Tenders of Dept Of The Navy Usa

Tenders of Dept Of The Navy Usa

DEPT OF THE NAVY USA Tender

Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Closing Date25 Jan 2025
Tender AmountRefer Documents 
Brand Name Or Equal Oem Kace Ball Valves

DEPT OF THE NAVY USA Tender

Machinery and Tools...+1Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Closing Date25 Jan 2025
Tender AmountRefer Documents 
Request For Information - Sources Sought naval Air Warfare Center, Aircraft Division Lakehurst, Nj rsd Depot Level Repair Facility - Request For Information/sources Sought (rfi) introduction: this Request For Information (rfi) Is Issued Pursuant To Far 15.201(e) And In Conformance With Dfars Pgi 206.302.this Is A Request For Information/sources Sought (rfi) Notice To Solicit Comments, Questions And Feedback From Industry Regarding Their Interest In And Capacity To Conduct A “depot Level” Repair/overhaul Of An Electro-hydraulic Device (rapid Securing Device (rsd)). The Rsd Is One Of The Main Assemblies Of A Us Navy Helicopter Landing System Called Recovery Assist, Securing, And Traversing (rast). The Rsd Is Installed On Multiple Us Navy Vessels And Is Used To Secure And Maneuver Military Helicopters On The Flight Deck. nawcad Lakehurst Is Requesting To Establish An Independent Overhaul Facility Which Will Supplement Existing Organic Repair/overhaul Capacity With The Capability To Refurbish Approximately 18-24 Rsds Per Year. The Repair/overhaul Involves Disassembly, Corrosion Control, Inspection And Testing Of Numerous Parts And Assemblies, Changeout Of Mandatory Parts, Reassembly, And Functional As Well As Load Testing. interested Parties May Submit Technical Literature/brochures On Solutions That Meet These Material Requirements. Any Relevant Information May Also Be Submitted For Consideration To Aid In Refinement Of This Requirement. this Rfi Is Not A Request For Proposal: it Is A Market Research Tool Being Used To Determine Potential And Eligible Vendors Capable Of Providing Services Described Herein Prior To Determining The Method Of Acquisition And Issuance Of A Request For Proposal. The Government Is Not Obligated To And Will Not Pay For Any Information Received From Potential Sources As A Result Of This Notice. eligibility: the Psc For This Requirement Is J017 (maintenance, Repair, And Rebuilding Of Equipment- Aircraft Launching, Landing, And Ground Handling Equipment). Naics Is 811310 (commercial And Industrial Machinery And Equipment (except Automotive And Electronic) Repair And Maintenance). All Interested Businesses Are Encouraged To Respond. submittal Information: it Is Requested That Interested Businesses Submit To The Contracting Office A Brief Capabilities Statement Package Demonstrating Ability To Meet The Requirements Outlined In Description. Responses Must Include 0610-rsd Overhaul Facility In Subject. This Documentation Must Address, At A Minimum, The Following: company Contact Information To Include: Company Name, Company Address, Cage Code, Company Business Size, And Point-of-contact (poc) Name, Phone Number, Fax Number, And E-mail Address. company Profile To Include: Number Of Employees And Duns Number; statement Regarding Capability: if You Are A Small Business, Provide An Explanation Of Your Company's Ability To Perform At Least 50% Of The Tasking Described In The Specifications. the Capability Statement Package Shall Be Sent Via Email To Air- 2.5.2.5.2 Navair Lakehurst Contracts, Zaib Nageeb, Zaib.nageeb.civ@us.navy.mil . Submissions Must Be Received At The Office Cited No Later Than 5:30 P.m. Eastern Standard Time On 4 October 2024. description: general Rsd Information: overall Dimensions – 100 X 70 X 14 Inches weight – 3200 Lbs hydraulic Fluid – Mil-h-83282a electrical – Input: 200v +/- 10% 3 Phase 400 Hz +/- 10% Current: Full Load – 6.7a Start Up - 25a representative Components: Accumulator, Hydraulic Actuators, Chains, Wire Rope Cables, Mechanical Linkages, Steel Plates, Machined Parts, Hydraulic Piping, Hydraulic Pump And Motor, Filter, Pulleys. how To Respond: all Interested Parties Must Submit Written Responses, Preferably Via Electronic Mail Within Fifteen (15) Days After Release Of This Rfi With Product Information That Meets All Or A Subset Of The Aforementioned Attributes. Please Submit Your Response To This Rfi Via E-mail No Later Than 4 October 2024, 5:30 Pm Edt To Contract Specialist, Zaib Nageeb At Zaib.nageeb.civ@us.navy.mil. The Navy Does Not Intend To Award A Contract On The Basis Of This Request Or Otherwise Pay For The Information Solicited. While The Navy Intends To Use This Information For Future Acquisition Planning Purposes, It Will Not Release Any Information About Your Approach That Might In Any Way Compromise Your Competitive Posture Or Proprietary Information. The Navy Will Not Use Any Information Provided To Level Your Company’s Approach Relative To Another Competitor. All Information Received In Response To This Rfi That Is Marked Proprietary Will Be Handled Accordingly. The Navy Will Not Be Liable For Or Suffer Any Consequential Damages For Any Proprietary Information Not Properly Identified. Proprietary Information Will Be Safeguarded In Accordance With The Applicable Navy Regulations. Responses To This Rfi Will Not Be Returned. Respondents Will Not Be Notified Of The Result Of The Review. Failure To Respond To This Rfi Does Not Preclude Participation In Any Future Associated Rfp/rfq That May Be Issued. Information Provided In No Way Binds The Navy To Solicit Or Award A Contract. If A Solicitation Is Released, It Will Be Synopsized On The System For Award Management (sam) Website: Www.sam.gov. It Is The Potential Vendor's Responsibility To Monitor This Site For The Release Of Any Follow-on Information.

