DEPT OF THE ARMY USA Tender
Chemical Products
United States
Closing Date23 Jan 2025
Tender AmountRefer Documents
Details: Amending Solicitation To Provide An Updated Attachment 0002 - Price Matrix 30dec2024. All Other Terms And Conditions Remain The Same. this Is A Combined Synopsis/solicitation For Commercial Products Or Commercial Services Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes Only The Solicitation; Quotes Are Being Requested And A Formal Solicitation Will Not Be Issued. this Is A Request For Quote (rfq) Using Far Part 12, Acquisition Of Commercial Items; The Solicitation Number Is W519tc25qnitr For Potassium Nitrate Class 1, Mil-dtl-156d. the Solicitation And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-03. As A Result Of The Updated Federal Acquisition Circular, A New Clause, 52.204-27 Prohibition On A Byte Dance Covered Application (jun 2023), Has Been Incorporated Into This Solicitation And Falls Under 52.212-5. the Naics Code For This Procurement Is 325998 All Other Miscellaneous Chemical Product And Preparation Manufacturing. The Small Business Size Standard For This Naics Is 650. The Product Service Code Is 1370 Pyrotechnics. offerors Must Be Registered Within The System For Award Management (sam) Database At Time Of Response To This Solicitation. The Website For Sam Is Https://www.sam.gov/. addendum To 52.212-1, Instructions To Offerors – Commercial description: please See Attachment 0002 – Pricing Matrix For Clin Structure. **see Attachment 0001 – Purchase Description - Mil-dtl-156d, 23dec2024, And Attachment 0005- Rfq Questionnaire – 17dec2024. type Of Acquisition And Contract award Will Be Made Using Best Value, Resulting In A Single Award Firm Fixed Price Contract. place Of Performance performance Will Be Fob Destination At The Following: 300 Highway 361 crane In 47522 b3608 proposal Submission Requirements offerors Shall Submit The Following In Response To This Solicitation: price – Offerors Must Submit Completed Price Matrix At Attachment 0002. All Sections Shall Be Completed. Prices Shall Be Stated To 2 Decimal Places. completed Provision At Attachment 0003 – Far 52.204-24, Paragraph (d)(1) And (d)(2). completed Provision At Attachment 0004 – Far 52.212-3 Alt 1, Paragraph (b) Only. completed Responses To The Questions Provided In The Rfq Questionnaire In Attachment 0005. part One: Evaluation Factor 1 – Technical quoters Shall Submit Responses To The Responses To The Rfq Questionnaire Provided At Attachment 0005 That Correspond To This Solicitation. do Not Include Specific (individuals’) Names Of Government And/or Contractor Personnel. do Not Include Price/rates. part Two: Evaluation Factor 2 – Price quoters Shall Adhere To The Instructions On The Government Provided Price Matrix (attachment 0002) And Fully Complete All Required Fields. basis For Award the Government Will Award One (1) Award To The Offeror Whose Offer Who Provides The Best Value To The Government Using A Lowest Price Technically Acceptable (lpta) Approach. 1. This Order Will Be Awarded On The Basis Of Technical Acceptability And Price. 2. The Basis For Technical Acceptance Is Whether All The Requested Items Are Provided In The Quote Presented By The Offeror. The Items Presented Should Match The Technical Specifications And Not To Exceed Quantity. 3. Following, The Determination Of Technical Acceptance, The Lowest Price Of The Technically Acceptable Quotes Will Receive The Award. 4. In Accordance With Far 52.212-1(g), Quotations Are Intended To Be Evaluated And The Award Made, Without Discussions, Unless Discussions Are Determined Necessary. 5. Total Price Is Calculated As The Sum Of All Clins Added Together. 6. The Government Reserves The Right To Award Based On The Contractor’s Location. evaluation Criteria the Government Will Evaluate Quotations As Follows: factor 1: Technical: the Government Will Evaluate Factor 1, Technical, Using The Following Criteria: demonstration Of A Clear Understanding Of The Requirements And Deliverables, And On The Offeror’s Expressed Ability To Successfully Perform. The Offerors Will Be Evaluated Based On Responses To Three Criteria: Technical Expertise/ Experience, Project Team, And Technical Approach. if The Quotation Sufficiently Addresses The Rfq Questionnaire And Demonstrates A Clear Understanding And Ability To Perform The Requirement, Then The Government Will Accept Without Further Explanation That The Contractor Can Perform All Pd Requirements. The Quoter May Discuss Non-critical Requirements. However, If The Quoter Provides Statements Which Cause The Government To Question The Quoter’s Ability To Perform Those Non-critical Requirements, Such Statements Will Be Evaluated Accordingly. technical Will Be Rated Using The Following Standards In Table 1: technical Ratings description outstanding this Rating Is Only Available To Those That Have Attended The Site Visit In Addition To The Following: Quotation Indicates An Exceptional Approach And Understanding Of The Requirements And Contains Multiple Strengths. Established Team Has An Extensive Background In Explosive Contaminated Facility Remediation To Include Utilizing Remote Operated Waterjet Segmentation. Quotation Includes Detailed Previous Project Experience In The Major Contract Requirements. Quote Includes A Well Thought-out Proposed Technical Approach To Each Of The Project’s Phases. good quotation Meets Requirements And Indicates A Thorough Level Of Expertise And An Understanding Of The Requirements. Established Team Has Background In Explosive Contaminated Facility Remediation And Previous Experience In The Major Contract Requirements Including Remote Operated Waterjet Segmentation. Quote Includes A Solid Technical Approach. Strengths Outweigh Any Weaknesses. Risk Of Unsuccessful Performance Is Low. acceptable quotation Meets Requirements And Indicates An Adequate Level Of Expertise And An Understanding Of The Requirements. Established Team Has An Extensive Background In Hazardous Facility Remediation And The Major Contract Requirements Including Explosives Familiarity, Although Little To No Experience In Remote Operated Explosive Contaminated Facility Remediation Specifically. Proposed Technical Approach Is Adequately Addressed, But Not Specific. Strengths And Weaknesses Are Offsetting Or Will Have Little Or No Impact On Task Order Performance. Risk Of Unsuccessful Performance Is Moderate. marginal quotation Does Not Demonstrate An Adequate Approach And Understanding Of The Requirements. Established Team Has Very Limited Background In Explosive Facility Contamination Remediation And The Major Contract Requirements. Proposed Technical Approach Is Flawed Or Is Too Vague For Government To Determine Acceptability. Risk Of Unsuccessful Performance Is High. unacceptable quotation Does Not Meet Requirements And Contains One Or More Deficiencies. Appropriate Team Has Not Been Established, Or Established Team Does Not Have Sufficient Experience To Complete The Project Tasks Without Significant Government Oversight. Risk Of Unsuccessful Performance Is High. If This Criterion Is Rated As Unacceptable, Additional Factors Will Not Be Evaluated And The Quotation Is Not Eligible For Award. definitions strength strength Is Defined As A Particular Aspect Of The Quoter’s Submission That Has Merit Or Exceeds Specified Performance Capability Requirements In A Way That Will Be Advantageous To The Government During Task Order Performance. weakness weakness Is Defined As Any Flaw In The Quotation That Increases The Risk Of Unsuccessful Task Order Performance. Deficiency Is Defined As Any Material Failure Of A Quotation To Meet A Government Requirement Or A Combination Of Weaknesses In A Quotation That Increases The Risk Of Unsuccessful Task Order Performance To An Unacceptable Level. factor 2: price the Government Will Evaluate Factor 2 – Price, For The Following: compliance: Quotations Will Be Evaluated For Compliance Based Upon The Submission Requirements Contained In The Solicitation. price Reasonableness: The Quoter’s Price Quotation Will Be Evaluated To Determine Reasonableness. In Accordance With Far 31.201-3, A Price Is Reasonable If, In Its Nature And Amount, Does Not Exceed That Which Would Be Incurred By A Prudent Person In Conduct Of Competitive Business. total Price Is Calculated As The Sum Of All Clins Added Together listing Of Attachments attachment 0001 - Pd 23dec2024 attachment 0002 - Pricing Matrix attachment 0003 - Far 52.204-24 Provision attachment 0004 - Far 52.212-3 Alt 1 Provision attachment 0005 - Rfq Questionnaire attachment 0006 - Provisions And Clauses deadline For Submission offers Are Due On 23 January 2025 No Later Than 12:30 Pm Central Time. offers Shall Be Submitted In The Following Way: electronically Via Email To The Contract Specialist, Dustin Sexton,dustin.p.sexton.civ@army.mil And Contracting Officer, Bryce Willett,bryce.t.willett.civ@army.mil. Offerors Shall Include “w519tc25qnitr Response – [insertofferor’s Name]” Within The Subject Line. questions questions Shall Be Submitted In The Same Manner As Offers, Electronically Via Email To The Contract Specialist And Contracting Officer Listed Above. **note: Interested Offerors Must Submit Any Questions Concerning This Solicitation No Later Than 08 January 2025, To Enable The Buyer To Respond. Questions Not Received Prior To 08 January 2025 Will Not Be Considered. If Needed, A Final Amendment Will Be Submitted By 15 January 2025. end Of Addendum 52.212-1
