Civil Work Tenders

Civil Work Tenders

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) November 20, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0051 – Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 2. 25ed0052 – Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 3. 25ed0053 – Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro 4. 25ed0054 – Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro 5. 25ed0055 – Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro 6. 25ed0056 – Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro 7. 25ed0057 – Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro 8. 25ed0058 – Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro 9. 25ed0059 – Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro 10. 25ed0060 – Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro 11. 25ed0061 – Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro 12. 25ed0062 – Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro 13. 25ed0063 – Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro 14. 25ed0064 – Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro 15. 25ed0065 – Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro 16. 25ed0066 – Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro 17. 25ed0067 – Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro 18. 25ed0068 – Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0051 Php 49,000,000.00 25ed0052 Php 49,000,000.00 25ed0053 Php 49,000,000.00 25ed0054 Php 4,950,000.00 25ed0055 Php 19,600,000.00 25ed0056 Php 1,980,000.00 25ed0057 Php 5,940,000.00 25ed0058 Php 4,950,000.00 25ed0059 Php 49,000,000.00 25ed0060 Php 4,950,000.00 25ed0061 Php 4,950,000.00 25ed0062 Php 4,950,000.00 25ed0063 Php 4,950,000.00 25ed0064 Php 4,950,000.00 25ed0065 Php 4,950,000.00 25ed0066 Php 4,950,000.00 25ed0067 Php 1,980,000.00 25ed0068 Php 4,950,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0051 Name Of Contract : Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 262 L.m. Seawall With Concrete Sheet Pile, 262 L.m. Portland Cement Concrete Pavement, And 10 M. Bridge. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 333 C.d. 2.2 Contract I.d. No. : 25ed0052 Name Of Contract : Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 338 L.m. Seawall With Concrete Sheet Pile, 338 L.m. Portland Cement Concrete Pavement, And Hexapod Spurdike. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.3 Contract I.d. No. : 25ed0053 Name Of Contract : Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 986.00 L.m. 4 Layer Of Gabion Revetment. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.4 Contract I.d. No. : 25ed0054 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Complete Construction Of 10.00 M. X 12.00 M., 1-storey Multi – Purpose Building, With Painting Works, With Stainless Railing, Steel Paint, Grills, Drop Ceiling, Plumbing, Electrical & Carpentry Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.5 Contract I.d. No. : 25ed0055 Name Of Contract : Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 77.90 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 19,600,000.00 Contract Duration : 216 C.d. 2.6 Contract I.d. No. : 25ed0056 Name Of Contract : Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : Completion Of 20.00 M. X 30.00 M. Covered Court With 3 Steps Of Bleachers (43.10 Ln.m.) With Roofing With Repainting Of Steel Trusses And Purlins, And Painting Works Of Stage With Replacement And Additional Of Lighting Fixture Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 90 C.d. 2.7 Contract I.d. No. : 25ed0057 Name Of Contract : Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 20.00 M., 1-storey Multi – Purpose Building (post Harvest Facility) Without Embankment, Slab On Fill, Paintings And Electrical Works. Approved Budget For The Contract : Php 5,940,000.00 Contract Duration : 150 C.d. 2.8 Contract I.d. No. : 25ed0058 Name Of Contract : Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Construction Of Road: Width = 5.0 M.; Thickness = 0.20 M.; Length = 373.50 M.; Aggregate Subbase Course Thickness = 0.20 M.; Shoulder Width = 1.00 M. 2. Construction Of Slope Protection: A. Sta. 00+034.00 – Sta. 00+090.00; Length = 56.00 M. (both Side) B. Sta. 00+320.00 – Sta. 00+400.00; Length = 80.00 M. (left Side) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.9 Contract I.d. No. : 25ed0059 Name Of Contract : Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Construction Of 205.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.10 Contract I.d. No. : 25ed0060 Name Of Contract : Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 464.00 M. With Proposed Streetlight, Edge Protection And Rcpc At Selected Section And No Shoulder On Both Sides. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.11 Contract I.d. No. : 25ed0061 Name Of Contract : Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Concreting Of 511.00 L.m. Of Road (width = 5.00 M., 0.20 M. Thk. Pccp) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.12 Contract I.d. No. : 25ed0062 Name Of Contract : Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : 1. Concreting Of 473.00 L.m. Of Road (width = 4.00 M., 0.20 M Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 0.50 M. Asbc Shoulder And Slope Protection. 2. Remove And Replace Existing Rcpc. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.13 Contract I.d. No. : 25ed0063 Name Of Contract : Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 583.00 M. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.14 Contract I.d. No. : 25ed0064 Name Of Contract : Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk=0.20 M.) With Total Length Of 482.00 M. With 0.50 M. Gravel Shoulder On Both Sides At Selected Road Section And With Proposed Rcpc, Slope Protection And Edge Protection At Selected Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.15 Contract I.d. No. : 25ed0065 Name Of Contract : Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 4 M. Width Road (thk = 0.20 M.) With Total Length Of 47.80 L.m. 2. Construction Of 660.20 M. Concrete Open Line Canal With Steel Grating Cover At Intermittent Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.16 Contract I.d. No. : 25ed0066 Name Of Contract : Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Construction Of Drainage With 600 Mm. Diameter Rcpc With Curb And Gutter. 2. Construction Of Drainage With Bar Grates. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.17 Contract I.d. No. : 25ed0067 Name Of Contract : Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 27.00 M. Covered Court With Roofing 18 M. X 19.5 M. Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 180 C.d. 2.18 Contract I.d. No. : 25ed0068 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Complete Construction Of 8.00 M. X 10.00 M., 2-storey Multi – Purpose Building, With Painting Works, With Steel Door, Ladder (fire Exit), Ramp With Stainless Railings, Plumbing And Electrical Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20 – December 10, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0051 Php 25,000.00 25ed0052 Php 25,000.00 25ed0053 Php 25,000.00 25ed0054 Php 5,000.00 25ed0055 Php 25,000.00 25ed0056 Php 5,000.00 25ed0057 Php 10,000.00 25ed0058 Php 5,000.00 25ed0059 Php 25,000.00 25ed0060 Php 5,000.00 25ed0061 Php 5,000.00 25ed0062 Php 5,000.00 25ed0063 Php 5,000.00 25ed0064 Php 5,000.00 25ed0065 Php 5,000.00 25ed0066 Php 5,000.00 25ed0067 Php 5,000.00 25ed0068 Php 5,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided Thast Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On November 27, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before December 10, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On December 10, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Mercedes G. Aspi Bac Vice Chairperson
Closing Date10 Dec 2024
Tender AmountPHP 1.9 Million (USD 33.5 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) November 20, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0051 – Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 2. 25ed0052 – Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 3. 25ed0053 – Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro 4. 25ed0054 – Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro 5. 25ed0055 – Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro 6. 25ed0056 – Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro 7. 25ed0057 – Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro 8. 25ed0058 – Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro 9. 25ed0059 – Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro 10. 25ed0060 – Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro 11. 25ed0061 – Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro 12. 25ed0062 – Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro 13. 25ed0063 – Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro 14. 25ed0064 – Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro 15. 25ed0065 – Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro 16. 25ed0066 – Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro 17. 25ed0067 – Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro 18. 25ed0068 – Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0051 Php 49,000,000.00 25ed0052 Php 49,000,000.00 25ed0053 Php 49,000,000.00 25ed0054 Php 4,950,000.00 25ed0055 Php 19,600,000.00 25ed0056 Php 1,980,000.00 25ed0057 Php 5,940,000.00 25ed0058 Php 4,950,000.00 25ed0059 Php 49,000,000.00 25ed0060 Php 4,950,000.00 25ed0061 Php 4,950,000.00 25ed0062 Php 4,950,000.00 25ed0063 Php 4,950,000.00 25ed0064 Php 4,950,000.00 25ed0065 Php 4,950,000.00 25ed0066 Php 4,950,000.00 25ed0067 Php 1,980,000.00 25ed0068 Php 4,950,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0051 Name Of Contract : Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 262 L.m. Seawall With Concrete Sheet Pile, 262 L.m. Portland Cement Concrete Pavement, And 10 M. Bridge. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 333 C.d. 2.2 Contract I.d. No. : 25ed0052 Name Of Contract : Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 338 L.m. Seawall With Concrete Sheet Pile, 338 L.m. Portland Cement Concrete Pavement, And Hexapod Spurdike. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.3 Contract I.d. No. : 25ed0053 Name Of Contract : Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 986.00 L.m. 4 Layer Of Gabion Revetment. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.4 Contract I.d. No. : 25ed0054 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Complete Construction Of 10.00 M. X 12.00 M., 1-storey Multi – Purpose Building, With Painting Works, With Stainless Railing, Steel Paint, Grills, Drop Ceiling, Plumbing, Electrical & Carpentry Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.5 Contract I.d. No. : 25ed0055 Name Of Contract : Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 77.90 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 19,600,000.00 Contract Duration : 216 C.d. 2.6 Contract I.d. No. : 25ed0056 Name Of Contract : Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : Completion Of 20.00 M. X 30.00 M. Covered Court With 3 Steps Of Bleachers (43.10 Ln.m.) With Roofing With Repainting Of Steel Trusses And Purlins, And Painting Works Of Stage With Replacement And Additional Of Lighting Fixture Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 90 C.d. 2.7 Contract I.d. No. : 25ed0057 Name Of Contract : Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 20.00 M., 1-storey Multi – Purpose Building (post Harvest Facility) Without Embankment, Slab On Fill, Paintings And Electrical Works. Approved Budget For The Contract : Php 5,940,000.00 Contract Duration : 150 C.d. 2.8 Contract I.d. No. : 25ed0058 Name Of Contract : Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Construction Of Road: Width = 5.0 M.; Thickness = 0.20 M.; Length = 373.50 M.; Aggregate Subbase Course Thickness = 0.20 M.; Shoulder Width = 1.00 M. 2. Construction Of Slope Protection: A. Sta. 00+034.00 – Sta. 00+090.00; Length = 56.00 M. (both Side) B. Sta. 00+320.00 – Sta. 00+400.00; Length = 80.00 M. (left Side) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.9 Contract I.d. No. : 25ed0059 Name Of Contract : Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Construction Of 205.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.10 Contract I.d. No. : 25ed0060 Name Of Contract : Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 464.00 M. With Proposed Streetlight, Edge Protection And Rcpc At Selected Section And No Shoulder On Both Sides. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.11 Contract I.d. No. : 25ed0061 Name Of Contract : Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Concreting Of 511.00 L.m. Of Road (width = 5.00 M., 0.20 M. Thk. Pccp) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.12 Contract I.d. No. : 25ed0062 Name Of Contract : Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : 1. Concreting Of 473.00 L.m. Of Road (width = 4.00 M., 0.20 M Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 0.50 M. Asbc Shoulder And Slope Protection. 2. Remove And Replace Existing Rcpc. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.13 Contract I.d. No. : 25ed0063 Name Of Contract : Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 583.00 M. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.14 Contract I.d. No. : 25ed0064 Name Of Contract : Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk=0.20 M.) With Total Length Of 482.00 M. With 0.50 M. Gravel Shoulder On Both Sides At Selected Road Section And With Proposed Rcpc, Slope Protection And Edge Protection At Selected Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.15 Contract I.d. No. : 25ed0065 Name Of Contract : Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 4 M. Width Road (thk = 0.20 M.) With Total Length Of 47.80 L.m. 2. Construction Of 660.20 M. Concrete Open Line Canal With Steel Grating Cover At Intermittent Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.16 Contract I.d. No. : 25ed0066 Name Of Contract : Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Construction Of Drainage With 600 Mm. Diameter Rcpc With Curb And Gutter. 2. Construction Of Drainage With Bar Grates. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.17 Contract I.d. No. : 25ed0067 Name Of Contract : Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 27.00 M. Covered Court With Roofing 18 M. X 19.5 M. Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 180 C.d. 2.18 Contract I.d. No. : 25ed0068 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Complete Construction Of 8.00 M. X 10.00 M., 2-storey Multi – Purpose Building, With Painting Works, With Steel Door, Ladder (fire Exit), Ramp With Stainless Railings, Plumbing And Electrical Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20 – December 10, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0051 Php 25,000.00 25ed0052 Php 25,000.00 25ed0053 Php 25,000.00 25ed0054 Php 5,000.00 25ed0055 Php 25,000.00 25ed0056 Php 5,000.00 25ed0057 Php 10,000.00 25ed0058 Php 5,000.00 25ed0059 Php 25,000.00 25ed0060 Php 5,000.00 25ed0061 Php 5,000.00 25ed0062 Php 5,000.00 25ed0063 Php 5,000.00 25ed0064 Php 5,000.00 25ed0065 Php 5,000.00 25ed0066 Php 5,000.00 25ed0067 Php 5,000.00 25ed0068 Php 5,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided Thast Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On November 27, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before December 10, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On December 10, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Mercedes G. Aspi Bac Vice Chairperson
