Fencing Tenders

Fencing Tenders

Qatar Energy Tender

Civil And Construction...+2Others, Pipe Line Project
Qatar
Details: Future Tenders (asset Integrity (mesaieed)) Call Off Contract For Pipelines Corrosion Indirect Insp Tender Description: Corrosions On Non-piggable/ Piggable Buried Gas And Liquid Pipelines Have Become Serious Concern, Especially For The Buried Pipelines. To Ensure Delivery Of The Products Through The Pipeline, It Is Imperative For Qp To Maintain Integrity Of The Pipelines By Means Of Continuous Evaluation Of The Pipelines Conditions And As Preventive Measure By Identifying The Prominent Issues Within The Line. With The Objective To Maintain Asset Integrity, Qatarenergy Intends To Engage A Contractor To Carry Out Call Off Contract For External And Internal Corrosion Indirect Inspection Services (ecda And Icda) For Non-piggable Pipelines. The Locations Of The Scope To Be Covered Under The Contract Shall Include Qatarenergy Area Within The Doha/ Mic/ Rlic And Ngl Complex Fenced Areas Wherein Qatarenergy Gas And Liquid Pipelines Are Located. The Contract Shall Be Based On Call Off Basis. Specific Scope Will Be Provided Through Issuance Of Release Orders (ros) To Proceed With The Specific Scope. The Scope Of The Services Cover The Provisions Of All Resources To Carry Out The Following And All Required Reports And Close Out Documents And Project Dossiers At End Of The Ro: 1. Pre-assessment 2. Indirect Inspection: A. External Corrosion Indirect Inspection For Qp's Gas And Liquid Pipelines By Using Any Of The Following Survey And Soil Resistivity Methods: -,,closed Internal Potential Survey (cips) -,,direct Current Voltage Gradient (dcvg) -,,alternate Current Voltage Gradient (acvg) -,,pipeline Current Mapper (pcm) B. The Provision To Locate Internal Corrosion Areas Of Buried Gas And Liquid Pipeline By Calculating The Inclination Profile Of The Pipeline, Change In Elevation, Critical Angles And Suitable Depth Of Cover Measurement. 3. Direct Assessment Of The Pipeline Conditions By Reviewing The Coating Conditions, Pipeline Defects (corrosion) And Features Of The Surrounding Locations. 4. Any Other Activities To Be Carried Out To Perform The Scope. Such Activities Shall Include Rectifications, Re-performance And Cleaning Up Of The Worksite To Reinstate And Make Good The Impacted Existing Facilities And Bring The Same To Their Original Conditions. 5. Submissions Of All Reports (draft And Final) And Recommendations Thereof For Qatarenergy Planned Tender Issue: 23/09/25 Planned Contract Award: 13/01/26
Closing Date13 Jan 2026
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others...+2Civil And Construction, Pipe Line Project
United States
Details: Statement Of Work repair Steam Vents - 583-25-517 introduction city Steam Is Vented Through A Shallow Concrete Trench Into Risers From The Main Steam Vault. Three Vent Pipes Connected To Relief Valves Ranging From 35 Psi To 110 Psi Are Located In The Trench. the Three Steam Vent Pipes Have Failed, Leading To A Critical Situation Where Steam Is Backing Up Into The Mechanical Space, Creating A Hazardous Work Environment. Immediate Action Is Required To Prevent Further Risks. Steam Is Also Venting Openly Through The Concrete Shallow Trench, Posing A Potential Threat To Va Employees Entering/exiting The Richard L. Roudebush Veterans Affairs Medical Center (vamc) Through The South Basement Entrance. objective the Main Objective Of This Project Is To Remove The Three (3) Failed Steam Vent Pipes, Merge The Remaining Sections Of The Three Steam Vent Pipes Into One Main Collector In The Mechanical Space, And Connect The Collector To An Existing Riser. period Of Performance And Work Hours the Contractor Shall Complete All The Requirements Described In This Scope Of Work Within 30 Calendar Days After The Notice To Proceed. maintaining The Medical Center's Operational Capability Is Paramount, And The Contractor Shall Coordinate All Activity Schedules With The Cor Prior To Execution And Two Weeks In Advance. According To The Nature Of The Work, This Project Can Be Conducted During Regular Business Hours And/or After-hours/weekends. Regular Business Hours Are 7 Am To 4 Pm, Monday Through Friday. Work Requiring Outages Shall Be Completed After Hours Or On Weekends As Coordinated With The Cor. scope Of Work the Contractor Shall Provide All Necessary Services, Supervision, Labor, Transportation, Supplies, Equipment, Tools, Licenses, Chemicals, And Materials To Execute The Following: all Work Shall Be Completed During The Non-heating Season To Avoid Or Minimize Medical Center Operational Disruptions. work Shall Be Phased Based On The Available Shutdown Time Windows (five Hours Or Less) And Va-approved Shutdown Dates. c. Shutdowns Proposed By The Contractor Shall Be Properly Coordinated With The Affected Services In Advance And Approved By The Va. plan, Implement, Monitor, And Adjust All The Required Site-specific Safety Measures To Accomplish The Work Needed In Compliance With Osha. the Main Steam Vault Is Under High-temperature Conditions, And The Contractor Must Comply With The Osha Heat Stress Regulation. the Main Steam Vault Is A Permit-required Confined Space (prcs), And The Contractor Must Comply With The Osha Confined Space Regulation And Va Prcs Program. plan, Implement, Monitor, And Adjust All The Required Safety Measures To Accomplish The Work In A Prcs Under High-temperature Conditions (i.e., Organizational Measures, Collective And Personal Protective Equipment, Rescue Team, Air And Temperature Monitoring, Trained Personnel, Etc., As Needed). before The Work Starts, Cordon Off The Work Area And The Steam Vault Entrance From The Public With 6 High Chain Link Temporary Fencing. Provide Temporary Fenced Areas With Warning And Wayfinding Signs. excavate And Clean Debris From The Concrete Shallow Trench And Remove It Off-site. cut The Three (3) Failed Vent Pipes In The Mechanical Space And At The Riser And Remove Them Off-site. Vent Pipe Sizes Are 10-inch, 8-inch, And 6-inch In Diameter. remove The 8-inch And 6-inch Risers Off Site. complete Non-destructive Testing (i.e., X-ray Inspection) To Determine If The Metal Thickness Of The Existing 10-inch Riser Is Enough To Weld On. merge The Remaining Sections Of The Three (3) Steam Vent Pipes Into A 10-inch Collector Inside The Steam Vault. provide And Install Enough And Appropriate Pipe Supports/stands For The New Steam Vent Pipe System. the New Steam Vent Collector Shall Go Through One Of The Existing Wall Penetrations And Follow The Path Of The Existing Steam Vent Pipes Up To The 10-inch Riser. connect The Steam Vent Collector To The Existing 10-inch Riser. pipe Material Shall Be Astm A106, Grade B, Seamless Carbon Steel, Schedule 40, Butt Weld. All Pipe Connections Shall Be Welded. close The Two (2) Unused Concrete Wall Penetrations On Both Sides Of The Wall With Stainless-steel Plates And Stainless-steel Anchors For Corrosion Resistance. A High-temperature Resistance Gasket Shall Be Installed Between The Concrete Wall And The Stainless-steel Plates. dimensions And Details Are Based On The Best Available Information. However, The Contractor Shall Not Strictly Rely On The Provided Information. The Contractor Shall Verify Existing Site Conditions, Locations, Dimensions, Quantities, And Accuracy. the Contractor Shall Provide, Maintain, And Adjust Safety Equipment And Measures To Protect Construction Workers And The Public. This Shall Include Additional Equipment And Measures That May Be Required By The Cor Or The Va Safety Service During The Contract. the