Fabrication Tenders
Fabrication Tenders
Provincial Government Of Aklan Tender
Others

Philippines
Closing Soon4 Mar 2025
Tender AmountPHP 1.5 Million (USD 27.5 K)
Details: Description A. Fisheries Resource Assessment, Enhancement, Management, Monitoring And Protection 1. 4 Sets - 1. Procurement Of Materials For Fish Enhancing Devices (feds) And On Proposed And Established Mpas A. 5 Rolls Polypropylene Rope # 44 (22mm) 200mtrs B. 5 Pcs Fiberglass Floats (box-type) Fabricated (12"x12"24") 2. 2 Sets - 2. Procurement Of Support Equipment In The Conduct Of Fishery Law Enforcement Capacitation, Underwater Assessment Of Established And Potential Fisheries Resource Management (frm) Projects A. 1 Unit - Camera Drone (combo) Easy Acro Flip, Roll, 180° Drift 1/1.3" Cmos Super-wide-angle Camera 4k/60fps Hdr Videos 10-bit D-log M Color Mode Downward/backward Visual Positioning Max Transmission Distance: 13 Km, Max Transmission Bitrate: 60mbps 46gb Large Internal Storage, High-speed Quick Transfer Automatic Return To Home (rth) B.1 Unit - Global Positioning System (gps) Physical Dimensions: 3.4" X 7.2" X 1.3" (8.76 X 18.30 X 3.27 Cm) Touchscreen Display Size: 2.55"w X 4.25"h (6.48 X 10.80 Cm); 5" Diag (12.70 Cm) Display Resolution: 480 X 800 Pixels Display Type: Wvga Transflective, Duel Orientation Weight: 14.0 Oz (397 G) With Included Lithium-ion Battery Pack Battery Type: Rechargeable Lithium-ion (included) Or 3 Aa Batteries (not Battery Life: Gps Mode: Up To 18 Hours' Expedition Mode: Up To 330 Connections: Yes (wi-fi, Bluetooth, Ant+) C.1 Unit - Underwater Camera With Protective Casing Body Type: Compact Max Resolution: 4000 X 3000 Image Ratio W:h: 1:1, 4:3, 3:2, 16:9 Effective Pixels: 12 Megapixels Processor: Truepic Viii Image: Iso Auto, Iso 100-12800 Articulated Lcd: Fixed Manual Focus: Yes Storage Types: Sd/sdhc/sdxc Card (uhs-i Support) Connectivity: Usb 2.0 (480 Mbit/sec), Charging, Hdmi Physical: D. Resource Assessment Materials D.1. 5 Pcs - Transect Line 60m, Heavy Duty D.2. 2 Units - Stainless Quadrats 1mx1m D.3. 2units – Fabricated Tripods (1m Width, 10cm Both Sides For Scale, 1.2m Height) D.4. 5 Pcs Slate (plastic, 11" X 13") E. 5 Units Dual-band Radio For Fle Specification: Rf Power: 5 Watts Frequency Range: Vhf: 136mhz-174mhz | Uhf: 400mhz-470mhz Memory Channels: Up To 128 Channels Frequency Stability: 2.5ppm Operation Temperature: -30c +60c Channel Spacing: 25kh(w), 12.5khz(n) Special Feature: Dual Ppt Water Resistant Inclusions: Unit Manual Charger Adaptor Antenna Belt Clip Hand Strap Battery Pack (1750mah) 3. 3 Sets - 3. Red Tide Monitoring Activity A. Red Tide Monitoring Kit A.1. 1 Unit - Plankton Net Horizontal And Vertical Towig Applications; Mouth Dia: 30cm; Length: 90cm; Mesh Size: 20 Micron; 10 Meter Calibrated Rope; 2 Kgs Lead Weight. The Net Includes: Plankton Net, Heavy Duty Nitex Nylon Net; Stainless Steel Ring And Three Point Bridle; Pvc Collecting Bucket; Mechanical Flowmeters Non Metallic A.2. 10 Bottles - Polyethylene (pe) Bottle, 250ml, Translucent, Wide- Mouth Bottle With Screw Cap, Leak-proof, Hdpe A.3. 2 Bottles - Wash Bottle, Ldpe, 500ml With Interchangeable Wash Head, Soft To Squeeze A.4. 2 Pcs - Labeling Pen (finepoint, Permanent, Black) A.5. 3 Pcs - Masking Tape (1 Inch) A.6 2 Pcs Styro Box/ice Box With Handle, 19 3/8" X 9 5/8" X 12 3/4" A.7. 1 Box - Sampling Bags (ziplock, 100pcs/pack) A.8. 1 Box - Gloves (powder Free, Nitrile) 100 Pcs/box A.9. 1 Pack - Rubber Band, 70mm Min Lay Flat Length (#18), 350g/ Pack A.10. 20 Rolls Paper Towel 3 Ply/roll A.11. 1 Unit Refractometer Type: Hand-held Refractometer A.12. 1 Units Dissolved Oxygen Meter With Thermometer Custom One - Chip Of Microprocessor Lst Circuit 13mm (0.5"). Super Large Lcd Display With Contrast Adjustment For Best Viewing Angle Operation Temperature: 0°c To 50°c (32°f To 122°f) Operation Humidity: Max. 80% Rh Power Current: Approw. Dc 6.6 Ma Accuracy (23 ± 5°) Sensor Structure: Polarographic Type Oxygen Probe With An Incorporated Temperature Weight: 335 G/0.74 Lb Accessories Included: Oxygen Probe, Oxygen Case, Oxygen Manual, Spare Diaphragm, Probe-filling Electrolyteoxel03 X-x-x
City Of Borongan Eastern Samar Tender
Automobiles and Auto Parts

Philippines
Closing Date6 Mar 2025
Tender AmountPHP 1.3 Million (USD 23.2 K)
Description: Supply And Delivery Of Dog Catcher Vehicle (utility Truck Or Van Type) With Fabricated Dog Cage For Lgu-borongan City, Eastern Samar (re-bid) , Vehicles ,city Of Borongan, Eastern Samar
