Fabrication Tenders
Fabrication Tenders
Rail Coach Factory - RCF Tender
Transportation and Logistics
Ireps
India
Closing Date22 Apr 2025
Tender AmountRefer Documents This is an estimated amount, exact amount may vary.
Details: Description :set Of End Construction For 3 Phase Memu/tc Medha Coaches, As Per Drawing:
mp23end3ph Version 0, Packing Instruction: 1. The Supplier Shall Pack The End Wall In A Suit
ably Designed Returnable Fixture In Such A Way That End Wall Shall Not Get Scratched,
damaged, Twisted During Transportation, Storage And Lifting And To Avoid Scratches O
n Outer Surface. It Should Be Seperated By Suitable Environment Friendly Blocks To Ava
oid Rubbing Of Two Endwall Surfaces . It Should Have Standard Clamping /fastening Me
chanism So That It Can Be Opened Easily. It Should Have Firm's Identification Mark. 2. Firs
t Returanable Fixture Along With End Wall Be Retained By Rcf & This Fixture Shall Be Ex
changed In The Second Lot Supply And So On. At The End Of The Contact, The Firm Shall C
ollect The Remaining Returnable Packing Fixture From Rcf. 3. The Packing Fixture/frame
to Be Fabricated Having Sufficient Strenght To Bear Approximate 2 Tonne Load In Static
& Moving Condition Of Two Coach Sets Of End Wall. 4. The Fixture /frame/pallet Should
be Designed So That The Packed End Wall Preferably Remain In Vertical Position To Minim
ize Surface Area. 5. It Should Also Be Suitable For Storage Of End Wallunder Open Sky. [
warranty Period: 30 Months After The Date Of Delivery ] ]
North Eastern Railway - NER Tender
Electrical Goods and Equipments...+1Electrical and Electronics
Ireps
India
Closing Soon20 Mar 2025
Tender AmountINR 500 K (USD 5.7 K) This is an estimated amount, exact amount may vary.
Description: Description :smps (110v Dc To 24 V Dc) For Pfs, Part No. Ofeppfs33000-3. Make:oasis Fabrication [ War
ranty Period: 30 Months After The Date Of Delivery ] ]
301-310 of 1755 active Tenders