Defence Tenders
Defence Tenders
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand wash basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand wash basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with piping made of PPs, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler piping for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date13 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with PPS pipes, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler pipes for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date31 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with PPS pipes, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler pipes for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date31 Jan 2025
Tender AmountRefer Documents
FEDERAL HIGHWAY ADMINISTRATION USA Tender
Civil And Construction...+1Others
United States
Details: Federal Highway Administration
eastern Federal Lands Highway Division
sources Sought Announcement No. 693c73-25-ss-0005
george Washington & Jefferson National Forests
project Va Erfo Fs Gwjef808 2020-2(1)
submittal Information
issue Date: December 18th, 2024
due Date For Responses: January 17th, 2025 2:00 Pm Est
submit Responses To: Mr. Michael Sun At Eflhd.contracts@dot.gov
submittals Should Be Made In Electronic Format Only
synopsis:
this Is A Sources Sought Announcement And Is For Information Purposes Only. This Is Not A Request For Proposals, Quotations, Or Bids. No Solicitation Is Currently Available. The Purpose Of This Announcement Is To Determine The Availability And Capability Of All Qualified Sources For A Construction Project Involving Slide Repairs And Extensive Soil Nail/gabion Wall Construction In George Washington And Jefferson National Forests, Located In Bedford, Scott, Tazewell, And Wythe Counties, Virginia.
the Project Consists Of Traffic Closure, Drainage Replacements, Articulated Block And Reinforced Concrete Pavement, Temporary Bridges, Bridge Scour Repairs, Streambank Revetment, And Other Miscellaneous Work. The Primary Objective Of The Proposed Contract Is To Repair Damage From These Erfo Events On All Sites.
the Work Is Divided Into Bid Schedules As Follows:
schedule A (base Contract) - Little Stony Road (fsr-700). The Work Includes Geotechnical Slide Repairs With Soil Nail Walls. There Are 2 Proposed Walls Of 105 And 55 Feet Long. Shoring And Bracing Will Be Required To Construct The Wall. The Gravel Roadway Resurfacing Will 400 Feet Long. The Road Will Be Closed During The Construction.
schedule B (option 1) - Punch And Judy Road (fsr-618). The Work Includes Geotechnical Slide Repairs With An Approximately 400-foot-long Soil Nail Wall And 61-foot-long Gabion Basket Wall. Shoring And Bracing Will Be Required To Construct The Wall. The Gravel Road Resurfacing Will Be Approximately 1,030 Feet Long. The Rock Cut Slope Will Receive Wire Mesh Draped Rockfall Protection. The Road Will Be Closed During The Construction.
schedule C (option 2) - Dry Run Road (fsr-14). The Work Includes Replacing An Undersized Pipe Culvert With A 4-foot Span By 3-foot Rise Concrete Box Culvert With Articulated Block To Reinforce Approaches, Surfacing Aggregate For Spot Repair Of Road Surface, And 3 Locations Of Slope Revetment With Riprap And To Repair Scour Holes Under 2 Bridge Abutments. The Road Will Be Closed During The Construction.
schedule D (option 3) - Hussy Mountain Horse Camp Road (fsr-14a). The Repair Work Includes Replacing The Existing Damaged Wooden Low Water Crossing (lwc) With A 10-foot Span By 4.5-foot Rise Reinforced Concrete Open Bottom Box Culvert, Construction Of Minor Reinforced Concrete Pavement To Reinforce The Lwc Approaches, Raising The Existing Approximately 0.1-mile Long Travel Way Surface By 2-3 Feet With Crushed Aggregate, Drainage Improvements, Replacement Of The Wooden Fence And Metal Gate, And Approximately 60 Feet Long Riprap Revetment At Stream Bank. The Existing Water Line Pvc Pipe Connected To The Existing Wooden Lwc Will Need To Be Protected During The Construction And Reattached To The New Lwc. The Road Will Be Closed During The Construction.
schedule E (option 4) - Blackhorse Gap East Road (fsr 186). The Existing Triple Culvert (60-inch Span By 46-inch Rise Pipe Arches) Lwc Will Be Replaced With A 19-foot Rise By 5.5 Foot Span Open Bottom Concrete Culvert. The Profile Will Be Raised About 2 Feet. The Culvert Approaches With Be Paved With Minor Reinforced Concrete Pavement At The Culvert Approaches To Strengthen And Eliminate Section Loss. Riprap Will Be Placed To Protect Stream Banks. The Work Will Require A Temporary Bridge Placed Next To The Existing Structure During The Construction So That The Local Traffic Can Be Maintained.
