Electrical Tenders

Electrical Tenders

National Irrigation Administration Tender

Philippines
Closing Date28 Jan 2025
Tender AmountPHP 141.5 Million (USD 2.4 Million)
Details: Description Invitation To Bid For Construction Of Solar Powered Pump With Ai Satellite-assisted Monitoring And Fertigation System For Zds Imo Projects (cluster 1) The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-egpipcluster12025-018 (infra) Project Name : Zamboanga Del Sur Imo Projects Contract Location : Zamboanga Del Sur Scope Of Works : Construction Of Solar Powered Pump With Ai Satellite-assisted Monitoring And Fertigation System (cluster 1) Approved Budget For The Contract (abc) : Php 141,525,729.76 Contract Duration : 240 Calendar Days Amount Of Bidding Documents : Php 50,000.00 The Nia – Ro9 Bac Is Conducting A Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : January 9 – 15, 2025 At 8:30 Am Pre-bid Conference : January 16, 2025 At 9:00 Am Submission Of Bids : January 28, 2025 At 8:30 Am Opening Of Bids : January 28, 2025 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting January 9 – 28, 2025. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 16 January 2025 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 28 January 2025 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/mhf-qztj-ggs Opening Of Bids : Https://meet.google.com/qdi-eomz-cfs 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Well Drilling, Supply/installation Of Pump Irrigation Projects With Mechanical, Irrigation & Flood Control And Electrical Works To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “medium B” Category: “a”, Sp-wd (well-drilling Work), Sp-ee (electrical Works), And Sp-me (mechanical Works). Additional Valid Certificate Of Well Driller Registration Issued By The National Water Resources Board (nwrb) Will Be Evaluated. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 3 Years A Licensed Civil Engineer. Experienced In Solar Powered Irrigation Projects. Shall Render Full-time Service To The Project Until Completion. 5 Years 9 Office Engineer 3 Years A Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Materials Engineer 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 5 Years 1 Foreman 5 Years Experienced In Solar Powered Irrigation Projects. Shall Render Full-time Service To The Project Until Completion. 5 Years 9 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 9 Geologist 3 Years A Licensed Geologist With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 5 Years 1 Electrical Engineer 3 Years A Licensed Electrical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 5 Years 1 Mechanical Engineer 3 Years A Licensed Mechanical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 5 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 3 Compressor 160 Cfm 3 Generator Set 15kva 3 Water Pump (for Pump Testing) 15hp 3 Dump Truck 10 Cu.m. 3 Dump Truck 4 Cu.m. 3 Welding Machine 300a 9 Concrete Mixer 1-bagger 3 Concrete Vibrator 5hp 3 Butt Fusion Machine Up To 2” Diameter 3 Service Vehicle 4x4 Pick-up 1 Geo-resistivity Equipment (multi-electrode) Up To 100m Depth 1 Survey Instrument 1 Set Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 3 Dump Truck 10 Cu.m. 3 Dump Truck 4 Cu.m. 3 Service Vehicle 4x4 Pick-up 1 Geo-resistivity Equipment (multi-electrode) Up To 100m Depth 1 Survey Instrument 1 Set The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit Package 1: Dipolo Ris – Php 28,215,173.24 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega (5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 160.00 Ln. M D Well Casing And Well Development Well Development 2.00 Unit Gravel Pack/gravel Filter 2.60 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 160.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 160.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 2.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 2.00 Set Flow Meter 2.00 Assy 4" Hydraulic Control Valve 2.00 Assy Pipes And Fittings 2.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 2.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 64.00 Pc Mc4 Connector 120.00 Pair Dc Cable From Pv String (1x4mm²) 376.00 M Ac Cable (8.0 Mm²) 376.00 M 2" ⌀ Rsc Conduit 376.00 M Grounding 2.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 2.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 2.00 Lot Installation 2.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 2.00 Lot Installation 2.00 Lot Structure Excavation(manual) 8.64 Cu.m Structure Backfill (manual) 4.86 Cu.m Class "a" Concrete 4.32 Cu.m Gravel Blanket 46.04 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 667.92 Kgs Cut, Bend And Place 667.92 Kgs Painting Works 9.00 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 2.00 Lot Installation 2.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 2.00 Lot Installation 2.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 174.00 Pc Installation 174.00 Pc Pipes And Fittings 2.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 11.00 Roll Installation 11.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 10.00 Roll Installation 10.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 10.00 Roll Installation 10.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 27.38 Cu.m Structure Backfill (manual) 10.28 Cu.m Class "a" Concrete 61.36 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 2,073.22 Kg Cut, Bend And Place 2,073.22 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 68.56 Sq.m Cyclone Chain Wire 206.10 Ln.m 2" Ø G.i Pipe( Sch. 40) 350.40 Ln.m Painting Works 21.28 Sq.m Water Proofing 176.00 Sq.m Gravel Blanket 6.62 Cu.m. Red Oxide Metal Primer 0.54 Sq.m N Construction Of Control House Structure Excavation(manual) 6.44 Cu.m Structure Backfill (manual) 2.34 Cu.m Class "a" Concrete 8.66 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 828.50 Kg Cut, Bend And Place 828.50 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 50.96 Sq.m Painting Works 143.38 Sq.m Water Proofing 24.50 Sq.m Gravel Blanket 2.14 Cu.m. Package 2: Salug Ris – Php 14,124,344.00 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 77.00 Pc Installation 77.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m. Package 3: Labangan Ris – Php 14,075,712.81 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 77.00 Pc Installation 77.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m. Package 4 - Campo Iv Pip: Php 14,101,468.25 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 77.00 Pc Installation 77.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m. Package 5 - Sta. Cruz Boniao Cis: Php 14,210,411.77 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 77.00 Pc Installation 77.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m. Package 6 - Dagohoy Cis: Php 14,205,997.44 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 83.00 Pc Installation 83.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m. Package 7 - San Miguel Pip: Php 14,183,248.07 A Construction Of Fourteen (14) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 77.00 Pc Installation 77.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m. Package 8 - Bag-ong Baroy Spip: Php 14,213,268.46 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 77.00 Pc Installation 77.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m. Package 9 - Rebokon Cis: Php 14,196,105.72 A Construction Of Two (2) Unit 15hp Solar Pv Submersible Pumping System @ 80m Depth Mobilization And Demobilization, Temporary Facilities And Construction Of Safety And Health Program Mobilization And Demobilization 1.00 Ls Temporary Facilities Construction Of Worker Shed/bodega ( 5 X 4 Meters) 1.00 Ls Construction Of Project Billboard 2.00 Units B Construction Safety And Health Program 1.00 Ls C Well Drilling 80.00 Ln. M D Well Casing And Well Development Well Development 1.00 Unit Gravel Pack/gravel Filter 1.30 Cu.m. Supply And Delivery Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M Installation Of 8" ⌀ Upvc Pipe X 6m 80.00 Ln. M E Pumping Test (specification Of Pump To Be Procured Is Based On The Result Of Pumping Test) Pump Test (using 15hp Pump) 1.00 Lot F Supply, Delivery And Installation Of Submersible Pump, Piping & Accessories Supply And Delivery Submersible Pump (15hp) 1.00 Set Flow Meter 1.00 Assy 4" Hydraulic Control Valve 1.00 Assy Pipes And Fittings 1.00 Lot Installation Installation Of Submersible Pump (15hp), Flow Meter, Hydraulic Control Valve, And Pipes And Fittings 1.00 Lot G Solar Panel Supply And Delivery Pv Modules (solar Panel 600watts) 32.00 Pc Mc4 Connector 60.00 Pair Dc Cable From Pv String (1x4mm²) 188.00 M Ac Cable (8.0 Mm²) 188.00 M 2" ⌀ Rsc Conduit 188.00 M Grounding 1.00 Lot Installation Installation Of Pv Modules, Conduits, Cables And Accessories 1.00 Lot H Inverter & Control Panel Inverter And Control Panel Supply & Delivery 1.00 Lot Installation 1.00 Lot I Mounting Structures Mounting Structure Supply ,delivery And Fabrication 1.00 Lot Installation 1.00 Lot Structure Excavation(manual) 4.32 Cu.m Structure Backfill (manual) 2.43 Cu.m Class "a" Concrete 2.16 Cu.m Gravel Blanket 23.02 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 333.96 Kgs Cut, Bend And Place 333.96 Kgs Painting Works 4.50 Sq.m J Ai Satellite Assisted Monitoring System Ai Satellite Assisted Monitoring System Supply & Delivery 1.00 Lot Installation 1.00 Lot K Fertigation System Fertigation System & Accessories Supply & Delivery 1.00 Lot Installation 1.00 Lot L Distribution Pipes Hdpe Iso4427 Sdr 21 2" Dia X 6m Supply & Delivery 83.00 Pc Installation 83.00 Pc Pipes And Fittings 1.00 Lot 4" Layflat Pipe(including End Connectors) Supply & Delivery 5.00 Roll Installation 5.00 Roll 3" Layflat Pipe (including End Connectors) Supply & Delivery 3.00 Roll Installation 3.00 Roll 2" Layflat Pipe (including End Connectors) Supply & Delivery 2.00 Roll Installation 2.00 Roll M Construction Of Perimeter Fence,stilling Pool And Nia Logo Structure Excavation(manual) 13.69 Cu.m Structure Backfill (manual) 5.14 Cu.m Class "a" Concrete 30.68 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 1,036.61 Kg Cut, Bend And Place 1,036.61 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 34.28 Sq.m Cyclone Chain Wire 103.05 Ln.m 2" Ø G.i Pipe( Sch. 40) 175.20 Ln.m Painting Works 10.64 Sq.m Water Proofing 88.00 Sq.m Gravel Blanket 3.31 Cu.m. Red Oxide Metal Primer 0.27 Sq.m N Construction Of Control House Structure Excavation(manual) 3.22 Cu.m Structure Backfill (manual) 1.17 Cu.m Class "a" Concrete 4.33 Cu.m Reinforcing Steel Bar Furnishing & Stockpilling 414.25 Kg Cut, Bend And Place 414.25 Kg Masonry Works 4" Thk. Chb (laying & Plastering Of Both Sides) 25.48 Sq.m Painting Works 71.69 Sq.m Water Proofing 12.25 Sq.m Gravel Blanket 1.07 Cu.m.

