Tenders of Drezdenko
Drezdenko Tender
Others
Corrigendum : Closing Date Modified
Poland
The subject of the Order is: A) Delivery, assembly and commissioning of electrical and teletechnical installations: Disassembly of the existing 296 fluorescent lamp luminaires in 44 school rooms for various purposes, Installation of new energy-saving LED luminaires based on the Room Lighting Design prepared by the Contractor - Preliminary Assumptions Are Assembly Approx. 215 pcs. (classes), 56 pcs. (other rooms) and 2 pcs. (outdoor luminaires), Luminaires used in other rooms are to be equipped with a programmable power supply, sensors, motion detector and analysis of the lighting level allowing to adjust the level of intensity Lights To The Surrounding Conditions. In the case of no movement in the area of the luminaire, smooth, two-stage reduction of the flux, Power supply of devices along with the supply of wires, Installation of emergency lighting luminaires - approx. 20 pcs., Chasing out and dressing grooves, priming the substrate and painting the mortared surface, Disposal of dismantled luminaires and fluorescent lamps, Preparation of as-built documentation for lighting and measurement of illuminance in rooms, luminaires should have a CE declaration and an Enec certificate and meet the requirements of the applicable Pn standard -en. B) Delivery, assembly and start-up of the photovoltaic installation together with the handover for operation and confirmation of acceptance by the competent power plant of notifications for connection to the power grid of the installation without comments, and warranty and service: preparation of complete design documentation for the photovoltaic installation and obtaining all opinions, arrangements and permits , Expertises, Administrative Decisions, Analyzes, Studies and Materials Necessary for Task Implementation, Installation of Structures for PV Panels, Installation of PV Panels on a Structure Specially Designed for This Purpose, Requiring the Least Interference with the Roof Covering. Any punctures in the top layer of the roof must be effectively repaired and protected against water access, Laying of cable routes and cables from PV panels to the Electrical Switchgear, Modernization of the Electrical Switchgear, Installation of the PV Switchgear - Ac and Dc Switchgear, Installation of the Automation System, Execution Installation tests and checking the correct operation of the apparatus, System start-up and adjustments and start-up of the entire installation with the performance of the required electrical measurements, Preparation of as-built documentation for the installation in question, along with the attachment of relevant certificates and approvals regarding the solutions used and installed devices, Making the necessary mounting holes in order to Inserting the devices, Brick up the assembly openings after inserting the devices, Making culverts in places where cable routes go through walls, roofs or other obstacles, Sealing of culverts, Sealing of the roof structure (connections of roof panels before laying the Pv installation), Execution of an expert opinion of roof load capacity With opinions confirming the possibility of installing photovoltaic panels on the indicated roof in Stwior. Reporting the Installation in question to Ze I Psp. Completion of the procedure for connecting the installation to the distribution network and ensuring that the bipolar meter is installed by the electricity distributor, Installation of a monitoring device that collects all data from the inverter on the system side, informing about the status of the installation at a given moment, which means that it should contain a data logger, Offering Archiving And Data Processing Options. Provide free full - remote and local access for the user and have the ability to notify via SMS and e-mail about the occurrence of a failure. The device should have a communication module that can work with devices from many manufacturers of inverters. It should give the possibility of logging into the network as an administrator or guest in order to view the current operating parameters of the installation, Service training. C) A detailed description of the subject of the Order has been specified in the Structure and the Bill of Quantities. The offer should include a set of supplies, construction works and services necessary to carry out the project, including the effective completion of formalities related to commissioning and handing over to the Employer. The Contractor shall also include, within its scope, those Additional Works and Elements which have not been specified but are Important or Necessary for proper functioning and required maintenance as well as for obtaining the Guarantee. Details are included in Swz.
Closing Date26 Jun 2025
Tender AmountPLN 64 Million (USD 17.2 Million)
Drezdenko Tender
Furnitures and Fixtures
Corrigendum : Closing Date Modified
Poland
Construction and reconstruction of municipal roads: ul. Velvet and Mała in Rybie, ul. Stawowa, Sięgacz I ul. Dzika In Nowe Grocholice And Ul. Mikołaj Rej in Sękocin Stary
Closing Date18 Feb 2025
Tender AmountRefer Documents
1-10 of 18 archived Tenders