the Federal Highway Administration (fhwa), Eastern Federal Lands Highway Division (eflhd), Anticipates Awarding A Construction Contract No Earlier Than September 2025. The Cost Of The Entire Project Is Estimated To Be Between $5,000,000.00 To $10,00,000.00.
qualified Prime Contractors Shall Submit The Following Information By E-mail To Eflhd.contracts@dot.gov (attn: Mr. Michael Sun No Later Than 2:00pm (est) On January 17th, 2025.
1. A Positive Statement Of Your Intention To Submit A Bid For The Solicitation When It Is Issued As A Prime Contractor Containing Your Full Business Name, Address, Point Of Contact, Phone Number, E-mail Address, And Web Site (if Any).
2. Your Firm’s Size Standard Under Naics Code 237310; Highway, Street And Bridge Construction ($45 Million). All Firms Shall Be Certified And Registered Under The Naics Code 237310 In The System For Award Management (sam) Located At Https://www.sam.gov/ Prior To The Submission Of Bids Or Proposals.
3. Identify All Applicable Classifications For Your Firm Such As Small Business; Woman-owned Small Business; 8(a) Small Business; Small-disadvantaged Business; Hubzone Small Business; Service-disabled Veteran-owned Small Business; Etc. This Information Must Be Provided To Determine Whether The "rule Of 2" Has Been Met For Any Socio-economic Category For Set-aside Purposes. Please Note That The Size Of A Small Business Firm Includes All Parents, Subsidiaries, Affiliates, Etc. Refer To The Code Of Federal Regulations 13 Cfr 121.103 For Information On How The Sba Determines Affiliation And 13 Cfr 121.108 Regarding The Penalties For Misrepresentation Of Size Status.
4. Offeror's Ability To Perform At Least 50% Of The Total Amount Of Work To Be Performed Under The Contract As A Large Business Prime Contractor Per Far Clause 52.236-1 – Performance Of Work By The Contractor; Or Ability To Perform At Least 15% Of The Cost Of Contract Performance Effort With Its Own Workforce As A Small Business Prime Contractor Per Far Clause 52.219-14 Limitations On Subcontracting.
5. Offeror's Capability To Perform A Contract Of This Magnitude And Complexity Including Specialized Construction, Soil Nail Walls, Gabion Baskets, Temporary Bridge, Slide Repairs, Road Resurfacing, And Concrete Box Culverts Within The Past 5 Years, Including A Brief Description Of The Project, Customer Name, Timelines Of Performance, Customer Satisfaction, And Dollar Value Of Project. If A Member Of A Joint Venture (jv), The Offeror Should Include Relevant Information From Both Members Of The Jv.
6. Offeror's Experience In Coordinating With Multiple Federal, State, And Local Agencies For The Successful Completion Of A Construction Project Performed Within The Last 5 Years, Including A Brief Description Of The Project, Customer Name, Timelines Of Performance, Customer Satisfaction, And Dollar Value Of Project. If A Member Of A Joint Venture, The Offeror Should Include Relevant Information From Both Members Of The Jv.
7. Commercial And Government Entity (cage) Code And Unique Entity Id; If A Member Of A Joint-venture (jv) Or Mentor-protégé Agreement With The Sba, Please Provide Information On Both Members Of The Jv.
8. Please Provide Your Current Per Contract And Aggregate Bonding Capacities.
responses To This Source Sought Announcement Shall Be Limited To 5 Pages, Single-spaced, With Font Size 12 Or Larger Using Times New Roman Or Arial. Page Margins No Smaller Than 1” And Page Size Shall Be No Greater Than 8.5” X 11.” Submission Shall Be Provided In Electronic Format Readable And Searchable By Adobe Acrobat Or Microsoft Word. Do Not Submit Marketing Material, Slide Presentations, Or Technical Papers. Do Not Submit Resumes.
please Reference “sources Sought Announcement No. 693c73-25-ss-0005 For Project Va Erfo Fs Gwjef808 2020-2(1)” In The Subject Line Of Your Email.