Closing Date10 Dec 2024
Tender AmountPHP 4.9 Million (USD 83.9 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) November 20, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0051 – Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 2. 25ed0052 – Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 3. 25ed0053 – Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro 4. 25ed0054 – Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro 5. 25ed0055 – Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro 6. 25ed0056 – Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro 7. 25ed0057 – Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro 8. 25ed0058 – Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro 9. 25ed0059 – Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro 10. 25ed0060 – Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro 11. 25ed0061 – Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro 12. 25ed0062 – Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro 13. 25ed0063 – Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro 14. 25ed0064 – Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro 15. 25ed0065 – Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro 16. 25ed0066 – Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro 17. 25ed0067 – Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro 18. 25ed0068 – Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0051 Php 49,000,000.00 25ed0052 Php 49,000,000.00 25ed0053 Php 49,000,000.00 25ed0054 Php 4,950,000.00 25ed0055 Php 19,600,000.00 25ed0056 Php 1,980,000.00 25ed0057 Php 5,940,000.00 25ed0058 Php 4,950,000.00 25ed0059 Php 49,000,000.00 25ed0060 Php 4,950,000.00 25ed0061 Php 4,950,000.00 25ed0062 Php 4,950,000.00 25ed0063 Php 4,950,000.00 25ed0064 Php 4,950,000.00 25ed0065 Php 4,950,000.00 25ed0066 Php 4,950,000.00 25ed0067 Php 1,980,000.00 25ed0068 Php 4,950,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0051 Name Of Contract : Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 262 L.m. Seawall With Concrete Sheet Pile, 262 L.m. Portland Cement Concrete Pavement, And 10 M. Bridge. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 333 C.d. 2.2 Contract I.d. No. : 25ed0052 Name Of Contract : Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 338 L.m. Seawall With Concrete Sheet Pile, 338 L.m. Portland Cement Concrete Pavement, And Hexapod Spurdike. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.3 Contract I.d. No. : 25ed0053 Name Of Contract : Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 986.00 L.m. 4 Layer Of Gabion Revetment. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.4 Contract I.d. No. : 25ed0054 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Complete Construction Of 10.00 M. X 12.00 M., 1-storey Multi – Purpose Building, With Painting Works, With Stainless Railing, Steel Paint, Grills, Drop Ceiling, Plumbing, Electrical & Carpentry Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.5 Contract I.d. No. : 25ed0055 Name Of Contract : Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 77.90 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 19,600,000.00 Contract Duration : 216 C.d. 2.6 Contract I.d. No. : 25ed0056 Name Of Contract : Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : Completion Of 20.00 M. X 30.00 M. Covered Court With 3 Steps Of Bleachers (43.10 Ln.m.) With Roofing With Repainting Of Steel Trusses And Purlins, And Painting Works Of Stage With Replacement And Additional Of Lighting Fixture Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 90 C.d. 2.7 Contract I.d. No. : 25ed0057 Name Of Contract : Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 20.00 M., 1-storey Multi – Purpose Building (post Harvest Facility) Without Embankment, Slab On Fill, Paintings And Electrical Works. Approved Budget For The Contract : Php 5,940,000.00 Contract Duration : 150 C.d. 2.8 Contract I.d. No. : 25ed0058 Name Of Contract : Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Construction Of Road: Width = 5.0 M.; Thickness = 0.20 M.; Length = 373.50 M.; Aggregate Subbase Course Thickness = 0.20 M.; Shoulder Width = 1.00 M. 2. Construction Of Slope Protection: A. Sta. 00+034.00 – Sta. 00+090.00; Length = 56.00 M. (both Side) B. Sta. 00+320.00 – Sta. 00+400.00; Length = 80.00 M. (left Side) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.9 Contract I.d. No. : 25ed0059 Name Of Contract : Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Construction Of 205.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.10 Contract I.d. No. : 25ed0060 Name Of Contract : Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 464.00 M. With Proposed Streetlight, Edge Protection And Rcpc At Selected Section And No Shoulder On Both Sides. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.11 Contract I.d. No. : 25ed0061 Name Of Contract : Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Concreting Of 511.00 L.m. Of Road (width = 5.00 M., 0.20 M. Thk. Pccp) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.12 Contract I.d. No. : 25ed0062 Name Of Contract : Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : 1. Concreting Of 473.00 L.m. Of Road (width = 4.00 M., 0.20 M Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 0.50 M. Asbc Shoulder And Slope Protection. 2. Remove And Replace Existing Rcpc. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.13 Contract I.d. No. : 25ed0063 Name Of Contract : Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 583.00 M. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.14 Contract I.d. No. : 25ed0064 Name Of Contract : Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk=0.20 M.) With Total Length Of 482.00 M. With 0.50 M. Gravel Shoulder On Both Sides At Selected Road Section And With Proposed Rcpc, Slope Protection And Edge Protection At Selected Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.15 Contract I.d. No. : 25ed0065 Name Of Contract : Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 4 M. Width Road (thk = 0.20 M.) With Total Length Of 47.80 L.m. 2. Construction Of 660.20 M. Concrete Open Line Canal With Steel Grating Cover At Intermittent Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.16 Contract I.d. No. : 25ed0066 Name Of Contract : Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Construction Of Drainage With 600 Mm. Diameter Rcpc With Curb And Gutter. 2. Construction Of Drainage With Bar Grates. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.17 Contract I.d. No. : 25ed0067 Name Of Contract : Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 27.00 M. Covered Court With Roofing 18 M. X 19.5 M. Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 180 C.d. 2.18 Contract I.d. No. : 25ed0068 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Complete Construction Of 8.00 M. X 10.00 M., 2-storey Multi – Purpose Building, With Painting Works, With Steel Door, Ladder (fire Exit), Ramp With Stainless Railings, Plumbing And Electrical Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20 – December 10, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0051 Php 25,000.00 25ed0052 Php 25,000.00 25ed0053 Php 25,000.00 25ed0054 Php 5,000.00 25ed0055 Php 25,000.00 25ed0056 Php 5,000.00 25ed0057 Php 10,000.00 25ed0058 Php 5,000.00 25ed0059 Php 25,000.00 25ed0060 Php 5,000.00 25ed0061 Php 5,000.00 25ed0062 Php 5,000.00 25ed0063 Php 5,000.00 25ed0064 Php 5,000.00 25ed0065 Php 5,000.00 25ed0066 Php 5,000.00 25ed0067 Php 5,000.00 25ed0068 Php 5,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided Thast Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On November 27, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before December 10, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On December 10, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Mercedes G. Aspi Bac Vice Chairperson
Closing Date10 Dec 2024
Tender AmountPHP 4.9 Million (USD 83.9 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) November 20, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0051 – Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 2. 25ed0052 – Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 3. 25ed0053 – Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro 4. 25ed0054 – Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro 5. 25ed0055 – Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro 6. 25ed0056 – Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro 7. 25ed0057 – Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro 8. 25ed0058 – Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro 9. 25ed0059 – Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro 10. 25ed0060 – Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro 11. 25ed0061 – Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro 12. 25ed0062 – Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro 13. 25ed0063 – Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro 14. 25ed0064 – Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro 15. 25ed0065 – Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro 16. 25ed0066 – Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro 17. 25ed0067 – Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro 18. 25ed0068 – Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0051 Php 49,000,000.00 25ed0052 Php 49,000,000.00 25ed0053 Php 49,000,000.00 25ed0054 Php 4,950,000.00 25ed0055 Php 19,600,000.00 25ed0056 Php 1,980,000.00 25ed0057 Php 5,940,000.00 25ed0058 Php 4,950,000.00 25ed0059 Php 49,000,000.00 25ed0060 Php 4,950,000.00 25ed0061 Php 4,950,000.00 25ed0062 Php 4,950,000.00 25ed0063 Php 4,950,000.00 25ed0064 Php 4,950,000.00 25ed0065 Php 4,950,000.00 25ed0066 Php 4,950,000.00 25ed0067 Php 1,980,000.00 25ed0068 Php 4,950,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0051 Name Of Contract : Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 262 L.m. Seawall With Concrete Sheet Pile, 262 L.m. Portland Cement Concrete Pavement, And 10 M. Bridge. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 333 C.d. 2.2 Contract I.d. No. : 25ed0052 Name Of Contract : Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 338 L.m. Seawall With Concrete Sheet Pile, 338 L.m. Portland Cement Concrete Pavement, And Hexapod Spurdike. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.3 Contract I.d. No. : 25ed0053 Name Of Contract : Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 986.00 L.m. 4 Layer Of Gabion Revetment. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.4 Contract I.d. No. : 25ed0054 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Complete Construction Of 10.00 M. X 12.00 M., 1-storey Multi – Purpose Building, With Painting Works, With Stainless Railing, Steel Paint, Grills, Drop Ceiling, Plumbing, Electrical & Carpentry Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.5 Contract I.d. No. : 25ed0055 Name Of Contract : Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 77.90 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 19,600,000.00 Contract Duration : 216 C.d. 2.6 Contract I.d. No. : 25ed0056 Name Of Contract : Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : Completion Of 20.00 M. X 30.00 M. Covered Court With 3 Steps Of Bleachers (43.10 Ln.m.) With Roofing With Repainting Of Steel Trusses And Purlins, And Painting Works Of Stage With Replacement And Additional Of Lighting Fixture Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 90 C.d. 2.7 Contract I.d. No. : 25ed0057 Name Of Contract : Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 20.00 M., 1-storey Multi – Purpose Building (post Harvest Facility) Without Embankment, Slab On Fill, Paintings And Electrical Works. Approved Budget For The Contract : Php 5,940,000.00 Contract Duration : 150 C.d. 2.8 Contract I.d. No. : 25ed0058 Name Of Contract : Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Construction Of Road: Width = 5.0 M.; Thickness = 0.20 M.; Length = 373.50 M.; Aggregate Subbase Course Thickness = 0.20 M.; Shoulder Width = 1.00 M. 2. Construction Of Slope Protection: A. Sta. 00+034.00 – Sta. 00+090.00; Length = 56.00 M. (both Side) B. Sta. 00+320.00 – Sta. 00+400.00; Length = 80.00 M. (left Side) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.9 Contract I.d. No. : 25ed0059 Name Of Contract : Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Construction Of 205.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.10 Contract I.d. No. : 25ed0060 Name Of Contract : Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 464.00 M. With Proposed Streetlight, Edge Protection And Rcpc At Selected Section And No Shoulder On Both Sides. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.11 Contract I.d. No. : 25ed0061 Name Of Contract : Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Concreting Of 511.00 L.m. Of Road (width = 5.00 M., 0.20 M. Thk. Pccp) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.12 Contract I.d. No. : 25ed0062 Name Of Contract : Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : 1. Concreting Of 473.00 L.m. Of Road (width = 4.00 M., 0.20 M Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 0.50 M. Asbc Shoulder And Slope Protection. 2. Remove And Replace Existing Rcpc. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.13 Contract I.d. No. : 25ed0063 Name Of Contract : Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 583.00 M. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.14 Contract I.d. No. : 25ed0064 Name Of Contract : Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk=0.20 M.) With Total Length Of 482.00 M. With 0.50 M. Gravel Shoulder On Both Sides At Selected Road Section And With Proposed Rcpc, Slope Protection And Edge Protection At Selected Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.15 Contract I.d. No. : 25ed0065 Name Of Contract : Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 4 M. Width Road (thk = 0.20 M.) With Total Length Of 47.80 L.m. 2. Construction Of 660.20 M. Concrete Open Line Canal With Steel Grating Cover At Intermittent Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.16 Contract I.d. No. : 25ed0066 Name Of Contract : Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Construction Of Drainage With 600 Mm. Diameter Rcpc With Curb And Gutter. 2. Construction Of Drainage With Bar Grates. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.17 Contract I.d. No. : 25ed0067 Name Of Contract : Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 27.00 M. Covered Court With Roofing 18 M. X 19.5 M. Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 180 C.d. 2.18 Contract I.d. No. : 25ed0068 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Complete Construction Of 8.00 M. X 10.00 M., 2-storey Multi – Purpose Building, With Painting Works, With Steel Door, Ladder (fire Exit), Ramp With Stainless Railings, Plumbing And Electrical Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20 – December 10, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0051 Php 25,000.00 25ed0052 Php 25,000.00 25ed0053 Php 25,000.00 25ed0054 Php 5,000.00 25ed0055 Php 25,000.00 25ed0056 Php 5,000.00 25ed0057 Php 10,000.00 25ed0058 Php 5,000.00 25ed0059 Php 25,000.00 25ed0060 Php 5,000.00 25ed0061 Php 5,000.00 25ed0062 Php 5,000.00 25ed0063 Php 5,000.00 25ed0064 Php 5,000.00 25ed0065 Php 5,000.00 25ed0066 Php 5,000.00 25ed0067 Php 5,000.00 25ed0068 Php 5,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided Thast Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On November 27, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before December 10, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On December 10, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Mercedes G. Aspi Bac Vice Chairperson