City Government Of Navotas Tender

Philippines
Closing Soon13 Jan 2025
Tender AmountPHP 1 Million (USD 17.2 K)
Details: Description Request For Quotations: Please Quote Your Best Offer For The Item/s Described Below, Subject To The Terms And Conditions Provided At The Dorsal Portion Of This Request For Quotation. Submit Your Quotation Duly Signed By You Or Your Duly Representative And Copies Of Eligibility Requirements (business Permit, Local/national Tax Clearance And Philgeps Certificate Of Registration) Not Later Than The Deadline For Submission. Items: Procurement For The Repair & Maintenance Of Transportation Equipment: Motor Vehicle Under The Repair & Maintenance Fund Of The City General Services Office Lot 1-repair & Maintenance Of Transportation Equipment: Motor Vehicle Unit Qty "item Description " Unit Cost " Lot 1 Repair And Maintenance Of Transportation Equipment : Motor Vehicle 1,000,000.00 Ordering Agreement - Supply Of Vehicle Parts For Minor Repairs And Maintenance At The Navotas Motorpool For 4 - Wheel Vehicles Pc/s 50 Battery Lug 150.00 Mtr/s 50 Wire-#10,16,18 290.00 Pc/s 50 Switches- 2gang,3gang,6gang 950.00 Pc/s 50 Handle Switch 1,200.00 Pc/s 100 Oil Seal 950.00 Pc/s 100 Battery Terminal Ci Brass 260.00 Pc/s 50 Brake Master 4,700.00 Pc/s 100 Repair Kit 1,200.00 Set/s 100 Brake Pads 2,500.00 Set/s 100 Brake Shoe 3,500.00 Pc/s 100 Drum Brake 6,900.00 Pc/s 100 Brake Hose 950.00 Pc/s 100 Bleeder Valve 1,250.00 Pc/s 100 Return Spring 950.00 Pc/s 150 Lug Nuts 95.00 Pc/s 150 Bolt/nut 65.00 Pc/s 300 Clips 75.00 Pc/s 150 Wheel Cap 95.00 Pc/s 150 Wheel Boot 95.00 Pc/s 50 Rotor Disk Brake 1,900.00 Pc/s 100 Headlight Bulb 850.00 Pc/s 100 Bulb Socket 150.00 Pc/s 100 Brake Light 250.00 Pc/s 100 Signal Light Bulb 150.00 Pc/s 100 Clutch Cable 3,900.00 Pc/s 100 Gas Cable 2,500.00 Mtr/s 50 Copper Tube 250.00 Pc/s 100 Hand Brake Cable 2,500.00 Pc/s 50 Lever 650.00 Pc/s 150 Air Filter 1,200.00 Pc/s 50 Hose-radiator Inlet 3,600.00 Pc/s 50 Hose-radiator Outlet "b" 3,100.00 Pc/s 50 Hose-radiator Outlet "c" 3,800.00 Pc/s 50 Hose-radiator Outlet 1,900.00 Pc/s 50 Hose-fill Line 1,350.00 Pc/s 50 Hose-heater 1,315.00 Pc/s 100 Hose Clamp 95.00 Pc/s 50 Belt "v" 3,700.00 Pc/s 50 Ribbed Belt-v 3,400.00 Pc/s 100 Radiator Hose 1,700.00 Pc/s 100 Radiator Cap 1,200.00 Pc/s 100 Fan Belt 1,600.00 Pc/s 150 Spark Plug 650.00 Pc/s 150 Spark Plug Terminal 380.00 Ltr/s 150 Radiator Coolant 550.00 Pc/s 100 Wheel Hub 1,600.00 Pc/s 100 Wheel Bearing 1,450.00 Pc/s 50 Wheel Cylinder 1,650.00 Pc/s 150 Seal 350.00 Box/s 30 Automotive Fuse 5a,10a,15a,20a,25a,30a 350.00 Assy/s 50 Horn 2,400.00 Pc/s 100 Relay 950.00 Ltr/s 150 Gear Oil 375.00 Pc/s 150 Tire Valve 150.00 Pc/s 150 Tire Selant 325.00 Pc/s 100 Throttle Controller 2,450.00 Pc/s 100 Tube 750.00 Pc/s 100 Truck Tubes 1,200.00 Pc/s 100 Flap 550.00 Ltr/s 150 High Performance Gear Oil 700.00 Assy/s 50 Clutch Master 3,100.00 Assy/s 50 Secondary Master 2,500.00 Set/s 50 Fender Liner 2,500.00 Pc/s 50 Floor Guard Rubber 3,000.00 Pc/s 50 Steering Wheel Cover 2,200.00 Pc/s 50 Side Mirror 1,200.00 Pc/s 50 Side Mirror Glass Only 350.00 Pc/s 50 Oil Filter 850.00 Pc/s 50 Coil 1,500.00 Unit 20 Radiator Assy. 5,200.00 Bottle/s 50 Coolant 3l 750.00 Bottle/s 100 Engine Oil 800ml 650.00 Assy. 30 Starter Motor Assy 10,990.00 Assy. 30 Alternator Assy 11,500.00 Pc/s 20 Alternator Pulley 950.00 Assy. 30 Fan Motor Assy. 3,800.00 Bottle/s 100 Brake Fluid 3l 340.00 Assy. 20 Fuel Pump Assy. 1,750.00 Pc/s 20 Clutch Disc 4,700.00 Pc/s 20 Clutch Cover 4,450.00 Pc/s 20 Pressure Plate 4,650.00 Pc/s 20 Release Bearing 2,150.00 Pc/s 30 Timing Belt 3,500.00 Pc/s 30 Tensioner Bearing 2,250.00 Pc/s 30 Tensioner Adjuster 950.00 Pc/s 30 Camshaft Oil Seal 1,350.00 Pc/s 50 Fuel Filter 980.00 Pc/s 20 Hydrovac Brake Booster 9,500.00 Pc/s 20 Ignition Switch 3,800.00 Pc/s 20 Intake Manifold Gasket 1,200.00 Pc/s 20 Intake/exhaust Valve 850.00 Pc/s 20 Knucle Bearing 1,200.00 Set/s 20 Leaf Spring Set 4,350.00 Pc/s 20 Main Bearing 3,500.00 Pc/s 20 Connecting Rod 3,800.00 Pc/s 20 Thrust Washer 1,450.00 Pc/s 20 Regulator 2,500.00 Pc/s 50 Car Charger Cigar Port 490.00 Pc/s 20 Steering Bearing 2,500.00 Pc/s 50 Ignition Coil 1,950.00 Pc/s 50 U-bolt 350.00 Pc/s 20 Power Steering Fluid Reservoir 1,350.00 Pc/s 20 Rotor Disc 4,950.00 Pc/s 20 Ball Joint 1,950.00 Set/s 20 Stabilizer Link 2,450.00 Pc/s 20 Bearing 1,350.00 Assy. 20 Shock Absorber 4,500.00 Set/s 30 Coil Spring 3,500.00 Pc/s 50 Battery Lug 150.00 Mtr/s 50 Wire-#10,16,18 290.00 Pc/s 50 Switches- 2gang,3gang,6gang 650.00 Pc/s 100 Oil Seal 350.00 Pc/s 100 Oil Filter 180.00 Pc/s 100 Engine Oil 550.00 Pc/s 100 Battery Terminal Ci Brass 100.00 Pc/s 50 Brake Master 950.00 Pc/s 100 Repair Kit 1,200.00 Set/s 100 Brake Pads 850.00 Set/s 100 Brake Shoe 950.00 Pc/s 100 Drum Brake 950.00 Pc/s 100 Brake Hose 650.00 Pc/s 150 Lug Nuts 95.00 Pc/s 150 Bolt/nut 65.00 Pc/s 150 Wheel Cap 95.00 Pc/s 150 Wheel Boot 95.00 Pc/s 50 Rotor Disk Brake 1,750.00 Pc/s 100 Headlight Bulb 250.00 Pc/s 100 Bulb Socket 150.00 Pc/s 100 Clutch Cable 550.00 Pc/s 100 Gas Cable 750.00 Pc/s 100 Hand Brake Cable 890.00 Pc/s 50 Lever 650.00 Pc/s 150 Air Filter 550.00 Pc/s 100 Hose Clamp 95.00 Pc/s 50 Belt "v" 1,200.00 Pc/s 150 Flyball 140.00 Pc/s 150 Slider 140.00 Pc/s 100 Pulley 950.00 Pc/s 100 Radiator Hose 650.00 Pc/s 100 Radiator Cap 490.00 Pc/s 150 Spark Plug 650.00 Pc/s 150 Spark Plug Terminal 650.00 Pc/s 5 E-cab 1000 Battery Charger 10,500.00 Pc/s 10 Wiper Motor 2,200.00 Pc/s 10 Meter Assy. 1,500.00 Pc/s 10 E-cab Braker 350.00 Ltr/s 150 Radiator Coolant 550.00 Pc/s 100 Wheel Hub 1,600.00 Pc/s 100 Wheel Bearing 750.00 Pc/s 50 Wheel Cylinder 850.00 Pc/s 150 Automotive Fuse 65.00 Assy/s 50 Horn 950.00 Pc/s 100 Relay 320.00 Ltr/s 150 Gear Oil 375.00 Pc/s 20 Breaker 450.00 Pc/s 150 Tire Valve 150.00 Pc/s 150 Tire Selant 325.00 Pc/s 100 Throttle Controller 350.00 Pc/s 50 Fun350 395.00 Set/s 50 Sprocket & Chain Set 6,800.00 Pc/s 50 Ecargo 375.00 Pc/s 100 Tube 280.00 Ltr/s 150 High Performance Gear Oil 700.00 Assy/s 50 Clutch Master 2,500.00 Pc/s 30 Side Stand 650.00 Pc/s 30 Center Stand 1,500.00 Pc/s 50 Wiper Arm 1,500.00 Assy/s 30 Exhaust Pipe 2,500.00 Pc/s 50 Stand Spring 150.00 Pc/s 50 Side Mirror 450.00 Pc/s 50 Chain 3,000.00 Pc/s 50 Front Sprocket 1,450.00 Pc/s 50 Rear Sprocket 2,800.00 Pc/s 50 Fender 980.00 Assy/s 50 Shock Absorber 2,500.00 Set/s 50 Sprocket & Chain Set 6,800.00 -tires Pc/s 10 10.00r20 18,500.00 Pc/s 10 11r22.5 25,500.00 Pc/s 10 165/80r13 5,400.00 Pc/s 30 185/60r15 5,700.00 Pc/s 50 185/70r14 6,000.00 Pc/s 30 185/70r15 8,600.00 Pc/s 30 185/80r14 7,100.00 Pc/s 40 185r-14c 6,700.00 Pc/s 10 195/70r15c 7,250.00 Pc/s 20 195r14c 8ply 7,600.00 Pc/s 50 195r15 7,680.00 Pc/s 30 205/65r16 8,600.00 Pc/s 20 205/85r16 13,100.00 Pc/s 50 205/65r15 8,400.00 Pc/s 30 215/70r - 16c 9,570.00 Pc/s 20 235/75r17.5 15,100.00 Pc/s 10 235/70r15 9,900.00 Pc/s 10 295/70r17 39,500.00 Pc/s 30 750/16 14,600.00 Pc/s 30 700/16 11,100.00 Pc/s 20 7.00/15 13,500.00 Pc/s 30 R(3.25-17) 3,100.00 Pc/s 30 F(2.75 - 17) 3,000.00 Pc/s 30 70-90-14 4,100.00 Pc/s 30 F(80-90-14) 4,100.00 Pc/s 30 (2.75-18) 2,850.00 Pc/s 30 (2.75-17) 2,500.00 Pc/s 30 (3.75-17) 2,800.00 Pc/s 30 (3.75 - 12) 2,900.00 Pc/s 30 (3.50 - 12) 2,750.00 Pc/s 30 (4.10-18) 3,600.00 Pc/s 30 (2.75-21) 4,300.00 Pc/s 30 (80/80-14) 3,800.00 Pc/s 30 (90/80-14) 4,100.00 Pc/s 30 2.75 – 17 2,650.00 Pc/s 30 3.00 – 17 2,850.00 -batteries Pc/s 30 Mg7l 4,000.00 Pc/s 30 Yb7bl 2,200.00 Pc/s 30 Ytx4l 2,200.00 Pc/s 30 12n9-4b-1 2,200.00 Pc/s 30 2sm 8,600.00 Pc/s 50 3sm 9,900.00 Pc/s 30 6sm 11,800.00 Pc/s 30 B24l 8,300.00 Pc/s 30 Ln3 11,000.00 Pc/s 20 2d 14,500.00 Pc/s 20 4d 16,200.00 Pc/s 20 8d 21,800.00 Pc/s 30 Ns60 8,300.00 Pc/s 15 E-cab Battery 11,200.00 -wiper Blades Pc/s 50 12" 500.00 Pc/s 50 14" 550.00 Pc/s 50 16" 600.00 Pc/s 50 17" 650.00 Pc/s 50 18" 700.00 Pc/s 50 19" 700.00 Pc/s 50 20" 750.00 Pc/s 50 21" 800.00 Pc/s 50 24" 850.00 Pc/s 50 26" 900.00 -lot 1 Navotas Motorpool Vehicle Repair And Maintenance Tools & Other Supplies Navotas Motorpool Vehicle Repair And Maintenance Tools & Other Supplies 200,000.00 Gal. 100 Car Wash And Wax Shampoo 330.00 Bottle/s 100 Car Wax, Wax And Dry, 769ml 880.00 Oz. 100 Carnauba Cleaner Paste Wax 14 Fl 850.00 Bottle/s 100 High Gloss Tire Black, 250ml 330.00 Pc/s 150 Chamois Towel 380.00 Pack/s 150 Microfiber Absorbent Square Towel 40*40cm 250.00 Set/s 10 6-32mm Combination Wrench Set 4,500.00 Set/s 10 Professional Car Tools Socket Wrench Complete Set 7,800.00 Set/s 10 Diagonal Combination Long Nose Pump Plier Pliers Set 2,000.00 Set/s 10 Tools Original Rapid Cross Wrench 17,19,21,23mm 2,140.00 Set/s 10 Vise Grip Set 5wr And 10wr (set) 2,500.00 Pc/s 10 Adjustable Wrenches Set (6", 8", 10") 1,500.00 Pc/s 10 High Pressure Washer Water Spray Gun 726.00 Pc/s 10 High Pressure Hose 20meters 2,915.00 Set/s 10 Power Sprayer Repair Kit - V-packing And Valve Seal 600.00 Pc/s 10 Lengthened Squeegee Cleaner Brush Shower Car Wiper Sponge 450.00 Pc/s 10 Industrial Multi-function Grease Gun (500g - 8500psi) 1,500.00 Unit 10 Electric Car Polisher Machine Auto Polishing Buffing 2,200.00 Pc/s 10 Soft Wool Clean Polishing Buffing Bonnet Pad For Car Auto 180mm/7" 420.00 Unit/s 1 Hydraulic Press 10 Ton 39,200.00 Unit/s 3 Bottle Jack 20tons 6,000.00 Unit/s 10 3 Tons Industrial Jack Stand 2pcs / Pair Iht 3,100.00 Unit/s 10 70mai Car Jump Starte Portable 70mai Car Jump Starte Portable 4,100.00 Pc/s 10 High Pressure Washer Brass Quick Coupler Connectors 600.00 Pack/s 50 Tubeless Tire Seal Strip Repair Plug 250.00 Pack/s 50 Tire Patches 50mm 1,000.00 Set/s 20 Auto Tire Repair Kit Tool 650.00 Can 50 Vulcanizing Solution 400.00 Pc/s 10 Car Tire Repair Kit Roller Auto Patch Roller 850.00 Gallon/s 20 Bac-to-zero Solution 4,000.00 Gallon/s 20 Disinfectant Solution 1,100.00 Set/s 10 Booster Cable 800amp Heavy Duty 5.0m 12/24v With Plastic Case 4,500.00 Pc/s 10 Heavy Duty Plastic Tool Box 980.00 Unit 2 Original Industrial (empty) Roller Cabinet With 7pcs Drawers 29,000.00 Set/s 10 Spark Plug Wrench Set 16" And 21" 1,700.00 Set/s 10 8pcs Screwdriver Set - Heavy Duty 1,545.00 Unit 10 6t/8t/12t Hydraulic Crimper Tool Kit Tube Terminals Lugs Battery Wire Crimping Force 3,800.00 Set/s 10 18pcs Hex Key And Torx Key Set(allen) 914.00 Pc/s 10 Philip Screw 200mm 310.00 Pc/s 10 Screw Driver 200mm 310.00 Set/s 1 Mini Obd2 Scanner Car Diagnostic Tools 25,000.00 Can 100 Brake Cleaner 650.00 Can 100 Electronic Contact Cleaner 650.00 Can 100 Anti Rust Lubricant 277ml 550.00 Pc/s 100 Epoxy Steel 210.00 Pc/s 100 Electrical Tape, Big 90.00 Pc/s 50 Tapelon 30.00 Unit 1 3 Jawed Puller 1,500.00 Set/s 1 Inner Bearing Puller 1,500.00 Set/s 1 Car Steering Wheel Puller Removal Tool 1,200.00 Set/s 1 Caliper Piston Compressor Press Tool Kit 1,200.00 Set/s 1 Snapring Plier Set 1,500.00 30 Can Grease 350.00 30 Can Chain Lube 950.00 50 Pc/s Electrical Tape, Small 60.00 20 Pc/s Boat Battery 3sm 9,900.00 50 Pc/s Floor Matting 1,600.00 50 Pc/s Seat Cover 2,800.00 60 Pc/s Dashboard Matting 650.00 150 Pc/s Car Headlight Cleaner 350.00 150 Pc/s Car Glass Cleaner 350.00 2 Set/s High Pressure Washer 1700w, 220v 6,000.00 20 Assy./s Car Key Duplicate 800.00 50 Unit/s Bottle Jack 4tons 3,000.00 100 Pc/s Car Air Freshener 210.00 1 Unit/s 2hp Air Compressor, Cylinder: 2, Phase: 1, Pressure: 115, Psi Capacity: 88liters 32,500.00 100 Btls Acid Rain Remover (250ml) 450.00 1 Unit Water Dispenser 8,000.00 1 Unit Dc Inverter Mma-300 Welding Machine 20,000.00 1 Unit " Oxy-acetylene Cutting Outfit W/complete Accessories Oxygen Cylinder, Acetylene Cylinder W/content 28,000.00 2 Unit Heavy Duty Soldering Iron 300a/200a 6,300.00 10 Kilos " Stainless Steel Electrode 308-1/16 1,500.00 20 Kilos Bronze Rod 1/8" 150.00 20 Can Soldering Paste Soldering Paste 300.00 20 Roll Lead Soldering Wire (250g) 500.00 20 Pound Borax 1 350.00 1 Unit Cordless Impact Wrench 18v 12,500.00 1 Unit Hydraulic Floor Jack (double Pump, Low Profile), Model:asj-5l Max Lifting Cap: 5tons, Lifting Height: 75-500mm, Net Weight: 45kgs 20,000.00 2 Unit 40" Car Creeper 2,100.00 1 Unit Automatic Wire Stripper Cutting Crimper 8 1/4" Detection Cutter 4in1 1,800.00 5 Set/s T- Handle Socket Wrench #8,10,12,14,17,19 1,500.00 10 Set/s Wrench 8-32mm 2,000.00 3 Unit Air Blow Gun / Air Duster 16mm 350.00 5 Unit Vice Grip 1,000.00 5 Unit Hammer 650.00 5 Unit Voltage Tester Car Truck Circuit Tester Pen Automotive 450.00 5 Unit Battery Load Tester 100amp Load 1,100.00 5 Unit Spout Funnel For Oil 1,600.00 5 Unit Car Repair Inspection Lamp Work Light 450.00 5 Set/s Torque Wrech 1/2drive Click Type 2,000.00 Unit 5 Jack Stand 6 Tons, Min Height: 382mm, Max Height: 600mm 5,600.00 Set/s 5 Steel Toe Rubber Boots 1,200.00 Set/s 10 Mechanical Heavy Duty Working Gloves 200.00 Set/s 5 Safety Shoes High Cut Sewed And Vulcanized Leather Safety Shoes Boots 650.00 Pc/s 5 Leather Long-sleeved Apron Waterproof Oil-proof 900.00 Set/s 10 Arm Band Heat Protector 450.00 Pc/s 5 Cover All Safety Suits 1,100.00 Pc/s 5 Hard Hat Safety Helmet 500.00 Gallon/s 20 Water Soluble Oil Degreaser 400.00 Pc/s 300 Rags 3.00 Pc/s 300 Sand Paper- #600,#1000,#1,200 10.00 Set/s 10 Wire Brushes Set Nylon,steel,stainless 100.00 Pc/s 10 Top Box Alloy, 45l 10,800.00 Set/s 10 Top Box Bracket 2,200.00 Abc:php1,000,000.00 Delivery Schedule: By Ordering Agreement (terms Of Reference Attached To The Pr) -spare Parts Must Be Deliver Within 3 Calendar Days -tools & Supplies Within 15 Calendar Days Upon Receipt Of The Delivery Ordering Contract Note: For Other Information, Queries And Specifications Pertaining To The Said Request Please Coordinate With Our Canvasser (please Secure Complete List And/or Rfq Form From Ms. Maricar E. Pablo, At 09676781263 Pauline Anne S. Sioco At 09338100230, And Roxette May P. Poblete At 0936-493-5632 Or Email Address: Procurement@navotas.gov.ph) Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required. 2. Bidders May Quote For All The Items. 3. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Days Calendar Days From The Date Of Submission. 4. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. Delivery Period Expressed Merely In Days Or Working Days Shall Be Rejected. 7. Award Of Contract Shall Be Made To The Lowest Quotation (for Goods And Infrastructure) Or, The Highest Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 8. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initiated By You Or Any Of Your Duly Authorized Representative/s. 9. The Item/s Shall Be Delivered As Indicated In The Approved Bac Resolution/purchase Order. 10. The Procuring Entity Concerned Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 11. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The City Government Of Navotas Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. For The Committee Original Signed Atty. Joel Joselito D. Parong Bac Chairperson

