Cctv Tenders
Cctv Tenders
City Of Malabon Tender
Others
Philippines
Closing Date4 Dec 2024
Tender AmountPHP 4.2 Million (USD 71.4 K)
Details: Description Invitation To Bid For Procurement Of Various Tools And Equipments For The City Of Malabon University 1. The City Government Of Malabon, Through The Malasakit Fund Intends To Apply The Sum Of Four Million Two Hundred Forteen Thousand Two Hundred Seventy Two Pesos Only (p 4,214,272.00), Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Procurement Of Various Tools And Equipments For The City Of Malabon University. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Malabon Now Invites Bids From Eligible Bidders For Procurement Of Various Tools And Equipments For The City Of Malabon University. Delivery Of Goods Is Required Within The Period Specified Under Section Vi. Schedule Of Requirements. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (r.a. 9184), Otherwise Known As The “government Procurement Reform Act,” And Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To R.a. 5183 And Subject To Commonwealth Act 138. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Secretariat And Inspect The Bidding Documents At The Address Given Below From November 15, 2024 To December 04, 2024; 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee In The Amount Of Five Thousand Pesos (p 5, 000. 00). 6. The City Government Of Malabon Will Hold A Pre-bid Conference On November 25, 2024 (monday); 3:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. 7. Bids Must Be Delivered To The Address Below On Or Before December 05, 2024 (thursday); 12:00 N.n. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms Set In The Amount Stated In Itb Clause 18. 8. Bid Opening Shall Be On December 05, 2024 (thursday); 2:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 9. The City Government Of Malabon Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information Please Refer To: (originally Signed) Florlinda Ayroso Head- Bac Secretariat (originally Signed) Mr. Alexander T. Rosete Chairperson - Bids And Awards Committee 1 Unit Desktop Set Windows Home 11, Intel Core I5-13400, 8 Gb Ddr4, 1tb Hdd, 256 Gb M.2 2280 Pci-e Ssd, Intel Uhd 730 Graphics For 13th Generation Ms Office For Home & Student, 21.5” Screen Monitor, 1920x1080 @ 100hz, Apc Bvx650 650w Ups Web Cam A4 Tech Headset Noise Cancelling A4 Tech Keyboard And Mouse Set (a4 Tech) 2 Unit Printer Print Speed Of Up To 25.0 Ipm, Prints Up To A3+ (for Simplex), Automatic Duplex Printing, Ultra High Page Yield Of 7500 Pages (black) And 6000 Pages (colour), Wifi, Wifi Direct, Ethernet, Remote Print Driver, Scan To Cloud 3 Unit Mobile Phone 602” Fhd + Dynamic Amolded 2x Galaxy Ai (circle To Search, Live Translate, Chat Assist, Note Assist, Photo Assist), 50mp Ois Wide Lens Dual Sim + Esim 4000mah Battery 3 Unit 55 Inch Smart Tv 55” Smart Tv With Wall Bracket 2 Unit Air Conditioning Unit Dual Standard Inverter Split Type Air Conditioner 2.5hp 3 Unit Closed Circuit Television 6channel 4mp Colorvu Audio Poe 16cameras Outdoor Ip Cctv Package Ip 16/16cra4 8* 4mp Colorvu Audio Bullet Ip Camera (ds-2cd1047g2-luf), 8* 4mp Colorvu Audio Turret Ip Camera (ds-2cd1347g2-luf), 1* 16ch Nvr (ds-7716ni-i4) , 1* 16-port Unmanaged Poe Switch For 16port Switch Kit, 2*8-port Poe Switch For 8 Port Switch Kit., H.265+/h.265/h.264+/h.264 Video Formats, Up To 16/32-ch Ip Camera Inputs, Up To 1-ch@32 Mp/2-ch@12 Mp/16-ch@1080p Decoding Capacity, Up To 160/256 Mbps Incoming Bandwidth, 4mp Colorvu Audio Bullet Ip Camera (ds-2cd1047g2-luf) Specs, High Quality Imaging With 4 Mp Resolution, 24/7 Colorful Imaging, Support Human And Vehicle Detection, Water And Dust Resistant (ip67), Clear Imaging Even With Strong Back Lighting Due To 120 Db Wdr, Efficient H.265+ Compression Technology, Support On-board Storage Up To 256gb (sd Card Slot), Built-in Microphone For Real-time Audio Security , 4mp Colorvu Audio Turret Ip Camera (ds-2cd1347g2-luf) , 16port Switch (ds-3e1318p-ei/m) 2 Unit Projector High Performance Home Cinema,4k Enhanced, Full Hd, Uhd Bd And Hdr Support, Smooth Fast Moving Action, Farme Interpolation And Detail Enhancement, 5000 Hours Lamp Life In Eco Mode, Fully Motorized Optics, Powered Zoom, Focus And Lens Shift, Wide Lens Shift, Vertical +96.3% And Horizontal +47.1 %
Province Of Negros Oriental Tender
Philippines
Closing Date10 Dec 2024
Tender AmountPHP 18.2 Million (USD 309 K)
Details: Description Invitation To Bid Bid No. B-395-2024 1. The Provincial Government Of Negros Oriental, Through Source Of Fund: Early Procurement Activity (epa), Intends To Apply The Sum Of Eighteen Million Two Hundred Sixteen Thousand Sixty-five Pesos & 62/100 (php 18,216,065.62) Being The Abc To Payments Under The Contract To Furnish Security Services Good For One Hundred Eighty-five (185) Security Guards To Perform Duties From January 1 To April 30, 2025 To The Different Offices And Hospitals Of The Provincial Government Of Negros Oriental, For 395 Days Factor (24 Hours For 7 Days A Week With At Least 8 Hours Per Shift) For 185 Security Guards. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Negros Oriental Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00pm (monday To Friday). Wilma D. Padilla Bac Secretariat Office, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City Telephone Number : (035) 225-4835, Local 475 Or 477 / Telefax Number Of Bac Secretariat: (035) 226-3804 Email Address Of Bac Secretariat: Bac-secretariat@negor.gov.ph / Bac.secretariat.neg.or@gmail.com 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20, 2024 To December 10, 2024 Up To 1:00 In The Afternoon From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifteen Thousand Pesos (php 15,000.00). 6. The Bids And Awards Committee Will Hold A Pre-bid Conference On November 27, 2024 At 2:30 In The Afternoon At The Bac Conference Room, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City And/or Through Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before December 10, 2024 At 1:00 In The Afternoon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On December 10, 2024 At 1:30 In The Morning, Bac Conference Room, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City At The Given Address Below. The Attendance Of The Prospective Bidders Or His/her Duly Representative Is Highly Encouraged. 10. Submitted Documents Without Proper Tabbing For All Copies (3 Envelopes) With Name Of The Document (not Letters Or Numbers) And Not Book Bounded (soft/hard) Is Automatically Disqualified. 11. The Bac Of The Province Of Negros Oriental Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Engr. Berchmans N. Patrimonio (end-user) Provincial General Services Officer Capitol Area, Dumaguete City, Neg. Or. Arthur Fran P. Tolcidas Bac Chairman To Furnish Security Services Good For One Hundred Eighty-five (185) Security Guards To Perform Duties From January 1 To April 30, 2025 To The Different Offices And Hospitals Of The Provincial Government Of Negros Oriental, For 395 Days Factor (24 Hours For 7 Days A Week With At Least 8 Hours Per Shift) For 185 Security Guards Note: Please Refer To The Attached Security Personnel Posting List For The Different Offices And Hospitals In The Province, The Additional Contract Requirements, And Terms And Conditions Of The Contract. -x-x-x-x-x-x-x-x-x-x-x-x-x-x- Total Abc: P18,216,065.62 Technical Specifications Additional Set Of Technical Parameters 1. Stability A) Years Of Experience – 5 Years - Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project B) Liquidity Of The Contractor – Details As To The Stability Of The Agency, Data Of Resources And Other Factors Considered As Additional Set Technical Parameters C) Organizational Set Up – Based On The Standards Set By Padpao, Must Have A Branch Office In Metro Dumaguete Area With Base Radio And Landline Telephone At The Start Of Operation, Must Have A Duly Designated Supervisor For Every Guard Shift Within The Metro Dumaguete Area. Base Radio Must Be Located At The Branch Office. 2. Resources A) No. Of Licensed Firearms – One Is To One Per Shift B) No. Of Kinds Of Communication Devices – Functioning Vhf Base Radio & Portable Radio Units Equipped With Charger Plus One Extra Battery Pack For Each Guard Per Shift C) No. And Kind Of Motor Powered Vehicles – Minimum Of One Vehicle Per Shift For The Duly Designated Supervisor D) No. Of Licensed Guards – All Guards Assigned For Duty Should Be Duly Licensed 3. Security Plan - Security Plan For The Different Establishments To Be Secured - Comprehensive Security Plan Detailing The Areas Covered, Their Location And The Number Of Guards Involved 4. Other Factors A) Recruitment And Selection Criteria – Submission Of Quarterly Payroll And Remittance Report To The Procuring Entity And Submission Of Clearances From Sss, Hdmf And Philhealth On Their Regular Remittances B) Completeness Of Uniforms And Other Paraphernalias - Close Circuit Tv On Sensitive Areas (6 Cctv Camera) - Relatively Brand New Firearms Which Are Either Shotguns With Sling And/or 9mm Pistols Or .38 Cal. Revolvers With Extra Rounds Of Ammunitions - Nightstick, Whistle And Flashlight For Night Duty - First Aid Kit - Metal Detectors For The Capitol Building, Hospitals, And For Special Events At The Sports And Cultural Facilities Of The Province. C) Site Inspection