Contractor Shall Obtain All Necessary Permits And Licenses Required To Perform All Work Associated With The Project. The Contractor Is Responsible For Compliance With Federal, State, And Local Laws, Regulations, Codes, And Standards. all Services Provided Under This Contract Must Conform To The Standards And Specifications Of The Occupational Safety And Health Administration (osha), Nfpa, Va, And Original Equipment/material Manufacturer. specific Tasks the Contractor Shall Complete The Following Tasks During All Phases Of Construction: the Contractor Shall Agree With And Adhere To The Va Requirements And Pace Of Procedures Or Processes Derived From All The Involved Services That May Affect This Project. the Contractor Shall Implement And Follow All Prescribed Ilsm And/or Icra Measures And Procedures During The Performance Of This Project. the Contractor Shall Be Responsible For Damages Caused By Its Personnel And Shall Notify The Cor Promptly Of Any Damages To Government Property. the Contractor Shall Remove All Trash And Debris Upon Completion Of The Work. upon Completion Of All The Work Items, The Contractor Shall Conduct A Walkthrough With The Cor, Noting All Punch List Items. The Final Invoice Will Be Approved Once All Punch List Items Are Completed. safety And Infection Prevention the Contractor Is Responsible For Submitting A Site-specific Safety Plan For The Project, Which Must Be Approved Before Work Can Begin. The Safety Plan Shall Include Activity Hazard Analyses (aha) As Needed. the Contractor Must Submit A Job-specific Heat Stress Plan, Which Must Be Approved Before Work Begins. c. The Contractor Is Responsible For Submitting A Job-specific Confined Space Entry Plan For The Project, Which Must Be Approved Before Work Can Begin. appropriate Confined Space Training Certification Will Be Required For All Involved Workers. the Contractor Shall Be Thoroughly Familiar With Safety Rules And Regulations. A 30-hour Osha Competent Person Shall Be Present For All Work, And All Additional Workers Shall Have A Minimum 10-hour Osha Certification. all Skilled Trades Workers Performing Work For This Project Shall Have A Valid Certification For The Work And Tasks Being Performed. the Contractor Shall Submit A Hot Work Permit For Any Work That Involves Metal Cutting, Welding, Brazing, Grinding, Soldering, Or Chemical Welding. The Contractor Shall Also Establish Barriers While Conducting Hot Work In Areas Near Pedestrian Or Vehicle Traffic. the Contractor Shall Confine All Operations (including Storage/staging Of Materials) On Government Premises To Areas Authorized By The Cor. The Contractor Cannot Use Interstitial Spaces Or Mechanical Rooms As Storage Space. Contractors Are Responsible For Storing Their Tools, Equipment, And Materials Either In Conex Containers On The F Lot Or At The Cold Spring Road Va Facility. the Contractor Must Provide All Safety Measures To Re-route/guide Pedestrians And Vehicles While Restricting Or Blocking Routes Or Entrances By Means Of Signs, Cones, Fences, Etc. Coordination With The Cor And/or Va Police Shall Be Required Before Restrictions Or Closures. the Richard L. Roudebush Vamc Is A Smoke-free Facility, And It Is The Contractor S Responsibility To Maintain Compliance With This Policy At Construction Locations. all Work Associated With This Project Shall Be In Compliance With All Va Regulations Concerning Safety, Infection Control, Interim Life Safety, Personnel Access, And Proper Removal/safe Disposal Of Construction Waste And Debris. the Contractor Shall Provide A Monthly Waste Report In Compliance With Va Policy Requirements For Recycling And Waste Disposal. security the Contractor, Personnel, And Subcontractors Shall Be Subject To Federal Laws, Regulations, Standards, Va Directives, And Handbooks Regarding Information And Information System Security. at Least Three (3) Weeks Before Work Starts, The Contractor Is Responsible For Submitting Information About Their Employees And Subcontractor Employees Who Will Be On-site For Background Checks And Badging. the Contractor Shall Always Wear A Va Badge When They Are On Va Property. the C&a Requirements Do Not Apply. A Security Accreditation Package Is Not Required. the Building Will Remain Fully Occupied During This Work. Temporary Measures Are Required To Maintain Access To And Security Of The Existing Building. the Contractor Shall Report To The Cor Whenever Contracted Employees Perform Work On Site. all Work Performed Outside Of Regular Business Hours Of Operation, Which Are 7:00 A.m. To 4:30 P.m. On Weekdays (monday Through Friday), Shall Be Coordinated With The Cor. the Contractor Is Responsible For The Physical Security Of Job Sites, Materials, Equipment, And Tools And For Daily Inspections For Organization And Cleanliness Prior To Exiting The Job Site. The Contractor Shall Secure All Materials, Equipment, And Tools Before, During, And After Service. The Government Assumes No Liability For Loss Or Damage Of Contractor-owned Property Held On Government Premises. the Contractor Is Responsible For Preventing Unauthorized Access To The Work Site During The Project's Duration. all Contractor-furnished Materials, Equipment, And Tools Used Shall Be Standard Products Of Manufacturers Regularly Engaged In The Production Of Such Items. the Contractor Will Coordinate All Dumpster Locations With The Cor Before The Start Of Work. the Contractor Shall Reimburse The Va For Any Fines And Costs Incurred Due To Noncompliance By Contractors. the Contractor Shall Limit The Number Of Vehicles On-site During All Project Phases. The F-lot Is The Dedicated Contractor Parking And Mobile Office Staging Area. This Lot Has Limited Space Depending On The Currently Active Projects. Contractors And Contractor Employees May Be Required To Carpool And Park At The Va S Cold Springs Road Facility Located At 2669 Cold Springs Road, Indianapolis, In 46222. documents employee Information The Contractor Shall Provide Information About Their Employees And Subcontractor Employees Who Will Be On-site For Background Checks And Badging At Least Three (3) Weeks Before Work Starts. safety Plan The Contractor Shall Provide A Site-specific Safety Plan At Least Two (2) Weeks Before The Work Starts. heat Stress Plan The Contractor Shall Provide A Job-specific Heat Stress Plan At Least Two (2) Weeks Before The Work Starts. confined Space Entry Plan The Contractor Shall Provide A Job-specific Confined Space Entry Plan At Least Two (2) Weeks Before The Work Starts. schedule The Contractor Shall Provide A Complete, Detailed, And Accurate Project Schedule At Least Two Weeks Before The Work Starts. The Schedule Will Require The Cor's Approval. Changes To The Schedule Must Be Approved 48 Hours Prior To The Change. submittals The Contractor Shall Submit All Materials/products/prefabricated Items For Review And Approval By The Va Cor At Least Two (2) Weeks Before The Work Starts. The Contractor Shall Also Submit Any Alternate Or Replacement Materials/products/prefabricated Items With The Corresponding Specifications For Review And Approval By The Va Cor. hot Work Permits - The Contractor Shall Submit Hot Work Permits At Least Two (2) Weeks In Advance. utility Shutdown Permits - The Contractor Shall Submit Utility Shutdown Permits At Least Two (2) Weeks In Advance. daily Logs - The Contractor Shall Submit Daily Logs To The Cor Daily. daily Reports - The Contractor Shall Provide A Daily Report At The Conclusion Before The Next Workday. rfi - If The Documents Are Unclear, Submit An Rfi For Clarification Or Additional Information.
