Tenders of Dept Of The Navy Usa

Tenders of Dept Of The Navy Usa

DEPT OF THE NAVY USA Tender

United States
Closing Date3 Sep 2024
Tender AmountUSD 282.7 K 
This is an estimated amount, exact amount may vary.
Nsn 1h-4730-012226603-x5, Tdp Ver 005, Qty 12 Ea, Deliver To W25g1u, W1a8 Dla Distribution, New Cumberland, Pa 17070-5002, Deliver To W62g2t, W1a8 Dla Dist San Joaquin, Tracy, Ca 95304-5000. 1.this Requirement Is For The Manufacture Of 12 Ea Spacer, Flexible, Pip, Nsn 1h4730-01-222-6603 X5, P/n 299945-100 Iaw The Irpod/tdp. The Required Delivery Is 560 Days After The Date Of Contract.

DEPT OF THE NAVY USA Tender

Machinery and Tools
Corrigendum : Closing Date Modified
United States
Closing Date6 May 2024
Tender AmountUSD 538.5 K 
This is an estimated amount, exact amount may vary.
This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Subpart 12.6, As Supplemented With Far Part 13 Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. request For Quotation (rfq) N5523624q0051 Is Issued As A Total Small Business Set-aside . The Subject Solicitation Is Being Processed Using Far Part 12 And 13. Any Quote From A Large Business Is Ineligible For Award. The Applicable North American Industry Classification System (naics) Code Is 333517 - Machine Tool Manufacturing. this Solicitation Documents And Incorporates Provisions And Clauses That Are Those In Effect Through Federal Acquisition Circular 2024-03 (effective 23 February 2024) And Dfars Publication Notice 20240326. description : Southwest Regional Maintenance Center (swrmc) Requires Procurement And Delivery Of One (1) Dmg Mori Nvx 7000 Basic Machine (brand Name Or Equal) In Support Of Swrmc At Naval Base San Diego As Follows In Accordance With Product Description: Quote Shall Provide Delivery Date . one (1) Nvx7000 Vertical-machining Center Travel X/y/z: 1,540/760/660 Mm 60.6/29.9/26.0 In. Working Surface: 1,700x760 Mm 66.9x29.9 In. (p/n J-a02048) the Full Text Of Far And Dfar References, Provisions And Clauses May Be Accessed At Https://acquisition.gov. the Following Provisions And Clauses Apply To This Acquisition And Will Be Incorporated Into Any Resultant Purchase Order. 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements Jan 2017 52.204-7 System For Award Management Oct 2018 52.204-19 Incorporation By Reference Of Representations And Certifications Dec 2014 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021 52.204-26 Covered Telecommunications Equipment Or Services-representation Oct 2020 52.204-27 Prohibition On A Bytedance Covered Application Jun 2023 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations Nov 2015 52.209-11 Representation By Corporations Regarding Delinquent Tax Liability Or A Felony Conviction Under And federal Law Feb 2016 52.212-4 Contract Terms And Conditions--commercial Items Nov 2023 52.232-39 Unenforceability Of Unauthorized Obligations Jun 2013 52.232-40 Providing Accelerated Payments To Small Business Subcontractors Mar 2023 52.242-15 Stop-work Order Aug 1989 52.242-17 Government Delay Of Work Apr 1984 52.246-2 Inspections Of Supplies – Fixed Price Aug 1996 52.246-16 Responsibilities For Supplies Apr 1984 52.252-2 Clauses Incorporated By Reference Feb 1998 52.252-6 Authorized Deviations In Clauses Nov 2020 252.203-7000 Requirements Relating To Compensation To Former Dod Officials Sep 2011 252.203-7002 Requirements To Inform Employees Of Whistleblower Rights Dec 2022 252.203-7005 Representation Relating To Compensation Of Former Dod Officials Sep 2022 252.204-7000 Disclosure Of Information Oct 2016 252.204-7003 Control Of Government Work Product Apr 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information Controls Oct 2016 252.204-7009 Limitations On The Use Or Disclosure Of Third-party Contractor Reported Cyber Incident information Jan 2023 252.204-7012 Safeguarding Covered Defense Information And Cyber Incident Reporting Jan 2023 252.204-7015 Notice Of Authorized Disclosure Of Information By Litigation Support Jan 2023 252.204-7019 Notice Of Nist Sp 800-171 Dod Assessment Requirements Nov 2023 252.204-7020 Nist Sp 800-171 Dod Assessment Requirements Nov 2023 252.211-7003 Item Unique Identification And Valuation Jan 2023 252.215-7013 Supplies And Services Provided By Nontraditional Defense Contractors Jan 2023 252.223-7008 Prohibition Of Hexavalent Chromium Jan 2023 252.225-7000 Buy American – Balance Of Payments Program Certificate Feb 2024 252.225-7001 Buy American