 2024
Tender AmountPHP 10 Million (USD 169.3 K)
Details: Description Permits And Clearances, Project Billboard/signboard (for Lgu),project Billboard/signboard (for Coa),occupational Safety And Health Program, Mobilization/ Demobilization, Clearing And Grubbing, Structure Excavation (soft Rock),embankment From Structure Excavation, Embankment From Borrow(common Soil),gravel Fill, Structural Concrete (ftb, Column, Beam, 3000 Psi, Class A, 28 Days),structural Concrete (footing & Slab On Fill, 3000 Psi, Class A, 28 Days),reinforcing Steel Bar (deformed), Grade 40,formworks And Falseworks, Soil Poisoning, Finishing Hardware, Aluminum Glass Window (sliding Type),aluminum Glass Window(awning Type),doors(wood Panel),steel Doors And Frames(screen),frames (jambs),100mm Chb Non Load Bearing(including Reinforcing Steel),150mm Chb Non Load Bearing(including Reinforcing Steel),cement Plaster Finish, Steel Matting Fence, Masonry/concrete Painting, Metal Painting, Structural Steel, Trusses, Structural Steel, Purlins, Metal Structure Accessories (turn Buckle),metal Structure Accessories (cross Bracing),metal Structure Accessories (steel Plates),metal Structure Accessories (sag Rods),fabricated Metal Roofing Accessory (ga. 26 Ridge Roll, 0.551mmthk),fabricated Metal Roofing Accessory (ga. 26 Flashing, 0.551mmthk), Fabricated Metal Roofing Accessory (ga. 24 Gutter, 0.701mmthk), Prepainted Metal Sheets (rib Type, Long Span, Above 0.427mmthk), Sewer Line Works, Cold Water Lines, Plumbing Fixtures, Plumbing Fixtures, Downspout/storm Drain, Septic Vault, Conduit, Boxes, And Fittings (conduit Works/ Conduit Rough-in),wires And Wiring Devices, Panelboard With Main And Branch Breakers, Lighting Fixtures And Stone Masonry The Schedule Of Bac Activities Are As Follows: Bac Activities/schedule 1. Issuance & Availability Of Bidding Documents - November 6 – November 25, 2024 2. Pre-bid Conference - November 13,2024 – 2:30 Pm, Bac Office 3. Receipt And Opening Of Bids (includes Submission Of Eligibility Requirements And Eligibility Check) - November 25, 2024– 2:30 Pm, Bac Office 4. Bid Evaluation - November 26, 2024 5. Post Qualification - November 27, 2024 6. Approval Of Bac Resolution/issuance Of Notice Of Award - November 28, 2024 7. Contract Preparation And Signing - November 29, 2024 8. Issuance Of Notice To Proceed - December 2, 2024

Environmental Management Bureau Tender

Environmental Service
Philippines
Closing Date4 Dec 2024
Tender AmountPHP 10 Million (USD 169.3 K)
Details: Description Environmental Management Bureau Xii No. 2024-0003 Standard Form Number: Sf-good-05 Revised On: July 28, 2005 Invitation To Bid The Environmental Management Bureau (emb) Xii, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors/contractors To Apply For Bidding Of The Hereunder Project: Name Of Project : Procurement, Delivery, And Installation Of One (1) Lot Technical And Scientific Equipment (air Quality Monitoring Station) With Testing And Commissioning Approved Budget For The Contract : 10,000,000.00 Contract Duration : 60 Days Delivery Period : 60 Days Description Unit Cost (php) Procurement, Delivery, And Installation Of One (1) Lot Technical And Scientific Equipment (air Quality Monitoring Station) With Testing And Commissioning Components: 1. Air Quality Monitoring Equipment / Analyzer 2. Meteorological Instruments 3. Data Acquisition System 4. Shelter And Fence 5. Retractable Tower With Lighting Arrester 6. Network Connectivity **for Detailed Technical Specification, Please Refer On The Attached Terms Of Reference. ** Php 10,000,000.00 Total Php 10,000,000.00 Prospective Bidders Should Have Experience In Undertaking A Similar Project Within The Last 2 Years With An Amount Of At Least 50% Of The Proposed Project For Bidding. The Eligibility Check/screening As Well As The Preliminary Examination Of Bids Shall Use Non-discretionary “pass/fail” Criteria. Post Qualification Of The Lowest Calculated Bid Shall Be Conducted. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Schedule Of Advertisement November 14, 2024 – November 21, 2024 12:00 Nn 2. Pre-bid Conference November 22, 2024 1:30 P.m. 3. Opening Of Bids December 4, 2024 1:30 P.m. 4. Bid Evaluation December 5, 2024 2:00 P.m. 5. Post-qualification December 6, 2024 2:00 P.m. 6. Notice Of Award December 9, 2024 Bid Documents Will Be Available Only To Prospective Bidders Upon Payment Of A Non-refundable Amount Of Php 10,000.00 To The Cashier Of Emb Xii. The Emb Xii Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid. Engr. Rashid P. Abdullah Chairperson, Bac Date Of Publication: November 14, 2024