Dakshin Gujarat Vij Company Limited - DGVCL Tender

Paints and Enamels

India
Closing Soon4 Mar 2025
Tender AmountINR 216 K (USD 2.4 K)
Description: Tender For Painting Of Existing Tc-do-dp And Rsj/psc Pole With Fabrication Items Painting Work And Pole Numbering & Erection And Maintenance In Various Location Under Umargam Sub Division Under Vapi Industrial Division.(work To Be Carried Out In Other Sub-division In Case Of Emergency As Per Instruction Of Engineer-in-charge)
MUNICIPALITY OF BANAYOYO, ILOCOS SUR Tender
Civil And Construction...+1Civil Works Others

Philippines
Closing Soon3 Mar 2025
Tender AmountPHP 977.4 K (USD 16.8 K)
Details: Description 3.73 Mos. Occupation Safety And Health Program Earthworks 13 Sq.m. Removal Of Existing Concrete Pavement 15.55 Cu.m. Structure Excavation, Common Soil Plain & Reinforced Conc Works 5.47 Cu.m. Reinforced Concrete 55.8 Sq.m. Reinforcing Steel (deformed) Grade 40 264.49 Kgs. Reinforcing Steel (deformed) Grade 60 15.84 Sq.m. Formworks And Falseworks Finishing And Other Civil Works 71 M. Fabricated Metal Accessories, Gutter 11 M. Fabricated Metal Accessories, Flashing 201 Sq.m. Pre-painted Metal Sheets, Rib Type (curved) 99 Sq,m. Painting Works, Steel 1,581.90 Kgs Structural Steel, Trusses (gi Pipe) 450.18 Kgs Structural Steel, Purlins (tubu;ar) 54 Sq.m. Metal Structure Accessories, Bolts 8 Pcs Metal Structure Accessories, Turnbuckle 180.86 Kgs Metal Structure Accessories, Steel Base Plates Xxxnothing Followsxxx
Davao City Water District Tender
Automobiles and Auto Parts...+1Manpower Supply

Philippines
Closing Soon27 Feb 2025
Tender AmountPHP 300 K (USD 5.1 K)
Description: Supply Labor And Materials For The Fabrication Of 2 Unit/s. Trailer With Tailgate , Vehicle Parts And Accessories ,davao City Water District
Gujarat State Electricity Corporation Limited - GSECL Tender

Electrical Cables And Wires...+2Electrical Works, Electrical and Electronics

India
Closing Date7 Mar 2025
Tender AmountINR 883 K (USD 10.1 K)
Description: Work Contract For Miscellaneous C&i Related Works - Removal Of Old Cable Trays, Old Cables, Impulse Lines And Laying Of New Cable Trays, Cables, Impulse Lines And Fabrication & Removal Of M.s. Structures In Unit No.3 To 6 Of Ukai Tps.(wt-4753 Safety)
City Of Meycauayan Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Solar Installation and Products

Philippines
Closing Soon3 Mar 2025
Tender AmountPHP 47.9 Million (USD 827.1 K)
Details: Description I. General Requirements A. Mobilization/demobilization B. Temporary Facilities C. Safety And Health D. Project Signboard Ii. Construction Of Concrete Pedestal A. Excavation B. Backfill With Compaction C. Aggregate Base Course D. Concreting Works E. Rebar Works F. Formworks Iii. Fabrication And Installation Of Pole With Base Plate A. 25mm X 750m Anchor Bolt With Nut B. 15 Ft. Hot Dipped Galvanized Lamp Post (single Arm Type @ 2.00m) C. 25ft. Hot Dipped Galvanized Lamp Post (single Arm Type @ 2.00m) D. 19mm Thick Mild Steel Base Plate Iv. Purchasing And Installation Of Solar-powered Streetlight
Department Of Human Settlements And Urban Development - DHSUD Tender
Furnitures and Fixtures
Philippines
Closing Soon28 Feb 2025
Tender AmountPHP 320.5 K (USD 5.5 K)
Details: Description Request For Quotation Rfq-dhsudncr-25-023 Supply And Delivery Of Various Office Furniture For Dhsud-ncr Pursuant To Section 53.9 (small Value Procurement) Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, The Department Of Human Settlements And Urban Development (dhsud) - Ncr Would Like To Invite Your Company To Submit Quote Or Proposal For The Supply And Delivery Of Various Office Furniture For Dhsud-ncr The Approved Budget For The Contract (abc) Is Three Hundred Twenty Thousand Five Hundred Pesos (p 320,500.00), Inclusive Of All Existing And Appropriate Government Taxes And Charges. The Technical Specifications For The Said Procurement Items Are As Follows: (please See Attached Rfq) Unit Item Description Quantity Heavy Duty Movable Tv Stand For 50” Tv Budget: Php 9,000.00 Mobile Pedestal Cabinet Specifications: Dimensions: 40(w) X 56.5(d) X 65.5(h) Cm Fabricated W/ Heavy Gauges Material Steel Sheet With 3 Drawers Including 1 Central Lock, 1 Pen Tray And 1 File Divider 5 Swivel Castors Built For Ease On Mobility Powder-coated Steel Color: Beige Budget: Php 5,500.00 Training Table Training Table Size: 180x40x75cm Color: Wenge Budget: Php 4,500.00 Open Type Shelves Specification: 45" H X 36" W X 18" D