And Balance Of Payment Program Feb 2024 252.225-7002 Qualifying Country Sources As Subcontractors Mar 2022 252.225-7048 Export Controlled Items Jun 2013 252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports Dec 2018 252.232-7006 Wide Area Work Flow Payment Instructions. Jan 2023 252.232-7010 Levies On Contract Payments Dec 2006 252.237-7010 Prohibition On Interrogation Of Detainees By Contractor Personnel Jan 2023 252.244-7000 Subcontracts For Commercial Items Nov 2023 252.246-7003 Notification Of Potential Safety Issues Jan 2023 252.247-7023 Transportation On Supplies By Sea Jan 2023 52.212-5 – Contract Terms And Conditions Required To Implement Statutes Or Executive Orders – Commercial Products And Commercial Services (feb 2024) (a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: (1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (dec 2023) (section 1634 Of Pub. L. 115-91). (3) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232). (4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015). (5) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). (6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553). (7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805 Note)). (b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: _x_1) 52.203-6 , Restrictions On Subcontractor Sales To The Government (jun 2020), With Alternate I (nov 2021) (41 U.s.c. 4704 And 10 U.s.c. 4655). ___2) 52.203-13 , Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). ___3) 52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009 (jun 2010) (section 1553 Of Pub. L. 111-5). ___4) 52.203-17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far 3.900(a) _x_5) 52.204-10 , Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub. L. 109-282) (31 U.s.c. 6101 Note). ___6) [reserved ] ___7) 52.204-14, Service Contract Reporting Requirements (oct 2016) (pub. L. 111-117, Section 743 Of Div. C). ___8) 52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts (oct 2016) (pub. L. 111-117, Section 743 Of Div. C). ___9) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328). ___10) 52.204-28 , Federal Acquisition Supply Chain Security Act Orders—federal Supply Schedules, Governmentwide Acquisition Contracts, And Multi-agency Contracts. (dec 2023) (pub. L. 115–390, Title Ii). ___11) (i) 52.204-30 , Federal Acquisition Supply Chain Security Act Orders—prohibition. (dec 2023) (pub. L. 115–390, Title Ii). ___ (ii) Alternate I (dec 2023) Of 52.204–30. ___12) 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment. (nov 2021) (31 U.s.c. 6101 Note). _x_13) 52.209-9 , Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018) (41 U.s.c. 2313). ___14) [reserved]. ___15) 52.219-3, Notice Of Hubzone Set-aside Or Sole-source Award (oct 2022) (15 U.s.c. 657a). ___16) 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) (if The Offeror Elects To Waive The Preference, It Shall So Indicate In Its Offer) (15 U.s.c. 657a). ___17) [reserved] _x_18) (i) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644). ___ (ii) Alternate I (mar 2020) Of 52.219-6. ___19) (i) 52.219-7 , Notice Of Partial Small Business Set-aside (nov 2020) (15 U.s.c. 644). ___ (ii) Alternate I (mar 2020) Of 52.219-7. ___20) 52.219-8 , Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)). ___21) (i) 52.219-9, Small Business Subcontracting Plan (sep 2023) (15 U.s.c. 637(d)(4)). ___ (ii) Alternate I (nov 2016) Of 52.219-9. ___ (iii) Alternate Ii (nov 2016) Of 52.219-9. ___ (iv) Alternate Iii (jun 2020) Of 52.219-9. ___ (v) Alternate Iv (sep 2023) Of 52.219-9. ___22) (i) 52.219-13, Notice Of Set-aside Of Orders (mar 2020) (15 U.s.c. 644(r)). ___ (ii) Alternate I (mar 2020) Of 52.219-13. ___23) 52.219-14, Limitations On Subcontracting (oct 2022) (15 U.s.c. 637s). ___24) 52.219-16 , Liquidated Damages—subcontracting Plan (sep 2021) (15 U.s.c. 637(d)(4)(f)(i)). ___25) 52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) ( 15 U.s.c. 657f). _x_26) (i) 52.219-28, Post Award Small Business Program Representation (feb 2024) (15 U.s.c. 632(a)(2)). ___ (ii) Alternate I (mar 2020) Of 52.219-28. ___27) 52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantaged Women-owned Small Business Concerns (oct 2022) (15 U.s.c. 637(m)). ___28) 52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15 U.s.c. 637(m)). ___29) 52.219-32 , Orders Issued Directly Under Small Business Reserves (mar 2020) (15 U.s.c. 644(r)). ___30) 52.219-33 , Nonmanufacturer