BARANGAY 15, SAN JOSE, SAN NICOLAS, ILOCOS NORTE Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Soon25 Nov 2024
Tender AmountPHP 701.5 K (USD 11.8 K)
Details: Description Scope Of Works I. Waterproofing Works, 60.83 Sq.m. Ii. Fabrication/installation Of Sliding Window, 2.00 Sets Iii. Repair Of Damaged Roof Of Mph Building, 1.00 Lot Iv. Improvement Of Garden A. Common Excavation, 5.81 Cu.m. B. Removal/clearing Of Debris, 76.54 Sq.m. C. Wall Footing, 1.94 Cu.m. D. Masonry Works, 46.44 Sq.m. E. Plastering Works ( Rough Finish), 30.96 Sq.m. F. Garden Soil Filling, 75.04 Cu.m. V. Day Care Center Kid's Sink A. Concrete Works, 0.06 Cu.m. B. Masonry Works, 0.43 Sq.m. C. Plastering Works (smooth Finish), 1.51 Sq.m. D. Tile Laying Works, 2.83 Sq.m. E. Plumbing Works, 1.00 Lot Vi. Fence A. Common Excavation, 1.14 Cu.m. B. Concrete Works, 1.13 Cu.m. C. Masonry Works, 12.27 Sq.m. D. Plastering Works (smooth Finish), 19.36 Sq.m. Vii. Comfort Room A. Common Excavation, 2.36 Cu.m. B. Concrete Works, 1.54 Cu.m. C. Masonry Works, 14.07 Sq.m. D. Plastering Works ( Smooth Finish), 35.20 Sq.m. E. Roof And Roof Framing Works, 1 Lot F. Plumbing Works, 1.00 Lot G. Tile Laying Works, 28.75 Sq.m. Viii. Drainage Canal A. Demolition Of Pavement, 8.75 Sq.m. B. Common Excavation, 5.25 Cu.m. C. Wall Footing, 0.88 Cu.m. D. Masonry Works, 17.50 Sq.m. E. Plastering Works (smooth Finish), 17.50 Sq.m. F. Concrete Cover, 1.09 Cu.m. Ix. Electrical Works, 1.00 Lot Schedule Of Activities Advertisement/issuance Of Bidding Documents: Nov. 16- 25, 2024 Submission, Receipt & Opening Of Bids: Nov. 26, 2024 At 10:00 Am At The Brgy Mph Bid Evaluation: Nov. 27, 2024 Post Qualification: Nov. 28, 2024 To Dec. 4, 2024 Issuance Of Notice Of Award: Dec. 5-6, 2024 Contract Preparation And Signing: Dec. 9-10, 2024 Notice To Proceed: Dec. 11, 2024

Municipality Of Ro Aje Tender

Civil And Construction...+1Drainage Work
Montenegro
Closing Date8 Dec 2024
Tender AmountRefer Documents 
Details: The Indicative Scope Of Works Covers The Following Elements: 1. Sewerage Network: Construction Of The Sewerage Network: Phase I: - Pumping Station (150 L/s) For Transfer Of Collected Wastewater From The Urban Area; - Main Collector (gravity Collector Dn500; Inlet Part To Pumping Station With The Length Of 21 M; Pressure Line Dn300 L=65 M; Gravity Collector Dn400 L=622 M, Low Pressure Line Dn400 L=804 M, Gravity Collector Dn400 L=445 M) - Connections Of Ii And Iii Phase: Dn250 L=71 M, Pumping Station Q=1.8 L/s, H=8.7 M And Pressure Line Dn63 L=15 M. Phases Ii And Iii: - Wastewater Network With Total Length Of L=13,793 M. (lengths Of The Phase Ii And Phase Iii Are 5,529 M And 8,264 M, Respectively. Construction Of Phase I, Phase Ii And Iii Will Serve To 4500 Inhabitants. 2. Wastewater Treatment Plant Design And Construction Of A Conventional Activated Sludge Process With Biological Nutrient Removal (cas With Bnr) And Aerobic Sludge Stabilization, For 20,000 Pe. Peak Dry Weather Flow = 208 M³/h (58 L/s). Peak Wet Weather Flow = 400 M³/h (111 L/s). The Proposed Wwtp Shall Include The Following Units: Inlet Chamber, Coarse Screens With Screenings Washing And Compaction, Inlet Pumping Station, Preliminary Treatment (fine Screens With Screenings Washing And Compaction, Aerated Grit Chamber, Grit Washing And Separation), Biological Treatment (activated Sludge Process With Nutrient Removal), Sludge Treatment, Septic Sludge Reception Station, Odour Removal, Plant Infrastructure, Fences, Access And Internal Roads With Greenery, Utility Connections: Access Road (16 M); Power Supply; Water Supply (dn100, ~230m); Telecom. Works Will Be Implemented According To Fidic Yellow Book (1999 Ed). Total Expected Duration Of The Contract Is 48 Months Including 12 Months Of Defects Notification Period. The Municipality Of Rožaje Intends To Conduct Open International Procedure For Selection Of Contractor. The Selection Procedure Will Be Conducted Through The Procedure As Specified In The Practical Guide For European Union External Action (prag) And Eib Guide To Procurement (2018). In Case Of Any Conflict The Eib Guide To Procurement Https://www.eib.org/en/publications/guide-to-procurement.htm Will Apply..