Closing Date10 Dec 2024
Tender AmountPHP 4.9 Million (USD 83.9 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Road Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) October 22, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0001 – Construction Of Concrete Road, So. Star Apple, Poblacion, Baco, Oriental Mindoro 2. 25ed0002 - Construction Of Concrete Road, Barangay Malabo, Victoria, Oriental Mindoro 3. 25ed0003 - Construction Of Concrete Road, San Agustin 2, Naujan, Oriental Mindoro 4. 25ed0004 - Construction Of Drainage, Sitio Crossing, Brgy. Calsapa, San Teodoro, Oriental Mindoro 5. 25ed0005 – Construction Of Pedestrian Overpass At Calapan South Rd – K0006+000, Calapan City, Oriental Mindoro 6. 25ed0006 - Construction Of Tawiran – Guinobatan Bypass Road, Calapan City, Oriental Mindoro 7. 25ed0007 - Construction Of Bucayao – Panggalaan River Control At Barangay Buhuan, Calapan City, Oriental Mindoro 8. 25ed0008 - Construction Of Road (phase Iii) Sitio Olivo, Mabuhay I, Socorro, Oriental Mindoro 9. 25ed0009 - Construction Of Road, Barangay Mayabig, Baco, Oriental Mindoro 10. 25ed0010 - Construction Of Road, Sitio Buhuan, Barangay Comunal, Calapan City, Oriental Mindoro 11. 25ed0011 - Construction Of Road, Sitio Goldenville, Barangay San Rafael, Calapan City, Oriental Mindoro 12. 25ed0012 - Construction Of Road, Sitio Pandayan, Barangay Santa Rita, Calapan City, Oriental Mindoro 13. 25ed0013 - Construction Of Multi – Purpose Building (covered Court), Community Vocational High School, Barangay Masipit, Calapan City, Oriental Mindoro 14. 25ed0014 - Construction Of Multi – Purpose Building, Zone 4, Socorro, Oriental Mindoro 15. 25ed0015 - Construction Of Road Dike, Barangay Bagong Buhay, Naujan, Oriental Mindoro 16. 25ed0016 - Construction Of Flood Control Structure, Sitio Caguisikan, Barangay Gutad, Calapan City, Oriental Mindoro 17. 25ed0017 - Construction Of Seawall Structure, Sitio Proper, Barangay Navotas, Calapan City, Oriental Mindoro 18. 25ed0018 - Construction Of Seawall Structure, Barangay Pachoca, Calapan City, Oriental Mindoro 19. 25ed0019 - Construction Of Flood Control Structure, Barangay Managpi, Calapan City, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0001 Php 4,900,000.00 25ed0002 Php 4,900,000.00 25ed0003 Php 9,800,000.00 25ed0004 Php 4,900,000.00 25ed0005 Php 24,500,000.00 25ed0006 Php 68,600,000.00 25ed0007 Php 49,000,000.00 25ed0008 Php 4,900,000.00 25ed0009 Php 4,900,000.00 25ed0010 Php 4,900,000.00 25ed0011 Php 4,900,000.00 25ed0012 Php 4,950,000.00 25ed0013 Php 4,950,000.00 25ed0014 Php 4,950,000.00 25ed0015 Php 98,000,000.00 25ed0016 Php 99,646,400.00 25ed0017 Php 68,600,000.00 25ed0018 Php 29,400,000.00 25ed0019 Php 99,000,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0001 Name Of Contract : Construction Of Concrete Road, So. Star Apple, Poblacion, Baco, Oriental Mindoro Location : Baco, Oriental Mindoro Scope Of Works : 1. Concreting Of 479.90 L.m. Road (width=5.00 M. 0.20 M. Thk. Pccp, 0.20 Thk. Aggregate Subbase Course) With 1.00 M. Asbc Shoulder At Sta. 0+000.00 – Sta. 0+069.00 And 0.50 M. Asbc Shoulder At Sta. 0+153.10 – Sta. 0+564.00 And Construction Of Slope Protection. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.2 Contract I.d. No. : 25ed0002 Name Of Contract : Construction Of Concrete Road, Barangay Malabo, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Remove Pccp Width Of 4.0 M. & Replace Pccp Width Of 5.0m.; Thickness=0.20 M. Aggregate Subbase Course Thickness = 0.20 M. Length Road I = 440.00 M. Length Road Ii = 96.00 M. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 88 C.d. 2.3 Contract I.d. No. : 25ed0003 Name Of Contract : Construction Of Concrete Road, San Agustin 2, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thickness = 0.20 M., Aggregate Subbase Course Thickness = 0.20), With 1 M. Gravel Shoulder Both Sides; With Total Length Of 715.50 M.; With Stone Masonry Slope Protection At Intermittent Section. 2. Concreting Of 5 M. Width Road (thickness = 0.20 M., Aggregate Subbase Course Thickness = 0.20) Without Shoulder With Total Length Of 223.50 M. Approved Budget For The Contract : Php 9,800,000.00 Contract Duration : 131 C.d. 2.4 Contract I.d. No. : 25ed0004 Name Of Contract : Construction Of Drainage, Sitio Crossing, Brgy. Calsapa, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : Construction Of Drainage: Total Length = 284.50 L.m. Canal I: Closed Canal Depth = 1.50 M. Length = 140.00 Width = 3.0 M. Canal Ii: Open Canal R/s Depth = 1.40 M. Length = 144.50 Width = 0.70 M. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 151 C.d. 2.5 Contract I.d. No. : 25ed0005 Name Of Contract : Construction Of Pedestrian Overpass At Calapan South Rd – K0006+000, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 18.8 M. Footbridge, 2 Units Of 3.00 M. X 1.09 M. Box Culvert With Lengths Of 26 L.m. And 27 L.m. Approved Budget For The Contract : Php 24,500,000.00 Contract Duration : 250 C.d. 2.6 Contract I.d. No. : 25ed0006 Name Of Contract : Construction Of Tawiran – Guinobatan Bypass Road, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 1,166.50 L.m. Of Road (width = 13.4 M., 0.30m. Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With Gravel Shoulder On B/s W = Varies 2. Construction Of 64.00 L.m. Of Slope Protection On B/s. 3. Construction Of 18.00 L.m. Rcdg Bridge. Approved Budget For The Contract : Php 68,600,000.00 Contract Duration : 360 C.d. 2.7 Contract I.d. No. : 25ed0007 Name Of Contract : Construction Of Bucayao – Panggalaan River Control At Barangay Buhuan, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 120.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.8 Contract I.d. No. : 25ed0008 Name Of Contract : Construction Of Road (phase Iii) Sitio Olivo, Mabuhay I, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 361.00 M. With Slope Protection At Intermittent Section. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.9 Contract I.d. No. : 25ed0009 Name Of Contract : Construction Of Road, Barangay Mayabig, Baco, Oriental Mindoro Location : Baco, Oriental Mindoro Scope Of Works : 1. Concreting Of 366.00 L.m. Of Road (width = 5.0 M., 0.20 Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 1.00 M. Asbc Shoulder And Construction Of Slope Protection. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.10 Contract I.d. No. : 25ed0010 Name Of Contract : Construction Of Road, Sitio Buhuan, Barangay Comunal, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 330.00 M. 2. Construction Of Slope Protection – 282.80 L.m. On L.s. And 322.80 L.m. On R.s. 3. Installation Of 6.00 L.m. Rcpc, Diameter = 0.60 M., With Headwall. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 70 C.d. 2.11 Contract I.d. No. : 25ed0011 Name Of Contract : Construction Of Road, Sitio Goldenville, Barangay San Rafael, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5.00 M. Width Road (thk = 0.23 M.) With Total Length Of 446 M. With 1.00 M. Width Shoulder Of Aggregate Subbase Course 0.20 M. Thick. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 74 C.d. 2.12 Contract I.d. No. : 25ed0012 Name Of Contract : Construction Of Road, Sitio Pandayan, Barangay Santa Rita, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Construction Of Road: Width = 5.0 M.; Thickness = 0.20 M.; Length = 405.50 M. Aggregate Subbase Course Thickness = 0.20 M. 2. Road I: Construction Of Rcpc 0.60 M. Diameter @ Sta. 00+272.00 And With Slope Protection On R/s, Length = 338.00 M. 3. Edge Protection: Road I: Length = 338.00 M. (left Side); Road Ii: Length = 67.50 M. (both Sides) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.13 Contract I.d. No. : 25ed0013 Name Of Contract : Construction Of Multi – Purpose Building (covered Court), Community Vocational High School, Barangay Masipit, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 13.00 M. X 27.00 M. Covered Court With 9.00 M. X 7.00 M. Stage With Cr, Ceiling Works, Tile Works, Plumbing And Electrical Works With Flashing, Gutter, Catch Basin, Painting Works Of Steel And Masonry, Electrical Works With 60 Ln.m. Of Trench Drain Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.14 Contract I.d. No. : 25ed0014 Name Of Contract : Construction Of Multi – Purpose Building, Zone 4, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 27.00 M. Covered Court With Sidings Enclosure Of Court, With Stage (9.0 M. X 5.0 M.) 2 Steps Of Bleachers (27.00 Lm), Painting Works And Plumbing Works, Electrical Works Embankment 0.40 M. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.15 Contract I.d. No. : 25ed0015 Name Of Contract : Construction Of Road Dike, Barangay Bagong Buhay, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Construction Of 138.40 L.m. Road Dike With Geotube Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 98,000,000.00 Contract Duration : 333 C.d. 2.16 Contract I.d. No. : 25ed0016 Name Of Contract : Construction Of Flood Control Structure, Sitio Caguisikan, Barangay Gutad, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 362.40 L.m. Concrete Revetment Resting On Concrete Pile Cap With 9 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 99,646,400.00 Contract Duration : 333 C.d. 2.17 Contract I.d. No. : 25ed0017 Name Of Contract : Construction Of Seawall Structure, Sitio Proper, Barangay Navotas, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 541.60 L.m. Of Seawall Structure Resting On Concrete Pile Cap With 3 M. Steel Sheet Piles U-type Iii Approved Budget For The Contract : Php 68,600,000.00 Contract Duration : 314 C.d. 2.18 Contract I.d. No. : 25ed0018 Name Of Contract : Construction Of Seawall Structure, Barangay Pachoca, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 111.20 L.m. Concrete Revetment Resting On Concrete Pile Cap With 9 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 29,400,000.00 Contract Duration : 226 C.d. 2.19 Contract I.d. No. : 25ed0019 Name Of Contract : Construction Of Flood Control Structure, Barangay Managpi, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 278.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 99,000,000.00 Contract Duration : 333 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 22 – November 12, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0001 Php 5,000.00 25ed0002 Php 5,000.00 25ed0003 Php 10,000.00 25ed0004 Php 5,000.00 25ed0005 Php 25,000.00 25ed0006 Php 50,000.00 25ed0007 Php 25,000.00 25ed0008 Php 5,000.00 25ed0009 Php 5,000.00 25ed0010 Php 5,000.00 25ed0011 Php 5,000.00 25ed0012 Php 5,000.00 25ed0013 Php 5,000.00 25ed0014 Php 5,000.00 25ed0015 Php 50,000.00 25ed0016 Php 50,000.00 25ed0017 Php 50,000.00 25ed0018 Php 25,000.00 25ed0019 Php 50,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On October 29, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before November 12, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On November 12, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Albien M. Mahia Bac Chairperson
Closing Date27 Dec 2024
Tender AmountPHP 68.6 Million (USD 1.1 Million)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) November 20, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0051 – Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 2. 25ed0052 – Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro 3. 25ed0053 – Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro 4. 25ed0054 – Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro 5. 25ed0055 – Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro 6. 25ed0056 – Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro 7. 25ed0057 – Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro 8. 25ed0058 – Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro 9. 25ed0059 – Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro 10. 25ed0060 – Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro 11. 25ed0061 – Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro 12. 25ed0062 – Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro 13. 25ed0063 – Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro 14. 25ed0064 – Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro 15. 25ed0065 – Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro 16. 25ed0066 – Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro 17. 25ed0067 – Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro 18. 25ed0068 – Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0051 Php 49,000,000.00 25ed0052 Php 49,000,000.00 25ed0053 Php 49,000,000.00 25ed0054 Php 4,950,000.00 25ed0055 Php 19,600,000.00 25ed0056 Php 1,980,000.00 25ed0057 Php 5,940,000.00 25ed0058 Php 4,950,000.00 25ed0059 Php 49,000,000.00 25ed0060 Php 4,950,000.00 25ed0061 Php 4,950,000.00 25ed0062 Php 4,950,000.00 25ed0063 Php 4,950,000.00 25ed0064 Php 4,950,000.00 25ed0065 Php 4,950,000.00 25ed0066 Php 4,950,000.00 25ed0067 Php 1,980,000.00 25ed0068 Php 4,950,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0051 Name Of Contract : Construction Of Seawall, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 262 L.m. Seawall With Concrete Sheet Pile, 262 L.m. Portland Cement Concrete Pavement, And 10 M. Bridge. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 333 C.d. 2.2 Contract I.d. No. : 25ed0052 Name Of Contract : Construction Of Seawall, Phase Ii, Brgy. Poblacion, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 338 L.m. Seawall With Concrete Sheet Pile, 338 L.m. Portland Cement Concrete Pavement, And Hexapod Spurdike. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.3 Contract I.d. No. : 25ed0053 Name Of Contract : Construction Of Flood Control, Phase 2, Brgy. Tabinay, Puerto Galera, Oriental Mindoro Location : Puerto Galera, Oriental Mindoro Scope Of Works : Construction Of 986.00 L.m. 4 Layer Of Gabion Revetment. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.4 Contract I.d. No. : 25ed0054 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Bacawan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Complete Construction Of 10.00 M. X 12.00 M., 1-storey Multi – Purpose Building, With Painting Works, With Stainless Railing, Steel Paint, Grills, Drop Ceiling, Plumbing, Electrical & Carpentry Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.5 Contract I.d. No. : 25ed0055 Name Of Contract : Construction Of River Control Structure, Bucayao River, Managpi Section, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 77.90 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 19,600,000.00 Contract Duration : 216 C.d. 2.6 Contract I.d. No. : 25ed0056 Name Of Contract : Construction (completion) Of Multi – Purpose Building, Barangay Lumangbayan, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : Completion Of 20.00 M. X 30.00 M. Covered Court With 3 Steps Of Bleachers (43.10 Ln.m.) With Roofing With Repainting Of Steel Trusses And Purlins, And Painting Works Of Stage With Replacement And Additional Of Lighting Fixture Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 90 C.d. 2.7 Contract I.d. No. : 25ed0057 Name Of Contract : Construction/completion Of Multi – Purpose Building (post Harvest Facility), Victoria Business Hub, Barangay Babangonan, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 20.00 M., 1-storey Multi – Purpose Building (post Harvest Facility) Without Embankment, Slab On Fill, Paintings And Electrical Works. Approved Budget For The Contract : Php 5,940,000.00 Contract Duration : 150 C.d. 2.8 Contract I.d. No. : 25ed0058 Name Of Contract : Construction Of Road, Barangay Mabuhay Ii, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Construction Of Road: Width = 5.0 M.; Thickness = 0.20 M.; Length = 373.50 M.; Aggregate Subbase Course Thickness = 0.20 M.; Shoulder Width = 1.00 M. 2. Construction Of Slope Protection: A. Sta. 00+034.00 – Sta. 00+090.00; Length = 56.00 M. (both Side) B. Sta. 00+320.00 – Sta. 00+400.00; Length = 80.00 M. (left Side) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.9 Contract I.d. No. : 25ed0059 Name Of Contract : Construction Of River Protection Dike, Sitio Mapalad Maluanluan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : Construction Of 205.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Hot Rolled Z-type Fy50 (mhz13-820) Steel Sheet Piles. Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.10 Contract I.d. No. : 25ed0060 Name Of Contract : Construction Of Road, Sitio Centro, Barangay Guinobatan, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 464.00 M. With Proposed Streetlight, Edge Protection And Rcpc At Selected Section And No Shoulder On Both Sides. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.11 Contract I.d. No. : 25ed0061 Name Of Contract : Construction Of Road, Sitio Ibaba, Barangay Pinagsabangan 1, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Concreting Of 511.00 L.m. Of Road (width = 5.00 M., 0.20 M. Thk. Pccp) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.12 Contract I.d. No. : 25ed0062 Name Of Contract : Construction Of Road, Sitio Catmon, Barangay Casiligan, Pola, Oriental Mindoro Location : Pola, Oriental Mindoro Scope Of Works : 1. Concreting Of 473.00 L.m. Of Road (width = 4.00 M., 0.20 M Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 0.50 M. Asbc Shoulder And Slope Protection. 2. Remove And Replace Existing Rcpc. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.13 Contract I.d. No. : 25ed0063 Name Of Contract : Construction Of Road, Sitio Bagong Pag-asa, Barangay Pakyas, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 583.00 M. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.14 Contract I.d. No. : 25ed0064 Name Of Contract : Construction Of Road, Sitio Zone 7, Barangay San Gelacio, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk=0.20 M.) With Total Length Of 482.00 M. With 0.50 M. Gravel Shoulder On Both Sides At Selected Road Section And With Proposed Rcpc, Slope Protection And Edge Protection At Selected Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.15 Contract I.d. No. : 25ed0065 Name Of Contract : Construction Of Drainage Structure, Sitio 3 And 5, Barangay Bucayao, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 4 M. Width Road (thk = 0.20 M.) With Total Length Of 47.80 L.m. 2. Construction Of 660.20 M. Concrete Open Line Canal With Steel Grating Cover At Intermittent Section. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.16 Contract I.d. No. : 25ed0066 Name Of Contract : Rehabilitation Of Drainage Structure, Barangay San Vicente South, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Construction Of Drainage With 600 Mm. Diameter Rcpc With Curb And Gutter. 2. Construction Of Drainage With Bar Grates. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 147 C.d. 2.17 Contract I.d. No. : 25ed0067 Name Of Contract : Construction (completion) Of Multi – Purpose Building (covered Court), Zone – 1, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 27.00 M. Covered Court With Roofing 18 M. X 19.5 M. Approved Budget For The Contract : Php 1,980,000.00 Contract Duration : 180 C.d. 2.18 Contract I.d. No. : 25ed0068 Name Of Contract : Construction Of Multi – Purpose Building, Barangay Sampaguita, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Complete Construction Of 8.00 M. X 10.00 M., 2-storey Multi – Purpose Building, With Painting Works, With Steel Door, Ladder (fire Exit), Ramp With Stainless Railings, Plumbing And Electrical Works. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20 – December 10, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0051 Php 25,000.00 25ed0052 Php 25,000.00 25ed0053 Php 25,000.00 25ed0054 Php 5,000.00 25ed0055 Php 25,000.00 25ed0056 Php 5,000.00 25ed0057 Php 10,000.00 25ed0058 Php 5,000.00 25ed0059 Php 25,000.00 25ed0060 Php 5,000.00 25ed0061 Php 5,000.00 25ed0062 Php 5,000.00 25ed0063 Php 5,000.00 25ed0064 Php 5,000.00 25ed0065 Php 5,000.00 25ed0066 Php 5,000.00 25ed0067 Php 5,000.00 25ed0068 Php 5,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided Thast Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On November 27, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before December 10, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On December 10, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Mercedes G. Aspi Bac Vice Chairperson
Closing Date10 Dec 2024
Tender AmountPHP 4.9 Million (USD 83.9 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Road Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) October 22, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0001 – Construction Of Concrete Road, So. Star Apple, Poblacion, Baco, Oriental Mindoro 2. 25ed0002 - Construction Of Concrete Road, Barangay Malabo, Victoria, Oriental Mindoro 3. 25ed0003 - Construction Of Concrete Road, San Agustin 2, Naujan, Oriental Mindoro 4. 25ed0004 - Construction Of Drainage, Sitio Crossing, Brgy. Calsapa, San Teodoro, Oriental Mindoro 5. 25ed0005 – Construction Of Pedestrian Overpass At Calapan South Rd – K0006+000, Calapan City, Oriental Mindoro 6. 25ed0006 - Construction Of Tawiran – Guinobatan Bypass Road, Calapan City, Oriental Mindoro 7. 25ed0007 - Construction Of Bucayao – Panggalaan River Control At Barangay Buhuan, Calapan City, Oriental Mindoro 8. 25ed0008 - Construction Of Road (phase Iii) Sitio Olivo, Mabuhay I, Socorro, Oriental Mindoro 9. 25ed0009 - Construction Of Road, Barangay Mayabig, Baco, Oriental Mindoro 10. 25ed0010 - Construction Of Road, Sitio Buhuan, Barangay Comunal, Calapan City, Oriental Mindoro 11. 25ed0011 - Construction Of Road, Sitio Goldenville, Barangay San Rafael, Calapan City, Oriental Mindoro 12. 25ed0012 - Construction Of Road, Sitio Pandayan, Barangay Santa Rita, Calapan City, Oriental Mindoro 13. 25ed0013 - Construction Of Multi – Purpose Building (covered Court), Community Vocational High School, Barangay Masipit, Calapan City, Oriental Mindoro 14. 25ed0014 - Construction Of Multi – Purpose Building, Zone 4, Socorro, Oriental Mindoro 15. 25ed0015 - Construction Of Road Dike, Barangay Bagong Buhay, Naujan, Oriental Mindoro 16. 25ed0016 - Construction Of Flood Control Structure, Sitio Caguisikan, Barangay Gutad, Calapan City, Oriental Mindoro 17. 25ed0017 - Construction Of Seawall Structure, Sitio Proper, Barangay Navotas, Calapan City, Oriental Mindoro 18. 25ed0018 - Construction Of Seawall Structure, Barangay Pachoca, Calapan City, Oriental Mindoro 19. 25ed0019 - Construction Of Flood Control Structure, Barangay Managpi, Calapan City, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0001 Php 4,900,000.00 25ed0002 Php 4,900,000.00 25ed0003 Php 9,800,000.00 25ed0004 Php 4,900,000.00 25ed0005 Php 24,500,000.00 25ed0006 Php 68,600,000.00 25ed0007 Php 49,000,000.00 25ed0008 Php 4,900,000.00 25ed0009 Php 4,900,000.00 25ed0010 Php 4,900,000.00 25ed0011 Php 4,900,000.00 25ed0012 Php 4,950,000.00 25ed0013 Php 4,950,000.00 25ed0014 Php 4,950,000.00 25ed0015 Php 98,000,000.00 25ed0016 Php 99,646,400.00 25ed0017 Php 68,600,000.00 25ed0018 Php 29,400,000.00 25ed0019 Php 99,000,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0001 Name Of Contract : Construction Of Concrete Road, So. Star Apple, Poblacion, Baco, Oriental Mindoro Location : Baco, Oriental Mindoro Scope Of Works : 1. Concreting Of 479.90 L.m. Road (width=5.00 M. 0.20 M. Thk. Pccp, 0.20 Thk. Aggregate Subbase Course) With 1.00 M. Asbc Shoulder At Sta. 0+000.00 – Sta. 0+069.00 And 0.50 M. Asbc Shoulder At Sta. 0+153.10 – Sta. 0+564.00 And Construction Of Slope Protection. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.2 Contract I.d. No. : 25ed0002 Name Of Contract : Construction Of Concrete Road, Barangay Malabo, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Remove Pccp Width Of 4.0 M. & Replace Pccp Width Of 5.0m.; Thickness=0.20 M. Aggregate Subbase Course Thickness = 0.20 M. Length Road I = 440.00 M. Length Road Ii = 96.00 M. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 88 C.d. 2.3 Contract I.d. No. : 25ed0003 Name Of Contract : Construction Of Concrete Road, San Agustin 2, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thickness = 0.20 M., Aggregate Subbase Course Thickness = 0.20), With 1 M. Gravel Shoulder Both Sides; With Total Length Of 715.50 M.; With Stone Masonry Slope Protection At Intermittent Section. 2. Concreting Of 5 M. Width Road (thickness = 0.20 M., Aggregate Subbase Course Thickness = 0.20) Without Shoulder With Total Length Of 223.50 M. Approved Budget For The Contract : Php 9,800,000.00 Contract Duration : 131 C.d. 2.4 Contract I.d. No. : 25ed0004 Name Of Contract : Construction Of Drainage, Sitio Crossing, Brgy. Calsapa, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : Construction Of Drainage: Total Length = 284.50 L.m. Canal I: Closed Canal Depth = 1.50 M. Length = 140.00 Width = 3.0 M. Canal Ii: Open Canal R/s Depth = 1.40 M. Length = 144.50 Width = 0.70 M. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 151 C.d. 2.5 Contract I.d. No. : 25ed0005 Name Of Contract : Construction Of Pedestrian Overpass At Calapan South Rd – K0006+000, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 18.8 M. Footbridge, 2 Units Of 3.00 M. X 1.09 M. Box Culvert With Lengths Of 26 L.m. And 27 L.m. Approved Budget For The Contract : Php 24,500,000.00 Contract Duration : 250 C.d. 2.6 Contract I.d. No. : 25ed0006 Name Of Contract : Construction Of Tawiran – Guinobatan Bypass Road, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 1,166.50 L.m. Of Road (width = 13.4 M., 0.30m. Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With Gravel Shoulder On B/s W = Varies 2. Construction Of 64.00 L.m. Of Slope Protection On B/s. 3. Construction Of 18.00 L.m. Rcdg Bridge. Approved Budget For The Contract : Php 68,600,000.00 Contract Duration : 360 C.d. 2.7 Contract I.d. No. : 25ed0007 Name Of Contract : Construction Of Bucayao – Panggalaan River Control At Barangay Buhuan, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 120.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.8 Contract I.d. No. : 25ed0008 Name Of Contract : Construction Of Road (phase Iii) Sitio Olivo, Mabuhay I, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 361.00 M. With Slope Protection At Intermittent Section. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.9 Contract I.d. No. : 25ed0009 Name Of Contract : Construction Of Road, Barangay Mayabig, Baco, Oriental Mindoro Location : Baco, Oriental Mindoro Scope Of Works : 1. Concreting Of 366.00 L.m. Of Road (width = 5.0 M., 0.20 Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 1.00 M. Asbc Shoulder And Construction Of Slope Protection. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.10 Contract I.d. No. : 25ed0010 Name Of Contract : Construction Of Road, Sitio Buhuan, Barangay Comunal, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 330.00 M. 2. Construction Of Slope Protection – 282.80 L.m. On L.s. And 322.80 L.m. On R.s. 3. Installation Of 6.00 L.m. Rcpc, Diameter = 0.60 M., With Headwall. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 70 C.d. 2.11 Contract I.d. No. : 25ed0011 Name Of Contract : Construction Of Road, Sitio Goldenville, Barangay San Rafael, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 5.00 M. Width Road (thk = 0.23 M.) With Total Length Of 446 M. With 1.00 M. Width Shoulder Of Aggregate Subbase Course 0.20 M. Thick. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 74 C.d. 2.12 Contract I.d. No. : 25ed0012 Name Of Contract : Construction Of Road, Sitio Pandayan, Barangay Santa Rita, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Construction Of Road: Width = 5.0 M.; Thickness = 0.20 M.; Length = 405.50 M. Aggregate Subbase Course Thickness = 0.20 M. 2. Road I: Construction Of Rcpc 0.60 M. Diameter @ Sta. 00+272.00 And With Slope Protection On R/s, Length = 338.00 M. 3. Edge Protection: Road I: Length = 338.00 M. (left Side); Road Ii: Length = 67.50 M. (both Sides) Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 69 C.d. 2.13 Contract I.d. No. : 25ed0013 Name Of Contract : Construction Of Multi – Purpose Building (covered Court), Community Vocational High School, Barangay Masipit, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 13.00 M. X 27.00 M. Covered Court With 9.00 M. X 7.00 M. Stage With Cr, Ceiling Works, Tile Works, Plumbing And Electrical Works With Flashing, Gutter, Catch Basin, Painting Works Of Steel And Masonry, Electrical Works With 60 Ln.m. Of Trench Drain Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.14 Contract I.d. No. : 25ed0014 Name Of Contract : Construction Of Multi – Purpose Building, Zone 4, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : Construction Of 15.00 M. X 27.00 M. Covered Court With Sidings Enclosure Of Court, With Stage (9.0 M. X 5.0 M.) 2 Steps Of Bleachers (27.00 Lm), Painting Works And Plumbing Works, Electrical Works Embankment 0.40 M. Approved Budget For The Contract : Php 4,950,000.00 Contract Duration : 180 C.d. 2.15 Contract I.d. No. : 25ed0015 Name Of Contract : Construction Of Road Dike, Barangay Bagong Buhay, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Construction Of 138.40 L.m. Road Dike With Geotube Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 98,000,000.00 Contract Duration : 333 C.d. 2.16 Contract I.d. No. : 25ed0016 Name Of Contract : Construction Of Flood Control Structure, Sitio Caguisikan, Barangay Gutad, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 362.40 L.m. Concrete Revetment Resting On Concrete Pile Cap With 9 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 99,646,400.00 Contract Duration : 333 C.d. 2.17 Contract I.d. No. : 25ed0017 Name Of Contract : Construction Of Seawall Structure, Sitio Proper, Barangay Navotas, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 541.60 L.m. Of Seawall Structure Resting On Concrete Pile Cap With 3 M. Steel Sheet Piles U-type Iii Approved Budget For The Contract : Php 68,600,000.00 Contract Duration : 314 C.d. 2.18 Contract I.d. No. : 25ed0018 Name Of Contract : Construction Of Seawall Structure, Barangay Pachoca, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 111.20 L.m. Concrete Revetment Resting On Concrete Pile Cap With 9 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 29,400,000.00 Contract Duration : 226 C.d. 2.19 Contract I.d. No. : 25ed0019 Name Of Contract : Construction Of Flood Control Structure, Barangay Managpi, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 278.