Civil Engineering Tenders

Civil Engineering Tenders

Iarnr D Eireann Irish Rail Tender

Ireland
Closing Date15 Sep 2027
Tender AmountEUR 10 Million (USD 10.9 Million)
Details: The Qualification System Will Be Established For A Period Of Four Years From 15th August 2023 To 15th August 2027, With An Option To Extend Into Year Five And A Second Option To Extend Into Year Six At Ie’s Discretion. Applicants May Apply For Inclusion At Any Stage During The Life Of This Qs. Successful Candidates Will Be Expected To Be Able To Provide Ground Investigation Service, Utility Mapping And Structural Investigations To All Locations On The Irish Rail Network. The Purpose Of The Ground Investigation Service Will Be To Provide Factual Data And Interpretive Information In Factual And Interpretative Reports Respectively In Accordance With The ’specification And Related Documents For Ground Investigation In Ireland’, Engineers Ireland, Second Edition 2016’ To Facilitate The Detailed Design Of The Permanent And Temporary Civil And Structural Engineering Works. This Includes Examination Of Various Sites Along The Rail Network To Establish The Details Of The Different Soil Types/conditions, Water Levels Occurring To Aid In The Design Of Main Works And Waste Disposal Recommendations. The Exploratory Holes, Probing And In-situ And Laboratory Testing Will Be Used To Assess The Associated Ground Conditions For Various Civil Engineering Works. The Service Provider Shall Be Capable Of Carrying Out Shell And Auger, Cable Percussion, Rotary Coring And Window Sample Boreholes, Structural Coring, Trial Pitting, Slit Trenching, Dynamic Probing, In-situ And Laboratory Testing, Soil And Groundwater Sampling, Geophysical Surveying And Groundwater Level Monitoring. Applicants Are Advised That A Sizeable Amount Of Works Will Need To Be Carried Out Under Track Protection At Night, Including Weekend Nights. The Service Provider Shall Be Capable Of Preparing Detailed Factual And Interpretative Report In Accordance With Is En 1997-2:2007 And The Specification. These Reports Shall Be Prepared By Chartered Geotechnical Engineers, Chartered Engineering Geologist, Environmental Engineers And Environmental Scientists, The Reports Will Have To Be Issued To The Meet The Individual Project Programmes. The Service Provider May Be Required To Act As The Project Supervisor For The Construction Stage In Accordance With The Safety, Health And Welfare At Work (construction) Regulations And All Of Their Site Personal Must Be In Possession Of Irish Rail Approved Personal Track Safety (pts) Certificates Should They Be Required To Work On It Or Near The Railway Line. The Specific Investigation, Monitoring And Reporting Requirements For Each Project Will Be Detailed In Each Call-off Tender Documentation. Those Companies Successfully Appointed To The Qualification System Will Receive All Future Tender Enquires.. The Procurement Is Related To A Project And/or Programme Financed By European Union Funds: No