Oriental Mindoro Tender

Others
Philippines
Closing Soon25 Nov 2024
Tender AmountPHP 150 K (USD 2.5 K)
Details: Description Request To Submit Proposal/quotation (shopping - Sec. 52.1 (b)) Date : Company / Store Name And Address Please Quote Your Lowest Price On The Items Listed Below, Subject To The Terms And Conditions And Submit Your Quotation Duly Signed By Your Authorized Representative On The Deadline Of Submission Of This Quotation Together With The Documentary Requirements In The Return Sealed Envelope To Wit: 1. All Entries Must Be Typewritten Or Handwritten. 7. Quotation Are In Per Lot Basis. 2. The Approved Budget For The Contract Is Php 150,000.00 8. Documentary Requirements: 3. Delivery Period Within Seven (7) Calendar Days From A. Mayor's/business Permit The Date Of Receipt Of P.o. B. Philgeps Registration Certificate 4. Deadline Of Submission Of Quotation/proposal Or Number__________ Not Later Than C. If The Above-mentioned Requirements 5. Price Validity Shall Be For A Period Of Thirty (30) Calendar Days. Are Updated In On File At The Procuring 6. Suppliers/bidders Shall Submit Original Brochures Of The Entity/bac, Attachments Are Not Required Product Being Offered. May Anne Joy M. Ylagan Bac Chairperson For Goods And Services Item No. Qty. Unit Of Issue Goods And Its Specification Brand Unit Cost Total Cost 1 10 Pcs 1/2 Inch Big Puzzle Mat 2 1 Set Seesaw 3 1 Set Big Trampolione With Bouncing Fence 4 1 Set Tower Building Blocks 5 1 Set Stacking Cups 6 1 Set Playhouse Tent 7 1 Set Busy Cube Board 8 1 Set Slide 9 1 Set Ball Pit With Colorful Balls 10 1 Set Multi-maze Multi-function Wooden Math Around Bead Maze Letters 11 2 Pcs Yoga Ball Or Hopper Ball 12 1 Set Caterpillar Tunnel Kids 13 1 Set Balance Beam Gymnastics Obstacle Course For Kids Interblocking Stepping Board X-x-x For Distribution To Special Needs Education (sned) Center After Having Carefully Read And Accepted Your Terms And Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No./cellphone No./e-mail Address Position Tin No. This Is To Certify That The Undersigned Conducted This Request For Quotation/proposal For The Above Stated Items. End User Representative Shiela/bac Page 2 Of 2