Rule (sep 2021) (15 U.s.c. 637(a)(17)). _x_31) 52.222-3 , Convict Labor (jun 2003) (e.o.11755). _x_32) 52.222-19, Child Labor-cooperation With Authorities And Remedies (feb 2024). _x_33) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). _x_34) (i) 52.222-26, Equal Opportunity (sep 2016) (e.o.11246). ___ (ii) Alternate I (feb 1999) Of 52.222-26. _x_35) (i) 52.222-35 , Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). ___ (ii) Alternate I (jul 2014) Of 52.222-35. _x_36) (i) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). ___ (ii) Alternate I (jul 2014) Of 52.222-36. _x_37) 52.222-37 , Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). _x_38) 52.222-40 , Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). _x_39) (i) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627). ___ (ii) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). ___40) 52.222-54 , Employment Eligibility Verification (may 2022) (executive Order 12989). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items Or Certain Other Types Of Commercial Products Or Commercial Services As Prescribed In Far 22.1803.) ___41) (i) 52.223-9 , Estimate Of Percentage Of Recovered Material Content For Epa–designated Items (may 2008) (42 U.s.c. 6962(c)(3)(a)(ii)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.) ___ (ii) Alternate I (may 2008) Of 52.223-9 (42 U.s.c. 6962(i)(2)(c)). ___42) 52.223-11 , Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons (jun 2016) (e.o. 13693). ___43) 52.223-12 , Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners (jun 2016) (e.o. 13693). ___44) (i) 52.223-13 , Acquisition Of Epeat®-registered Imaging Equipment (jun 2014) (e.o.s 13423 And 13514). ___ (ii) Alternate I (oct 2015) Of 52.223-13. ___45) (i) 52.223-14 , Acquisition Of Epeat®-registered Televisions (jun 2014) (e.o.s 13423 And 13514). ___ (ii) Alternate I (jun 2014) Of 52.223-14. ___46) 52.223-15 , Energy Efficiency In Energy-consuming Products (may 2020) (42 U.s.c. 8259b). ___47) (i) 52.223-16 , Acquisition Of Epeat®-registered Personal Computer Products (oct 2015) (e.o.s 13423 And 13514). ___ (ii) Alternate I (jun 2014) Of 52.223-16. ___48) 52.223-18, Encouraging Contractor Policies To Ban Text Messaging While Driving (jun 2020) (e.o. 13513). ___49) 52.223-20 , Aerosols (jun 2016) (e.o. 13693). ___50) 52.223-21 , Foams (jun 2016) (e.o. 13693). ___51) (i) 52.224-3 Privacy Training (jan 2017) (5 U.s.c. 552 A). ___ (ii) Alternate I (jan 2017) Of 52.224-3. _x_52) (i) 52.225-1 , Buy American-supplies (oct 2022) (41 U.s.c. Chapter 83). ___ (ii) Alternate I (oct 2022) Of 52.225-1. ___53) (i) 52.225-3 , Buy American-free Trade Agreements-israeli Trade Act (nov 2023) ( 19 U.s.c. 3301 Note, 19 U.s.c. 2112 Note, 19 U.s.c. 3805 Note, 19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. ___ (ii) Alternate I [reserved]. ___ (iii) Alternate Ii (dec 2022) Of 52.225-3. ___ (iv) Alternate Iii (feb 2024) Of 52.225-3. ___ (v) Alternate Iv (oct 2022) Of 52.225-3. ___54) 52.225-5 , Trade Agreements (nov 2023) (19 U.s.c. 2501, Et Seq., 19 U.s.c. 3301 Note). ___55) 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) (e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). ___56) 52.225-26 , Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). ___57) 52.226-4 , Notice Of Disaster Or Emergency Area Set-aside (nov 2007) (42 U.s.c. 5150). ___58) 52.226-5 , Restrictions On Subcontracting Outside Disaster Or Emergency Area (nov 2007) (42 U.s.c. 5150). ___59) 52.229-12 , Tax On Certain Foreign Procurements (feb 2021). ___60) 52.232-29 , Terms For Financing Of Purchases Of Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). ___61) 52.232-30 , Installment Payments For Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). _x_62) 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018) (31 U.s.c. 3332). ___63) 52.232-34 , Payment By Electronic Funds Transfer-other Than System For Award Management (jul 2013) (31 U.s.c. 3332). ___64) 52.232-36 , Payment By Third Party (may 2014) (31 U.s.c. 3332). ___65) 52.239-1, Privacy Or Security Safeguards (aug 1996) (5 U.s.c. 552a). ___66) 52.242-5 , Payments To Small Business Subcontractors (jan 2017) (15 U.s.c. 637(d)(13)). ___67) (i) 52.247-64 , Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). ___ (ii) Alternate I (apr 2003) Of 52.247-64. ___ (iii) Alternate Ii (nov 2021) Of 52.247-64. (c) The Contractor Shall Comply With The Far Clauses In This Paragraph (c), Applicable