DEPT OF THE ARMY USA Tender

Consultancy Services
Corrigendum : Closing Date Modified
United States
Closing Soon25 Oct 2024
Tender AmountRefer Documents 
Details: The United States Army Corps Of Engineers (usace) Los Angeles District (spl), Survey And Mapping Section, Has A Requirement To Provide A-e Services Within The South Pacific Division (spd) Footprint Primarily For The Los Angeles District (spl), Other Spd Districts, Department Of Defense (dod) Agencies And International And Interagency Services (iis) Customers. Spl Is Synopsizing This Requirement In Accordance With The Brooks Act, With The Intent Of Awarding One Small Business A-e Idiq Contract (single Award Task Order Contract/satoc) To Support Spl A-e Survey And Mapping Services Requirements.the Usace Survey And Mapping Section Is A Technical Section That Relies On Specialized Equipment And Knowledge Of The Equipment To Produce Surveying Products. Each Task Order Awarded On This Satoc Will Have A Scope Of Work (sow) Developed That Will Specifically Detail The Performance Requirements For That Specific Project. These A-e Task Orders Under The Awarded Idiq May Include, But Are Not Limited To: Aerial Mapping, Field Surveying, Hydrographic Surveying, Cadastral Surveying, And Geodetic Surveys. The Work And Services May Include Photogrammetric Mapping, Airborne Laser Map Compilation, Analytical Bridging, Orthophotography, Precise Leveling, Total Station Mapping, And Boundary Surveys, Using Conventional Survey Techniques And Differential Global Positioning System (gps). The Work And Services May Include Coastal And Oceanographic Engineering Studies, Which Will Require Capabilities In Marine Field Data Collection, Surveying, And Mapping For Navigation And Shore Protection Civil Works Projects At Various Locations In The Los Angeles District (southern California) And South Pacific Division (northern California And Oregon). Spl Expects There Can Be Some Time Sensitive Tasking In Order To Respond With A-e Services To Contingency Operations And Natural Disasters. The Task Order Sow Will Include, In Detail, The Required Final Deliverables And The Period Of Performance For Each Task Order. This Synopsis For Survey And Mapping Support Engineering And Other Support Civil Engineering A-e Services Will Result In One Small Business A-e Idiq Contract (single Award Task Order Contract/satoc) For $8.0m.

Administrative Council Of The Port Of Benalmadena S A M Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Spain
Closing Date6 Dec 2024
Tender AmountEUR 214.6 K (USD 234.7 K)
Description: Hire the Service of a Civil, Canal and Port Engineer for the “drafting of the Construction Project, Health and Safety Coordination and Management of the Remodeling Works of Nautical Activities in the Nautical Center of the Benalmádena Marina, Málaga, Block III of the Project Proposal for Investment Actions in the Port of Benalmádena

DEPT OF THE NAVY USA Tender

United States
Closing Date20 Nov 2024
Tender AmountRefer Documents 
Details: 11 (55 Gal) Drums Of Solberg 3% Mil-spec Synthetic Fluorine-free Foam (sfff) – Total Small Business Set-aside-- scope: this Action Will Award A Firm Fixed Priced Purchase Order, On A Brand Specific Basis, To Acquire Solberg 3% Mil-spec Sfff Fire Fighters Foam. this Procurement Is For The Award Of A Firm Fixed Priced Commercial Contract To Acquire Solberg Firefighters Foam In Accordance With The Attached Equipment Specifications. Vendor Will Provide The Following Information To The Poc Identified On Award Before The Items Are Shipped: vendor Name: manufacturer Name: name Of The Agent: [note: This Should Be Solberg 3% Sfff]. container Size: [note: This Should Be 55 Gallons]. number Of Containers: [note: This Should Be Qty: 11]. safety Data Sheet (sds) the Foam Will Not Be Delivered To Nswc Pcd. It Will Be Direct Shipped Direct To The Following Address/poc: ship To: air Force Civil Engineering Center (afcec/cxae) 104 Research Road, Bldg. 9708 tyndall Afb, Fl 32403 requirements: item Name: Solberg 3% (gallon Drums) item Code: M40644 qty:11 see Attached Brand Name Justification delivered By: 8 January 2024 -------------------------------------------- email Subject Line Must Include Solicitation Number And Vendor Name At Beginning Of Subject Line award Will Be Based On The Best Value To The Government Considering Price, Delivery, Quality, And Past Performance email Quotes To Alan.t.bounds.civ@us.navy.mil On Or Before The Closing Date And Time Stated Above. the Government Will Not Accept Late Quotes. the Government Will Not Accept Quotes That Are Partial Or Incomplete provide Cage Code And Lead Time On Your Quote. vendors Must Be Able To Invoice Through Wide Area Workflow (wawf). if Shipping Is Not Included In The Price Include A Line Item For Shipping. vendors Must Ensure That They Have Received A Response Within 48 Business Hours After Quote Has Been Submitted To Remain Competitive. If No Response Is Receive Please Call Primary Then Secondary Contact. **review All Attachments Posted Prior To Submission Of Quote**

Iarnr D Eireann Irish Rail Tender

Ireland
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Oq For Paint & Welding Inspection Services

