Crane Tenders

Crane Tenders

INSTITUTION OF PRE SCHOOL EDUCATION 39 COMBINED TYPE CRANE OF THE UZHGOROD CITY COUNCIL OF THE ZAKARPATA REGION Tender

Civil And Construction...+1Civil Works Others
Ukraine
Closing Soon2 Dec 2024
Tender AmountUAH 579.3 K (USD 14 K)
Purchaser Name: INSTITUTION OF PRE SCHOOL EDUCATION 39 COMBINED TYPE CRANE OF THE UZHGOROD CITY COUNCIL OF THE ZAKARPATA | Закупівля На 2025 Рік

City Government Of Davao Tender

Civil And Construction...+1Road Construction
Philippines
Closing Soon27 Nov 2024
Tender AmountPHP 489.3 Million (USD 8.2 Million)
Details: Description The City Government Of Davao Now Invites Bidders For The Projects Under Batch 13-2024 As Listed Below. The Prospective Bidder Must Have Completed A Single Largest Contract Cost (slcc) That Is Similar To The Contract To Be Bid, And Whose Value, Adjusted To Current Prices Using The Psa Consumer Price Indices, Must Be At Least Fifty Percent (50%) Of The Abc To Be Bid: Provided, However, That Contractors Under Small A And B Categories Without Similar Experience On The Contract To Bid May Be Allowed To Bid If The Cost Of Such Contract Is Not More Than The Allowable Range Of Contract Cost (arcc) Of Their Registration Based On The Guidelines As Prescribed By The Pcab And Section 23.4.2.4 Of The 2016 Revised Irr Of Ra 9184 Updated As Of April 15, 2024. Moreover, A Contract Shall Be Considered "similar" To The Contract To The Bid If It Has The Same Major Categories Of Work. B13-2024-01 Project Title: Road Opening With Concreting Located At Purok Pag-ibig, Purok Salome, Purok Masaya To Purok Pagbabago, Brgy. Saloy, Calinan District (phase 2) Source Of Fund: Adf, Cy 2024 (24102) Approved Budget For The Contract: Php 160,000,000.00 Project Duration: 540 Calendar Days Pcab License: Road Medium B Cost Of Tender Documents: Php 50,000.00 Minimum Equipment Requirements: 1 Unit Hydraulic Excavator (0.80 Cu.m) 1 Unit Concrete Mixer (1-bagger) 1 Unit Bulldozer, D6h Series Ii Psds/dd 1 Unit Concrete Vibrator 1 Unit Motorized Road Grader (140hp), G710a 1 Unit Concrete Saw 1 Unit Vibratory Roller (10mt), Sd100dc 1 Unit Handroller Vibratory 1 Unit Dumptruck 5 Cu.m. Cap. 1 Unit Bar Cutter 1 Unit Hydraulic Excavator (0.80 Cu.m) W/ Breaker 2 Units Chainsaw 1 Unit Boomtruck 1 Unit Water Truck 1 Unit Payloader 1 Unit Tm Crane 86 Units Steel Forms 1 Unit Generator Set 1 Unit Vibratory Hammer B13-2024-02 Project Title: Construction Of Farm To Market Road From Purok 8 Gulansing To Sitio Kinse-kinse Proper, Brgy. Salapawan, Paquibato District Source Of Fund: Adf Cy 2024 (24094) Approved Budget For The Contract: Php 130,000,000.00 Project Duration: 540 Calendar Days Pcab License: Road Medium A Cost Of Tender Documents: Php 50,000.00 Minimum Equipment Requirements: 1 Unit Hydraulic Excavator (0.80 Cu.m) 1 Unit Payloader 1 Unit Bulldozer, D6h Series Ii Psds/dd 88 Units Steel Forms 1 Unit Motorized Road Grader (140hp), G710a 1 Unit Concrete Mixer (1-bagger) 1 Unit Vibratory Roller (10mt), Sd100dc 1 Unit Concrete Vibrator 1 Unit Hydraulic Excavator (0.80 Cu.m) W/ Breaker 1 Unit Concrete Saw 1 Unit Dumptruck 5 Cu.m. Cap. 1 Unit Handroller Vibratory 1 Unit Dumptruck 10 Cu.m Cap. 1 Unit Bar Cutter 1 Unit Boomtruck B13-2024-03 Project Title: Road Concreting With Drainage System From P-8 Puting Bato To Sitio Namnam, Brgy. Baganihan, Marilog District (with 2 Bridge Component) Source Of Fund: Adf , Cy 2024 (24104) Approved Budget For The Contract: Php 65,000,000.00 Project Duration: 300 Calendar Days Pcab License: Road/ Flood Control Medium A Cost Of Tender Documents: Php 50,000.00 Minimum Equipment Requirements: 88 Units Steel Forms 1 Unit Water Truck 1 Unit Bulldozer, D6h Series Ii Psds/dd 2 Units Concrete Mixer (1-bagger) 1 Unit Hydraulic Excavator (0.8 Cu.m) 1 Unit Concrete Vibrator 1 Unit Motorized Road Grader (140hp), G710a 1 Unit Concrete Saw 1 Unit Vibratory Roller (10mt), Sd100dc 1 Unit Handroller Vibratory 2 Units Dumptruck (12 Cu.yd) 1 Unit Bar Cutter 1 Units Payloader (1.5 Cu. M) B13-2024-04 Project Title: Road Concreting And Drainage System At Purok 1-c, Brgy. Talomo River, Calinan District Source Of Fund: Df, Sb1, Cy 2023 (23250) Approved Budget For The Contract: Php 30,000,000.00 Project Duration: 240 Calendar Days Pcab License: Road/ Flood Control Medium A Cost Of Tender Documents: Php 25,000.00 Minimum Equipment Requirements: 1 Unit Jackhammer W/ Air Compressor 1 Unit Handroller 1 Unit Dumptruck 5 Cu.m. 1 Unit