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Civil Works Others
United States
Closing Date13 Dec 2024
Tender AmountRefer Documents 
Details: Pre-solicitation Notice / Synopsis project Description: Motco Containerized Ammunition Holding Facilities anticipated Posting Date: 18 October 2024 pre-solicitation Notice Number: W9123825b0001 sam Posting Title: Usace Spk Dbb – Military Ocean Terminal Concord (motco) Containerized Ammunition Holding Facilities - Design-bid-build Construction – Concord, California (ca) sam Posting Description: the United States Army Corps Of Engineers (usace) Sacramento District (spk) Anticipates A Design-bid-build (dbb) Requirement To Construct Eleven (11) Containerized Ammunition Holding Facilities (cahf), A.k.a. Holding Pads, Each With Ammunition Storage Pads, Protective Earthen Berms, Reinforced Concrete Retaining Walls, All Designed In Accordance With Department Of Defense (dod) Explosive Safety Standards. the Cahf Must Support Container Handling Equipment For Day And Night Operations, Which Must Include Improved Or New Pavements, Lighting, Fire Protection, Alarm Systems, Lightning Protection Systems, Security Fencing, Intrusion Detection Systems (ids), Closed Circuit Television (cctv), Information Systems, And Storm Water Drainage Systems. supporting Facilities Include Utilities And Connections (water And Fire Suppression System, Electric, Storm Water, And Communications) And Site Development Grading, Landscaping, And Pavement Improvements, All Focused On The Management Of Munitions And Explosives (mec). the Intended Facilities Will Be Designed In Iaw Dod’s Unified Facilities Criteria (ufc 1-200-02) Which Includes A Minimum Of Forty (40) Year Life And Energy Efficiencies, Building Envelope And Integrated Building Systems Performance. in Consideration Of The Final Rule Amending The Federal Acquisition Regulation (far) On 22 December 2023, To Implement Executive Order 14063, Use Of Project Labor Agreements (plas) On Federal Construction Projects Mandated The Use Of Plas Where The Total Estimated Cost Of The Construction Contract Is Expected To Be $35 M Or More. Therefore, Far 52.222-33 Alt I (jan 2024) Notice Of Requirement For Project Labor Agreement, A Project Labor Agreement Will Be Required From The Apparent Successful Offeror Included In The Forthcoming Solicitation As A Result. the Government Anticipates A 540-day (calendar) Period Of Performance (pop) For This Project From Receipt Of The Notice To Proceed To Include Performance On All Options. due To The Security Posture At Motco, All Individuals Attempting To Gain Access To The Facilities Will Have To Comply With All Security Training Protocols. Moreover, Any Individual That Is Not A United States Citizen Will Not Be Allowed To Enter The Facility. in Accordance With Defense Federal Acquisition Regulation Supplement (dfars) 236.204(ii), The Magnitude Of Construction For The Anticipated Project Is Between $25,000,000 And $100,000,000. the Government Intends To Solicit An Invitation For Bids (ifb) In Accordance With Far Part 14, That Will Result In Award Of A Firm-fixed Price Contract. the Solicitation Is Anticipated To Be Issued Using North American Industrial Classification System (naics) Code 237990 Other Heavy And Civil Engineering Construction. The Small Business Size Standard For This Naics, As Established By The United States Small Business Administration (sba), Is $45,000,000 Annual Revenue. The Product And Service Code (psc) Is Anticipated To Be Y1ga Construction Of Ammunition Storage Buildings. the Solicitation Is Anticipated To Be Issued As Full And Open Competition Through The Procurement Integrated Enterprise Environment (piee - Https://piee.eb.mil) And Governmentwide Point Of Entry, The System For Award Management (sam - Www.sam.gov) On Or About 1 November 2024 With Bids Tentatively Due 13 December 2024. it Is Currently Anticipated That The Government Will Conduct A Pre-bid, Site Visit Approximately Ten Days After Issuance Of The Solicitation. The Solicitation Will Provide Additional Information Regarding The Exact Date And Time. Site Visit Participants Must Complete An Ncic Consent Form And Motco Form 190-3 In Accordance With Site Visit Access Requirements. If You Intend To Attend The Solicitation Site Visit, Please Consider Preparing The Forms In Advance And Submitting As Soon As The Solicitation Is Posted. Access Is Restricted To U.s. Citizens Only And There Is No Guarantee That Late Submissions Will Be Processed. Review And Follow The Instructions And Guidance Provided In Attachments 1 - 3, Which Provide (1) Instructions For Requesting Access And Completing Forms, As Well As Common Reasons For Denial, (2) Required Ncic Consent Form (one Per Attendee), And (3) Required Motco Form 190-3 (one Spreadsheet Per Company). The Ncic Consent Forms And Motco Form 190-3 Must Be Digitally Filled Out (not Printed With Handwritten Answers) Then Sent To Motco_correspondence@usace.army.mil After The Date And Time Have Been Finalized And Posted Within The Solicitation. When Completing The Motco Form 190-3, Ensure The Form Specifies The Project Is Located On The Tidal Side Of The Motco Installation. the Work In Totality Includes Sites That Are Non-contiguous. Due To The Location Of The Work Sites, It Is Anticipated That The Site Visit Will Take A Full Day To Complete. Please Plan Accordingly. The Specific Date, Time, Location, And Access Requirements Will Be Identified In Any Forthcoming Solicitation. please Do Not Request An Updated Schedule If Estimated Dates Are Surpassed; The Government Will Release All Information Publicly Through Piee And Sam When Updates Are Available. Requests For Schedule Updates May Be Ignored. please Do Not Request A Copy Of The Solicitation, Or Draft Plans Or Specs, As They Are Not Currently Available. Any Available Technical Data Will Be Furnished With Any Forthcoming Solicitation. Following Solicitation Release, All Responsible Sources May Submit A Bid That Shall Be Considered By The Agency. This Project And/or The Anticipated Solicitation May Be Changed, Delayed, Or Canceled At Any Time. the Anticipated Solicitation And Attachments Will Be Posted In Portable Document Format (.pdf) Which Will Require Adobe Acrobat Reader To Open And View Files. Adobe Acrobat Reader May Be Downloaded Free Of Charge At Http://www.adobe.com/products/reader. all Prospective Offerors Must Be Registered In The Piee System At Least One (1) Week Prior To The Anticipated Bid Due Date. Registration Is Not Required To Download Any Forthcoming Solicitation Documents, Plans, And/or Specifications, But Is Required To Submit A Bid. Copies Of The Solicitation And Attachments Will Be Made Available For Inspection Without Charge After The Solicitation Is Released, When Accessed Through Piee. Failure To Register In Piee Will Prevent Submission Of Bids As The Government Will Not Accept Them By Any Other Means. See Linked Piee Registration Instructions And Web-based Training For Information About How To Access The Piee Solicitation Module And Submit Bids. all Prospective Offerors Must Be Registered In Sam Before The Anticipated Solicitation Closing Date. Please See The Sam Website For Information About Sam Registration Requirements And Approval Timelines. as Mentioned, Bidders Will Be Required To Comply With Far 2.504 Pla Requirements. Plas In Connection With Public-sector Construction Contracts Must Be Structured To Allow All Contractors (union And Non-union) To Participate. Union Hiring Halls Through Which Applicants Must Ordinarily Pass To Obtain Work On A Particular Project Must Be Operated In A Manner That Does Not Discriminate Based On Union Membership. Potential Bidders Are Encouraged To Review The Requirements Of Far 22.504 And Establish Compliant Plas To Ensure Eligibility For Award. usace Will Not Notify Prospective Offerors Of Any Changes To The Solicitation; Offerors Must Monitor Piee And Sam For The Solicitation To Be Posted, And For Any Posted Changes Or Amendments. the Only Interested Vendors / Plan Holders / Bidders List Is Available Through Sam.gov; Contractors Are Responsible For Identifying Their Entity As An Interested Vendor And Contacting Other Interested Vendors. Usace Spk Will Not Review Capabilities Statements Submitted In Response To This Synopsis Or Coordinate Partnering Arrangements Between Parties. Contractors Should Check Sam.gov Frequently For Changes To The Interested Vendors List And This Notice.

