Electrical Work Tenders

Electrical Work Tenders

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DAVAO CITY 3RD DIS Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 19.8 Million (USD 342.2 K)
Details: Description Invitation To Bid "ib-cw-043-2025 For" 25lk0045 - Construction (completion) Of Multi-purpose Building, Sixto Babao Elementary School, Barangay Ilang, Davao City, Davao Del Sur The Department Of Public Works And Highway Davao City 3rd District Engineering Office, Through The Fy 2025 Dpwh Infrastructure Program Intends To Apply The Sum Of Php. 19,800,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 25lk0045 - Construction (completion) Of Multi-purpose Building, Sixto Babao Elementary School, Barangay Ilang, Davao City, Davao Del Sur. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Department Of Public Works And Highways Davao City 3rd District Engineering Office, Thru Its Bids And Awards Committee (bac), Invites Bids For The Hereunder Works: Contract Id : 25lk0045 Contract Name : Construction (completion) Of Multi-purpose Building, Sixto Babao Elementary School, Barangay Ilang, Davao City, Davao Del Sur Location : Davao City Scope Of Work : Other General Requirements, Earthwork, Reinforced Concrete, Finishings And Other Civil Works, Electrical Approved Budget For The Contract (abc): 19,800,000.00 Contract Duration : 240 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). "2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License For Size Range Of Atleast Small B. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00pm Or At The Dpwh Website." 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highway Davao City 3rd District Engineering Office And Inspect The Bidding Documents At Procurement Office, 2nd Floor, Dpwh Davao City 3rd Deo During Weekdays From 8:00 Am To 5:00pm. "5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025-february 18, 2025 Until 10:00 A.m. From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php. 25,000.00." "6. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids." 7. The Department Of Public Works And Highways Davao City 3rd District Engineering Office Will Hold A Pre-bid Conference On February 04, 2025 At 10:00 A.m. At The Main Conference Room, Dpwh Davao City 3rd Deo And/or Through Videoconferencing/via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Webcasting Via Zoom,which Shall Be Open To Prospective Bidders. "8. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In Bds Itb Clause 22. For Manual Submission, Bid Proposals May Be Submitted Through An Authorized Representative And Presentation Of Two (2) Valid Identification Issued By Government Institution." 9. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_davaocity3@dpwh.gov.ph For Electronic Submission On Or Before February 18, 2025 At 10:00 A.m. Bids Received Beyond The Specified Time Shall Be Marked As “late Bid” And Shall No Longer Be Opened. "10. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15." "11. Bid Opening Shall Be On February 18, 2025 Immediately After The Deadline For The Submission Of Bid, At The Main Conference Room, Dpwh Davao City 3rd Deo And Via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below." "12. The Department Of Public Works And Highways (davao City 3rd District Engineering Office) Thru Bids And Awards Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. " For Further Information, Please Refer To: Junellen G. Cañedo Acting Head, Procurement Unit Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Telephone: (082) 308 – 1139 Email : Canedojg2@dpwh.gov.ph Andrew A. Pangan Bac Chairperson Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Dpwhbac.davaocity3rd@gmail.com Date Of Posting January 28, 2025 Dpwh & Philgeps Websites Bulletin Board, Dpwh Davao City 3rd Deo Compound

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date27 Jan 2025
Tender AmountPHP 4.9 Million (USD 84.4 K)
Details: Description Part I Other General Requirements B.3(1) Permits And Clearances L.s. 1.00 B.5(1) Project Billboard/signboard Each 2.00 B.7(1) Occupational Safety And Health Program L.s. 1.00 Total Cost (part I) Carried To Summary Php Part Ii Civil, Mechanical, Electrical And Sanitary/plumbing Works Part A Earthworks 800(2) Clearing And Grubbing L.s. 1.00 803(1)a Structure Excavation (common Soil) Cu.m. 71.22 804(1)a Embankment From Roadway/structure Excavation (common Soil) Cu.m. 44.25 804(2)a Embankment From Borrow (common Soil) Cu.m. 16.64 804(7) Gravel Fill Cu.m. 15.08 Total Cost (part A) Carried To Summary Php Part B Plain And Reinforced Concrete Works 900(1)i Structural Concrete (class A, 28days) Cu.m. 65.38 902(1)a1 Reinforcing Steel (deformed)(grade 40) Kg 15,740.58 903(2) Formworks And Falseworks Sq.m. 408.17 Total Cost (part C) Carried To Summary Php Part C Finishing And Other Civil Works 1046(2)a1 Chb Non-load Bearing (including Reinforcing Steel)(100mm) Sq.m. 326.95 1010(2)b Doors (wood Panel) Sq.m. 5.25 1043(1) Pvc Doors And Frames Sq.m. 2.52 1007(1)b Aluminum Framed Glass Door (swing Type) Sq.m. 11.76 1005(1) Residential Casement (steel) Sq.m. 6.30 1008(1)c Aluminum Glass Windows (awning Type) 1.08 Sq.m. 1003(17) Carpentry