Concrete Vibrator 1 Unit Backhoe Pc - 60 1 Unit Concrete Saw 1 Unit 10w Dumptruck 1 Unit Bar Cutter 1 Unit Road Grader 88 Units Steel Forms 1 Unit Road Roller 1 Unit One Bagger Concrete Mixer 1 Unit Payloader B13-2024-05 Project Title:construction Of Farm To Market Road At Purok Olaniag To Purok Kibilog, Brgy. Mapula, Paquibato District (phase 3) Source Of Fund: Adf Cy2024 (24095) Approved Budget For The Contract: Php 24,000,000.00 Project Duration: 300 Calendar Days Pcab License: Road Small B Cost Of Tender Documents: Php 25,000.00 Minimum Equipment Requirements: 1 Unit Dumptruck 5 Cu.m. Cap. 1 Unit Water Truck/pump (16000l) 1 Unit Chainsaw 2 Units Handroller 2t Vibratory 1 Unit Hydraulic Backhoe (0.80 Cu.m.) 2 Units Concrete Vibrator 1 Unit Bulldozer, D6h Series Ii Psds/dd 2 Units Concrete Saw 1 Unit Dumptruck (12 Cu.yd) 2 Units Bar Cutter 1 Unit Backhoe Pc-60 176 Units Steel Forms 1 Unit Motorized Road Grader (140hp), G710a 1 Unit Concrete Mixer (one Bagger) 1 Unit Vibratory Roller (10mt), Sd100dc B13-2024-06 Project Title: Road Concreting At Purok 4 Sitio Magsaysay, Brgy. Catigan, Toril District Source Of Fund: Df, Sb No. 1, Cy 2024 (24199) Approved Budget For The Contract: Php 17,000,000.00 Project Duration: 180 Calendar Days Pcab License: Road Small B Cost Of Tender Documents: Php 25,000.00 Minimum Equipment Requirements: 2 Units Backhoe Pc-30 1 Unit Handroller, 2t, Vibratory 2 Units Dumptruck 5 Cu.m. Cap. 1 Unit Concrete Vibrator 1 Unit Road Grader 1 Unit Concrete Saw 1 Unit Road Roller, Vibratory 4 Units Bar Cutter 1 Unit Mini Dumptruck 102 Units Steel Forms 1 Unit Water Truck/pump (16000l) 1 Unit One Bagger Concrete Mixer B13-2024-07 Project Title: Construction Of Wastewater Treatment Facility For Marilog District Hospital, Brgy. Marilog Proper, Marilog District Source Of Fund: Adf Cy 2024 (24132) Approved Budget For The Contract: Php 15,000,000.00 Project Duration: 180 Calendar Days Pcab License: Gb-3 Water Treatment Plant & System Small B Cost Of Tender Documents: Php 25,000.00 Minimum Equipment Requirements: 1 Unit Backhoe Pc-30 1 Unit Cut-off Machine 1 Unit Mini Dump Truck 1 Unit Concrete Mixer ( 1-bagger) 1 Unit Plate Compactor 8 Units H-frame With Cross Bracing & Joint Pin 1 Unit Concrete Vibrator 2 Units Welding Machine 1 Unit Pumpcrete 2 Units Electric Grinder B13-2024-08 Project Title: Road Construction At Purok 1, Purok 2 And Purok 9, Brgy. Buda, Marilog District (phase 1) Source Of Fund: Df, Sb No. 1, Cy 2024 (24196) Approved Budget For The Contract: Php 14,250,000.00 Project Duration: 120 Calendar Days Pcab License: Road Small B Cost Of Tender Documents: Php 25,000.00 Minimum Equipment Requirements: 1 Unit Backhoe Pc-60 1 Unit Water Truck 1 Unit Bulldozer 1 Unit Concrete Vibrator 1 Unit Hydraulic Excavator (crawler) 1 Unit Concrete Saw 1 Unit Road Grader 84 Units Steel Forms 1 Unit Road Roller 1 Unit One Bagger Concrete Mixer 2 Units Dump Truck 1 Unit Electric Drill 1 Unit Chainsaw 1 Unit Bar Cutter 2 Units Payloader (1.50 Cu.m.) B13-2024-09 Project Title: Construction Of Perimeter Fence At Tagakpan Elementary School, Purok San Francisco, Tagakpan, Tugbok District, Davao City Source Of Fund: Sef 2024 (3321-a) Approved Budget For The Contract: Php 9,500,000.00 Project Duration: 240 Calendar Days Pcab License: Building Small B Cost Of Tender Documents: Php10,000.00 Minimum Equipment Requirements: 1 Unit Backhoe Pc – 35 1 Unit Concrete Vibrator 1 Unit Chainsaw 2 Units Bar/shear Cutter 1 Unit Dumptruck 1 Unit Electric Grinder 2 Units Jackhammer With Air Compressor 4 Units Welding Machine 1 Unit One Bagger Concrete Mixer 4 Units Cut-off Machine B13-2024-10 Project Title: Construction Of Bleachers With Canopy At Wangan Elementary School, Brgy. Wangan, Calinan District Source Of Fund: Df, Sb No. 1, Cy 2024 (24186) Approved Budget For The Contract: Php 7,500,000.00 Project Duration: 180 Calendar Days Pcab License: Building Small B Cost Of Tender Documents: Php 10,000.00 Minimum Equipment Requirements: 1 Unit Backhoe Pc-60 W/ Breaker 1 Unit Cargo Stake Truck 1 Unit Plate Compactor 1 Unit Dumptruck 1 Unit Walk-behind Compactor 1 Unit Steel Bar Bender 2 Units One-bagger Concrete Mixer 2 Units Welding Machine 2 Units Bar/shear Cutter 1 Unit Boom W/ Chainblock 2 Units Electric Grinder 1 Unit Oxy-actylene Cuttiing Outfit 2 Units Electric Handrill 2 Units Cut Off Machine 2 Units Tile Cutter B13-2024-11 Project Title: Construction Of Multipurpose Building At