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Civil Works Others
United States
Closing Date13 Dec 2024
Tender AmountRefer Documents
Details: Pre-solicitation Notice / Synopsis project Description: Motco Containerized Ammunition Holding Facilities anticipated Posting Date: 18 October 2024 pre-solicitation Notice Number: W9123825b0001 sam Posting Title: Usace Spk Dbb – Military Ocean Terminal Concord (motco) Containerized Ammunition Holding Facilities - Design-bid-build Construction – Concord, California (ca) sam Posting Description: the United States Army Corps Of Engineers (usace) Sacramento District (spk) Anticipates A Design-bid-build (dbb) Requirement To Construct Eleven (11) Containerized Ammunition Holding Facilities (cahf), A.k.a. Holding Pads, Each With Ammunition Storage Pads, Protective Earthen Berms, Reinforced Concrete Retaining Walls, All Designed In Accordance With Department Of Defense (dod) Explosive Safety Standards. the Cahf Must Support Container Handling Equipment For Day And Night Operations, Which Must Include Improved Or New Pavements, Lighting, Fire Protection, Alarm Systems, Lightning Protection Systems, Security Fencing, Intrusion Detection Systems (ids), Closed Circuit Television (cctv), Information Systems, And Storm Water Drainage Systems. supporting Facilities Include Utilities And Connections (water And Fire Suppression System, Electric, Storm Water, And Communications) And Site Development Grading, Landscaping, And Pavement Improvements, All Focused On The Management Of Munitions And Explosives (mec). the Intended Facilities Will Be Designed In Iaw Dod’s Unified Facilities Criteria (ufc 1-200-02) Which Includes A Minimum Of Forty (40) Year Life And Energy Efficiencies, Building Envelope And Integrated Building Systems Performance. in Consideration Of The Final Rule Amending The Federal Acquisition Regulation (far) On 22 December 2023, To Implement Executive Order 14063, Use Of Project Labor Agreements (plas) On Federal Construction Projects Mandated The Use Of Plas Where The Total Estimated Cost Of The Construction Contract Is Expected To Be $35 M Or More. Therefore, Far 52.222-33 Alt I (jan 2024) Notice Of Requirement For Project Labor Agreement, A Project Labor Agreement Will Be Required From The Apparent Successful Offeror Included In The Forthcoming Solicitation As A Result. the Government Anticipates A 540-day (calendar) Period Of Performance (pop) For This Project From Receipt Of The Notice To Proceed To Include Performance On All Options. due To The Security Posture At Motco, All Individuals Attempting To Gain Access To The Facilities Will Have To Comply With All Security Training Protocols. Moreover, Any Individual That Is Not A United States Citizen Will Not Be Allowed To Enter The Facility. in Accordance With Defense Federal Acquisition Regulation Supplement (dfars) 236.204(ii), The Magnitude Of Construction For The Anticipated Project Is Between $25,000,000 And $100,000,000. the Government Intends To Solicit An Invitation For Bids (ifb) In Accordance With Far Part 14, That Will Result In Award Of A Firm-fixed Price Contract. the Solicitation Is Anticipated To Be Issued Using North American Industrial Classification System (naics) Code 237990 Other Heavy And Civil Engineering Construction. The Small Business Size Standard For This Naics, As Established By The United States Small Business Administration (sba), Is $45,000,000 Annual Revenue. The Product And Service Code (psc) Is Anticipated To Be Y1ga Construction Of Ammunition Storage Buildings. the Solicitation Is Anticipated To Be Issued As Full And Open Competition Through The Procurement Integrated Enterprise Environment (piee - Https://piee.eb.mil) And Governmentwide Point Of Entry, The System For Award Management (sam - Www.sam.gov) On Or About 1 November 2024 With Bids Tentatively Due 13 December 2024. it Is Currently Anticipated That The Government Will Conduct A Pre-bid, Site Visit Approximately Ten Days After Issuance Of The Solicitation. The Solicitation Will Provide Additional Information Regarding The Exact Date And Time. Site Visit Participants Must Complete An Ncic Consent Form And Motco Form 190-3 In Accordance With Site Visit Access Requirements. If You Intend To Attend The Solicitation Site Visit, Please Consider Preparing The Forms In Advance And Submitting As Soon As The Solicitation Is Posted. Access Is Restricted To U.s. Citizens Only And There Is No Guarantee That Late Submissions Will Be Processed. Review And Follow The Instructions And Guidance Provided In Attachments 1 - 3, Which Provide (1) Instructions For Requesting Access And Completing Forms, As Well As Common Reasons For Denial, (2) Required Ncic Consent Form (one Per Attendee), And (3) Required Motco Form 190-3 (one Spreadsheet Per Company). The Ncic Consent Forms And Motco Form 190-3 Must Be Digitally Filled Out (not Printed With Handwritten Answers) Then Sent To Motco_correspondence@usace.army.mil After The Date And Time Have Been Finalized And Posted Within The Solicitation. When Completing The Motco Form 190-3, Ensure The Form Specifies The Project Is Located On The Tidal Side Of The Motco Installation. the Work In Totality Includes Sites That Are Non-contiguous. Due To The Location Of The Work Sites, It Is Anticipated That The Site Visit Will Take A Full Day To Complete. Please Plan Accordingly. The Specific Date, Time, Location, And Access Requirements Will Be Identified In Any Forthcoming Solicitation. please Do Not Request An Updated Schedule If Estimated Dates Are Surpassed; The Government Will Release All Information Publicly Through Piee And Sam When Updates Are Available. Requests For Schedule Updates May Be Ignored. please Do Not Request A Copy Of The Solicitation, Or Draft Plans Or Specs, As They Are Not Currently Available. Any Available Technical Data Will Be Furnished With Any Forthcoming Solicitation. Following Solicitation Release, All Responsible Sources May Submit A Bid That Shall Be Considered By The Agency. This Project And/or The Anticipated Solicitation May Be Changed, Delayed, Or Canceled At Any Time. the Anticipated Solicitation And Attachments Will Be Posted In Portable Document Format (.pdf) Which Will Require Adobe Acrobat Reader To Open And View Files. Adobe Acrobat Reader May Be Downloaded Free Of Charge At Http://www.adobe.com/products/reader. all Prospective Offerors Must Be Registered In The Piee System At Least One (1) Week Prior To The Anticipated Bid Due Date. Registration Is Not Required To Download Any Forthcoming Solicitation Documents, Plans, And/or Specifications, But Is Required To Submit A Bid. Copies Of The Solicitation And Attachments Will Be Made Available For Inspection Without Charge After The Solicitation Is Released, When Accessed Through Piee. Failure To Register In Piee Will Prevent Submission Of Bids As The Government Will Not Accept Them By Any Other Means. See Linked Piee Registration Instructions And Web-based Training For Information About How To Access The Piee Solicitation Module And Submit Bids. all Prospective Offerors Must Be Registered In Sam Before The Anticipated Solicitation Closing Date. Please See The Sam Website For Information About Sam Registration Requirements And Approval Timelines. as Mentioned, Bidders Will Be Required To Comply With Far 2.504 Pla Requirements. Plas In Connection With Public-sector Construction Contracts Must Be Structured To Allow All Contractors (union And Non-union) To Participate. Union Hiring Halls Through Which Applicants Must Ordinarily Pass To Obtain Work On A Particular Project Must Be Operated In A Manner That Does Not Discriminate Based On Union Membership. Potential Bidders Are Encouraged To Review The Requirements Of Far 22.504 And Establish Compliant Plas To Ensure Eligibility For Award. usace Will Not Notify Prospective Offerors Of Any Changes To The Solicitation; Offerors Must Monitor Piee And Sam For The Solicitation To Be Posted, And For Any Posted Changes Or Amendments. the Only Interested Vendors / Plan Holders / Bidders List Is Available Through Sam.gov; Contractors Are Responsible For Identifying Their Entity As An Interested Vendor And Contacting Other Interested Vendors. Usace Spk Will Not Review Capabilities Statements Submitted In Response To This Synopsis Or Coordinate Partnering Arrangements Between Parties. Contractors Should Check Sam.gov Frequently For Changes To The Interested Vendors List And This Notice.