And Joinery Works (doors Jambs) L.s. 1.00 1004(2) Finishing Hardware (lockset & Hinges) L.s. 1.00 1051(1)a Railing L.s. 1.00 1027(1) Cement Plaster Finish Sq.m. 602.14 1016(1)a Waterproofing(cement-base) Sq.m. 133.82 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Sq.m. 199.28 1018(1) Glazed Tiles And Trims Sq.m. 27.59 1018(2) Unglazed Tiles Sq.m. 155.60 1032(1)a Painting Works(masonry/concrete) Sq.m. 968.19 1032(1)b Painting Works (wood) Sq.m. 20.27 1032(1)c Painting Works (steel) Sq.m. 211.81 1014(1)a2 Pre-painted Metal Sheets(above 0.427mm, Corrugated, Long Span) Sq.m. 113.76 1013(2)a Fabricated Metal Roofing Accessory (gauge 26(0.551mm), Ridge/hip Rolls) L.m. 15.80 1013(2)b Fabricated Metal Roofing Accessory (gauge 26(0.551mm), Flashing) L.m. 14.40 1047(8)a Structural Steel (trusses) Kg 2,152.48 1047(8)b Structural Steel (purlins) Kg 1,281.42 1047(5)a Metal Structure Accessories (bolts And Rods) Kg 5.68 1047(5)d Metal Structure Accessories (steel Plates) Kg. 101.74 1047(5)b Metal Structure Accessories (sagrods) Kg 23.43 1001(8) Sewer Lines Works L.s. 1.00 1001(9) Storm Drainage And Downspout L.s. 1.00 1002(4) Plumbing Fixtures L.s. 1.00 1002(24) Cold Water Lines L.s. 1.00 1001(6) Catch Basin L.s. 1.00 Total Cost (part C) Carried To Summary Php Part D Electrical 1100(10) Conduits, Boxes & Fittings(conduit Works/conduit Rough-in) L.s. 1.00 1101(33) Wires And Wiring Devices L.s. 1.00 1102(1) Panelboard With Main & Branch Breakers L.s. 1.00 1103(1) Lighting Fixtures L.s. 1.00 Total Cost (part D) Carried To Summary Php Part E Mechanical 1200(1) Ventilating Equipment L.s. 1.00 Total Cost (part E) Carried To Summary Php

Province Of Misamis Oriental Tender

Civil And Construction...+1Water Storage And Supply
Philippines
Closing Date6 Feb 2025
Tender AmountPHP 1.6 Million (USD 28 K)
Details: Description Invitation To Bid 1. The Provincial Government Of Misamis Oriental, Through The Excise Tax/trust Fund Intends To Apply The Sum Of One Million Six Hundred Forty Two Thousand Six Hundred Thirty Five And 52/100 (php 1,642,635.52) Being The Approved Budget For The Contract Abc To Payments Under The Contract For Construction Of Water System, Barangay Balintad, Manticao, Misamis Oriental, Under Purchase No. 0036-25 Dated January 13, 2025. Description Of Works Part I. Other General Requirements B.5 Project Billboard/signboard B.7(1) Occupational Safety And Health Program B.9 Mobilization/demobilization Part Ii. Civil, Mechanical, Electrical And Sanitary/plumbing Works Part A. Construction Of Intake Box 803(1)a Structure Excavation 900(1)c1 Structural Concrete, Class “a” (28 Days) 902(1)a1 Reinforcing Steel (deformed) Grade 40 903(2) Formworks And Falseworks 1046(2)a1 Chb Non-load Bearing (including Reinforcing Steel, 100mm) 1027(1) Cement Plaster Finish Part B Construction Of Reservoir 803(1)a Structure Excavation 804(1)a Embankment (from Structure Excavation) 804(4) Gravel Fill 900(1)c1 Structural Concrete, Class “a” (28 Days) 902(1)a1 Reinforcing Steel (deformed) Grade 40 903(2) Formworks And Falseworks 1032(1)a Painting Works (masonry/concrete) Part D Water Supply 1201(12) Valves And Pipes Fittings 1600(2) Pipeline Trench Excavation 1601(1) Fill And Backfill 1602(5) Polyethylene (pe) Plastic Pipes Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Misamis Oriental Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required 40 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Bids And Awards Committee Thru The Bac Secretariat At The Procurement Unit, Capitol Building, Cagayan De Oro City And Inspect The Bidding Documents At The Address Given Below During [8:00am-5:00 Pm]. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On [january 16, 2025 To February 05, 2025; 8:00-3:00 Pm] From The Given Address And Website(s) Below Bids And Awards Committee Thru The Bac Secretariat At The Procurement Unit, Capitol Building, Cagayan De Oro City And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of [php5,000.00]. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment. 6. The Provincial Government Of Misamis Oriental Will Hold A Pre-bid Conference On January 23, 2025;10:30am At The Bids And Awards Committee Office, 2nd Floor Capitol Building, Cagayan De Oro City, Which Be Open To Prospective Bidders 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Bids And Awards Committee Office, Conference Room, 2nd Floor, Capitol Building, Cagayan De Oro City On Or Before February 06, 2025;10:00am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On February 06, 2025; 10:30am At The Given Address Bids And Awards Committee Office, Conference Room, 2nd Floor, Capitol Building, Cagayan De Oro City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Provincial Government Of Misamis Oriental Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ms. Jacquiline M. Noble Head, Bac Secretariat C/o Procurement Unit Capitol Building Cagayan De Oro City. Bacmisamisoriental@gmail.com Www.misamisoriental.gov.ph Filemon R. Aguilar, Jr. Bac, Chairman

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DAVAO CITY 3RD DIS Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 6.9 Million (USD 119.8 K)