Closing Date5 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: Market Research And Sources Sought Notice For Information On Capability And Availability Of Potential Contractors Interested In Proposing On A Firm-fixed-price Contract With Cost Plus Fixed-fee (cpff) Line Items To Provide Maintenance, Repair, And Operation Of Facilities, Vehicles, And Equipment At The Tennessee Tombigbee Waterway And Okatibbee Lake Project Facilities By Providing All Planning, Supervision, Administration, Labor, Equipment, Materials, Supplies, And Replacement Or Repair Parts. the Place Of Performance Is The Tennessee Tombigbee Waterway Project Office, 3606 West Plymouth Road, Columbus, Mississippi 39701, And Includes The Okatibbee Lake And Resource Office Near Collinsville, Mississippi. The Anticipated Period Of Performance Is 01 March 2026 To 28 February 2027, With Four Additional One-year Option Periods. the Statement Of Work Includes The Following: provide Services For Maintenance, Repair, Minor Construction, And Operation Of The Tennessee Tombigbee Waterway. The Project Is A Vital Inland Waterway That Connects The North-flowing Tennessee River To The South-flowing Tombigbee River. The Waterway Extends From Mile 217 On The Bwt Near Demopolis, Alabama, To Mile 215 On The Tennessee River In The Pickwick Pool Near The Common Boundary Of Mississippi, Tennessee, And Alabama. The Project Is Located In West Central Alabama And Northeastern Mississippi; Sumter, Greene, And Pickens Counties In Alabama, And Noxubee, Lowndes, Clay, Monroe, Itawamba, Prentiss, Lauderdale, Kemper And Tishomingo Counties In Mississippi. The Overall Length (navigation Miles) Of The Tennessee-tombigbee Waterway Is 234 Miles. As Constructed, The Project Has Ten Locks And Dams And Numerous Other Related Navigation Structures And Features Such As Spillways, Flow Structures, Stabilization Structures, Levees, Dikes, Etc. Currently The Project Navigation Is Providing For Approximately 1300 Commercial Lockage’s Annually And 750 Recreational Lockages. The Commodity Tonnage For 2024 Was Approximately 7 Million Tons. Recreational Areas Were Completed Early In 1994 And Include Eight Class A Campgrounds, Three Visitor Centers And 52 Day Use Areas (including Okatibbee Sites) Providing For Boating, Fishing, Picnicking, Swimming, And Other Recreation Activities, Wildlife Management Areas On Project And Wildlife Mitigation Lands In Both Alabama And Mississippi. The Project Is Operated Under The Direction Of Mobile District, U.s. Army Corps Of Engineers, Mobile, Alabama. Average Annual Visitation Exceeds 1 Million Visitors. the Contract Scope Of Work Will Include, But Is Not Limited To, Some Or All Of The Following Types Of Work: Maintenance And Repair Of Locks Dams, Levees, Riprap/concrete Structures, Flow Structures, Buildings, Offices, Maintenance Facilities, Operation Areas, Project Roads, Vehicles, Floating Plant, Boathouses, Bathhouses, Washhouses, Toilets, Gatehouses, Security And Other Fences, Sanitary Disposal Systems, Launching Ramps, Playground Equipment, Bulletin Boards, Game Courts, Water And Electrical Systems, Telephone Lines, Picnic Sites, Campsites, And Other Related Facilities. Work Required To Perform This Type Of Maintenance Includes Carpentry, Masonry, Electrical, Electronics, Mechanical, Structural, Plumbing, Chipping, Caulking, Sealing, Cleaning, Welding And Replacing Parts Or Equipment. Additional Maintenance Work Includes Guardrails, Gates, Electric Barrier Gates, Signs, Bumper Blocks, Landscaped Areas, Beaches, Navigation Or Swimming Buoys, Paved Roads, Parking Lots, Trails, Navigation Aids, Courtesy Docks, And Boundary Lines. Services To Be Performed Include General Maintenance, Cleaning, Custodial Service, Garbage Removal, Grass Mowing, Saddle Dike And Overlook Clearing, Debris Removal, Operation Of The Project Visitor Centers, Repair To Riprap Slopes, Repair To Earthen Slopes, Excavation, Wildlife Management Food Plots And Storage And Disposal Of Hazardous And/or Toxic Materials. The Project Is Used For Navigation, Recreation, And Wildlife Management. this Is A Market Research And Sources Sought Notice Only. No Award Will Result From This Sources Sought Notice. There Is No Solicitation Available At This Time; Therefore, Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released, It Will Be Synopsized In Accordance With The Federal Acquisition Regulation And Its Supplements. It Is The Contractor’s Responsibility To Monitor The Government Point Of Entry For The Release Of Any Solicitation. this Sources Sought Notice Is Not To Be Construed As A Commitment By The U.s. Army Corps Of Engineers (usace), Mobile District To Issue A Solicitation Or Ultimately Award A Contract. Neither Unsolicited Proposals Nor Other Kinds Of Offers Will Be Considered In Response To This Sources Sought Notice. This Source Sought Notice Does Not Create An Obligation On Behalf Of The Government To Make An Award Of Any Contract Pursuant To This Announcement. the Purpose Of This Sources Sought Notice Is To Determine The Availability Of Qualified Contractors To Perform These Services And To Determine Socioeconomic Classifications (small Business, Hubzone, Service-disabled Veteran Owned Small Businesses, Women Owned Small Businesses, Etc.) Associated With Each. The Primary North American Industrial Classification System (naics) Code Applicable To This Requirement Is 561210, The Small Business Standard For Which Is A Concern, Including Its Affiliates Whose Average Annual Gross Revenues Does Not Exceed $47.0m For The Past Three Years. responses To This Sources Sought Notice Will Be Used By The Government In Making Appropriate Acquisition Decisions. response Instructions responses Are Requested With The Following Information: 1. Contractor’s Name, Address, Points Of Contact With Telephone Numbers And E-mail Addresses. 2. Business Size/classification (to Include Any Designations Such As Small Business, Hubzone, Section 8(a) Contractor, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women Owned Small Business, Etc.) Shall Be Indicated On The First Page Of Submission. 3. Contractor Shall Identify The Percentage Of Services Provided To The Commercial Marketplace And The Percentage Of Services Provided To Government Agencies. 4. Documentation Should Be Submitted With The Following Considerations: a. Describe Your Capability And Experience To Provide Services For Maintenance, Repair, Minor Construction, And Operation Of A Large Multipurpose Navigation Project That Includes Locks, Dams, Levees, Riprap/concrete Structures, Flow Structures, Buildings, Offices, Maintenance Facilities, Operation Areas, Project Roads, Vehicles, Floating Plant, Boathouses, Bathhouses, Washhouses, Toilets, Gatehouses, Security And Other Fences, Sanitary Disposal Systems, Launching Ramps, Playground Equipment, Bulletin Boards, Game Courts, Water And Electrical Systems, Telephone Lines, Picnic Sites, Campsites, And Other Related Facilities. Work Required To Perform This Type Of Maintenance Includes Carpentry, Masonry, Electrical, Electronics, Mechanical, Structural, Plumbing, Chipping, Caulking, Sealing, Cleaning, Welding, And Replacing Parts Or Equipment. Additional Maintenance Work Includes Guardrails, Gates, Electric Barrier Gates, Signs, Bumper Blocks, Landscaped Areas, Beaches, Navigation Or Swimming Buoys, Paved Roads, Parking Lots, Trails, Navigation Aids, Courtesy Docks, And Boundary Lines. Services To Be Performed Include General Maintenance, Cleaning, Custodial Service, Garbage Removal, Grass Mowing, Saddle Dike And Overlook Clearing, Debris Removal, Operation Of The Project Visitor Centers, Repair To Riprap Slopes, Repair To Earthen Slopes, Excavation, Wildlife Management Food Plots And Storage And Disposal Of Hazardous And/or Toxic Materials. The Project Is Used For Navigation, Recreation, And Wildlife Management. for Planning Purposes, The Above Requirements Will Be Addressed In The Following Technical Provisions (tps): fixed Price: Tp-1 General Management; Tp-2 Cleaning Services, Refuse Removal, And Waste Removal; Tp-3 Grass Mowing And Maintenance Of Grassed And Landscaped Areas; Tp-4 Operation Of Wastewater Treatment Facilities. cost Plus: Tp-5 Operation And Maintenance Of Visitor Centers; Tp-6 Non-routine Cleaning Services, Refuse Removal, And Waste Removal; Tp-7 Non-routine Grass Mowing, And Maintenance Of Grassed And Landscaped Areas; Tp-8 Boundary Line Maintenance; Tp-9 Maintenance Of