City Of Dasmarinas Tender
Machinery and Tools...+1Automobiles and Auto Parts
Philippines
Closing Date6 Dec 2024
Tender AmountPHP 4 Million (USD 69 K)
Details: Description 24-10-3270 Cesu 1. Tires 12.00 X 20 ……………………………………………………………… 22 Units 2. Tubes 12.00 X 20 ……………………………………………………………. 24 Pcs. 3. Flaps 12.00 X 20 …………………………………………………………….. 24 Pcs. (tube Type – Lug Type) 24-10-3271 Cesu 4. Tires 9.00 X 20 ………………………………………………………………. 4 Units 5. Tubes 9.00 X 20 …………………………………………………………….. 8 Units 6. Flaps 9.00 X 2. ……………………………………………………………….. 8 Units 24-10-3272 Cesu 7. Tires 10.00 X 20 …………………………………………………………….. 4 Units 8. Tubes 10.00 X 20 …………………………………………………………… 4 Units 9. Flaps 10.00 X 20 ……………………………………………………………. 4 Units 24-10-3273 Cesu 10. Tires 8.25 X 16 ……………………………………………………………… 14 Units 11. Tubes 8.25 X 16 ……………………………………………………………. 28 Units 12. Flaps 8.25 X 16 …………………………………………………………….. 28 Units 24-10-3274 Cesu 13. Tires 11.00 X 20 …………………………………………………………… 18 Units 14. Tubes 11.00 X 20 …………………………………………………………. 20 Units 15. Flaps 11.00 X 20 ………………………………………………………….. 20 Units 24-10-3275 Cesu 16. Tires 12.00 R22.5 ………………………………………………………… 20 Units Tubeless – Lug Type 24-10-3276 Cesu 17. Tires 12.00 R22.5 ……………………………………………………….. 20 Units Tubeless – Lug Type 24-10-3277 Cesu 18. Tires 12.00 R22.5 ………………………………………………………. 16 Units 24-10-3354 Cesu 19. Tubes 13.00 X 24 ……………………………………………………….. 4 Pcs 20. Flaps 13.00 X 24 ………………………………………………………… 4 Pcs 24-10-3357 Cesu 21. Air Cooler W/ Sample ……………………………………………….. 1 Pc 22. Hi & Low Valve W/ Sample ……………………………………….. 2 Pcs 23. Air Hose Connector #8 …………………………………………….. 4 Pcs 24. Air Hose Connector #12 …………………………………………… 4 Pcs 24-10-3359 Cesu 25. Wiper Blade L/r Assy With Arm ………………………………. 2 Set (dz14251740014) 24-10-3361 Cesu 26. Propeller Crossjoint Assy …………………………………………. 2 Pcs 24-10-3363 Cesu 27. Tires 185 R14c ………………………………………………………… 4 Units 24-10-3347 Office Of The City Mayor 28. Oil Filter Vic C-415 …………………………………………………. 1 Pc 29. Air Filter …………………………………………………………………. 1 Pc 30. Fuel Filter ………………………………………………………………. 1 Pc 31. Wiper Water Reservoir W/ Motor ………………………….. 1 Unit 32. Drive Belt ………………………………………………………………. 1 Pc 33. Wd40 ……………………………………………………………………. 2 Cans 34. Aircon Fan Assy. ……………………………………………………. 2 Pcs 35. Wiper Blade Banana Type 18’18 …………………………… 1 Set 24-10-3349 Office Of The City Mayor 36. Oil Filter Vic C-306 ………………………………………………. 1 Pc 37. Fuel Filter Assy. ……………………………………………………. 1 Pc 38. Air Cleaner …………………………………………………………… 1 Pc 39. Back Door Handle Assy. ……………………………………….. 1 Unit 40. Window Mechanism Front L/r …………………………….. 1 Set 41. Steering Belt (3280) …………………………………………….. 1 Pc 42. Alternator Belt (2430) …………………………………………. 2 Pcs 43. Wiper Blade L/r ………………………………………………….. 1 Set 44. Aircon Belt (3360) ……………………………………………….. 1 Pc 45. Valve Cover Gasket ……………………………………………… 1 Pc 46. Half Moon …………………………………………………………… 1 Pc 47. Tail Light Assy. L/r With Bulb ………………………………. 1 Set 24-10-3352 Cctv & Security Force Unit 48. Engine Oil Sae 15w40 Gasoline ………………………….. 8 Liters 49. Oil Filter ……………………………………………………………… 1 Pc 50. Air Cleaner …………………………………………………………. 1pc 51. Cabin Filter ………………………………………………………… 1 Pc 24-10-3329 La Funeraria De Dasmariñas 52. Engine Oil 15w 40 (diesel) ……………………………. 7 Liters 53. Oil Filter Vic C-111 ………………………………………… 1 Pc 54. Fuel Filter Element ………………………………………... 1 Pc 24-10-3330 La Funeraria De Dasmariñas 55. Engine Oil 15w-40 (diesel) ……………………………. 8 Liters 56. Oil Filter Vic C-111 ………………………………………… 1 Pc 24-10-3331 La Funeraria De Dasmariñas 57. Engine Oil 15w-40 (diesel) ……………………………. 8 Liters 58. Oil Filter Vic C-111 ………………………………………… 1 Pc 24-10-3332 La Funeraria De Dasmariñas 59. Engine Oil 15w-40 (diesel) ……………………………. 8 Liters 60. Oil Filter Vic C-111 ………………………………………… 1 Pc 24-10-3333 La Funeraria De Dasmariñas 61. Engine Oil 15w-40 (diesel) ……………………………. 8 Liters 62. Oil Filter Vic C-034 ………………………………………… 1 Pc 24-10-3334 La Funeraria De Dasmariñas 63. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 64. Oil Filter Vic C-034 ………………………………………….. 1 Pc 24-10- 3335 La Funeraria De Dasmariñas 65. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 66. Oil Filter Vic C-034 …………………………………………… 1 Pc 24-10-3336 La Funeraria De Dasmariñas 67. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 68. Oil Filter Vic C-306 …………………………………………… 1 Pc 24-10-3337 La Funeraria De Dasmariñas 69. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 70. Oil Filter Vic C-306 …………………………………………… 1 Pc 24-10-3338 La Funeraria De Dasmariñas 71. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 72. Oil Filter Vic C-415 …………………………………………… 1 Pc 24-10-3339 La Funeraria De Dasmariñas 73. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 74. Oil Filter Vic C-415 …………………………………………… 1 Pc 24-10-3340 La Funeraria De Dasmariñas 75. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 76. Oil Filter Vic C-415 …………………………………………… 1 Pc 24-10-3341 La Funeraria De Dasmariñas 77. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 78. Oil Filter Vic C-415 …………………………………………… 1 Pc 24-10-3342 La Funeraria De Dasmariñas 79. Engine Oil 15w-40 (diesel) …………………………….. 8 Liters 80. Oil Filter Vic C-415 …………………………………………… 1 Pc 24-10-3346 Office Of City Mayor 81. Engine Oil Sae 15w40 Diesel ………………………………… 8 Liters 82. Oil Filter Vic C-111 ………………………………………………… 1 Pc 83. Fuel Filter Element ………………………………………………… 1 Pc 84. Air Filter ………………………………………………………………… 1 Pc 85. Cabin Filter ……………………………………………………………. 1 Pc 86. Coolant …………………………………………….. 10 Liters 24-11-3387 Office Of The City Mayor 87. Clutch Lining …………………………………….. 1 Pc 88. Pressure Plate …………………………………… 1 Pc 89. Release Bearing ………………………………… 1 Pc 90. Pilot Bearing ……………………………………… 1 Pc 91. Brake Cleaner ……………………………………. 2 Cans 24-11-3398 Office Of The City Engineering 92. Brake Pad Front L/r ………………………….. 1 Set 93. Brake Shoe Rear L/r …………………………. 1 Set 94. Brake Cleaner ……………………………………. 2 Cans 95. Wd40 ………………………………………………… 2 Cans 24-11-3399 Office Of The City Engineering 96. Engine Oil Sae 15w40 Gasoline ………………………. 7 Liters 97. Oil Filter Vic C-415 ………………………………………… 1 Pc 98. Air Filter ………………………………………………………… 1 Pc 99. Cabin Filter …………………………………………………….. 1 Pc 100. Fuel Filter ……………………………………………………….. 1 Pc 101. Brake Pad Front L/r …………………………………………. 1 Set 102. Brake Pad Rear L/r ………………………………………….. 1 Set 24-11-3400 Octtm 103. Flywheel Assy ……………………………………………. 1 Unit 24-11-3401 Octtm 104. Oil Filter Lf 3345 …………………………………………… 1 Pc 105. Air Cleaner …………………………………………………… 1 Unit 106. 15w-40 Engine Oil (diesel) ……………………………. 1 Pail 107. Air Cleaner ……………………………………………………. 1 Pc 24-11-3402 Octtm 108. Sprocket Oil Seal …………………………………………….. 1 Unit 109. Clutch Lining Assy ……………………………………………. 1 Unit 110. Muffler With Elbow ………………………………………….. 1 Set 111. Ignition Switch …………………………………………………. 1 Set 112. Battery …………………………………………………………….. 1 Unit 113. Slide Gasket (clutch Cover Gasket) ……………………… 1 Unit 114. Brake Pad Front/rear ………………………………………….. 1 Set 115. Brake Disc Rear ……………………………………………………. 1 Unit 24-11-3403 Octtm 116. Harness Assy …………………………………………………… 1 Unit 117. Stator Assy ……………………………………………………….. 1 Unit 118. Signal Light Front L/r ………………………………………… 1 Set 119. Signal Light Rear L/r ………………………………………….. 1 Set 120. Rectifier ……………………………………………………………… 1 Unit 121. Cdi ……………………………………………………………………… 1 Unit 122. Spark Plug …………………………………………………………… 1 Pc Please Be Informed That The City Government Of Dasmariñas Is Only Accepting Cash Or Manager’s Checks Issued By A Universal Or Commercial Bank Equivalent To 2% Of The Approved Budget For The Contract (abc) As The Only Form Of Bid Security And A Performance Security Equivalent To 5% Of The Total Contract Price.