Directorate Maritime Procurement Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Canada
Closing Date23 Dec 2024
Tender AmountRefer Documents 
Description: Notice Of Proposed Procurement The Department Of National Defence Has A Requirement For The Items Detailed Below. The Delivery Is Requested At Cfb Esquimalt, British Columbia And Cfb Halifax, Nova Scotia . Item 1, Gsin: N4720, Nsn: 21-9109663, Hose Set, Nonmetallic Part No.: Cb122m0204-0187, Ncage: 01276, Danfoss Power Solutions Ii, Llc Or Part No.: Cch122m0204-0187, Ncage: 3ad25, Safran Electrical Compnents Canada Inc Quantity: 16, Unit Of Issue: Ea, To Be Delivered To Cfb Esquimalt, British Columbia. Item 2, Gsin: N4720, Nsn: 21-9109663, Hose Set, Nonmetallic Part No.: Cb122m0204-0187, Ncage: 01276, Danfoss Power Solutions Ii, Llc Or Part No.: Cch122m0204-0187, Ncage: 3ad25, Safran Electrical Compnents Canada Inc Quantity: 16, Unit Of Issue: Ea, To Be Delivered To Cfb Halifax, Nova Scotia. Item 3, Gsin: N4720, Nsn: 01-3981643, Hose Assembly Set, Nonmetallic Part No.: Cb122p0243-0134, Ncage: 01276, Danfoss Power Solutions Ii, Llc Or Part No.: Cch122m0243-0134, Ncage: 3ad25, Safran Electrical Compnents Canada Inc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Esquimalt, British Columbia. Item 4, Gsin: N4720, Nsn: 01-3981643, Hose Assembly Set, Nonmetallic Part No.: Cb122p0243-0134, Ncage: 01276, Danfoss Power Solutions Ii, Llc Or Part No.: Cch122m0243-0134, Ncage: 3ad25, Safran Electrical Compnents Canada Inc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Halifax, Nova Scotia. Item 5, Gsin: N4720, Nsn: 21-9109665, Hose Set, Nonmetallic Part No.: Cb122p0255-0210, Ncage: 01276, Danfoss Power Solutions Ii, Llc Or Part No.: Cch122p0255-0210, Ncage: 3ad25, Safran Electrical Compnents Canada Inc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Esquimalt, British Columbia. Item 6, Gsin: N4720, Nsn: 21-9109665, Hose Set, Nonmetallic Part No.: Cb122p0255-0210, Ncage: 01276, Danfoss Power Solutions Ii, Llc Or Part No.: Cch122p0255-0210, Ncage: 3ad25, Safran Electrical Compnents Canada Inc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Halifax, Nova Scotia. Item 7, Gsin: N4720, Nsn: 21-9109666, Hose Set, Nonmetallic Part No.: Cb122p0264-0207, Ncage: 01276, Danfoss Power Solutions Ii, Llc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Esquimalt, British Columbia. Item 8, Gsin N4720, Nsn: 21-9109666, Hose Set, Nonmetallic Part No.: Cb122p0264-0207, Ncage: 01276, Danfoss Power Solutions Ii, Llc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Halifax, Nova Scotia. Item 9, Gsin: N4720, Nsn: 21-9109668, Hose Set, Nonmetallic Part No.: Cb122p0355-0197, Ncage: 01276, Danfoss Power Solutions Ii, Llc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Esquimalt, British Columbia. Item 10, Gsin: N4720, Nsn: 21-9109668, Hose Set, Nonmetallic Part No.: Cb122p0355-0197, Ncage: 01276, Danfoss Power Solutions Ii, Llc Quantity: 7, Unit Of Issue: Ea, To Be Delivered To Cfb Halifax, Nova Scotia. Item 11, Gsin: N4720, Nsn: 21-9109678, Hose Assembly, Nonmetallic Part No.: Fa6390mmm0246, Ncage: 01276, Danfoss Power Solutions Ii, Llc Quantity: 12, Unit Of Issue: Ea, To Be Delivered To Cfb Esquimalt, British Columbia.. Item 12, Gsin: N4720, Nsn: 21-9109678, Hose Assembly, Nonmetallic Part No.: Fa6390mmm0246, Ncage: 01276, Danfoss Power Solutions Ii, Llc Quantity: 12, Unit Of Issue: Ea, To Be Delivered To Cfb Halifax, Nova Scotia. Bidders Proposing An Equivalent Or A Substitute Product Must Indicate The Brand Name And Model And/or Part Number And The Ncage They Are Offering. Bidders Must Submit Prices In Canadian Dollars. Bids Submitted In Foreign Currency Will Be Rejected. The Requirement Does Not Offer Exchange Rate Fluctuation Risk Mitigation. Requests For Exchange Rate Fluctuation Risk Mitigation Will Not Be Considered. All Bids Including Such Provision Will Render The Bid Non-responsive. The Crown Retains The Rights To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada.

Municipal Economy Of The Middle Mountain Road Tender

Civil And Construction...+1Civil Works Others
Germany
Closing Date4 Dec 2024
Tender AmountRefer Documents 
Description: Public tender Vob/a Due to the stability of the retaining wall being at risk, the construction project involves the renovation of this retaining wall in Bensheim-Schöneberg on the paths “im Gerstengrund” and “am Schloßpark”. After a heavy rainfall event in January 2022, there was also a local subsidence of the gravel path “am Schloßpark” running along the embankment crown. The affected section of the path was then immediately cordoned off. The planned measures include: Renovation of the Bensheim-Schöneberg retaining wall: - Dismantling of the rubble stone wall approx. 60 m³ - Dismantling of the concrete retaining wall approx. 15 m³ - Dismantling of the fall protection two-beam wooden railing approx. 50 m - Dismantling of the fence system approx. 10 m - Excavation work in the embankment area approx. 95 m³ - Excavation work strip foundation renewed rubble stone wall approx. 51 m³ - Excavation work temporary ramp in the embankment area approx. 115 m³ - Trench for foundation beams for railings at the top edge of the embankment approx. 40 m³ - Excavation work embankment for erosion protection approx. 130 m² - Repair of the sidewalk areas “at the castle park” and “in Gerstengrund” approx. 150 m² - Special foundation engineering work soil nailing 56 pieces, L = approx. 196 m - Shotcrete - Nail wall approx. 22 M³ - Reinforcing steel shotcrete shell approx. 2.5t - Structural securing of quarry stone masonry shell, wall anchor approx. 70 M - Mortared quarry stone masonry, approx. 75 M³ - Concrete work foundation for quarry stone masonry, approx. 22.5 M³ - Concrete work for railings on the top edge of the slope approx. 32 M³ - Reinforcing steel foundations approx. Approx. 4.8 T - Scaffolding work, working scaffold for shotcrete nail wall and quarry stone wall - Filler bar railing approx. 51 M - Rockfall protection system approx. 30 M - Drainage area of shotcrete shell approx. 95 M² drainage layer