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Closing Soon15 Jan 2025
Tender AmountRefer Documents 
Details: This Is A Sources Sought Announcement Only. It Is Neither A Solicitation Announcement Nor A Request For Proposals Or Quotes And Does Not Obligate The Government To Award A Contract. Requests For A Solicitation Will Not Receive A Response. Responses To This Sources Sought Must Be In Writing. The Purpose Of This Sources Sought Announcement Is For Market Research To Make Appropriate Acquisition Decisions And To Gain Knowledge Of Potential Qualified Service-disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), Hubzone And Other Small Businesses Interested And Capable Of Providing The Services Described Below. Documentation Of Technical Expertise Must Be Presented In Sufficient Detail For The Government To Determine That Your Company Possesses The Necessary Functional Area Expertise And Experience To Compete For This Acquisition. Responses To This Notice Shall Include The Following: (a) Company Name (b) Address (c) Point Of Contact (d) Phone, Fax, And Email (e) Unique Entity Id (f) Cage Code (g) Tax Id Number (h) Type Of Small Business, E.g. Services Disabled Veteran Owned Small Business, Veteran-owned Small Business, 8(a), Hubzone, Women Owned Small Business, Small Disadvantaged Business, Or Small Business Hubzone Business And (i) Must Provide A Capability Statement That Addresses The Organizations Qualifications And Ability To Perform As A Contractor For The Work Described Below. the Loma Linda Va Health Care System (llvahcs) Located At 11201 Benton St., Loma Linda, Ca 92357 Is Seeking A Potential Qualified Contractor To Establish Full Maintenance Service For The Equipment And Systems Listed Below. important Information: The Government Is Not Obligated To Nor Will It Pay For Or Reimburse Any Costs Associated With Responding To This Sources Sought Synopsis Request. This Notice Shall Not Be Construed As A Commitment By The Government To Issue A Solicitation Or Ultimately Award A Contract, Nor Does It Restrict The Government To A Particular Acquisition Approach. The Government Will In No Way Be Bound To This Information If Any Solicitation Is Issued. The Va Is Mandated By Public Law 109-461 To Consider A Total Set-aside For Service-disabled Veteran Owned Small Business Set Aside. However, If Response By Service-disabled Veteran Owned Small Business Firms Proves Inadequate, An Alternate Set-aside Or Full And Open Competition May Be Determined. No Sub-contracting Opportunity Is Anticipated. The North American Classification System (naics) Code For This Acquisition Is 811210 Electronic And Precision Equipment Repair And Maintenance ($34 Million Dollars). notice To Potential Offerors: All Offerors Who Provide Goods Or Services To The United States Federal Government Must Be Registered In The System For Award Management (sam) At Www.sam.gov. Additionally, All Service-disabled Veteran Owned Businesses Or Veteran Owned Businesses Who Respond To A Solicitation On This Project Must Be Registered With The U.s. Small Business Administration Located At Https://veterans.certify.sba.gov All Interested Offerors Should Submit Information By E-mail To William.cornick@va.gov. All Information Submissions To Be Marked Attn: William Cornick, Contract Specialist And Should Be Received No Later Than 4:30 Pm Pst On January 14, 2025. 1. Scope Of Work: 1.1. The Contractor Will Furnish All Labor, Transportation, Parts, Test Equipment, Tools, And Expertise Necessary To Maintain The New Steris Washer Enclosure Install Located At The Loma Linda Va Medical Center. The Vendor Shall Provide The Following Coverages On The System: The Vendor Shall Have The Ability To Apply All Steris Washer Enclosure Part Changes To Ensure The System Is Installed And Maintained According To Manufacturer S Standards. 1.2. This Contract Is Effective For 1 Year Upon Date Of Award Plus 4 One-year Options That May Be Exercised By The Va. 1.3.. The Contractor, Their Personnel, And Their Subcontractors Shall Be Subject To The Federal Laws, Regulations, Standards, And Va Directives And Handbooks Regarding Information And Information System Security As Delineated In This Contract. 1.4. Normal Service Requirements Under This Contract Consist Of Scheduled Preventive Maintenance Inspections, Adjustments Repairs, As Specified Herein, Along With Scheduled Contractor Maintenance In Response To Service Calls Made By Va Loma Linda To The Contractor Due To A Partial Or Complete System Or Subsystem Failure Which Requires The Contractor To Respond Within A Specified Time Frame To Make Needed Repairs/adjustments To The System. 2. Equipment: 2.1. The Equipment To Be Serviced/maintained Includes: top Enclosure Panel 7053l / 7053hp 8 Ft. Ceiling, 4 Washers. install Of Top Enclosure Panels For 4 Washers 3. Definitions/acronyms: 3.1. Vall - Va Loma Linda Health Care System. Consists Of The Main Campus: 11201 Benton Street Address (909-825-7084)). 3.2. Co Contracting Officer. 3.3. Cor Contracting Officer S Representative. 3.4. Iaw In Accordance With 3.5. Pm Preventive Maintenance Inspection. Services Which Are Periodic In Nature And Are Required To Maintain The Equipment In Such Condition That It May Be Operated In Accordance With Its Intended Design And Functional Capacity With Minimal Incidence Of Malfunction Or Inoperative Conditions. 3.6. Fse Field Service Engineer. A Person Who Is Authorized By The Contractor. 3.7. Fsr Field Service Report. A Documentation Of The Services Rendered For Each Incidence Of Work Performance Under The Terms And Conditions Of The Contract. 3.8. Acceptance Signature Signature Of Va Loma Linda Employee Who Indicates Fse Demonstrated Service Conclusion/status And User Has Accepted Work As Complete/pending As Stated In Esr. 3.9. Authorization Signature Cor S Signature; Indicates Cor Accepts Work Status As Stated In Esr. 3.10. Osha Occupational Safety And Health Administration. 3.11. First Look / Co-op Type Of Service Contract Coverage Where The Va Bess Attempts To Solve Minor Problems Or Makes Easily Completed Repairs With Parts Provided By The Vendor. May Also Include The Va Bess Accomplishing Scheduled Maintenance (pm) Instead Of The Vendor Performing It. This Type Of Coverage Normally Results In A Cost Savings To The Government. 3.12. Bess Biomedical Equipment Support Specialist. Va Employee Responsible Vendor Coordination Of Maintenance For Va Owned Medical Equipment. 4. Conformance Standards: 4.1. Contract Service Shall Ensure That The Equipment/system Functions In Conformance With The Latest Published Edition Of Nfpa-99, Osha, Manufacturer S Network Equipment/system. Upgrades/updates Shall Be Installed In Strict Accordance With Manufacturer S Specifications And Must Operate Within Manufacturer S Specifications And Must Operate Within Manufacturer S Specified Parameters. 5. Hours Of Coverage: 5.1. The Contractor Will Respond By Phone At No Additional Charge, Within The Normal Business Hours (8:00 Am To 5:00 Pm (cst) M-f). 5.2. All Scheduled Service/repairs Shall Be Performed During These Normal Hours Of Coverage Unless One Of The Following Conditions Exist: 5.2.1 The Contractor Wishes To Perform Such Maintenance At A Time That Is Outside Of The Normal Hours Of Coverage, At No Additional Cost To The Government, And The Contractor Submits A Request To The Cor Prior To The Proposed Start Of The Maintenance And The Request Is Approved By The Cor Before Work Is Begun. 5.2.1.1 The Cor Directs That The Scheduled Maintenance Be Performed At A Time That Is Outside The Normal Hours Of Coverage And The Additional Cost Is Recommended By The Cor And Authorized By The Co. 5.3. Scheduled Maintenance Shall Be Performed In Accordance At The Manufacturer S Recommended Intervals And Should Be Scheduled/completed During The Month The Va Requests. Changes In This Periodicity Will Occur Only When Approval Is Granted By The Cor And Co. 5.4. Scheduling For Unscheduled Maintenance Requirements Outside Of Normal Hours Shall Be Coordinated With And Require The Approval Of The Cor. 5.6. Federal Holidays Observed By Va Loma Linda Are: labor Day columbus Day veteran S Day thanksgiving Day new Years Day martin Luther King Day president's Day memorial Day independence Day Christmas Day and Any Other Day Specifically Designated By The President Of The United States. 6. Unscheduled Maintenance: 6.1. Contractor Shall Maintain The Equipment In Accordance With Manufacturer S Standards. 6.2. The Contractor Shall Provide Repair Service, Which May Consist Of Calibration, Cleaning, Oiling, Adjusting, Replacing Parts, And Installing Parts. 6.3. All Parts Will Be Covered In This Agreement. 6.4. The Contracting Officer, Cor And Designated Alternate Have The Authority To Approve/request A Service Call From The Contractor. 6.5. Response Time: 6.5.1. Contractor S Fse Shall Respond By Phone During Normal Business Hours Or Within (30) Minutes After Normal Business Hours. 6.5.2. If The Problem Cannot Be Corrected By Phone Or By Remote Diagnostics The Contractor Will Dispatch A Technician To Arrive Not Later Than 4 Business Hours After The Call Is Placed. Uptime Commitment Shall Be 95%. 7. Scheduled Maintenance: 7.1. Contractor Shall Perform Pm Service To Ensure That Equipment Listed In The Schedule Performs In Accordance With The Manufacturer's Recommendations As Published In The Manufacturer S Maintenance Manuals For The System. 7.2. Contractor Shall Provide And Utilize Procedures And Checklists With Worksheet Originals Indicating Work Performed And Actual Values Obtained (as Applicable) Provided To The Cor At The Completion Of The Pm. 7.3. Pm Services Shall Include, But Need Not Be Limited To, The Following: 7.3.1. Cleaning Of Equipment To Include Filters, Gearing, And Other Parts. 7.3.2. Reviewing Operating System Software Diagnostics To Ensure That The System Is Operating As Specified By The Manufacturer S Specifications. 7.3.3. Calibrating And Lubricating The Equipment. 7.3.4. Performing Remedial Maintenance Of Non-emergent Nature. 7.3.5. Performing Electrical Safety Inspection Iaw Nfpa 99. 8. Parts: 8.1 The Contractor Will Provide All Replacement Parts Needed To Keep The System In Operating Condition As Originally Designed By The Manufacturer. 8.2 Parts May Be Repaired Or Replaced, As The Contractor Deems Appropriate. No Used Parts Will Be Used To Repair This Equipment. 8.3 Parts Shall Be Shipped For Arrival The Next Day By 1030 A.m. 9. Service Manuals: 9.1. Va Will Not Provide Service Manuals Of Service Diagnostic Software To The Contractor. The Contractor Shall Obtain, Have On File, And Make Available To Its Fses All Operational And Technical Documentation, (such As: Operational And Service Manuals, Schematics, And Parts List), Which Are Necessary To Meet The Performance Requirements Of This Contract. 9.2. The Location And Listing Of The Service Data Manuals, By Name, And/or The Manuals Themselves Shall Be Provided To The Contracting Officer Upon Request. 10. Documentation/reports: 10.1. Documentation Shall Include Detailed Descriptions Of The Scheduled And Unscheduled Maintenance Procedures Performed, Including Replaced Parts And Prices Required To Maintain The Equipment In Accordance With Manufacturer Specifications. Test Equipment Used For Calibration Shall Be Listed On The Service Report By Manufacturer, Model Number, Serial Number And Date Due Calibration. 10.2. Any Additional Charges Claimed Will Be Approved By The Co Via The Cor Before Service Is Completed. 11. Reporting Requirements: 11.1. Upon Arrival At Va Loma Linda, The Contractor Must Check In In With Va Loma Linda Police Dispatch To Obtain A Contractor Badge. The Contractor Will Always Visibly Wear The Badge While On Va Loma Linda Premises And Must Turn In The Badge Before Leaving Va Loma Linda Premises. 11.2. When Service Is Completed, The Fse Shall Document Services Rendered On A Legible Esr(s) And Submit To The Bess Who Set-up The Service. The Esr Can Be Submitted When Logging Out With Biomed, Via An Internet Web Site Or E-mail. Esrs Should Be Submitted Not Later Than 5 Business Days After Service Is Complete. Preferred Method Of Delivery Is Via Email To The Assigned Bess / Biomedical Technician. 11.3. In Those Cases When The Biomed Office Is Closed, Contractor Personnel Will Log In And/or Out Via The Va Police And After-hours Service Shall Be Prearranged With The Bess. 12. Services Beyond The Contract Scope: 12.1. Contractor Shall Immediately, But Not Later Than 24 Consecutive Hours After Discovery, Notify The Co And Cor, (in Writing), Of The Existence Of The Development Of Any Defects In, Or Repairs Required To, The Scheduled Equipment Which The Contractor Considers He/she Is Not Responsible For Under The Terms Of The Contract. 12.2. Contactor Shall Furnish The Cor With A Written Estimate Of The Cost To Make Necessary Repairs. 13. Condition Of Equipment: 13.1. The Contractor Accepts Responsibility For The Equipment Described In As Is Condition. 13.2. Failure To Inspect The Equipment Prior To Contract Award Shall Not Relieve The Contractor From Performance. of The Requirements Of This Contract. 14. Test Equipment: 14.1. Test Equipment Calibration Shall Be Traceable To National Institutes Of Standard Technology Standards. Each Service Report Shall List Test Equipment Used And Date Calibration To Nist Is Due. Test Equipment Out Of Calibration Shall Not Be Used. 15. Identification, Parking, Smoking, And Va Regulations: 15.1. Contractor S Fse(s) Identification Will Be Visible At All Times While On The Premises Of The Va. Identification Shall Include, At A Minimum, The Employee S Name, Position, And The Contractor S Trade Name. 15.2. It Is The Responsibility Of The Contractor To Park In The Appropriate Designated Parking Areas. Information On Parking Is Available From Va Police Service. Va Will Not Invalidate Or Make Reimbursement For Parking Violations Of The Contractor Under Any Conditions. 15.3. Smoking Is Prohibited Inside All Va Buildings. 15.4. Possession Of Weapons Is Prohibited. Enclosed Containers, Including Tool Kits, Shall Be Subject To Search. 15.5. Violations Of Va Regulations May Result In Citation Answerable In The United States (federal) District Court, Not A Local District, State Or Municipal Court. 16. Contractor Qualifications: 16.2. Fully Qualified Is Based Upon Training And Experience In The Field. For Training, The Fse(s) Has Successfully Completed A Formalized Training Program For The Equipment Identified In This Solicitation As Required By The Original Equipment Manufacturer (oem) And Equal To What The Manufacturer Provides Their Own Field Service Personnel. 16.3. Contractor Must Provide, Upon Request, Evidence Of Appropriate Training Of Any Fse(s) Providing Services Under Terms Of The Contract. Subcontracting Of Any Ensuing Award Of This Solicitation Will Not Be Allowed Without Written Permission Of The Contracting Officer. 16.4. Contractor Must Have Access To All Oem Proprietary Information Due To The Critical Nature Of These Services. Examples Of This Information Would Be Software Updates And Factory Service Bulletins That Describe Updates/modifications Needed To Make The Equipment Under This Contract Safe For Use.