Details: Description Invitation To Bid "ib-cw-042-2025 For" 25lk0044 - Construction (completion) Of Multi-purpose Building (covered Court), Barangay Buhangin Proper, Davao City, Davao Del Sur The Department Of Public Works And Highway Davao City 3rd District Engineering Office, Through The Fy 2025 Dpwh Infrastructure Program Intends To Apply The Sum Of Php. 6,930,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 25lk0044 - Construction (completion) Of Multi-purpose Building (covered Court), Barangay Buhangin Proper, Davao City, Davao Del Sur. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Department Of Public Works And Highways Davao City 3rd District Engineering Office, Thru Its Bids And Awards Committee (bac), Invites Bids For The Hereunder Works: Contract Id : 25lk0044 Contract Name : Construction (completion) Of Multi-purpose Building (covered Court), Barangay Buhangin Proper, Davao City, Davao Del Sur Location : Davao City Scope Of Work : Other General Requirements, Earthwork, Reinforced Concrete, Finishings And Other Civil Works, Electrical Approved Budget For The Contract (abc): 6,930,000.00 Contract Duration : 150 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). "2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License For Size Range Of Atleast Small B. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00pm Or At The Dpwh Website." 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highway Davao City 3rd District Engineering Office And Inspect The Bidding Documents At Procurement Office, 2nd Floor, Dpwh Davao City 3rd Deo During Weekdays From 8:00 Am To 5:00pm. "5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025-february 18, 2025 Until 10:00 A.m. From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php. 10,000.00." "6. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids." 7. The Department Of Public Works And Highways Davao City 3rd District Engineering Office Will Hold A Pre-bid Conference On February 04, 2025 At 10:00 A.m. At The Main Conference Room, Dpwh Davao City 3rd Deo And/or Through Videoconferencing/via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Webcasting Via Zoom,which Shall Be Open To Prospective Bidders. "8. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In Bds Itb Clause 22. For Manual Submission, Bid Proposals May Be Submitted Through An Authorized Representative And Presentation Of Two (2) Valid Identification Issued By Government Institution." 9. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_davaocity3@dpwh.gov.ph For Electronic Submission On Or Before February 18, 2025 At 10:00 A.m. Bids Received Beyond The Specified Time Shall Be Marked As “late Bid” And Shall No Longer Be Opened. "10. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15." "11. Bid Opening Shall Be On February 18, 2025 Immediately After The Deadline For The Submission Of Bid, At The Main Conference Room, Dpwh Davao City 3rd Deo And Via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below." "12. The Department Of Public Works And Highways (davao City 3rd District Engineering Office) Thru Bids And Awards Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. " For Further Information, Please Refer To: Junellen G. Cañedo Acting Head, Procurement Unit Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Telephone: (082) 308 – 1139 Email : Canedojg2@dpwh.gov.ph Andrew A. Pangan Bac Chairperson Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Dpwhbac.davaocity3rd@gmail.com Date Of Posting January 28, 2025 Dpwh & Philgeps Websites Bulletin Board, Dpwh Davao City 3rd Deo Compound

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DAVAO CITY 3RD DIS Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 9.9 Million (USD 171.1 K)
Details: Description Invitation To Bid "ib-cw-041-2025 For" 25lk0043 - Construction Of Multi-purpose Building (covered Court), Barangay Panacan, Davao City, Davao Del Sur The Department Of Public Works And Highway Davao City 3rd District Engineering Office, Through The Fy 2025 Dpwh Infrastructure Program Intends To Apply The Sum Of Php. 9,900,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 25lk0043 - Construction Of Multi-purpose Building (covered Court), Barangay Panacan, Davao City, Davao Del Sur. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Department Of Public Works And Highways Davao City 3rd District Engineering Office, Thru Its Bids And Awards Committee (bac), Invites Bids For The Hereunder Works: Contract Id : 25lk0043 Contract Name : Construction Of Multi-purpose Building (covered Court), Barangay Panacan, Davao City, Davao Del Sur Location : Davao City Scope Of Work : Other General Requirements, Earthwork, Reinforced Concrete, Finishings And Other Civil Works, Electrical Approved Budget For The Contract (abc): 9,900,000.00 Contract Duration : 180 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). "2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License For Size Range Of Atleast Small B. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00pm Or At The Dpwh Website." 