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 99,000,000.00 Contract Duration : 333 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 22 – November 12, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0001 Php 5,000.00 25ed0002 Php 5,000.00 25ed0003 Php 10,000.00 25ed0004 Php 5,000.00 25ed0005 Php 25,000.00 25ed0006 Php 50,000.00 25ed0007 Php 25,000.00 25ed0008 Php 5,000.00 25ed0009 Php 5,000.00 25ed0010 Php 5,000.00 25ed0011 Php 5,000.00 25ed0012 Php 5,000.00 25ed0013 Php 5,000.00 25ed0014 Php 5,000.00 25ed0015 Php 50,000.00 25ed0016 Php 50,000.00 25ed0017 Php 50,000.00 25ed0018 Php 25,000.00 25ed0019 Php 50,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On October 29, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before November 12, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On November 12, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Albien M. Mahia Bac Chairperson
Closing Date27 Dec 2024
Tender AmountPHP 4.9 Million (USD 83.9 K)

Department Of Social Welfare And Development Region Xii Tender

Food Products
Philippines
Details: Description Department Of Social Welfare And Development Field Office Xii Regional Center, Brgy. Carpenter Hills, Koronadal City, 9506 Philippine Bidding Documents For The Early Procurement Activity For The Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/municipalities Of Sultan Kudarat And Cotabato Province Project Identification No. Dswd12-sfp(epa)-2024-11-004lot2 Government Of The Republic Of The Philippines Sixth Edition July 2020 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..7 Section Ii. Instructions To Bidders…………………………………………...10 1. Scope Of Bid ………………………………………………………………………. 11 2. Funding Information………………………………………………………………. 11 3. Bidding Requirements ……………………………………………………………. 11 4. Corrupt, Fraudulent, Collusive, And Coercive Practices………………………….. 11 5. Eligible Bidders…………………………………………………………………… 11 6. Origin Of Goods ………………………………………………………………….. 12 7. Subcontracts ……………………………………………………………………… 12 8. Pre-bid Conference ………………………………………………………………. 12 9. Clarification And Amendment Of Bidding Documents …………………………… 13 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 13 11. Documents Comprising The Bid: Financial Component …………………………... 13 12. Bid Prices …………………………………………………………………………. 13 13. Bid And Payment Currencies ……………………………………………………… 14 14. Bid Security ………………………………………………………………………. 14 15. Sealing And Marking Of Bids ……………………………………………………… 15 16. Deadline For Submission Of Bids …………………………………………………. 15 17. Opening And Preliminary Examination Of Bids ………………………………….. 15 18. Domestic Preference ……………………………………………………………… 15 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 15 20. Post-qualification ………………………………………………………………… 16 21. Signing Of The Contract …………………………………………………………… 16 Section Iii. Bid Data Sheet …………………………………………………..17 Section Iv. General Conditions Of Contract ……………………...………..21 1. Scope Of Contract ………………………………………………………………… 22 2. Advance Payment And Terms Of Payment ……………………………………….. 22 3. Performance Security ……………………………………………………………. 22 4. Inspection And Tests ……………………………………………………………… 22 5. Warranty …………………………………………………………………………. 23 6. Liability Of The Supplier ………………………………………………………….. 23 Section V. Special Conditions Of Contract ………………………………….24 Section Vi. Schedule Of Requirements ……………………………………....27 Section Vii. Technical Specifications …………………………………………29 Section Viii. Checklist Of Technical And Financial Documents …………..32 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Invitation To Bid For The Dswd12-sfp(epa)-2024-11-004lot2 Early Procurement Activity For The Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/municipalities Of Sultan Kudarat And Cotabato Province 1. The Department Of Social Welfare And Development Field Office Xii, Through The Early Procurement Activities (epa) Of National Expenditure Plan (nep) For Fy 2025 Intends To Apply The Sum Of Four Million Five Hundred Eighty-nine Thousand And Eight Hundred Fifty-six Pesos Only (₱4,589,856.00) Being The Abc To Payments Under The Contract For Dswd12-sfp(epa)-2024-11-004lot2 Early Procurement Activity For The Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/municipalities Of Sultan Kudarat And Cotabato Province. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Social Welfare And Development Field Office Xii Now Invites Bids For The Above Procurement Project. Delivery Of The Goods/services Is Required To Be Delivered Within Six (6) Months Contract Duration Based On The Schedule Set By The End-user. Bidders Should Have Completed, Within One (1) Year From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Department Of Social Welfare And Development Field Office Xii – Bids And Awards Committee Secretariat Office And Inspect The Bidding Documents At The Address Given Below During Office Hours (8:00a.m. To 5:00 P.m.). 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 27, 2024 To December 16, 2024, 05:00 P.m. From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Approved Budget For The Contract Bid Docs Amount ₱4,589,856.00 Php 5,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Department Of Social Welfare And Development Field Office Xii Will Hold A Pre-bid Conference On December 03, 2024, 1:00 P.m. At Dswd Field Office 12, Regional Center, Brgy. Carpenter Hill, Koronadal City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below On Or Before December 17, 2024, 09:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening And Evaluation Shall Be On December 17, 2024, 1:00 P.m. At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Social Welfare And Development Field Office Xii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Dswd 12 – Bac Secretariat Head Administrative Division – Procurement Section Dswd Field Office 12, Regional Center, Brgy. Carpenter Hills, Koronadal City, 9506 Procurement.fo12@dswd.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://fo12.dswd.gov.ph/bid-bulletin/ Https://www.philgeps.gov.ph November 25, 2024 Jackiya A. Lao Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Department Of Social Welfare And Development Field Office Xii Wishes To Receive Bids For Early Procurement Activity For The Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/ Municipalities Of Sultan Kudarat And Cotabato Province With Identification Number Dswd12-sfp(epa)-2024-11-004lot2. The Procurement Project (referred To Herein As “project”) Is Composed Of One Lot Or Item, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Fy 2025 In The Amount Of Four Million Five Hundred Eighty-nine Thousand And Eight Hundred Fifty-six Pesos Only (₱4,589,856.00) 2.2. The Source Of Funding The General Appropriations Act. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On December 3, 2024, 1:00 P.m. And At Its Physical Address Department Of Social Welfare And Development Field Office 12, Regional Center, Brgy. Carpenter Hill, Koronadal City As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, On/or Before December 06, 2024 Or At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within One (1) Year Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In The Bds. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until April 17, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items, Which Shall Be Awarded As Separate Contracts Per Item. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Nutribun B. Completed Within At Least One (1) Year Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than ₱91,797.12 Or The Amount Equivalent To Two Percent (2%) Of Abc If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than ₱229,492.80 Or The Amount Equivalent To Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.1 1. All Forms Must Be Submitted Using The Prescribed Format Provided By The Procuring Entity And Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 2. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialled By The Duly Authorized Representative/s Of The Bidder, Otherwise, Bids Shall Be Subject To An Outright Disqualification. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Supplier Of The Notice Of Post Qualification From The Bac That The Supplier Has The Lowest Calculated Bid (lcb) Or Single Calculated Bid (scb), The Supplier Shall Submit And/or Present The Following Requirements For Post Qualification In Accordance To Section 34 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra9184: 1. Present Original Copy Of The Following: A. Latest Income Tax Return And Business Tax Return ( For 3rd Quarter Of 2024) B. Latest Value Added Tax (vat) Return ( For 3rd Quarter Of 2024, If Applicable) Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing & Payment System (efps) Shall Be Accepted. C. Valid Philgeps Registration Certificate (platinum Membership) (all Pages) D. Valid Registration Certificate From Securities And Exchange Commission (sec) For Corporations, Or From Department Of Trade And Industry (dti) For Sole Proprietorship, Or From Cooperative Development Authority (cda) For Cooperatives; E. Valid Business/mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Bidder Is Located; F. Valid Tax Clearance Per Eo 398, Series Of 2005, As Finally Reviewed And Approved By The Bir; G. Bureau Of Internal Revenue (bir) Registration Certificate. H. Copy Of Contracts Or Po’s, Notice Of Award (noa) And Notice To Proceed (ntp) For All On-going Contracts I. End-user’s Acceptance, Official Receipt (duplicate Or Triplicate Copy) Or Sales Invoice With Collection Receipt/s (duplicate Or Triplicate Copy) Relative To Single Largest Completed Contract J. Company Profile And Organizational Chart. Company Printed Brochure May Be Included. K. Vicinity Map/location Of The Business. L. Other Appropriate Licenses And Permits Required By Law And Stated In The Bidding Documents. Failure To Submit Any Of The Post-qualification Requirements On Time, Or A Finding Against The Veracity Thereof, Shall Disqualify The Bidder For Award. Provided In The Event That A Finding Against The Veracity Of Any Of The Documents Submitted Is Made, It Shall Cause The Forfeiture Of The Bid Security In Accordance With Section 69 Of The Irr Of Ra 9184. Note: For Post Qualification Purposes Only 20.3 Each Bidder Shall Submit The Following In One (1) “mother” Envelope Duly Sealed And Labeled, Containing Two (2) Sets Of Envelopes For Technical Component Envelope And Financial Component Envelope. Bidding Documents Shall Be Prepared With Proper Label And Tabbing For Easy Checking And Evaluation During Bid Opening. 20.4 All Envelopes Shall Be Labeled/marked As Follows: To : Jackiya A. Lao Chairperson Bids And Awards Committee Dswd-field Office 12 From :_______________________________ (name Of Bidder In Capital Letters) Address: _______________________________ (address Of Bidder In Capital Letters) Project: Early Procurement Activity For The Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/municipalities Of Sultan Kudarat And Cotabato Province Bid Ref No.: Itb No. Dswd12-sfp(epa)-2024-11-004lot2 Approved Budget For The Contract : ₱4,589,856.00 Do Not Open Before: 17 December 2024; 1:00 P.m. 21.2 No Further Instructions Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: Delivery Term: To Be Delivered Within Six (6) Months Contract Duration Based On The Schedule Set By The End-user Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – Not Applicable Packaging – Refer To The Technical Specifications The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. Transportation – Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 The Terms Of Payment Shall Be As Follows: Monthly Payment Based On Actual Delivery With Supporting Documents (delivery Receipts (dr), Inspection And Acceptance Report (iar), And Sales/charge Invoice Partial Payment Must Correspond To The Value Of Goods Delivered And Accepted After The Appropriate Inspection And Acceptance Procedures. Proof Of Deliveries (delivery Receipts Or Acknowledgement Receipts) Must Be Signed By An Authorized Person To Support Claims For Payment. 