Fencing Tenders

Fencing Tenders

Department Of Public Works And Highways Tender

Civil And Construction...+1Road Construction
Philippines
Closing Date7 Jan 2025
Tender AmountPHP 149.9 Million (USD 2.5 Million)
Details: Description Invitation To Bid For General Santos City Underpass (mabuhay-bulaong Road And Digos-makar Road Intersection), South Cotabato (package 5) 1. The Department Of Public Works And Highways Central Office, Through The Gaa, Fy 2024 (ra 11975) Intends To Apply The Sum Of Php 149,991,310.67 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Contract Id No. 24z00027, General Santos City Underpass (mabuhay-bulaong Road And Digos-makar Road Intersection), South Cotabato (package 5). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Public Works And Highways Central Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : General Santos City Underpass (mabuhay-bulaong Road And Digos-makar Road Intersection), South Cotabato (package 5) Contract Id No. : 24z00027 Locations : General Santos City, South Cotabato Scope Of Works : Scope Of Works Includes Construction Of Concrete Sidewalk, Bike Lane, Concrete Lined Canal/drainage And Construction Of Outermost Lane (third Lane) With Ramp; Finishing Works Of Bored Piles, Diaphragm Walls And Retaining Walls Including Cladding; Landscaping, Safety Barrier Fence And Gantry, Generator Set, Fire Protection System, And Installation Of Traffic Signalization System. Abc : Php 149,991,310.67 Contract Duration : 270 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). 3. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Size Range Of At Least Medium B For Roads And License Category Of A. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Updated As Of July 19, 2024 Of Republic Act 9184 (ra 9184). 5. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways Central Office And Inspect The Bidding Documents At Procurement Service, Room 502-c, 5th Floor, Dpwh Building, Bonifacio Drive, Port Area, Manila During Weekdays From 7:00 Am To 4:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 28, 2024 From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 50,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person For Bid Submitted Manually. 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways Central Office Will Hold A Pre-bid Conference On December 17, 2024, 9:00 A.m. At The Bidding Room, Room 503, 5th Floor, Dpwh Building, Bonifacio Drive, Port Area, Manila And Through Zoom (meeting Id: 849 7617 6886 And Passcode: 553212) And Live-streamed On Youtube: Https://www.youtube.com/@dpwh.co.civilworks, Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In Bds Clause 17. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_co_civilworks@dpwh.gov.ph For Electronic Submission On Or Before January 7, 2025, 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On January 7, 2025, Immediately After The Deadline For The Submission Of Bid, At The Multi-purpose Hall, 5th Floor, Dpwh Building, Bonifacio Drive, Port Area, Manila And Through Zoom (meeting Id: 849 7617 6886 And Passcode: 553212) And Live-streamed On Youtube: Https://www.youtube.com/@dpwh.co.civilworks. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways Central Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184 Updated As Of July 19, 2024, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Allan S. Borromeo, Ceso Iii Director, Bureau Of Construction Dpwh Central Office, Bonifacio Drive, Port Area, Manila 1018 Telephone No. (+632)5304-3340 Email Address: Borromeo.allan@dpwh.gov.ph Ma. Victoria S. Gregorio Director, Procurement Service Dpwh Central Office, Bonifacio Drive, Port Area, Manila 1018 Telephone No. (+632)5304-3122 Email Address: Gregorio.ma_victoria@dpwh.gov.ph Very Truly Yours, Ador G. Canlas, Ceso Iv Undersecretary For Technical Services And Information Management Service Chairperson, Bids And Awards Committee For Civil Works

Municipality Budimerice Tender

Others
Czech Republic
Closing Date14 Jan 2025
Tender AmountCZK 21.2 Million (USD 875.7 K)
Details: The Subject of the Performance of This Public Contract Is the New Construction of a Detached Building for the Education and Education of Children in the Budiměřice Residential Complex on Plots No. 11/23 and 11/19. The Project Also Includes Engineering Networks, Paved Areas, Fencing and Land Improvements. The Subject of the Performance Will Be Staged as Follows, However, the Work Is Considered and Awarded as One Unit: 1st Stage: According to Appendix No. 4a of This Contract, Schedule of Measurements - 1st Stage 2nd Stage: According to Appendix No. 4b of This Contract, Schedule of Measurements - 2nd Stage A Detailed Definition of the Subject of the Public Contract Is Given in Appendix No. 5 of this Tender Documentation, Prepared by Pilsprojekt, Sro, Ičo 29115744, with its registered office at Částkova 74, 326 00 Pilsen. The Definition of the Subject of this Public Contract is Further Specified in Annex No. 3 of the Tender Documentation.