To Commercial Services, That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: ___1) 52.222-41 , Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter67). ___2) 52.222-42 , Statement Of Equivalent Rates For Federal Hires (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). ___3) 52.222-43 , Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year And Option Contracts) (aug 2018) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). ___4) 52.222-44 , Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). ___5) 52.222-51 , Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67). ___6) 52.222-53 , Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67). ___7) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). ___8) 52.222-62 , Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). ___9) 52.226-6 , Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). (d) Comptroller General Examination Of Record. The Contractor Shall Comply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of The Simplified Acquisition Threshold, As Defined In Far 2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At 52.215-2, Audit And Records-negotiation. (1) The Comptroller General Of The United States, Or An Authorized Representative Of The Comptroller General, Shall Have Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2) The Contractor Shall Make Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart 4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminated Shall Be Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Of Claims Arising Under Or Relating To This Contract Shall Be Made Available Until Such Appeals, Litigation, Or Claims Are Finally Resolved. (3) As Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e) (1) Notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract For Commercial Products Or Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Down Shall Be As Required By The Clause- (i) 52.203-13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). (ii) 52.203-17, Contractor Employee Whistleblower Rights (nov 2023) ( 41 U.s.c. 4712). (iii) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (dec 2023) (section 1634 Of Pub. L. 115-91). (v) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232). (vi) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328). (vii) (a) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—prohibition. (dec 2023) (pub. L. 115–390, Title Ii). (b) Alternate I (dec 2023) Of 52.204–30. (viii) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)), In All Subcontracts That Offer Further Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far 19.702(a) On The Date Of Subcontract Award, The Subcontractor Must Include 52.219-8 In Lower Tier Subcontracts That Offer Subcontracting Opportunities. (ix) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). (x) 52.222-26, Equal Opportunity (sep 2015) (e.o.11246). (xi) 52.222-35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). (xii) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). (xiii) 52.222-37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). (xiv) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause 52.222-40. (xv) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67). (xvi) (a) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o 13627). (b) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). (xvii) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67). (xviii) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67). (xix) 52.222-54, Employment Eligibility Verification (may 2022) (e.o. 12989). (xx) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). (xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). (xxii) (a) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a). (b) Alternate I (jan 2017) Of 52.224-3. (xxiii) 52.225-26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv) 52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause 52.226-6. (xxv) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of 52.232-40. (xxvi) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause 52.247-64. (2) While Not Required, The Contractor May Include In Its Subcontracts For Commercial Products And Commercial Services A Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. (end Of Clause) the Following Navsea Provisions And Clauses Apply To This Acquisition And Will Be Incorporated Into Any Resultant Purchase Order. c-202-h001 Additional Definitions – Basic