Department Of Agriculture Tender

Software and IT Solutions
Philippines
Closing Date27 Jan 2025
Tender AmountPHP 16.4 Million (USD 283.1 K)
Details: Description Invitation To Bid For The Supply, Delivery, Subscription, Installation, And Configuration Of Various Ict Equipment And Network Softwares 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The Gaa Fy 2025 Intends To Apply The Sum Of Sixteen Million Four Hundred Thirty-two Thousand Pesos (php16,432,000.00) With Project Identification Number Da-rfo 1-2025-goods-032 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Each Lot, To Wit: Project Title Abc (php) Lot 1: Supply And Delivery Of Various Ict Equipment 7,912,000.00 Lot 2: Supply, Delivery And Subscription Of Various Ict Software 2,900,000.00 Lot 3: Supply, Delivery, Installation And Configuration Of Various Ict Network Equipment 4,620,000.00 Lot 4: Supply, Delivery, Installation And Configuration Of 100-port Data And Voice Structured Cabling With Fiber Optic Cable Backbones 1,000,000.00 Total 16,432,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Above-mentioned Procurement Project With The Following Details And Minimum Specifications, To Wit: Lot No. Particulars/descriptions Quantity Unit Cost Total Cost 1 Supply And Delivery Of Ict Equipment For Office Productivity Of Da-rfo 1 Employees 1 Lot 7,912,000.00 7,912,000.00 1) Laptop (high End, Branded) Processor: 13th Gen, 10 Cores, 16 Threads, 24mb Smart Cache, Up To 4.90 Ghz Max Turbo Frequency, 45w Base Power, Maximum Turbopower 105w Display: 15.6inch Fhd (1920x1080), 144hz, Ips-level Memory: 16gb Ddr5-5200 Max 64gb 2 Slots Storage: 1tb M.2 Ssd Slot (nvme Pcie Gen4) Graphics: 4608 Cuda Cores With Boost Clock 1230 - 2175 Mhz, 8gb Gddr6 Webcam: Hd Type (30fps@720p) Communication: Gb Lan 802.11 Ax Wi-fi 6 + Bluetooth V5.2 1x Type-c (usb3.2 Gen1 / Dp) 2x Type-a Usb3.2 Gen1 1x Type-a Usb2.0 Battery: 3-cell 53.5 Battery (whr) Ac Adapter: 200w Adapter Operating System: Licensed Windows 11 4 Units 2) Desktop Computer (high End, Branded) Lga1700 14th Generation Processor Family 20 Mb L3 Cache, 10 Cores, 16 Threads 16gb Ddr4 3200 512gb Nvme Gen 4 Ssd + 1tb Hdd 7200rpm Dedicated 6gb Ddr6 Graphics Card With Wi-fi And Bluetooth With Wireless Keyboard And Mouse Combo With 23.8 Inches Monitor Native 1920 X 1080 With Licensed Windows 11 Os Installed 10 Units 3) Laptop (regular, Branded) 13th Generation Mobile Processor 16gb 4800mhz Ddr5 512 Gb Nvme Ssd 15.6" Full Hd Wireless Ieee 802.11 A/b/g/n+ac+ax Capable 2x Usb Gen 3.2 Ports 1x Usb 3.2 Type C Port Built-in Webcam And Microphone Rechargeable Built-in Li-ion Battery With Licensed Windows 11 Os Installed 19 Units 4) Desktop Computer (regular, Branded) Lga1700 14th Generation Processor Family 8 Gb Memory Ddr5 Memory 512 Gb Nvme Ssd Gen. 4 23.8 Inch Full Hd Native 1920 X 1080 With Mouse And Keyboard With Licensed Windows 11 Os Installed With Lan, Wifi And Bluetooth Vga/dvi-d, Hdmi Or Display Port 14 Units 5) Printer 3-in-1 W/ Adf, A3 Color Printer 800 Nozzles Black, 256 Nozzles Per Color (cmy) Can Print Up To A3+ Size Paper Wifi, Wifi Direct And Ethernet Connection 4800 X 2400 Dpi Hi-speed Usb 2.0 Connectivity Duplex Printing Capable, Up To A3 Scan And Copy Thru Adf Scan And Copy Thru Glass Bed Bi-directional Printing Up To 25 Ipm Printing Speed With Consumables 100-240v Voltage, 50-60hz Frequency 10 Units 6) Portable Printer Print Speed Up To 14ppm With Built-in Battery Colour Lcd Panel Wifi And Wifi Direct Connectivity Bi-directional/uni-directional Printing Hi-speed Usb 2.0 Connectivity 14 Units 7) Multi-function Printer (for Pvc Id Card) Friction Feed Pvc Id Card Printing Enabled Micropiezo Printhead Bi-directional Printing 1.5pl Minimum Ink Droplet Size Maximum Print Resolution Of 5760 X 1440 Dpi With Variable-sized Droplet Technology Usb 2.0 Connection Wireless Capable Esc/p-r, Esc/p Raster Language With Bundled Consumables With Additional 1 Set Extra Consumables 3 Units 8) Multi-function Printer Printer Type: Print, Scan, Copy And Fax Maximum Resolution: 4800 X 1200 Dpi Print Speeds Up To 15.5ipm For Black And 8.5ipm For Colour Auto-duplex Printing Adf Capability Ethernet & Wi-fi Direct Colour Touch Lcd Screen Usb 2.0 Connectivity 15 Units 9) 3-in-1 Network Printer/ Scanner/ Photocopier Printer Type: Print/copy/scan/fax Precisioncore Printhead Bi-directional Printing 4800 X 1200 Dpi Maximum Resolution 2-sided Printing Capable 600 X 600dpi Copy Resolution Friction Paper Feed Front And Rear Tray With Lcd Screen Network: Ethernet, Wi-fi Ieee 802.11b/g/n, Wi-fi Direct Usb 2.0 Connection Ac 220-240v 50-60hz Up To A3 And A3+ Paper Size Cassette Capacity Of 250 Sheets For A4 (80gsm) Rear Capacity Of 20 Sheets For A3+ (80gsm) Up To 5.0 Ipm Scan Speed @200dpi With Bundled Consumables With Additional 1 Extra Set Of Consumables With 1 Piece Maintenance Box 10 Units 10) Dot Matrix Printer Impact Dot Matrix 9-pin Wide Carriage Up To 496cpi Prints Up To 6-part Forms 15,000 Power On Hours Mtbf Usb 2.0, Bi-directional Parallel Supported Bi-direction With Logic Seeking 200 Million Strokes/wire Printhead Life 2 Units 11) Flatbed Scanner Minimum Technical Specifications: Colour Scanner A4 Sheet-fed, 3-pass Duplex Scanner Led Light Source 1,200 X1,200 Dpi Output Resolution 215.9 X 3,048 Mm Maximum Document Size Supports 50 Gsm – 120 Gsm Paper Thickness 50 Sheets Adf Capacity Scan Speed Up To 25ppm/10ipm (300 Dpi) 24 Units 12) Portable Document Scanner A4 Sheet-fed, Simplex Colour Scanner Optical Resolution: 600 X 600 Dpi Output Resolution: 50 – 1,200 Dpi 216 X 1,828.8 Mm Maximum Document Size Contact Image Sensors (cis) Compact Size And Footprint Powered Via Usb, Ac Adapter Or Built-in Battery Scan Speed Up To 4.0sec Per Sheet (on Battery) Usb 2.0, Wi-fi And Wi-fi A/p Mode Connectivity 20 Units 13) Projector (indoor) Native Resolution Full Hd (1080p) Large Screen Projection Up To 391" 3000 Lumens Of Colour And White Brightness Comes With Android Tv™2 Dongle And Chromecast Built-in™ 5w Speaker (with Enclosure) Life (normal / Eco): 6,000 / 12,000 Hours (normal / Eco) F-number: 1.44 Focal Length: 16.4mm Zoom Ratio: 1.0 – 1.35 (digital Zoom) Throw Ratio: 1.19 – 1.61 Usb Type A: 1 (for 2a Power Supply, Firmware Update And Copy Osd Settings) Usb Type B: 1 (for Firmware Update And Copy Osd Settings) Hdmi: 1 (hdcp 1.4) 10 Units 14) Dslr Camera 24.2mp Aps-c Cmos Sensor Dual Pixel Cmos Af Ii 4k30 Video, 4k60 With Crop; Hdr-pq 23 Fps E. Shutter, 15 Fps Mech. Shutter 2.36m-dot Oled Evf 1.04m-dot Vari-angle Touchscreen Lcd Multi-function Shoe, Wi-fi And Bluetooth 18-45mm F/4.5-6.3 Is Stm Lens Lithium-ion Battery Pack Charger For Battery Pack 8 Units 15) Portable Audio System (branded) Digital Wireless Microphone Included Output Power: At Least 1100 Watts 30hz-20khz (-6db) Dynamic Frequency Range With 3.5mm Audio Cable Input Bluetooth Connection Usb Playback Guitar And Microphone Input True Wireless Stereo Using Bluetooth Connection With Rca Output Microphone Specifications: Frequency: 2404 - 2478mhz Encryption: Aes - 128 Working Range: 30m (100ft) Latency: < 12ms Frequency / Channel Selection: Adaptive Channel Selection Frequency Response: 50hz - 15khz Dynamic Range: 100db@ 1k Hz Signal -to -noise: 59dba Thd: < 1% @ 94db Spl, 200 - 10khz Microphone Rechargeable Battery: 600mah, 3.7v Li-ion Battery Dongle Battery: 700mah 3.7v Li-ion Battery Playtime Of Microphone: Up To 20 Hours Playtime Of Dongle: Up To 12 Hours Microphone Battery Charge Time: < 2.5h In Off Mode Dongle Battery Charge Time: < 2.5h In Off Mode Microphone Head: 16mm Ecm Transmitting Power: < 10dbm Receiver Maximum Output Level: < 1v Rms 6 Units 16) Handheld Gps Receiver 2.2" Transflective, 65k Color Tft Display Type 240 X 320 Pixels Display Resolution 25 Hrs Battery Life Ipx7 Water Rating High-sensitivity Receiver 2 Aa Nimh Or Lithium Rechargeable Batteries And Charger Included 30 Units 2 Supply, Delivery And Subscription To Various Ict Software 1 Lot 2,900,000.00 2,900,000.00 1) Graphic Design Platform 1tb Of Cloud Storage 1000 Brand Kits 100m+ Photos, Videos, Graphics, Audio Ai-generated Writing And Designs Unlimited Premium Templates Ai Admin Controls Edit, Comment, And Collaborate In Real-time With Online Customer Support 3-year Subscription *1 Account = 3 Users 5 Units 2) Cad Modeling Software Civil-infrastructure/engineering Design And Documentation Software Supports Computer-aided Design And Building Information Modeling Site And Survey Workflows Drainage Design And Analysis Plan Production And Documentation Intersection Design Corridor, Geotechnical And Terrain Modeling Commercial New Single User With Electronic-license Delivery (eld) 1 Year Subscription 2 Units 3) Cad And Drafting Software With Specialized Toolsets Commercial New Single User 2d Crafting, Drawing & Annotation 3d Modeling & Visualization Architecture, Mechanical, Map 3d, Electrical, Plant 3d And Raster Design Toolsets Commercial New Single User With Electronic-license Delivery (eld) 3 Year Subscription 2 Units 4) Cad And Drafting Software With Specialized Toolsets Commercial New Single User 2d Crafting, Drawing & Annotation 3d Modeling & Visualization Architecture, Mechanical, Map 3d, Electrical, Plant 3d And Raster Design Toolsets Commercial New Single User With Electronic-license Delivery (eld) 1 Year Subscription 2 Units 5) Office Productivity Software On Premise - Open License Graphical User Interface/keyboard Driven Menu System Support In Inserting And Editing 3d Models Support To Scalable Vector Graphics (svg) With Filters Live Preview While Formatting With Built-in Language Translator Support For Touch-enabled Devices, Digital Pens And Mouse For Drawing Shapes, Writing Out Complex Math Problems And Highlighting Text. With Accessibility Checker With Support For International Standards 45 Units 3 Supply, Delivery, Installation And Configuration Of Ict Network Equipment Of Da-rfo 1 1 Lot 4,620,000.00 4,620,000.00 1) Network Firewall Subscription At Least 3yrs Throughput Ngfw, Ips & Threat Protection: 1.6, 2.6 & 1 Gbps Concurrent Ssl-vpn Users: 500 2.2 Gbps Application Control Throughput Capwap Throughput (http 64k): 15gbps Heat Dissipation: At Least 100.6 Btu/h 80plus Compliant Power Supply Efficiency Rating Ports: 2 Ge Rj45 Wan, 4 Ge Rj45 Or Sfp Shared Ports, 1 Console And Usb Port Concurrent Tcp Sessions: 1.5million 10,000 Firewall Policies Throughput Ipsec Vpn: 11.5 Gbps Compliance Fcc Part 15b, Class A, Ce, Rcm, Vcci,ul/cul, Cb, Bsmi Ac Power Supply 100–240v Ac, 50/60 Hz Form Factor (supports Eia/non-eia Standards) Rack Mount, 1 Ru With Complete Accessories & Compatible With Existing Network Setup. 