Purok 4, Brgy. San Isidro, Bunawan District Source Of Fund: Df, Sb No. 1, 2024 (24206) Approved Budget For The Contract: Php 4,000,000.00 Project Duration: 150 Calendar Days Pcab License: Building Small B Cost Of Tender Documents: Php 5,000.00 Minimum Equipment Requirements: 1 Unit Jackhammer With Air Compressor 2 Units Welding Machine 1 Unit Mini Dumptruck 1 Unit Cut Off Machine 1 Unit Backhoe Pc-30 1 Unit Electric Grinder 1 Unit Plate Compactor 2 Units Electric Drill 1 Unit One Bagger Mixer 2 Units Riveter 1 Unit Concrete Vibrator 2 Units Tile Cutter 2 Units Bar/shear Cutter 6 Units H-frame W/cross Bracing And Joint Pin B13-2024-12 Project Title: Construction Of Mini Green Park With Solar Lights And Drainage System Along Bonifacio-mabini-aurora Junctions, Brgy. 33-d, Poblacion District Source Of Fund: Df, Sb No. 1, Cy2023 (23269) Approved Budget For The Contract: Php 3,450,000.00 Project Duration: 120 Calendar Days Pcab License: Gb-4 Playground Or Recreational Work/ Electrical Works/ Flood Control Small B Cost Of Tender Documents: Php 5,000.00 Minimum Equipment Requirements: 2 Units Bar/shear Cutter 1 Unit One Bagger Concrete Mixer 1 Unit Boom Truck 1 Unit Plate Compactor 1 Unit Concrete Vibrator 1 Unit Tile Cutter 1 Unit Electric Grinder 1 Unit Welding Machine 1 Unit Mini-dumptruck B13-2024-13 Project Title: Installation Of Solar Street Lights At Purok 8 And 9 Duha, San Rafael, Brgy. 10-a, Poblacion District Source Of Fund: Adf Cy 2024 (24057) Approved Budget For The Contract: Php 4,000,000.00 Project Duration: 60 Calendar Days Pcab License: Electrical Works Small B Cost Of Tender Documents: Php 5,000.00 Minimum Equipment Requirements: 1 Unit Concrete Mixer 1 Unit Jackhammer With Generator Set 1 Unit Concrete Vibrator 1 Unit Boom Truck B13-2024-14 Project Title: Construction Of Concrete Pathway With Drainage At Subasta Elementary School, Brgy. Subasta, Calinan District Source Of Fund: Df, Sb No. 1, Cy 2024 (24184) Approved Budget For The Contract: Php 3,600,000.00 Project Duration: 120 Calendar Days Pcab License: Road/ Flood Control Small B Cost Of Tender Documents: Php 5,000.00 Minimum Equipment Requirements: 1 Unit Cargo Stake Truck/low Bed Truck 1 Unit Concrete Saw 1 Unit Jack Hammer With Air Compressor 1 Unit Concrete Vibrator 1 Unit Dumptruck 5 Cu.m. Cap. 1 Unit Steel Forms 1 Unit Backhoe (pc-60) 1 Unit Bar Cutter 1 Unit Hand Roller B13-2024-15 Project Title: Completion Of Multipurpose Building At Megkawayan Elementary School, Brgy. Megkawayan, Calinan District, Davao City Source Of Fund: Sef Cy 2024 (3321-a) Approved Budget For The Contract: Php 2,000,000.00 Project Duration: 60 Calendar Days Pcab License: Building Small B Cost Of Tender Documents: Php 5,000.00 Minimum Equipment Requirements: 1 Unit One-bagger Concrete Mixer 2 Units Electric Grinder 1 Unit Concrete Vibrator 1 Unit Welding Machine 1 Unit Bar/shear Cutter 1 Unit Cut-off Machine 12 Units H-frame With Cross Bracing & Joint Pin 4 Units Tile Cutter 2 Units Electric Handrill Procurement Activity Schedule A. Issuance Of Bidding Documents November 6 To 27, 2024 8:00 Am To 5:00 Pm Bac Secretariat For Civil Works (excluding Saturdays, Sundays & Holidays) B. Pre-bid Conference November 13, 2024, 10:30 Am Virtual Meeting Through Zoom C. Deadline Of Submission And Receipt Of Bids November 27, 2024, 9:00 Am Bac Conference Room, Ground Floor, City Hall, Davao City D. Opening Of Bids November 27, 2024, 10:30 Am Virtual Meeting Through Zoom (sgd) Atty. Joseph Dominic S. Felizarta, Ce Bac Chairman

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date17 Dec 2024
Tender AmountPHP 1.4 Million (USD 24.3 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 1.00 Lot Minor Tools (10% Of Labor Cost) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 22.00 1.00 A. Safety Practitioner/officer (part Time) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 20.16 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 20.16 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 17.64 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 17.64 M3 Embankment From Structure Excavation Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 4.84 M3 Dpwh Standard Output Per Hour (oph)= 1.2 M3 4.84 M3 Gravel Bedding Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Plate Compactor (5 Hp) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 " Structural Concrete (footing, Slab On Fill)" Quantity 9.18 