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender
Others
United States
Closing Soon10 Jan 2025
Tender AmountRefer Documents
Details: Sources Sought Number: Fd-2025-071 notice Type: Sources Sought Synopsis title: Coastal Virginia Offshore Wind (cvow) Survey Mitigation Research Survey response Date: January 10, 2025 this Is A Sources Sought Synopsis And Is Not A Pre-solicitation Announcement. The Purpose Of This Market Research And Sources Sought Notice Is To Gain Knowledge Of Potential Qualified U.s. Domestic Businesses, Which Could Include Small Business, Hubzone, 8(a), Service Disabled Veteran Owned, Women Owned Small Business Firms And Even Large Businesses. Responses To This Sources Sought Synopsis Will Be Used By The Government In Making Appropriate Acquisition Decisions. background: noaa Fisheries Performs Standardized, Scientific Surveys To Assess Changes In Abundance And Population Metrics Of Fish, Invertebrates, And Protected Species Over Space And Time. In Response To The Potential Disruption Of Long-running (some More Than 30 Years) Survey Missions, The Southeast Fisheries Science Center Has Developed A Survey Mitigation Plan Intended To Guide The Development And Implementation Of A Program To Mitigate Impacts Of Wind Energy Development On Fisheries Surveys In The Southeast Region. Construction Of Wind Turbines Along The U.s. East Coast Allows For Some Feasibility Testing Of Survey Methodologies Adapted For Data Collection Within And Around Wind Farms. This Project Aims To Identify And Develop New Survey Approaches And Will Require The Contracting Of Vessel(s) That Can Support Several Scientists And Deploy And Recover Multiple Types Of Survey Gear Near The Offshore Wind Turbines Located At The Cvow Pilot Area Over The Course Of 7 Days. intended Use/purpose: we Will Test The Feasibility Of Using The Following Methodologies Within And Around Wind Farms: Diver Surveys, Video Trap Surveys, Passive Acoustic Monitoring, Echosounder, Multibeam, Ctd, Uncrewed Aerial Systems, Water Collection, Benthic Sample Collection, Uncrewed Underwater Systems. Although A Single Vessel Is Preferred, Noaa Will Also Consider Multiple Vessels Working Together As An Alternative. special Requirements/essential Salient Features: vessel Must Have, In Proper Working Order, All Required United States Coast Guard (uscg) Approved Safety, Navigation, And Communication Devices And Equipment. vessel Shall Have Sufficient Fuel Capacity To Support Operations For Seven Full Days At Sea Without Refueling. vessel Shall Have A Rear Deck Area Clear Of Obstructions For Setting Up, Stowing, Rinsing, And Dismantling Survey Gear. vessel Will Be Able To Maintain Station Using Dynamic Positioning vessel Must Have An Indoor Dry Counter Area Suitable For Project Scientists To Use Government Provided Laptops And Other Small Electronic Equipment. The Workspace Shall Include Access To Adjacent Electrical Outlets (120 Vac, 60 Hz). the Contractor Must Provide Clean And Sanitary Berthing Accommodations For Up To 8 Male And Female Government Personnel. Personnel May Share Berthing Arrangements, But Must Allow For Separate Rooms For Male And Female Personnel. Berthing Spaces Must Contain At Least One Drawer Or Closet Per Occupant For Stowage Of Clothing And Personal Gear, Lighting, Ventilation, Emergency Exit, And Separated From Machinery Or Fuel Tanks. Quarters And Furnishings Shall Contain Fireproof Installations And Co Monitors Where Applicable. berthing Requirements, Including The Number And Gender Of Government Personnel, Will Be Provided By The Project Lead Approximately Two Weeks Prior To Departure. The Project Lead And Captain Will Work Together On A Detailed Berthing Plan To Accommodate The Gender Mix Of The Government Personnel, Taking Into Consideration The Current Complement Of The Vessel. vessel Must Have A Potable Fresh Water Supply For Vessel And Personal Use (including Showers And Laundry) For All Personnel Aboard For The Duration Of The Charter. The Potable Water System Shall Have Dedicated Tanks (treated And Coated), Ventilated With Insect Screens Installed (if Appropriate), And A Dedicated Potable Water Hose With Filters That Remove Particulates Including Rust. vessel Must Provide Clean Linens Including Mattresses, Clean Fitted Sheets, Pillows, And Towels For Government Personnel. the Vessel Must Have A Minimum Of Two Heads And Two Freshwater Showers Available To Government Personnel. Additional Heads/showers Are Desired But Not Required And May Be Given Additional Consideration During Technical Evaluation. The Vessel Shall Provide Sufficient Soap, Toilet Paper, And Paper Towels For The Number Of Personnel On-board And The Duration Of The Charter. all Indoor Vessel Workspaces, Berthing, And Galley Spaces Must Be Adequately Ventilated And Free From Tobacco Smoke, Excessive Engine Noise, And Hydrocarbon Fumes. the Vessel Must Be Able To Maintain Underway Status, Including All Engine-room Functionality, For The Entire Duration Of The Charter. The Vessel Must Be Able To Maintain All Housekeeping, Deck, And Other Necessary Services While Underway Or While On-station (at Anchor Or Otherwise). vessel Captain And Crew Shall Comply With Waste Management, In An Effort To Reduce Marine Debris Pollution, Vessel Regulations As Described In Section V Of The Marpol Convention. The Vessel Is Required To Have A Storage Facility, With Or Without A Trash Compactor, To Retain All Refuse, Or A Means To Incinerate This Refuse So That It Is Not Disposed Of At Sea. the Contractor Must Provide A Captain, Appropriately Licensed By The Uscg For The Gross Tonnage Of The Vessel, For The Duration Of The Charter. The Captain Shall Be Competent In The Use Of Navigation And Safety Equipment. The Captain Shall Have Experience Launching And Recovering Scientific Equipment, Navigating Busy Waterways, And Operating In The Offshore Environment. The Captain Will Work Directly With The Chief Scientists For Matters Pertaining To Deck Layout, Berthing Arrangements, Trip Itinerary, Planning, And Operations. The Captain Will Be Familiar With All Contract And Statement Of Work Requirements. the Contractor Must Provide Adequate Crew To Meet Uscg Safe Manning Levels And Provide Appropriate Crew To Safely Conduct The Required Operations. The Contractor Must Provide Skilled Individuals On The Vessel Capable Of Crane Operations And Line Handling For Launch And Recovery Of All Small Boats And Cargo. captain And Crew Must Have All Required And Necessary Qualifications, Licenses, And Certifications Appropriate To Their Position. All Contractor Crew Will Be Physically Capable Of Performing All Required Tasks During The Charter. The Contractor Will Provide The Tpoc With The Captain And Crew Qualifications For Those Individuals That Will Be Sailing On The Charter At The Pre-charter Meeting Or No Less Than 14 Days Prior To Departure. all Contractor And Government Personnel Must Comply With Noaa And Sefsc Personnel Conduct Policies Including: Eeo, Workplace Harassment, Substance Abuse, Safety, And Environmental Awareness. A Zero Tolerance Policy For Any Type Of Harassment Will Be Enforced. The Contractor Must Provide Safe, Efficient Working Conditions And Accommodations To The Government Personnel Free From Violence, Threats Of Violence, Harassment (including Sexual Harassment), Intimidation, And Other Disruptive Behavior. The Contractor, Its Agents, Subcontractors, And Employees, Including The Captain And Crew Of The Vessel Must Not Harass, Assault, Oppose, Impede, Intimidate, Threaten, Interfere With Or Make Unwelcome Advances Toward Any Member Of Government Personnel. Violation Under This Clause May Result In Termination Of The Contract, At The Discretion Of The Government Under The Default Clause, And Consequent Liability Of The Contractor To The Government For Any Costs Incurred, As Well As Debarment, Suspension Or Similar Action From Future Participation In Government Contracts. Violation Of The Contractor’s Obligations Under This Clause May Result In Criminal And/or Civil Prosecution Of The Person(s) Involved By Either The Government Or Affected Government Personnel, As Provided By Applicable Law, As Well As Adverse Performance Evaluation Under The Terms And Conditions Of This Contract. during The Charter Period, The Possession Or Use Of Intoxicating Substances And/or Illegal Drugs, By Any Person, Is Not Permitted And May Be Grounds For Termination Of This Contract By The Government. delivery Schedule: the Cruise Must Be Completed Between April 1, 2025 And April 16, 2025. the North American Industry Classification Code (naics) Is 483114 With A Size Standard Of 550 Employees. interested Firms Shall Provide, In Writing, A Brief Narrative (no More Than 3 Pages In Length) And Documentation To Support Your Firm’s Capability And Experience Specific To Meeting This Requirement Herein And Include Your Firm’s Name, Address, Point Of Contact, Telephone Number, Sam Ueid Number, Ccr Cage Number, Business Type And Size (i.e., Small, Large, Non-profit, Educational, Etc.). Any Response That Does Not Include This Information Will Not Be Considered. The Government Will Review Your Response To Determine If Your Firm Has The Experience, Knowledge And Capability To Provide The Items As Specified Above. Do Not Provide A Generic Capabilities Statement. Only Respond With A Detailed Capabilities That Clearly Shows Capabilities To Meet The Above Specific Requirements. this Request For Information Does Not Constitute A Commitment, Implied Or Otherwise, That A Procurement Action Will Be Issued. Nor Does This Request For Information Constitute A Commitment, Implied Or Otherwise, That Any Procurement Action May Be Issued For The Government’s Requirements. no Entitlement To Payment Of Direct Or Indirect Costs Or Charges By The Government Will Arise Because Of The Submission Of Contractor’s Information. The Government Shall Not Be Liable For Or Suffer Any Consequential Damages For Proprietary Information Not Properly Identified. Proprietary Information Will Be Safeguarded In Accordance With The Applicable Government Regulations. all Contractors Doing Business With The Government Are Required To Be Registered And Active With The System For Award Management (sam) Website. note: This Sources Sought Is Not Considered A Request For Proposal But A Request For Information Only. No Solicitation Document Is Available. No Contract Will Be Awarded Based On Responses Received To This Notice. responses Shall Reference Sources Sought Fd-2025-071 And Be Sent To Amy.gilliland@noaa.gov