Gauge #24 With Four (4) Detachable Shelves With Double Stiffener With Rubber Footings Painted With Plain Gray Enamel Finish Budget: Php 5,500.00 Four Layer Cabinet Specifications: Overall Dimension: 90(w)x48(d)x132(h)cm Load Capacity: 40 Kgs Per Drawer Equipped With Built-in Handle With Anti-tilt Lock Mechanism Gauqe #22 (0.7mm) Thick Full Extension Ball Bearing Drawer Slides Provision For Vertical And Horizontal Filing Compatible With A4,fc,letter And Legal Size Files Adjustable Vertical Divider Painted With Powder Coated Beige/gray Finish Budget: Php 12,500.00 Heavy Duty Fold-in-half Tables Specifications: Color: Black Dimensions:123 Cm X 61 Cm X 74 Cm Lightweight Powder-coated Steel Frame Weather Resistant High Density Polyethylene Table Top Php 3,000.00 Office Visitor Chairs Specifications: Seat & Backrest: Plywood + Foam Covered With Pu Faux Leather. Frame & Legs: Metal Tube In Chrome Plating Finish. Color: Black, Beige Or White Budget: Php 3,000.00 Office Visitor Chairs Specifications: Material: Mesh, Pvc, Metal Frame & Legs: Metal Tube In Chrome Plating Finish. Color: Black Budget: Php 3,000.00 6-seater Conference Table Color: Black Or Brown Budget: Php 18,000.00 Office Table Dimension: W 1200mm X D 600mm X H 750mm Color: Beige/gray Middle Drawer With Lock 3-side Drawers With Center Lock Budget: Php 10,000.00 Executive Table Melamine Finish Combi-lock Drawers Open Shelves Grommet Color: Preferably Black Budget: Php 25,000.00 Executive Office Chair High Back Wooden Armrest And Legs Color: Leatherette Black Budget: Php 15,000.00 4-seater Gang Chair Budget: Php 9,000.00 Terms And Conditions: 1. Interested Bidders Must Submit An E-copy Of The Documentary Requirements Listed Below Along With The Proposal/quotation; 2. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable; 3. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected; 4. In Case Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Bid, The Department Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005; 5. The Item/s Shall Be Delivered According To The Requirements Specified In The Technical Specifications; 6. The Department Shall Have The Right To Inspect The Item/s To Check Its Conformity With The Required Minimum Technical Specifications; 7. Liquidated Damages Equivalent To One Tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Dhsud-ncr May Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It; 8. Payment Shall Be Processed Within 15 To 30 Working Days After Inspection And Acceptance Of Goods And Services, And Upon The Submission Of The Required Supporting Documents, In Accordance With Existing Government Accounting Rules And Regulations. Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Bidder’s Account; 9. Issuance Of Official Receipts (or) Or Sales Invoice (si) In The Name Of The Department Of Human Settlements And Urban Development-ncr (dhsud - Ncr) Is Mandatory. The Supplier Shall Bear The Cost Of Mailing The Or Or Si. Supporting Documents: 1. Philgeps Registration Number / Certificate Of Philgeps Membership; 2. 2025 Mayor’s Permit/business Permit; (note: In Case The Permit Has Recently Expired, Please Submit The Old Permit And Attach The Official Receipt For The Renewal Application Thereof.) 3. Bir 2303 Certificate Of Registration. 4. Tax Clearance 5. Income Tax Return 6. Signed Omnibus Sworn Statement (oss) • Notarized Oss Shall Be Submitted By The Lcrb Or Scrb Prior To Processing Of Payment; • For Sole Proprietorship, Dti Business Name Registration Shall Be Submitted With The Signed Oss; • For Partnership/corporations, Notarized Special Power Of Attorney (spa), Or Notarized Secretary’s Certificate (whichever Is Applicable) Shall Be Submitted As Supporting Document To The Signed Oss; If The Authorized Representative In The Reply Slip Is Not The Same Person Who Executed The Oss, Kindly Attach Copy Of The Notarized Spa Together With The Valid Government Issued Identification Card Of Both Signatories.. Instructions: 1. Accomplish This Reply Slip Correctly And Accurately. 2. Do Not Alter The Contents Of This Form In Any Way. 3. Technical Specifications Are Mandatory. Failure To Comply With Any Of The Mandatory Requirements Will Disqualify Your Quotation. 