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 9.18 M3 "structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 " Structural Concrete (footing Tie Beam, Wall Footing)" Quantity 5.76 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 5.76 M3 "structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 " Structural Concrete (columns)" Quantity 8.19 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 8.19 M3 "structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 4.48 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 4.48 M3 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 1,873.17 Kg Dpwh Standard Output Per Hour (oph)= 143.438 Kg 1873.17 Kg "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 31.50 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 31.50 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 102.40 M2 Dpwh Standard Output Per Hour (oph)= 3.825 M2 102.40 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 2,224.80 Kg Dpwh Standard Output Per Hour (oph)= 85 Kg 2224.80 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 5.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purtins Quantity 387.70 Kg Dpwh Standard Output Per Hour (oph)= 90.45 Kg 387.70 Kg Structural Steel Purtins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene 0.00 - C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (6) Metal Structure Accessories (steel Plates) Quantity 22.00 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 22.00 Kg Metal Structure Accessories (steel Plates) Direct Cost: A. Materials: 1.05 Kg A. Steel Plates B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (7)b Metal Structure Accessories (sag Rods) Quantity 41.98 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 41.98 Kg Metal Structure Accessories (sag Rods) Direct Cost: A. Materials: 1.05 Kg A. Sag Rods With Nuts & Bolts B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (4) Metal Structure Accessories (cross Bracing) Quantity 51.98 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 51.98 Kg Metal Structure Accessories (cross Bracing) Direct Cost: A. Materials: 1.05 Kg A. Cross Bracing B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)c Metal Structure Accessories (turnbuckle) Quantity 16.00 Each Dpwh Standard Output Per Hour (oph)= 1 Each 16.00 Each Metal Structure Accessories (turnbuckle) Direct Cost: A. Materials: 1.05 Kg A. Turnbuckle B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 101.49 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 101.49 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings & Metal Fascia) Quantity 38.80 M Dpwh Standard Output Per Hour (oph)= 10.6 M 38.80 M Fabricated Metal Roofing Accessory (flashings & Metal Fascia) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 19.60 M Dpwh Standard Output Per Hour (oph)= 0 M 19.60 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)a1 Fabricated Metal Roofing Accessory (ridge Roll) Quantity 12.00 M Dpwh Standard Output Per Hour (oph)= 11.8 M 12.00 M Fabricated Metal Roofing Accessory (ridge Roll) Direct Cost: A. Materials: 1.05 M A. Prepainted Ridge Roll, Ga. 24 (0.701mmx2.44mm) 19.00 Pc B. Blind Rivets 0.00 - C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) " Reflective Insulation" Quantity 94.08 M2 Dpwh Standard Output Per Hour (oph)= 5.56 M2 94.08 M2 "reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 129.40 M2 Dpwh Standard Output Per Hour (oph)= 2 M2 129.40 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Canada
Closing Date5 Dec 2024
Tender AmountRefer Documents 
Details: Without Being Limited Thereto, The Principal Works, Forming Part Of This Contract, Include:  Providing The Complete Mobilization Required For The Execution Of The Works (Crane, Mobile Crane, Containers, Protection, Signalers, Waste Containers, Etc.). Removal Of Existing Roof Components Up To The Existing Concrete Decking With The Cleaning And Resurfacing Works Of The Latter In Order To Provide A Sound And Level Support Surface Prior To The Installation Of The Vapour Barrier.  Removal Of All Existing Metal Flashings, Counter Flashings At Parapets, Appliance Bases And Wall Upstands.  Selective Demolition Work At The Head And Base Of The Walls In The Required Locations In Order To Carry Out The Renovation Work And Their Junctions With The Existing Construction Elements (roofs, Wall Upstands).  