Bgis Pwgsc Rp1 Tender
Civil And Construction...+1Drainage Work
Canada
Closing Date28 Feb 2025
Tender AmountRefer Documents
Details: The Work Consists Of: Providing The Complete Mobilization Required For The Completion Of The Work (crane, Containers, Protection) The Removal Of The Components Of The Existing Roof Up To The Existing Concrete Decking. The Removal Of All Flashings, Existing Metal Counter-flashings At The Parapets, At The Bases Of Devices And At The Upstands Of The Walls. The Installation Of A New White Roof Composition, In Two-layer Elastomeric Membrane, With New Roof Drains. The Complete Installation Of An Anti-fall System (anchors + Lifelines). The Installation Of New Ladders
Bgis Pwgsc Rp1 Tender
Civil And Construction...+1Drainage Work
Canada
Closing Date28 Feb 2025
Tender AmountNA
Details: The Work Consists Of: Providing The Complete Mobilization Required For The Completion Of The Work (crane, Containers, Protection) The Removal Of The Components Of The Existing Roof Up To The Existing Concrete Decking. The Removal Of All Flashings, Existing Metal Counter-flashings At The Parapets, At The Bases Of Devices And At The Upstands Of The Walls. The Installation Of A New White Roof Composition, In Two-layer Elastomeric Membrane, With New Roof Drains. The Complete Installation Of An Anti-fall System (anchors + Lifelines). The Installation Of New Ladders
DEFENSE LOGISTICS AGENCY USA Tender
Aerospace and Defence
United States
Closing Date1 Nov 2025
Tender AmountRefer Documents
Details: Please Note – Nsns May Be Added To Any Subsequent Contract Per The Scope Of This Action. This Action’s Scope Is Listed Below. A Current Program Nsn Listing Is Attached To This Announcement. this Annoucement Is Linked To The Project's Sources Sought. The Sources Sought Contains Additional Program Information And A Market Survey Questionnaire. Please Feel Free To Review The Sources Sought And Provide A Response To The Market Survery Questionnaire. Please Provide Any Market Survey Responses Or Questions To Bret Griffin (bret.griffin@dla.mil) Or Robert Harris (robert.harris@dla.mil). the Jltvci Successor Project Will Be A 5 Year Multiple Award Contract(s) (mac) Supporting A Broad Range Of Joint Light Tactical Vehicles (jltv). The Proposed Contract Will Have An Ordering Period Of A Two-year Base Period, And Three (3) One-year Option Periods, Totaling Five (5) Potential Contract Years. Individual Orders Will Be Used To Supply The Items Within Scope Of This Contract. scope the Scope Of This Joint Light Tactical Vehicle Competitive Initiative (jltvci) Contract Includes Any Fully Competitive And/or Limited Source(s) Dod Or Dla Managed Product, Used By The Dod Or The Federal Government To Produce, Repair Or Replace Any Item, Or System, Used On These Joint Light Tactical Vehicles. The Weapon System Designator Codes (wsdcs) Within The Scope Of This Contract Include, But Are Not Limited To: Army J8a, And The Following Marine Wsdcs: O0m United States Marine Corps (usmc) General Purpose Truck, O1m Usmc Heavy Guns Carrier, O2m Usmc Close Combat Weapons Carrier, And O3m Usmc Truck Utility. The Federal Supply Classes (fsc) Covering These Items Include, But Are Not Limited To: 2010 Ship And Boat Propulsion Components 2510 Vehicular Cab, Body, And Frame Structural Components 2520 Vehicular Power Transmission Components 2530 Vehicular Brake, Steering, Axle, Wheel, And Track Components 2540 Vehicular Furniture And Accessories 2541 Weapons Systems Specific Vehicular Accessories 2590 Miscellaneous Vehicular Components 2805 Gasoline Reciprocating Engines 2815 Diesel Engines And Components 2910 Engine Fuel System Components, Nonaircraft 2920 Engine Electrical System Components, Nonaircraft 2930 Engine Cooling System Components, Nonaircraft 2940 Engine Air And Oil Filters, Strainers, And Cleaners, Nonaircraft 2990 Miscellaneous Engine Accessories, Nonaircraft 3020 Gears, Pulleys, Sprockets, And Transmission Chain 3030 Belting, Drive Belts, Fan Belts, And Accessories 3040 Miscellaneous Power Transmission Equipment 3110 Bearings, Antifriction, Unmounted 3120 Bearings, Plain, Unmounted 3950 Winches, Hoists, Cranes, And Derricks 3990 Miscellaneous Materials Handling Equipment 4010 Chain And Wire Rope 4130 Refrigeration And Air Conditioning Components 4210 Firefighting Equipment 4320 Power And Hand Pumps 4330 Centrifugals, Separators, And Pressure And Vacuum Filters 4710 Pipe, Tube And Rigid Tubing 4720 Hose And Flexible Tubing 4730 Hose, Pipe, Tube, Lubrication, And Railing Fittings 4810 Valves, Powered 4820 Valves, Nonpowered 4910 Motor Vehicle Maintenance And Repair Shop Specialized Equipment 5315 Nails, Machine Keys, And Pins 5325 Fastening Devices 5330 Packing And Gasket Materials 5340 Hardware, Commercial 5342 Hardware, Weapon System 5355 Knobs And Pointers 5365 Bushings, Rings, Shims, And Spacers 5430 Storage Tanks 5895 Miscellaneous Communication Equipment 5905 Resistor 5925 Circuit Breakers 5930 Switches 5935 Connectors, Electrical 5963 Electronic Modules 5970 Electrical Insulators And Insulating Materials 5985 Antennas, Waveguides, And Related Equipment 5995 Cable, Cord, And Wire Assemblies: Communication Equipment 5998 Electrical And Electronic Assemblies, Boards, Cards, And Associated Hardware 5999 Miscellaneous Electrical And Electronic Components 6150 Miscellaneous Electric Power And Distribution Equipment 6220 Electric Vehicular Lights And Fixtures 6350 Miscellaneous Alarm, Signal, And Security Detection Systems 6620 Engine Instruments 6625 Electrical And Electronic Properties Measuring And Testing Instruments 6650 Optical Instruments, Test Equipment, Components And Accessories 6680 Liquid And Gas Flow, Liquid Level, And Mechanical Motion Measuring Instruments 6685 Pressure, Temperature, And Humidity Measuring And Controlling Instruments 6695 Combination And Miscellaneous Instruments 7690 Miscellaneous Printed Matter 8145 Specialized Shipping And Storage Containers the Project Currently Contains 7210 Nsns That May Be Ordered During The Period Of Performance. items Are Continuously Being Cleared Technically, And Having Nsn Numbers Assigned To Them, So The List Of 7210 Potential Nsns Is Not The Entire List That May Be Added To This Procurement But Are Nsns That Are Known At This Time. all Items Within The Scope Of The Solicitation Will Be Considered On The Contract And May Be Ordered During The Period Of Performance. nsns Within The Scope May Be Added To This Initiative Or Any Resulting Contract At A Later Date. The Solicitation Will Include Dlad Procurement Note L27 – Addition And Deletion Of Items To Facilitate The Addition Of Any Future Nsns To This Initiative Or Any Resulting Contract(s). this Solicitation May Be The Only Planned Opportunity That A Contractor Will Have To Submit A Proposal For Nsns That Fall Within The Scope Of This Solicitation. all Responsible Sources May Submit An Offer/quote Which Shall Be Considered. one Or More Of The Items Under This Acquisition May Be Subject To An Agreement On Government Procurement Approved And Implemented In The United States By The Trade Agreements Act Of 1979. All Offers Shall Be In The English Language And In U.s. Dollars. All Interested Suppliers May Submit An Offer. the Solicitation Will Be Available On Dla’s Internet Bid Site (https://www.dibbs.bsm.dla.mil/rfp/) On Its Issue Date On Or About September 2, 2025. the Small Business Size Standard Is _1000__ Employees. drawings/specifications For Some Nsns Will Be Available Through The Dibbs Solicitation Link In The Synopsis On The Solicitation Issue Date. specifications, Plans Or Drawings Are Not Available Are Not Avaialable For All Nsns. the Total Duration Of This Action Shall Not Exceed 5 Years. while Price May Be A Significant Factor In The Evaluation Of Offers, The Final Award Decision Will Be Based Upon A Combination Of Price, Delivery, Past Performance, And Other Evaluation Factors As Described In The Solicitation.