4. Failure To Follow These Instructions Will Disqualify Your Entire Quotation. Your Quotation Or Bid Proposal Must Be Submitted Together With The Attached Reply Slip And The Above Mentioned Documentary Requirements, On Or Before 10:00 Am, 28 February 2025 Through Personal Delivery, And In A Sealed Envelope, To Administrative And Finance Division – Procurement Unit Located At The 5th Floor, Dhsud Building, Kalayaan Avenue Corner Mayaman Street, Diliman, Quezon City, Or Through Electronic Mail At Jay.cariaga@dhsud.gov.ph The Dhsud - Ncr Bids And Awards Committee (bac), Through The Concerned End Unit And The Bac Secretariat Will Recommend The Award Of The Contract To The Dhsud - Ncr Head Of The Procuring Entity (hope) Of A Bidder With The Single/lowest Calculated Responsive Bid (scrb/lcrb) Pursuant To Section 37.1.1 Of The 2016 Revised Irr Of Ra 9184. The Dhsud - Ncr Reserves The Right To Reject Any And All Quotations/bids, To Annul The Procurement Process, Declare A Failure Of Bidding, To Reject All Quotations/bids At Any Time Prior To Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Bidder/s, And To Accept Only The Offer That Is Most Advantageous To The Government Pursuant To Sec. 41 Of The 2016 Revised Irr Of Ra 9184. For More Details, Please Email Us Or Contact Mr. Jay Michael R. Cariaga At Cellphone Number +639771041795. (original Signed) Maria Remelyn Sanchez Officer-in-charge, Administrative And Finance Division
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon28 Feb 2025
Tender AmountRefer Documents
Description: Contact Information|4|n792.06|s8x|215-697-0275|patrick.j.horan23.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type ||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect|||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|332439|600|||||||||||
facsimile Proposals (oct 1997)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. In Addition To Price, The Following
non-price Evaluation Factor Shall Be Used To Evaluate Offers And Are Listed In Descending Order Of Importance.
relevant Past Performance
technical Capability
the Non-price Evaluation Factors, When Combined, Are Significantly More Important Than Price. There Are No Subfactors.
the Government Reserves The Right To Obtain Information For Use In The Evaluation Of Past Performance From Any And All Sources Including Sources Outside Of The Government. Offerors Lacking Relevant Past Performance History Will Not Be Evaluated Favorably Or
unfavorably On Past Performance. The Government Will Consider The Quality Of An Offeror's Relevant Past Performance. This Consideration Is Separate And Distinct From The Contracting Officer's Responsibility Determination. The Assessment Of The Offeror's R
relevant Past Performance Will Be Used As A Means Of Evaluating The Relative Risk Of The Offeror And Other Competitors In Successfully Meet The Requirements Of The Rfp. In Determining The Rating For The Past Performance Evaluation Factor, The Government Will Give Greater Consideration To The Contracts Which The Government Feels Are Most Relevant To The Rfp.
the Government Reserves The Right To Award The Contract To Other Than The Lowest Priced Offeror.
page Limitation-excluding The Cover Page, Table Of Contents, Past Performance Project Forms The Technical Capability Proposal Is Limited To Fifteen (25) Pages In At Least 11pt. Font And 1" Margins. Pages In Excess Of This Limitation Will Not Be Evaluated. The
pages Excluded From Evaluation Will Be At The Discretion Of The Agency.
contractors Are Informed That It Is The Government's Desire To Make Award On Initial Proposals When Deemed Possible By The Contracting Officer, However The Government Reserves The Right To Communicate And/or Negotiate With Offerors If Later Determined Necessary.
none Price Proposal (all Non-price Factors) -the Contractor Is Required To Submit The Following Non-price Information:
1. Relevant Past Performance:
the Contractor Is Provided An Opportunity To Demonstrate Relevant Past Performance On Contracts Currently Being Performed Or Performed Within The Past Three (3) Years. The Government Will Determine Relevance By Analyzing The Scope And Magnitude Of The Reference
contracts And Comparing Them To The Instant Requirement. The Government Reserves The Right To Evaluate Submitted Projects Individually Or In The Aggregate In Order To Determine Relevance And Will Do So Consistently Across All Evaluated Offers. The Government
will Consider The Quality Of The Contractor's Relevant Past Performance.
reference Contracts: A. The Contractor May Submit Up To A Maximum Of Three (3) Contracts For Evaluation. The Government Reserves The Right To Obtain Information From Sources Other Than Those Identified By The Contractor.