The Installation Of A New White Roof Composition, In Two-Layer Elastomeric Membrane, With New Roof Drains, Including All Sealing And Flashing Work, Necessary For The Execution Of The Work. All Of The Work Will Be Guaranteed By The Contractor Jointly With The Membrane Manufacturer For A Period Of Fifteen (15) Years, Including All Components Of The Roof Supplied And Installed (materials & Labor).  The Preparatory Work And Complete Installation Of A Fall Protection System (anchors + Lifelines).  The Installation Of New Ladders.  Waterproofing works (repair, leveling, renovation) at the junctions with existing construction elements (roof, wall upstands): sealing, membrane and membrane and metal flashing works.  All dismantling and temporary support works, storage, reconnection of existing equipment in the areas affected by the works and their reinstallation following the latter.  Coordination of the different trades and the different contractors (roofer, glazier, etc.).  Repair and leveling works for any damage incurred during the execution of this project, with new materials compatible or identical to the existing ones.  All necessary interventions in areas not included in the work, but affected by related works.  The Deployment and Safe Operation of the Site.

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Canada
Closing Date5 Dec 2024
Tender AmountNA 
Details: Without Being Limited Thereto, The Principal Works, Forming Part Of This Contract, Include:  Providing The Complete Mobilization Required For The Execution Of The Works (Crane, Mobile Crane, Containers, Protection, Signalers, Waste Containers, Etc.). Removal Of Existing Roof Components Up To The Existing Concrete Decking With The Cleaning And Resurfacing Works Of The Latter In Order To Provide A Sound And Level Support Surface Prior To The Installation Of The Vapour Barrier.  Removal Of All Existing Metal Flashings, Counter Flashings At Parapets, Appliance Bases And Wall Upstands.  Selective Demolition Work At The Head And Base Of The Walls In The Required Locations In Order To Carry Out The Renovation Work And Their Junctions With The Existing Construction Elements (roofs, Wall Upstands).  The Installation Of A New White Roof Composition, In Two-Layer Elastomeric Membrane, With New Roof Drains, Including All Sealing And Flashing Work, Necessary For The Execution Of The Work. All Of The Work Will Be Guaranteed By The Contractor Jointly With The Membrane Manufacturer For A Period Of Fifteen (15) Years, Including All Components Of The Roof Supplied And Installed (materials & Labor).  The Preparatory Work And Complete Installation Of A Fall Protection System (anchors + Lifelines).  The Installation Of New Ladders.  Waterproofing works (repair, leveling, renovation) at the junctions with existing construction elements (roof, wall upstands): sealing, membrane and membrane and metal flashing works.  All dismantling and temporary support works, storage, reconnection of existing equipment in the areas affected by the works and their reinstallation following the latter.  Coordination of the different trades and the different contractors (roofer, glazier, etc.).  Repair and leveling works for any damage incurred during the execution of this project, with new materials compatible or identical to the existing ones.  All necessary interventions in areas not included in the work, but affected by related works.  The Deployment and Safe Operation of the Site.

Landesbetrieb Forst Brandenburg, Forstbetrieb Bad Belzig Tender

Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
Germany
Closing Date6 Dec 2024
Tender AmountRefer Documents 
Details: Implementation of traffic safety measures in the area of the LFB, the Bad Belzig forestry company, the Klosterheide district, the Kloster Lehnin administrative municipality. The traffic safety measures are carried out on public roads_l88, L89, Lehnin_ Emstal country road, Gohlitzsee country road, Am Fischersberg, Potsdamer Straße as well as in forest areas with adjacent residential areas/at the sports field. The measure includes the deadwood pruning/green pruning of 66 trees, the removal of the treetops of 3 trees and one felling. Required technology: Working lifting platform with a working crane of at least 25 m, preferably 30 m, all-terrain, approved and tested. Implementation period 50th week to 52nd week 2024. An on-site inspection must be carried out independently and attached to the tender documents in accordance with Appendix_4_. Appendix 4 is part of the tender.