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Excavation
Corrigendum : Closing Date Modified
United States
Closing Date31 Dec 2024
Tender AmountRefer Documents 
Details: W912pm24b0003 the U.s. Army Corps Of Engineers, Wilmington District Requires A Contract To Provide Dredging, Transporting, Placing, Planting And Shaping Beach Fill And Performing All Pre And Post Construction Beach Surveys. The Borrow Area For Carolina Beach And Kure Beach Is Located At The Kure Beach Borrow Area B. The Estimated Beach Fill Quantities For Carolina Beach Is 1,200,000 Cy. The Estimated Beach Fill Quantities For Kure Beach Is 700,000 Cy. All Beach Work Will Not Begin Until 16 November And Must Be Completed By 30 April. Dredging With Hopper Dredges Will Be Limited To The Period Of 01 December Through 15 April. this Solicitation Is Unrestricted. the Contract Issued Will Be Firm Fixed Price. the Magnitude Of Construction Of This Project Is Between $10,000,000.00 And $25,000,000.00. this Solicitation Will Be Issued In Electronic Format Only And Will Be Available On Or About 15 November 2024. the Bid Opening Date Will Be Specified In The Solicitation When It Is Issued. No Additional Media (cd-rom, Floppy Disks, Facsimiles, Etc.) Will Be Provided. Paper Copies Of This Solicitation Will Not Be Available. Other Methods Of Requesting A Package Will Not Be Honored. the North American Industry Classification System (naics) Code Is 237990 – Other Heavy And Civil Engineering Construction And The Size Standard Is $37,000,000.00. offerors Must Be Registered In The System For Award Management (sam) In Order To Be Eligible To Receive An Award From Any Government Solicitation. Call 1-866-606-8220 For More Information Or Visit The Sam Website At Www.sam.gov. After Completing Sam, In Order To Download Documents Contractors And Their Subcontractors Must Register At Www.sam.gov. In Order To Locate Solicitation, Contractors Can Go To Www. Sam.gov And Search For The Solicitation Number. contractors Can Register To Be Put On A Plan Holders List That Others Can Access Through The Www.sam.gov Website. It Is The Offeror's Responsibility To Check The Internet Address Provided As Necessary For Any Posted Changes To This Solicitation And All Amendments. For Additional Information Or Assistance, Please Contact Diana Curl, Contract Specialist, Email Diana.d.curl@usace.army.mil Or Rosalind Shoemaker, Contract Officer, Phone (910) 251-4436, Email Rosalind.m.shoemaker@usace.army.mil.

Technical Tender

United Kingdom
Closing Date1 Nov 2024
Tender AmountEUR 46 Million (USD 50.3 Million)
Details: The Integrated Site Works Framework (iswf)seeks To Undertake Work Which Supports The Delivery Of Ongoing Site Works, Asset Refurbishment And Projects Relating To General Infrastructure And Operations - Removal Of Existing Assets And Replacing With New To Facilitate Future Missions Of The Low Level Repository Llwr) Site In Drigg, Cumbria. The Iswf Will Serve As A Multidisciplinary Vehicle For The Nws Organisation To Carry Out Works And Services At The Repository Site. These Activities Will Be Managed Through Project Orders, Which Are Awarded As Call-offs From The Framework. The Essential Capabilities Required Through This Framework Include: - Civil Engineering Works - Mechanical Engineering Design And Installation Works - Electrical Engineering Design And Installation Works - Demolition And Remediation Works - Other Including Prelims/management, Allowance For Emergent Tasks Etc. During The Framework The Scopes Of Work Will Be Developed Through The Following Activities: - Condition Surveys Or Routine Inspections That Result In Work Above And Beyond Standard Maintenance - System Health Reports And Associated Checks - Asset Management Lifecycle Plans. The Known Site Works Scope Includes The Following Scope: - Leachate Management System - Electrical Distribution - Radiometric Systems - Grouting Facility - Mechanical And Statutory Systems - Civil Services - Alarm And Communications Systems - Transport Fleet (on Site) - Environmental Systems - Security Systems - Water Supplies - Electrical Supplies - Site Remediation & Legacy Structures - Site Baseline Configuration To Facilitate Delivery Of Site Works For The Scope, The Following Capabilities Are Being Sought From The Supply-chain Through This Framework: - Multidiscipline Site Works Delivery Encompassing Site Works, Mechanical And Ce&i Installations, Testing And Commissioning. - Production Of Single Discipline And / Or Low Complexity Detailed Design Outputs And Solutions For Self-delivery (design And Build) Or Subcontract Delivery Via Supply-chain. - Demolition And Land Remediation Capability, Including Access To Specialist Services Via Supply-chain Network For Example, Environmental / Contamination Analysis, Waste Management - Capability For Handling And Removal Of Asbestos, And Ground Contaminants Associated With Royal Ordnance Factory Legacy Products. Tendered In Line With The Open Procedure (inclusive Of Pass/fail Supplier Questionnaires) Organisations Are Invited To Submit Their Itt Responses Via Nws's Atamis System ( Https://atamis-2464.my.site.com/s/welcome ), Which Can Be Accessed Against Record Ref C13254 [integratedsite Works Framework (iswf)] Which Is Listed Within The 'find Opportunities' Area On The Portal.