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highway Davao City 3rd District Engineering Office And Inspect The Bidding Documents At Procurement Office, 2nd Floor, Dpwh Davao City 3rd Deo During Weekdays From 8:00 Am To 5:00pm. "5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025-february 18, 2025 Until 10:00 A.m. From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php. 10,000.00." "6. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids." 7. The Department Of Public Works And Highways Davao City 3rd District Engineering Office Will Hold A Pre-bid Conference On February 04, 2025 At 10:00 A.m. At The Main Conference Room, Dpwh Davao City 3rd Deo And/or Through Videoconferencing/via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Webcasting Via Zoom,which Shall Be Open To Prospective Bidders. "8. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In Bds Itb Clause 22. For Manual Submission, Bid Proposals May Be Submitted Through An Authorized Representative And Presentation Of Two (2) Valid Identification Issued By Government Institution." 9. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_davaocity3@dpwh.gov.ph For Electronic Submission On Or Before February 18, 2025 At 10:00 A.m. Bids Received Beyond The Specified Time Shall Be Marked As “late Bid” And Shall No Longer Be Opened. "10. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15." "11. Bid Opening Shall Be On February 18, 2025 Immediately After The Deadline For The Submission Of Bid, At The Main Conference Room, Dpwh Davao City 3rd Deo And Via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below." "12. The Department Of Public Works And Highways (davao City 3rd District Engineering Office) Thru Bids And Awards Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. " For Further Information, Please Refer To: Junellen G. Cañedo Acting Head, Procurement Unit Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Telephone: (082) 308 – 1139 Email : Canedojg2@dpwh.gov.ph Andrew A. Pangan Bac Chairperson Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Dpwhbac.davaocity3rd@gmail.com Date Of Posting January 28, 2025 Dpwh & Philgeps Websites Bulletin Board, Dpwh Davao City 3rd Deo Compound

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DAVAO CITY 3RD DIS Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Closing Date16 Jan 2025
Tender AmountPHP 67.5 Million (USD 1.1 Million)
Details: Description Invitation To Bid Ib-cw-026-2025 For 25lk0046 - Construction Of Davao City Sub-deo Equipment Management Division (emd), Panacan, Davao City The Department Of Public Works And Highway Davao City 3rd District Engineering Office, Through The Fy 2025 Dpwh Infrastructure Program Intends To Apply The Sum Of Php. 67,550,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 25lk0046- Construction Of Davao City Sub Deo Equipment Management Division (emd), Panacan, Davao City. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Department Of Public Works And Highways Davao City 3rd District Engineering Office, Thru Its Bids And Awards Committee (bac), Invites Bids For The Hereunder Works: Contract Id : 25lk0046 Contract Name: Construction Of Davao City Sub-deo Equipment Management Division (emd), Panacan, Davao City Location : Davao City Scope Of Work: Other General Requirements, Earthwork, Reinforced Concrete, Finishings And Other Civil Works, Electrical, Mechanical Approved Budget For The Contract (abc):67,550,000.00 Contract Duration : 300 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License For Size Range Of Atleast Medium A. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00pm Or At The Dpwh Website. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highway Davao City 3rd District Engineering Office And Inspect The Bidding Documents At Procurement Office, 2nd Floor, Dpwh Davao City 3rd Deo During Weekdays From 8:00 Am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 27, 2024 December 18, 2024 Until 10:00 A.m. From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php. 50,000.00. 6. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 7. The Department Of Public Works And Highways Davao City 3rd District Engineering Office Will Hold A Pre-bid Conference On December 04, 2024 At 10:00 A.m. At The Conference Room, 2nd Floor,dpwh Davao City 3rd Deo And/or Through Videoconferencing/via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Webcasting Via Zoom,which Shall Be Open To Prospective Bidders. 8. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In Bds Itb Clause 22. For Manual Submission, Bid Proposals May Be Submitted Through An Authorized Representative And Presentation Of Two (2) Valid Identification Issued By Government Institution. 9. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_davaocity3@dpwh.gov.ph For Electronic Submission On Or Before December 18, 2024 At 10:00 A.m. Bids Received Beyond The Specified Time Shall Be Marked As “late Bid” And Shall No Longer Be Opened. 10. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 11. Bid Opening Shall Be On December 18, 2024 Immediately After The Deadline For The Submission Of Bid, At The Conference Room, 2nd Floor, Dpwh Davao City 3rd Deo And Via Youtube Livestreaming Of The Official Page Dpwh Davao City 3rd Deo Procurement Ls Or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 12. The Department Of Public Works And Highways (davao City 3rd District Engineering Office) Thru Bids And Awards Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Junellen G. Cañedo Acting Head, Procurement Unit Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Telephone: (082) 308 – 1138 Email : Canedojg2@dpwh.gov.ph Andrew A. Pangan Bac Chairperson Dpwh Davao City 3rd District Engineering Office Dpwh-emd Compound, Km. 13, Panacan, Davao City, Region Xi Dpwhbac.davaocity3rd@gmail.com Date Of Posting November 27, 2024 Dpwh & Philgeps Websites Bulletin Board, Dpwh Davao City 3rd Deo Compound