Buildings, Structures, Mechanical, Plumbing, And Electrical Systems (tenn-tom); Tp-10 Maintenance Of Buildings, Structures, Mechanical, Plumbing, And Electrical Systems (okatibbee Lake Site); Tp-11 Lock, Dam, Spillway And Flow Structure Maintenance; Tp-12 Channel Maintenance; Tp-13 Slope Repair And Maintenance; Tp-14 Disposal Area Maintenance; Tp-15 Facility Closing, Winterizing, Re-opening, And Flood Response/recovery; Tp-16 Maintenance And Repair Of Paved Roads, Crushed Stone Roads, Gravel Roads, And Parking Areas; Tp-17 Maintenance And Repair Of Fencing, Signs, Buoys, Gates, Barricades, Bulletin Boards, Concrete Bumpers, Posts, Guardrails, And Traffic Counters; Tp-18 Pest And Aquatic Plant Control; Tp-19 Wildlife And Forestry Management; Tp-20 Recreation Facility Repairs And Renovation; Tp-21 Emergency Response Support, Storage And Disposal Of Hazardous And Toxic Materials; Tp-22 Major Lock Maintenance Closures; Tp-23 Maintenance Of Government Furnished Equipment And Vehicles. b. Describe Your Capability And Experience In The Performance Of Similar Service Contracts In The Last 5 Years For Operation And Maintenance Of Large Multipurpose Lake Projects With Similar Size And Scope To The Tennessee Tombigbee Waterway And Okatibbee Lake Projects. c. Describe Your Capability And Experience To Perform Firm-fixed Price And Cost-plus Contract Services For Operation And Maintenance Type Services. Additionally, Describe Your Capability And Experience To Perform Contract Services Utilizing Two Or More Contract Formats (firm-fixed Price, Cost Plus, Etc.). d. Describe Your Capability And Experience To Provide Contract Services That Successfully Demonstrate Contractor’s Timeliness/effectiveness Of Contract Problem Resolution Without Extensive Customer Guidance. e. Describe Your Capability And Experience To Provide Effective On-site Management, Including Management Of Subcontractors, Suppliers, Materials, And Labor Force. Also, Describe Your Capability And Experience To Hire, Apply, And Retain A Qualified Workforce For This Effort. f. Describe Your Capability And Experience To Provide Adequate Defense Contract Audit Agency (dcaa) Approved Accounting System For Management And Tracking Of Costs For Multiple Technical Provisions And Business Lines. g. Describe Your Capability And Experience To Timely And Accurately Submit Monthly Invoices With Appropriate Supporting Documentation, Monthly Status Reports/budget Variance Reports, Compliance With Established Budgets And Avoidance Of Significant And/or Unexplained Variances (under Runs Or Overruns). h. Describe Your Capability And Experience To Simultaneously Manage Multiple Projects And Disciplines. i. Describe Your Capability And Experience To Incorporate And Manage Changes Of Requirements And/or Priorities Within Scope Of Contract Including Planning, Execution And Response To Customer Changes. j. Describe Your Capability And Experience To Successfully Respond To Emergency And/or Surge Situations (including Notifying Contracting Officer Representative Or Contracting Officer In A Timely Manner Regarding Urgent Contractual Issues). k. Describe Your Capability And Experience To Execute A Successful Quality Control Program. l. Describe Your Capability And Experience To Execute A Successful Safety Program To Include Ability To Maintain An Environment Of Safety, Adhere To Its Approved Safety Plan, And Respond And Correct Safety Issues. m. Provide Information Regarding Cost Type Contracts You Have Performed To Include The Contract Number, Dates, Amount, Location, Final Rating, And Point Of Contact Name And Telephone Number For Verification. the Above Requested Information Shall Not Exceed A Total Of Fifteen (15) Pages On 8.5" X 11" Paper, 12-point Times New Roman Font, With A Minimum Of One (1) Inch Margins All Around. Please Do Not Provide Standard Marketing Brochures Or Catalogs. Responses Will Be Evaluated On The Basis Of Demonstrated Functional Capability. responses Are Due No Later Than 10 January 2025, 2:00 P.m. Cst. Responses Received After This Date And Time May Not Be Reviewed. responses Shall Be Submitted Via Email To Ms. Sophia Chin, Contract Specialist, At Sophia.m.chin@usace.army.mil And Mr. Ben Neely, Supervisory Contract Specialist, At Benjamin.m.neely@usace.army.mil. In The Subject Line Of Your Email State: Response To Tenn-tom O&m. No Responses Will Be Accepted By Mail Or Fax. Submittals Will Not Be Returned. Telephonic Responses Will Not Be Honored.
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

Offizielle Bezeichnung Tender

Civil And Construction...+1Civil Works Others
Germany
Description: Contract notice - General guideline, standard regulation Open procedure (construction work) JMS - New construction of the second construction phase of a primary school building with a 2-field sports hall and 22 parking spaces Lot 023 Demolition and dismantling work JMS - New construction of the second construction phase of a gr ... MoreJMS - New construction of the second construction phase of a primary school building with a 2-field sports hall and 22 parking spaces Lot 023 Demolition and dismantling work JMS - New construction of the second construction phase of a primary school building with a 2-field sports hall and 22 parking spaces Main services of this tender: - Construction site equipment including equipment for pollutant remediation, 1 parking space - Demolition of metal fences/railings, total approx. 100 m - Demolition of steel escape stairs 2 pieces - Dismantling of paved areas, total approx. 360 m2 - Demolition of external concrete stairs, total approx. 50 m2 - Lawn/weed layer Removal, total approx. 830 m2 - Topsoil removal 20-40cm, total approx. 600 m2 - Makeshift construction road, total approx. 600 m2 - Dismantling of hazardous substances and disposal of asbestos-fb, total approx. 920 m - Dismantling of hazardous substances and disposal of asbestos-containing ribbed radiators, total 120 pieces - Dismantling of hazardous substances and disposal of Kmf-containing insulation pads, total 700 m2 - Dismantling of hazardous substances and disposal of Pak-containing pipes, total 200 pieces - Dismantling of hazardous substances and disposal of PCB-containing capacitors, total 300 pieces - Total demolition of Pavilion 3, incl. Foundations, total approx. 2,060 m3 - Partial demolition of pavilions 1+2 including above-ground toilet facilities, total approx. 3,540 m3 - Backfilling of earth pit Pav. 3, Rc-1, creating handover level, total approx. 640 m3 - Backfilling of basement Pav. 1+2, crawl space, mineral demolition, total approx. 1,320 m3
Closing Date17 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Corrigendum : Closing Date Modified
United States
Details: The United States Army Corps Of Engineers (usace), Transatlantic Middle East District (tam), Is Releasing The Following Presolicitation Notice For The Purpose Of Making Notification To The Public And To Solicit Responses For The Prequalification Of Sources. While All Attempts Have Been Made To Ensure The Accuracy Of The Information Presented Below, The Government Does Not Guarantee Its Accuracy, And Prior To Award, Reserves The Right To Make Any Changes To The Project As Deemed Necessary. this Notice Is For Construction Of The Fleet Maintenance Facility & Tactical Operations Center (p992) Project At Shaikh Isa Air Base In The Kingdom Of Bahrain. The P992 Project Is A Programmed Military Construction (milcon) Project. project Scope: The P992 Project Will Construct A Two-story, Steel-frame Fleet Maintenance Facility (fmf) Using Pre-engineered Metal Building (pemb) On A Concrete Slab Foundation And Structural Floor, Insulated Metal Roof Panels On Steel Purlins, Interior Prefabricated Metal Module Units, And Exterior Rf Shielding Membrane. The Facility Will Include Maintenance And Repair Areas, Personnel Support Areas And Storage. Its Function Is To Support Associated Asset Of P-8a Aircraft Housed In The Adjacent P-8a Hangar. Project Also Constructs A Single-story Tactical Operations Center (toc); The Facility Will Be Composed Of Pemb On A Concrete Slab Foundation. The Facility Will Include Administrative And Operational Areas. The Facility Will Consolidate Requirements Currently Housed In Multiple Relocatable Facilities As Well As Provide Operational Support To The P-8a Aircraft. this Project Alters Building #5070 (133.78 M2). Alterations Will Involve Minor Repair To No More Than 30% Of The Existing Gypsum