2. Technical Capability
the Government Desires That Offerors Demonstrate Technical Capability To Satisfy The Government's Requirements. The Offeror's Response Will Be Evaluated To Determine Whether Its Response Poses Risk To Performance Or Whether It Will Result In Better Value To The
government. In Response To This Evaluation Factor, Offerors Shall Address Its Manufacturing Equipment; Inspection Method Sheets; Incoming Inspection Sheets; Process Sheets; Quality System Compliance; Welding Certification.
in Responding To The Above Areas Of The Technical Capability Factor, It Is Incumbent Upon The Offeror Provide A Level Of Detail The Demonstrates To The Government's Satisfaction That The Offeror Has The Technical Capability To Perform The Requirement. If The
proposal Lacks Sufficient Detail, It May Result In The Government Assessing Risk In The Proposal. While There Is No Prescribed Method For Demonstrating Technical Capability, The Below Are Items Of Interest To The Government That The Contractor May, At Its
discretion, Address To Assist The Government In Gaining An Understanding Of The Offerors Technical Capability. Offerors Are Cautioned That While These Areas Of Interest Are Not Mandatory Elements That Are Required To Be Addressed, Failure To Address Them Or
comparable Indicia Of Technical Capability, May Limit The Government's Understanding Of Technical Risk And Result In The Assignment Of Commensurate Risk. Offerors Are Also Notified That Some Of These Indicia Of Capability Are Overlapping, I.e., Two Or More May
evidence The Same Facet Of Capability.
certification Of Possession Or Access To The Following Equipment:for Aluminum And Steel Welded Containers, & Bladebox/riveted Construction
1.brake Press
2.extrusion Dies
3.cnc Machining Center(s) Capable Of Lathe And/or Milling Operations
copies Of Inspection Method Sheets Used In-process And/or At Final Inspection
copies Of Incoming Inspection Documents That Show Material Certificates Of Conformance, And If Applicable, Dimensional Conformance
process/operation Sheets To Show Ability To Conform To Drawing Requirements In The Following Areas: Weld Preparation; Welding Procedure Specifications Production Lot Testing
proof Of Compliance To Iso9001, And/or, As9100.
applicable Up-to-date Welder Certifications Showing Highest-level Certification Obtained Aws D1.1 For Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3 For Sheet Steel And Aws D1.6 For Stainless Steel.
if The Offeror Address Any Or All Of The Above, Or Provides Comparable Indicia Of Capability, It Is Encouraged To Provide Supporting Evidence And Detail, Such As But Not Limited To Receipts, Certifications, Drawings, Test Results/ Logs, Maintenance Records,
calibration Records, Inspection Reports, Audits, Etc. The Weigh Accorded To Supporting Evidence Will Be At The Discretion Of The Government.
the Technical Capability Proposals Will Be Evaluated To Determine The Risk Of Unsuccessful Performance As Well As Relative Risk Compared To Other Offerors.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Ordersdelivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted And Preferred.
\
1. Scope
1.1 Pre-award / Post Award Requirements:
due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended.
1.2 Container Shell Material Is ;aluminum; .
manufacturing This Item Requires Two Individual Piece Be Made. One Being The
outer Shell Or The Container That Houses The T-56 Qeca. The Second Being The
inner Frame Adapter Assembly (ifaa). They Are A Set Item Under This Tdp.
1.3 When Discrepancies Exist Between These Requirements And Those On Current
manufacturer's Drawings,contact Code ;buyer On Page One; Or Code N241.10
1.4 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;container Research Corporation; Drawing Number ( ;05259; ) ;706e001; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.5 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents
drawing Data=std-225 |05259| | |c| | | |
drawing Data=std-228 |05259| | |c| | | |
drawing Data=std-295 |05259| | |c| | | |
drawing Data=std-360 |05259| | |c| | | |
drawing Data=13c099 |05259| | |c| | | |
drawing Data=13c102 |05259| | |c| | | |
drawing Data=15930 |80132| | |d| | | |
drawing Data=17e070 |05259| | |c| | | |
drawing Data=706b009 |05259| | |c| | | |
drawing Data=706d010 |05259| | |c| | | |
drawing Data=706d012 |05259| | |c| | | |
drawing Data=706d013 |05259| | |c| | | |
drawing Data=706d014 |05259| | |c| | | |
drawing Data=706d020 |05259| | |c| | | |
drawing Data=706e001 |05259| | |c| | | |
drawing Data=706e002 |05259| | |c| | | |
drawing Data=706e003 |05259| | |c| | | |
drawing Data=706e004 |05259| | |c| | | |
drawing Data=706e005 |05259| | |c| | | |
drawing Data=706e006 |05259| | |c| | | |
drawing Data=706e007 |05259| | |c| | | |
drawing Data=706e008 |05259| | |c| | | |
drawing Data=706e011 |05259| | |c| | | |
drawing Data=706e015 |05259| | |c| | | |
drawing Data=706e016 |05259| | |c| | | |
drawing Data=706e017 |05259| | |c| | | |
drawing Data=706e018 |05259| | |c| | | |
drawing Data=706e019 |05259| | |c| | | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
3. Requirements
3.1 One Third (1/3) Unit Of Desiccant (mil-d-3464, Type Ii Nondusting) Per Cubic Foot Of Container Interior Volume Shall Be Placed In Desiccant Holder Of Each Container At Time Of Shipment.