DEPT OF THE NAVY USA Tender

Civil And Construction...+1Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
This Is A Sources Sought Notice Only. This Notice Does Not Constitute A Request For Proposal, Request For Quote, Or Invitation For Bid. The Intent Of This Notice Is To Identify Potential Offerors For Market Research Purposes And To Determine Whether To Set-aside The Requirement For Small Businesses. naval Facilities Engineering Systems Command Mid-atlantic Is Specifically Seeking Small Business Mechanical Contractors With Current Relevant Qualifications, Experience, Personnel, And Capabilities To Perform The Proposed Requirement. the Resulting Contract(s) Will Provide For New Construction, Renovation, Alteration, And Repair For Mechanical, Electrical And Plumbing Projects Primarily Located At Marine Corps Installations East (mci East). The Proposed Seed Project For This Solicitation Is Titled Modify Existing Generators And Wiring Un660, Marine Corps Base Camp Lejeune And The Estimated Construction Cost For This Project Is Between $1,000,000 And $5,000,000. Task Orders Under The Macc Will Be Design-bid-build. Work Will Be Primarily Performed At Marine Corps Base Camp Lejeune (including The New River Air Station And Other Related Facilities) And Marine Corps Air Station Cherry Point. the Procurement Method Is Contracting By Negotiation Far Part 15. the North American Industry Classification System (naics) Code For This Procurement Is 238220 And The Annual Size Standard Is $19,000,000. the Government Intends To Award This Contract To More Than One Contractor. The Government Will Give Fair Consideration To All Awardees In Placing Orders Based On Criteria Stated In The Solicitation. the Contract Term Will Be A Base Period One (1) Year Plus Four (4) Option Years. Only The Base Period Of The Contract Will Offer A Minimum Guarantee. the Contracts Will Replace Four (4) Contracts For Similar Services Awarded In 2020. Combined Task Order Requirements Issued Under All Four Contracts Were Not To Exceed A Maximum Amount Of Two Hundred Forty Million Dollars ($240,000,000). Information About The Incumbent Contractors Is Included Below: mechworks Mechanical Contractors, Inc. 5441 Hwy 70 morehead City, Nc 28557 north State Mechanical, Inc. 225 Ellis Blvd jacksonville, Nc 28540 r&w Construction Company, Inc. 2646 Richlands Highway jacksonville, Nc 28540 siler Excavating, Llc 1217 Buffalo Road clairfiled, Tn 37715 requests Under The Freedom Of Information Act Are Not Required For This Information. offerors Can View And/or Download The Solicitation, And Any Attachments, At Https://beta.sam.gov/ When It Becomes Available. the Proposed Contract Listed Here Is Being Considered For 100 Percent Set-aside For Small Business (sb). Interested Sb Concerns Should, As Early As Possible But Not Later Than 14days Of This Notice, Indicate Interest In The Acquisition By Providing To The Contracting Office Above Evidence Of Capability To Perform And A Positive Statement Of Eligibility As A Small Business Concern. If Adequate Interest Is Not Received From Sb Concerns, The Solicitation Will Be Issued As Unrestricted Without Further Notice. duns Number cage Code small Business Classification(s) Under Naics Code 238220 a List Demonstrating Prime Contractor Experience Performing A Minimum Of Five (5) Projects Within The Past Five (5) Years. The Contractor Should Seek To Demonstrate Their Performance Of Mechanical, Electrical, And Plumbing Work Through The Listed Projects. For The Projects Provided, Include The Project Title, Description, Contract Amount, Award Date, Completion Date, Role Of The Contractor, And Percentage Of Work Self-performed For Each Job. generic Capability Statements, Company Brochures, Or Other Such Material Will Not Be Reviewed. the Solicitation Utilizes Source Selection Procedures Which Require Offerors To Submit A Technical Proposal, Past Performance And Experience Information, And A Price Proposal For Evaluation By The Government. offerors Shall Submit With Their Offer A Bid Bond In The Amount Of 20% Of The Construction Wage Rate Requirements Statute For The Work. notifications Of Interest Must Be Submitted In Writing Via Email; Phone Calls Will Not Be Accepted. Notifications That Do Not Address All The Required Information Will Not Be Considered. Interested Parties Should Respond As Soon As Possible But No Later Than Close Of Business January 27, 2025. Responses To This Sources Sought Notice Shall Be Emailed To The Following Address: Kyle.l.vaughan2.civ@us.navy.mil. Telephonic Submissions And Questions Will Not Be Entertained.