4 The Inspections And Tests That Will Be Conducted By The Lgu;c/mswdo/focal Person/sfp Staff, Dswd Inspection Committee, Final Acceptance By The Dswd Acceptance Committee, And End-user Section Vi. Schedule Of Requirements Dswd12-sfp(epa)-2024-11-004lot2 Early Procurement Activity For The Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/municipalities Of Sultan Kudarat And Cotabato Province The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/ Municipalities Of Sultan Kudarat And Cotabato Province: Delivery Of The Goods/services Is Required To Be Delivered Within Six (6) Months Contract Duration Based On The Schedule Set By The End-user 1 Enhanced Nutribun, Ready-to-eat Bread From Good Quality Flour In Two Or Three (3) Variants: (squash, Sweet Potato And / Or Carrot) With Natural Color And Flavor, Softer In Texture And Containing Vitamin A, Calcium, Iron, Zinc, Potassium And Iodine, Has Zero Trans Fat And No Cholesterol; 4 Days Shelf Life At Room Temperature. Each Bun Weighs 80 Grams; With 250 Kilocalories, 9 Grams Protein, 44 Grams Carbohydrates, 4 Grams Dietary Fiber, 15 Grams Sugar, 220 Mg Sodium. Primary Packaging: Single Packed In Clear Polypropylene Bags 80g/pack: Label Declaration (brand Name, Product Name, Net Weight, Nutritional Facts And Labeled With ""not For Sale""). Secondary Packaging: In Sets Per Dcc Based On The Submitted Food Distribution List. 286866 Pcs 286866 Pcs Supply And Delivery Of The Following: Sultan Kudarat Province: Tacurong City 10200 Pcs Lambayong 9600 Pcs Pres. Quirino 6780 Pcs Columbio 6900 Pcs Lutayan 4200 Pcs Isulan 7920 Pcs Esperanza 9000 Pcs Bagumbayan 13200 Pcs Lebak 13260 Pcs Kalamansig 11400 Pcs Palimbang 12600 Pcs Sen. Ninoy Aquino 6804 Pcs Cotabato Province: Alamada 24000 Pcs Aleosan 5400 Pcs Libungan 8100 Pcs Midsayap 10800 Pcs Pigcawayan 5400 Pcs Pikit 6900 Pcs Antipas 4590 Pcs Arakan 10800 Pcs Kidapawan City 16800 Pcs Magpet 7200 Pcs Makilala 10038 Pcs Pres. Roxas 8100 Pcs Banisilan 6000 Pcs Carmen 10500 Pcs Kabacan 7542 Pcs Matalam 11112 Pcs Mlang 10920 Pcs Tulunan 10800 Pcs Notes: The Supplier Must Be A Dost-fnri Adaptor Of Enhanced Nutribun And Must Provide A Certification From Department Of Science And Technology-food And Nutrition Research Institute (dost-fnri). The Supplier Must Have An Existing Physical Store Of Bakery Products. The Supplier Must Have An Existing Production Facility With Sanitary Permit Subject For Post-qualification To Ensure The Freshness Of The Breads. Nutribun Must Be Baked One (1) Day Before The Delivery Date And Expiry Should Be At Least 4 Days From Delivery Date. Manufacturing And Expiry Date Must Be Indicated In The Primary Packaging. The Supplier Must Attach Photos And Provide Sample Of Their Product Packed In Sample Packaging With Complete Label During Scheduled Bid Opening. Ingredients Of Nutribuns Preferably With Halal Certification. Primary Packaging Must Be Labeled With "not For Sale". Free Delivery To Lgus' Receiving Areas, Within The Attached Schedule Of Delivery And Timeline (8:00 Am To 12:00 Nn). Two Delivery Sites For Lgu Lake Sebu; 1.) Lake Sebu Proper And 2.) Brgy. Ned. Suppliers Should Observe The Health/safety Protocols, Workers Should Wear Protective Equipment From The Production, Preparation, And Delivery Of Enhanced Nutribuns To The Lgus. Delivery: Delivery Will Commence As Per Schedule Set By The End-user. Supplier Must Have Closed Delivery Vehicle Per Lgu. All Food Items On The Delivery Schedule Must Be Delivered On The Same Day. The Supplier Must Coordinate To The End-user/assigned Field Office Staff 3-5 Days Before The Delivery Date. Any Damaged/lacking Goods Upon Delivery Shall Be Replaced Immediately. The Supplier Must Bring Buffer Stock For Replacement. Acceptance And Inspection: Acceptance By The Lgu;c/mswdo/focal Person/sfp Staff. Inspected By The Dswd Inspection Committee. Final Acceptance By The Dswd Acceptance Committee. Payment Term: Monthly Payment Upon Completion Of Supporting Documents (delivery Receipts, Inspection And Acceptance Report, And Sales/charge Invoice) Of The Total Monthly Delivery. Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ Section Vii. Technical Specifications Technical Specifications Dswd12-sfp(epa)-2024-11-004lot2 Early Procurement Activity For The Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/municipalities Of Sultan Kudarat And Cotabato Province Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] Supply And Delivery Of Enhanced Nutribun For Sfp Cy 2025 In Cities/municipalities Of Sultan Kudarat And Cotabato Province: 1 Enhanced Nutribun, Ready-to-eat Bread From Good Quality Flour In Two Or Three (3) Variants: (squash, Sweet Potato And / Or Carrot) With Natural Color And Flavor, Softer In Texture And Containing Vitamin A, Calcium, Iron, Zinc, Potassium And Iodine, Has Zero Trans Fat And No Cholesterol; 4 Days Shelf Life At Room Temperature. Each Bun Weighs 80 Grams; With 250 Kilocalories, 9 Grams Protein, 44 Grams Carbohydrates, 4 Grams Dietary Fiber, 15 Grams Sugar, 220 Mg Sodium. Primary Packaging: Single Packed In Clear Polypropylene Bags 80g/pack: Label Declaration (brand Name, Product Name, Net Weight, Nutritional Facts And Labeled With "not For Sale"). Secondary Packaging: In Sets Per Dcc Based On The Submitted Food Distribution List - 286866 Pcs Supply And Delivery Of The Following: Sultan Kudarat Province: Tacurong City 10200 Pcs Lambayong 9600 Pcs Pres. Quirino 6780 Pcs Columbio 6900 Pcs Lutayan 4200 Pcs Isulan 7920 Pcs Esperanza 9000 Pcs Bagumbayan 13200 Pcs Lebak 13260 Pcs Kalamansig 11400 Pcs Palimbang 12600 Pcs Sen. Ninoy Aquino 6804 Pcs Cotabato Province: Alamada 24000 Pcs Aleosan 5400 Pcs Libungan 8100 Pcs Midsayap 10800 Pcs Pigcawayan 5400 Pcs Pikit 6900 Pcs Antipas 4590 Pcs Notes: The Supplier Must Be A Dost-fnri Adaptor Of Enhanced Nutribun And Must Provide A Certification From Department Of Science And Technology-food And Nutrition Research Institute (dost-fnri). The Supplier Must Have An Existing Physical Store Of Bakery Products. The Supplier Must Have An Existing Production Facility With Sanitary Permit Subject For Post-qualification To Ensure The Freshness Of The Breads. Nutribun Must Be Baked One (1) Day Before The Delivery Date And Expiry Should Be At Least 4 Days From Delivery Date. Manufacturing And Expiry Date Must Be Indicated In The Primary Packaging. The Supplier Must Attach Photos And Provide Sample Of Their Product Packed In Sample Packaging With Complete Label During Scheduled Bid Opening. Ingredients Of Nutribuns Preferably With Halal Certification. Primary Packaging Must Be Labeled With "not For Sale". Free Delivery To Lgus' Receiving Areas, Within The Attached Schedule Of Delivery And Timeline (8:00 Am To 12:00 Nn). Suppliers Should Observe The Health/safety Protocols, Workers Should Wear Protective Equipment From The Production, Preparation, And Delivery Of Enhanced Nutribuns To The Lgus. Delivery: Delivery Will Commence As Per Schedule Set By The End-user. Supplier Must Have Closed Delivery Vehicle Per Lgu. All Food Items On The Delivery Schedule Must Be Delivered On The Same Day. The Supplier Must Coordinate To The End-user/assigned Field Office Staff 3-5 Days Before The Delivery Date. Any Damaged/lacking Goods Upon Delivery Shall Be Replaced Immediately. The Supplier Must Bring Buffer Stock For Replacement. Acceptance And Inspection: Acceptance By The Lgu;c/mswdo/focal Person/sfp Staff. Inspected By The Dswd Inspection Committee. Final Acceptance By The Dswd Acceptance Committee. Payment Term: Monthly Payment Upon Completion Of Supporting Documents (delivery Receipts, Inspection And Acceptance Report, And Sales/charge Invoice) Of The Total Monthly Delivery. Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e) Conformity With The Technical Specifications, Which Includes Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts; And ⬜ (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (i) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (k) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (l) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Date17 Dec 2024
Tender AmountPHP 4.5 Million (USD 77.7 K)

Department Of Agrarian Reform - DAR Tender

Others
Philippines
Details: Description Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign Assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations 5 Section I. Invitation To Bid 8 Section Ii. Instructions To Bidders 12 1. Scope Of Bid 12 2. Funding Information 12 3. Bidding Requirements 12 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 13 5. Eligible Bidders 13 6. Origin Of Goods 13 7. Subcontracts 13 8. Pre-bid Conference 14 9. Clarification And Amendment Of Bidding Documents 14 10. Documents Comprising The Bid: Eligibility And Technical Components 14 11. Documents Comprising The Bid: Financial Component 14 12. Bid Prices 15 13. Bid And Payment Currencies 15 14. Bid Security 16 15. Sealing And Marking Of Bids 16 16. Deadline For Submission Of Bids 16 17. Opening And Preliminary Examination Of Bids 16 18. Domestic Preference 17 19. Detailed Evaluation And Comparison Of Bids 17 20. Post-qualification 17 21. Signing Of The Contract 18 Section Iii. Bid Data Sheet 18 Section Iv. General Conditions Of Contract 21 1. Scope Of Contract 21 2. Advance Payment And Terms Of Payment 21 3. Performance Security 22 4. Inspection And Tests 22 5. Warranty 22 6. Liability Of The Supplier 22 Section V. Special Conditions Of Contract 23 Section Vi. Schedule Of Requirements 27 Section Vii. Technical Specifications 28 Section Viii. Checklist Of Technical And Financial Documents 32 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Department Of Agrarian Reform Tunay Na Pagbabago Sa Repormang Agraryo Proj. Ref. No. 072-no-2024 Invitation To Bid Procurement Of Security Services Of Dar Provincial Office Of Negros Oriental January 2025 To December 2025 1.) The Department Of Agrarian Reform Provincial Office, Dumaguete City, Province Of Negros Oriental, Through The General Appropriations Act Of Fy-2025 Intends To Apply The Sum Of Nine Hundred Twelve Thousand Nine Hundred Eighty-six Pesos And 25/100 (php 912,986.25) Being The Abc To Payments Under The Contract For The Procurement Of Three (3) Security Services From January 1, 2025 To December 31, 2025 For Dar In Negros Oriental, With Identification Number 072-no-2024 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2.) The Department Of Agrarian Reform - Negros Oriental Now Invites Bids For The Provision Of Security Services To Provide Well-trained And Qualified Security Guards Who Can Effectively Provide Security Services: 1) 1 Security Guard, 8 Hours Tour- Of- Duty From Monday To Sunday At Darpo 2) 2 Security Guards, 8 Hours Tour- Of- Duty From Monday To Friday For 2 Shifts To The Dar Motorpool. Delivery Of The Goods Is Required On January To December 2025. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. (instructions To Bidders). 3.) Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. B. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. 4.) Prospective Bidders May Obtain Further Information From Department Of Agrarian Reform Province Of Negros Oriental - General Services Unit, Market Place, Calindagan, Dumaguete City, And Inspect The Bidding Documents At The Address Given Below During Office Hours, Monday To Friday From 8:00 O’clock In The Morning To 5:00 O’clock In The Afternoon. 5.) A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 25, 2024, Mondays To Fridays From 8:00 O’clock In The Morning To 5:00 O’clock In The Afternoon From The Given Address, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Pesos (php 1,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees An Official Receipt Paid To The Dar Cashier, If It Will Be Presented In Person, By Facsimile, Or Through Electronic Means. 6.) The Dar Provincial Office Of Dumaguete City, Negros Oriental, Through The Bac Will Hold A Pre-bid Conference On December 2, 2024 At 9:00 O’clock In The Afternoon At The Dar, Market Place, Calindagan, Dumaguete City, Which Shall Be Open To Prospective Bidders. 7.) Bids Must Be Duly Received By The Bac Secretariat Through By Manual Submission At The Office Address Indicated Below On Or Before December 16, 2024 10:00 O’clock In The Morning. Late Bids Shall Not Be Accepted. 8.) All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9.) Bid Opening Shall Be On December 16, 2024 At 1:00 O’clock In The Afternoon At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10.) The Dar Provincial Office Of Dumaguete City, Negros Oriental, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.) For Further Information, Please Refer To: Anthony Rey D. Lobrido Dar Negros Oriental, General Services Unit Dar Provincial Office Dumaguete City, Negros Oriental The Market Place, Calindagan Email Add: Gsudarnegor2018@gmail.com (035) 531-3448 / 0905-542-4359 12.) You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps For Online Bid Submission: Email Add: Gsudarnegor2018@gmail.com November 22, 2024 Sgd. Lilany P. Dipaling Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Department Of Agrarian Reform Provincial Office Of Negros Oriental, Wishes To Receive Bids For The Procurement Of Three (3) Security Services With Identification Numbers 072-no-2024. The Procurement Project (referred To Herein As “project”). The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Fy-2025 In The Amount Of Nine Hundred Twelve Thousand Nine Hundred Eighty-six Pesos And 28/100 Only (php 912,986.28). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On December 2, 2024 At 9:00 O’clock In The Morning And Its Physical Address Dar, Marketplace, Calindagan, Dumaguete City, Negros Oriental. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Exwarehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In The Bds. 12.2. (not Applicable) 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration1 Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until April 15, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14.3. (not Applicable) 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On Or Before 10:00 O’clock In The Morning Of December 16, 2024 At Dar Provincial Office Of Negros Oriental, The Marketplace, Calindagan, Dumaguete City, Negros Oriental. 16.2. (not Applicable) 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. (not Applicable) 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2 (not Applicable) 19.3 The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4 The Project Shall Be Awarded As : One Project Having Several Items Grouped Into Several Lots, Which Shall Be Awarded As Separate Contracts Per Lot. 19.5 Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19. Post-qualification 20.1. (not Applicable) 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, That It Is One Of The Eligible Bidders Who Have Submitted Bids That Are Found To Be Technically And Financially Compliant, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. 21.2. (not Applicable) 21.3. (not Applicable) 21.4. (not Applicable) 21.5. (not Applicable) Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 1 The Procuring Entity Is: Department Of Agrarian Reform Provincial Office Of Negros Oriental (dar-negros Oriental) 1.1 The Lot And Reference Is: Project Ref. No. 072-no-2024 2 The Funding Source Is: The Government Of The Philippines (gop) Through The General Appropriations Act 2025, In The Amount Of Php 912,986.28. The Name Of The Project Is “procurement Of Security Services For The Dar In Negros Oriental For The Period January 1, 2025 To December 31, 2025”. 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Procurement Of Security Services For Dar Negros Oriental-cy 2025. B. Completed Within Two Years Prior To The Deadline For The Submission And Receipt Of Bids. 5.4 The Bidder Must Have Completed A Single Largest Completed Contract Similar To The Contract To Be Bid, And Whose Value, Adjusted To Current Prices Using The National Statistics Office (nso) Consumer Price Indices, Must Be At Least Equal To 50% Of The Abc, Within Three Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 (not Applicable) 12 (not Applicable) 8.1 Subcontracting Is Not Allowed 8.2 Not Applicable No Further Instructions. The Statement Of All Ongoing And Completed Government And Private Contracts Shall Include All Such Contracts Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. Error! Reference Source Not Found. A Detailed Cost Distribution Per Month For Each Security Guard, For Seven (7) And Five (5) Working Days, Respectively. The Amount Paid Directly To Security Guard And Amount Paid To Government In Favor Of Security Guard Shall Be In Accordance With Padpao And Based On Wage Order No. Rovii-25. The Computation Shall Also Include: • Agency Fee • Vat For Bid Price Computation, The Said Contract Rate Per Security Guard Multiplied By The Number Of Security Guards (for Seven (7) And Five (5) Working Days, Respectively) Multiplied By The Number Of Months. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Php 18,259.73, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Php 45,649.31, If Bid Security Is In Surety Bond. No Incidental Services Are Required. Bid Prices Shall Be Fixed. Adjustable Price Proposals Shall Be Treated As Non-responsive And Shall Be Rejected. 16 Extraordinary Circumstances Refer To Events That May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. 20.2 (no Further Instructions) 21.2 (no Further Instructions) Bid Modification Is Allowed To Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. Discrepancies In The Financial Bid Will Be Settled In Accordance To Section 32.2.3 Of The Revised Irr Of Ra 9184. Evaluation Of Bids Shall Be Based On The Bid Price Quoted In The Financial Bid Form And The Corresponding Wage Cost Breakdown. Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing And Payment System (epfs) Shall Be Accepted. Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 1. Pnp License To Operate 2. Fesagss Clearance 3. Padpao Clearance 4. Nlrc And Dole Clearance (no Final Judgment/decision Finding Illegal Dismissal, Failure To Pay Minimum Wage, Unfair Labor Practice, And The Like) 5. Certification Or Proof Of Remittance For The 2nd And 3rd Quarters Of 2024 For Sss And Phil. Health Premium Contributions (stamped “received” With Corresponding Ors And Listing Of Members). 6. Certification Or Proof Of Pag-ibig Fund Premium Contributions 7. (stamped “received” With Corresponding Ors And Listing Of Members). Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 2.3. (not Applicable) 2.4 (not Applicable) 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 5. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity.  Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein.   Special Conditions Of Contract Gcc Clause 1 The Security Agency Shall Render The Required Security Services In Accordance With The Terms Of Reference (tor) Of Contract, Deployment Schedule, And Schedule Of Requirements The Security Agency Must Comply With The Minimum Qualifications Of Security Agency, Minimum Qualification Of Security Personnel, And Minimum-security Equipment Requirement. Security Agency Minimum Requirements: - Stability - A. Valid And Updated License To Operate Issued By The Philippine National Police, Civil Security Group - Supervisory Office For Security Investigation Agencies (pnp-csg-sosia); B. At Least Three (3) Years Of Experience In The Security Business Operations; C. With Good Office Set Up, Personnel And Office Tools And Equipment. - Resources - A. With A Minimum Number And Kind Of Equipment And Supplies As Specified In Security Support Equipment, With At Least 20 Security Guards That Are Organic To The Service Provider, With At Least One Supervisor Minimum Qualification Of Security Personnel: - A. Must Be At Least 21 Years Old; B. At Least High School Graduate; C. Has Undergone Pre-licensing Training Programs For New Recruits, Or Refresher Training Programs To Include, Among Others, First-aid Administration, Fire-fighting Techniques; D. Height: At Least 5'4"; Weight: At Least 63 Kg; Physically And Mentally Fit; E. Of Good Moral Character And Reputation Supported With Nbi Clearance; F. Knows How To Deal Pleasantly And Courteously With Personnel, Clients And The General Public, Supported With A Certification From Security Agency; G. Proof Of Neuro-psychiatric And Drug Test Clearance From Any Accredited Drug Testing Laboratory. Provided That Items (b),(c), And (d) Shall Be Supported With A Regular License (private Security License Card). Provided Further That Both Regular License (private Security License Card) And Nbi Clearance Shall Be Valid As Of The Date Of Opening Of Bid And Subject To Renewal, If The Same Should Expire During The Contract Implementation. Minimum Security Equipment Requirement: - A. Operational, Functional And Well-maintained Firearms (9mm Pistol, Shotgun) With Valid License In The Name Of The Security Agency (plus One (1) Magazine For Each Firearm); B. Handheld Radio With Valid Ntc License; C. Uniform (which Includes Handcuffs, Teargas, Heavy Duty Flash Lights, Whistle, Tickler, Ballpen, First Aid Kit). Security Plan To Be Submitted By The Security Agency Together With Its Bid Proposal And For Approval By Darpo Negros Oriental Prior To Contract Implementation. It Should Include Protocol Relative To Crowd Control And Dispersal Particularly When Rallies Are Staged Within The Perimeter Of The Office, Actions On Emergency Cases/situations, Such As Fire, Earthquakes, And Other Man Made/natural Calamities Which May Beset The Office. Report On The Delivery Of The Security Services Shall Be Submitted By The Security Agency Monthly Covering The Period January 1-december 31, 2025. Upon Delivery Of The Security Agency To The Project Site, The Security Agency Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: A. Copy Of Payslips And Evidence Of Receipt By The Security Personnel; B. Proof Of Remittance Of Premiums To Sss, Philhealth, Hdmf And Ecc For The Benefits Of The Security Personnel. Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). The Supplier Is Required To Provide All The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: Security Services For The Darpo Negros Oriental And Motorpool Consisting Of, But Not Limited To, The Following Functions And Duties Of The Security Guards: - A. Watch, Safeguard And Protect The Dar Provincial Office And Pmo Properties And Facilities In The Area From Burglary, Robbery, Theft, Sabotage, Fire, Vandalism And Other Unlawful Acts; B. Inspect And Patrol The Premises Regularly; C. Ensure That Unauthorized Persons Are Kept Out Of The Guarded Premises; D. Guarantee Peace And Order Within The Guarded Premises At All Times; E. Operate/monitor Cctv Installed At The Premises; F. Provide Detailed Reports To Management On Any Incidents, Disruptions Or Unlawful Activities Within The Guarded Premises; G. Perform Other Tasks As Required Or Assigned By The Management; H. The Assigned Security Guards Shall Wear Daily The Uniform And Identification Card Prescribed By The Security Agency, I. The Assigned Security Guards Shall Strictly Adhere To The Dar Provincial Office Policies In The Discharge Of His/her Duties And Responsibilities. Additional Documentary Requirements Of The Service Provider: - Valid/updated Pnp License To Operate - Individual Profile/resume Of Personnel To Be Deployed - Security Plan Including Investigation And Reporting Procedures, Safety Protocols - Current /valid National Certification Ii For Security Services Issued And Certified By The Technical Education And Skills Development Authority (tesda) 2 Payment Of Security Services The Security Agency Shall Pay The Personnel Based On The Computation (see Annex A) And Will Adopt Any Increase Based On Dole Mandate. The Security Agency Shall Be Paid Monthly Upon Submission Of Documentary Requirements, Subject To Existing And Applicable Accounting And Auditing Laws, Rules, And Regulations. The Security Agency Shall Submit Proof Of Compliance With Legal Requirements On The Payment Of Salaries Such As Duly Signed Payroll, Issuance Of Payslip To Security Guards, Premium Remittances To Sss, Philhealth, Hdmf, Ecc Among Others, And Taxes. 3 Inspection The Inspections And Tests That Will Be Conducted Are: Physical Inspection Of Personnel.   Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity (monthly) Total Delivered, Weeks/months Security Guards 3 3 12 Months The Security Agency Shall Provide Three (3) Licensed Security Guard A Day Who Will Render Services Based On Schedule To Be Assigned By Management On Rotational Basis Including Saturdays And Sundays. The Three (3) Security Guards Will Render Services At The Dar Provincial Office Of Negros Oriental And Dar Provincial Motorpool Located At The Marketplace, Calindagan, Dumaguete City, Negros Oriental. Section Vii. Technical Specifications Notes For Preparing The Technical Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Their Bids. In The Context Of Competitive Bidding, The Specifications (e.g. Production/delivery Schedule, Manpower Requirements, And After-sales Service/parts, Descriptions Of The Lots Or Items) Must Be Prepared To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Transparency, Equity, Efficiency, Fairness, And Economy In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation And Post-qualification Facilitated. The Specifications Should Require That All Items, Materials And Accessories To Be Included Or Incorporated In The Goods Be New, Unused, And Of The Most Recent Or Current Models, And That They Include Or Incorporate All Recent Improvements In Design And Materials Unless Otherwise Provided In The Contract. Samples Of Specifications From Previous Similar Procurements Are Useful In This Respect. The Use Of Metric Units Is Encouraged. Depending On The Complexity Of The Goods And The Repetitiveness Of The Type Of Procurement, It May Be Advantageous To Standardize The General Technical Specifications And Incorporate Them In A Separate Subsection. The General Technical Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Manufacturing Similar Goods. Deletions Or Addenda Should Then Adapt The General Technical Specifications To The Particular Procurement. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Equipment, Materials, And Workmanship, Recognized Philippine And International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Equipment, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure At Least A Substantially Equal Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Special Conditions Of Contract Or The Technical Specifications. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Technical Specifications To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished Or Tested, The Provisions Of The Latest Edition Or Revision Of The Relevant Standards And Codes Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure Substantial Equivalence To The Standards And Codes Specified Will Be Acceptable. Reference To Brand Name And Catalogue Number Should Be Avoided As Far As Possible; Where Unavoidable They Should Always Be Followed By The Words “or At Least Equivalent.” References To Brand Names Cannot Be Used When The Funding Source Is The Gop. Where Appropriate, Drawings, Including Site Plans As Required, May Be Furnished By The Procuring Entity With The Bidding Documents. Similarly, The Supplier May Be Requested To Provide Drawings Or Samples Either With Its Bid Or For Prior Review By The Procuring Entity During Contract Execution. Bidders Are Also Required, As Part Of The Technical Specifications, To Complete Their Statement Of Compliance Demonstrating How The Items Comply With The Specification.   Technical Specifications Item Specification Statement Of Compliance Bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidders Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Provisions Of Itb Clause, Applicable Laws, And Issuances. 1 Security Agency Minimum Qualification 2 Minimum Qualifications Of Security Personnel 3 Minimum Security Equipment Requirement 4 Security Plan 5 Payment Terms And Conditions 4 Others • Accessible Business Office Within Negros Oriental Upon Award Of The Contract • Policy Directives On Recruitment And Selection Of Security Guards • Two Sets Of Complete Uniforms • Technical Documents: 1. Company Profile 2. Organizational Chart 3. List Of Clients For The Past Three Years 4. List Of Firearms And Communication Equipment To Be Used In The Dar The Agency Contractor Shall Maintain A Satisfactory Level Of Performance Throughout The Term Of The Contract Based On The Following Set Of Performance Criteria: 1. Quality Service Delivered 2. Time Management 3. Management And Suitability Of Personnel 4. Contract Administration And Management 5. Regular Progress Report The Dar May Assess These Criteria Though The Agency Contractor’s: 1. Monthly Evaluation Form; 2. Monthly Feedback Form; 3. Bundy Clock Or Logbook Of Attendance; 4. Wearing Of Uniform; 5. Completion Slip/form; And 6. Team Leader’s Monitoring Report, Etc. I Hereby Certify To Comply With All The Above Technical Specifications. _____________________ _________________________ ____________ Name Of Company/bidder Signature Over Printed Name Of Date Representative Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); In Accordance With Section 8.5.2 Of The Irr; Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (d) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (e) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (h) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or Aftersales/parts, If Applicable; And ⬜ (i) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (j) The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (o) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (p) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Soon3 Dec 2024
Tender AmountPHP 912.9 K (USD 15.4 K)

Department Of Social Welfare And Development Region Xii Tender

Others
Philippines