DEPT OF THE AIR FORCE USA Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
United States
Closing Soon22 Oct 2024
Tender AmountRefer Documents 
Details: //amendment 3// 10/15/2024 - Extended The Solictation Date By 7 Days From 15 Oct 2024 To 22 Oct 2024. //amendment 2// 10/02/2024 - Update To Sow And Seed Project Sow. //amendment 1// 9/20/2024 - Extended The Solicitation Date By 14 Days From 1 Oct 2024 To 15 Oct 2024. the Simplified Acquisition Of Base Engineer Requirement (saber) Contract Is An Indefinite Delivery, Indefinite Quantity (idiq) Contract Required To Accomplish A Broad Range Of Construction, Sustainment, Restoration And Modernization Projects On Real Property At Minot Air Force Base (mafb), North Dakota (nd) That Are Of A Suitable Size And Complexity To Allow For Quick Design Execution And Construction. Work May Include Maintenance, Repair, Alteration, Renovation And New Construction. The Contract Is Intended As A 100% Small Business Set-aside With A $9.9 Million Ceiling. Task Orders Will Range From $2,000 To $750,000. Mafb Is Home To Two Major Air Force Components, The 5th Bomb Wing And The 91st Missile Wing. The Mafb Saber Contract's Primary Goal Is To Expedite Contract Award By Reducing 5th Civil Engineer Squadron's (5 Ces) Design Work And Acquisition Lead Time. Prompt Response And Execution Of All Task Orders Is Required. The Contracting Officer (co) Will Issue A Request For Proposal (rfp) Describing Basic Requirements For Each Individual Task Order (to).