COMMUNAL POTENT PAYMENT OF PRESCHOOL ENCLOSURE THE CRANE OF YAKUSHINETSKY FOR THE SAKE OF Tender
Others
Ukraine
Closing Soon14 Jan 2025
Tender AmountUAH 59.4 K (USD 1.4 K)
Purchaser Name: COMMUNAL POTENT PAYMENT OF PRESCHOOL ENCLOSURE THE CRANE OF YAKUSHINETSKY FOR THE SAKE OF | Поставка (передача) Товару Здійснюється Дрібними Партіями Транспортом Постачальника Один Раз На Тиждень З 08:00 До 15:00 Години, (транспортом З Дотриманням Санітарно-гігієнічних Умов Зберігання Та Перевезення Товару), Згідно Попереднього Зроблених Заявок. Замовник Має Право В Окремих Випадках Зумовлених Зменшенням Фактичного Відвідування Дітей Навчального Закладу У Зв’язку З Не Передбачуваними Обставинами (дострокові Канікули, Карантин, Тощо), Зменшити Або Змінити Обсяг Замовлення До П’ятниці Кожного Тижня Відносно Попередньо Наданих Заявок.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date8 Nov 2025
Tender AmountRefer Documents
Details: Request For Information (rfi) naval Facilities Engineering Systems Command(navfac) Engineering And Expeditionary Warfare Center(exwc) equipment Services Support (ess) Contracted Maintenance And Repair Contract At Naval Station Rota, Spain this Rfi Is Issued Solely For The Purposes Of Obtaining Information Not Readily Available To The Government For Planning Purposes, In Accordance With Far 15.201(e). It Does Not Constitute A Request For Proposal (rfp) Or A Promise To Issue An Rfp For Any Particular Supplies Or Services In The Future. Furthermore, The Government Is Not At This Time Seeking Proposals And Will Not Accept Unsolicited Proposals. Responders Are Advised That The Government Will Not Pay For Any Information Or Administrative Costs Incurred In Response To This Rfi; All Costs Associated With Responding To This Rfi Will Be Solely At The Interested Party’s Expense. all Interested Parties (small, Medium, And Large Businesses Concerns) Are Invited To Submit A Response. In Addition To The Information Requested By The Government, Interested Parties Are Encouraged To Provide Any Other Information They Deem Relevant. the Naval Facilities (navfac) Engineering And Expeditionary Warfare Center (exwc) Has A Potential Requirement For A Firm Fixed Priced, Indefinite Delivery Indefinite Quantity (idiq) To Establish An Equipment Services Support (ess) Maintenance And Repair Contract At Naval Station Rota, Spain (navsta Rota) With A 60-month Ordering Period. Exwc Is Conducting Market Research To Determine The Range Of Available Contractors And Assess Their Capabilities To Support The Navy’s Maintenance And Repair Support Contract On Navsta Rota. The Intent Of This Ess Contract Is To Have One Or More Contractors Provide Intermediate And Depot Level Maintenance And Repair Services On Naval Expeditionary Equipment Assets Located At Navsta Rota. This Support Would Include: Inspections, Maintenance, Refurbishment, Repairs, Upgrades, Modernization, And Modifications Provided To Support Of The Naval Construction Equipment And Support Vehicles That Have Deteriorated (to Various Degrees) Into A Defective, Damaged, Or Reduced Operational Condition. the Government Plans To Award The Contracted Maintenance And Repair Contract Under One Of The Following Naics Codes: 811310: Commercial And Industrial Machinery And Equipment (except Automotive And Electronic) Repair And Maintenance the Government Intends To Allow Award Of Fixed-price Task Orders Under This Idiq Contract.the Period Of Performance Or Delivery Dates For Task Orders Will Be Determined At The Individual Task Order Level. location Of Work. If Implemented, It Is Anticipated At This Time That Some Portion Of The Work Would Be Performed At The Designated Repair Facility And/or At Other Locations On Navsta Rota. Although Subject To Change, The Following Provides An Overview Of The Current Location Strategy. maintenance And Repair Services annual Safety Inspections (avsi) perform Pre-operational Checks perform Services In Accordance With Manufacturers Recommended Specifications troubleshoot Automotive And Equipment Mechanical Andelectrical Issues cycling Of Equipment spot Checks load Testing Of Generators replacement Of Tires container Repair vehicle And Equipment Restoration diesel Engine Repair transmission And Drive Train Repair repair And/or The Individual Replacement Of Automotiveand Equipment Mechanical And Electrical Parts/devices replacement Of Body Components. ability To Source Original Equipment Manufacturer Parts; And If Required, After Market Equivalents, Rebuilt, Orused Suitable Substitutes size Of Scope. If Implemented, The Contractor Would Be Responsible For Inspections, Maintenance, And Repair Of Naval Construction Equipment And Support Vehicles. Currently There Are Approximately 650 Individual Pieces Of Naval Construction Equipment And Support Vehicles Assigned To Naval Expeditionary Forces That Potentially Could Be Supported By The Maintenance And Repair Program. equipment Range. The Following List Is Intended To Provide A Small Sample Of Naval Construction Equipment And Support Vehicles That May Be Included In The Maintenance And Repair Program; It Is Not Intended To Be An All-inclusive List. Naval Construction Equipment Is Composed Of A Mixture Of Civil Engineering Support Equipment (cese), Material Handling Equipment (mhe), Weight Handling Equipment (whe), A Variety Of Support Equipment. The Exact Make-up Of Equipment Make, Model, And Type Will Change Over Time Based On The Needs Of The Navy. (1) Automotive Vehicles (e.g. Trucks, Truck Tractors, Buses, Etc.) (2) Heavy And Light Construction Equipment (includes Motorized And Non-motorized Equipment) (3) Material Handling Equipment (e.g. Forklifts, Tele-handlers, Container Handlers, Etc.) (4) Weight Handling Equipment (i.e. Cranes) (5) Specialized Construction Support Equipment (e.g.light Plants, Air Compressors, Portable Welders, Etc.) (6) Power Support Equipment (i.e. Generators, Ecu(environmental Control Units), Portable Power Panels,etc.) (7) Trailers (e.g. Towable, Fifth-wheel, Etc.) (8) International Standard Organization (iso) Shippingcontainer ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ the Government Will Not Award A Contract On The Basis Of This Rfi And Will Not Reimburse Or Otherwise Pay For Any Information Received.this Rfi Is Issued For The Purpose Of Encouraging Communication And Exchanges Of Information Between The Government And Interested Parties. Responses To This Request Are Voluntary And The Government Will Not Pay Any Direct Or Indirect Costs For Any Information Or Materials Received In Response To This Rfi. Information Received In Response To This Rfi May Be Used To Structure Future Solicitations. All Responses Received May Be Held For An Extended Period Of Time Or Destroyed. In No Case Will Any Responses To This Rfi Be Returned To The Originator Or Information Submitted Shared With Any Other Respondents. Respondents Will Not Be Notified Of The Results Of The Market Research, Nor Will The Government Provide Feedback To Respondents With Respect To Any Information Submitted Under This Rfi.proprietary Data Shall Not Be Submitted. an Award Will Not Be Made Based On Any Information Or Offers Received In Response To This Notice. Not Responding To This Rfi Does Not Preclude Participation In Any Future Rfp, If Any Is Issued. If A Solicitation Is Released, It Will Be Synopsized On The System For Award Management (sam) Website. It Is The Responsibility Of The Potential Offerors To Monitor Those Sites For Additional Information Pertaining To This Requirement. please Provide Comments Or Questions Regarding The Proposed Strategic Service Contract Described In This Rfi. one Electronically Submitted Response Shall Be Received No Later Than 5:00pm Eastern Time On 08 November 2024 And Reference: Equipment Services Support (ess) Contracted Maintenance And Repair Contract At Naval Station Rota, Spain. submissions Should Be Limited To Ten Megabytes Or Less; And In A Format Compatible With Microsoft Office Or Adobe Pdf, And Includeattachment 1: Corporate Background Information Questionnaire interested Businesses Shall Submit Responses By Email To Desiree E. Garcia At Desiree.e,garcia9.civ@us.navy.mil And Jake O. Blas, Jake.o.blas.civ@us.navy.mil. Please Submit All Written Questions By Email To Desiree E. Garcia And Jake O. Blas. No Phone Or Email Solicitations With Regards To The Status Of Any Subsequent Rfp Will Be Accepted Prior To Its Release.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Civil Works Others
United States
Closing Date23 Jan 2025
Tender AmountRefer Documents
Details: Questions And Answers: sheet Gi016 Icra Legend D States That The Dashed Line Is For: Wall Type D, Reference Gi002.
sheet Gi002 Wall Type D Shows Metal Stud With Two Layers Of Drywall To Deck.
please Confirm Which Type Of Barrier Is Required.
the Barriers Shall Be Two Hours Fire Rated Unless The Cor Specify/agree To A Different Plan. bid Alternate 3 Reads;
base Bid Except All D Wing Elevators. This Alternate Shall Only Include Work Required For The A Wing.
i Assume This Should Read: Base Bid Except Delete All D Wing Elevators bid Alternate 3: Base Bid Delete All D Wing Elevators. This Alternate Shall Only Include Work Required For The A Wing. will The Owner Accept Procore Project Management Software As The Primary Submittal And Data Tracking Tool For This Project?
procore Is Acceptable. is This Project Tax-exempt, And Will The Co/cor Provide The Necessary Tax-exempt Certificates?