DEPT OF THE NAVY USA Tender

Civil And Construction...+1Civil Works Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Uss Howard Ddg83 Fy25 5c1 Sra Bundle 3

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Contact Information|4|n741.6|gdh|n/a|tyreese.c.smith.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|w62g2t|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750 Emp|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| all Freight Is Fob Origin. any Resulting Contract Will Be In Accordance To The Terms And Conditions Of Thebasic Ordering Agreement #n0010424gz901 the Resultant Award Of This Buy Solicitation Will Be Issued Bilaterally, Requiring The Contractor?s Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. government Source Inspection Is Required. Unit Price:__________ Firm Total Price:__________ Firm Procurement Turnaround Time (ptat) :__________ Awardee Cage: __________ Inspection & Acceptance Cage, If Not At Source:__________ \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Sleeve And Slide,di . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Sleeve And Slide,di Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;78062 3311930; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. this Slide And Sleeve Matched Set Is Supplied Separately From The Valve In Which It Will Be Installed. It Has Been Tested For Conformance To Proof Pressure, Friction And Leakage Requirements Per The Associated Acceptance Test Procedure (atp). However, Sargent cannot Guarantee Conformance To Valve Assembly Test Requirements Once Installed. Acoustic Testing Has Not Been Performed On This Slide And Sleeve Matched Set As This Testing Requires The Parent Valve Assembly To Evaluate Performance.

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Contact Information|4|n7m2.25|bsh|see Email|marcus.a.hill21.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| critical Safety Item (aug 2011)|4|all Items In The Schedule|||| option For Increased Quantity (mar 1989)|1|365 Days| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| annual Representations And Certifications (may 2024)|13|334419|750 Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ "all Freight Is Fob Origin. this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. the Government Is Seeking A Repair Turnaround Time (rtat) Of: 117 Days government Source Inspection (gsi) Is Required. please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work. your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________ the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Driver,fire Control . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Driver,fire Control Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;15090 5336475; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Bell And Gossett (xylem Water Solutions)