Closing Date17 Jan 2025
Tender AmountRefer Documents
Directorate General Fire Services Civil Defence And Home Guards Tender
Goods
Software and IT Solutions...+1Security and Emergency Services
Eprocure
Corrigendum : Closing Date Modified
India
Purchaser Name: Directorate General Fire Services Civil Defence And Home Guards | Appointment Of Master System Integrator For Implementation Of Central Unified Command And Control Platform Based Fire And Emergency Service Management System
Closing Soon7 Jan 2025
Tender AmountRefer Documents
Directorate General Fire Services Civil Defence And Home Guards Tender
Services
Software and IT Solutions
Eprocure
Corrigendum : Closing Date Modified
India
Purchaser Name: Directorate General Fire Services Civil Defence And Home Guards | Request For Proposal For Selection Of System Integrator For Digital Transformation Of Directorate Of Fire And Emergency Services, Odisha
Closing Soon7 Jan 2025
Tender AmountRefer Documents
Ministry Of Defence, Air Force Command, Logistics Center Woensdrecht Tender
Others
Netherlands
Purchaser Name: Ministry Of Defence, Air Force Command, Logistics Center Woensdrecht | Framework Agreement For The Supply Of Communication Ear Plugs (in-ear) And Related Spare Parts
Closing Soon7 Jan 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Civil Works Others
United States
Details: Date Soliciation Documents Available (approx.): 14 January 2025
this Project Is Advertised On An Unrestricted Basis.
this Solicitation Is A “best Value”, Two-phase Source Selection. In Phase One, Offerors Will Compete For The Opportunity To Submit Proposals For Phase Two. In Phase One, An Offeror Must Submit Certain Specified Information Regarding Its Company’s Past Performance And Technical Approach. Price Is Not A Submission Requirement In Phase One. Based On The Results Of Phase One Evaluations, The Government Will Select Two Or More Of The Most Highly Rated Offerors To Participate In Phase Two. However, The Government Reserves The Right To Reject Any And/all Offers. In Phase Two, Offerors Will Compete To Determine Which Offerors Will Be Awarded An Indefinite Delivery/indefinite Quantity (idiq) Contract And Be Included In The Matoc Pool. Price Proposals Will Be Submitted In Phase Two And Will Consist Of Two Bid Schedules: Bid Schedule No. 1 (rates) And Bid Schedule No.2 (seed Project Price). Following Phase Two Evaluations, The Government Intends To Award Two Or More Matocs And To Award The Seed Project (bid Schedule No. 2) To One Of The Awardees. However, The Government, At Its Discretion, Is Not Obligated To Award Any Matocs Or The Seed Project As A Result Of The Evaluations.
description Of Work (physical Characteristics)
the Government Intends To Award Multiple Contracts Pursuant To This Solicitation. These Contracts Shall Be Indefinite Delivery/ Indefinite Quantity (idiq) Multiple Award Task Order Contracts (matoc) With Design Build Capabilities To Support U.s. Army Corps Of Engineers, Mobile District, Military Construction And Support For Others Program For Construction Requirements In Central America. This Requirement Is Being Handled By The U.s. Army Corps Of Engineers, Mobile District; Mobile, Alabama.
the Term Of The Contract Is Limited To A Five Year Ordering Period. The Guaranteed Minimum For The Contract Is $1,000. The Total Dollar Capacity For The Contract Is $99 Million Over Five Years.
contractors Shall Complete All Work Under Their Contract In Accordance With Schedules That Are Established In Each Task Order. Work Will Vary From Site To Site, Or Location, And Will Require Extensive Knowledge Of Construction And Renovation Projects. Submittal Dates Will Be Included In The Individual Task Orders. These Dates Identify When Information Is Due To The Issuing Government Office And Other Addresses Identified In The Individual Task Orders. The Types And Numbers Of Submittals And Dates And Places For Review Meetings Shall Be Established By Each Task Order Under This Contract. Defense Base Act (dba) Insurance Will Be Required For All The Task Orders.
the Government Anticipates That Task Orders Will Be Awarded On A Firm Fixed-price Basis.