3.2 At Faying Surfaces, Discontinuous Welds, Or Other Areas Where Atmospheric Liquids May Be Retained By Capillary Action, The Crevice Shall Be Sealed Using Sealing Compound Mil-s-81733 Or Equivalent.
3.3 Reference To Cadmium Plating Shall Be Deleted And The Following Substituted: "finish Shall Be Electrodeposited Alkaline Zinc-nickel Alloy In Accordance With Astm B 841 Class 1, Type B, Grade 3."
3.4 The Shock Mount Listed In The Drawing Package (whether Identified As Sole Source, Recommended, Or Suggested) Has Been Tested And Approved For The Shock Mitigation System Of This Container. No Other Shock Mount May Be Substituted Without Written Permission
of Naval Inventory Control Point, Philadelphia Unless An Alternate Is Specifically Indentified In This Contract. ;no Other; Is An Approved Alternate Mount.
acceptance Criteria For Aluminum Fabrication //all Welds Shall Be Visually Inspected. Visual Inspection Shall Include 5 Power Magnifications When Suspect Condition Is To Be Examined Beyond The Capability Of Normal Vision. A Weld Shall Be Acceptable By Visual
inspection If It Shows The Following:(1) The Weld Shall Have No Cracks (2) Through Fusion Shall Exist Between Adjacent Layers Of Weld Metal, And Between Weld Metal And Base Metal. (3) Weld Profiles Shall Be In Conformance With Aws D1.2 D1.2m:2003. (4)
porosity Is Not Permitted. Critical And Major Welds On The Ifaa Shall Be Subjected To Further Non-destructive Testing Using Dye Penetrant Inspection To Determine The Presence Of Surface Cracks.
welding And Welder Qualifications Shall Meet Current Aws D1.2 Standards.
additionally, Cleaning Preparations Shall Be In Accordance With Mil-c-5541
and The Cleaning Paragraph Located In The Welding Requirement Section Of
the Contract.
all Containers Must Be Affixed With A Nameplate That Includes A
unique Identification (uid) Marking As Referenced In The Drawing Package
drawing ;(80132) 15930; And Iaw Mil-std-130 Latest Revision. The Contractor
shall Contact Navicp Code ;n241.17 (0771.17); Or Code 0771.10 For The Alphanumeric
sequential Serial Number Group That Makes Up Part Of The Uid.
the Uidwill Be Included On The Nameplate In Data Matrix Format.
3.5 Welding And Welder Qualifications Shall Be In Accordance With Aws D1.1
for Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3
for Sheet Steel And Aws D1.6 For Stainless Steel. Proper Controls Shall Be Used To Prevent Melt Through Or Burn Through. For Aluminum, Filler For Welding 6061 Alloy Shall Be 4043: Filler For Welding 5000 Series Alloys
to Themselves Or To 6061 Shall Be 5356 Or 5556. In Addition,welding And
weld Inspection Shall Include:
(1) Visual Inspection Shall Include 5x (5power) Magnification When A Suspect
condition Is To Be Examined Beyond The Capability Of Normal Vision.
(2) Critical And Major Welds May Be Subjected To Further Non Destructive
testing (such As Dye Penetrant Inspection)as Prescribed By The Buying Activity.
(3) Proper Documentation Shall Be Available For Review By Government Personnel.
3.6 Work Instructions. Work Instructions Shall Be Posted At Theoperator's Work Station Giving Procedures To Control The Welding Process, I.e., Filler Material, Weld Size, Electrical And Gas Characteristics, Including Flow Rate.
3.7 Materials And Materials Control. The Quality Program Shall Assure That The Materials Used In Fabrication Or Processing, I.e., Base Metals And Weld Filler Material, Be Inspected And Conform To The Applicable Physical, Chemical And Other Technical
requirements (supplier's Certification Is Sufficient).
3.8 Controls. Weld Filler Materials Shall Be Clearly Identified And Segregated From Each Other Both When In Storage And At The Work Station. Work Station Environment Shall Be Controlled To Prevent Conditions Adverse To Proper Gas Shielding.
3.9 Cleaning. Parts To Be Welded Shall Be Cleaned To Remove Surface Soils Such As Oils, Waxes, Grease, Inks, Etc. Except That Uninhibited Alkaline Solutions Such As Sodium Hydroxide Shall Not Be Used.
3.10 Deoxidizing. The Cleaned Parts Shall Be Chemically Deoxidized No More Than 10 Days Prior To Welding To Remove Thick Surface Oxide Films. (if The Material Or Work Is Exposed To An Outdoor Environment, This Time Limit Shall Be Reduced To A Maximum Of 3
days, To Account For Atmospheric Effects.) Mechanical Cleaning Methods Shall Be Applied Just Prior To The Actual Start Of Welding, To Remove Any Reoxidation Or Residual Thin Oxide Films.