yes because Of Covid-19 Throughout The U.s. And The Resulting Federal, State, And Local Governments Responses/requirements, Are There Any New Work Requirements Or Mandates That Will Be Required By The Va On This Project?
at This Point There Are No New Requirements, However If The Va Announced Any Requirement Regarding To This In The Future, The Contractor Shall Follow. will You Confirm Contractors Need To Follow The Tb Policy Stated In Spec 01 35 26 1.16?
specifications Shall Be Followed Unless The Va Waive The Requirement. what Is The Approximate Duration Between Issuing The Award And Issuing The Ntp?
typical Turnaround Time For An Ntp After Award Is Approximately 2-3 Weeks. for Planning The Preliminary Project Schedule, Please Provide An Anticipated Award Date.
the Government Is Currently Anticipating An Award Date Sometime Around The End Of January Beginning Of February Pending Any Unforeseen Circumstances. how Many Calendar Days Should Be Included In The Critical-path Method Schedule For The Owner And A/e To Review And Respond To Rfis?
response Times To Be Discussed At The Pre-construction Meeting, Post Contract Award. how Many Calendar Days Should Be Included In The Critical-path Method Schedule For Owner And A/e Submittal Review?
response Time To Be Discussed After Award During The Pre-construction Meeting. will The Government Provide The 3-d Revit Design Model In Native File Format For The Creation Of Coordination Drawings And Use By Contractor?
native Files May Be Requested Once Construction Is Underway. please Confirm That The Superintendent Cannot Dual Hat As Cqc Or Ssho.
contractor Shall Follow The Specifications. Ssho Cannot Be The Superintendent. If The Superintendent Have The Necessary Qualifications Of The Cqc (proven Qualifications), He/she Can Be However, They Must Also Have To Prove/show That The Personnel Ran Two Elevators Project That Are 100% Completed At The Same Capacity Or At Least One Completed Project At The Same Capacity And 5 Years Of Experience Of Similar Mep Projects. please Confirm That The Project Scope Will Be Completed During Normal Working Hours, Not Nights And Weekends.
contractor Shall Review Drawings, Sow, And Specs To Have Full Understanding. There Are Work To Be Done Off Hours And Weekends. can You Confirm That The Owner Will Be Contracting Directly With A Third-party Commissioning Agent For Commissioning The Project And That The Contractor Is Only To Include Participation/coordination With The Commissioning Agent?
the Va Will Hire A 3rd Party For Commissioning. Contractor Shall Follow All Requirements Of Commissioning That Indicated In The Specifications And All Project Documents. knowing That The Campus Is Limited On Space And Parking, It Is Critical That The Contractor Project Superintendent Have Freedom Of Access And Close Proximity To The Work. Can The Va/owner Provide A Designated Parking Spot For The Contractor Project Superintendent?
there Will Be Two Permits For Parking Spots In Campus. has The Facility Operation & Maintenance Team Reviewed The Contract Documents For Operability To Avoid Change Orders?
contractor Shall Follow All Drawings, Specs, Sow, And All Project Documents. can The Contractor Use An Existing Office Inside The Building For A Temporary Construction Office During Construction Instead Of Setting Up A Temporary Trailer?
no can The Contractor Use The Existing Restroom Facilities In The Work Area Or Adjacent Ones Nearby?
yes But If The Bathrooms Are Assigned For Certain People Or Category, Then No. Generally There Will Be Restrooms Available Close By The Work Location. They Shall Not Also Carry Dust And Leave Footprints On The Floor On/from Work Location To The Bathroom. If Occurred, Contractor Shall Immediately Clean That. If Contractor Misuse The Bathrooms, They May Lose The Privilege Of Using Them. can The Contractor Use The Existing On-sites Utilities For Temporary Electrical And Water Free Of Charge?
yes, If They Are Available And Approved By The Cor. The Va Will Not Be Responsible For Labor Or Materials To Get Utilities To The Work Site. The Cor Will Have To Approve The Source Of Utility If Available. will The Owner Provide The Fire Watch During The Period That The Fire Suppression And/or Fire Alarm System Is Not In Service?
fire Watch Shall Be The Contractor S Responsibility Not The Va. Permits Shall Be Submitted And Approved Prior To Starting The Work. please Provide Detailed Guidance For Noise And Vibration Operations, Including Acceptable Levels/duration, Hours Of Operations For Acceptable Levels, And Acceptable Noise Levels After Hours.
contractors Shall Follow The Specifications. it Appears There Is Some Minor Masonry Work On This Project. Will There Be Specification For The Masonry Scope Of Work, Prior To Bidding?
reference General Notes On Sheet Ss001 And Call Outs On Details. can You Confirm The Time Of Submission? Sam.gov Shows January 7, 10:00 Am Est. The Original Solicitation Shows 2:00 Pm Est.
the Solicitation Due Date Is January 23, 2025, At 2:00 Pm Est please Confirm The Bid Bond Will Need To Be Mailed In Prior To Bid.
the Va Can Accept A Scanned Copy Of The Original Document With Wet Signatures As Acceptable Bond Submission. Mailing In Physical Copies Is No Longer Required. refer To Drawing Pl100. Specifically, The Left-hand Side #2 Plumbing Sanitary Sub-basement Wing D.
the 2 Ss Line Running From Os-d-1 Indicates That This Line Is To Be Demolished (because It Is A Dashed Line). The Note At The End Of That Line, #3, Makes It Seem Like We Are Supposed To Connect New Vent Here. Our Question Is, Do We Run New Vent Piping After Removing This And What Size?
the Drawing Referenced In This Rfi Is Essentially A New Work Plan And There Is No Demolition Of The Piping In Question. The Dashed Linework Is Intended To Indicate Vent Piping, Whereas The Solid Linework Is Drainage Piping. The New 2 Vent Is To Connect To The Existing System As Indicated On The Drawing And To Meet Actual Site Conditions. refer To The Specifications. 22 13 00 | 2.1 B & C - Facility Sanitary And Vent Piping
the Specs Call For Copper Dwv Or Pvc For This Type Of Piping. Section C Says The Following;
"c. Polyvinyl Chloride (pvc)
1. Polyvinyl Chloride (pvc) Pipe And Fittings Are Permitted Where The
waste Temperature Is Less Than 60 Degrees C (140 Degrees F).
2. Pvc Piping And Fittings Shall Not Be Used For The Following
applications:
a. Waste Collected From Steam Condensate Drains.
b. Spaces Such As Mechanical Equipment Rooms, Kitchens, Sterile Processing Services, Sterilizer Areas, And Areas Designated For Sleep.
c. Vertical Waste And Soil Stacks Serving More Than Two Floors.
d. Exposed In Mechanical Equipment Rooms.
e. Exposed Inside Of Ceiling Return Plenums."
our Question Is, Does This Mean We Can't Use Pvc In This Area Based On This Verbiage?
pvc Piping Is Not Allowed are We Able To Use Regrigerant Press Fittings On This Project?
press Fittings Are Not Allowed please Confirm The Va S Intent For The Prime Contractor To Have A Full Time Superintendent For The Entirety Of The Project.
yes please Confirm The Va S Intent For The Prime Contractor To Have A Full-time Ssho On Site For The Entirety Of The Project.
contractor To Follow The Specs please Confirm Va S Intent For The Prime Contractor To Have A Full-time Qcm On Site For The Entirety Of The Project.
contractor To Follow The Specs. can Any Of The Above Individuals Double Or Triple Hat?
contractor Shall Follow The Specifications. Ssho Can Not Be The Superintendent. If The Superintendent Have The Necessary Qualifications Of The Cqc (proven Qualifications), He/she Can Be However, They Must Also Have To Prove/show That The Personnel Ran Two Elevators Project That Are 100% Completed At The Same Capacity Or At Least One Completed Project At The Same Capacity And 5 Years Of Experience Of Similar Mep Projects can Any Of The Above Individuals Be An Employee Of A Subcontractor, Or Will The Va Require The Above Individuals To Be A Full-time Employee Of The Prime Contractor?
contractor To Follow The Specs will Microsoft Project Be An Acceptable Scheduling Tool For The Project?
the Va Can Accept That. what Software Will Be Utilized On The Project For Submittal Transfers? Will The Prime Contractor Be Responsible For Purchasing And Maintaining? the Va Will Not Purchase Or Maintain Any Software, Typically The Gc Provides (purchases) The Software And Issues User Licenses For The A/e And Va. will The Client Require Any Construction Management Software To Be Utilized On The Project? Will The Prime Contractor Be Responsible For Purchasing And Maintaining? contractor To Follow The Specs And Project Documents. The Va Will Not Purchase Or Maintain Any Software, Typically The Gc Provides (purchases) The Software And Issues User Licenses For The A/e And Va. do The Elevators Currently Receive A Pre-transfer Signal From The Ats (automatic Transfer Switch)? The New Controllers Will Require A Pre-transfer Signal From The Ats.
existing Elevators Operate On Emergency Power. Pre-transfer Signal Wiring May Be Required. Contractor Shall Provide All Appurtenance To Comply With Specification §14 21 10 2.9.c if No Pre-transfer Signal Currently Exists, Does The Ats Have The Capability To Time Delay And Send A Pretransfer Signal To The Elevators It Serves? Additionally, Where Is The Ats Located Within The Building For Each Elevator Identified In The Solicitation? Conductors Will Need To Be Run In Conduit And Programmed To Function. Contractor Needs To Know The Length Of Run, Quantity Or Runs, And Potential Routing.