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date10 Feb 2025
Tender AmountPHP 5 Million (USD 86.1 K)
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon 1. The Local Government Unit Of Irosin, Through The Lgsf-fabdp(ntf-elcac-fy 2024) Intends To Apply The Sum Of Five Million Pesos (p 5,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Construction Of Municipal Building Brgy. Cawayan, Irosin, Sorsogon, Infr-03-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Construction Of Municipal Building Brgy. Cawayan, Irosin, Sorsogon Brief Description: Construction Of 1 Unit,2-classroom School Building With A Total Of 162.00 Sq.m. Floor Area With Amenities And Grouted Rip-rap/slope Protection Approved Budget For The Contract : P 5,000,000.00 Source Of Fund : Lsgf_fabdp(ntf-elcac-fy 2024) 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Two Hundred Ten (210) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 17, 2025 Until February 10, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On January 24, 2025, 9:00am At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 10, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 10, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 17, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon, With Project Identification Number Infr-03-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Lgsf-fabdp(ntf-elcac-fy 2024) In The Amount Of Five Million Pesos ( P 5,000,000.00). 2.2. The Source Of Funding Is: Lgsf-fabdp(ntf-elcac-fy 2024) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 17 , 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon I.earthworks Ii. Rebar Works Iii. Formworks Iv. Concrete Works V. Masonry Works Vi. Trusses & Roofing Works Vii. Ceiling Works Viii. Plumbing Works Ix. Electrical Works X. Painting Works Xi. Doors And Windows Xii. Tile Works Xiii. Steel Works Spl-1 Grouted Rip-rap/slope Protection Spl-2 Amenities Spl-3 Hauling Of Materials To Jobsite Spl-4 Ppe’s Spl-5 Temporary Facilities Spl-6 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Key Personnel General Experience Relevant Experience 1. Foreman 2. Le Operator 3. Skilled Worker 4.laborer 10.5 Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.tampering Machine 2. Water Truck 3. Concrete Mixer 4. Bar Cutter 5. Welding Machine 6. Enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 210 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Construction Of Two Classroom Building For Cawayan Elementary School. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 210 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 210 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Earthworks 1.00 Lot Ii Rebar Works 4,789.81 Kls Iii Formworks 1.00 Lot Iv Concrete Works 53.14 Cu.m. V Masonry Works 214.96 Sq.m. Vi Trusses & Roofing Works 172.00 Sq.m. Vii Ceiling Works 166.50 Sq.m. Viii Plumbing Works 1.00 Lot Ix Electrical Works 1.00 Lot X Painting Works 1.00 Lot Xi Doors And Windows 1.00 Lot Xii Tile Works 25.64 Sq.m. Xiii Steel Works 1.00 Lot Spl-1 Grouted Rip-rap/slope Protection 61.40 Cu.m. Spl-2 Amenities 1.00 Lot Spl-3 Hauling Of Materials To Jobsite 1.00 Lot Spl-4 Ppe’s 1.00 Lot Spl-5 Temporary Facilities 1.00 Lot Spl-6 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-03-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-03-2025 Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-03-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 1.8 Million (USD 31.2 K)
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Improvement/upgrading Of Super Health Center 1. The Local Government Unit Of Irosin, Through The 20% Edf 2025 Intends To Apply The Sum Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Improvement/upgrading Of Super Health Center, Infr-05-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Improvement/upgrading Of Super Health Center Brief Description: Fabrication/installation Of Forms & Rsb And Concrete Pouring For Concrete Counters/tile Setting For Lavatories And Counters/acp Cladding Of Cabinets/installation Of Plumbing And Electrical Fixtures And Fabrication/installation Of Canopies Approved Budget For The Contract : P 1,809,845.00 Source Of Fund : 20% Edf 2025 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Ninety (90) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025 Until February 18, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On February 5, 2025, 2:00pm At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 18, 2025, 1:59 Pm At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 18, 2025, 2025, 2:00 Pm At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 28, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Improvement/upgrading Of Super Health Center, With Project Identification Number Infr-05-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2025 In The Amount Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00). 