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date17 Dec 2024
Tender AmountPHP 2.5 Million (USD 42.5 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 Ls 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 6.00 A. Backhoe (0.80 Mᶾ) 1.00 6.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: Ppe 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 15.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 4.40 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 4.40 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 4.40 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 4.40 M3 Embankment From Structure Excavation Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 0.75 A. Plate Compactor (5 Hp) 1.00 0.75 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 9.60 M3 Dpwh Standard Output Per Hour (oph)= 1.20 M3 9.60 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Plate Compactor (5 Hp) 0.00 0.00 Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 " Structural Concrete (footing, Slab On Fill) " Quantity 19.80 M3 Dpwh Standard Output Per Hour (oph)= 0.36 M3 19.80 M3 " Structural Concrete (footing, Slab On Fill) " Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 " Structural Concrete (columns)" Quantity 1.73 M3 Dpwh Standard Output Per Hour (oph)= 0.36 M3 1.73 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1)" Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 939.93 Kg Dpwh Standard Output Per Hour (oph)= 143.44 Kg 939.93 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 84.00 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 84.00 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel (roof Truss, Gi Pipe - Column, Rectangular Tube -for Walling, Strut & Strut Member) Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.00 L.s 1.00 L.s Structural Steel (roof Truss, Gi Pipe - Column, Rectangular Tube -for Walling, Strut & Strut Member) Direct Cost: A. Materials: 70.00 Length/s A. Structural Steel (angular Bar 2"x2'x3/16") 55.00 Length/s B. Structural Steel (angular Bar 1 1/2x1 1/2x3/16) 6.00 Length/s C.gi Pipe Sched 40(6") 48.00 Length/s D.12mm Deformed Bar 24.00 Length/s E.rectangular Tube 2"x3"*6meters 2.00 Tank F. Acetylene 2.00 Tank G. Oxygen 2.00 Box H. Welding Rod I. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 6.00 1.00 A. Construction Foreman 6.00 2.00 B. Skilled Laborer 6.00 5.00 C. Unskilled Laborer Erection 6.00 3.00 A. Skilled Laborer 6.00 5.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 4.00 1.00 A. Welding Machine 4.00 1.00 B. Cutting Outfit 4.00 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins (horizontal Support For Lighting Fixtures) Quantity 917.86 Kg Dpwh Standard Output Per Hour (oph)= 90.45 Kg 917.86 Kg Structural Steel Purlins (horizontal Support For Lighting Fixtures) Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene 0.00 0 C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (7)b Metal Structure Accessories (sag Rods) Quantity 56.96 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 56.96 Kg Metal Structure Accessories (sag Rods) Direct Cost: A. Materials: 1.05 Kg A. Sag Rods With Nuts & Bolts B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (4) Metal Structure Accessories (cross Bracing) Quantity 58.63 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 58.63 Kg Metal Structure Accessories (cross Bracing) Direct Cost: A. Materials: 1.05 Kg A. Cross Bracing B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)c Metal Structure Accessories (turnbuckle) Quantity 16.00 Each Dpwh Standard Output Per Hour (oph)= 1.000 Each 16.00 Each Metal Structure Accessories (turnbuckle) Direct Cost: A. Materials: 1.05 Kg A. Cross Bracing B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 210.60 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 210.60 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Quantity 58.00 M Dpwh Standard Output Per Hour (oph)= 10.600 M 58.00 M Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 1.05 M B.metal Fascia 19.00 Pc C. Blind Rivets D. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 26.00 M Dpwh Standard Output Per Hour (oph)= 11.800 M 26.00 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets D. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)a1 Fabricated Metal Roofing Accessory (ridge Roll) Quantity 13.00 M Dpwh Standard Output Per Hour (oph)= 11.800 M 13.00 M Fabricated Metal Roofing Accessory (ridge Roll) Direct Cost: A. Materials: 1.05 M A. Prepainted Ridge Roll, Ga. 24 (0.701mmx2.44mm) 19.00 Pc B. Blind Rivets 0.00 0 C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) " Reflective Insulation" Quantity 208.00 M2 Dpwh Standard Output Per Hour (oph)= 5.560 M2 208.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Walling Quantity 450.90 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 450.90 M2 4.5mm Fiber Cement Board On Metal Frame Walling Direct Cost: A. Materials: 0.37 Pc A. 4.5mm Fiber Cement Board 0.37 Pc B. Marine Plywood 1/4 14.00 Pc C. Rivets 4.00 Pc D. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1)e2 Metal Spandrel On Metal Frame Walling Quantity 226.80 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 226.80 M2 Metal Spandrel On Metal Frame Walling Direct Cost: A. Materials: 1.13 Pc "a.metal Tracks 5m Length " 0.36 Pc B. Metal Studs 5m 14.00 Pc C. Rivets 4.00 Pc D. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1009(1)a Jalousie (window Glass) Quantity 17.28 M2 Dpwh Standard Output Per Hour (oph)= 0.270 M2 17.28 M2 Jalousie (window Glass) Direct Cost: A. Materials: 1.00 M2 A.jalousie (window Glass, Inc. Jalousie Casing) B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1004(2) Finishing Hardware Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Finishing Hardware Direct Cost: A. Materials: 4.00 Set A.door Locks (schlage Or Equivalent) 12.00 Pc B. Hinge (50mmx101mm) B. Manpower: Number Of Hours Labor Cost For This Items Are To Be Considered/included In The Installations Of Doors, Windows & Other Fab. Materials Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (4) Wooden Doors & Windows Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Wooden Doors & Windows Direct Cost: A. Materials: 1.00 Set A.door Jamb (d-1) (8 Sets) 1.00 Set B.window Jamb (w-1) C. Consumables (5% Of The Material Cost) B. Manpower: Number Of Hours 2.00 1.00 A. Construction Foreman 2.00 1.00 B. Skilled Laborer 2.