Board Walls/ceilings And Painting Of All The Existing Gypsum Board Wall/ceiling Surfaces. information Systems Include Basic Telephone And Secure Telephone, Secure Computer Network, Fiber Optics, Cable Television, Security (ids/ess) And Fire Alarm Systems And Infrastructure. this Project Will Provide Anti-terrorism/force Protection (at/fp) Features And Comply With At/fp Regulations And Physical Security Mitigation In Accordance With Dod Minimum Anti- Terrorism Standards For Buildings. User Generated Unit Costs Were Used Were Used For This Project And Include The Cost Of Features To Meet The Minimum Dod At/fp Standards. built-in Equipment Includes 60 Hz And 400 Hz Power Converters And Systems, Power Filters, Emergency Back-up Power Generator At The Toc, Three Oversize Access Doors, Acu-902 Pod Cooler, Storage Rack Shelving And Raised Access Flooring. pavement Facilities Include Pads For Generators, Hvac Equipment And A Concrete Airfield Access Ramp Extension. Paving And Site Improvements Include Grading, Asphalt Road Repair, Security Fencing, Entry Control Points, And Concrete Paver Installation. site Preparation Includes Site Clearing Of Existing Structures, Underground Utility Relocations And Preparation For Construction. electric Utilities Include Site Lighting, Prime-rated Generators, Underground Electric Distribution Systems, Antenna Infrastructure, Telecommunications Infrastructure, Antenna Cable, And Relocation Of Existing Underground Electrical And Telecommunications Systems. Mechanical Utilities Include Storm Water Lines And Fire Water Supply Lines. The Project Includes Force Protection Barriers. this Project Contains A Secure Hotel Component And Will Require A U.s. Contractor With A Defense Counterintelligence And Security Agency Issued Active Facilities Clearance Listing (fcl) At The Secret Level Or Higher. magnitude Of Construction: The Magnitude Of Construction For This Project Is Estimated To Be Between $10,000,000.00 And $25,000,000.00. period Of Performance: The Estimated Overall Period Of Performance (pop) Is Five Hundred Ninety-nine (599) Calendar Days From Notice To Proceed (ntp) For The Entire Scope Of Work. location Of The Work: The Location Of The Project Is Shaikh Isa Air Base In The Kingdom Of Bahrain. tentative Milestone Dates: The Design-bid-build (d-b-b) Solicitation Is Scheduled For Release In May Of 2022. Offeror’s Proposals May Be Due 30 Days Following Release Of The Solicitation And Contract Award Is Estimated To Be In August Of 2022. project Classification: The Project Is Classified Through The North American Industry Classification System (naics) Under Code 236220 Commercial And Institutional Building Construction With A Small Business Size Of $39.5 Million. However, As This Requirement Will Be Performed Oconus, Small Business Set Asides Will Not Be Used. This Solicitation Will Be Advertised As A Full And Open Requirement Using Prequalification Of Sources. solicitation Documents: Solicitation Documents Will Only Be Provided To Offerors Who Have Responded To This Notice And Have Been Determined To Be Qualified In Accordance With This Notice. To Be Qualified, Interested Firms Must Have An Active Registration In Sam.gov And Possess A Facility Clearance Level (fcl) Of Secret Or Higher, Issued In Accordance With The National Industrial Security Program Operating Manual (nispom), Dod 5220.22-m By The Closing Of This Posting. If The Interested Firm Is A Joint Venture (jv), All Members Of The Jv And The Jv Itself Must Possess A Secret Fcl Or Higher At The Date And Time Of The Close Of This Posting. Any Interested Firm Must Provide A Response To This Pre-solicitation Notice Identifying Its Name, Physical Address, Email Address, And Commercial And Government Entity (cage) Code. A Copy Of The Offerors Fcl Must Be Provided. interested Offerors Are Required To Sign And Return The Attached Controlled Unclassified Non-disclosure Agreement (nda). Upon Government Receipt Of A Signed Nda And Verification Of A Firm's Sam Registration, Cage Code And Fcl, Specifications/drawings And Other Related Project Documents Will Be Released To Eligible Offerors By Secure Document Transfer Method, Such As Dod Safe Site. Paper Copies Of The Solicitation Will Not Be Issued, And Solicitation Documents Will Not Be Posted Publicly. Telephone And Fax Requests For This Solicitation Will Not Be Honored. Project Files Are Portable Document Format (pdf) Files And Can Be Viewed, Navigated, Or Printed Using Adobe Acrobat Reader. the Request For Proposal Will Only Be Released To Offerors Who Have Met The Prequalification Of Sources Requirment. interested Offerors Are Required To Respond To This Notice By Submitting A Copy Of Their Active Fcl And Nda Documents And Emailing Them To Sam Cornwell At Samuel.i.cornwell@usace.army.mil And Jesse Hobbs At Jesse.a.hobbs@usace.army.mil No Later Than 13 May, 2022 By 4:00 Pm Eastern Daylight Time. be Advised That This Is A Presolicitation Notice Only And Is Not A Solicitation. This Notice Does Not Restrict The Government From Utilizing A Different Acquisition Approach Or Making Any Changes To The Project Scope Or Terms, Or To Award Some, All, Or No Resultant Contracts. The Government Will Not Reimburse Respondents For Any Costs Incurred In Preparation Of A Response To This Notice. If You Have Any Questions, Please Email Both Sam Cornwell At Samuel.i.cornwell@usace.army.mil And Jesse Hobbs At Jesse.a.hobbs@usace.army.mil.
Closing Date13 May 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Civil Works Others
United States
Description: Project Labor Agreements (pla S) Survey And Request For Contractor Capability Statement Package this Is A Sources Sought Notice For Market Research Only. no Award Will Be Made From This Sources Sought Notice. this Sources Sought Notice (ssn) Is For Market Research Purposes In Accordance With Federal Acquisition Regulation (far) Part 10 And Far 15.201(e), To Determine The Availability And Technical Capabilities Of Qualified Sources. It Does Not Constitute A Solicitation And Is Not To Be Considered As A Commitment By The Government. All Firms Responding To This Notice Are Advised That Their Response To This Notice Is Not A Request That Will Be Considered For Contract Award. All Interested Parties Will Be Required To Respond To The Resultant Solicitation Separately From Their Response To This Notice. jefferson Barracks National Cemetery, sylvan Springs, Phase 1a Expansion project Scope the U.s. Department Of Veterans Affairs (va) Seeks Expressions Of Interest For A Construction Contract At Jefferson Barracks National Cemetery, Sylvan Springs, Phase 1a Expansion With The Use Of A Project Labor Agreement (pla). The North American Industry Classification System (naics) Of 237990 (other Heavy And Civil Engineering Construction) With The Size Standard Of $45.0 Million. The Approximate Project Duration Will Be 912 Calendar Days From The Notice To Proceed. The Estimated Magnitude For This Project Is Between $50,000,000 And $100,000,000. Va Is Considering Conducting This Acquisition As A Best Value With Tradeoffs In Accordance With Far Part 15, Contracting By Negotiation. project Description: the Purpose Of This Phase 1a Expansion Project For Jefferson Barracks National Cemetery Is To Enable The Existing National Cemetery To Continue To Provide Burial Services For Eligible Veterans In Missouri. Jefferson Barracks National Cemetery Is Located Near St. Louis, Missouri. the National Cemetery Administration (nca) Contracted This 33.6-acre Cemetery Expansion Project To Increase Burial Capacity Of Jefferson Barracks National Cemetery (jbnc) To Serve Veterans In The St. Louis Area. This Cemetery Expansion Project Identified On New Land. The Proposed Development Will Provide Continued Service To An Estimated Fiscal Year (fy) 2024 Veteran Population Of Approximately 208,000 Within A 75-mile Service Area. This Proposed Development Will Provide An Additional 15 Years Of Continued Burial Service To A Veteran Population Who Has Been Served By This National Cemetery Since 1827. this Project Will Provide For An Additional 15-year Inventory Of The More Efficient Casketed, Double-depth, Pre-placed Crypts Before Depletion Of The Current Inventory, And Extend The Full Range Of Burial Options Until Fy 2044, As Well As Provide Several Nominal Cemetery Operational And Infrastructure Improvements Within The Older Cemetery Grounds. this Project Will Provide For The Following Elements And