1 Unit 2) Network Switch (access) 10/1g Uplink Ports Forwarding And Switching Rate: 261.9 Mbps & 176 Gbps Per Hour Mean Time Between Failures: At Least 503,400 Jumbo Frames Capacity: 9198 Bytes Flash And Dram: 4gb And 2 Gb Entries Of Flexible Netflow: 16,000 Flows On 24 Or 48 Port Gigabit Ethernet Models Bandwidth Stacking: At Least 80 Gbps Mac Addresses Total And Ipv4 Routes: At Least 16,000 And 11,000 Routing Entries For Ipv4 & Ipv6: 3,000 & 1,500 Qos Scale & Acl Entries: 1000 With Complete Accessories & Compatible With Existing Devices. 1 Unit 3) Wireless Lan Controller (bundled With 6-ap & Licenses) Fixed Service Port: Auto-negotiation 10/100/1000base-t, Auto Mdi/mdix Crossover Standard Rj45 & Usb Port Management Port 40w Max. Power Consumption 200,000 Hours Mean Time Between Failure (mtbf) At The Standard Temperature 2048 Maximum Number Of Configurable Access Points Default Number Of Manageable Access Point Of 32 448 Maximum Number Of Manageable Access Point Wlan Service: 2048 Maximum Wlan Id At Least 32,768 Mac Address Entries 4096 Of Virtual Lans Ipv4 Address Pools: 2,000 Ipv4 Addresses: 24,576 Ipv6 Address Pools: 256 Ipv6 Addresses: 2,048 Ieee 802.11 Protocols: 802.11, 802.11b, 802.11a, 802.11g, 802.11d, 802.11h, 802.11w, 802.11k, 802.11v, 802.11r, 802.11i, 802.11e, 802.11n, 802.11ac, And 802.11ax Ieee 802.11 Security And Encryption: Multi-ssid Mode,ssid Hiding Ieee 802.11i-compliant Psk Authentication, Wpa And Wpa2,wpa3: Wpa3-personal (sae), Wpa3-enterprise (ccmp, 128-bit), And Wpa3-enterprise (gcmp, 192-bit),wep (wep/wep128), Tkip, Ccmp, Anti-arp Spoofing User Access Management: Console Port Login, Telnet Login, Ssh Login, And Ftp Upload Maximum Number Of Stas Supported By The Built-in Portal Server:1,500 Number Of Acl Entries:65,536 Entries With Six (6) Compatible Wireless Access Point With Six (6) Licenses Included Bundled With Training And Certification With Complete Accessories. 1 Unit 4) Network Attached Storage (nas) 64 Bit Cpu Architecture Cpu Frequency: 2.6 / 3.1 Ghz System Memory 2gb Ddr4 Ecc Drive Bays: At Least 4 Compatible Drive Type: 3.5" Sata Hdd & 2.5 Sata Ssd External Ports: 2 Rj-45 1 Gbe Lan Ports, 1 Usb 3.2 Gen 1 Port Pcie Expansion: 1 X Gen3 X 2 Network Upgrade Slot System Fan: 40mm X 40mm X 3pcs 28.5 Db(a) Noise Level Power Supply Unit : 100 Watts Power Consumption: 37.93 Watts (access), 13.43 Watts (hdd Hibernation) Rohs Compliant Bundled With At Least 4 Hdd (16tb) With Complete Required Accessories 2 Units 5) Ups 10kva (rack-mounted) Capacity: 10kva Rackmounted With Battery Input: Voltage: 200-240v +/- 10% Voltage Range: 176-3000v +/- 10% (full Load) Frequency: 56hz - 64hz Battery: 16 X 12v/9ah Output Voltage: 220-240v +/- 10% Frequency: 50hz-60hz +/- 5% Transfer Time: 0 (ac To Battery), 0ms (inverse To Bypass) True Double Conversion Microprocessor Control Technology Ensures High Reliability Input Power Factor Correction Output Power Factor 0.8 Waveform (batt Mode): Pure Sine Wave With Complete Accessories And Warranty. 4 Units 6) Wireless Access Point Max Throughput Up To 400mbps At 2.4g, Up To 867 Mbps At 5g 1.267 Gbps Ofdm: Bpsk@6/9mbps, Qpsk@12/18mbps, 16-qam@24mbps, 64-qam@48/54mbps Protocol: Concurrent 802.11ac Wave2, Wave1, 802.11a/b/g/n Spatial Streams: 2.4g 2x2mimo 5g 2x2mimo Antenna: Internal Antennas(2.4g: 2dbi,5g: 2dbi) Operating Bands: 802.11b/g/n: 2.4g ~ 2.4835ghz, 802.11a/n/ac: 5g:5.150~5.250ghz,5.725~5.850ghz 11b: -91dbm (1mbps), -88dbm (5mbps), -85dbm (11mbps) 11a/g: -89dbm (6mbps), -80dbm (24mbps), -76dbm (36mbps), -71dbm (54mbps) 11n: -83dbm@mcs0, -65dbm@mcs7, -83dbm@mcs8, -65dbm@mcs15 11ac Ht20: -83dbm (mcs0), -57dbm (mcs9) 11ac Ht40: -79dbm (mcs0), -57dbm (mcs9) 20 Units 7) Unmanaged Switch Ports:16 X 10/100base-x Poe+ Ports, 2 X 10/100/1000base-t Ports With 2-port Gigabit Rackmount Poe Switch Layer Type: Unmanaged Switching Capacity:7.2 Gbps Forwarding Rate:5.36 Mpps Mac Address Table:8000 Fan: Fanless Port Surge:6kv 4 Units 8) Ups 1kva Available Capacity : 1kva / 600w Line Interactive Switching Ups 2 X 12v7ah Battery Input Power : 190~240va (50~60hz) Output Power : 220~230va (50~60hz) 24 Units 9) Drone (quadcopter) Gimbal:3-axis Flight Control System: Gnss Support Gps, Beidou, Galileo Maximum Operating Distance:9.3 Miles / 15 Km Battery Capacity:5000 Mah / 77 Wh Charging Temperature 41 To 104°f / 5 To 40°c Maximum Ascent Speed 17.9 Mph / 8 M/s Maximum Descent Speed 13.4 Mph / 6 M/s Maximum Wind Resistance 26.8 Mph / 12 M/s Flight Ceiling 3.7 Miles / 6000 M Image Sensor:4/3″-type Cmos Sensor Resolution Effective: 20 Megapixel (5280 X 3956) Focal Length: 24mm (35mm Equivalent) Field Of View: 84° Maximum Aperture: F/2.8 Minimum Aperture: F/11 Minimum Focus Distance:3.3′/1 M Rotor Configuration: 4 Operating Temperature:14 To 104°f/-10 To 40°c With Complete Accessories, Controller Device, Bag And Extra Batteries And Propeller. Bundled With Formal Drone Pilot And Safety Training, Drone Pilot License & Rpas Certifications Acquisition. 1 Unit 4 100-port Data And Voice Structured Cabling With Fiber Optic Cable Backbones 1 Lot 1,000,000.00 1,000,000.00 Managed Switch Bandwidth Stacking: At Least 80 Gbps Entries Of Flexible Netflow: 32,000 On 24 Or 48 Port Multigigabit Models Stacking Switch Capacity & Forwarding Rate: 256 Gbps & 190 Mbps Jumbo Frames Capacity: 9198 Bytes Flash And Dram: 4gb And 2 Gb Forwarding And Switching: At Least 130.95 Mbps And 176 Gbps Per Hour Mean Time Between Failures: At Least 346,270 Mac Addresses Total And Ipv4 Routes: At Least 16,000 And 11,000 Routing Entries For Ipv4 & Ipv6: 3,000 & 1,500 Sfp Transceiver Module Hot Pluggable Sfp Msa Compliant To Maximize Uptime And Simplify Maintenance Modal Bandwidth Min :400 At Least 1804 Ft. Operating Distance Stackwise Cables Support 16 Gbps Speeds In Both Directions, Yielding A Traffic Total Of 32 Gbps Bandwidth Bidirectionally Cable Length:1.6 Ft Conductor: Copper Network Server Rack Cabinet Minimum Technical Specifications: Capacity: 22u With Exhaust Fans And Power Distribution Cables, I/o Ports And Accessories 1 Lot Roughing-in Materials For Horizontal And Backbone Distribution 1 Lot Roughing-in Materials For Fiber Backbone Distribution 1 Lot Mobilization / Demobilization 1 Lot Testing And Commissioning 1 Lot Preparation, Documentation Of As-built Plan Drawings And Turn-over Of Network Design And Diagram 1 Lot Cables, I/o Ports And Accessories 1 Lot Grand Total 16,432,000.00 All Equipment With 1 Year Warranty On Parts & Services. Drop Off Point: Da Rfo I, City Of San Fernando, La Union Delivery Schedule: 90 Calendar Days From Receipt Of Notice To Proceed (ntp). Delivery Of The Goods Is Required Within 90 Calendar Days Upon Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From January 7-27, 2025 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Project Title Bid Docs Fee Lot 1: Supply And Delivery Of Various Ict Equipment 10,000.00 Lot 2: Supply, Delivery And Subscription Of Various Ict Software 5,000.00 Lot 3: Supply, Delivery, Installation And Configuration Of Various Ict Network Equipment 5,000.00 Lot 4: Supply, Delivery, Installation And Configuration Of 100-port Data And Voice Structured Cabling With Fiber Optic Cable Backbones 1,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. Note: For Lot Procurement, The Maximum Fee For The Bidding Documents For Each Lot Shall Be Based On Its Abc, In Accordance With The Guidelines Issued By The Gppb; Provided That The Total Fees For The Bidding Documents Of All Lots Shall Not Exceed The Maximum Fee Prescribed In The Guidelines For The Sum Of The Abc Of All Lots. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 14 January 2025, 1:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 27 January 2025, 1:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 27 January 2025, 1:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa. C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Eligibility Requirements Can Be Fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed By The Bidder/authorized Representative On Each And Every Page Thereof. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No. :(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo 1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ January 6, 2025 Approved: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-goods-032