Department Of National Defence DND Tender

Software and IT Solutions
Canada
Closing Soon29 Nov 2024
Tender AmountRefer Documents 
Description: Notice Of Proposed Procurement This Requirement Is Only Open To The Below List Of Pre-qualified Suppliers Under The Task Based Informatics Professional Services (tbips) Supply Arrangement. Task Based En578-170432, Professional Services Requirement File Number: W8485-tbips2025-03 Tier 2 (> $3.75m) This Requirement Is For The Department Of National Defence (dnd). This Requirement Is For: • Stream 1: Applications Services • Stream 4: Business Services For The Services Of: • One (1) A.6 Programmer/software Developer - Principal Software Developer (psd3) – Level 3 • One (1) A.6 Programmer/software Developer - Software Developer Team Lead (sdtl3) – Level 3 • Three (3) A.6 Programmer/software Developer (sd3) – Level 3 • Three (3) B.1 Business Analyst (ba3) – Level 3 Number Of Contracts: This Bid Solicitation Is Intended To Result In The Award Of One (1) Contract For Fifteen (15) Months, Plus Two (2) Irrevocable Option Periods Of 6 Months Each, Allowing Canada To Extend The Term Of The Contract. Request For Proposal (rfp) Documents Will Be E-mailed Directly, From The Dnd Point Of Contact (dnd Poc) To The Qualified Supply Arrangement Holders Who Are Being Invited To Bid On This Requirement. Bidders Are Advised That Rfp Documents Are Not Available On The Government Electronic Tendering System. (https://canadabuys.canada.ca/en/tender-opportunities). Location Of Work To Be Performed Region(s): National Capital Region Specific Location(s): 455 Boulevard De La Carrière, Gatineau, Qc Security Requirement Security Requirements Check List: Secret Supplier Security Clearance Required: Fsc - Secret Security Level Required (document Safeguarding): None Estimated Level Of Effort: The Estimated Level Of Effort Of The Contract Will Be For 240 Days Per Year. Estimated Time Frame Of Contract: 06 January 2025 To 31 March 2026 Plus Two (2) Irrevocable Option Periods Of 6 Months Each. Enquiries: Enquiries Regarding This Rfp Requirement Must Be Submitted To The Dnd Poc Listed Below. File Number: W8485-tbips2025-03 Dnd Poc: Khan Check E-mail: Dapservicesbidreceiving-doaservicesreceptiondessoumissions@forces.gc.ca The Department Of National Defence (dnd) Requires Eight (8) Resources To Support The Development Of The Air Force Master Interface System (afmis) Expansion Project, And The Royal Canadian Air Force (rcaf) Command And Control Mission Planning Enhancement (c2mpe) Initiative. Work Includes Design, Development, Prototyping, Testing, And Implementation Of Software Applications. It Also Includes Development Of Operating Procedures And Subsequent Development Of Training Materials For The Royal Canadian Air Force (rcaf). Documents May Be Submitted In Either Official Language Of Canada. The Tbips Method Of Supply Is A Result Of A Formal Competitive Process Which Was Established As A Result Of Extensive Consultations With Industry. The Method Of Supply Provides Suppliers With An On-going Opportunity To Become Prequalified For Participation In Future Bidding Opportunities. To Obtain More Information About How To Become A Pre-qualified Supplier For Tbips, Please Contact Public Works And Government Services Canada (pwgsc) At: Rcnmdai.ncrimos@tpsgc-pwgsc.gc.ca For General Information On The Various Pwgsc Methods Of Supply, Or To Obtain Specific Information On A Pwgsc Professional Service Method Of Supply, Please Visit Pwgsc's Buy And Sell Website At: Https://buyandsell.gc.ca/for-businesses/selling-to-the-government-of-canada/register-as-a-supplier/register-to-provide-services. List Of Pre-qualified Suppliers This Requirement Is Open Only To The Following Companies Who Qualified Under The Stated Consultant Categories, Level Of Expertise, Security Level, Region And Tier: 1. 01 Millennium Consulting Inc. 2. 1511995 Ontario Inc., Tundra Technical Solutions In Joint Venture 3. 4165047 Canada Inc., Innovision Consulting Inc., In Joint Venture 4. 529040 Ontario Inc And 880382 Ontario Inc 5. 9149481 Canada Inc. 6. A.t. Consulting And Recruiting Inc. 7. Accenture Inc. 8. Acosys Consulting Services Inc./ Services Conseils Acosys Inc., Pricewaterhousecoopers Llp, In Joint Venture 9. Adga Group Consultants Inc. 10. Adirondack Information Management Inc. 11. Adirondack Information Management Inc., Amita Corporation, Artemp Personnel Services Inc., The Aim Group Inc.,in Joint Venture 12. Adrm Technology Consulting Group Corp. 13. Adrm Technology Consulting Group Corp. And Randstad Interim Inc 14. Affinity Staffing Inc. 15. Akkodis Canada Inc. 16. Alika Internet Technologies Inc., Lnine Consulting Inc. In Joint Venture 17. Alithya Canada Inc 18. Alivaktuk Consulting Inc. & Navpoint Consulting Group Inc. In Jv 19. Allan Clarke & Associates Inc.; The Halifax Computer Consulting Group Inc.; In Joint Venture 20. Altis Recruitment & Technology Inc. 21. Axons Canada Inc., Levio Conseils Inc., In Joint Venture 22. Bdo Canada Llp 23. Benchmark Corp 24. Beyond Technologies Consulting Inc. 25. Bits In Glass Inc. 26. Cache Computer Consulting Corp. 27. Cache Computer