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)b Door (wooden Panel) Quantity 9.46 M2 Dpwh Standard Output Per Hour (oph)= 0.360 M2 9.46 M2 Door (wooden Panel) Direct Cost: A. Materials: 1.00 M2 A.wooden Panel Door B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap 0.00 0 H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 220.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 4.00 Set E. Two-gang Switch 16.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1.000 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker 0.00 0 B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 19.00 Set A. 1-18 Watts Downlight/pinlight, Recessed Type 1.00 Units B. Emergency Lamp (twin Head) B. Manpower: Number Of Hours 29.00 1.00 A. Construction Foreman 29.00 1.00 B. Skilled Laborer 29.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)a Painting Works (masonry Painting) Quantity 226.80 M2 Dpwh Standard Output Per Hour (oph)= 2.100 M2 226.80 M2 Painting Works (masonry Painting) Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 118.29 M2 Dpwh Standard Output Per Hour (oph)= 2.000 M2 118.29 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner 0.00 0 D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date17 Dec 2024
Tender AmountPHP 2.4 Million (USD 41.3 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 22.00 1.00 A. Safety Practitioner/officer (part Time) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 20.16 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 20.16 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 17.64 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 17.64 M3 Embankment From Structure Excavation Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 4.84 M3 Dpwh Standard Output Per Hour (oph)= 1.2 M3 4.84 M3 Gravel Bedding Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Plate Compactor (5 Hp) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 " Structural Concrete (footing, Slab On Fill " Quantity 11.16 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 11.16 M3 "structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 " Structural Concrete (footing Tie Beam, Wall Footing)" Quantity 5.76 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 5.76 M3 "structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 " Structural Concrete (columns)" Quantity 8.19 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 8.19 M3 "structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 4.48 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 4.48 M3 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 1,899.17 Kg Dpwh Standard Output Per Hour (oph)= 143.438 Kg 1899.17 Kg "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 31.50 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 31.50 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 102.40 M2 Dpwh Standard Output Per Hour (oph)= 3.825 M2 102.40 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1027(1) Cement Plaster Finish Quantity 210.76 M2 Dpwh Standard Output Per Hour (oph)= 7.125 M2 210.76 M2 Cement Plaster Finish Direct Cost: A. Materials: 0.33 Bag A. Cement 0.03 Cu.m B. Sand B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 2,224.80 Kg Dpwh Standard Output Per Hour (oph)= 85 Kg 2224.80 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 5.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) 0.00 - Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 387.70 Kg Dpwh Standard Output Per Hour (oph)= 90.45 Kg 387.70 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene 0.00 - C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (6) Metal Structure Accessories (steel Plates) Quantity 22.00 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 22.00 Kg Metal Structure Accessories (steel Plates) Direct Cost: A. Materials: 1.05 Kg A. Steel Plates B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (7)b Metal Structure Accessories (sag Rods) Quantity 41.98 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 41.98 Kg Metal Structure Accessories (sag Rods) Direct Cost: A. Materials: 1.05 Kg A. Sag Rods With Nuts & Bolts B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (4) Metal Structure Accessories (cross Bracing) Quantity 51.98 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 51.98 Kg Metal Structure Accessories (cross Bracing) Direct Cost: A. Materials: 1.05 Kg A. Cross Bracing B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)c Metal Structure Accessories (turnbuckle) Quantity 16.00 Each Dpwh Standard Output Per Hour (oph)= 1 Each 16.00 Each Metal Structure Accessories (turnbuckle) Direct Cost: A. Materials: 1.05 Kg A. Turnbuckle B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 101.49 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 101.49 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Quantity 38.80 M Dpwh Standard Output Per Hour (oph)= 10.6 M 38.80 M Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 19.60 M Dpwh Standard Output Per Hour (oph)= 0 M 19.60 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)a1 Fabricated Metal Roofing Accessory (ridge Roll) Quantity 12.00 M Dpwh Standard Output Per Hour (oph)= 11.8 M 12.00 M Fabricated Metal Roofing Accessory (ridge Roll) Direct Cost: A. Materials: 1.05 M A. Prepainted Ridge Roll, Ga. 24 (0.701mmx2.44mm) 19.00 Pc B. Blind Rivets 0.00 - C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) " Reflective Insulation" Quantity 94.08 M2 Dpwh Standard Output Per Hour (oph)= 5.56 M2 94.08 M2 "reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Ceiling Quantity 94.08 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 94.08 M2 4.5mm Fiber Cement Board On Metal Frame Ceiling Direct Cost: A. Materials: 0.37 Pc "a. 4.5mm Fiber Cement Board" 1.13 Pc "b.metal Furring 3m Length " 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1)e2 Metal Spandrel On Metal Frame Ceiling Quantity 94.08 M2 Dpwh Standard Output Per Hour (oph)= 0 M2 94.08 M2 Metal Spandrel On Metal Frame Ceiling Direct Cost: A. Materials: 1.05 Sq.m. "a. Pre-painted Sheet - Spandrel" 1.13 Pc "b.metal Furring 3m Length" 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1009(1)a Jalousie Glass Quantity 10.22 M2 Dpwh Standard Output Per Hour (oph)= 0.27 M2 10.22 M2 Jalousie Glass Direct Cost: A. Materials: 1.00 M2 A.jalousie (window Glass, Inc. Jalousie Casing) 0.00 - B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1004(2) Finishing Hardware Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Finishing Hardware Direct Cost: A. Materials: 33.00 Set A.door Locks (schlage Or Equivalent) 132.00 Pc B. Hinge (50mmx101mm) B. Manpower: Number Of Hours Labor Cost For This Items Are To Be Considered/included In The Installations Of Doors, Windows Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (4) Wooden Doors & Windows Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Wooden Doors & Windows Direct Cost: A. Materials: 2.00 Set A.door Jamb (d-1) 4.00 Set B.window Jamb (w-2) C. Consumables (5% Of The Material Cost) B. Manpower: Number Of Hours 2.00 1.00 A. Construction Foreman 2.00 1.00 B. Skilled Laborer 2.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)b Door (wooden Panel) Quantity 4.32 M2 Dpwh Standard Output Per Hour (oph)= 0.36 M2 4.32 M2 Door (wooden Panel) Direct Cost: A. Materials: 1.00 M2 A.wooden Panel Door B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 20.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 2.00 B. Skilled Laborer 47.39 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 250.00 M A.3.5 Mm2 Electric Wire Thhn 180.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 4.00 Set D. One-gang Switch 4.00 Set E. Two-gang Switch 6.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet 0.00 - H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 2.00 B. Skilled Laborer 28.05 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs C. 30 Amp. Plug-in Breaker 2.00 Pcs D. 20 Amp. Plug-in Breaker 2.00 Pcs E. 15 Amp. Plug-in Breaker F. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 2.00 B. Skilled Laborer 5.50 3.00 C. Unskilled Laborer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 5.00 Set A. 2-40 Watts Flourescent Lamp(t5) 2.00 Units B. Emergency Lamp (twin Head) B. Manpower: Number Of Hours 29.00 1.00 A. Construction Foreman 29.00 2.00 B. Skilled Laborer 29.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)a Painting Works (masonry Painting) Quantity 205.00 M2 Dpwh Standard Output Per Hour (oph)= 2.1 M2 205.00 M2 1032(1)a Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 129.40 M2 Dpwh Standard Output Per Hour (oph)= 2 M2 129.40 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner 0.00 - D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1051(6) Railings Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Railings Direct Cost: A. Materials: 5.00 Pc/s A.50mm Gi Pipe (sched. 40) 25.59 Kg/s B. Welding Rod 0.00 C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 60.00 1.00 A. Construction Foreman 60.00 2.00 B. Skilled Laborer 60.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 40.00 1.00 A. Welding Machine (500) 40.00 1.00 B. Cutting Outfit Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Kl rwerk Wansdorf GmbH ber P2m Berlin GmbH Tender

Machinery and Tools
Germany
Closing Date20 Dec 2024
Tender AmountRefer Documents 
Details: At the Wansdorf sewage treatment plant, the machinery and EMSR technology of the digested sludge tanks 1 and 2 and the mixed sludge tank are being renewed. The measure essentially includes: Digested sludge tank: - Dismantling and disposal of existing agitator and crane 2 pieces, - Delivery and installation of new agitator 2 pieces (motor power: 5.5 kW, 400 V, circulation volume flow: min. 6.5 M3/s, shaft length approx. 4,820 mm, nominal torque: 1,990 Nm), Mixed sludge tank: - Dismantling and disposal of existing agitator 1 piece, - Delivery and installation of new submersible motor agitators with installation kit and lifting device 2 pieces (propeller diameter: 0.58 M, speed: 475 min-1, thrust: min. 1270 N (f), 5.28 kW (p1), specific energy input: 24 W/m3 (p1ges/v), Sludge hall: - Delivery and installation of Söffel pump with control (qmax 18.5 M3/h, Hmin. 1 M, Hmax 18 m), pipe DN 150 5 m, fittings, - delivery and assembly of gate valves DN 150 with Auma drive 2 St Emsr: - installation and commissioning of the agitator drives of the digested sludge tank 1/2 and the mixed sludge tank - renewal of the Auma gate valves in the sludge hall - installation, commissioning and calibration of new radar measuring probes (fill level) in the tanks - integration of the agitators, gate valves, basement drainage pump and the measuring technology into the process control system - programming of the PCS7 automation system, adaptation of the operating images - renewal of the Nshv inserts for the outlets of the agitators and Auma drives (retrofit). - renewal of the cable laying systems on the tanks - renewal of the local control stations and intermediate terminal boxes - creation of the potential equalization for the newly constructed system parts and renewal of the lightning protection - testing of the electrical system - commissioning and functional tests - instruction - documentation
851-860 of 859 active Tenders