Details: Description Department Of Social Welfare And Development Field Office Xii Regional Center, Brgy. Carpenter Hills, Koronadal City, 9506 Philippine Bidding Documents For The Early Procurement Activity/ies For The Bidding Of Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province Project Identification No. Dswd12-sfp(epa)-2024-11-003 Government Of The Republic Of The Philippines Sixth Edition July 2020 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..7 Section Ii. Instructions To Bidders…………………………………………...10 1. Scope Of Bid ………………………………………………………………………. 11 2. Funding Information………………………………………………………………. 11 3. Bidding Requirements ……………………………………………………………. 11 4. Corrupt, Fraudulent, Collusive, And Coercive Practices………………………….. 11 5. Eligible Bidders…………………………………………………………………… 11 6. Origin Of Goods ………………………………………………………………….. 12 7. Subcontracts ……………………………………………………………………… 12 8. Pre-bid Conference ………………………………………………………………. 12 9. Clarification And Amendment Of Bidding Documents …………………………… 13 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 13 11. Documents Comprising The Bid: Financial Component …………………………... 13 12. Bid Prices …………………………………………………………………………. 13 13. Bid And Payment Currencies ……………………………………………………… 14 14. Bid Security ………………………………………………………………………. 14 15. Sealing And Marking Of Bids ……………………………………………………… 15 16. Deadline For Submission Of Bids …………………………………………………. 15 17. Opening And Preliminary Examination Of Bids ………………………………….. 15 18. Domestic Preference ……………………………………………………………… 15 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 15 20. Post-qualification ………………………………………………………………… 16 21. Signing Of The Contract …………………………………………………………… 16 Section Iii. Bid Data Sheet …………………………………………………..17 Section Iv. General Conditions Of Contract ……………………...………..21 1. Scope Of Contract ………………………………………………………………… 22 2. Advance Payment And Terms Of Payment ……………………………………….. 22 3. Performance Security ……………………………………………………………. 22 4. Inspection And Tests ……………………………………………………………… 22 5. Warranty …………………………………………………………………………. 23 6. Liability Of The Supplier ………………………………………………………….. 23 Section V. Special Conditions Of Contract ………………………………….24 Section Vi. Schedule Of Requirements ……………………………………....27 Section Vii. Technical Specifications …………………………………………29 Section Viii. Checklist Of Technical And Financial Documents …………..32 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Invitation To Bid For The Dswd12-sfp(epa)-2024-11-003 Early Procurement Activity For The Bidding Of Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province 1. The Department Of Social Welfare And Development Field Office Xii, Through The Early Procurement Activities (epa) Of National Expenditure Plan (nep) For Fy 2025 Intends To Apply The Sum Of Fourteen Million Two Hundred Thousand And Six Hundred Pesos Only (₱14,200,600.00) Being The Abc To Payments Under The Contract For Dswd12-sfp(epa)-2024-11-003 Early Procurement Activity For The Bidding Of Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Social Welfare And Development Field Office Xii Now Invites Bids For The Above Procurement Project. Delivery Of The Goods/services Is Required To Be Delivered Within Six (6) Months Contract Duration Based On The Schedule Set By The End-user. Bidders Should Have Completed, Within One (1) Year From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Department Of Social Welfare And Development Field Office Xii – Bids And Awards Committee Secretariat Office And Inspect The Bidding Documents At The Address Given Below During Office Hours (8:00a.m. To 5:00 P.m.). 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 27, 2024 To December 16, 2024, 05:00 P.m. From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Approved Budget For The Contract Bid Docs Amount ₱ 14,200,600.00 Php 25,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Department Of Social Welfare And Development Field Office Xii Will Hold A Pre-bid Conference On December 03, 2024, 1:00 P.m. At Dswd Field Office 12, Regional Center, Brgy. Carpenter Hill, Koronadal City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below On Or Before December 17, 2024, 09:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening And Evaluation Shall Be On December 17, 2024, 1:00 P.m. At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Social Welfare And Development Field Office Xii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Dswd 12 – Bac Secretariat Head Administrative Division – Procurement Section Dswd Field Office 12, Regional Center, Brgy. Carpenter Hills, Koronadal City, 9506 Procurement.fo12@dswd.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://fo12.dswd.gov.ph/bid-bulletin/ Https://www.philgeps.gov.ph November 25, 2024 Jackiya A. Lao Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Department Of Social Welfare And Development Field Office Xii Wishes To Receive Bids For Early Procurement Activity For The Bidding Of Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province With Identification Number Dswd12-sfp(epa)-2024-11-003. The Procurement Project (referred To Herein As “project”) Is Composed Of One Lot Or Item, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Fy 2025 In The Amount Of Fourteen Million Two Hundred Thousand And Six Hundred Pesos Only (₱14,200,600.00) 2.2. The Source Of Funding The General Appropriations Act. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On December 3, 2024, 1:00 P.m. And At Its Physical Address Department Of Social Welfare And Development Field Office 12, Regional Center, Brgy. Carpenter Hill, Koronadal City As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, On/or Before December 06, 2024 Or At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within One (1) Year Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In The Bds. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until April 17, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items, Which Shall Be Awarded As Separate Contracts Per Item. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Rice And Iron Fortified Rice B. Completed Within At Least One (1) Year Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than ₱284,012.00 Or The Amount Equivalent To Two Percent (2%) Of Abc If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than ₱710,030.00 Or The Amount Equivalent To Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.1 1. All Forms Must Be Submitted Using The Prescribed Format Provided By The Procuring Entity And Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 2. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialled By The Duly Authorized Representative/s Of The Bidder, Otherwise, Bids Shall Be Subject To An Outright Disqualification. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Supplier Of The Notice Of Post Qualification From The Bac That The Supplier Has The Lowest Calculated Bid (lcb) Or Single Calculated Bid (scb), The Supplier Shall Submit And/or Present The Following Requirements For Post Qualification In Accordance To Section 34 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra9184: 1. Present Original Copy Of The Following: A. Latest Income Tax Return And Business Tax Return ( For 3rd Quarter Of 2024) B. Latest Value Added Tax (vat) Return ( For 3rd Quarter Of 2024, If Applicable) Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing & Payment System (efps) Shall Be Accepted. C. Valid Philgeps Registration Certificate (platinum Membership) (all Pages) D. Valid Registration Certificate From Securities And Exchange Commission (sec) For Corporations, Or From Department Of Trade And Industry (dti) For Sole Proprietorship, Or From Cooperative Development Authority (cda) For Cooperatives; E. Valid Business/mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Bidder Is Located; F. Valid Tax Clearance Per Eo 398, Series Of 2005, As Finally Reviewed And Approved By The Bir; G. Bureau Of Internal Revenue (bir) Registration Certificate. H. Copy Of Contracts Or Po’s, Notice Of Award (noa) And Notice To Proceed (ntp) For All On-going Contracts I. End-user’s Acceptance, Official Receipt (duplicate Or Triplicate Copy) Or Sales Invoice With Collection Receipt/s (duplicate Or Triplicate Copy) Relative To Single Largest Completed Contract J. Company Profile And Organizational Chart. Company Printed Brochure May Be Included. K. Vicinity Map/location Of The Business. L. Other Appropriate Licenses And Permits Required By Law And Stated In The Bidding Documents. Failure To Submit Any Of The Post-qualification Requirements On Time, Or A Finding Against The Veracity Thereof, Shall Disqualify The Bidder For Award. Provided In The Event That A Finding Against The Veracity Of Any Of The Documents Submitted Is Made, It Shall Cause The Forfeiture Of The Bid Security In Accordance With Section 69 Of The Irr Of Ra 9184. Note: For Post Qualification Purposes Only 20.3 Each Bidder Shall Submit The Following In One (1) “mother” Envelope Duly Sealed And Labeled, Containing Two (2) Sets Of Envelopes For Technical Component Envelope And Financial Component Envelope. Bidding Documents Shall Be Prepared With Proper Label And Tabbing For Easy Checking And Evaluation During Bid Opening. 20.4 All Envelopes Shall Be Labeled/marked As Follows: To : Jackiya A. Lao Chairperson Bids And Awards Committee Dswd-field Office 12 From :_______________________________ (name Of Bidder In Capital Letters) Address: _______________________________ (address Of Bidder In Capital Letters) Project: Early Procurement Activity For The Bidding Of Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province Bid Ref No.: Itb No. Dswd12-sfp(epa)-2024-11-003 Approved Budget For The Contract : ₱ 14,200,600.00 Do Not Open Before: 17 December 2024; 1:00 P.m. 21.2 No Further Instructions Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: Delivery Term: To Be Delivered Within Six (6) Months Contract Duration Based On The Schedule Set By The End-user Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – Not Applicable Packaging – Refer To The Technical Specifications The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. Transportation – Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 The Terms Of Payment Shall Be As Follows: Monthly Payment Based On Actual Delivery With Supporting Documents (delivery Receipts (dr), Inspection And Acceptance Report (iar), And Sales/charge Invoice Partial Payment Must Correspond To The Value Of Goods Delivered And Accepted After The Appropriate Inspection And Acceptance Procedures. Proof Of Deliveries (delivery Receipts Or Acknowledgement Receipts) Must Be Signed By An Authorized Person To Support Claims For Payment. 4 The Inspections And Tests That Will Be Conducted By The Lgu;c/mswdo/focal Person/sfp Staff, Dswd Inspection Committee, Final Acceptance By The Dswd Acceptance Committee, And End-user Section Vi. Schedule Of Requirements Dswd12-sfp(epa)-2024-11-003 Early Procurement Activity For The Bidding Of Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/ Municipalities Of Cotabato Province Delivery Of The Goods/services Is Required To Be Delivered Within Six (6) Months Contract Duration Based On The Schedule Set By The End-user 1 Iron Fortified Rice- An Enriched Rice Made By Blending Iron Rice Premix (irp) With A Good Variety Rice Using An Efficient Blending Machine, 50 Kilograms Per Bag. 3737 Bag/s 3737 Bag/s Supply And Delivery Of The Following: Cotabato Province: Alamada 279 Bag/s Aleosan 125 Bag/s Libungan 189 Bag/s Midsayap 250 Bag/s Pigcawayan 125 Bag/s Pikit 160 Bag/s Antipas 106 Bag/s Arakan 251 Bag/s Kidapawan City 391 Bag/s Magpet 167 Bag/s Makilala 234 Bag/s Pres. Roxas 188 Bag/s Banisilan 139 Bag/s Carmen 193 Bag/s Kabacan 176 Bag/s Matalam 259 Bag/s Mlang 254 Bag/s Tulunan 251 Bag/s Notes: The Supplier Must Be A Dost-fnri Adaptor Of Iron Fortified Rice And Must Provide A Certification From Department Of Science And Technology-food And Nutrition Research Institute (dost-fnri). The Supplier Must Have An Existing Warehouse. The Supplier Must Have An Existing Production Facility With Sanitary Permit Subject For Post-qualification To Ensure The Quality Of Iron Fortified Rice. Production And Expiration Dates Must Be Indicated In The Packaging. The Supplier Must Attach Photos And Provide Sample Of Their Product Packed In Sample Packaging With Complete Label During Scheduled Bid Opening. Packaging Must Be Labeled With "not For Sale". Free Delivery To Lgus' Receiving Areas, Within The Attached Schedule Of Delivery And Timeline (8:00 Am To 12:00 Nn). Suppliers Should Observe The Health/safety Protocols, Workers Should Wear Protective Equipment From The Production, Preparation, And Delivery Of Commercial Rice To The Lgus. Delivery: Delivery Will Commence As Per Schedule Set By The End-user. Supplier Must Have Closed Delivery Vehicle Per Lgu. All Food Items On The Delivery Schedule Must Be Delivered On The Same Day. The Supplier Must Coordinate To The End-user/assigned Field Office Staff 3-5 Days Before The Delivery Date. Any Damaged/lacking Goods Upon Delivery Shall Be Replaced Immediately. The Supplier Must Bring Buffer Stock For Replacement. Acceptance And Inspection: Acceptance By The Lgu;c/mswdo/focal Person/sfp Staff. Inspected By The Dswd Inspection Committee. Final Acceptance By The Dswd Acceptance Committee. Payment Term: Monthly Payment Upon Completion Of Supporting Documents (delivery Receipts, Inspection And Acceptance Report, And Sales/charge Invoice) Of The Total Monthly Delivery. Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ Section Vii. Technical Specifications Technical Specifications Dswd12-sfp(epa)-2024-11-003 Early Procurement Activity For The Bidding Of Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] Supply And Delivery Of Iron Fortified Rice For Sfp Cy 2025 In City/municipalities Of Cotabato Province 1 Iron Fortified Rice- An Enriched Rice Made By Blending Iron Rice Premix (irp) With A Good Variety Rice Using An Efficient Blending Machine, 50 Kilograms Per Bag. 3737 Bag/s Supply And Delivery Of The Following: Cotabato Province: Alamada 279 Bag/s Aleosan 125 Bag/s Libungan 189 Bag/s Midsayap 250 Bag/s Pigcawayan 125 Bag/s Pikit 160 Bag/s Antipas 106 Bag/s Arakan 251 Bag/s Kidapawan City 391 Bag/s Magpet 167 Bag/s Makilala 234 Bag/s Pres. Roxas 188 Bag/s Banisilan 139 Bag/s Carmen 193 Bag/s Kabacan 176 Bag/s Matalam 259 Bag/s Mlang 254 Bag/s Tulunan 251 Bag/s Notes: The Supplier Must Be A Dost-fnri Adaptor Of Iron Fortified Rice And Must Provide A Certification From Department Of Science And Technology-food And Nutrition Research Institute (dost-fnri). The Supplier Must Have An Existing Warehouse. The Supplier Must Have An Existing Production Facility With Sanitary Permit Subject For Post-qualification To Ensure The Quality Of Iron Fortified Rice. Production And Expiration Dates Must Be Indicated In The Packaging. The Supplier Must Attach Photos And Provide Sample Of Their Product Packed In Sample Packaging With Complete Label During Scheduled Bid Opening. Packaging Must Be Labeled With "not For Sale". Free Delivery To Lgus' Receiving Areas, Within The Attached Schedule Of Delivery And Timeline (8:00 Am To 12:00 Nn). Suppliers Should Observe The Health/safety Protocols, Workers Should Wear Protective Equipment From The Production, Preparation, And Delivery Of Commercial Rice To The Lgus. Delivery: Delivery Will Commence As Per Schedule Set By The End-user. Supplier Must Have Closed Delivery Vehicle Per Lgu. All Food Items On The Delivery Schedule Must Be Delivered On The Same Day. The Supplier Must Coordinate To The End-user/assigned Field Office Staff 3-5 Days Before The Delivery Date. Any Damaged/lacking Goods Upon Delivery Shall Be Replaced Immediately. The Supplier Must Bring Buffer Stock For Replacement. Acceptance And Inspection: Acceptance By The Lgu;c/mswdo/focal Person/sfp Staff. Inspected By The Dswd Inspection Committee. Final Acceptance By The Dswd Acceptance Committee. Payment Term: Monthly Payment Upon Completion Of Supporting Documents (delivery Receipts, Inspection And Acceptance Report, And Sales/charge Invoice) Of The Total Monthly Delivery. Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e) Conformity With The Technical Specifications, Which Includes Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts; And ⬜ (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (i) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (k) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (l) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Date17 Dec 2024
Tender AmountPHP 14.2 Million (USD 240.4 K)
7591-7600 of 7632 active Tenders