3.10.1 Chemical Treatment. An Acid Deoxidizing Treatment Shall Be Applied By Either Immersion Or Brushing/wiping. Deoxidizers Acceptable For Use Shall Include Nitric Acid, Sulfuric Chromic, Phosphoric Chromic, Or Equivalent Solutions. Sodium Hydroxide
solutions Shall Not Be Used. Care Shall Be Taken To Assure 100% Solution Coverage Of The Area To Be Welded. To Allow An Adequately Sized Deoxidized Area For Good Welding, The Solution Shall Be Applied To An Area Extending At Least 2 Inches From The Weld Site,
or Ending At Any Closer Adjacent Edge.
3.10.2 Mechanical Means. Immediately Prior To Welding, Mechanical Cleaning Methods Shall Be Applied To The Weld Areas Previously Chemically Treated To Assure Removal Of Residual Or Reformed Oxides, If Any. Acceptable Methods Of Mechanical Cleaning Include
stainless Steel Wire Brushing, Scraping, Filing, Or Sanding. However, Abrasives Containing Iron And Its Oxides, Steel Wool And Wire, And Copper Alloy Based Wire, Which May Become Embedded With Galvanically Active Metals And Accelerate Corrosion Of Aluminum
alloys Shall Not Be Used. Mechanical Methods Shall Be Vigorous Enough To Adequately Remove Any Residual Oxide Films, But Gentle Enough To Avoid Forming An Excessively Rough Surface In The Comparatively Soft Metal Underneath.
contact Code N241.17 Or N241.10 To Arrange For First Article Test Facility Location.
when A First Article Is Required The Contractor Shall Submit A Copy Of The Drawings, Contracts And Approved Eco's, Deviations, Waivers And Modifications In The Records Receptacle Of The First Article Container.
contact Code ;buyer On Page One; Or Code N241.10 To Arrange For First Article Test Location
when A First Article Is Required, The Contractor Shall Submit A Paper Copy Of The Drawings (size 11" X 17"), Contracts And Approved Ecp's Eco's, Deviations Waivers, And Modifications In The Records Recepticle Or Inside The Container Submitted For The First
article.
welding And Welder Qualifications Shall Meet Current Aws D1.2 Standards.
additionally, Cleaning Preperations Shall Be In Accordance With Mil-c-5541
and The Cleaning Paragraph Located In The Welding Requirements Section Of The Contract
4. Quality Assurance
4.1 100% Production Leak Test. Each Container, Uninstrumented And Without Dummy Load, Shall Be Raised To A Height Of 18 Inches And Allowed To Fall Freely To A Concrete Or Similarly Hard Surface, Landing Flat On Its Base. The Container Shall Then Be Prepared
for Testing By Sealing All Breathing Devices And Inserting Suitable Pressurized Fittings And Gauges. The Container Shall Be Closed And Sealed In A Normal Manner. The Pneumatic-pressure Technique Of Method 5009 Of Federal Test Method Standard No. 101c Shall Be
used To Detect Leakage. An Initial Pressure Setting Equal To 1.0 + 0.1 - 0 Psig Shall Be Used. After Stabilization, Pressure Shall Be Monitored For Thirty Minutes. Any Loss In Pressure In Excess Of 0.05 Psig (adjusted For Changes In Temperature And Barometric
pressure) Shall Be Cause For Rejection. Warning
container May Explode Or Fasteners May Fail During Test. Use Protective Barriers To Avoid Injury To Personnel.
all Welds On The Ifaa Will Be Visually Inspected In Accordance With Aws B1.11:2000 And Then Dye Penetrant Inspected In Accordance With Aws B1.10:1999. The Weld Inspection Criteria Is Listed In The Requirments Section Note. Additional Acceptance Criteria Is Also
in Mil-w-22248 Or Awsd1.2:2003
4.2 The Tests To Be Performed Under The First Article Approval Clause (far 52.209-4) Of The Contract Are Listed Below.
4.2.1 Dimensional Test (special) ;to Drawing (05259) 706e001-1 And Sub-drawings Isapplicable.;
4.2.2 Requirements Of: ;to Drawing (05259) 706e001-1 And Sub-drawings Is Applicable.;
4.2.3 Form: ;applies;
4.2.4 Fit: ;applies, Use Actual Item;
4.2.5 Function ;applies;
4.2.6 Compliance With Drawing ( ;05259; ) ;706e001-1; , Revision ;latest; And Specifications Referenced Therein.
4.3 In Addition To The Above Tests, The First Article(s) To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With Contract Requirements Requirements.
4.4 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Testing.
4.5 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be $ ;20,000; For The First Article Testing. This Cost Factor Will Be Added, For Solicitation Purposes, To The Price Of All Offerors For Whom The Government Will
require Such Testing.
4.6 Disposition Of Fat Samples
4.6.1 ;zero; Sample(s) Shall Not Be Returned To The Contractor Because They Shall Be Destroyed During Testing.
4.6.2 ;all; Unless Otherwise Provided For In The Contract, Sample(s) Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The
sample(s) Have Inspection Approval From The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
;n/a; Sample(s) Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due.
4.7 Test Sample Coating Instructions
4.7.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative.this Paragraph Does Not Apply To Shipping Containers.