existing Elevators Operate On Emergency Power. Pre-transfer Signal Wiring May Be Required. Contractor Verify In-field Capabilities Of Existing Ats With Pre-transfer Signaling. Final Connections Shall Comply With §14 21 10 - 2.9.c. Atss Are Located In Rooms As Indicated Below:
'aats-eq1' --> Room A-b140 'aats-eq4' --> Room A-b140 'ats1d1' --> Room D-b009 'ats1d2' --> Room D-b009. can The Va Please Identify A Lay Down Area On Site Where Contractors Can Stage Materials And Equipment?
please Review The Sow And Project Documents. The Va Will Not Give A Space To Store Materials Onsite. Csr Will Be Available For Trailers. can The Va Please Identify The Location Of Placement For Project Dumpsters?
f Lot. please Provide Contract Information For Existing Building Fire Alarm Vendor.
at This Moment Aadco Does The Testing, And Korsen Does The Programming. We Are Currently Upgrading The Whole System, It Will Be Siemens, Project Will Be Awarded Soon. please Provide Contact Information For Existing Building Fire Protection Vendor.
grunau Fire Protections. Granaufire.com. (317) 872-7360 6011 E Hanna Ave, Suite A, Indianapolis, In 46203 new 24 X24 Sump Pit 24 Deep. Would The Va Be Open To The Contractor Installing Surface Mounted Sump Pumps? surface Pumps Could Be Considered But Must Meet The Elevator Code, Capacity In Gpm And Head To Be Suitable, And Be Coordinated With The Site Conditions.
this Is A Code Allowable Approach, However Any Contractor That Uses This Approach Would Have To Provide The Discharge Calculations Meet Requirements And Provide As Built For All Installation Parameters And Equipment Placement. All Roofing Work Shall Be Performed By Contractor Approved By Existing Roof Manufacturer To Patch And Repair Existing Roofing System. Contractor Shall Be Responsible For Checking Existing Roofing System Warranty Status And Furnishing A Complete Roof Rework, Repair And Patching System That Will Be In Compliance With Any Existing Remaining Roof Warranties. New Work Shall Provide Full New System Warranties. Can The Va Please Identify The Existing Roof Manufacturer?
d Wing And A Wing Are Spf Roofs Manufactured By Progressive Materials. can The Va Please Verify That The Job Will Be Installed Under The 2022 Code For The Elevators? Are Any Parts Of That Being Deleted For This Project?
amse A17.1-2022 will All The Hoisting Of Materials Need To Be Done On Sunday? Does This Include Crane Picks On D Wing And Interior Hoisting On A Wing?
no. Crane Lift On The D-wing Shall Happen On Sunday. Interior Hoisting On A Wing Does Not Have To Happen On Sunday, You Can Do That During Normal Business Hours. can The Va Please Clarify The Icra Wall Types For Each Elevator? Due To The Shading Of The Cabs On The Phasing Plan It Is Difficult To Decipher What Icra Wall Types Are Required In What Areas.
icra Forms Were Provided As Part Of Design Submission. Contractor Needs To Fill It Out For Every Area Needing Enclosed And Submit To Va For Approval. Icra Barriers Are Dependent On Type Of Work Being Done, Type Of Departments Surrounding Work Area, Etc. If Elevator Doors Are Being Remove From Elevator Shaft Then The Icra Barrier Needs To Meet The Same Fire Rating Requirements Of The Adjacent Walls/ Partitions. based On The Questions And Answers We Anticipate Receiving From The Government Along With The Upcoming Holiday, We Are Requesting Additional Time To Work With Our Vendors And Ensure Our Pricing Is Accurate. Will The Va Please Issue A Bid Extension?
the Bid Due Date Has Been Extended To January 23, 2025 At 14:00 can The Va Please Clarify The Bas/bms Scope Of Work For The Project?
will Any Of The New Equipment Require Bas/bms Connections?
if So, Please Clarify Which Equipment Will Require These Connections.
does This Equipment Currently Have Bas/bms Connections Fed To Them?
if There Are Not Existing Connections, And The Va Is Requesting Them, Can The Va Identify The Source Panels For The New Connections?
who Is The Current Bas/bms Service Provider At The Facility?
existing Are Not Connected To Our Building Automation System. Contractor Shall Review Drawing And Specs For New Installations. please Clarify If We Are To Submit 2 Or 3 Alternate Bid Deducts. As Per Solicitation Page 5 Or Bid Alternate In Dwg Gi000.
there Are Three Alternates And Base Bid As Noted On The Invitation To Bid. Also Please Review The Sow For Clarifications. please Clarify The Locations Of The Abatement.
environmental Drawings Detail Locations Of Known Or Suspected Hazardous Materials Related To Scope Of Work Areas. please Confirm If Superintendent Can Satisfy The Role Of Qc?
if The Superintendent Has The Necessary Qualifications Of The Cqc (proven Qualifications), Proposed Superintendents Can Be However, They Must Also Have To Prove/show That The Personnel Ran Two Elevators Project That Are 100% Completed At The Same Capacity Or At Least On Completed Project At The Same Capacity And 5 Years Of Experience Of Similar Mep Projects. solicitation States All Submittals Must Be Sent Within 15 Days Of Award. Please Clarify? (solicitations Page 8)
this Could Be Discussed After Award. The Va Is Willing To Agree On A Reasonable Time Frame. will Prime Contractor Be Required To Be In Attendance During Fire Watch? (solicitation Page 10)
contractor Shall Have A Personnel To Be The Fire Watch While Conducting Any Work That May Require Fire Watch. drawing Gi015, Detail 3. Note 10.43 Category C. What Is The Risk Group For This Containment?
risk Category Varies At All Locations Depending On Surrounding Departments. Patient Risk Group High Risk Designated For All Containment Enclosures. Deviations Where Possible To Be Coordinated With Va. note 10.45 For Different Landings State Category B. What Is Risk Group For The Different Landings? Notes State To Verify With Cor/hospital Staff?
risk Category Varies At All Locations Depending On Surrounding Departments. Patient Risk Group High Risk Designated For All Containment Enclosures. Deviations Where Possible To Be Coordinated With Va. drawing Gi016, For Vestibule In Blood Draw Areas, Where Can Exhaust Be Routed From Negative Air Machine?
exhaust To Closest Adjacent Window Systems Plan North Of A2127 drawing Gi017 What Is Risk Group For Basement?
risk Category Varies At All Locations Depending On Surrounding Departments. Patient Risk Group High Risk Designated For All Containment Enclosures. Deviations Where Possible To Be Coordinated With Va. please Confirm Only Elevator S7 Will Be Required To Have An Oil Water Separator?
only Elevator S7 Requires An Oil Water Separator. which Code Year Shall Be Utilized For The Elevators Asme Code A17.1?
discussion: Statement Of Work References Most Recent Code But Refers The Asme A17.1-2010, Specifications Reference Asme A17.1-2019 In 14 21 10, Sention 2.7, D, N.
the Most Recent Code Year Is 2022. Please Confirm The Correct Code Year For The Project. Additionally, The Design Drawings Do Not Comply With The Requirements For 2022 And Have Several Lacking Items. It Is Suspected The Design Was Done For Code Year 2019. Please Advise.
asme A17.1-2022 Is The Governing Code. do The Elevators Currently Operate On Emergency Power? Do The Elevators Currently Have Pretransfer Signal Wire Which Initiates The Countdown As Indicated In Items C?
discussion: It Is Important To Know If The Current Functionality Exists For The Time Delay Transfer To Emergency Power Under Loss Of Normal Power To Appropriately Estimate Cost. Should New Signal Wire Be Needed For The Ats And Emergency Power Functionality The Length Of Run Will Be Critical In Estimating The Project. Please Confirm If The Pre-transfer Signal Wire Is Currently In Place For The Elevators And If The Conduit And Conductor May Be Re-used.
existing Elevators Operate On Emergency Power. Pre-transfer Signal Wiring May Be Required. Contractor Shall Provide All Appurtenances To Comply With Specification §14 21 10 2.9.c do All Elevators Have Existing Shunt Trip Devices And Functional Shunt Trip Circuitry Tied To The Fire Alarm System? discussion: Note 24 On Drawing Sheet E-201 Acknowledges The Requirement For All Elevators To Be Shunted. All Elevators Have Sprinkled Machine Rooms And Therefore Require Shunting. However, During The Site Visit No Shunt Trip Devices Were Observed And Their Location / Existence Was Unclear. Please Confirm All Elevators In The Scope Of Work Are Currently Serviced By Shunt Trip Breakers And The Shunt Trip Functionality Is Active And Connected To The Heat Detectors In The Respective Machine Spaces. Shunt Trip Breakers Are Costly And Expected To Be Retained. Should Any Device Lack Shunt Trips Or Require Shunt Trip Breaker Replacement It Is Critical To Know Prior To Bidding.
existing Shunt Trip Devices Are Present At Distribution Equipment Feeding All Elevator Controls. what Digital Monitor Is Required On The Icra Enclosure? discussion: Note 8 Is Mentioned Throughout On Icra Barrier Pages. Shall Digital Monitors Be Required To Show Negative Pressure Locally? Is There A Remote Monitoring Requirement? Is There A Particular Required Device Brand / Model That Is Required? Please Expand On The Requirement Guidelines. (note: Magnehelic Is Noted In The Scope Of Work, But No Model Number Is Given. Google Search Returns Mechanical Gauges Which Conflict With The Digital Guidance Given In The Drawings.)