2.2. The Source Of Funding Is: 20% Edf 2025 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On February 18, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Improvement/upgrading Of Super Health Center I.forms And Scaffolding Works Ii. Rsb Works Iii. Concrete Works Iv. Tile Works V. Ceiling Works Vi. Electrical Works Vii. Painting Works Viii. Doors And Windows Ix. Canopy Works X. Other Works Spl-1 Amenities Spl-2 Ppe’s Spl-3 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Improvement/upgrading Of Super Health Center Key Personnel General Experience Relevant Experience 1. Foreman 2. Skilled Worker 3.laborer 10.5 Improvement/upgrading Of Super Health Center The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.concrete Mixer 2. Water Truck 3.welding Machine 4. Enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 90 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Upgrading Of Super Health Center. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 90 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 90 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Improvement/upgrading Of Super Health Center Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Forms And Scaffolding Works 1.00 Lot Ii Rsb Works 166.00 Kgs Iii Concrete Works 5.00 Cu.m. Iv Tile Works 205.00 Sq.m. V Ceiling Works 335.24 Sq.m. Vi Electrical Works 1.00 Lot Vii Painting Works 1.00 Lot Viii Doors And Windows 1.00 Lot Ix Canopy Works 1.00 Lot X Other Works 1.00 Lot Spl-1 Amenities 1.00 Lot Spl-2 Ppe’s 1.00 Lot Spl-3 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-05-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Improvement/upgrading Of Super Health Center; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Improvement/upgrading Of Super Health Center. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-05-2025 Improvement/upgrading Of Super Health Center Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Improvement/upgrading Of Super Health Center; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-05-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.

City Of Valencia Tender

Civil And Construction...+1Road Construction
Philippines
Closing Date27 Jan 2025
Tender AmountPHP 9.5 Million (USD 163.6 K)
Details: Description Contract Reference No. 03-2025 01/03/2025 Local Government Of Valencia Catarata Street, Poblacion, Valencia City, Bukidnon, Philippines Philippine Access (088) 828-5430 Invitation To Bid For The Road Concreting At Purok 3, Pinatilan, Valencia City, Bukidnon 1. The City Government Of Valencia Through Its Annual Appropriations Intends To Apply The Sum Of Nine Million Five Hundred Ninety-nine Thousand Seven Hundred Eighty-one Pesos And 65/100 (php 9,599,781.65) Being The Approved Budget Of The Contract (abc) To Payments Under The Contract For The Road Concreting At Purok 3, Pinatilan, Valencia City, Bukidnon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Valencia Now Invites Bids For The Road Concreting At Purok 3, Pinatilan, Valencia City, Bukidnon. Particulars Describes As Follows: Item No. Qty Unit Description Road Concreting At Purok 3, Barangay Pinatilan, Valencia City, Bukidnon With The Following Scope Of Works: Concreting Of Road - 2.5m Width/lane, 0.23m Thick Pccp With Gravel Surface Shoulder - 1m B/s ;'removal And Relocation Of Fibeco Post @stat. 0+037.902 Other General Requirements Project Billboards/signboards Occupational Safety And Health Program Traffic Management Mobilization / Demobilization Removal And Relocation Of Utilities/electrical Pole Civil Works Earthworks Clearing And Grubbing Specifications Unit Cost Total Cost 1 B.5 B.7(2) B.8(2) B.9 B.12 100(1) 1 2 1 1 1 1 0.16 Lot Each Ls Ls Ls Each Ha See Attached Plan And Specifications 9,599,781.65 74,974.51 102(2) 104(1)a 105(1)a 1660.91 215 5600 Cu.m. Cu.m. Cu.m. 74,974.51 74,974.51 74,974.51 74,974.51 74,974.51 74,974.51 74,974.51 74,974.51 74,974.51 200(1) 840.00 Cu.m. Surplus Common Excavation Embankment From Roadway Excavation (common Soil) Subgrade Preparation (common Material) Subbase And Base Course Aggregate Subbase Course Surface Courses Gravel Surface Course Portland Cement Concrete Pavement (unreinforced) - 0.23m Thick 14days X-x-x-x-x-x-nothing Follows-x-x-x-x-x-x-x- X- Total Amount: 300(1) 368.00 311(1)c1 3,970.00 Cu.m. Sq.m. 9,599,781.65 Required Number Of Days For Completion Is 100 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Within 10 Years From The Date Of Submission And Receipt Of The Bid Hereof. The Description Of An "eligible Bidder" Is Contained In The Bidding Documents, Particularly In Section Ii. Instructions To Bidders. 3. No Time Extension Shall Be Granted Unless On Fortuitous Event, Acts Of Nature Or Any Natural Calamities. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary "pass/fail" Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act". Bidding Is Restricted To Filipino Citizens, Sole Proprietorship, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 5. Interested Bidders May Obtain Further Information From Josafat L. Caipang, Head Of Lgu-valencia City Bac Secretariat And Inspect The Bidding Documents At Address Given Below From Mondays-fridays 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders On January 4, 2025 To Opening Date From The Address Below And Upon Payment Of Non-refundable Fee For The Bidding Documents In The Amount Ten Thousand Pesos (php 10,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) Provided That The Bidders Shall Pay The Non-refundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Site Inspection Is Required From Every Interested Bidder And Site Inspection Certificate Shall Form Part Of The Bid Documents. No Site Inspection Certificate Shall Mean Automatic Disqualification. Site Inspection Schedule Is On January 10, 2025 At 10:00 O’clock In The Morning, Assembly Area At Bac Office. 6. The City Government Of Valencia Will Hold Its Pre-bid Conference On January 13, 2025 (1:30 Pm) At The Bac Office, City Hall Compound, City Of Valencia, Bukidnon Which Shall Be Open To All Interested Bidders. 7. Only Project Engineers, Materials Engineer And The Like Are Required To Attend The Pre-bid Conference. In The Absence Of The Same, The Representative Must Present To The Bac An Authorization Letter Signed By The Owner. 8. Interested Contractor Are Required To Include In Their Technical Bid Proposal The Duly Signed List Of Contractor's Equipment Units, Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project. 9. Prospective Bidders Who Were Not Able To Purchase Bid Documents Prior To The Bid Opening Shall Not Be Opened And Will Be Disqualified. 10. Bids Must Be Delivered To The Address Below On Or Before (1:00 Pm) January 27, 2025. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Representative Who Chooses To Attend At The Address Below. Bid Opening Shall Be On (1:30 Pm) January 27, 2025 At Bac Office, City Hall Compound, City Of Valencia, Bukidnon. Late Bids Shall Not Be Accepted. The Clock In The Bac Office Shall Serve As The Time Reference, And Shall Be The Basis For The Official Time Received Of The Bidding Documents Submitted In The Office. 11. The City Government Of Valencia Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid. 12. The Head Of The Procuring Entity (hope) Reserves The Right To Accept Or Reject Any Or All Bids To Annul The Bidding Process, At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. All Correspondence Shall Be Addressed To The Bac Secretariat, Attention: Mr. Abe P. Gillaco, Mpa, Bac Chairman. 14. For Further Information, Please Refer To: Lgu Valencia City-josafat L. Caipang Admin Office, 8709 Catarata St., Poblacion, Valencia City, Bukidnon Tel. No. (088) 828-5430 Abe P. Gillaco, Mpa Bac Chairman

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Building Construction
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
Details: Introduction network Contracting Office 1 (nco 1), Supporting Va New England Healthcare System (visn 1) And The Va Boston Healthcare System (hcs) Is Seeking Potential Sources For An Upcoming Requirement As Described In The Attached Statement Of Work For The Project; Upgrade Visn 1 Laundry Building 45. This Notice Is Not A Request For Proposals. This Notice Is A Market Research Tool And Has Not Been Set-aside For Any Small Business Category, However The Notice Is Issued To Determine Appropriate Set-aside Categories. Responses To This Notice, In Conjunction With Other Government Market Research Resources, Will Be Used By The Contracting Officer To Determine The Applicable Socio-economic Set-aside For The Procurement. the Purpose Of This Notice Is To Determine If There Are Qualified Sdvosbs Or Vosbs, Wosbs, And Small Businesses That Have The Experience With This Type Of Work And If Such Firms Are Interested In This Procurement. Once The Appropriate Set-aside Is Determined, A Separate Public Announcement Requesting Bids Or Proposals Will Be Publicized On Sam.gov Contract Opportunities In Accordance With 40 U.s. Code § 1101 And Far 36.601. The Solicitation Is Estimated To Be Released In March 2025. general Project Description, Magnitude, And Naics the Va Boston Hcs In Brockton, Ma, Requires A Contractor To All Labor, Equipment, Materials And Supervision For The Renovation And Improvements Of The Visn 1 Laundry, Building 45 For Veterans Affairs Medical Center, Brockton, Massachusetts In Accordance With Contract Documents. the Renovation Includes Selective Demolition Of All Existing Mechanical, Electrical And Plumbing (mep) Systems, Selective Demolition Of Existing Finishes, Doors, Structural Slab, And Other Existing Items. The Renovation Also Includes The Construction Of Structural Improvements, Doors, Electrical Systems, Hvac Systems, Plumbing Systems, Start-up Of Previously Installed Elevator By Renovating Associated Electrical And Mechanical Components, And Interior And Exterior Finishes. In Addition To The Renovation, The Improvements To Building 45 Include Ensuring Exterior Envelop Around Doors, Windows, And Stair Towers Along With Any