Features: base Bid General Construction: the Base Bid Work Of This Contract Includes Phased Requirements. These Phases Are Referred To As Eto And Remainder Of The Work. The Eto Shall Be Completed Within The Established Time Frame Indicated In The Contract. Completion Of The Eto Work Will Follow Procedures Like Those For Final Completion And Acceptance, With The Facilities Within The Eto Being Completed And Turned Over To The Cemetery For Use To Begin Operation Of The Cemetery While The Remaining Work Is Completed. Eto Shall Be Completed And Accepted By Nca For Operation Within 252 Calendar Days From Notice To Proceed. While The Work Of The Eto Is Being Performed, Work For The Remainder Of The Project Can Also Be Performed. work Of The Contract Includes Site Demolition, General Construction, Relocation And Installation Of New Site Utilities, Installation Of Pre-placed Burial Crypts, Columbarium Niches, Roadway Improvements, New Roads, Walks, Grading, Drainage, Site Furnishings, Landscaping And Irrigation Necessary Removal Of Existing Structures And Construction And Certain Other Items And All Other Work Necessary To Construct The Project. The Contractor Shall Obtain State/local Construction Permitting As Required And Conduct All Protected Habitat Preservation, Wetlands, And Mitigation Efforts As Required To Meet Governing Body Mandates. By The End Of The Performance Period All Work Shall Be Satisfactorily Completed And Ready For Custody, Transfer, And Acceptance By Nca. All Punch List Items Shall Be Satisfactorily Addressed, All Commissioning Completed, And All Training Accomplished. replace And Upgrade Carpeting And Painted Finishes In The Administration/ Pic Building. Replace Select Electrical Service Panels In Maintenance Buildings 3001, 3002, And 3003. interment Areas: casketed Remains: a) Approximately 18,500 Pre-placed Crypt Full Casket Gravesites b) Approximately 2,100 Traditional Casket Gravesites cremated Remains: a) Approximately 10,900 In-ground Cremation b) Approximately 5,000 Columbarium Niches base Bid Furnish Pre-placed Crypts: procure, Manufacture, Deliver, Off-load And Store Furnish And Deliver To The Site All Pre-placed Crypts. additive Items Subject To Budget Adequacy: additive #1 Maintenance Yard: install Maintenance Storage Yard And Associated Site Work, Including But Not Limited To Pavements, Curbs, Drainage, Fencing And Gates, Signage, Landscaping, And Irrigation. additive #2 Storage Building: install Maintenance Material Storage Building Including But Not Limited To Sitework, Pavements, Curbing, Concrete Foundations, Concrete Walls, Structural Steel, And Standing Seam Metal Roofing. additive #3 Satellite Maintenance Building: install Satellite Maintenance Building And Associated Site Work Including But Not Limited To Sitework, Utilities, Concrete Foundations, Concrete Slab, Engineered Metal Building, Hvac System, Concrete Masonry Walls, Metal Wall Panels, Standing Seam Metal Roof, Doors, Windows, Interior Finishes, Landscaping, Irrigation, Signage And All Other Work Necessary To Construct The Building. additive #4 Demolish/replace Committal Shelter #4: demolish And Replace Committal Shelter #4(in Main Cemetery) Along With Associate Sitework, Concrete Foundations, Concrete Piers, Curbs, Paving, Standing Seam Metal Roof, Landscaping, Irrigation, Site Furniture And Signage. --- End Of Project Scope --- project Labor Agreement (pla): a Pla Is Defined As A Pre-hire Collective Bargaining Agreement With One Or More Labor Organizations That Establishes The Terms And Conditions Of Employment For A Specific Construction Project And Is An Agreement Described In 29 U.s.c. 158(f). federal Acquisition Regulation (far) 22.503 Policy: (a) Project Labor Agreement (pla) Is A Tool That Agencies May Use To Promote Economy And Efficiency In Federal Procurement. Pursuant To Executive Order 13502, Agencies Are Encouraged To Consider Requiring The Use Of Project Labor Agreements In Connection With Large-scale Construction Projects. (b) An Agency May, If Appropriate, Require That Every Contractor And Subcontractor Engaged In Construction On The Project Agree, For That Project, To Negotiate Or Become A Party To A Project Labor Agreement With One Or More Labor Organizations If The Agency Decides That The Use Of Project Labor Agreements Will- (1) Advance The Federal Government's Interest In Achieving Economy And Efficiency In Federal Procurement, Producing Labor-management Stability, And Ensuring Compliance With Laws And Regulations Governing Safety And Health, Equal Employment Opportunity, Labor And Employment Standards, And Other Matters; And (2) Be Consistent With Law. (c) Agencies May Also Consider The Following Factors In Deciding Whether The Use Of A Project Labor Agreement Is Appropriate For The Construction Project: (1) The Project Will Require Multiple Construction Contractors And/or Subcontractors Employing Workers In Multiple Crafts Or Trades. (2) There Is A Shortage Of Skilled Labor In The Region In Which The Construction Project Will Be Sited. (3) Completion Of The Project Will Require An Extended Period Of Time. (4) Project Labor Agreements Have Been Used On Comparable Projects Undertaken By Federal, State, Municipal, Or Private Entities In The Geographic Area Of The Project. (5) A Project Labor Agreement Will Promote The Agency S Long Term Program Interests, Such As Facilitating The Training Of A Skilled Workforce To Meet The Agency S Future Construction Needs. (6) Any Other Factors That The Agency Decides Are Appropriate. see Far Provision: 52.222-33 Notice Of Requirement For Project Labor Agreement And Far Clause 52.222-34 Project Labor Agreement For Further Details. project Labor Agreement (pla) Questionnaire (please Respond To The Questions Below) 1. Is Your Company Familiar With Project Labor Agreement (pla) And Its Use On Construction Projects? yes/no comments: 2. Would Your Company Likely Submit A Proposal For The Va Construction Solicitation That Requires The Use Of A Pla? yes/no comments: 3. If Va Requires A Pla, Would Your Proposed Construction Cost Likely To Increase Or Decrease And What Is The Likely Percentage Of Cost Increase Or Decrease? comments: 4. Does The Va Requirement To Use Of A Pla On A Construction Project Restrict Competition? yes/no comments: 5. Do You Expect Subcontractor Resistance Should Va Requires The Use Of A Pla On This Construction Solicitation? yes/no comments: 6. Do You Have Additional Comments Regarding The Use Of A Pla For This Project? yes/no comments: --- End Of Pla Questionnaire --- contractor Capability Statement Package: firms Interested In Submitting Their Capabilities For This Project Must Include The Following Information Compiled Into A Contractor Capability Statement Package: cover Letter/introduction That Includes Company Name, Address, System For Award Management Database At Https://www.sam.gov/portal/sam Sam.gov Unique Entity Id Numbers, Point Of Contact With Phone Number And E-mail Address. business Size Determination. State Your Firm S Socioeconomic Type And Business Size: Such As (service-disabled Small Business, Veteran Owned Small Business, Small Business, Woman Owned Small Business, Large Business, Etc.). if Identifying As A Service-disabled Veteran-owned Small Business (sdvosb) Firm (or Jv), Veteran Owned Small Business Firm (vosb) (or Jv), You Must Be Registered In The U.s. Small Business Administration Veterans Small Business Certification (vetcert) Database At: Https://veterans.certify.sba.gov. Provide Evidence Of Certification. bonding Capacity: provide A Letter From Your Surety, On Surety Letterhead That Affirms Your Company S Bonding Capacity To Furnish A Bid Bond, Payment Bond, And Performance Bond For A Project Between $50 - $100 Million. contractor Capability Statement Shall Include, But Not Be Limited, To The Following: corporate Experience: provide Projects In The Past Five (5) Years That Are Valued At Approximately $30m Or Greater In Construction Costs, And demonstrate Your Company S Experience Constructing Or Managing The Construction Of Projects That Match The Following Characteristics: a. Va/nca National Cemetery Projects. (if No National Cemetery Experiences Provide Projects Similar Such As Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres). b. State/local/private Cemetery Projects. c. Projects Requiring The Construction Of Multiple Features Typical To A National Cemetery Such As Pre-cast, Placed Crypts; Columbaria