for Purposes Of Fair Bidding Utilize Digital Monitors With Local Display. Remote Monitoring Is Not Required. No Specific Brand Is Required, But Reference Spec Section 02 82 11 For Negative Air Monitoring Requirements. shall Remote Monitoring Be Provided For All Elevator On 1 Monitoring Station In The Electric Shop? discussion: Shall All Contract Elevators Be Monitored From The Same Machine In The Electric Shop?
not Required For This Project. shall The Car Have Security Override Features Like Lockdown Or Any Special Security Features? discussion: Standard Features Will Be Provided However If Security Or Lockdown Features Are Required For Active Shooter Type Scenarios A Detailed Description Of The Desired Functionality Must Be Provided So The Additional Programming And Hardware May Be Quoted With The Control System.
these Additional Features Are Not Required. which Seismic Zone Does The Facility Lie Within? discussion: Specification 14 21 10, Section 1.5, C, 1, C. Indicates Rail Bracket Requirements For Seismic Zone 2. It Is My Understanding That The Indianapolis Facility Falls Within The Seismic Zone 1 Which Encompasses The Majority Of The State. Please Confirm The Seismic Zone Requirement For This Project Is Zone 1 And The Zone 2 Note Is An Error.
per Us Dept. Of Va Seismic Zone Map, Indianapolis Is In An Area Of Moderate Low Seismicity. This Facility Is Risk Category Iv And Falls Under Ibc Seismic Design Category D Per Rp 10-22 Referenced In H-18-8 Seismic Design Requirements. is The Contractor Exempt From Indiana Sales Tax As A Passthrough For This Project? discussion: States Such As New Mexico And South Dakota Require Contractors To Pay Local Sales Tax On Projects Although The Federal Entity Is Exempt. This Exemption Does Not Pass Through To The Contractor. Please Confirm Whether Or Not The Sales Tax Exemption For The Richard L . Roudebush Vamc Allows Passthrough To The Contractor.
project Is Tax-exempt And Contracting Will Provide Any Necessary Certificates. is The Contractor To Make The Cleared Pit Space Between P8/p9 And P10 Pits Compliant?
discussion: The Drawings Lack Guidance For Electrical Or Fire Installations In The Void Crawlspace Between The P8/p9 And P10 Elevator Pits. This Space Being Accessible By The Elevator Pits And Open To The Other Side Should Be Barricaded, Switched, Lighted And Smoke Device Controlled. Please Advise If Any Modifications To The Crawl Space Shall Be Required.
reference Keynote 1.02 On Ae Sheets. request Bid Date Be Extended To 1/31/2025 At Minimum To Allow Contractors To Price The Job After Rfi Responses Have Been Answered And To Adequately Communicate With Vendors As The Holiday Impact To Vendor Operations Is Substantial?
discussion: Please Provide, At Minimum, 2 Weeks After Rfi S Have Been Returned Before Bid Due Date. This Will Allow The Contractors Fair Time To Appropriately Price The Project. Additionally, The Holiday S Make Vendor Pricing For Materials Near Impossible.
the Bid Due Date Has Been Extended To 1/23/2025. shall A Second Iteration Of Rfi S Be Allowed To Follow Up On Responses To The First Set?
discussion: It Is Generally Helpful To Allow A Follow Up Round Of Rfi S To Provide Further Clarification To The Answers Provided To Round 1. It Often Become Necessary To Ask A Different Question When Given An Unexpected Answer To The First Set. Please Advise.
a Second Round Of Rfi S Will Not Be Accepted.
DEPT OF THE AIR FORCE USA Tender
Civil And Construction...+2Civil Works Others, Machinery and Tools
United States
Closing Date23 Jan 2025
Tender AmountRefer Documents
Details: 23d Force Support Squadron Strives To Meet The Needs Of Our Customer Base. Grassy Pond Currently Has Three (3) Floating Docks On Our Main Lake That Need To Be Replaced And Three (3) Floating Docks That Needs To Be Repaired Due To Damage Sustained From Tropical Storm Debby And Hurricane Helene. One Of The Damaged Floating Docks That Needs To Be Repaired Is Located At Mission Lake On Moody Afb. 23d Force Support Squadron Requires The Full Replacement Of Three (3) Floating Docks And The Repair Of Three (3) Floating Docks.
replacements:
• One (1) 75' X 6' T-shaped Floating Dock With 10' Entry/walkway On The East Trail (replacement)
- All Of The Framework And Handrails Will Be Galvanized Steel, A Composite Deck, And A Poly Float.
handrails = 1-1/4" Sch 40 Pipe (1-5/8" Od) With A .140" Wall Thickness Made Of Galvanized Steel Or Thicker
handrails To Encompass Entire Floating Dock Including Entry Way
- 20' X 6' Dock Section With Rails
- "t" Is 15' X 6' Dock Section With Rails, A 3' Gate To Allow For Access To The Floating Dock For Boats, And Boat Bumpers To Ensure No Damage Done To The Docks By Boats
- 10' Entry Ramp
entry Ramp To Be Secured To The Shore With 2 Ea 3" Sch 40 Pilings Embedded 6' Into The Ground And Include Non-slip
- Pilings = 4 Ea (3" Sch 40 Galvanized Steel)
6' Minimum Embedded + Depth Of The Water + 3' Out Of Water
pilings Are To Be Hollow In The Middle
round Out Sharp Edges
drive In The Pilings
- Custom Galvanized Steel Slide Brackets For Pilings = 4 Ea • One (1) 75' X 6' With 5' Entry/walkway Floating Dock With No Handrails Near Bldg 2019 (replacement)
- All Of The Framework Will Be Galvanized Steel, A Composite Deck, And A Poly Float.
- Three (3) 20' X 6' Dock Section With No Rails
- One (1) 15' X 6' Dock Section With No Rails
- 5' Entry Ramp With No Handrails
entry Ramp To Be Secured To The Shore With 2 Ea 3" Sch 40 Pilings Embedded 6' Into The Ground And Include Non-slip
- Pilings = 4 Ea (3" Sch 40 Galvanized Steel)
6' Minimum Embedded + Depth Of The Water + 3' Out Of Water
pilings Are To Be Hollow In The Middle
round Out Sharp Edges
drive In The Pilings
- Custom Galvanized Steel Slide Brackets For Pilings = 4 Ea • One (1) 35' X 6' Floating Dock With 12' Ramp For The Boat Launch With No Handrails (replacement)
- All Of The Framework Will Be Galvanized Steel, A Composite Deck, And A Poly Float.
- One (1) 20' X 6' Dock Section With No Rails
- One (1) 15' X 6' Dock Section With No Rails
- 12' Entry Ramp With No Handrails
entry Ramp To Be Secured To The Shore With 2 Ea 3" Sch 40 Pilings Embedded 6' Into The Ground And Include Non-slip
- Pilings = 2 Ea (3" Sch 40 Galvanized Steel)
6' Minimum Embedded + Depth Of The Water + 3' Out Of Water
pilings Are To Be Hollow In The Middle
round Out Sharp Edges
drive In The Pilings
- Custom Galvanized Steel Slide Brackets For Pilings = 2 Ea repairs: • One (1) T-shaped Floating Dock On The Backside Of Our Boat Storage Area. (repair)
- Screw Down All Loose Deck Boards With Stainless Steel Screws.
- Straighten Out The "t" Connection And Re-secure Floating Dock.
- Add Six (6) Piling Ring Extensions To Six (6) Existing Pilings To Move Pilings Further From The Dock And Ensure The Longevity Of The Floating Dock.
- Replace All 84 Lower Handrail Bolts On The Handrails, Install Backing Washers, And Re-attach The Handrails With New Bolts.
- Straighten And Reinstall All Handrails Back To Original Condition. • One (1) T-shaped Floating Dock At Mission Lake. (repair)
- Straighten Center Broken Walkway And Re-secure To The Land Using Existing Pilings (pilings Are 3" Sch 40 Galvanized Steel).
- Add Eight (8) Piling Ring Extensions To Eight (8) Existing Pilings To Move Pilings Further From The Dock And Ensure The Longevity Of The Floating Dock.
- Replace All 84 Lower Handrail Bolts On The Handrails, Install Backing Washers, And Re-attach The Handrails With New Bolts. • One (1) T-shaped Floating Dock At Dock Near The East Trail Of Grassy Pond (repair)
- Repair And Re-secure Two Side Handrails That Detached During The Storm And Are Slightly Bent.
- Repair And Re-secure Handicap Handrail On Entry Walkway.