Consulting Corp., Beyond Technologies Consulting Inc. Solutions Beyond Technologies Inc., In Joint Venture 28. Calian Ltd. 29. Calian Ltd., Dwp Solutions Inc., In Joint Venture 30. Cgi Information Systems And Management Consultants Inc. 31. Cistel Technology Inc. 32. Closereach Ltd. 33. Closereach Ltd., Snapsearch Inc., Bell, Browne, Molnar & Delicate Consulting Inc., In Joint Venture 34. Cofomo Inc. 35. Computacenter Canada Inc. 36. Corgta Inc. 37. Dare Human Resources Corporation 38. Deloitte Inc. 39. Dls Technology Corporation 40. Dolomite - Pur – Phirelight – Sphyrna In Jv 41. Donna Cona Inc. 42. Donna Conna Inc., Ibm Canada Limited In Joint Venture 43. Enet4s Software Solutions Ltd., Entaros Inc. In Joint Venture 44. Eperformance Inc. 45. Equasion Business Technologies Consulting Inc And Watershed Information Technology Inc In Cjv 46. Ernst & Young Llp 47. Esit Canada Enterprise Services Co. Esit Canada Services Auxentreprises Cie. 48. Evision Inc., Softsim Technologies Inc. In Joint Venture 49. Experis Canada Inc. 50. Freebalance Inc. 51. Fujitsu Consulting (canada) Inc./fujitsu Conseil (canada) Inc. 52. General Dynamics Land Systems – Canada Corporation 53. Green Light Consulting Solutions Inc. 54. Gsi International Consulting Inc. 55. Hubspoke Inc. 56. I.m.p. Group Limited 57. I4c Information Technology Consulting Inc 58. Ibiska Telecom Inc. 59. Ibm Canada Limited/ibm Canada Limitée 60. Ifathom Corporation 61. Illuminz Solutions Inc. 62. Infosys Public Services Inc 63. Innobec And Mdos In Jv 64. Insync Systems Inc. 65. Ipss Inc. 66. Ipss Inc. / Long View Systems Corporation, In Joint Venture 67. It/net - Ottawa Inc. 68. It/net Ottawa Inc, Kpmg Llp, In Joint Venture 69. Kpmg Llp 70. Kyndryl Canada Limited; Ism Information Systems Management Corporation In Joint Venture 71. Le Groupe Conseil Bronson Consulting Group 72. Leo-pisces Services Group Inc. 73. Leverage Technology Resources Inc. 74. Levio Conseils Inc. 75. Makwa Resourcing Inc. 76. Makwa Resourcing Inc., Tpg Technology Consulting Ltd. In Joint Venture 77. Maplesoft Consulting Inc. 78. Maplestream Inc., Cofomo Inc. In Joint Venture 79. Maverin Business Services Inc. 80. Maverin Inc. 81. Maximus Canada Services, Inc. 82. Mda Systems Ltd. 83. Mdos Consulting Inc. 84. Messa Computing Inc. 85. Mgis Inc. 86. Michael Wager Consulting Inc. 87. Mindwire Systems Ltd. 88. Mindwire Systems Ltd., Akkada Professional Services Inc., Hubspoke Inc., In Joint Venture 89. Mnp Llp 90. Mnp Llp, Nortak Software Ltd., In Joint Venture 91. Monz Consulting Inc., Newfound Recruiting Corporation. In Joint Venture 92. Munvo Solutions Inc. 93. Myticas Consulting Inc. 94. Navpoint Consulting Group Inc. 95. Newfound Recruiting Corporation 96. Nexus Systems Group Inc. 97. Nisha Technologies Inc. 98. Nrns Incorporated 99. Onaki Création S.e.n.c., Ibiska Telecom Inc., In Joint Venture 100. Onx Enterprise Solutions Ltd. 101. Orangutech Inc. 102. Oxaro Inc. 103. Pennant Canada Limited 104. Precisionerp Incorporated 105. Precisionit Inc,ids Systems Consultants Inc., Precisionerp Incorporated, In Joint Venture 106. Pricewaterhouse Coopers Llp 107. Primex Project Management Limited 108. Procom Consultants Group Ltd. 109. Professional Quality Assurance Ltd. 110. Prologic Systems Ltd. 111. Promaxis Systems Inc 112. Protak Consulting Group Inc. 113. Qa Consultants Inc. 114. Qmr Staffing Solutions Incorporated 115. Quarry Consulting Inc. 116. Raise Limited 117. Randstad Interim Inc. 118. Raymond Chabot Grant Thornton Consulting Inc. 119. Redspace Inc. 120. Robertson & Company Ltd. 121. S.i. Systems Ulc 122. Samson & Associés Cpa/consultation Inc 123. Sapper Labs Inc., Electronic Warfare Associates - Canada, Ltd, In Joint Venture 124. Seasi Consulting Inc. 125. Shore Consulting Group Inc. 126. Sierra Systems Group Inc. 127. Skyfly Solutions Inc., Ifathom Corp., Epi-use Now Inc. In Joint Venture 128. Softsim Technologies Inc. 129. Solutions Moerae Inc 130. Sra Staffing Solutions Ltd. 131. Sundiata Warren Group Inc. 132. Symbiotic Group Inc., Akkodis Canada Inc., In Joint Venture 133. Systematix It Solutions Inc./systematix Technologies De L'information Inc./les Services Conseils Systematix Inc. In Joint Venture. 134. Systematix Solutions Ti Inc/systematix It Solutions Inc 135. Systemscope Inc. 136. T.e.s. Contract Services Inc. 137. Tag Hr The Associates Group Inc. 138. Tato Recruiting Inc., S.i. Systems Ulc, In Joint Venture 139. Teksystems Canada Corp./société Teksystems Canada 140. Templates 4 Business, Inc. 141. The Aim Group Inc. 142. The Barrington Consulting Group Inc. 143. The Bell Telephone Company Of Canada Or Bell Canada/la Compagnie De Téléphone Bell Du Canada Ou Bell Canada 144. The Halifax Computer Consulting Group Inc. 145. The Ktl Group, Inc. 146. The Vcan Group Inc. 147. Thinking Big Information Technology Inc. 148. Thomas&schmidt Inc. 149. Tpg Technology Consulting Ltd. 150. Trm Technologies Inc. 151. Tundra Technical Solutions Inc 152. Turtle Technologies Inc. 153. Unisys Canada Inc. 154. Valcom Consulting Group Inc. 155. Vantix Systems Inc. 156. Vooban 157. Worldhire Inc 158. Yoush Inc. 159. Zernam Enterprise Inc