National Irrigation Administration Tender

Civil And Construction...+1Irrigation Work
Philippines
Closing Soon26 Dec 2024
Tender AmountPHP 94.4 Million (USD 1.6 Million)
Details: Description Section I. Invitation To Bid Invitation To Bid For Construction Of Solar Powered Pump With Ai Satellite-assisted Monitoring And Fertigation System For Zds Imo & Zs Imo Projects (clustered) The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-egpipclustered2025-007 (infra) Project Name : Zambo. Sur & Zambo. Sibugay (clustered) Contract Location : Zambo. Sur & Zambo. Sibugay Scope Of Works : Construction Of Six (6) Units Solar Powered Pump With Ai Satellite-assisted Monitoring And Fertigation System Approved Budget For The Contract (abc) : Php 94,429,518.64 Contract Duration : 150 Calendar Days Amount Of Bidding Documents : Php 50,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : December 7 – 26, 2024 At 8:30 Am Pre-bid Conference : December 13, 2024 At 9:00 Am Submission Of Bids : December 26, 2024 At 8:30 Am Opening Of Bids : December 26, 2024 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting December 7 – 26, 2024. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 13 December 2024 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 26 December 2024 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/hev-uxfp-utg Opening Of Bids : Https://meet.google.com/bkn-midq-rvv Any Requests For Additional Information Concerning This Bidding Shall Be Directed To The Following: Marietta M. Cortes Bac Secretariat Head, Nia-regional Office Regional Center Ix, Balintawak, Pagadian City, Zambo. Sur Niaregion9bac@gmail.com 09630884373 – Office Number Date Posted: December 7, 2024 (sgd) Antonio B. Gujeling Bac Chairperson 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation And Flood Control With Experience In Solar Powered Pumps To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “medium A” Category: “b” (per Pcab Board Resolution No. 201, Series Of 2017), Sp-wd (well-drilling Work) And Sp-me (mechanical Works). Additional Valid Certificate Of Well Driller Registration Issued By The National Water Resources Board (nwrb) Will Be Evaluated. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years A Licensed Civil Engineer. Experienced In Solar Powered Irrigation Projects. Shall Render Full-time Service To The Project Until Completion. 10 Years 2 Office Engineer 3 Years A Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 2 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 2 Foreman 5 Years Experienced In Solar Powered Irrigation Projects. Shall Render Full-time Service To The Project Until Completion. 5 Years 6 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 2 Geologist 5 Years A Licensed Geologist With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 5 Years 2 Electrical Engineer 3 Years A Licensed Electrical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 2 Mechanical Engineer 3 Years A Licensed Mechanical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 2 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 4 Compressor 160 Cfm 4 Generator Set 15kva 4 Submersible Pump (for Pump Testing) 15hp 4 Dump Truck 10 Cu.m. 2 Welding Machine 300a 6 Concrete Mixer 1-bagger 6 Butt Fusion Machine Up To 6” Diameter 1 Geo-resistivity Equipment (multi-electrode) Up To 100m Depth 2 Survey Instrument 1 Set Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 4 Dump Truck 10 Cu.m. 2 Geo-resistivity Equipment (multi-electrode) Up To 100m Depth 2 Survey Instrument 1 Set The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit Package 1 – Bag-ong Baroy Spip: 18,931,006.76 A. Construction Of One (1) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega (5x4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Unit B. Construction Safety And Health Program 1.00 Ls C. Well Drilling 80.00 Ln.m D. Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m Supply And Delivery Of 8” Ø Upvc Pipe X 6m 80.00 Ln.m Installation Of 8” Ø Upvc Pipe X 6m 80.00 Ln.m E. Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F. Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4” Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G. Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm2) 188.00 M Ac Cable (8.0mm2) 188.00 M 2” Ø Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H. Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I. Mounting Structures Mounting Structure Supply, Delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation (manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class “a” Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 333.96 Kg Cut, Bend And Place 333.96 Kg Painting Works 4.50 Sq.m J. Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K. Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L. Distribution Pipes Hdpe Iso4427 Sdr 21 2” Dia X 6m Supply & Delivery 676.00 Pc Installation 676.00 Pc Pipes And Fittings 1.00 Lot 4” Layflat Pipe (including End Connectors) Supply & Delivery 22.00 Roll Installation 22.00 Roll 3” Layflat Pipe (including End Connectors) Supply & Delivery 20.00 Roll Installation 20.00 Roll 2” Layflat Pipe (including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll M. Construction Of Perimeter Fence, Stilling Pool And Nia Logo Structure Excavation (manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class “a” Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4” Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2” Ø G.i. Pipe (sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m Red Oxide Metal Primer 0.27 Sq.m N. Construction Of Control House Structure Excavation (manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class “a” Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4” Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m Package 2 – Compound Pip: 14,197,882.09 A. Construction Of One (1) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega (5x4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Unit B. Construction Safety And Health Program 1.00 Ls C. Well Drilling 80.00 Ln.m D. Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m Supply And Delivery Of 8” Ø Upvc Pipe X 6m 80.00 Ln.m Installation Of 8” Ø Upvc Pipe X 6m 80.00 Ln.m E. Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F. Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4” Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G. Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm2) 188.00 M Ac Cable (8.0mm2) 188.00 M 2” Ø Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H. Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I. Mounting Structures Mounting Structure Supply, Delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation (manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class “a” Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 333.96 Kg Cut, Bend And Place 333.96 Kg Painting Works 4.50 Sq.m J. Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K. Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L. Distribution Pipes Hdpe Iso4427 Sdr 21 2” Dia X 6m Supply & Delivery 74.00 Pc Installation 74.00 Pc Pipes And Fittings 1.00 Lot 4” Layflat Pipe (including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3” Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2” Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M. Construction Of Perimeter Fence, Stilling Pool And Nia Logo Structure Excavation (manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class “a” Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4” Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2” Ø G.i. Pipe (sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m Red Oxide Metal Primer 0.27 Sq.m N. Construction Of Control House Structure Excavation (manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class “a” Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4” Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m Package 3 – Rebokon Cis: 14,213,268.46 A. Construction Of One (1) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega (5x4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Unit B. Construction Safety And Health Program 1.00 Ls C. Well Drilling 80.00 Ln.m D. Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m Supply And Delivery Of 8” Ø Upvc Pipe X 6m 80.00 Ln.m Installation Of 8” Ø Upvc Pipe X 6m 80.00 Ln.m E. Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F. Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4” Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G. Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm2) 188.00 M Ac Cable (8.0mm2) 188.00 M 2” Ø Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H. Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I. Mounting Structures Mounting Structure Supply, Delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation (manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class “a” Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 333.96 Kg Cut, Bend And Place 333.96 Kg Painting Works 4.50 Sq.m J. Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K. Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L. Distribution Pipes Hdpe Iso4427 Sdr 21 2” Dia X 6m Supply & Delivery 83.00 Pc Installation 83.00 Pc Pipes And Fittings 1.00 Lot 4” Layflat Pipe (including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3” Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2” Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M. Construction Of Perimeter Fence, Stilling Pool And Nia Logo Structure Excavation (manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class “a” Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4” Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2” Ø G.i. Pipe (sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m Red Oxide Metal Primer 0.27 Sq.m N. Construction Of Control House Structure Excavation (manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class “a” Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpiling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4” Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m Package 4 – Calape Pip: 18,835,027.79 I. Temporary Works, Construction Plant, Mobilization Of Construction Equipment And Demobilization 1.00 Ls Ii. Construction Safety And Health Program 1.00 Ls Iii. Well Drilling 50.00 Ln.m Iv. Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.46 Cu.m Supply And Delivery Of 8” Ø Upvc Pipe X 3m 50.00 Ln.m Installation Of 8” Ø Upvc Pipe X 3m 50.00 Ln.m V. Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using Submersible Pump 10hp 4” Dia) 1.00 Lot Vi. Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump & Motor (15hp) 1.00 Set Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump & Motor (15hp), Pipes And Fittings 1.00 Lot Vii. Solar Panel Supply And Delivery Pv Modules (solar Panel 550watts) 30.00 Unit Pv Modules (solar Panel 550watts Accessories) 30.00 Unit Installation Installation Of Pv Modules And Accessories 1.00 Lot Viii. Solar Inverter, Solar Charge Controller And Cctv Security System Supply & Delivery Solar Inverter & Solar Charge Controller 1.00 Set Cctv Security System 1.00 Set Installation Installation Of Solar Inverter, Solar Charge Controller & Cctv 1.00 Lot Ix. Mounting Structures Structure Excavation (manual) 58.40 Cu.m Structure Backfill (manual) 23.80 Cu.m Gravel Blanket (gravel Bedding Manual) 24.90 Cu.m Concrete 3000 Psi Plain Concrete 20.00 Cu.m Reinforcing Steel Bar (grade 40) 2,738.90 Kg Roofing And Metal Works 1.00 Ls X. Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot Xi. Fertigation System Supply & Delivery 1.00 Lot Installation 1.00 Lot Xii. Distribution Pipes 4” Ø Hdpe (sdr 17) Supply & Delivery 30.00 Pc Installation 30.00 Pc Pipes And Fittings 1.00 Lot 1” Ø Hdpe (sdr 17) Supply & Delivery 180.00 M Installation 180.00 M Pipes And Fittings 1.00 Lot Xiii. Security Fence Structure Excavation 50.30 Cu.m Structure Backfill 32.10 Cu.m Gravel Blanket (gravel Bedding) 11.10 Cu.m Concrete 3000 Psi Plain Concrete 11.90 Cu.m Reinforcing Steel Bars (grade 40) 1,695.20 Kg Masonry Works 4” Concrete Hollow Blocks 115.50 Sq.m Mortar And Plastering 139.40 Sq.m Galvanized Interlink Mesh (2” X 2”) 310.00 Sq.m Xiv. Water Storage Tank Structure Excavation (manual) 78.40 Cu.m Structure Backfill (manual) 12.40 Cu.m Gravel Blanket (gravel Bedding) 21.00 Cu.m Concrete 3000 Psi Plain Concrete 39.00 Cu.m Reinforcing Steel Bars (grade 40) 5,191.00 Kg Roofing And Metal Works 1.00 Ls Painting Works 74.20 Sq.m Waterproofing 115.60 Sq.m Xv. Control Room Structure Excavation 44.10 Cu.m Structure Backfill 7.30 Cu.m Gravel Blanket (gravel Bedding) 23.50 Cu.m Concrete 3000 Psi Plain Concrete 4.30 Cu.m Reinforcing Steel Bars (grade 40) 829.10 Kg Masonry Works 4” Concrete Hollow Blocks 70.90 Sq.m Plastering 117.90 Sq.m Roofing And Metal Works 1.00 Ls Doors And Windows 1.00 Unit Ceiling Works 10.10 Sq.m Electrical Works 1.00 Ls Painting Works 85.90 Sq.m Tile Works 9.60 Sq.m Plumbing Works 1.00 Ls Xvi. Canalization Common Excavation 839.30 Cu.m Common Backfill 755.90 Cu.m Gravel Blanket (gravel Bedding) 142.45 Cu.m Concrete 2400 Psi Plain Concrete 221.20 Cu.m Reinforcing Steel Bars (grade 40) 8,681.50 Kg Xvii. Canal Structures Common Excavation 100.00 Cu.m Common Backfill 124.20 Cu.m Gravel Blanket (gravel Bedding) 13.50 Cu.m Concrete 3000 Psi Plain Concrete 40.80 Cu.m Reinforcing Steel Bars (grade 40) 3,354.90 Kg Package 5 – Balungisan Pip: 14,126,151.23 I. Temporary Works, Construction Plant, Mobilization Of Construction Equipment And Demobilization 1.00 Ls Ii. Construction Safety And Health Program 1.00 Ls Iii. Well Drilling 50.00 Ln.m Iv. Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.46 Cu.m Supply And Delivery Of 8” Ø Upvc Pipe X 3m 50.00 Ln.m Installation Of 8” Ø Upvc Pipe X 3m 50.00 Ln.m V. Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using Submersible Pump 10hp 4” Dia) 1.00 Lot Vi. Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump & Motor (15hp) 1.00 Set Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump & Motor (15hp), Pipes And Fittings 1.00 Lot Vii. Solar Panel Supply And Delivery Pv Modules (solar Panel 550watts) 30.00 Unit Pv Modules (solar Panel 550watts Accessories) 30.00 Unit Installation Installation Of Pv Modules And Accessories 1.00 Lot Viii. Solar Inverter, Solar Charge Controller And Cctv Security System Supply & Delivery Solar Inverter & Solar Charge Controller 1.00 Set Cctv Security System 1.00 Set Installation Installation Of Solar Inverter, Solar Charge Controller & Cctv 1.00 Lot Ix. Mounting Structures Structure Excavation (manual) 58.40 Cu.m Structure Backfill (manual) 23.80 Cu.m Gravel Blanket (gravel Bedding Manual) 24.90 Cu.m Concrete 3000 Psi Plain Concrete 20.00 Cu.m Reinforcing Steel Bar (grade 40) 2,738.90 Kg Roofing And Metal Works 1.00 Ls X. Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot Xi. Fertigation System Supply & Delivery 1.00 Lot Installation 1.00 Lot Xii. Distribution Pipes 4” Ø Hdpe (sdr 17) Supply & Delivery 30.00 Pc Installation 30.00 Pc Pipes And Fittings 1.00 Lot 1” Ø Hdpe (sdr 17) Supply & Delivery 180.00 M Installation 180.00 M Pipes And Fittings 1.00 Lot Xiii. Security Fence Structure Excavation 50.30 Cu.m Structure Backfill 32.10 Cu.m Gravel Blanket (gravel Bedding) 11.10 Cu.m Concrete 3000 Psi Plain Concrete 11.90 Cu.m Reinforcing Steel Bars (grade 40) 1,695.20 Kg Masonry Works 4” Concrete Hollow Blocks 115.50 Sq.m Mortar And Plastering 139.40 Sq.m Galvanized Interlink Mesh (2” X 2”) 310.00 Sq.m Xiv. Water Storage Tank Structure Excavation (manual) 78.40 Cu.m Structure Backfill (manual) 12.40 Cu.m Gravel Blanket (gravel Bedding) 21.00 Cu.m Concrete 3000 Psi Plain Concrete 39.00 Cu.m Reinforcing Steel Bars (grade 40) 5,191.00 Kg Roofing And Metal Works 1.00 Ls Painting Works 74.20 Sq.m Waterproofing 115.60 Sq.m Xv. Control Room Structure Excavation 44.10 Cu.m Structure Backfill 7.30 Cu.m Gravel Blanket (gravel Bedding) 23.50 Cu.m Concrete 3000 Psi Plain Concrete 4.30 Cu.m Reinforcing Steel Bars (grade 40) 829.10 Kg Masonry Works 4” Concrete Hollow Blocks 70.90 Sq.m Plastering 117.90 Sq.m Roofing And Metal Works 1.00 Ls Doors And Windows 1.00 Unit Ceiling Works 10.10 Sq.m Electrical Works 1.00 Ls Painting Works 85.90 Sq.m Tile Works 9.60 Sq.m Plumbing Works 1.00 Ls Xvi. Canalization Common Excavation 198.50 Cu.m Common Backfill 247.90 Cu.m Gravel Blanket (gravel Bedding) 96.00 Cu.m Concrete 2400 Psi Plain Concrete 82.00 Cu.m Reinforcing Steel Bars (grade 40) 2,919.20 Kg Xvii. Canal Structures Common Excavation 35.60 Cu.m Common Backfill 43.20 Cu.m Gravel Blanket (gravel Bedding) 4.50 Cu.m Concrete 3000 Psi Plain Concrete 14.20 Cu.m Reinforcing Steel Bars (grade 40) 1,135.50 Kg Package 6 – Sanito Cis: 14,126,182.31 I. Temporary Works, Construction Plant, Mobilization Of Construction Equipment And Demobilization 1.00 Ls Ii. Construction Safety And Health Program 1.00 Ls Iii. Establishment Of Shallow Tube Well Well Drilling 50.00 Ln.m Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m Supply & Delivery Of Upvc Pipe 6” Ø X 3m 50.00 Ln.m Installation Of Upvc Pipe 6” Ø X 3m 50.00 Ln.m Pump Testing (using 15hp 4” Ø) 1.00 Lot Iv. Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump & Motor (15hp) 1.00 Unit Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump & Motor (15hp), Pipes And Fittings 1.00 Lot V. Solar House Structure Excavation (manual) 60.40 Cu.m Structure Backfill (manual) 25.90 Cu.m Gravel Blanket (gravel Bedding Manual) 24.90 Cu.m Concrete 3000 Psi Plain Concrete 20.00 Cu.m Reinforcing Steel Bars (grade 40) 2,738.90 Kg Roofing And Metal Works 1.00 Ls Vi. Solar Panel Supply And Delivery Pv Modules (solar Panel 550watts) 22.00 Unit Pv Modules (solar Panel 550watts Accessories) 22.00 Unit Installation Installation Of Pv Modules And Accessories 1.00 Lot Vii. Solar Inverter, Solar Charge Controller And Cctv Security System Supply & Delivery Solar Inverter & Solar Charge Controller 1.00 Set Cctv Security System 1.00 Set Installation Installation Of Solar Inverter, Solar Charge Controller & Cctv 1.00 Lot Viii. Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot Ix. Fertigation System Supply & Delivery 1.00 Lot Installation 1.00 Lot X. Control Room Structure Excavation 45.21 Cu.m Structure Backfill 12.40 Cu.m Gravel Blanket (gravel Bedding) 23.50 Cu.m Concrete 3000 Psi Plain Concrete 4.30 Cu.m Reinforcing Steel Bars (grade 40) 829.10 Kg Masonry Works 4” Concrete Hollow Blocks 70.90 Sq.m Plastering 117.90 Sq.m Roofing And Metal Works 1.00 Ls Doors And Windows 1.00 Unit Ceiling Works 10.10 Sq.m Electrical Works 1.00 Ls Painting Works 85.90 Sq.m Tile Works 9.60 Sq.m Plumbing Works 1.00 Ls Xi. Water Storage Tank Structure Excavation (manual) 78.40 Cu.m Structure Backfill (manual) 12.50 Cu.m Gravel Blanket (gravel Bedding) 21.00 Cu.m Concrete 3000 Psi Plain Concrete 39.00 Cu.m Reinforcing Steel Bars (grade 40) 5,191.00 Kg Roofing And Metal Works 1.00 Ls Cementitious Waterproofing 151.20 Sq.m Xii. Distribution Pipes 1” Ø Hdpe (sdr 17) Supply & Delivery 200.00 M Installation 200.00 M Pipes And Fittings 1.00 Lot 4” Ø Hdpe (sdr 17) Supply & Delivery 37.00 Pc Installation 37.00 Pc Pipes And Fittings 1.00 Lot Painting Works 74.20 Sq.m Xiii. Security Fence Structure Excavation 54.30 Cu.m Structure Backfill 32.10 Cu.m Gravel Blanket (gravel Bedding) 11.10 Cu.m Concrete 3000 Psi Plain Concrete 11.90 Cu.m Reinforcing Steel Bars (grade 40) 1,695.20 Kg Masonry Works 4” Concrete Hollow Blocks 115.50 Sq.m Mortar And Plastering 139.40 Sq.m Galvanized Interlink Mesh (2” X 2”) 310.00 Sq.m Xiv. Canalization Structure Excavation 127.90 Cu.m Structure Backfill 63.70 Cu.m Gravel Blanket (gravel Bedding) 100.00 Cu.m Concrete 2400 Psi Plain Concrete 80.30 Cu.m Reinforcing Steel Bars (grade 40) 2,858.40 Kg Xv. Canal Structures Structure Excavation 42.37 Cu.m Structure Backfill 34.16 Cu.m Concrete 3000 Psi Plain Concrete 13.50 Cu.m Reinforcing Steel Bars (grade 40) 1,158.10 Kg