- Two (2) Piling Extensions 4" Sch 40 Pipe To Be Secured Through The Center Of Existing Pilings To Ensure Stability Of Floating Dock. • Must Include:
- All Required Equipment, Tools, Materials, Including But Not Limited To Aquatic Vehicles, Storage For Materials, Forklifts, Cranes,
- Fees To Obtain Any Relative Permits (i.e. Dig Permits)
- All Required Demolition Including Concrete/curbing/poles/rods
- Own Dumpster For Disposal
- Removal Of All Waste
- All Required Construction To Include But Not Limited To Pilings/footers And Assembly Of The Floating Dock
- All Required Transportation/travel standard 1-year Warranty To Be Provided By Contractor. deliver To 5360 Grassy Pond Rd , Lake Park, Ga 31636 site Visit: a Site Visit Will Be Held On Tuesday January 14 2025 At 9:00 Am Est. While Attendance Is Not Mandatory, It Is Highly Recommended. Vendors Are Encouraged To Inspect The Site In Order To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance To The Extent That Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. Please Arrive At The Moody Air Force Base Visitor's Center No Later Than 8:30 Am Est For Check-in (required For All Contractors Prior To Entering The Base) To Ensure On Time Arrival For The Site Visit. for Completing The Attached Base Pass Forms Please Put Your Business Name Next To The "prime Contractor" Spot (where Abcd Is Present). Replace The Name John Doe With The Full Name Of The Member Requesting Base Access For The Site Visit, Include Date Of
birth (ssn Is Not To Be Added On The Form But May Be Needed For Check-in) And Company For All Additional Members That May Be Attending. When Complete, Email The Base Pass To Ryan.trevino.2@us.af.mil No Later Than Cob Monday January 13, 2025 At 11:30 Am Est. see Mission Lake Base Map For Directions To The Meeting Point At Moody Afb.
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Civil Works Others
United States
Closing Date29 Jan 2025
Tender AmountRefer Documents
Details: Project Title: Test Maintenance Fabrication Facility, Aberdeen Proving Grounds, Maryland. solicitation Number: W912dr25ra009 this Is A Sources Sought Notice Only. This Is Not A Request For Proposals, Quotations Or Bids. There Will Not Be A Solicitation, Specifications, Or Drawings Available At This Time. the U.s. Army Corps Of Engineers (usace), Baltimore District, Requests Letters Of Interest From Qualified Small And Other Than Small Business Construction Contractors Interested In Performing Work On The Potential Construction Of The Test Maintenance Fabrication Facility, Aberdeen Proving Grounds, Maryland. by Way Of This Market Survey/sources Sought Notice, The Usace Baltimore District Intends To Determine The Extent Of Capable Firms That Are Engaged In Providing The Services Described Hereunder. Responses To This Sources Sought Announcement Will Be Used By The Government To Make Appropriate Acquisition Decisions. Therefore, The Type Of Set-aside Decision To Be Issued Will Depend Upon The Capabilities Of The Responses To This Notice. responses To This Notice Are Not Offers And Cannot Be Accepted By The U.s. Government To Form A Binding Contract. It Is The Responsibility Of The Interested Parties To Monitor This Site For Additional Information Pertaining To This Notice. note: There Will Be A Pla Requirement For This Project. project Description: the U.s. Army Corps Of Engineers, Baltimore District (nab), Has Been Tasked To Solicit For And Award Construction Services For The Test Maintenance Fabrication Facility, Aberdeen Proving Grounds, Maryland. The Proposed Project Will Be A Competitive, Firm-fixed-price (ffp), Design-bid-build (dbb) Contract Procured In Accordance With Far 15, Contracting By Negotiations, Under A Lowest Price Technically Acceptable (lpta) Process. the Project Will Consist Of A Design Bid Build (dbb) New Construction Of A 113,800 Square Foot Slab On Grade Test Maintenance Fabrication Facility (tmff) At Aberdeen Proving Ground (apg). The Tmff Includes Secure Areas (no Scif), Tool Crib, Material Storage Area With Overhead Cranes, Administrative Areas, Conference Area, Technical Publication Reference Area, Restroom Facilities, And Employee Break And Locker Rooms. Supporting Facility Elements Include All Pertinent Utilities, Employee Parking Area, Fenced Secure Vehicle Parking Area, Concrete Hardstand, Walks, Curbs And Gutters, Storm Drainage, Storm Water Management, Landscape Plantings, Fencing And Signage As Well As Utilizing Structural Soil Stabilization Practices (i.e. Soil Cement Technologies). Access For Persons With Disabilities Will Be Provided In The Administrative And Common Areas Only. Heat And Air Conditioning Will Be Self-contained Systems. The Project Will Also Include The Identification And Relocation Of An Existing Ductbank Which Traverses The Proposed Site, And The Demolition And Disposal Of An Existing 10,556 Square Foot Building And Associated Above Ground 2,000-gallon Fuel Storage Tank. No Hazmat Concerns Have Been Identified For The Building To Be Demolished. Force Protection Measures Include The Use Of Standoff Distances And Security Fencing. Design And Construction Will Comply With, And Include, Where Feasible, Components For Sustainable Design & Development (sdd), Low Impact Development (lid), Renewable Energy, Net-zero Water, And Leed. The Facility Will Be Designed To A Minimum Life Of 40 Years In Accordance With Dod's Unified Facilities Criteria (ufc 1-200-02) Including Energy Efficiencies, Building Envelope And Integrated Building Systems Performance. the Purpose Of This Notice Is To Gain Knowledge Of Interest, Capabilities And Qualifications Of Various Members Of Industry, To Include The Small Business Community: Small Business (sb), Section 8(a), Historically Underutilized Business Zones (hubzones), Small Disadvantaged Business (sdb), Veteran-owned Small Business (vosb), Service-disabled Veteran-owned Small Business (sdvosb), And Women-owned Small Business (wosb). The Government Must Ensure There Is Adequate Competition Within Any Given Socioeconomic Category Of Responsible Contractors. Large Businesses Are Not Prohibited From Submitting A Response To This Notice; However, Sb, Section 8(a), Hubzone, Sdvosb, Sdb, Vosb, And Wosb Are Highly Encouraged To Participate. in Accordance With Dfar 236.204 – Disclosure Of The Magnitude Of Construction Projects, The Magnitude Of This Project Between $25m And $100m. The North American Industry Classification System (naics) Code For This Procurement Is 236220 – “commercial And Institutional Building Construction”, Which Has A Small Business Size Standard Of $45,000,000. prior Government Contract Work Is Not Required For Submitting A Response To This Sources Sought Notice. responders Should Address All The Following In Their Submittal: 1. Firm's Name, Address, Point Of Contact, Phone Number, E-mail Address, Cage Code And Uei Number. 2. Indicate If Your Company Is Currently Registered With The Systems For Award Management (sam) Database. If Not, Indicate If It Has Been Registered Or Does It Plan To Register. 3.in Consideration Of Naics Code 236220, With A Small Business Size Standard In Dollars Of $45m, Indicate Your Firm’s Business Classified (size): Large Business, Small Business, Veteran Owned Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Woman-owned Small Business, Hubzone Small Business, Or 8(a) Business. 4.indicate If Your Company Is Currently Prohibited From Doing Business With The Federal Government. Yes/no. (if Yes, Explain). 5.provide A Letter From The Surety Regarding The Bonding Capability For A Single Contract Action And Aggregate Both Expressed In Dollars. 6.indicate If Your Company Is Interested In Performing As A Prime Or Subcontract For The Above Project. 7.provide Three (3) Example Projects Similar To The Requirements Described Above Completed Within The Past Seven (7) Years. Include Point Of Contact Information For The Examples Provided As Past Performance On Indicated Projects May Be Verified. Contractors With Unsatisfactory Past Performance May Not Be Considered Capable Of Successfully Performing This Type Of Work. 8.responders Should Have Experience In The Areas Listed Below And Provide Narratives Identifying That Specific Experience: capability Statements Should Include Information And Details Of A Minimum Of Three (3) Projects With Similar Scope Of Work And Magnitude Of Construction Within The Past Seven (7) Years. One (1) Project Must Be 100% Completed, While The Remaining Two (2) Must Be 75% Completed. These Projects Must Be Of Relevant Scope And Have Either A Minimum Project Size Of 50,000 Building Gross Square Foot (bgsf) Or Demonstrate A Minimum Completion Value Of $50,000,000.00. successful Experience With Leed Silver Construction And Environmental Low Impact Development. successful Experience With Building Information Management (bim) Technology. independent Full-time, Dedicated, Self-performing (prime Contractor) Safety Staff. us Citizens (should Include Naturalized Citizens/legal Citizen). total Submittal Shall Be No Longer Than Fifteen (15) Pages In One (1).pdf File Double-sided Pages Will Count As Two (2) Separate Pages. comments Will Be Shared With The Government And The Project Design Team, But Otherwise Will Be Held In Strict Confidence. submission Instructions: this Notice Is Not A Request For Proposal, Quote Or Bid. It Is A Market Research Tool Being Utilized To Determine The Availability Of Potential Qualified Contractors Before Determining The Method Of Acquisition. In Addition, This Sources Sought Is Not To Be Considered As A Commitment By The Government, Nor Will The Government Pay For Any Information Solicited Or Delivered. interested Parties Who Consider Themselves Qualified To Perform The Above-listed Requirement Are Invited To Submit A Response To This Sources Sought Notice Nlt 11:00 Am Eastern Standard Time (est) 29 January 2025. All Responses Under This Sources Sought Notice Must Be Emailed To Amber.l.rose@usace.army.mil And Tamara.c.bonomolo@usace.army.mil Referencing The Sources Sought Notice Number W912dr25r13mf telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Their Submissions. If You Have Any Questions Concerning This Opportunity, Please Contact: Amber Rose Via Email; Amber.l.rose@usace.army.mil.
831-840 of 844 active Tenders