4.8 Fat Approval Criteria
4.8.1 Far 52.209-4 Applies
(a) The Contractors Shall Deliver ;one (1); ; Unit(s) Of The Following Cage ( ;05259; ; ) Part Number ;706e001-1; ; , Revision ;latest; ; Within ;160; ; Calendar Days From The Date Of This Contract To The Government At
; Test Facility Addresses
naval Air Warfare Center Aircraft Division
highway 547, Building 678
lakehurst, Nj 08733
nswc Indian Head Division, Detachment Picatinny
building 458, Whittemore Ave.
picatinny Arsenal, Nj 07806-5000; ;
marking Of Test Sample(s) Shipping Container Shall Be As Follows, Citing This Contract Number: "for First Article Testing. Not Rfi Material. Do Not Take Up In Stock Contract Number:____________"
for First Article Test, The Shipping Documentation Shall Contain This Contract Number And Lot/item Identification. The Characteristics That The First Article Must Meet And The Testing Requirements Are Specified Elsewhere In This Contract.
(b) Upon Shipment Of First Article Sample(s), Two (2) Copies Of The Material Inspection And Receiving Report (dd Form 250) Bearing The Qar's Signature And Indication Of Preliminary Inspection Shall Be Forwarded To The Navicp- Philadelphia Code Cited In Block
10.a Of Sf33, With Duplicate Copies To Navicp Code 072 And To The Designated Test Facility. The Envelopes Shall Be Clearly Marked: "do Not Open In Mail Room".
within ;120; ; Days After Receipt Of The Samples, The Test Site Shall Complete Testing/evaluation And Submit Two (2) Copies Of Their Test Report With Conclusions And Recommendations To The Navicp Code Cited In Block 10.a Of The Sf33.
(c) Within ;120; ; Calendar Days After The Government Receives The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional
approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The Contractor.
a Notice Of Disapproval Shall Cite Reasons For Disapproval.
(d) If The First Article Is Disapproved, The Contractor, Upon Government Request, Shall Submit An Additional First Article For Testing. After Each Request, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First Article Or
select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Furnish Any Additional First Article To The
government Under The Terms And Conditions And Within The Time Specified By The Government. The Government Shall Act On This First Article Within The Time Limit Specified In Paragraph (b) Above. The Government Reserves The Right To Require An Equitable
adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any Additional Costs To The Government Related To These Tests.
(e) If The Contractor Fails To Deliver Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract
(f) Unless Otherwise Provided In The Contract, The Contractor -
(1) May Deliver The Approved First Article As Part Of The Contract Quantity, Provided It Meets All Contract Requirements For Acceptance And Was Not Consumed Or Destroyed In Testing: And
(2) Shall Remove And Dispose Of Any First Article From The Government Test Facility At The Contractors Expense.
(g) If The Government Does Not Act Within The Time Specified In Paragraph (b) Or (c) Above The Contracting Officer Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance
dates And/or The Contract Price, And Any Other Contractual Term Affected By The Delay.
(h) The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts Support, And Repair Of The First Article During Any First Article Test.
(i) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Of, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be
allocable To This Contract For (1) Progress Payments, Or (2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government
(j) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To This Effect With Each First Article.
(k) The Contractor Shall Provide Specific Written Notification To The Procuring Contracting Officer Informing Him/her Of The Shipment Of Any Article(s) Furnished In Accordance With This Clause. Such Notification Must Be Addressed To The Attention Of The
navicp Code Specified In Block 10.a Of The Sf33, With Copies To Navicp Code 072 And To The Testing Activity. Failure To Provide Such Notification Shall Excuse The Government From Any Delay In Performing First Article Testing And Informing The Contractor Of
the Results Thereof.
(l) Fourteen (14) Days Prior To Shipment Of First Article Samples, The Contractor Shall Notify The Designated Test Facility In Writing Of The Anticipated Shipping Date, With An Information Copy To The Pco, Navicp Philadelphia, Attn: (cite Code Found In Block
10.a Of The Sf33). The Contractor Shall Also Arrange For Preliminary Inspection Of Test Samples By The Dcmc/qar.
4.9 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate)
(a) Unless Otherwise Specified In The Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The
government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section
1001.)
(b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And One
that Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First Article
approval Requirements
(c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The
government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule
he Offers To The Government. Offeror's Proposed Alternate Delivery Schedule (based On Waiver Of First Article Approval Requirements)
within Days:
item No. _______________ Quantity:_______ After Date Of Contract:__________
all Costs And Responsibilities Related To The First Article Test Submission Container Shipment To And From The First Article Test Facility Are To Be Borne By The Contractor.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
this Niin And Tdp Are Setup For The Procurement Of Both, An Inner-frame And Anouter-shell Container For The T56 Qeca Engine. I. Stanke, 0771.13, X2458, 03/25/05.
this Buy Has The Updated Drawings For The Extrusion Which Are No Longer Source Controlled.
additionally, On Drawing Number 706e005 The Roller Assembly, (part Number 17c069-1) Listed As Item Number 26, Has An Alternate Source Of Supply. This Alternate Source Of Supply Is Hilman Inc., Cage (28013), And The Part Number Is From Drawing Number 5-ot-03119,
rev. "9". I. Stanke, 0771.13, X2458, 09/27/05.
1561-1570 of 1710 active Tenders