City Center for Culture and Sports Tender

Others
Czech Republic
Closing Date24 Jan 2025
Tender AmountCZK 2.3 Million (USD 94.5 K)
Details: The subject of the small-scale public contract is the modernization of the social facilities of the open-air cinema in Sezimovo Ústí, in the building of the projection room. The current social facilities in the underground floor will be reconstructed, and a new toilet for the disabled will be created on the above-ground floor. The action is divided into two stages, which are necessarily related and will be directly connected to each other. In the first stage, all work in the 1st floor from the point of view of social facilities will take place. The subject of the second stage will be the construction of a ramp and a toilet for the disabled in the 1st floor. The construction plan represents construction modifications in the following scope: 1. Demolition and dismantling work. 2. Replacement of all interior cladding, plaster, floors, doors and sanitary ware, fixtures. 3. In the 1st floor, an opening will be bricked up into the projection room and a new one will be knocked down into the perimeter wall in place of the existing window as an entrance. An outdoor ramp with a railing will be built at the entrance and a new toilet will be installed. 4. New distributions of the technical equipment of the buildings will also be carried out, modifications to the existing air conditioning equipment and electrical installations will be made. 5. The water supply connection will be made new along the original route, and this will be 17 MA long, equipped with a water meter, and the heating of hot water will be solved by a boiler without circulation. 6. Modifications to the air conditioning system will be carried out; the suction part of the distributions, including the fan, will be dismantled and replaced with new ones, the exhaust part will be renovated. 7. The electrical installation of the modified parts will be connected from the existing switchboard, which will be modified to add circuit breakers to the DIN rail; Existing Circuits Will Be Disconnected And Canceled. 8. All Details Are Part Of The Attached Project Documentation. 9. The Contractor Is Obliged To Use Selected Reference Products During Implementation Regarding The Tiling And Flooring Selected By The Client: Flooring: • Vogue System Interni In Nero 20x20 Tile: • Vogue System Interni Ghiaccio 20x20 – White • Hidra Prisma White Mate 20x20/ Retro Flooring Deceram Pam Cement Star Black 20x20 Rett. (This is another name for the same cladding) 10. Requirements for the profession: Construction (demolition work, excavations, foundation construction of the ramp, waterproofing, replacement of window and door fillings, wall surface treatment), plumbing work, locksmith work, so-called - ventilation distribution, electrical 11. During the work, the investor will convene inspection days. Necessary consultations will be carried out continuously, according to the current situation in the progress of the work. All results of the consultations will be stated in a separate record. 12. The work will be valued and subsequently carried out according to the project documentation and the specified description of the public contract.

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n7m2.7|egp|7176052048|andrew.stader@navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| liquidated Damages--supplies, Services, Or Research And Development (sep 2000)|1|tbd| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| equal Opportunity For Veterans (jun 2020)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| contractor Purchasing System Administration-basic (may 2014)|1|| authorized Deviations In Clauses (nov 2020)|2||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| small Business Program Representations (feb 2024)|4|334111|1250||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| certification Regarding Knowledge Of Child Labor For Listed End Products(feb 2021))|4||||| annual Representations And Certifications (may 2024)|13|334111|1250|||||||||||| alterations In Solicitation (apr 1984)|3|||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ all Freight Is Fob Origin. this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. the Government Is Seeking A Repair Turnaround Time (rtat) Of: 180 Days government Source Inspection (gsi) Is Required. please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work. your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________ important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A ""reconciliation Modification"" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Filter Subassembly . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Filter Subassembly Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;1vpw8 01-p43011j001 1vpw8 01-p43243j001 ; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Power Supply Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Power Supply Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;1vpw8 01-p42975j001; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;1vpw8 01-p46160f001 ; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Power Supply . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Power Supply Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;1vpw8 01-p43910j001 Or 01-p43005j001; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Assy,black Io Bridg . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Assy,black Io Bridg Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;1vpw8 01-p46100f001 ; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Receiver Subassembl . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Receiver Subassembl Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;1vpw8 01-p45945f001; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Module,infosec . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Module,infosec Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;1vpw8 01-p46920j001 1vpw8 01-p46920j002; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Building Construction
United States
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Details: Synopsis: Request For Architectural And Engineer Sf330 Submission. solicitation: 36c2552r00031 Renovate Restrooms And Lactation Spaces sf330 Request Information For Project 589a7-25-501: this Ae Services Requirement Is Being Procured In Accordance With The Brooks Act (public Law 0582) And Implemented In Accordance With The Federal Acquisition Regulation (far) Subpart 36. Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work Per The Evaluation Factors Listed Below. this Procurement Is Restricted To Service-disabled Veteran Owned Small Business (sdvosb) Firms. This Requirement Is Being Procured In Accordance With The Vaam 836.6 Implemented In Far Subpart 36.6. this Is Not A Request For Proposal (rfp) And An Award Will Not Be Made With This Announcement. This Announcement Is A Request For Sf330 S From Qualified Contractors Who Meet The Professional Requirements Listed Herein. the Selection Criteria For This Acquisition Will Be In Accordance With Far 36 And Are Listed Below In Descending Order Of Importance. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. The Contract Is Anticipated To Be Awarded By March 31, 2025. award Of Any Resultant Contract Is Contingent Upon The Availability Of Funds. no Solicitation Document Is Available And No Other Information Pertaining To Project Scope Is Available. Any Request For Assistance With Submission Or Other Procedural Matters Shall Be Submitted Via Email Only To Kevin.mahoney3@va.gov Personal Visits To Discuss This Announcement Will Not Be Allowed. the Naics Code For This Procurement Is 541310 Architect Services With A Small Business Size Standard Of $12.5 Million. Award Of A Firm Fixed Price Contract Is Anticipated. Anticipated Time For Completion Of Design Is Approximately 180 Calendar Days After The Notice To Proceed Has Been Issued Including Time For Va Reviews. The Ae Firm Shall Also Be Required To Perform Construction Period Services If Award Of A Construction Project Contract Is Made. database Registration Information: verification Of Status Of The Offeror Shall Be Accomplished Before Review Of Sf 330. This Acquisition Is 100% Set-aside For Qualified Service Disabled Veteran Owned Small Business. Only Architect-engineer Businesses Inc Compliance With Vaar 852.219-10 Are Eligible. Only A/e Firms Verified And Listed In The Sba Vendor Information Pages Database, (veteran Small Business Certification (sba.gov), Shall Be Considered. Firms Not Verified At The Time Of Receipt Of The Sf 330 In The Sba Veteran Small Business Certification Program Shall Be Considered Non-responsive And Shall Be Excluded From Further Consideration. system For Award Management (sam): federal Acquisition Registrations Require That Federal Contractors Register In The System For Award Management (sam) Database At Https://sam.gov/content/ And Enter All Mandatory Information Into The System. Award Cannot Be Made Until The Contractor Has Registered. Offerors Shall Be Actively Registered In Sam Prior To Submitting Their Qualifications Package. Any Firm Not Actively Registered In Sam By The Date Of Receipt Of The Sf 330 Shall Be Considered Non-responsive And Shall Be Excluded From Further Consideration. the Excluded Parties List System (epls): to Ensure That The Individuals Providing Services Under The Contract Have Not Engaged In Fraud Or Abuse Regarding Sections 1128 And1128a Of The Social Security Act Regarding Federal Health Care Programs, The Contractor Is Required To Check The Excluded Parties List System (epls) Located At Https://sam.gov/content/ For Each Person Providing Services Under This Contract. Further The Contractor Is Required To Certify That All Persons Listed In The Qualifications Package Have Been Compared Against The Epls List And Are Not Listed. During The Performance Of This Contract The Contractor Is Prohibited From Using Any Individual Or Business Listed On The List Of Excluded Individuals/entities. e-verify System: companies Awarded A Contract With The Federal Government Shall Be Required To Enroll In E-verify Within 30 Days Of The Contract Award Date. They Shall Also Need To Begin Using The E-verify System To Confirm That All Of Their New Hires And Their Employees Directly Working On Federal Contracts Are Authorized To Legally Work In The United States. E-verify Is An Internet-based System That Allows An Employer, Using Information Reported On An Employee's Form I-9, To Determine The Eligibility Of That Employee To Work In The United States. There Is No Charge To Employers To Use E-verify. (far 52.222-54) a-e Firms Are Required To Respond If Interested By Submitting One (1) Completed Standard Form 330 Qualification Package Parts I And Ii To Include All Consultants (form Available On-line At: Http://www.gsa.gov/portal/forms/download/116486. Must Include In Part I Section H An Organizational Chart Of The Firm (excludes Consultants), And Information Pertaining To A Design Quality Management Plan. Submission Information Incorporated By Reference Shall Not Be Considered. All Submissions Shall Be Made Electronically. Packages Which Are Hand Delivered Or Delivered Via Surface Mail Or Any Other Method Other Than Electronically Shall Not Be Reviewed. completed Package Shall Be Delivered Electronically On Or Before January 31, 2025 At 2:00pm Central Time To: Kevin.mahoney3@va.gov Hard Copies Shall Not Be Accepted. The Email Subject Line Shall Clearly Identify The Sf330 Request Number: 36c25525r0031 Renovate Restrooms And Lactation Spaces Sf330 Request Information For Project 589a7-25-501: the Size Of The Pdf Document Must Be Below 10 Mg Or The Va Email Will Error Out And Reject The Application. It Is The Contractor S Responsibility To Ensure That The Application Is Received. Only One Email Will Be Accepted From Each Firm (contractor). evaluation Factors: selection Criteria Are In Accordance With Federal Acquisition Regulation (far) Part 36.602-1 And Va Acquisition Regulation (vaar) Part 836.602-1. Prospective Firms Are Required To Address All Selection Criteria Within Submitted Sf 330 Packages Using Additional Pages As Necessary. Sf 330 Submissions Including Any Additional Pages Are Not To Exceed Fifty (50) Pages Exclusive Of Table Of Contents, Title Page, And Divider Pages. Each Side Of A Piece Of Paper Is One Page (i.e., Two Pages To A Single Sheet Of Paper). Blank Pages Are Not Included In The Count. sf330 Submission Packages Which Exceed 50 Pages Will Be Considered Non-responsive And Shall Be Excluded From Further Consideration. The Only Exclusions To The 50-page Limit As Listed In The Request For Sf330 Are: Table Of Contents, Title Page, And Divider Pages. Title Page Shall Not Exceed More Than One (1) Page. Table Of Contents Shall Only Contain The Information Necessary To Define The Contents Of The Document. Divider Pages May Contain A Maximum Of One (1) Line Of Description. Responses Must Reference 36c25525r0031 Renovate Restrooms And Lactation Spaces Sf330 Request Information For Project 589a7-25-501: prospective Firms Are Required To Address All Selection Criteria Within Submitted Sf 330 Packages And The Information Contained Herein. qualifications (sf330) Submitted By Each Firm For 36c25525r0031 And Project 589a7-25-501 Renovate Restrooms And Lactation Spaces Will Be Reviewed And Evaluated Based On The Following Evaluation Criteria Listed Below: evaluation Factors For Sf330 Review Submitted For project 589a7-25-501 Renovate Restrooms And Lactation Spaces Selection Criteria Are In Accordance With Federal Acquisition Regulation (far) Part 36.602-1 And Va Acquisition Regulation (vaar) Part 836.602-1. Prospective Firms Are Required To Address All Selection Criteria Within Submitted Sf 330 Packages Using Additional Pages As Necessary. Sf 330 Submissions Including Any Additional Pages Are Not To Exceed Fifty (50) Pages Exclusive Of Table Of Contents, Title Page, And Divider Pages. Each Side Of A Piece Of Paper Is One Page (i.e., Two Pages To A Single Sheet Of Paper). Blank Pages Are Not Included In The Count. sf330 Submission Packages Which Exceed 50 Pages Will Be Considered Non-responsive And Shall Be Excluded From Further Consideration. The Only Exclusions To The 50-page Limit As Listed In The Request For Sf330 Are: Table Of Contents, Title Page, And Divider Pages. Title Page Shall Not Exceed More Than One (1) Page. Table Of Contents Shall Only Contain The Information Necessary To Define The Contents Of The Document. Divider Pages May Contain A Maximum Of One (1) Line Of Description. Responses Must Reference 36c25525r0031 Renovate Restrooms And Lactation Spaces Sf330 Request Information For Project 589a7-25-501: prospective Firms Are Required To Address All Selection Criteria Within Submitted Sf 330 Packages And The Information Contained Herein. qualifications (sf330) Submitted By Each Firm For 36c25525r0031 And Project 589a7-25-501 Renovate Restrooms And Lactation Spaces Will Be Reviewed And Evaluated Based On The Following Evaluation Criteria Listed Below: evaluation Factors For Sf330 Review Submitted For project 589a7-25-501 Renovate Restrooms And Lactation Spaces professional Qualifications: The Qualifications Of The Individuals Which Will Be Used For These Services Will Be Examined For Experience And Education And Their Record Of Working Together As A Team. Ae Firms Shall Have Professional Architects, Engineers, And Consultants Who Are Licensed In The United States Of America. Current And Valid License Information Must Be Provided. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, And Experience Relevant To A Project Of This Size And Scope) Of Personnel Proposed For Assignment To The Project. key Positions And Disciplines For This Project Which Will Be Evaluated Include, But Are Not Limited To: architect/designer interior Design electrical Engineer project Manager plumbing Engineer mechanical Engineer fire Protection Engineer quality Assurance industrial Hygienist cost Estimator a/e Firms Are Required To Develop Their Own Team Based Upon Their Understanding Of The Project Requirements And Not Solely Upon The Previous List. specialized Experience And Technical Competence: A/e Firms Must Have Specific Design Experience And Technical Skill In The Type And Scope Of Work Required For Renovations And New Construction At Existing Medical Facilities, Including, Where Appropriate, Renovating Space For Patient Privacy And Rehabilitation Services, Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. Experience And Qualifications Of Personnel Proposed For Assignment To The Project And Their Record Of Working Together As A Team. Ae Firms With Demonstrated Experience Of Higher Numbers Of Team Members Who Are Key Personnel Working Together On Past Projects Will Receive A Higher Score Than Those That Do Not Demonstrated Experience Of Higher Numbers Of Team Members Who Are Key Personnel Working Together On Past Projects. submissions Shall Include No More And No Less Than One (1) And No More Than Three (3) Recent And Relevant Government And Private Experience Projects Similar In Size Scope And Complexity, And Experience With The Type Of Projects/competence Above That Were Completed By The Ae Firm Submitting The 330 S. Relevant Is Defined As Those Task Requirements Identified In The Project Description. Recent Is Defined As Design And Construction Period For Projects That Are Both Design And Construction Complete Within The Past 5 (five) Years. Each Project Shall Include The Following: project Title, Contract Number, Location And Detailed Narrative Describing The Scope Of Services Provided Including The Type Of Work Performed By The Offeror And Its Role In The Project I.e., Prime Contract, Teaming Partner, Or Subcontractor. project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. services & Deliverables Provided Under The Contract/task Order. period Of Performance, Including Start And Completion Dates. total Dollar Value Of The Project For Both The Award Cost And Final (completed) Cost. federal, State, Or Private Enterprise Contract? the Evaluation Will Also Consider Narratives Addressing The Following Topics In Section H. Simply Re-stating This List In Section H Will Not Be Sufficient. The Narrative Of How The Firm Addresses Each Of These Will Be Evaluated. the Management Approaches. the Coordination Of Disciplines And Subcontractors quality Control Procedures, And familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Federal, State, And Local Standards. capacity: The Prime Contractor Will Be Evaluated To Determine If It Has The General Workload And Staffing Capacity Within Its Design Office Which Will Be Responsible For The Design To Accomplish The Work In The Required Time.â  In Accordance With Vaar 852.219-75:  in The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-73.  any Work That A Similarly Situated Vip-listed Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded.   Prime Contractor Must Include Its Certification Of Compliance With The Limitations On Subcontracting Specified In 852.219-75 With Its 330 Submissions. past Performance: Provide Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Project Cost Control, Quality Of Work, And Compliance With Performance Schedules. Information Presented Must Clearly Demonstrate The Construction Cost Limit, A/e Created Cost Estimate, And Final Awarded Cost Of The Project. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Cpars Entry. Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted With Each Project In Section F So Cpars Can Be Reviewed In The Database. for Any Project That Does Not Have Cpars Data Available, A Past Performance Questionnaire (ppq) May Be Submitted With The Sf330. The Ppq Should Be Rated And Signed By The Evaluator. If A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. evaluations Will Consider Ratings On Projects Which Are Design And Construction Complete In The Last Three (3) Years, Information Regarding Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf 330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. location Of Design Firm: Per Far 36.602-1 Selection Criteria: Market Research Indicates That At Least 3 Qualified Firms Exist Within A 500-mile Radius Of The Wichita Va Medical Center Located At 5500 E. Kellogg, Wichita, Kansas 67218. This Procurement Is Restricted To Service-disabled Veteran Owned Small Business (sdvosb) Firms Located Within A 500-mile Radius Of The Robert J. Dole Veterans Affairs Medical Center (vamc) In Wichita, Kansas. Architectural Prime Contractors Whose Primary (i.e., Headquarters, Primary Corporate Office, Main Office) Physical Business Address Is Within A 500-mile Radius From The Wichita Va Medical Center Located At 5500 E. Kellogg, Wichita Kansas 67218 And Resides Within The Borders Of The United States Of America Will Receive A Higher Score On Evaluations. architectural Prime Contractors Whose Primary Physical Business Address Is Outside A 500-mile Radius From The Wichita Va Medical Center Located At 5500 E. Kellogg, Wichita Kansas 67218 And Resides Within The Borders Of The United States Of America Will Receive A Lesser Score On Evaluations. architectural Prime Contractors Are Required To Verify The Primary Physical Business Address (described Above) As Part Of The Sf330 Response. If The Information Cannot Be Verified As Required, The Sf330 Will Be Found To Be Nonresponsive And Will Not Receive Further Consideration. sf 330 Submissions From Companies Located Outside The Borders Of The United States Of America Shall Not Be Considered. claims And Terminations: Any Record Of Significant Claims Against The Firm Or Terminated Contracts Because Of Improper Or Incomplete Architectural And Engineering Services Will Be Examined.