Fredrikstad Kommune Tender

Norway
Closing Date1 Dec 2031
Tender AmountRefer Documents 
Details: Dynamic purchasing system: dps building and construction related consultancy services - establishment of a dps The contracting authority invites tenderers to a restricted contest for the establishment of a dynamic purchasing system for future procurements of consultancy and advisory services for building and construction and related areas.Click here https://permalink.Mercell.Com/165992361.Aspx.The purpose of the system; system organisationthe dynamic purchasing system that will be entered into is broad and is intended to be used for spatial planning, administration and management, design and regulation, control, and preparation of tender documents.Fredrikstad municipality excludes extremely complex and demanding assignments from the dps, for example, comprehensive, advanced and complex engineering design assignments or assignments requiring expertise in special competence areas. by using the dps for holding tender contests, fredrikstad municipality will also see which companies are included in the system, and the extent to which these can be expected to have the necessary competence.Contracts for construction manager assignments, less complex engineering design assignments will be announced within the dps. further assignments of less complexity, for example, inspection of civil engineering execution or condition assessments.Scope of the system: the system includes consultancy and advisory services in all technical building and municipal engineering disciplines as well as architect services (architect and landscape architect). this can, for example, include: (the list is not exhaustive) see the tender documentation.The contracts within the dynamic purchasing system will normally be based on the standard templates ns 8401, ns 8402 or ns 8403. fredrikstad municipalitys service procurement contract can also be used. the contracts will follow each individual contest in the system.Ordering authorities at the contracting authoritythe dynamic purchasing system will apply for all of fredrikstad municipality and all its entities, as well as fredrikstad church council and hvaler municipality.Overlapping and supporting contractsfredrikstad municipality currently has a number of framework agreements for the above-mentioned disciplines. emphasis is put on the fact that some of the disciplines will join as an option in the dps, as the current contracts have different final dates.In addition fredrikstad municipality will enter into framework agreements for minor assignments. fredrikstad reserves the right to use the dps for minor assignments.These contracts will exist alongside the dynamic purchasing system that fredrikstad municipality will sign. where there are framework agreements binding fredrikstad municipality to purchase within the contracts, these will be utilised. the dynamic purchasing system will thus not be able to lead to so-called contract leaks, but will supplement, and in the long run within some areas be able to replace framework agreements ent

Stoke On Trent City Council Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United Kingdom
Closing Date6 Nov 2024
Tender AmountEUR 450 K (USD 492.1 K)
Details: Stoke-on-trent City Council Has Allocated Some Funding For A Kitchen Extension At Burnwood Community School. The Current Kitchen Is Approximately 92 Sqm In Size And Accommodates 6 Adults Along With A Variety Of Kitchen Appliances. An Extension Is Required Due To The Large Increase In The School's Pupil Population. In 2011 The Kitchen Provided Around 150 Meals However Due To The Vast Increase In Pupil Numbers, The School Is Now Providing Upwards Of 400 Meals Per Day For Pupils From Nursery To Year 6. The Extension Design Is Expected To Comply With Bb103. The Council Intends To Utilise A 2-stage Design And Build Contract For This Project. As Such, The Council Is Now Looking To Appoint A Contractor To Undertake A Pre-construction Services Agreement (pcsa). The Contractor Will Be Required To Undertake All Design Work Required To Complete Riba Stages Up To And Including Riba Stage 4, With An Approval Process At The End Of Each Riba Stage. The Contractor Will Need To Provide Services In A Number Of Fields Including Architectural Design, Mechanical, Electrical, Structural And Civil Engineering, Building Surveying, Quantity Surveying, And Project Management. Cost Management And Quantity Surveying Services Will Be Required To Ensure That The Design That Is Being Developed Can Be Delivered For The Allocated Budget. These Services Can Be Provided Either In-house Or Through Sub-contracted Specialists. The Successful Contractor Will Have And Be Able To Demonstrate Expert Knowledge And Recent Experience Of Working With Educational Buildings. The Consultant Will Need To Attend An Inception Meeting On Site, And Meetings To Present The Work To Date At The End Of Each Riba Stage, With Progress Meetings Throughout The Work Period Arranged As Necessary. These May Be Able To Take The Form Of Virtual Meetings If Appropriate. The City Council Has Allocated A Total Budget Of £450,000 For The Kitchen Extension. This Budget Is To Include All Costs Including The Pcsa Fee, Any Other Fees, Surveys Or Direct Costs, Construction And Fit Out. The Deadline For The Completion Of The Kitchen Extension Is The End Of August 2025, In Order That The Kitchen Is Operational For The Start Of The School Year In September 2025. This Allows 6 Weeks For Construction During The School Summer Holidays, Which Is The Preferred Construction Period. If Construction Is Anticipated To Take Longer Than 6 Weeks, Consideration Will Need To Be Given To The Impact On The School's Operation And Meal Provision During The Term-time Period. The Contractor Will Be Required To Provide A Construction Programme And Logistics Plan For The Construction Period As Part Of The Pcsa Process. At The End Of The Pcsa Period, The Contractor Will Provide Their Contractors Proposals And The Contract Sum For The Construction.
941-950 of 1063 active Tenders