Niches, Memorial Walls, Cast Or Natural Stone Columbarium Caps, Cast Or Natural Stone Veneers, Turf (sod) Placement And Maintenance, Tree And Shrub Placement And Maintenance, Irrigation Systems With Mainlines Exceeding 4-inch In Diameter, Irrigation Central Control Systems, Roadways, Wetlands/environmental Remediation Or Restoration. d. Building Construction, Building Remodel, Mass/fine Grading & Excavation, Site Utilities, Paving, New Golf Courses Or Expansions, Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres. describe Your Experience With As Many Of The Elements Of Construction Identified, Below, As You Can: i. Mass/fine Grading & Excavation Site Utilities prefer To See Projects Involving Earth Work And Grading For Cemeteries, Parks, Or Site Development Projects Of At Least 10 Acres. ii. Site Utilities demonstrate Experience With Storm Water Management Systems And Site Drainage For Flat Sites. demonstrate Experience With Potable Water Distribution From A Well, Or Municipal Source. demonstrate Experience With Sanitary Waste Systems, Both Powts & Municipal. iii. Paving paving Projects May Include Private & Local Asphalt Roads; Concrete Curb & Gutter, Asphalt Parking Lots, And Concrete Sidewalk, On Site Development Projects Of At Least 10 Acres. experience In Missouri Or Similar Climates Is Preferred, But Not Required. iv. Landscaping landscaping Projects Involving Planting And Lawn Installation For Cemeteries, Parks, Golf Courses Or Other Site Development Projects Of At Least 10 Acres In Climates Similar To St. Louis, Missouri. v. Irrigation irrigation System Installation For Cemetery, Park, Golf Course, Or Other Types Of Development Sites Of At Least 10 Acres. Include Experience With Irrigation Ponds, Wells, Pumping Systems If You Have It. vi. Precast Concrete Burial Components demonstrate Experience With Successful Fabrication And Installation Of Precast Crypt And Precast Columbarium, If You Have It. vii. Phasing And Continuity Of Operations demonstrate Experience With Best Practices To Successfully Complete Phased Site Work At An Occupied And Functioning Facility In A Way To Minimize Noise And Dust And Minimize Detrimental Effects On Cemetery Operations. current Project List: provide A Detailed List Of Ongoing Contracts & Projects. The Description Shall Include: project Type award Amount award Date estimated Completion Date ---- End Of Contractor Capability Statement Package --- please Submit Your Comments To The Pla Questionnaire And The Contractor Capability Statement Package Via Email To Joshua Gibson, Contracting Officer, At Joshua.gibson2@va.gov, No Later Than 3:00 Pm Et On January 6, 2025, In The Subject Line State Jefferson Barracks National Cemetery, Phase 1a Expansion And [company Name]". Note That This Mailbox Will Only Accept E-mails Of 15mb In Size Or Smaller, So You May Break Your Submission Into Multiple Emails If Needed. All Information Concerning This Requirement, When It Proceeds To Solicitation, Will Be Posted Only On The Federal Business Opportunities Website (https://sam.gov). --- End Of Sources Sought Notice ---
Closing Soon6 Jan 2025
Tender AmountRefer Documents 

Public Works And Government Services Canada Tender

Others
Canada
Details: Trade Agreement: Ceta / Wto-agp / Cptpp / Cfta / Fta With Uk Tendering Procedures: All Interested Suppliers May Submit A Bid Competitive Procurement Strategy: Best Overall Proposal Comprehensive Land Claim Agreement: No Nature Of Requirements: Requirement: The Department Of National Defence (dnd) Land Command Support System (lcss) Has A Requirement For The Provision Of Various Communications Cable Assemblies, Over A Period Of 7-10 Years, At An Overall Estimated Value Of $75,000,000.00. By Means Of This Request For Supply Arrangements (rfsa), Canada Intends To Establish/maintain A List Of Qualified Suppliers For The Communications Cables Assemblies. Qualification Will Be Based Entirely On Meeting The Mandatory Requirements Of This Rfsa. Qualified Suppliers Shall Provide Communications Cable Assemblies, On An 'as And When Required’ Basis. Individual Requirements Will Be Competed Among Pre-qualified Suppliers Under A Supply Arrangement. The Cable Assemblies Are Build-to-print, I.e. Must Be Produced In Compliance With The Specifications Provided By Canada. Controlled Goods This Requirement Includes Controlled Goods Information. Bidders Must Be Registered, Exempt Or Excluded Under The Controlled Goods Program To Receive The Information, As Detailed In The Rfsa Document. Trade Agreements A) The Majority Of Specific Requirements Under The Supply Arrangement Will Be For Excluded Goods Under Federal Supply Classification (fsc) N5900 Electrical And Electronic Equipment Components, Sub-category 5995 Cable, Cord And Wire Assemblies. Only The Canadian Free Trade Agreement (cfta) Will Apply To Those Specific Requirements, And Bid Solicitations Of Any Resulting Supply Arrangement May Be Subject To A Preference For Canadian Goods And/or Services Or May Be Limited To Canadian Goods And/or Services. B) When International Trade Agreements Apply To Specific Requirements Identified Under The Supply Arrangement, Those Requirements Will Be Subject To The Provisions Of The World Trade Organization Agreement On Government Procurement (wto-agp), And The Canadian Free Trade Agreement (cfta). Canadian Content When Section A) Of Trade Agreements (above) Applies, The Goods And/or Services Covered By The Supply Arrangement May Be Limited To Canadian Goods And/or Services. A Request For Supply Arrangement Is Not A Contract. Canada Is Under No Obligation To Solicit Any Proposals Through The Request For Supply Arrangement. Any Level(s) Of Effort Specified Herein Is An Approximation Of Requirements Given In Good Faith. Delivery Date: 14/06/2024 The Crown Retains The Right To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada.
Closing Date31 Jul 2025
Tender AmountRefer Documents 

DEPT OF THE AIR FORCE USA Tender

Civil And Construction...+1Civil Works Others
United States
Details: The Purpose Of This Project Is To Provide Laughlin Afb Is Seeking A Safe Place To Store Boats And Protect Them From The Weather. Currently, There Is No Weather Protection For Boats In The Fenced-in Lot At The Marina. This Area (del Rio, Tx) Is Susceptible To Hail, Flash Floods, And Extreme Heat That Can Damage Maritime Property Such As Boats And Jet-skis. naf Funds Are Presently Available For This Effort. The Government Reserves The Right To Cancel The Solicitation, Either Before Or After The Closing Date. In The Event The Government Cancels The Solicitation, The Government Has No Obligation To Reimburse An Offeror For Any Costs. Please Note The Magnitude Of This Project Is: Between $250,000 And $500,000. the Contractor Shall Furnish All Materials, Labor, Tools, Equipment, Transportation, And All Other Incidentals Necessary To Complete The Work Outlined In This Statement Of Work (soo) To Install Overhead Protection Over The Boat Lot In The Marina. This Project Is A Design-build Contract. The Contractor Shall Be Responsible For A Complete 100% Design And For The Construction Of The Design. the Period Of Performance (pop) For This Contract Is A Total Of 236 Calendar Days. This Project Shall Have Three Notices To Proceed (ntp). Ntp #1 Shall Be For Design Submittals And Have A Pop Of 90 Calendar Days. This Time Includes 32 Days For Government Review. Ntp #2 Shall Be For Pre-construction Submittals And Have A Pop Of 30 Calendar Days. Contractor Shall Allow The Government Up To 14 Calendar Days To Review These Submittals. Ntp #3 Shall Be For Construction And Have A Pop Of 70 Calendar Days. the Acquisition Will Be A Total Small Business Set Aside For Veteran-owned Service Disabled Certified. The Naics Code For The Acquisition Is236220 And The Applicable Small Business Standard Size Is $45m. Any Interested Party May Download A Copy Of The Solicitation Form This Website Once It Has Been Released. Copies Of The Solicitation Are Not Available For Mailing. All Responsible Sources May Submit A Proposal Which Shall Be Considered. The Government Anticipates Award Of A Firm-fixed Price Contract As A Result Of The Solicitation. All Prospective Offerors Must Be Registered In The System For Award Management (sam) To Be Eligible For Award. Registration May Be Accomplished At The Website, Https://www.sam.gov. site Visit Will Be Thursday 19 December At 10:00 Am. Questions And Answers Will Be Due Friday 03 January At 2:00 Pm.