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date9 Jan 2025
Tender AmountPHP 7.9 Million (USD 134.2 K)
Details: Description Republic Of The Philippines Department Of Public Works And Highways Davao Oriental 1st District Engineering Office Lucod, Baganga, Davao Oriental Invitation To Bid (itb No. 2024-166) For Construction Of Multi-purpose Building (gymnasium Covered Court), Sitio Libuac, Barangay Old Macopa, Manay, Davao Oriental, Manay, Davao Oriental 1. The Department Of Public Works And Highway Davao Oriental 1st District Engineering Office, Through The Fy 2025 Regular Infra Program Intends To Apply The Sum Of Php7,920,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 25lf0077 – Construction Of Multi-purpose Building (gymnasium Covered Court), Sitio Libuac, Barangay Old Macopa, Manay, Davao Oriental, Manay, Davao Oriental Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Public Works And Highways Davao Oriental 1st District Engineering Office, Thru Its Bids And Awards Committee (bac), Invites Bids For The Hereunder Works: Contract Id : 25lf0077 Contract Name : Construction Of Multi-purpose Building (gymnasium Covered Court), Sitio Libuac, Barangay Old Macopa, Manay, Davao Oriental Location : Manay, Davao Oriental Scope Of Works : • Construction Of Covered Court (634.49 Sq.m.), Installation Of 36 Ln.m. Fence Approved Budget For The Contract (abc) : Php7,920,000.00 Contract Duration : 120 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). 3. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B For Building. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highway Davao Oriental 1st District Engineering Office And Inspect The Bidding Documents At Procurement Office, 2nd Floor, Dpwh Building, Lucod, Baganga, Davao Oriental During Weekdays From 8:00 Am To 5:00pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 13, 2024 To January 09, 2025 Until 10:00 A.m. From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php10,000.00. 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways Davao Oriental 1st District Engineering Office Will Hold A Pre-bid Conference On December 20, 2024 At 10:00 A.m. At The Conference Room, 2nd Floor, Dpwh Building, Lucod, Baganga, Davao Oriental And/or Through Videoconferencing/webcasting Via Zoom, Which Shall Be Open To Prospective Bidders. Live Streaming Of Pre-bid Conference And Opening Of Bids Of The Said Procurement Can Be Viewed/watched Live Thru Official Facebook Page: Dpwh Davao Oriental 1st Deo - Bac (https://www.facebook.com/dpwh-davao-oriental-1st-deo-bac-109051221022684/) And Via Zoom Application With Meeting Id: 4206160051 Password:dpwhbga On The Dates Above. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In Bds Itb Clause 17. Bid Proposals May Be Submitted Through An Authorized Representative Together With A Company Id And Any Government Issued Id And The Original Authorization Letter (i.e. Special Power Of Attorney For Sole Proprietorship; Or Board/partnership/joint Venture Resolution With Secretary’s Certificate For Corporation/partnership/joint Venture/cooperative) With Attached Confirmation From The Owner/amo Of The Firm Through Their Registered Email Address In Civil Works Application (cwa) And Contact Number For The Authenticity And Veracity Of Said Authorization Letter. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_davaooriental1@dpwh.gov.ph For Electronic Submission On Or Before January 09, 2025 At 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On January 09, 2024, Immediately After The Deadline For The Submission Of Bid, At The Conference Room, 2nd Floor, Dpwh Building, Lucod, Baganga, Davao Oriental And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 13. The Department Of Public Works And Highway Davao Oriental 1st District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Odessa T. Manligoy Head, Bac Secretariat Dpwh Davao Oriental First District Engineering Office Lucod, Baganga, Davao Oriental Tel. No. (087) 306-2988 Do1bac@yahoo.com (sgd)wilfredo L. Metucua Engineer Iii/chief, Maint. Section Bac, Chairperson Davao Oriental First District Engineering Office Lucod, Baganga, Davao Oriental Tel. No. (087) 306-2988 Do1bac@yahoo.com Date Of Posting: December 13, 2024 To December 19, 2024 Dpwh & Philgeps Websites Bulletin Board, Dpwh Davao Oriental 1st Deo Compound

Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender

Civil And Construction...+1Others
Germany
Closing Date13 Jan 2025
Tender AmountRefer Documents 
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand wash basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand wash basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with piping made of PPs, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler piping for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.

Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender

Civil And Construction...+1Others
Germany
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with PPS pipes, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler pipes for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.

Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender

Civil And Construction...+1Others
Germany
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with PPS pipes, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler pipes for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.

The Town Of Senomaty Tender

Chemical Products
Czech Republic
Closing Date20 Jan 2025
Tender AmountCZK 1.3 Million (USD 53.6 K)
Details: The subject of performance is the preparation of single-stage (combined) project documentation for the issuance of a joint permit in the scope and details of the documentation for the execution of construction (dps), which will be based on the study, which is an annex to the procurement documentation. The subject of the project is the demolition of the existing building and the construction of a new multi-purpose building. On the first floor, there are facilities for the school canteen and the school kitchen, storage areas and a hairdresser's area. The second floor is intended for four residential units with a basement. The study is processed by Ing. Sheet. Markéta Bromová, Čka 04034. The place of construction is Parcel Number St. 310 V K.ú. Senomats. The current School Canteen Building That Now Stands On The Site Will Be Removed. The subject of the Dps Project is also the Necessary Surrounding Paved Area (parking lot, access walkways) and Gastro Equipment of the School Canteen. The subject of the project is not fencing and leisure space in front of the building. The estimated investment costs of the construction itself is approx. 40 million. CZK.

Stadt K Nigs Wusterhausen, Dezernat Zentrale Dienste Und Finanzen, Amt Verwaltungsmanagement, Sachgebiet Vergabe Vertragsmanagement Tender

Civil And Construction...+1Civil Works Others
Germany
Closing Date8 Jan 2025
Tender AmountRefer Documents 
Details: The town of Königs Wusterhausen intends to award the construction work in the construction project "conversion of bus stops with crossing aid and car park Niederlehmer Chaussee L30" in 15713 Königs Wusterhausen - Ot Wernsdorf. The subject of this tendering procedure is the construction preparation / clearing of the construction site. Rough quantities of the measure: 1. Construction site preparation - setting up and clearing the construction site - maintaining the construction site - staking out the construction area - erecting, maintaining and removing 20.00 m of construction fencing 2. Traffic safety - traffic law. Obtaining orders - 20.00 m of protective fence erected - clearing - moving the protective fence 3. Demolition, felling and clearing work - 23.00 pieces of felling trees, trunk circumference 30 - 50 cm - 18.00 pieces of felling trees, trunk circumference >50 - 100 cm - 27.00 pieces of felling trees, trunk circumference >100 - 200 cm - 2.00 pieces of felling trees, trunk circumference >200 cm - 250 cm - 3,500.00 m2 of building site clearing branches, growth, trunk circumference. Up to 50 cm - professional disposal of cuttings, trunks, roots and crown material