DEPT OF THE NAVY USA Tender

Scraps
United States
Closing Soon9 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n743.49|wvm|7176052147|benjamin.t.spangler.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20|0001aa|25|365|0001ab|lot|see Dd1423|0001ac|1|150|||||||||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a |n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| first Article Approval--government Testing (sep 1989)|7|1|0001ac|150|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000|30|x|| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| progress Payments (nov 2021)|4||||| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|13|335931|600|||||||||||| cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1|| instructions To Offerors -- Competitive Acquisition (nov 2021)|2||| type Of Contract (apr 1984)|1|firm Fixed| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x|| evaluation Of First Article Testing|3|x|$42,000|| this Amendment Is Issued To Update Solicitation Clauses. this Requirement Is Not A Small Business Set-aside And Is Full And Open. \ ---this Requirement Is Not A Small Business Set-aside.--- 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already Onfile At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286. 3. The Following Proposed Delivery Schedule Applies: submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. weld Procedure And Qual Data 120 Days Adc Lt approval Of Weld Procedures And Qual Data 60 Days After Receipt fat Report 150 Days After Approval Of Pr Lt approval Of Fat Report 30 Days After Receipt Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract. 4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). 5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000. 6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation. 7. This Solicitation Requires First Article Testing. Far 52.290-4 First Article Approval - Government Testing For More Details. 8. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Or Faxed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=1197258 |53711| C| |d|0001 | C|49998|0876328 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080211|f| |01| document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-24231 | | |e |130426|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Electrical Hull Fitting And Transmitter Cable Assembly For The An/bst-1 Must Be In Accordance With Naval Ship Engineering Center Drawing 803-1197258, Except As Amplified Or Modified Herein.; 3.2 ;ls2swu-12 Cable Is To Be Used In Lieu Of Ls2swua-12 Cable.; 3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required. 3.4 ;the First Article Test (fat) Sample(s) Must Not Be Delivered Against The Contract Quantity.; 3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;receptacle Body, Item 14; material - ;qq-n-281, Class A; part - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; material - ;qq-n-286, Form 2, Cold Drawn Or Hot Finished, Annealed And Age Hardened And Must Meet The Mechanical Requirements Cited In Note 2.h Of Drawing 803-1197258 Except The Brinell Hardness Minimum Is 250 Instead Of 265 As Listed In Note 2.h; 3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - Quality Conformance/compliance Inspection item - ;each Electrical Hull Fitting Assembly; performance - ;mil-dtl-24231, Table I For Type Iv And Note 22 On Drawing 803-1197258; acceptance - ;mil-dtl-24231; test - ;dye Penetrant Inspection; item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Annealing And Age Hardening item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; performance - Qq-n-286 test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer) item - Weldments performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Visual And Dye Penetrant Inspection (final Layer) item - Weldments performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1); Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000; For First Article Tests In Accordance With The ;requirements Of Mil-dtl-24231, Table I For Type Iv And Note 21 On Drawing 803-1197258; . 3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.24.2 Inspection For Completeness And Proper Type. 3.24.3 Verification Of Material Quality Received. 3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.24.6 Identification And Protection From Improper Use Or Disposition. 3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.24.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.28 Material Handling - The Written Material Control Process Must Include The Following: 3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.29 Receiving Inspection - 3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.29.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.30 Discrepancy Reporting - 3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt - Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding. this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding. this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 12 - See Clause 52.209-3 For Submittal Timeframes.

The City Of Rovensko Pod Troskami Tender

Czech Republic
Closing Date3 Feb 2025
Tender AmountRefer Documents 
Details: The Subject of the Sub-Limit Public Contract for Work, "Reconstruction of the Rovensko Pod Troskami Primary School" Is the Renovation of the Buildings of the Primary School No. 213 (Construction Modifications of the Social Facilities in the 1st and 2nd Grades Including the Replacement of Existing Aged Water Distribution Systems in the Classrooms, Sewage Sewage, Electrical Installations and Addition of Air Conditioning to the Social Facilities and Partly to the Central Heating System) and No. 413 (Replacement of the Roofing Including Partial Replacement of the Formwork and Repair of the Truss, Installation of a New Eaves System). The Public Contract Is Divided Into Parts Pursuant to Section 101 of the Public Procurement Act: Part 1) Construction Modifications of the Primary School No. 213 Part 2) Replacement of the Roofing of the Primary School No. 413 Inspection of the Place of Performance Will Take Place on January 14, 2025 from 9:00 AM, with a Meeting of Participants at the Place of Implementation, at Elementary School No. 213 for Both Parts of the Public Contract.