Oct 2018 c-215-h002 Contractor Proposal Navsea Oct 2018 f-242-h001 Contractor Notice Regarding Late Delivery Oct 2018 g-232-h002 Payment Instructions And Contract Type Summary For Payment Office Feb 2024 g-232-h005 Supplemental Instructions Regarding Invoicing Jan 2019 g-242-h001 Government Contract Administration Points Of Contact And Responsibilities Oct 2023 a. 52.212-1 Instructions To Offerors – Commercial Products And Commercial Services Sep 2023. Offerors Must Comply With All Instructions Contained Herein. (1) Offerors May Submit Written Questions During The Quote Preparation Period. All Questions Must Be Received No Later Than 02 May 2024, 11:00 Am (pacific) To Allow Adequate Time To Prepare And Issue Responses To All Offerors Prior To The Date And Time Set For Receipt Of Quotes. Only Written Questions Will Receive A Response. All Questions And Quotes Shall Be Directed To: southwest Regional Maintenance Center (swrmc) – C410a Procurement email: Cite The Solicitation Number In The Subject Line - N5523624q0051 email Addresses: Elisa.r.allison.civ@us.navy.mil And Cynthia.y.urias.civ@us.navy.mil b. 52.212-2 Evaluation Commercial Items, Evaluation – Commercial Products And Commercial Services Nov 2021. (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers: evaluation Factors – The Evaluation Factors That Will Be Used Are: 1. Technical Acceptability – Ability To Meet The Salient Characteristics Of The Product Description 2. Price – Low Price Technically Acceptable (lpta) 3. Past Performance – Based On The Supplier Performance Risk System price: The Government Will Evaluate The Proposed Price For Reasonableness In Accordance With Far 13.106-3 (a)(1). past Performance: The Government Will Consider The Recency And Relevancy Of Past Performance Information Compared To The Requirements Detailed In The Product Description, The Source Of The Information, The Context Of The Data And General Trends In The Offeror's Performance And Any Associated Risk. The Government Will Also Consider The Extent Of The Offeror's Ability To Perform Previous Contracts Successfully. Per Dfars Provision 252.213-7000 Notice To Prospective Suppliers On Use Of Supplier Performance Risk System In Past Performance Evaluations Is Hereby Incorporated By Reference. a) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) c. 52.212-3 Offeror Representations And Certifications – Commercial Products And Commercial Services Feb 2024. offerors Shall Complete Only Paragraphs (b) Of This Provision If The Offeror Has Completed The Annual Representations And Certification Electronically Via The System For Award (sam) Website Located At Https://www.sam.gov/sam/ (only Complete And Return If There Are Changes To Current Sam Registration. If 52.212-3 Is Not Returned, The Contractor Is Affirming That The Current Sam Registration Is Current, Accurate, And Complete). Lack Of Registration In The System For Award Management (sam) Database Will Make An Offeror Ineligible For Award. d. 52.212-4 Contract Terms And Conditions -- Commercial Products And Commercial Services Nov 2023 standard Commercial Warranties Apply. applicable Provisions And Clauses: the Far Requires The Use Of The System For Award Management (sam) In Federal Solicitations As A Part Of The Offer Submission Process To Satisfy Far 52.212-4. More Information On Sam Is Found At Https://www.sam.gov/portal/public/sam/. packaging Requirements: Packaging And Preservation Shall Be Performed In Accordance With The Best Commercial Practices To Afford Maximum Protection Against Damage. d-211-h005 Identification Marking Of Parts – Alternative I Oct 2018 delivery Instructions: Item Shall Be Priced At F.o.b. Destination. Inspection And Acceptance Shall Be At Destination By The Government. special Contract Requirements: please Submit Your Quote Via E-mail To Elisa Allison, Elisa.r.allison.civ@us.navy.mil (primary) And Cynthia Urias, Cynthia.y.urias.civ@us.navy.mil (secondary). quotes Must Be Received By The Destination Inbox No Later Than *06 May 2024, 11:00 Am (pacific)* Or They Will Not Be Considered For Award.

DEPT OF THE NAVY USA Tender

United States
Closing Date21 Aug 2024
Tender AmountUSD 2.8 Million 
This is an estimated amount, exact amount may vary.
Solicitation N3220524r4135 Is Hereby Released. Please See Attached Documents.

DEPT OF THE NAVY USA Tender

United States
Closing Date9 Aug 2024
Tender AmountUSD 49.4 K 
This is an estimated amount, exact amount may vary.