City Of Manila Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Tender Amount Updated
Philippines
Closing Soon26 Dec 2024
Tender AmountPHP 528.8 Million (USD 8.9 Million)
Details: Description Republic Of The Philippines City Of Manila Office Of The City Mayor Bids And Awards Committee Invitation To Bid The City Government Of Manila, Through The Special Education Fund Fy 2025, Intends To Apply The Following Amounts For The Following Proposed Projects: 1. Contract Id : 2024-sef-20 Contract Name : Upgrading Of Electrical System At Juan Luna Elementary School Approved Budget For The Contract : ₱ 22,100,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 2. Contract Id : 2024-sef-21 Contract Name : Repair / Improvement Of Various Areas At Manuel Roxas High School Approved Budget For The Contract : ₱ 72,000,000.00 Contract Duration : 180 Calendar Days Cost Of Bidding Documents : ₱ 30,000.00 3. Contract Id : 2024-sef-22 Contract Name : Upgrading Of Perimeter Fence At Bacood Elementary School Approved Budget For The Contract : ₱ 2,200,000.00 Contract Duration : 60 Calendar Days Cost Of Bidding Documents : ₱ 3,000.00 4. Contract Id : 2024-sef-23 Contract Name : Repair / Rehabilitation Of H.e. Building At Mariano Marcos Memorial High School Approved Budget For The Contract : ₱ 18,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 5. Contract Id : 2024-sef-24 Contract Name : Repair / Rehabilitation Of Marcos Type School Building At A. H. Lacson Elementary School Approved Budget For The Contract : ₱ 44,000,000.00 Contract Duration : 150 Calendar Days Cost Of Bidding Documents : ₱ 25,000.00 6. Contract Id : 2024-sef-25 Contract Name : Construction Of Exit Stairs At Annex Building And Perimeter Wall At Margarita Roxas De Ayala Elementary School Approved Budget For The Contract : ₱ 5,500,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 6,000.00 7. Contract Id : 2024-sef-26 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At A. Regidor Elementary School Approved Budget For The Contract : ₱ 22,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 8. Contract Id : 2024-sef-27 Contract Name : Improvement Of Offices And Roofing System And Construction Of Sewerage Treatment Plant (stp) At Division Of City Schools Approved Budget For The Contract : ₱ 45,000,000.00 Contract Duration : 180 Calendar Days Cost Of Bidding Documents : ₱ 25,000.00 9. Contract Id : 2024-sef-28 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At T. Earnshaw Elementary School Approved Budget For The Contract : ₱ 29,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 10. Contract Id : 2024-sef-29 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At Pio Del Pilar Elementary School Approved Budget For The Contract : ₱ 22,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 11. Contract Id : 2024-sef-30 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At M. Agoncillo Elementary School Approved Budget For The Contract : ₱ 28,000,000.00 Contract Duration : 150 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 12. Contract Id : 2024-sef-31 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At M. Aquino Elementary School Approved Budget For The Contract : ₱ 20,000,000.00 Contract Duration : 150 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 13. Contract Id : 2024-sef-32 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At G. Del Pilar Elementary School Approved Budget For The Contract : ₱ 25,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 14. Contract Id : 2024-sef-33 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At R. Palma Elementary School Approved Budget For The Contract : ₱ 27,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 15. Contract Id : 2024-sef-34 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At Villamor High School (main Building) Approved Budget For The Contract : ₱ 20,000,000.00 Contract Duration : 150 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 16. Contract Id : 2024-sef-35 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At A. C. Herrera Elementary School Approved Budget For The Contract : ₱ 23,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 17. Contract Id : 2024-sef-36 Contract Name : Upgrading Of Electrical System At Barrio Obrero Elementary School Approved Budget For The Contract : ₱ 30,000,000.00 Contract Duration : 150 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 18. Contract Id : 2024-sef-37 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At Beata Elementary School Approved Budget For The Contract : ₱ 27,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 19. Contract Id : 2024-sef-38 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At J. C. De Jesus Elementary School Approved Budget For The Contract : ₱ 12,000,000.00 Contract Duration : 105 Calendar Days Cost Of Bidding Documents : ₱ 15,000.00 20. Contract Id : 2024-sef-39 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At Legarda Elementary School Approved Budget For The Contract : ₱ 20,000,000.00 Contract Duration : 120 Calendar Days Cost Of Bidding Documents : ₱ 20,000.00 21. Contract Id : 2024-sef-40 Contract Name : Repair / Rehabilitation / Improvement Of Various Areas At Lapu-lapu Elementary School Approved Budget For The Contract : ₱ 15,000,000.00 Contract Duration : 60 Calendar Days Cost Of Bidding Documents : ₱ 15,000.00 Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bid Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents In The Amount Stated Above. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. The Complete Schedule Of Activities Is Listed As Follows: Activities Schedule 1. Issuance Of Bid Documents December 5 - 26 2. Pre-bid Conference December 12 - 10:00 A.m. 3. Deadline For The Issuance Of Bid Documents December 26 – 9:00 A.m. 4. Bidding Proper; Opening Of Bid Envelopes December 26 – 10:00 A.m. 5. Bid Evaluation December 27 The City Government Of Manila Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Engr. Moises G. Alcantara Oic - City Engineer 3rd Floor, Manila City Hall Building Approved By: Atty. Mary Grace R. Chua, Cpa City Budget Officer And Chairperson, Bids And Awards Committee
2161-2170 of 2200 active Tenders