Municipality Of Kola In Tender

Civil And Construction...+1Drainage Work
Montenegro
Closing Date8 Dec 2024
Tender AmountRefer Documents 
Details: The Indicative Scope Of Works Covers The Following Elements: 1. Sewerage Network Construction Of Sewerage Network In The Approximate Length Of 9.2 Km Which Will Serve To 3000 Inhabitants In The Following Settlements: Kolašin City Centre, Braće Vujisić (dulovina), Breza And Partly Smailagića Polje And Gornji Pažanj. 2. Water Supply Priority Measures Water Supply Priority Measures Include Services, Supplies And Construction Works To Be Designed, Supplied, Installed And Constructed By The Contractor. - Preparatory Services (operational Gis, Hid Based Hydraulic Model, Leakage Detection For 30 Km Of Network And Detailed Design Of New Elements Including Scada) - Supply, Installation And Commissioning Of Bulk Flowmeters, And Water Meters (400), Establishment Of Dmas And Scada - Works For Upgrade Of The Water Distribution System Hydraulic Configuration. 3. Wastewater Treatment Plant Design And Construction Of Wwtp In Bakovići Settlement - Conventional Activated Sludge Process And Aerobic Sludge Stabilization. Design And Construction Of The Wwtp Shall Include Two Phases: Phase I - 4000 Pe (to Be Constructed): Wastewater Flowrate (including Infiltration) = 765 M³/d (9 L/s); Peak Dry Weather Flow = 57 M³/h (16 L/s); Peak Wet Weather Flow To =109 M³/h. Phase Ii - Additional 2000 Pe (to Be Considered In Design): Wastewater Flowrate (including Infiltration= 1045 M³/d (12 L/s); Peak Dry Weather Flow = 77 M³/h (21 L/s); Peak Wet Weather Flow = 150 M³/h The Proposed Process For Wwtp Includes: Influent Pipe And By-pass Line, Inlet Chamber, Coarse Screens, Fine Screens, Aerated Grit Chamber, Distribution Chamber, Primary Sedimentation, Activated Sludge And Secondary Sedimentation (biological) Treatment, Effluent Control And Measurement Chamber, Discharge Line To The Tara River, Sludge Pumping Station, Sludge Distribution Chamber, Sludge Thickener, Sludge Reed Beds, Drainage Pumping Station, Building For Guard, Laboratory, Blowers, Warehouse, Odour Control, Plant Infrastructure, Fences, Access And Internal Roads With Greenery, Utility Connections: Pressure Effluent Line (dn280, 1870 M); Access Road (2100 M); Power Supply; Water Supply (dn100, 1195 M); Telecom. Works Will Be Implemented According To Fidic Yellow Book (1999 Ed). Total Expected Duration Of The Contract Is 48 Months, Including 12 Months Of Defects Notification Period. The Municipality Of Kolašin Intends To Conduct Open International Procedure For Selection Of Contractor. The Selection Procedure Will Be Conducted Through The Procedure As Specified In The Practical Guide For European Union External Action (prag) And Eib Guide To Procurement (2018). In Case Of Any Conflict The Eib Guide To Procurement Https://www.eib.org/en/publications/guide-to-procurement.htm Will Apply..
2451-2460 of 2538 active Tenders