Technical Rescue (confined Space) Training & Certification

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Closing Date3 Sep 2024
Tender AmountRefer Documents 
66--computer,air Data, In Repair/modification Of

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Closing Date3 Sep 2024
Tender AmountRefer Documents 
Contact Information|4|n743.38|wvf|717-605-3528|heather.vanhoy@navy.mil| item Unique Identification And Valuation (mar 2016)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Sections C & E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection/acceptance Point|6||||||| time Of Delivery (june 1997)|20||||||||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (dec 2018)|16|stand Alone Receiving Report-certifications Combo-receiving Report & Invoice-material|n/a|tbd|n00104|tbd|n39040-certifications,s4306a-material |n50286|tbd|133.2|n/a|n/a|s4306a-material|n/a|n/a|see Dd1423|port_p tnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Time Of Delivery|one Year From Time Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (mar 2020)|13|332722|500|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| evaluation Criteria And Basis For Award-|1|| the Quantity Has Increased To 500 Ea, Please Provide Pricing For The Revised Quantity, \ this Amendment Is To Extend The Close Date To 08/27/2021. 1. Dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail,transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In. 3. The Following Proposed Delivery Schedule Submission Of All Certification Data Cdrls 20 Days Prior To Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt final Delivery Of Material (186 Days) 4. This Requirement Falls Under The Special Emergency Procurement Authority(sepa) In Accordance With 41 U.s.c. 1903 And Class Deviation 2018-o0013. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;5100768 0br59 B B; document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-a193 | | | |200515|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 ;stud, Bottoming, To Be In Accordance With Dresser-rand Drawing 5100768, Part Number 5100768-115, Except As Amplified Or Modified Herein.; 3.2 The Unit Of Issue Is Each. the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener. 3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;stud, Bottoming; material - ;mil-dtl-1222, Grade B16 (astm-a193); 3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - ;liquid Penetrant Inspection Or Magnetic Particle Inspection (wet Method) (either Inspection Is Acceptable); item - ;stud, Bottoming; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 3.5 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.5.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.5.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.5.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.6 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.6.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.7 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.9 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.10 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.11 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.11.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.11.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.11.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.11.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.11.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.12 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.12.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.12.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.13 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.13.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.13.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.13.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.13.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.13.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.14 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.14.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.14.2 Inspection For Completeness And Proper Type. 3.14.3 Verification Of Material Quality Received. 3.14.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.14.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.14.6 Identification And Protection From Improper Use Or Disposition. 3.14.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.14.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.14.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.15 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. 3.15.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.16 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.17 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.17.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Mil-dtl-1222; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition, grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied. 3.17.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ________________ And Heat Treat Number ________________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.17.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.17.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.17.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.18 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.18.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.18.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.19 Material Handling - The Written Material Control Process Must Include The Following: 3.19.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.19.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.19.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.19.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.19.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.20 Receiving Inspection - 3.20.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.20.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.21 Discrepancy Reporting - 3.21.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.22 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.22.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.22.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.22.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports must Also Be 100% Inspected For Completeness And Legibility. 3.22.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.23 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Closing Date5 Sep 2024
Tender AmountRefer Documents 