Department Of Public Works And Highways Tender
Civil And Construction...+1Building Construction
Philippines
Closing Soon26 Nov 2024
Tender AmountPHP 64.5 Million (USD 1 Million)
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Ii Dalan Na Pavvurulun, Rgc, Carig Sur, Tuguegarao City, Cagayan Invitation To Bid For 24b00127 : Construction Of Two - Storey Building For Procurement Service: Department Of Budget And Management (ps-dbm) Regional Depot - Tuguegarao 1. The Dpwh Regional Office Ii, Through The 2024 Ps-dbm Revolving Fund Intends To Apply The Sum Of ₱64,525,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract 24b00127: Construction Of Two - Storey Building For Procurement Service: Department Of Budget And Management (ps-dbm) Regional Depot - Tuguegarao. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Dpwh Regional Office Ii Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Construction Of Two - Storey Building For Procurement Service: Department Of Budget And Management (ps-dbm) Regional Depot - Tuguegarao Contract Id No. : 24b00127 Location : Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Brief Project Description : Ps-dbm Building, Generator Set With Generator Set House And Concrete Pavement, Building = 23.0 X 33.8 Meters Scope Of Works : Facilities For The Engineer • Provision (rental Basis), Operation And Maintenance Of Combined Field Office, Laboratory And Living Quarters Building For The Engineer • Provision Of Furniture /fixtures Equipment & Appliances For The Field Office Of The Engineer Other General Requirements • Permits And Clearances • Project Billboard/signboard (dpwh, Coa, Denr) • Occupational Safety And Health Program • Traffic Management • Mobilization/demobilization • Additional Geotechnical Investigation Earthworks • Trees (furnishing And Transplanting) • Clearing And Grubbing • Removal Of Trees • Structure Excavation • Embankment (from Structure Excavation And Borrow) • Gravel Fill Subbase And Base Preparation • Aggregate Subbase Course Surface Courses • Pccp, 0.15m Thick, 14-day Concrete Plain And Reinforced Concrete Works • Structural Concrete, (3000 & 4000) Psi, Class A, 28 Days • Lean Concrete • Reinforcing Steel Grade (40 & 60) • Formworks And Falseworks Finishing And Other Civil Works • Soil Poisoning • Ceiling, Metal Frame, Gypsum Board • Aluminum Metal Cladding • Modular Partition • Louver Window • Flush Door • Aluminum Framed Glass Doors (swing Type) • Aluminum Glass Windows, (casement, Awning, Fixed) Type • Frames (jambs, Sills, Head, Transoms And Mullions) • Doors, (flush, Wood Panel) • Roll-up Doors • Waterproofing, Liquid • Built-up And Preformed Membrane • Canopy Drain With Strainer • Unglazed Tiles • Cement (floor, Plaster) Finish • Stucco Finish • Painting Works, (masonry/concrete, Steel) • Pvc Doors And Frames • Chb Non-load Bearing (including Reinforcing Steel), (100 & 150) Mm • Louver Block • Metal Structure Accessories • Metal Railing (steel) • Sanitary/plumbing Fixtures • Cold Water Lines • Sewer Line Works • Storm Drainage And Downspout Electrical Works • Rigid Steel Conduit • Rigid Polyvinyl Chloride Pipes (pvc/upvc) • Boxes/wire Gutter • Fittings And Accessories • Electric Wire • Single Pole Wall Switch On One Switch Plate • Duplex (2 Single Pole Wall Switches On One Switch Plate) • Triplex (3 Single Pole Wall Switches On One Switch Plate) • Three-way Switch • Single Convenience Outlet/receptacle, Grounding Type (gt) • Duplex Convenience Outlets/receptacles (gt) • Pop-up Type/floor Duplex Convenience Outlet/receptacle (gt) • Wires And Wiring Devices • Panelboard With Main & Branch Breakers • Pad Mounted Distribution Transformer (oisc) With Complete Accessories • Generator (single Or Three Phase - Standby) • Lighting Fixtures Electronic Works • Network Cabling • Cctv System • Network Video Recorder • Lcd, Led Monitor • Door Access And Card Reader System • Public Address System • System Management Amplifier • Remote Microphone • Ceiling Speaker • Wall Mount Speaker • Wires/cables • Fire Alarm System • Smoke Detector With Base • Heat Detector With Base • Fire Alarm Control Panel • Manual Pull Station Switch • Back-up Battery Pack Mechanical Works • Ventilating Equipment • Exhaust Fan (ceiling Cassette, Wall Mounted, Wall Mounted, Industrial Type) • Booster Pump With Control • Water Tank (stainless) • Fire Department Connections For Wet And Dry Type System • Air Conditioning System (vrf/vrv) • Service Elevator Approved Budget For The Contract (abc) : ₱64,525,000.00 Contract Duration : 243 Calendar Days Inclusive Of 16 Unworkable/rainy Days, 47 Sundays And Holidays 2. The Major Category Of Work For The Project Is Bicwoplc - Buildings: Construction-without Piles-low Rise-concrete Frame(1 To 5 Storey ). 3. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Size Range Of At Least Medium A. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Pursuant To Gppb Resolution No. 15- 2021 Dated October 14, 2021, Prospective Bidders Shall Submit In Their First Envelope The Updated Philgeps Certificate Of Platinum Registration And Membership In Accordance With Sections 23.3, 24.4.3 And 54 Of Republic Act 9184 (ra9184), All Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Supporting The Veracity, Authenticity And Validity Of The Certificate Shall Remain Current And Updated, And That Failure By The Prospective Bidder To Update Its Philgeps Certificate Of Platinum Registration And Membership With The Current And Updated Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Shall Result In The Automatic Suspension Of The Validity Of Its Certificate Of Platinum Registration And Membership Until Such Time That All Of The Expired Class “a” Eligibility Documents Has Been Updated. 5. Bidders Are Required To Update Their Existing Philgeps Registration (platinum) In The Dpwh Civil Works Registry Prior To The Scheduled Receipt And Opening Of Bids. 6. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 7. Interested Bidders May Obtain Further Information From The Dpwh Regional Office Ii And Inspect The Bidding Documents At Procurement Staff, 4th Floor, Dpwh Regional Office No. Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan During Weekdays From 8:00 A.m. To 5:00 P.m.. 8. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 6 - 26, 2024, From The Address Given Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifty Thousand Pesos Only (₱50,000.00). Pursuant To Section 17. 5 Of The 2016 Revised Irr Of Ra 9184, Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of Ra 9184 And Its Irr. 9. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 10. The Dpwh Regional Office Ii Will Hold A Pre-bid Conference On November 13, 2024, 1:00 Pm At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan, And/or Through Webcasting Via Youtube Channel (dpwh Regional Office Ii Procurement Livestream) Which Shall Be Open To Prospective Bidders. Prospective Bidders Are Encouraged To Send Their Technical Personnel To Attend The Pre-bid Conference. 11. Bid Submission May Be Done Manually Or Electronically. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds Clause 17. 12. Bids Must Be Duly Received By The Bac Secretariat For Manual Submission At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Or At Electronicbids_r2@dpwh.gov.ph For Electronic Submission And Receipt Of Bids On Or Before November 26, 2024 At 10:00 Am. Late Bids Shall Not Be Accepted. 13. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Bds Clause 15.1. 14. Bid Opening Shall Be On November 26, 2024, Immediately After The Deadline For The Submission Of Bid At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 15. The Dpwh Regional Office Ii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra 9184, Updated As Of July 19, 2024, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 16. You May Visit The Following Websites; For Downloading Bidding Documents: Dpwh Website: Www.dpwh.gov.ph Philgeps Website: Www.philgeps.gov.ph Livestreaming Website: Https://www.youtube.com/@dpwh.ro.2 For Online Bid Submission: Electronicbids_r2@dpwh.gov.ph 17. For Further Information, Please Refer To: Hilario Y. Casem Engineer Iv Head, Procurement Staff Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Contact No.: 0935-176-0624 Email Address: Casem.hilario@dpwh.gov.ph Bernard T. Calabazaron Chief, Qah Division Bac Chairperson Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Calabazaron.bernard@dpwh.gov.ph Date Of Posting: Dpwh And Philgeps Websites: November 6 -12, 2024 Conspicuous Place (procurement Bulletin Board): November 6 -12, 2024
Department Of Agriculture Tender
Others
Philippines
Closing Soon21 Nov 2024
Tender AmountPHP 16.6 Million (USD 282.7 K)
Details: Description Invitation To Bid For The Provision Of Security Services Of Da Rfo 1 For The Period Of January 1, 2025 To December 31, 2025 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of Sixteen Million Six Hundred Sixty-seven Thousand Forty Pesos (php16,667,040.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Provision Of Security Services Of Da Rfo 1 For The Period Of January 1, 2025 To December 31, 2025 With Project Identification Number Da-rfo-1-2025-goods-002. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Minimum Specifications, To Wit: Particulars/descriptions Da Rfo-i Proper (city Of San Fernando, La Union), 3 Posts With 3 Regular Shifts Per Post Da Iliarc, Sapilang (bacnotan, La Union), 1 Post With 3 Regular Shifts Per Post 1 Night Shift Da-prec, Sta. Barbara, Pangasinan (main Office), 1 Post With 3 Regular Shifts Per Post Plus 1 Night Shift Da-prec, Sta. Barbara, Pangasinan (breeding Station), 1 Post With 3 Regular Shifts Per Post Plus 1 Night Shift Da-prec, Sual, Pangasinan, 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-prec, Sual, Pangasinan (incubation Hub), 3 Posts With 3 Regular Shifts Da-inrec (batac Office), 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-inrec (dingras Livestock Station), 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-inrec (dingras Admin Office/crops Station), 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-regional Integrated Agricultural Laboratories (rial) Building In Tebag, Sta Barbara, Pangasinan, 1 Post With 3 Regular Shifts Koica Rpc, Sta. Barbara, Pangasinan, 1 Post With 3 Regular Shifts Isrec, San Juan, Ilocos Sur, 1 Post With 3 Regular Shifts Plus 1 Night Shift Total Number Of Guards = 56 For Night Shift 9:00 Pm To 5:00 Am Regular Shift (3 Shifts 7:00am To 3:00pm; 3:00pm To 11:00pm; 11:00pm To 7:00am) Terms And Conditions: I. Security Service Provider Guarantees To Deploy Licensed, Competent, Uniformed, Armed And Bonded Security Guards In Accordance With R.a. 5487 As Amended, To Wit: 1. Filipino Citizen, Of Legal Age But Not Over 55 Years Of Age; 2. Physically, Psychologically And Mentally Fit In Accordance With Para-military Standards Including Height And Weight; 3. Neuro-psychological And Drug-test Eligible; 4. Of Good Moral Character, Cleared By Law Enforcement Agencies W/ No Derogatory Record Of Criminal Offense, Moral Turpitude Or Previous Conviction Of Any Wrong Doing; 5. Alert, And Preferably With Functional Emergency Or Disaster Preparedness Training Certified By Concerned Agencies; 6. No Record As Adversarial Party To Any Previous Or Pending Judicial Or Quasi-judicial Case With Da Rfo 1 Or Its Stations; 7. With Agency-paid And Up-to-date/timely Remittance Of Sss, Philhealth Or Pag-ibig Premiums; 8. Preferably Knows How To Drive, With Professional Driver's License; 9. Preferably With Personal Accident Insurance; 10. Must Be Neat And Clean In Proper Uniform And Armed With A Functional Long Fire Arms (shotgun For Stations) Or Pistol With Ammunition And Metal Detector At All Times During His/her Tour Of Duty. Ii. Security Service Provider Must Comply With The Additional Set Of Technical Parameters For Security Guards Pursuant To Gppb Res. 024-2007, Dated September 28, 2007. Iii. The Security Service Provider Must Be An Active Employer Registered With The Following Agencies: (1) Social Security System (sss); (2) Home Development Mutual Fund (pag-ibig Fund), And (3) Philippine Health Insurance Corporation (philhealth). Iv. The Security Service Provider Must Provide, Install And Maintain Cctv Cameras With Complete Accessories For The Security Purposes Of The Following Offices/stations: 1. Da Rfo1 (43 Cameras) 2. Inrec Batac (35 Cameras) 3. Inrec Dingras (18 Cameras) 4. Isrec San Juan (10 Cameras) 5. Iliarc (20 Cameras) 6. Prec Sta. Barbara (main) (38 Cameras) 7. Prec Sta. Barbara (breeding) (18 Cameras) 8. Prec Sual (19 Cameras) 9. Prec Sual (incubation Hub) (10 Cameras) 10. Rial-sta. Barbara, Pangasinan (5 Cameras) V. Security Service Provider Must Submit The Ff: (1) Dole Certification Of Bidder's Compliance With Existing Labor Laws; (2) Certification From Nlrc Indicating That The Bidder Has No Pending/on-going Cases; (3) Dole Registration As Service Contractor Pursuant To Dole Department Order No. 174, Series Of 2017; (4) Sworn Statement Of The Bidder Of No Adverse Decision Rendered By The Dole And Nlrc Within Five (5) Years. Vi. The Security Service Provider Must Have Security Plans Which Shall Be Carried Out In All Offices/stations Where Guards Will Be Posted And Must Pay The Salary Of The Security Personnel On Time. Vii. The Security Service Provider Must Provide Copy For Da-rfo 1 The Ff: (1) Good Moral Character, Cleared By Law Enforcement Agencies W/ No Derogatory Record Of Criminal Offense, Moral Turpitude Or Previous Conviction Of Any Wrong Doing; (2) Neuro-psychological Eligibility; (3) Drug-test Eligibility. Viii. The Security Service Provider Must Be Willing To Allow Its Security Guards To Be Subjected To Further Neuro Psychological And Drug Testing As May Be Necessary Upon Due Notice. Ix. The Security Service Provider Must Have Headquarters/offices/ Supervisors Within The Province Of Deployment Of The Security Guards To Enable Them To Conduct Inspection Or Supervision Even During Wee Hours. X. The Security Service Provider Must Provide One (1) Motorcycle Service For Incubation Hub-sual, Pangasinan. The Contract For The Provision Of Security Service Shall Start On January 1, 2025. Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From October 30, 2024 To November 18, 2024 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php25,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 06 November 2024, 10:00 Am At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 18 November 2024, 2:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 18 November 2024, 2:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa. C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Eligibility Requirements Can Be Fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed By The Bidder/authorized Representative On Each And Every Page Thereof. E. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: E.1 Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or E.2 The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No. :(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo 1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ October 29, 2024 Approved: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-goods-002
Philippine Merchant Marine Academy Tender
Others
Philippines
Closing Date9 Dec 2024
Tender AmountPHP 79.9 Million (USD 1.3 Million)
Details: Description Quantity Unit Item Description 1 Lot Procurement Of Integrated Full Mission Bridge And Engine Room Simulator With Desktop Station Full Mission Bridge Simulator (fmbs) And Mini Bridge Stations’ Features And Applications, Major Components, Bridge Simulator Performance Standards And Hardware 1. Major Components The Full Mission Bridge Simulators That Can Be Integrated With Engine Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Bridge Station With 270° Horizontal Display (class A Configuration); B. Seven (7) Mini Bridge Stations With 120° Horizontal Display (class B Configuration); C. One (1) Server Station; D. One (1) Instructor Station; E. One (1) Simulator Scenario Development Station; And F. One (1) Briefing/ Debriefing Station. 2. Features And Applications 2.1 The Bridge Simulator Should Provide A Realistic, Ship-like Environment Based On Real Hardware Consoles And High-quality Visualization. The Systems Include Major Components Such As Conning, Radar/ Arpa And Ecdis, Gmdss, Navigation Equipment, Bearing Finder, Steering Control Console, Engine Control, Auto Pilot System, Overhead Display, Etc. 2.2 The Bridge Simulator Product Shall Be Certified And Compliant As Class A (full Mission), B (multi-task), C (limited Task), And D (cloud-based Distant Learning) Type-approved Maritime Simulator System By An Internationally Recognized Classification Society. The Compliance With Classification Shall Be Reflected In The Certificate Of The Product. 2.3 The Simulator Can Be Utilized To A Variety Of Navigation Techniques Under Different Environmental Conditions, Serving A Wide Range Of Purposes As Follows: 1. Control Of The Ship While Navigating In The Operational And Emergency Modes In Various Weather Conditions With The Possibility Of Setting Wind And Current Parameters; 2. Analysis Of The Above-water Situation In Day And Night Conditions; In Poor Visibility By Visible Navigation Lights And Information Received From Radar/ Arpa; 3. Use Of The Electronic Chart-based Navigational Information System (ecdis); 4. Practical Use Of Radio Equipment And Global Maritime Distress And Safety System (gmdss) Facilities; 5. Application Of The International Regulations For Preventing Collisions At Sea; 6. Ship Control During Anchoring And Mooring; 7. Ship Control During Towing Operations; 8. Ship Control During Maneuvers "man Overboard"; 9. Rational Methods Of Ship Control In Case Of Main Engines (me) And Ship And Navigation Equipment Failures During Movement; 10. Eye Survey Of Above-water And Radar Situation, Determination Of Vessel Movement Elements; 11. Navigational Situation Assessment By Visual Observation During Daytime, By Lights At Night Time And By Observation Of Transmission Of Echo Signals On Ppi Simulators In Conditions Of Limited Visibility; 12. Visual Determination Of Vessel Movement Patterns, Maneuvering Capabilities And Dimensions; 13. Selection And Execution Of Collision Avoidance Maneuvers In Open Sea, During Night And In Limited Visibility Conditions Using Radar/arpa; 14. Evaluation Of Accuracy Of Primary And Secondary Information Received From Arpa, Consideration Of Factors Affecting Accuracy Of Arpa And Delay In Formation Of Secondary Radar Information; 15. Orientation Of Ships In Complex Navigation Conditions In Daytime And Nighttime And In Conditions Of Limited Visibility; 16. Use Of Ecdis For Preliminary And Executive Plotting, Practicing Correct Response To Emergency Signals Produced By Ecdis, Solution Of Chart-metric Tasks And Ensuring Safety Of Navigation With The Use Of Information Received From Ecdis; 17. Use Of Basic Capabilities Of Marine Mobile Service And Marine Mobile Satellite Service. 2.4 The Bridge Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate. · Table A-ii/1.1 - Plan And Conduct A Passage And Determine Position. • Table A-ii/1.2 - Maintain A Safe Navigational Watch. • Table A-ii/1.3 - Use Of Radar And Arpa To Maintain Safety Of Navigation. § Table A-ii/1.4 - Use Of Ecdis To Maintain The Safety Of Navigation. • Table A-ii/1.5 - Respond To Emergencies. • Table A-ii/1.6 - Respond To A Distress Signal At Sea. • Table A-ii/1.8 - Transmit And Receive Information By Visual Signaling. • Table A-ii/1.9 - Manoeuvre The Ship. • Table A-ii/2.1 - Plan A Voyage And Conduct Navigation. • Table A-ii/2.2 - Determine Position And The Accuracy Of Resultant Position Fix By Any Means. • Table A-ii/2.3 - Determine And Allow For Compass Errors. • Table A-ii/2.4 - Co-ordinate Search And Rescue Operations. • Table A-ii/2.5 - Establish Watchkeeping Arrangements And Procedures. • Table A-ii/2.6 - Maintain Safe Navigation Through The Use Of Information From Navigation Equipment And Systems To Assist Command Decision-making. • Table A-ii/2.7 - Maintain The Safety Of Navigation Through The Use Of Ecdis And Associated Navigation Systems To Assist Command Decision Making. • Table A-ii/2.10 - Maneuver And Handle A Ship In All Conditions. • Table A-ii/2.11 - Operate Remote Controls Of Propulsion Plant And Engineering Systems And Services. • Table A-ii/3.1 - Plan And Conduct A Coastal Passage And Determine Position. • Table A-ii/3.2 - Maintain A Safe Navigational Watch. • Table A-ii/3.3 - Respond To Emergencies. • Table A-ii/3.4 - Respond To A Distress Signal At Sea. • Table A-ii/3.5 - Manoeuvre The Ship And Operate Small Ship Power Plants. • Table A-ii/4.1 - Steer The Ship And Also Comply With Helm Orders In The English Language. • Table A-ii/4.2 - Keep A Proper Look-out By Sight And Hearing. § Table A-ii/5.2 - Contribute To Berthing, Anchoring And Other Mooring Operations. • Table A-v/4-1.1 - Contribute To Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-1.2 - Monitor And Ensure Compliance With Legislative Requirements. • Table A-v/4-1.3 - Apply Safe Working Practices, Respond To Emergencies. • Table A-v/4-1.4 - Ensure Compliance With Pollution-prevention Requirements And Prevent Environmental Hazards. • Table A-v/4-2.1 - Plan And Conduct A Voyage In Polar Waters. • Table A-v/4-2.2 - Manage The Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-2.3 - Maintain Safety Of The Ship's Crew And Passengers And The Operational Condition Of Life- Saving, Firefighting And Other Safety Systems. 