Municipality Of Itogon, Benguet Tender

Food Products
Corrigendum : Closing Date Modified
Philippines
Closing Date22 Jan 2025
Tender AmountPHP 3 Million (USD 52.9 K)
Details: Description Lot 1 - Groceries Item No. Quantity Unit Of Issue Item Description 1 643 Kg All Purpose Flour (1kg) 2 12 Kg Baking Powder (1kg) 3 240 Packs Burger Bun (6pcs/pack) 4 519 Packs Burger Patties (6pcs/container-228g) 5 87 Packs Cheese (22 Slices/pack) 6 46 Packs Chicken Nuggets Star Shape (200g/pack) 7 20 Kg Chicken Quarter Leg (/kg) 8 133 Packs Chicken Whole / Pack 9 8 Packs Cocoa Powder (500g) 10 185 Cans Condensed Creamer (390g) 11 51 Gallon Cooking Oil (4 L/gallon) 12 53 Packs Corn Starch (1kg/pack) 13 6 Packs Dry Yeast (800g) 14 99 Trays Egg (m-30pcs/tray) 15 149 Cans Evaporated Milk (370ml) 16 364 Packs Fishball (1kg/pack) 17 105 Packs French Fries (450g) 18 20 Packs Fresh Gata (200ml) 19 143 Kg Glutinous Rice (1kg) 20 366 Packs Hotdog - Cheese Flavor (250g/pack) 21 360 Packs Hotdog - Regular (250g/pack) 22 73 Packs Jumbo Siopao (10pcs/pack) 23 18 Gallon Ketchup (4 L/gallon 24 368 Packs Kikiam (500g/pack) 25 152 Packs Longganisa Skinless (450g/pack) 26 324 Packs Longganisa Smoked (225g/pack) 27 7 Kg Margarine Classic (1kg) 28 18 Gallon Mayonaise (3.5 L/gallon) 29 20 Kg Pork Meat (/kg) 30 10 Kg Pork Meat Grind (1kg) 31 25 Packs Pork Siomai Japanese (30pcs/pack) 32 371 Packs Pork Siomai Yellow (30pcs/pack) 33 212 Packs Pork Tocino (450g/pack) 34 100 Kg Raw Peanut /kg (for Peanut Butter Making) 35 180 Packs Shanghai (15pcs/pack) 36 519 Sacks Special Commercial Rice (25kg/sack) 37 35 Sack Sugar - Washed (25kg/sack) 38 35 Kg Sugar Brown (1kg) 39 11 Sacks Sugar White- Refined (25kg/sack) 40 238 Packs Sweet Ham (220g/pack) 41 7 Packs Whip Cream Powder (500g) 42 30 Sets (100 Pcs) 12 Oz Buko Cup Set, Printed White Plastic Cup With Lid And Sealer 43 1 Set 144 Pcs High Quality Puto Molder Multicolor Baking Tools For Puto Kutchinta Assorted Medium 44 1 Pcs 22cm Sifter For Baking Premium Quality Fine Mesh Stainless Steel Strainers With Wide Resting Ear Design - Strainer Wire Mesh - Fine Mesh Strainers 45 1 Set 236pcs Cake Kit With Decoration Icing Nozzle Set Pastry Bag Spatula Muffins Cupcake Molds Baking Supplies 46 4 Unit 32cm Non-stick Frying Pan 304 Stainless Steel Frying Pan Double Layer Full Mesh Pot Cooker 47 10 Sets 50pcs 8oz/ 232ml/ Small Plastic Peanut Butter Jar 48 2 Unit "makapal Palanggana Wash Basin Stainless Steel Supported Weight 8kg Dimension (l X W X H) 63cmx63cmx16cm" 49 2 Pcs 9 Inches Round Pan 50 10 Packs "aluminum Foil 5meters/8meters Wrap Food Grade Foil Wrapper Sheet Roll" 51 4 Unit Aluminum Frying Pan "kawa" 49cmx42cmx15cm Diameter 52 1 Set Bakeware Sets 10 Piece Non-stick Bakeware Set - Carbon Steel Baking Tray Set, Suitable For Oven, Refrigerator And Freezer 53 9 Pcs Baking Pan, Non Stick, Rectangular, 27.5x18x6cm 54 5 Pcs Stainless Basin 55cm 55 1 Pcs Big Pot, Double Handle Cast Iron Size #1, Big Kawali, Frying Pan Wok 56 1 Pcs "caldero/cauldron Pot Aluminum Double Handle (d1-d5) Size (diameter 34.5cm) Sizes (lxwxh) D1=37.5x34.5x23.5cm" 57 10 Dozen Drinkingware Coffee Mug Brown Coffee Cup 9oz/ 250ml 58 100 Pcs "peanut Butter Jar/ Orange Cup Cannister Condiments Container Large 624 Grams 650ml 22oz" 59 100 Pcs "peanut Butter Jar/ Orange Cup Cannister Condiments Container Medium 454 Grams 473ml 16oz" 60 100 Pcs "peanut Butter Jar/ Orange Cup Cannister Condiments Container Small 227 Grams 234ml 8oz" 61 12 Pcs Pie Pan 12"inch X 1 Inch Height 62 5 Set "plastic Puto Cups/ Baking Cups/ Kutsinta Cups Mold/ Sauce Dish/ Macaroons/ Pichi Pichi/ Soy Sauce Thick Plastic. Good Quality. Random Color Upon Order. 100pcs Per Order Medium #5-6cm" 63 1 Pcs S/s Soup Laddle With Wooden Handle 6oz 64 2 Pcs Special J.kawa 42"-44" 65 4 Pcs Stainless Bowl 55cm 66 1 Set Stainless Steel Measuring Cup Stackable Kitchen Measuring Tool 67 2 Unit Stainless Wok Pan And Non-stick (38cm, 1.6 Kg) 68 2 Set Steel Mixing Bowl Set Of 3 With Capacity Markings Indicator Lot 2: Equipment: Item No. Quantity Unit Of Issue Item Description 1 19 Unit 11kg Lpg Gas Tank With Content 2 1 Unit 2in1 Burger Griller With Deep Fryer (with Free Cooking Kits) 3 3 Unit "3 Layer Electric Steamer 9.0l Capacity 1.1l Water Tank Capacity Rapid Steam System Pp Body And Pc Tray See Through Water Window All Removable Parts Are Dishwasher Safe 60-minutes Times Heating And Power Lights Secure Non-slip Feet" 4 3 Unit "3.5 Cu.ft. Showcase Chiller 7-level Temperature Control, Double Glass Door Blower Fan, Led Light, Price Tag Shelves 3 Adjustable Coated Wire Shelves Clean Back Design, Fan-cooled System Recessed Handle, Internal & External Lamps Switch, Front Levelling Feet 100w Input Power " 5 15 Unit 3in1 Burger Griller With Deep Fryer And Steamer 6 1 Pcs 41cm Steamer - 3 Layer Aluminum 7 1 Unit "55l Electric Oven Tempered Glass Door Accessories: Bake Tray, Baking Rack, Tray/rack Handle, Rotisserie Stick And Rotisserie Fork Inner Dimension 420x340x290mm" 8 1 Unit "5l Electric Stand Mixer Net Weight (kg): 6.6 Kg Gross Weight (packed): 8.25 Kg Net Weight (wxhxd): 420x395x255 Mm (16.54x15.55x10.04in)" 9 1 Unit 6.8 Cu.ft. Solid Top Chest Freezer/chiller 10 3 Unit 6ft. Folding Table 11 1 Unit "7 Speed Electric High Grade Super Hand Mixer Pancake/cupcake Batter Dispenser Whisk Chrome Beater Balloon Whisk He-133 *model: He-133 *body Material: Plastic *blade Material: Stainless Steel *rated Wattage: 260 Watts *rated Voltage: 220-240 Volts *gear Position: 7 Speed *rated Frequency: 50/60hz *controls Type: Knob Control *item Dimension Lxwxh: 18 X 6.5 X 12.1 Centimeters" 12 1 Unit "90 Liters Capacity Oven 250c Temperature Control 60 Min. Timer With Bell Ring With Convection And Rotisserie Function Inner Light/indicator Lamp Heater Selector Switch Tempered Glass Door Stainless Steel Heating Elements 5 Stages Of Switch Heating And Function Selector Accessories: Bake Tray 52.6 X 36.2 Cm 685x454x426mm Inner Dimension: 515x415x330mm Baking Racks, Tray/rack Handle, Rotisserie Stick And Rotisserie Forks" 13 2 Unit "blender 1.5-liter Glass Jar 2 Speed Control With Pulse Function Stainless Steel Blade Overheat Projector On Motor With Safety Lock Powerful Motor For Superior Blender" 14 1 Unit "boiler Coffee Maker And Tea Maker Perculator 7.0 Liter Double-layer Stainless Steel Wall Boil Dry Protection Switch Stainless Steel Lid With Lock Internal Water Gauge 1100 Watts" 15 1 Unit Cast Iron C40 Single Burner 16 1 Unit "chest Freezer 7.0 Cu.ft. Hd Inverter Solid Top *hd Inverter Compressor *dual Function Technology (freezer Or Chiller) *electric Control *galvanized Interior *led Light *roller Feet *recessed Handle With Key Lock *dimension (hxwxd) 85x91x55 Cm" 17 1 Unit Commercial Pressure Cooker High Quality 304 Stainless Steel Large Capacity Pressure Cooker 32cm 15 Liters 18 2 Unit Digital Weighing Scale 30kg 19 1 Unit "donut Maker 16 Hole Machine Double Sided Heating Doughnut Makers Breakfast Machine Hot Cake Waffle Maker Power: 1400w Voltage: 220-240v Plug Type: Eu Plug Power Source: Electric Color: Stainless Steel + Black Heating: Heating On Both Sides Materials: Non-stick Coated" 20 2 Unit Electric Oven 23l Heo23r 4 Function 23 Liters 21 11 Unit Electric Oven, 90 Liters Capacity, 120 Min Timer W/ Bell Ring 100-250c Temp Control 22 29 Unit Fc-06 Adf Chest Freezer 6 Cu.ft., Dual Function-freezer Or Chiller 8-level Frontal Temperature 23 1 Unit "food Dehydrator Voltage: 220v Frequency: 10 Layers 50hz Power: 800w Net Weight: 11kg Size: 380 X 400 X 465 Mm Stainless Steel Trays Outer Body Temperature: 30-90 Degress" 24 1 Unit Food Steamer Hfs-55 / 3 Level Food Steamer Food Steamer 10.0l Hfs55 25 2 Unit "four Layer Glass Box Organizer Display Four Layers, Each With A Height Of 15.25 Cm, A Length Of 61 Cm And A Width Of 23 Cm " 26 5 Unit "heavy Duty Double Burner Stove G1000max 2 Twin Jet 120mm Black Cast Iron Burner Brass Burner Cap Automatic Piezo Ignition System Gas Power: 5.2 Kw #304 Stainless Steel Body Cast Iron Trivet Unit Dimension: 69.4(w) X 36(d) X 14.5(h) Cm Box Dimension: 75(w) X 46(d) X 17(h) Cm Net Weight: 6.1 Kg Gross Weight: 7.5 Kg" 27 10 Unit "heavy Duty Electric Stand Mixer 8-speed Multiple Function Stand Mixer 5-liter Stainless Bowl 600 Watts High-powered Motor Soft Start That Minimizes Splatter With Aluminum Dough Hooks And Beater Guard With Stainless Steel Wire Whisk" 28 1 Unit Heavy Duty Ice Crusher Machine 29 1 Unit "heavy Duty Rice Cooker 5.6l Irc-560n Teflex Non-stick Coating Pot Stainless Steel Body Cool Touch Handle Pilot Light Indicator 5.6 Liter Capacity Cooks Up To 30 Cups Of Rice Measurements: L48 X W39 X H30.5cm Model: Irc-560n 1950w" 30 1 Unit Heavy Duty Single Burner Cast Iron Autmatic Ignition Gas Stove 31 1 Unit "heavy Duty Steamer Makapal Matibay Aluminum 3 Layer Steamer Bottom Layer Is The Base 2nd And 3rd Layer Are The Steamer" 32 1 Unit "heavy Duty Wet And Dry Grinding Machine Pang Giling (corn, Rice, Coffee, Soyabeans, Peanut) 1.5hp, 220v" 33 1 Unit "ice Box Cooler Insulated W/ Free Ice Scoop 45l Material Plastic Volume Capacity 45l" 34 1 Unit "microwave Oven 20l Model: P70b20ap-st Voltage: 220v Capacity: 20l Power Source: 230-240v / 50hz/ 700-1200w" 35 1 Unit "peanut Butter Machine/ Sesame Sauce Grinder/ Pulping Machine/ Nuts Almond Milk Machine Model: Hr-160y Brand: Meatpro Power: 1.5kw Hz: 60hz Rotation Speed: 1450r/min Voltage: 220v Capacity: 35pkg/h Emery Wheel Diameter: 160mm" 36 1 Pcs "square Beach Umbrella 70” Classic Style Durable And Stylish Good Quality Perfect For Outdoor Use Light Weight. Easy To Carry Anywhere Perfect Protection From Sunlight And Rain Easy Set-up" 37 1 Unit "standard Double Gas Stove With Free Regulator Stainless Top And Front Double Detachable Top Burner 560mm X 380mm X 125mm" 38 2 Unit "steamer 3 Layers Aluminum Measurement: 36cm Diameter, 13cm Height Per Layer" 39 1 Unit "vacuum Sealer Machine With Seal Bags And Starter Kit Four Sealing Modes Longer Food Preservation Theory: Temperature Controller Usage: Household Power Type: None Display Size: 2.0-3.9 Inches Color: Silver Materials: Stainless Steel + Abs Shell Seal Length: Max. 30cm Vacuum Pressure:-85 Kpa" 40 25 Unit Weighing Scale (20kg) 41 3 Unit Weighing Scale 60kg Capacity Lot 3: Agricultural Item No. Quantity Unit Of Issue Item Description 1 7 Sack 14-14-14 Fertilizer (50kg/sack) 2 1 Unit "2 In 1 Electrical And Manual Knapsack Sprayer Net Weight (kg): 5.25 Capacity Of Tank: 16l Working Pressure (mpa): 0.15-0.4 Pump: Diaphragm Pump Stroke: 1.4mm Voltage: 12 Nozzle: 1.4mm Battery: 12v / 8ah" 3 215 Meters Black Nylon Net (per Meter) 4 3 Rolls Gi Wire Gauge #14 5 1 Unit Grab Hoe, Heavy Duty, 23cm, Metal Handle 6 3 Unit "grass Cutter Gx35; Aircooled; 4 Cycle; Verticle Piston Vlave; Gasoline Engine; 31ml Maximum Output: 1.0/6500; Fuel Used: Gasoline Engine Fuel Tank Capacity (l): 76" 7 140 Kg Greenhouse Plastic, .04mil Thickness, Standard Size, Per Kilo 8 345 Kg Greenhouse Plastic, .05mil Thickness, Standard Size, Per Kilo 9 1 Unit Hand Tiller / Cultivator 7.5 Hp, Gasoline Engine Industrial Rotary Tiller Machine Cultivator Power Weeder With Complete Accessories 10 2 Unit Hand Tiller / Cultivator 7hp, Diesel Engine Industrila Rotary Tiller Machine Cultivator Machine 11 2 Rolls Rainbow Garden Hose / Water Hose 1/2" X 90m 12 8 Rolls Rainbow Garden Hose / Water Hose 3/4" X 60m 13 4 Unit Rake With Handle 14 1 Unit "rubber Garden Hose 1"" Heavy Duty Garden Hose Braided High Pressure Pvc Water Hose 50 Meters / Roll" 15 2 Unit "rubber Garden Hose 1/2"" Heavy Duty Garden Hose Braided High Pressure Pvc Water Hose 90 Meters / Roll" 16 2 Sacks Urea 50kg/sack Lot 4: Tarpaulin Item No. Quantity Unit Of Issue Item Description 1 104 Pcs Tarpaulin (2ftx3ft)
7701-7710 of 8129 active Tenders