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Contact Information|4|n774.19|gw0|717 605 4255|alexander.m.davies6.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| option For Increased Quantity (mar 1989)|1|365 Days From Date Of Award| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (jan 2025)|13|333618|1500|x|x|||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Alexander.m.davies6.civ@us.navy.mil. b. General Requirements: Mil-std Packaging, Government Source Inspection, Fob Source, Cav Reporting. c. This Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. d. Only A Firm-fixed (ffp), Not-to-exceed (nte), Or Estimated (est) Price For The Repair Of The Subject Item(s) Will Be Accepted. Quotes Limited To Test And Evaluation (t&e) Will Not Be Accepted. The Quoted Price Must Be For The Repair Of The Item(s). e. Must Adhere To Iuid Requirements Of Dfars 252.211-7003 f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Repair Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization. g. The Government Is Requesting A Repair Turnaround Time (rtat) Of: ## ______ Days After Receipt Of Asset. Repair Turnaround Time (rtat) Definition: The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The f-condition Asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In this Contract. please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25. throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences: _____/month (contractor Is To Fill In #). A Throughput Of "0" (zero) Per Month Reflects No Throughput constraint. induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer. h. Important Note: reconciliation Price Reduction: any Asset(s) For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late. However, Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If The contractor Does Not Meet The Required Rtat Due To Inexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit/per Month The Contractor Does Not Meet The Rtat: $___________, Up To A Maximum Of: $__________. (vendor Is To Fill In Amount) i. Your Quote Must Include The Following Information For Justification Purposes: - Repair Unit Price ________________ - Total Price________________ - Repair Turnaround Time (rtat) _____________ Days note: If You Are Not Quoting The Government's Requested Repair Turnaround Time (rtat) Or Sooner, You Must Provide Your Company's Capacity Constraints Below: ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ - Indicate Price Type: Firm-fixed-price _____ Not-to-exceed (ceiling Price) _____ Estimated _____ - New Unit Price_________________ - New Unit Delivery Lead Time____________ Days - T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br/ber, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. - The T&e Fee (if Asset Is Determined Br/ber) Was Determined Based On: ____________________________________________________________________ ____________________________________________________________________ - Award To Cage:________ - Inspection & Acceptance Cage, If Not The Same As Award To Cage: _________ - Facility/subcontractor Cage (where The Asset Should Be Shipped To), If Not Same As Award To Cage. __________ - Facility/subcontractor Or Packaging Facility Cage (where The Asset Will Be Shipped From), If Not The Same As Award To Cage. ________ - Basis Of Quoted Pricing: ; Estimated Costs____ ; Historical Repair Pricing___ ;other ______________________________________________ - Cost Breakdown Requested, Including Profit Rate (if Feasible). - Quote Expiration Date _______________________ (min Of 90 Days Is Requested). - Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) j. Options prospective Option Quantity Up To 100% notes: the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government Requests Up To A 100% (4 Ea) Option For A Period Of 365 Days. The Option Grants The Government The Unilateral Authority To Increase this Order Up To The Above Quantity Within 365 Days Of The Contract Award Date. This Will Incorporate Far Clause 52.217-6 (option For Increased Quantity) Into The Award. The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit price Specified. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, unless The Parties Otherwise Agree. A Modification Will Be Completed At The Time The Option Is Exercised And All Current Contract Terms And Conditions Will Apply To The Option Quantity. please Indicate If The Contracting Officer May Exercise The 100% Option Quantity For The Contract. yes ____ Or No ____ or If You Request A Variation To The Option Please Let Me Know In Your Quote. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Cooler,lubricating . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Cooler,lubricating Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;36wj4 6830956; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.

DEPT OF THE NAVY USA Tender

Civil And Construction...+1Civil Works Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
The Government Seeks Information Regarding The Replacement And Installation Of Overhead Coverings (or Similar Solutions). One Of The Coverings Will Be Attached To A Non-permanent Structure While Two Of The Coverings Will Be Attached To Permanent Structures.

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Contact Information|4|n741.6|gdh|n/a|tyreese.c.smith.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving ||tbd|n00104|tbd|tbd|w25g1u|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750 Emp|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| all Freight Is Fob Origin. any Resulting Contract Will Be In Accordance To The Terms And Conditions Of Thebasic Ordering Agreement #n0010424gz901 the Resultant Award Of This Repair Solicitation Will Be Issued Bilaterally, Requiring The Contractor?s Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. government Source Inspection (gsi) Is Required. your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This contract. Return Material Authorization # (rma), If Applicable:__________ Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________ \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Valve,linear,direct . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Valve,linear,direct Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;78062 52122-001; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1541-1550 of 2346 archived Tenders