Contact Information|4|n733.12|m5n|215 697 5936|linda.vong2.civ@us.navy.mil| commercial Product Procurement Notice|5|||||| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| fms Delivery And Shipping Instructions|3|||x| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days|45 Days Of The Last Delivery Under This Contract||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitations On Pass-through Charges (jun 2020)|1|| contract Terms And Conditions Required To Implement Statutes Or Executiveorders--commercial Products And Commercial Services (may 2024))|82||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| continued: Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--commercial Products And Commercial Services (feb 2024))|15|||||||||||||||| offeror Representations And Certifications--commercial Products And Commercialservices (may 2024))|3|||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|334412 Bare Printed Circuit Board Manufacturing|750||||||||||| facsimile Proposals (oct 1997)|1|| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||| evaluation--commercial Products And Commercial Services (nov 2021)|4||||| this Rfq Is For A Fms Spares Requirement. The Small Business Administration Representative At Navsup Wss Has Reviewed This Requirement And Determined That A Set-aside Recommendation Was Not Applicable For This Procurement. quotes May Be Emailed To The Below Email Address And Must Be Received On Or Before On The Closing Date Listed On Page 1 Of The Solicitation. linda.vong2.civ@us.navy.mil this Contract/delivery Order/purchase Order/modification Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal constitutes Bilateral Agreement To Issue This Contract/delivery Order/purchase Order/modification. \

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Closing Date5 Sep 2024
Tender AmountRefer Documents 
Contact Information|4|n743.4|wvp|717-605-3354|amanda.l.bailey50.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E. | inspection Of Supplies--fixed-price (aug 1996)|2||| variation In Quantity (apr 1984)|3|10%|10%|total Contract Quantity| general Information-fob-destination|1|a| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104 |tbd|n39040 |n50286 |tbd|133.2|n/a|n/a|n39040 |n/a|n/a|see Dd Fo rm 1423 |port_ptnh_wawf_notification@navy.mil | navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|365 Days After Acceptances Of Material|365 Days After Acceptances Of Material||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|331420|1,000|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| dd1423 Data Item A001 May Be Waived If Already On File At Navsup Wss Mechanicsburg. any Contract Awarded As A Result Of This Solicitation Will Be "do" Rated Order Certified For National Defense Use Under The Defense Priorities Allocations System (dpas). a Variation In Quantity Of -10% Of The Total Contract Quantity Is Allowed. See Far 52.211-16 For Further Details. navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000. if Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation. this Solicitation Has No Gsi. Inspect/accept Will Be Destination/destination. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-a530 | | |a |041001|a| | | document Ref Data=astm-b666 | | | |201101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=astm-a999 | | |a |040701|a| | | document Ref Data=sae Ams 2806 | | |c |080301|a| | | document Ref Data=sae Ams 2807 | | |a |000901|a| | | document Ref Data=sae Ams 2809 | | |a |070801|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=sae Ams-std-185 | | | |000901|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-p-24691 | | | |910204|a| 2| | document Ref Data=mil-p-24691 |0003| | |910204|a| 1| | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Mil-p-24691, Except As Amplified Or Modified Herein. Mil-p-24691 Ordering Data Information Is Provided Below: (a) Pipe And Tube, Carbon, Alloy, And Stainless Steel, Seamless And Welded; Mil-p-24691. (b) Pipe And Tube, Corrosion-resistant Stainless Steel, Seamless Or Welded; Mil-p-24691/3. (c) Type - ;1; Grade - ;304; (d) Fabrication By Other Than The Electric Furnace Process Is Not Applicable. (e) Pipe - Nominal Pipe Size - ;2 Inch; ; Schedule - ;80; Tube - Outside Diameter - ;n/a; ; Wall Thickness - ;n/a; Length - Unless Specific Lengths Are Specified Elsewhere In The Contract/purchase Order, ;single Random Lengths Of 15 To 22 Feet With Five Percent Permissible 12 To 15 Feet And Five Percent Permissible 22 To 24 Feet.; (f) Removed By Ammendment 2 Of Mil-p-24691. (g) An Alternate Soundness Inspection Is Not Required. (h) Ultrasonic Inspection Is Required. (i) Shear Wave Test Is Required To Be Conducted In Two Opposite Circumferential Directions. (j) Level Of Preservation, Packaging And Packing Must Be As Specified Elsewhere In The Contract/purchase Order. (k) Special Marking Is Required And Must Be As Specified Elsewhere In The Contract/purchase Order. note: Mil-p-24691/3 Conformance Requirements And Testing Sheet Is Available As Csd203 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/) 3.2 Bar, Pipe, And Tube Quantities - When This Order Results In Supplying Fewer Than 5 Pieces As Defined In The "length" Paragraph Above, All Material Must Be From A Single Heat Of Material. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below. test - Quality Conformance/compliance Inspection item - ;pipe; performance - ;mil-p-24691/3 (table I Groups B And C, With Sampling Per Mil-p-24691) note: Ndtelectric Test (eddy Current) Is Not An Acceptable Alternate For Hydrostatic Testing; acceptance - ;mil-p-24691 And Mil-p-24691/3; test - Ultrasonic Inspection item - ;pipe; performance - T9074-as-gib-010/271 And Mil-p-24691 acceptance - Mil-p-24691 attribute - Certificate Of Compliance For Seamless Tubing/pipe item - ;pipe; performance - Material Supplied Must Be In The Seamless Condition. 3.4 Chemical And Mechanical Certification - Certification Of Chemical And Mechanical Properties Must Be In Accordance With Data Item Description (did) Di-misc-81020 In Lieu Of Di-misc-80678. 3.5 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The information Listed Below. a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product. d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.6.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/ 3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. b. A Complete Description Of The Change To Be Made And The Need For That Change. c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. d. Proposed Changes To Documents Controlled By The Government. e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. f. Recommendations About The Way A Retrofit Should Be Accomplished. g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct. h. Impacts To The Operational Use Of The Product. i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. j. Milestones Relating To The Processing And Implementation Of The Engineeringchange. 3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.8 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.8.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.9 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.10 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.10.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements established In The Contract/purchase Order. 3.10.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities available For Audit By The Contracting Officer Or His Authorized Representative. 3.10.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.10.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. 3.10.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco. 3.11 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.11.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.11.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The government. 3.12 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate planning For Government Inspection Can Be Accomplished. 3.12.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.12.