Penetrations Are Sealed Properly. Moreover, Renovation Includes Construction Of A Service Platform And Stairs For Dedicated Emergency Generator System. The Focus Of The Project Is To Provide Structural Slab Repairs And Replacement To Sustain Required Laundry Equipment Loads And Vibrations. this Project Also Requires Specialized Personnel, With Specified Experience, To Assist In The Cqc System Manager For The Following Areas, As Applicable: Electrical, Mechanical, Civil, Structural, Environmental, Architectural, Materials Technician Submittals Clerk, Commissioning Agent/leed Specialist, And Low Voltage Systems. These Individuals Or Specified Technical Companies Are Directly Employed By The General Contractor And Cannot Be Employed By A Supplier Or Subcontractor On This Project; Be Responsible To The Cqc System Manager; Be Physically Present At The Construction Site During Work On The Specialized Personnel S Areas Of Responsibility; Have The Necessary Education Or Experience In Accordance With The Experience Matrix Listed Herein. These Individuals Can Perform Other Duties But Need To Be Allowed Sufficient Time To Perform The Specialized Personnel S Assigned Quality Controls Duties As Described In The Cqc Plan. A Single Person Can Cover More Than One Area Provided That The Single Person Is Qualified To Perform Qc Activities In Each Designated And That Workload Allows. experience Matrix area qualifications civil graduate Civil Engineer Or Construction Manager With 2 Years Experience In The Type Of Work Being Performed On This Project Or Technician With 5 Years Related Experience. mechanical graduate Mechanical Engineer With 2 Years Experience Or Construction Professional With 5 Years Of Experience Supervising Mechanical Features Of Work In The Field With A Construction Company. electrical graduate Electrical Engineer With 2 Years Related Experience Or Construction Professional With 5 Years Of Experience Supervising Electrical Features Of Work In The Field With A Construction Company. structural graduate Civil Engineer (with Structural Track Or Focus), Structural Engineer, Or Construction Manager With 2 Years Experience Or Construction Professional With 5 Years Experience Supervising Structural Features Of Work In The Field With A Construction Company. architectural graduate Architect With 2 Years Experience Or Construction Professional With 5 Years Of Related Experience. environmental graduate Environmental Engineer With 3 Years Experience. submittals submittal Clerk With 1 Year Experience. concrete, Pavement, And Soils materials Technician With 2 Years Experience For The Appropriate Area. testing, Adjusting, And Balancing (tab) specialist Must Be A Member Of Aabc Or An Experienced Technician Of The Firm Certified By The Nebb. design Quality Control Manager registered Architect Or Professional Engineer the Estimated Magnitude Of This Construction Project Is Between $5,000,000.00 And $10,000,000.00. This Information Is Provided Per Vaar 836.204. The Naics Code Is 236220 And The Small Business Size Standard Is $45 Million. Interested Parties Should Indicate Their Interest To Kyle Kiepke No Later Than 4:00 Pm Est Friday, January 17, 2025, Via Email At Kyle.kiepke@va.gov. information Sought a) Sam Unique Entity Id (uei) b) Bonding Capability; Per Contract And Aggregate. Provide Amount Of Aggregate Bonding Currently Available (i.e., Amount Not Committed). c) Experience. Submission Of A Maximum Of Three (3) Recent And Relevant Examples Of Completed Or Substantially Completed (eighty Percent (80%)) Projects Between $5,000,000.00 And $10,000,000.00, Of Similar Scope To The Upgrade Visn 1 Laundry Building 45 Project. relevant Experience Shall Include Repair And Strengthening Of Existing Heavy Load-bearing Reinforced Concrete Structural Elements (such As Beams, Columns, Slabs, And Foundations) And Structural Framing In Already Completed Building, Cast In Place Concrete (to Include Footing, Pier And Foundation Installation), Reinforced Cmu Wall Installation, Concrete Beam Enlargement, Epoxy Injection Crack Repair, Slab Repair, Underside Slab Repair, And All Other Work Similar In Scope. Recent Is Defined As Completed Within The Last Five (5) Years. submission Instructions interested Firms Shall Hold Active Sam Registration. Visit Www.sam.gov To Register In This Database. sdvosb Or Vosb Firms Shall Be Certified By Veterans Small Business Certification (vetcert) (veterans Small Business Certification (sba.gov). all Information Must Be Submitted In Sufficient Detail For A Decision To Be Made. Failure To Submit All Information Requested In Addition To The Below Form May Result In A Contractor Not Being Considered As An Interested Concern. If Adequate Interest Is Not Received By 4:00 Pm Est On December 1, 2024, This Action May Not Be Set-aside For Sdvosbs, Vosbs, Wosbs, Or Small Business Firms. Interested Firms Must Reply Via E-mail To Kyle.kiepke@va.gov With The Subject Attention: 36c24125r0008 - Upgrade Visn 1 Laundry Building 45 . disclaimer this Sources Sought Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Request That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Notice.
7311-7320 of 7371 archived Tenders