2.5 The Bridge Simulator Shall Allow For Training And Certification Of Watch Officers, Chief Officers, Captains, And Pilots Serving On Commercial And Fishing Vessels Of 500 Gross Tonnage Or More In Accordance With The Requirements Of The Imo Stcw Convention And Model Courses: · 1.07 – Radar Navigation, Radar Plotting And Use Of Arpa; · 1.08 – Radar, Arpa, Bridge Teamwork And Search & Rescue; · 1.22 – Ship Simulator And Bridge Teamwork; · 1.27 – Operational Use Of Electronic Chart Display And Information System (ecdis); · 1.32 – Operational Use Of Integrated Bridge System; · 1.34 – Operational Use Of Ais; · 2.02 – Maritime Sar Coordinator; · 3.11 – Marine Accident And Incident Investigation With Compendium; · 3.19 – Ship Security Officer; · 3.23 – Actions To Be Taken To Prevent Acts Of Piracy And Armed Robbery; · 7.01 – Master And Chief Mate; · 7.03 – Officer In Charge Of Navigational Watch; · 7.05 – Officer In Charge Of Navigational Watch Of Fishing Vessel; · 1.25 – General Operator’s Certificate For The Gmdss; · 1.26 – Restricted Operator’s Certificate For The Gmdss. 2.6 The Bridge Simulator Shall Have All The Ownship Models, Target Ship Models , Objects And Exercise Areas Available In The Database Of The Simulator Product. It Shall Also Include Polar Areas, The Existing Models And Areas In Current Simulator, Naval And Coast Guard Ship Models, Ship Models Ready For Integration With Engine Simulators And Ship/engine Models Using Future Fuels. 2.7 The Simulator Shall Have Intercom Installed In The Instructor Station And All Bridge Stations. 2.8 The Simulator Shall Have An Evaluation And Assessment Method Designed For The Evaluation And Assessment Of A Range Of Predefined Assessment Parameters From The Following Categories: • Planning And Conducting A Passage And Determine Position; • Maintain Safe Navigational Watch; • Using Radar And Arpa To Maintain Navigational Safety; • Ability To Operate And Analyze Information Obtained From Arpa; • Respond To Emergencies; • Use Imo Standard Marine Communication Phrases And Use English Inwriting And Speaking; • Transmit And Receive Information Using Visual Signals; • Maneuver The Ship; • Colreg. 2.9 The Simulator Shall Have The Ability To Set Up A Scoring And Grading System To Evaluate The Operator’s Performance. The Program Allows The Instructor To Monitor The Results Of The Bridge Team / Operator Workstation Performance. 2.10 The Simulator Shall Be Capable Of Simulating Ship Operation In Polar Waters Or Ice Navigation According To The Polar Code And Shall Have The Following Training Capabilities: - Ice Management Of Offshore Installations In An Arctic Environment, - Use Of Radar Data And Ice Charts In Ecdis While Navigating In Ice Conditions, - Following Of Icebreakers, - Offshore Loading Operations To Include Mooring To Single Point Mooring And Floating Production Storage And Offloading Equipment In Ice Conditions, And - Navigation In Shattered Ice, Along Hard Ice Edges, Bumping Against Ice Edges, In Open Pack Ice, In Ice Holes, And Spots Of Ice-free Water. 2.11 The Ice Navigation Environment Shall Have The Following Characteristics: - Capable Of Ice Accumulation On Ship Superstructure, - Ship’s Tracks On Ice Fields Re-freeze As Programmed By The User, - Ice Mounds And Channels Can Be Added By The User, - Characteristics Of Ice Resistance Are Based On The Type Of Ice, Thickness, And Accumulation, - Capable Of Traversing Large Ice Areas, And - Realistic Representation Of Iceberg Objects. 3. Bridge Simulator Performance Standards 3.1 Physical Realism The Bridge Simulator Stations Shall Have The Following Physical Realism: A. The Equipment, Consoles, And Workstations Shall Be Installed, Mounted, And Arranged In A Manner That Mimics An Actual Bridge Of A Ship. B. The Workstations Shall Have Standard Rubber Mat Flooring. The Simulator Shall Have The Following Equipment: C. Controls Of Propulsion Plant Operations, Including Engine Telegraph, Pitch-control And Thrusters. There Shall Be Indicators For Shaft(s) Revolutions And Pitch Of Propeller(s). There Shall Be Controls For At Least One Propeller And One Bow Thruster. D. Controls Of Propulsion Plant For Mooring Operations. By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Operation Of Such Controls. E. Controls Of Auxiliary Machinery. There Shall Be Controls For At Least Two Auxiliary Engines, Including Electric Power Supply Control. F. Steering Console, Including Equipment For Hand Steering And Automatic Steering With Controls For Switchover. There Shall Be Indicators Of Rudder Angle And Rate Of Turn. G. Steering Compass And Bearing Compass (or Repeater) With An Accuracy Of At Least 1 Degree. H. At Least One Radar/arpa Display/unit (automatic Radar Plotting Aid). It Shall Be Possible To Simulate Both A 10 Cm (s-band) And A 3 Cm (x-band) Radars. The Radar Shall Be Capable To Operate In The Stabilised Relative-motion Mode And Sea- And Ground-stabilised True-motion Modes (see Stcw Section A-1/12.4.1 And 1/12.5 And Paragraph 2 Of Section B-i/12). I. Communication Equipment Per Gmdss (global Maritime Distress Safety System) Framework, Covering At Least The Requirements For The Relevant Area. J. The Simulator Shall Include A Communications System That Will Allow For Internal Ship Communications To Be Conducted. K. Ecdis (electronic Chart Display And Information System) Displaying Selected Information From A System Electronic Navigational Chart (senc) With Positional Information From Navigation Sensors Like Ais And Radar To Assist The Mariner In Route Planning And Route Monitoring, And By Displaying Additional Navigation-related Information. (see Stcw Section B-i/12). L. Gps (global Positioning System), Echo-sounder And Speed Log Showing Speed Through The Water (1 Axis) For Ships Below 50,000 Grt And In Addition Speed And Distance Over Ground In Forward And Athwart Ship Direction For Ships Above 50,000 Grt. M. Instrument (anemometer) For Indication Of Relative Wind- Direction And Force. N. Ship Sound Signal Control Panel According To Colreg. O. Instrument For Indication Of Navigational Lights. P. Function For Transmitting Visual Signals (morse Light). Q. Control System For General Alarm And Fire Detection/alarm And Other Alarms. R. Ais (automatic Identification System). S. Ship-borne Meteorological Instrument. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: T. Controls For Propulsion Plant Operations, Including Engine Telegraph, Pitch Control, And Thrusters. There Shall Be Indicators For Shaft Revolutions And Pitch Of Propeller. There Shall Be Controls For At Least One Propeller And One Bow Thruster. U. Two Speed And Distance Measuring Devices. Each Device Should Operate On A Different Principle, And At Least One Device Should Be Capable Of Being Operated In Both The Sea And The Ground Stabilized Mode. V. Searchlight Controllable From Conning Positions. W. Manually Operated Flashing Red Light Visible From Astern To Indicate When The Ship Is Stopped. X. Vdr (voyage Data Recorder) Or Capability For Vessel History Track And Learner Actions Log From The Instructor And The Assessor Position. Y. Equipment Capable Of Receiving Ice, Icing Warnings, And Weather Information Charts. Z. Anchoring And Towing Arrangements. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Aa. Workstation For Navigating, Maneuvering And Monitoring Consisting Of: · Radar/arpa · Ecdis · Conning Display · Binoculars Control · Autopilot Control · Observer Position/ Visual Control · Information On Position-fixing Systems · Information On Ship Automatic Identification System (ais) · Heading Control System · Flags, Daytime Shapes And Sound Signals · Control For The Main Engine Including Emergency Stop · Control For The Main Rudder Using Helm · Controls For Thruster · Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Internal Communication Equipment · Public Address System · Vhf With Channel Selector · Remote Control For Searchlight · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Illumination Of Equipment And Displays In The Surrounding Darkness · Sound Reception System · Acknowledgment Of The Watch Alarm · Controls For Console Lighting · Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light Bb. Workstation For Manual Steering (wheelhouse) Consisting Of: · Steering Wheel · Rudder Pump Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn Cc. Workstation For Planning And Documentation Consisting Of: · Ecdis Including Navigation Planning Station · Route Planning Devices · Chart Table · Paper Charts · Plotting Aids Dd. Workstation For Communications Consisting Of: · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer Ee. All Systems Related To The Integrated Bridge System Shall Include Failure Control(s) And Method(s) To Train And Assess The Learner In The Use Of Advanced Equipment, Technology And Enable Familiarization And Training To Understand The Limitations Of Automatic Systems. 3.2 Behavioral Realism The Bridge Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulation Of Ownship Shall Be Based On A Mathematical Model With 6 Degrees Of Freedom. B. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Open Water Conditions, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. C. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Restricted Waterways, Including Shallow Water And Bank Effects, Interaction With Other Ships And Direct, Counter And Sheer Currents. D. The Simulator Shall Include Mathematical Models Of Different The Types Of Ownships. E. The Simulator Shall Include Tug Models That Can Realistically Simulate Tug Assistance During Maneuvering And Escort Operations. It Shall Be Possible To Simulate Pull, Push, Reposition Towing And Escorting. F. The Simulator Shall Include Exercise Areas Including Correct Data For Landmass, Depth, Buoys, Tidal Streams And Visual As Appropriate To The Nautical Chart And Publication Used For The Relevant Training Objectives. G. The Radar Simulation Equipment Shall Be Capable Of Model Weather, Tidal Streams, Current, Shadow Sectors, Spurious And False Echoes And Other Propagation Effects, And Generate Coastlines, Navigational Buoys And Search And Rescue Transponders. H. The Arpa Simulation Equipment Shall Incorporate The Facilities For: - Manual And Automatic Target Acquisition - Fast Track Information - Use Of Exclusion Areas - Vector/graphic Time-scale And Data Display - Trial Maneuvers. I. The Ecdis Simulation Equipment Shall Incorporate The Facilities For: - Integration With Other Navigation Systems - Own Position - Sea Area Display - Mode And Orientation - Chart Data Displayed - Route Monitoring - User-created Information Layers - Contacts (when Interfaced With Ais And/or Radar Tracking) - Radar Overlay Functions. J. The Simulator Shall Provide An Own Ship Engine Sound, Reflecting The Power Output. K. The Simulator Shall Provide Capabilities For Realistically Conduct Anchoring Operations. L. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Interaction With Applicable Anchor And Chain Dimensions With Different Bottom Holding Grounds, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. M. The Simulator Shall Provide Capabilities For Realistically Simulate The Function Of Mooring And Tug Lines And How Each Line Functions As Part Of An Overall System Taking Into Account The Capacities, Safe Working Loads, And Breaking Strengths Of Mooring Equipment Including Mooring Wires, Synthetic And Fiber Lines, Winches, Anchor Windlasses, Capstans, Bitts, Chocks And Bollards. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: N. The Own Ship Model Shall Realistically Simulate Hydrodynamics In Interaction With Solid Ice Edge. O. The Own Ship Model Shall Realistically Simulate Hydrodynamics And Ice Pressure In Interaction With Solid And Packed Ice. Ship Motion In Solid Ice Should Affect At Least Ship Speed And Turning Radius. P. The Own Ship Model Shall Realistically Simulate The Effects Of Reduced Stability As A Consequence Of Ice Accretion. Q. It Shall Be Possible To Simulate The Effect Of The Following Ice Conditions With Variations: - Ice Type - Ice Concentration - Ice Thickness. R. It Shall Be Possible To Realistically Simulate The Towing Of Ownship – Ownship, And Own Ship Target Ship And Target Ownship. It Shall Be Possible To Introduce Different Towing Gear Like Rope Or Steel Wire With Different Strength And Elasticity, Forward, Stern And Side Towing. S. It Shall Be Possible To Realistically Simulate The Interaction Between The Ships Propeller Wash And The Ice. T. It Shall Be Possible To Realistically Simulate Ice Drift. U. The Simulator Shall Be Equipped With Iceberg Targets Of At Least Six Different Sizes Including Realistic Underwater Bodies Which Interacts With The Sea Bottom. The Icebergs Should Be Visible On The Ship's Radar. V. Motion Through Ice Hummocks Should Be Simulated Realistically Considering Ship Icebreaking Capabilities And Affect Ship's Speed, Roll And Pitch. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation System: W. The Integrated Navigation System Should Combine Process And Evaluate Data From All Sensors In Use. The Integrity Of Data From Different Sensors Should Be Evaluated Prior To Distribution. X. The Integrated Navigation System Shall Ensure That The Different Types Of Information Are Distributed To The Relevant Parts Of The System, Applying A Consistent Common Reference System For All Types Of Information. Y. The Integrated Navigation System Shall Provide Information On Position, Speed, Heading, And Time. Z. The Integrated Navigation System Shall Be Able To Automatically, Continually And Graphically Indicate The Ship's Position, Speed And Heading And, Where Available, Depth In Relation To The Planned Route As Well As To Known And Detected Hazards. Aa. The Integrated Navigation System Shall, In Addition, Provide Means To Automatically Control Heading, Track Or Speed, And Monitor The Performance And Status Of These Controls. Bb. Alarms Shall Be Displayed So That The Alarm Reason And The Resulting Functional Restrictions Can Be Easily Understood. 3.3 Operating Environment The Bridge Simulator Shall Exhibit The Following Operating Environment: A. The Simulator Shall Be Able To Present Different Types Of Target Ships, Each Equipped With A Mathematical Model, Which Accounts For Motion, Drift And Steering Angles According To Forces Induced By Current, Wind Or Wave. B. The Targets Shall Be Equipped With Navigational And Signal-lights, Shapes, And Sound Signals, According To Rules Of The Road. The Signals Shall Be Individually Controlled By The Instructor, And The Sound Signals Shall Be Directional And Fade With Range. Each Ship Shall Have An Aspect Recognizable At A Distance Of 6 Nautical Miles In Clear Weather. A Ship Underway Shall Provide Relevant Bow- And Stern Wave. C. The Simulator Shall Be Equipped With Targets Enabling Search And Rescuing Persons From The Sea, Assisting A Ship In Distress And Responding To Emergencies Which Arise In Port. Such Targets Shall At Least Be: · Rocket Parachute Flares · Hand Flares · Buoyant Smoke Signals · Sart (search And Rescue Transponder) · Satellite Epirb (emergency Position Indicating Radio Beacon) · Lifeboat · Life Raft · Rescue Helicopter · Rescue Aircraft · People In Water. D. The Simulator Shall Be Able To Present At Least 20 Target Ships At The Same Time, Where The Instructor Shall Be Able To Programme Voyage Routes For Each Target Ship Individually. (see Stcw Section A-1/12.4.3) E. The Simulator Shall Provide A Realistic Visual Scenario By Day, Dusk Or By Night, Including Variable Meteorological Visibility, Changing In Time. It Shall Be Possible To Create A Range Of Visual Conditions, From Dense Fog To Clear Conditions. F. The Visual System And/or A Motion Platform Shall Replicate Movements Of Own Ship According To 6 Degrees Of Freedom. G. The Projection Of The View Shall Be Placed At Such A Distance And In Such A Manner From The Bridge Windows That Accurate Visual Bearings May Be Taken To Objects In The Scene. It Shall Be Possible To Use Binocular Systems For Observations. H. The Visual System Shall Present The Outside World By A View Around The Horizon (360°). The Horizontal Field Of View May Be Obtained By A View Of 270° And Where The Rest Of The Horizon May Be Panned (to Move The “camera”). (applicable Only To Full Mission Bridge Station With 270° Horizontal Display) I. The Visual System Shall Present The Outside World By A View Of At Least 120° Horizontal Field Of View. In Addition, At Least The Horizon From 120° Port To 120° Starboard Shall Be Able To Be Visualised By Any Method. (applicable Only To Mini Bridge Station With 120° Horizontal Display). J. The Visual System Shall Present A Vertical View From The Workstations For Navigation, Traffic Surveillance And Manoeuvring Enabling The Navigator To Detect And Monitor Objects Visually On The Sea Surface Up To The Horizon Within The Required Horizontal Field Of View When The Ship Is Pitching And Rolling. In Addition, By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Mooring Operations. K. The Visual System Shall Present All Navigational Marks According To Charts Used. L. The Visual System Shall Show Objects With Sufficient Realism (detailed Enough To Be Recognized As In Real Life). M. The Visual System Shall Show Mooring And Towing Lines With Sufficient Realism In Accordance With The Forces Effecting The Tension. N. The Visual System Shall Provide A Realistic Set Of Bow Wave, Sea Spray And Wakes In Accordance With Ships Power Output, Speed And Weather Conditions. O. The Visual System Shall Provide A Realistic Set Of Flue Gas Emission And Waving Flag Effect In Accordance With Ships Power Output, Speed And Weather Conditions. P. The Simulator Shall Be Capable Of Providing Environmental Sound According To Conditions Simulated. Q. The Navigated Waters Shall Include A Current Pattern, Changeable In Time, According To The Charts Used. Tidal Waters Shall Be Reflected. R. The Simulation Shall Include The Depth According To Charts Used, Reflecting Water Level According To Tidal Water Situation. S. The Simulator Shall Provide At Least Two Different Wave Spectra, Variable In Direction Height And Period. T. The Visual System Shall Provide A Realistic Set Of Wind Waves Including White Caps According To The Beaufort Wind Force Scale. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: U. The Visual System Shall Be Capable Of Showing Concentrations Of Solid And Broken Ice Of Different Thickness. V. The Visual System Shall Be Capable Of Showing The Result Of Icebreaking Including Opening, Twin Breaking And Compacting Channel. W. The Visual System Shall Be Capable Of Showing The Effects Of Searchlight. X. The Visual System Shall Be Capable Of Showing The Effects Of The Ice Accretion To The Own Ship Model. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Y. There Shall Be A Field Of View Around The Vessel Of 360° Obtained By An Observer Moving Within The Confines Of The Wheelhouse Or May Be Panned (to Move The Camera). 4. Hardware Requirements 1 Set 4.1 Full Mission Bridge Simulator (horizon Field View Of 270 Degrees) A. Steel Fabrication Of Main Bridge Consoles Consisting Of: I. Conning/maneuvering Console Ii. Radar Console Iii. Ecdis Console Iv. Bearing Console V. Navigation Aid Equipment Console Vi. Gmdss Console Vii. Steering Stand/console Viii. Chart Table Ix. Overhead Panel X. Gyro Repeater With Pelorus Stand Xi. Binoculars Xii. The Console Must Made Of Steel W/ Handrails B. Visual Specification (minimum Requirements) I. 9x 70” Visual Screens Led Backlit 1. Pc Visual Channel 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Hdmi Cable 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator C. 1x Conning Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) 8. Instrument Adds On Conning Console. D. 2x Ecdis Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) E. 2x Radar / Arpa Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) F. Binocular And Instrument (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2. Ssd 4. Rtx 4070 Or Higher 5. Keyboard/mouse 6. 2x 24" Monitor 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 8. Console Made Of Steel (tct 0.8 Mm To 2 Mm) G. Overhead Panel Display 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. At Least 1width And 0.4height 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator H. Radar/arpa I. Radar/arpa Keyboard (1 Set) Specifications: 1. Usb Interface 2. Console Mount Type I. Handset I. Handset Includes: 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box J. 1x Chart Table Console 1300mm X 1312mm (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Parallel Ruler Iii. 1x One-hand Compass Divider Steel Iv. 10x Plotting Triangle With Handle V. 1x Deck Log Book Vi. 1x Night Order Book Vii. 1x Bell Book Viii. 1x Chronometer Ix. Admiralty Paper Charts Related To Installed Maps In Simulator K. Gyro Repeater With Pelorus Stand 1. Bearing Repeater Compass 2. Pelorus Stand 3. Power: 24vd 4. Signal: Rs422 Nmea L. Weather Instruments 1. 1x Ships Clock 2. 1x Aneroid Barometer 3. 