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.12.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.12.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.12.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.13 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.13.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.13.2 Inspection For Completeness And Proper Type. 3.13.3 Verification Of Material Quality Received. 3.13.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.13.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.13.6 Identification And Protection From Improper Use Or Disposition. 3.13.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.13.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.13.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.14 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other required Objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within paragraph 3, Section C Of This Contract/purchase Order. 3.14.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In The Contract/purchase Order. 3.15 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.16 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. In Addition To The Marking Requirements On Applicable Specifications, Marking For Traceability Is Required. Pipe, Tube, And Metal Bar Must Have both Permanent Marking And Temporary Marking Applied As Specified Below. 3.16.1 Permanent Marking - Permanent Traceability Marking Must Be Marked On Each End Of Each Pipe, Tube, And Metal Bar. (monel And K-monel Bar: 3/4 Inch To 1 Inch Rods, And 7/8 Inch Hex Bar May Be Marked On The Surface Near The End Of Bar/rod, And Rod Less than 3/4 Inch And Hex Bar Less Than 7/8 Inch May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Tag Or Box.) All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792. An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order, And Differs From That Specified In The Specification. Electric Arc Marking Or Impression marking Is Strictly Prohibited On Thin Wall Tubing. (wall Thickness Of Less Than 0.125 Inch). 3.16.2 Temporary Marking - Temporary Marking Must Consist Of: name Or Trademark Of Manufacturer, Specification And Grade (as Applicable), Size, Contract Number, And The Traceability Marking. Pipe And Tube Marking Must Also Include Sml (for Seamless). Marking Must Be In Accordance With The Material Specification And sae-ams-2806, Sae-ams-2807, Sae-ams-2809, Table I Of Sae-ams-std-185, Or Astm-b666 As Applicable. Application Must Be In Accordance With Mil-std-792, Type A (temporary Ink Stenciling). An Alternate Method Is Permissible For Monel And K-monel Bar Provided It is An Available Option (temporary Marking Only) In The Applicable Material Specification, Except That Hot Finished Rod With Rough Ground Surface 3/4 Inch And Under May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Bag Or Box. contamination Levels For Ink Stenciling Must Be As Outlined In Paragraph 5.2 Of Mil-std-792. 3.17 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.17.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.17.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.17.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.17.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.17.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.18 Material Handling - The Written Material Control Process Must Include The Following: 3.18.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.18.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.18.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.18.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.18.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.19 Receiving Inspection - 3.19.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.19.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.20 Discrepancy Reporting - 3.20.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government. 3.21 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.21.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.21.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.21.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.21.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.22 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To The Contractor - 4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And contract Number Must Be Submitted To The Pco. 4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied conforms To The Specified Requirements. 6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - May 16 2013 - Removed Gsi From This Material. - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date5 Sep 2024
Tender AmountRefer Documents 
Contact Information|4|n793.04|t63|2156971360|anthony.boselli@navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receving Report Combo Type|n/a|tbd|n00383|tbd|tbd|"see Schedule"|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program - Basic (nov\23)|5|||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5|||||| buy American--balance Of Payments Program (nov 2014)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (mar 2023)|13|332710|500|||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Request For Proposal/ Quote (rfq) Is For The Repair Of: nsn: 7rh 4920 015323041 Gf pn: 88002847-103 quantity: 15 Ea please Submit Quote Via Email To Anthony.boselli@navy.mil By The Due Date Specified On Page 1, Block 10. if A Firm Fixed Price (ffp) Cannot Be Determined, Please Inform The Pco. these Items Require Government Source Approval Prior To Award. if You Are Not An Approved Source, You Must Submit, Together With your Proposal, The Information Detailed In The Navsup Wss Source approval Brochure Which Can Be Obtained Online At https://www.navsup.navy.mil/public/navsup/wss/business_opps/ under "commodities." Offers Received Which Fail To Provide All Data required By The Source Approval Brochure Will Not Be Considered For award Under This Solicitation. Please Note, If Evaluation Of A Source approval Request Submitted Hereunder Cannot Be Processed In Time and / Or Approval Requirements Preclude The Ability To Obtain Subject items In Time To Meet Government Requirements, Award Of Requirement may Be Continued Based On Fleet Support Needs. 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.1.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: dsp Assembly,aircra ;7rh 4920-01-532-3041; Nsn , ;(76301) 88002847-103; Part Number, Shall Be Performed Iaw: Dsp Assembly,aircra ;repair / Overhaul / Inspect In Accordance With Applicable Repair Manuals, Technical Specifications, Engineering Orders And drawings.; Publication (s). 1.1.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: dsp Assembly,aircra ;88002847-103; P/n, ;7rh 4920-01-532-3041; Nsn, ;latest; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. dsp Assembly,aircra ;the Boeing Co.defense Space & Security Div.; Company Name , ;6200 J S Mcdonnell Blvd.saint Louis Mo 63134-1939; Address , ;0pxv4; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Consultancy Services
Corrigendum : Closing Date Modified
United States
Closing Date5 Sep 2024
Tender AmountRefer Documents 
J059 - Caterpillar (cat) Equipment Maintenance Services.
9981-9990 of 10000 archived Tenders