objective. This Contract Will Require Contractors To Provide All Plant, Labor, Equipment And Materials Necessary To Perform Design, Construction, Incidental Demolition, Upgrade And Repair Of Facilities And Structures. Work Will Typically Include Vertical And Horizontal Construction, Site Work, Geotechnical Surveys, Landscaping, Surveying, Mapping, Mechanical And Electrical Work For Blast Resistant, Fortified Structures; Rigid And Flexible Paving For Roads, Airfields And Helipads; Parking Lots; Riverine And Marine Construction Of Floating Docks, Piers, And Barges; Dredging; Construction Of Remote And Temporary Camps, Firing Ranges, Rappel Towers, Shoot Houses, Fuel Systems, Ammunition Storage, Food Storage, Interior And Exterior Utilities To Include Water And Sewage Treatment, Water Wells, Communications, Electrical Power (to Include Generators And Solar And Wind Power), Security (to Include Field Fortifications, Wire Obstacles, Bunkers, Watch Towers And Security Fencing And Hardening Of Existing Facilities) And Safety Of Facilities. Facilities And Structures May Include Administrative Buildings, Barracks, Warehouses, Hangars, Schools, Motor Pools, Etc. The Work May Involve Replacement In Kind, Repairs, Upgrades And Modification Work And/or New Construction. It Also May Include Incidental Design And Testing, And Survey And Abatement For Lead Based Paint (lbp) And Asbestos Containing Materials (acm). Facility Repairs, Upgrades And Construction Shall Conform To The Requirements Of The Technical Criteria Listed In The Task Order. Task Orders May Require The Application Of U.s. Building Codes; International Building Code (ibc); National Electric Code (nec); Structural And Heating, Ventilation And Air Conditioning (hvac) Codes; And U.s. Department Of Defense Criteria That Include, But Are Not Limited To, Unified Facility Criteria (ufc) And Anti-terrorist And Force Protection (aftp) Requirements As Well As Any Host Nation Requirements That May Be Stricter Than Those Listed Above. In Addition, Construction Materials, Including, But Not Limited To Locally Available Aggregates, Cements, Reinforcing Steel, Structural Lumber, Block Masonry Products, Conduit And Electrical Devices, Pipe And Plumbing Fixtures, May Be Purchased Under This Contract. Some Construction May Occur At Remote Locations And Close Coordination Will Be Required With Both The Us Army Corps Of Engineers And Host Nation Military And Civilian Authorities Throughout The Life Of The Projects. Projects On Host Nation Military Installations Will Require That Employees Be Vetted For Security By Host Nation Military Authorities. The Work Described Herein Shall Be Accomplished Through The Implementation Of Task Orders Issued Under The Terms Of This Solicitation.
seed Project: To Be Identified In Phase Two
the North American Industry Classification System (naics) Code For This Project Is 236220.
estimated Cost Range Project: $25,000,000 To $100,000,000
offers Covering The Project Restricted To Small Business Yes_ __ No_ X _
*restricted To 8(a) Competitive For Region Iv Yes___ No_x_
Subcontracting Plan Required Yes_ __ No_ X__
field Office: Central America Resident Office
Poc: Ivan Olivieri, 251-694-4027
project Manager: Julie Walton, 251-694-4633
project Engineer: Steven Mcdavid, 251-690-2621
specification Engineer: Melody Little, 251-690-2916
contract Specialist: Terri Adams, 251-441-6500
note No. 1: All Prospective Contractors And Their Subcontractors And Suppliers Must Be Registered In The System For Award Management (sam.gov) Before They Will Be Allowed To Download Solicitation Information. Contractors Must Be Registered In The System For Award Management (sam) At Https://sam.gov/content/home Prior To Award Of This Contract. Solicitation Documents, Plans And Specifications Will Only Be Available Via The Procurement Integrated Enterprise Environment (piee) Website Https://piee.eb.mil See Attachments Piee Solicitation Module Vendor Access Instructions And Sop Piee Proposal Manager Offeror For Instructions On Getting Access To The Piee Solicitation Module And Submitting Your Proposal. Registration For Plans And Specifications Should Be Made Via The Procurement Integrated Enterprise Environment (piee) Website Https://piee.eb.mil. If You Are Not Registered, The United States Government Is Not Responsible For Providing You With Notifications Of Any Changes To This Solicitation. The Solicitation Will Be Available Only As A Direct Download. This Solicitation Will Not Be Issued On Cd-rom. Neither Telephonic, Mailed, Nor Fax Requests Will Be Accepted. Registration Should Be Completed One (1) Week Prior To The Issue Date. It Is Therefore The Contractor’s Responsibility To Monitor The Website Daily For The Solicitation To Be Posted, And For Any Posted Changes Or Amendments To This Solicitation. The Plans And Specifications And All Notifications Of Changes To This Solicitation Shall Only Be Made Through This Posting And Modifications Hereto. Plans And Specifications Will Not Be Provided In A Printed-paper Format; However, The Government Reserves The Right To Revert To Paper Medium When It Is Determined To Be In The Government's Best Interest. Note: This Solicitation Is In .pdf Format And Requires Adobe Acrobat Reader. Adobe Acrobat Reader May Be Downloaded Free Of Charge At Http://www.adobe.com/products/reader.