Closing Date21 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Others, Building Construction
United States
Details: Rfp No: W912dw25r0015 rfp Title: P97462 Supply Storage Activity Warehouse, Joint Base Lewis Mccord (jblm), Wa, Joint Base Lewis-mccord, Washington rfp Posted Date: On Or About 13 January 2025 offeror Response Due Date: On Or About 12 Febuary 2025 magnitude Of Construction: Is Between $25,000,000 And $100,000,000. psc Code: Y1jz Construction Of Miscellaneous Buildings naics Code: 236220 Commercial And Industrial Building Construction classification Code: Y - Construction Of Structures And Facilities set Aside: 8 (a) Set-aside ================================================================ for Information Only: This Synopsis Is Only A Notification A Request For Proposal (rfp) Is Anticipated And Forthcoming. All Questions Regarding This Synopsis Should Be Submitted In Writing Via Email To The Contract Specialist As Noted Below. the United States Army Corps Of Engineers (usace) Seattle District Anticipates Solicitation And Award Of A Firm-fixed Price Contract Resulting From Rfp W912dw25r0015. This Requirement Is A Design-build Project To Design And Construct A Supply Storage Activity Warehouse At Joint Base Lewis-mccord, Washington. the Request For Proposal (rfp) Will Be Available To All Business Firms With An Active Sam Registration. The North American Industry Classification System (naics) Code Is 236220 Commercial And Industrial Building Construction With A $45m Size Standard. in Accordance With Department Of Defense Federal Acquisition Regulation Supplement (dfars) 236.204, The Estimated Magnitude Of Construction Is Between $25,000,000 And $100,000,000. 100 Percent (%) Payment And Performance Bonds Will Be Required. project Description: project Consists Of Construction Of A New One-story 21,500 Sf Supply Storage Warehousebuilding, Two Stand-alone Canopies, Hardstand Areas, Paved Drives, And Parking Areas, Newlylandscaped Areas, Fencing, And Associated Walks, Site Drainage And All Associated Utilities On An Approximate 7-acre Site Of Lewis-main. (jblm) the Contractor Shall Furnish Separate Space For The Exclusive Use Of The Government. The Officespace Shall Include Approximately 700 Square Feet For The Exclusive Use Of The Government(minimum Two Offices, One Conference Room, One Restroom, And One Kitchenette Area) Withpower, Water, Appropriate Office Furniture, Heat And Air-conditioning, And Perform Any Necessary Maintenance. Each Office Shall Have A Minimum Of One Window With Operable Window Blinds. Electrical And Communications Outlets Shall Be Provided For Each Office Area And The Conferenceroom. Each Single Occupancy Office Area Shall Be Furnished With One 3-foot By 5-foot Desk Andone 3-foot By 5-foot Plans Table. The Desks Shall Each Have Side Drawers And A Lockable Centerdrawer, For A Minimum Of Five Drawers. The Plans Tables Shall Each Have One Central Drawer.each Double Occupancy Office Area Shall Be Furnished With Two Desks And Two Plans Tables Of The Same Type As The Single Occupancy Office Areas. Provide One Five-wheeled, Padded, Ergonomic Desk Chair For Each Desk. Each Single Office Shall Have A Four-legged, Padded "guest Chair" Similar To The Ergonomic Swivel Chairs And Roller Mat. Double Occupancy Offices Shall Have Two Four-legged, Padded "guest Chairs" Similar To The Ergonomic Swivel Chairs And Roller Mat. Each Single Office Area Shall Be Furnished With A 12-inch By 18-inch By 6-foot Metal Locker With A Shelf, Coat Hanger Rod, And Three Clothes Hooks. Double Occupancy Offices Shall Have Two 12-inch By 18-inch By 6-foot Metal Lockers With A Shelf, Coat Hanger Rod, And Three Clothes Hooks. Provide One Minimum 3-foot By 4-foot Whiteboard For Each Single Occupancy Office And Two Minimum 3-foot By 4-foot Whiteboards In Each Double Occupancy Office. Provide Two Mobile Plan Stands With Twelve Hanging Clamps Each. The Conference Room Shall Be Furnished With A 3.5-foot By 8-foot Conference Table, Six Padded Chairs Similar To The Ergonomic Swivel Chair And One 4-foot By 8-foot Whiteboard. Provide One Walk-off Mat At Each Building Entrance. Provide Two Ten-pound, Multi-purpose, Dry Chemical Fire. offerors: Please Be Advised Of On-line Registration Requirement In The System For Award Management (sam) Database Http://www.sam.gov/ And Directed Solicitation Provisions Concerning Electronic Annual On-line Representations And Certifications. Representations And Certifications Are Required To Be Updated Annually As A Minimum To Keep Information Current, Accurate And Complete. on Or About, 13 Jan 2025, [nsfcuc(1]the Rfp Documents For This Project Will Be Available Via The Website Https://sam.gov/ Under Contract Opportunities W912dw25r0015. Your Firm Must Be Registered With Https://sam.gov/ To Download The Rfp Documents. No Cd’s Or Hard Copies Will Be Made Available. Downloads Are Available Only Through Https://sam.gov/. Offerors Are Responsible For Checking Https://sam.gov/ Frequently For Any Update(s) To This Notice. The Government Is Not Responsible For Any Loss Of Internet Connectivity Or For An Offeror’s Inability To Access The Document(s) At The Referenced Website. To Obtain Automatic Notifications Of Updates To This Rfp, You Must Log In To Https://sam.gov/ And Add The Rfp To Your “watchlist.” If You Would Like To List Your Firm So Others Can See You Are An Interested Vendor, You Must Click The “add Me To Interested Vendors” Button In The Listing For This Rfp. Your Firm’s Proposal Shall Be Submitted Electronically Through The Procurement Integrated Enterprise Environment (piee) Solicitation Module At Https://piee.eb.mil/. to View The Rfp When Posted, Vendors Must Have An Active Registration In Sam.gov. for Piee Registration, Training, And Instructions For Posting An Offer, Refer To The Following Links: piee Registration: Https://piee.eb.mil/ note: There Are Two Vendor Roles (proposal Manager, Proposal View Only) For Piee Solicitation Module. The Proposal Manager Role Is Required To Submit An Offer To A Solicitation. Please Be Advised That When Using The Piee Solicitation Module, The User’s Email Address In Piee Must Match The Email Address On File In Sam.gov. piee Solicitation Module: training And Instructions Are Accessible Through Piee – Web Based Training (wbt) At Https://pieetraining.eb.mil/wbt/ (for Instructions Specific To Posting An Offer, Select; Solicitation Module è Proposals (offers) è Posting Offer) for Frequently Asked Questions (faqs) And Additional Training, Go To The Dod Procurement Toolbox – Solicitation Module At Https://dodprocurementtoolbox.com/site-pages/solicitation-module point-of-contact: the Point-of-contact For Administrative Or Contractual Questions Is Linda O’brien At Email: Linda.s.obrien@usace.army.mil. Once The Rfp Has Been Issued, All Questions Must Be Submitted In Accordance With The Rfp Instructions. [nsfcuc(1]i Think The Date Is About Right But Can We Maybe Push It Back To April 17? That Way If The Peer Review Comes Back Early Ready To Issue, Then We Don't Have To Sit Around Waiting.
Closing Date13 Feb 2025
Tender AmountRefer Documents 

Municipality Of Dinapigue, Isabela Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Province Of Isabela Municipality Of Dinapigue Invitation To Apply For Eligibility And To Bid Itb No. : 2025– 01 – 21 (01) The Local Government Unit Of Dinapigue, Isabela Through Its Bids And Awards Committee (bac), Invites All Interested Parties To Apply For Eligibility And To Bid For The Hereunder Project(s): 1. Name Of Project : Reconstruction Of Municipal/people’s Park Location : Brgy. Digumased, Dinapigue, Isabela Approved Budget For The Contract : ₱ 610,000.00 Bid Fee : ₱ 1,000.00 2. Name Of Project : Reconstruction Of Five (5) Lgu Compound Gates Location : Brgy. Digumased, Dinapigue, Isabela Approved Budget For The Contract : ₱ 275,000.00 Bid Fee : ₱ 500.00 3. Name Of Project : Reconstruction Of Perimeter Fence (lgu Compound) Location : Brgy. Digumased, Dinapigue, Isabela Approved Budget For The Contract : ₱ 310,000.00 Bid Fee : ₱ 500.00 4. Name Of Project : Road Concreting (purok 4, Brgy. Dibulo, Dinapigue) Location : Brgy. Dibulo, Dinapigue, Isabela Approved Budget For The Contract : ₱ 3,193,372.09 Bid Fee : ₱ 5,000.00 Interested Bidders May Obtain Information, Secure List Of Bidding Documents Through Its Bids & Awards Committee At The Office Of The Municipal Engineer, Dinapigue, Isabela. Bidding Activity Date & Time Venue Issuance Of Bidding Documents From January 2, 2025 To January 21, 2025, Office Hours Office Of The Municipal Engineer Pre – Bid Conference January 9, 2025, 8:30 Am Office Of The Municipal Engineer Submission & Opening Of Bids January 21, 2025, 8:30 Am Office Of The Municipal Engineer Failure To Follow The Above Mentioned Bidding Activity Instruction Will Be Ground For Disqualification To Attend The Said Bidding. The Local Government Unit Dinapigue, Isabela Reserves All Right To Accept Or Reject Any Bid, To Annul The Biding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Of Bidders. Prospective Bidders Should Have Experience In Undertaking A Similar Project. The Eligibility Check/screening As Well As The Preliminary Examination Bids Shall Use Non- Discretionary “pass/fail” Criteria. Post Qualification Of The Lowest Calculated Bid Shall Be Conducted. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference (s), Evaluation Of The Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provision Of Ra. 9184 And Its Implementing Rules And Regulation (irr). Approved By: (sgd) Jose Mario C. Viernes Chairman, Bids & Awards Committee
Closing Date21 Jan 2025
Tender AmountPHP 610 K (USD 10.5 K)
2031-2040 of 2089 active Tenders