note No. 2: All Bid Forms, Bid Bonds, And Other Normal Documents Required For The Bid Submittal, Including Amendments To The Bid Submittal, Shall Be Electronic Format With The Proposal.
note No. 3: All Advertisements Of Mobile District Projects Will Be Through The Procurement Integrated Enterprise Environment (piee) Website Https://piee.eb.mil. Detailed Information On This And Other Mobile District Projects (ordering Solicitations, Points Of Contact, Synopsis Of Work, Etc.) Are Available On The Internet At The Procurement Integrated Enterprise Environment (piee) Website Https://piee.eb.mil.
address Questions Concerning Downloading Of Plans/specifications To The Contract Specialist Indicated Above.
note No. 4: A Contractor Site Visit Will Be Conducted With Those Offerors Advancing To Phase Two. Phase Two Offerors Will Be Notified Via Amendment, As To When And Where The Site Visit Will Be Conducted.
note No. 5: The Request For Information (rfi) Process For Bidder Inquiries During The Advertisement Period Will Be Through The Projnet Internet-based System, And Specifics Will Be Contained In The Rfp Solicitation Package Available Exclusively From The Procurement Integrated Enterprise Environment (piee) Website Https://piee.eb.mil. Other Forms Of Communicating Rfis To The Government Will Not Be Honored. The Government Will Try To Respond To All Questions. However, Responses May Not Be Furnished To All Questions And Particularly Those Received Late In The Advertisement Period (0-10 Days Prior To Bid Opening.)
Closing Date18 Feb 2025
Tender AmountRefer Documents
Department Of Agriculture Tender
Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid For The Rebidding Of Provision Of Labor, Materials, Equipment Rental And Other Incidentals Needed For The Construction Of Livestock Housing Facility (beef Cattle) In Region 1 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of One Million Pesos (php1,000,000.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Rebidding Of Provision Of Labor, Materials, Equipment Rental And Other Incidentals Needed For The Construction Of Livestock Housing Facility (beef Cattle) In Region 1 With Project Identification Number Da Rfo-1-2025-infra-001-r. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Specifications, To Wit: Details And Specifications Project Site/location: Brgy. Calunetan, Sison, Pangasinan Project Description: Construction Of 135 Sq.m. Cattle House With Loafing Area, Feeding Through, Chute And Perimeter Fence Scope Of Work: Description Qty Unit I. General Requirements (permits & Project Billboard) 1.00 Lot Ii. Mobilization And Demobilization 1.00 Lot Iii. Safety And Health 1.00 Lot Iv. Earthworks 37.00 Cu.m. V. Rsb Works 1,163.00 Kgs. Vi. Form Works And Scaffoldings 600.00 Bd.ft. Vii. Concrete Works (class A) 30.00 Cu.m. Viii. Masonry Works (including Plastering) 28.00 Sq.m. Ix. Steel Works 1.00 Lot X. Tinsmithry Works 186.00 Sq.m. Xi. Painting Works 1.00 Lot Xii. Electrical Works 1.00 Lot Minimum Technical Personnel Required: • 1 Project Engineer • 1 Foreman • 6 Skilled Workers • 8 Unskilled Workers Minimum Equipment Required: • 1 One-bagger Mixer • Minor Tools Completion Of The Works Is Within Seventy (70) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours At 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture - Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 13, 2024 To January 7, 2025 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php1,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 20 December 2024, 3:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 07 January 2025, 2:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 07 January 2025, 2:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa; C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Requirements May Be Soft-bound/fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed, As Needed, By The Bidder/authorized Representative On Each And Every Page Thereof. E. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: E.1. Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or E.2. The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No.:(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ December 12, 2024 Approved By: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-infra-001-r
Closing Date21 Jan 2025
Tender AmountPHP 1 Million (USD 17.2 K)
4901-4910 of 4913 active Tenders