1x Hygrometer. M. Speaker With Subwoofer I. Channel Sound System Specification: 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 450watts Speaker With Subwoofer 4. Port: Mini Jack 7 Sets 4.2 Mini Bridge Simulator (horizon Field View Of 120 Degrees) A. Consoles Made In Formica Laminated Board Fabrication Of Main Bridge Consoles Consisting Of: I. Conning Console Ii. Radar Console Iii. Ecdis Console Iv. Maneuvering Console V. Chart Table With Gooseneck Dimming Light B. Mini Bridge Desktop Station (bridge Image Generator Computer For Visual, Conning, Radar, Maneuvering And Overhead Display) I. 3x 45” 4k Display For Visual (minimum Requirements) Ii. 1x Computer (minimum Requirements) 1. 256 M.2 Ssd 2. Rtx 4070 Or Higher 3. 1 X Keyboard/mouse 4. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iii. 1 X Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Keyboard/mouse 5. 24” Monitor 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iv. 1 X Overhead Panel Display V. 1 X Speakers (minimum Requirements) 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 150 Watts Speaker With Subwoofer 4. Port: Mini Jack Vi. 1 X Goose Neck Microphone Vii. 1 X Set Desktop Instrument Console Including: 1. Steering System / Autopilot / Nfu 2. Steering Wheel Viii. Dual Telegraph 1. 1 X Console Tables 2. 1 X Handheld Uhf Equipment 3. 1 X Console Made In Formica Laminated Board (tct 3/4 Inches) Ix. Chart Table And Plotting Aids (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 1x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator X. 1x Parallel Ruler Xi. 1x One-hand Compass Divider Steel Xii. 1x Plotting Triangle With Handle Xiii. 1x Chart Table At Least 1000mm X 700mm Xiv. 1x Deck Log Book Xv. 1x Night Order Book Xvi. 1x Bell Book Xvii. 1x Chronometer 1 Set 4.3 Bridge Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Handset 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box Iii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iv. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel V. 1x Drone View Monitor W/ Smart Tv 55” Tv Led (environment View Of Instructor) Vi. 1x Smart Tv 55” Tv Led For Cctv Vii. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Viii. Instructor Station Table Specification: Ix. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard X. Intercom Telephone / Public Announcement System Xi. 9x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Xii. 1x Ergodynamic Chair Xiii. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Bridge Simulator Scenario Development Station B. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations. I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Iii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Bridge Simulator The Full Mission Bridge Simulator Shall Have The Following Software And Controls For The Following Workstations: A. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Ecdis Slave Software · One (1) Conning Display Software · One (1) Radar/arpa 3cm · One (1) Radar/arpa 10cm · Nine (9) Realistic Visualization Software With 270° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · Two (2) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Gyro Repeater/pelorus Stand That Can Display Magnetic And Gyro Compass · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light B. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) – Track Control/auto Navigation C. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer · Weather Facsimile D. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.2 Mini Bridge Simulator The Mini Bridge Simulators Shall Have Each Of The Following Software And Controls For The Following Workstations: E. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Conning Display Software · One (1) Radar/arpa Interchangeable To 3cm & 10cm · Three (3) Realistic Visualization Software With 120° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · One (1) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Vdr Remote Alarm Panel · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light F. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) G. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer H. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.3 Instructor Station 1. The Instructor Workstation Is An Integral Part Of The Simulator And Is Designed To Control The Training Complex, Design (develop) Exercises, Perform Exercises In Real Time, Control Exercise Performance By Trainees, Change Environmental Conditions And Sailing Circumstances, As Well As Enter Own Ship Failure Variables, Document, And Archive The Position And Activity Of The Ship Involved In The Exercise. The Instructor Station Software Should Contain Navigation Areas As Well As Sub-tasks For Each Area, Allowing The Control Of All Active Vessels And Target Ships. 2. Navigation Instructor Software Includes: · Navigation Instructor · Evaluation And Assessment · Tug And Mooring · Radar/arpa · Electronic Navigational Chart: · Bird Eye Of Instructor · Debriefing System 3. Simulator Session(s) Control: • Exercise(s) Start, Pause, Re-start After The Pause, Stop On Bridge(s); • Setting The Initial Position For Own Ships; • Entering Faults Of Navigation Systems, Steering Gear, Propulsion Plant, Fire And General Alarm; • Ability To Set Faults Of Navigational Equipment; • Pulling Apart Ships That Have Collided Or Run Aground; • Control Of Target Vessels, Hoisting Flags Of The International Code Of Signals, Turning Their Sound Signals On And Turning Their Lights On/off; 4. The Software Modules Should Provide A Possibility To Flexibly Configure The Required Bridge Configuration. General: · An Integrated Application For Exercise Editing, Conducting And Debriefing; · Highly Accurate Data Representation Based On Vector Diagrams (ability To Automatically Load All Diagrams Related To The Selected Game Area); · Tools For Creating Exercises And Automatic Competency Assessment Scenarios; · Displaying Of The Actual Ship Contours; · Display Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamps; · Using The Mouse Wheel For Chart Scaling; · Control Of Simulator Session(s); · Continuous Automatic Recording Of Data During Exercise (main, Audio And Video Log Files); · Real Time, Slow Time, And Fast Time Modes; · Ability To Display And Print A New Pilot Card And A Table Of Maneuvering Characteristics Of The Ship; · Setting Parameters And Faults Of Navigation Equipment: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; · Setting Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases (ecdis); · Working With Measuring Tools: - Ability To Set Erbl; - Ability To Attach, Move Or Delete Erbl During An Exercise; 9. Ability To Attach Sart To The Life Raft; 5. Ability To Move Own Ship During Exercise Without Grounding Or Collision; 6. Ability To Apply Virtual Tug Force To 8 Points Of The Vessel’s Hull In Any Direction; 7. Display Of Actual Ship's Contours; 8. Continuous Display Of Parameters Of Vessel Movement And Environment Conditions: Course And Speed Of The Vessel, Course Over The Ground, Transversal Component Of Speed On The Bow And On The Stern, Gyro Heading, Rate Of Turn, Speed And Direction Of The Current And Wind, Height And Direction Of A Wave, Depth; 9. Independent Instructor Control For Wind And Swell Components Of The Wave; 10. Ability To Set Sea State Spectrum: · Pierson-moskowitz; · Phillips; · Ittc (international Towing Tank Conference); · Jonswap (joint North Sea Wave Project); · User. 11. Ability To Exclude Hydrodynamic Interaction With Mooring Walls In The Required Area; 12. Ability To Create A Template Containing A Set Of Objects (ships), Save And Use This Template In Other Exercises; 13. Ability To Save Environment Settings As A Template And Load A Previously Saved Template In Any Exercise And Area; 14. Mooring Operations: · Ability To Set The Rope Material; · Ability To Set The Initial State Of The Mooring Winch (render, Slack Away, Stop); · Ability To Set Mooring Winch Parameters (speed, Pulling Force, Holding Force); · Ability To Operate The Mooring Winch At The Instructor Workplace. 15. Anchor Operations: · Ability To Set User Ground Type With Required Anchor Holding Force Coefficients; · Display Of Anchor Position On The Instructor's Chart On The Ground. 16. Control Of Navigational Lights And Shapes: · Ability To Control The Navigational Lights; · Ability To Switch On/off Deck Lights On Target Ships. 17. Loading/discharging Of Own Ship During Exercises; 18. Weather Conditions Manager: · Ability To Set Predefined Weather Conditions By Beaufort Number (wind, Wave, Whitecaps And Foam, 3d Clouds, Cloud Layer, Visibility) On The Fly; · Ability To Set Customized Weather Conditions; · Visual Effects: Rain And Snow (low, Medium, High), Lightning, Reflection, Translucency, Sea With White Caps, Foam, Splashes, Bow-wave; · Separate Settings For Wind Wave And Swell; · Manual Control Of Wind Direction And Strength; · Adjustment Of Atmospheric Parameters – Temperature, Humidity, Pressure; · Ability To Use Thunderstorm, Precipitation; · Automatic Calculation Of The Position Of The Sun, Moon, Major Stars (up To 100) And Constellations, The Angle And Phase Of The Moon; · Ability To Set Wave Spectrum Type: Pierson-moskowitz; Jonswap (joint North Sea Wave Project); Phillips; User-defined; · Ability To Use Thunderstorm, Precipitation. 19. Rcc, Ship And Coast Stating Assignment; 20. Log Module With Possibility To Print Out And Create Archives; 21. Window For Listening/monitoring Of The Radiotelephone Traffic Including Possibilities To Interfere With Radiotelephone Traffic; 22. Ability To Introduce Background Noise From A List And Instrument Faults To The Trainee Stations. 23. Ability To Change Names, Call Signs, Mmsi, Telex Numbers And Inmarsat Mobile Numbers Of All Emulated Ship Stations And Coast Station According To The Needs Of Different Exercises; 24. Electronic Chart With Vessel Position Indication And The Ability To Change Position, Course And Speed; 25. Ability To Display And Instantly Change Trainee Station Positions On The Electronic Map For Search And Rescue (sar) Exercises; 26. Full Monitoring Of Any Trainee Workstation – The Ability To Monitor The Status Of Each Gmdss Unit And Listen To The Radio Traffic Of Each Trainee Station; 27. Connection To An External Printer; 28. Connection To An Active Speaker For Simultaneous Viewing Of Channels; 29. Providing Functions Of A Coast Telex Or Telephone Subscriber, Coast Radio Station And Rcc Operator From The Log Window; 30. Status Window For All Instruments At Any Workstation; 31. Ability To Log Communication And Trainee Actions For Playback And Later Review; 32. Database Of Coastal Stations, Navtex And Msi Stations And Inmarsat Shore-based Stations Plotted On The Chart; 33. Information About The Gmdss Sea Areas On The Chart; 34. Approximate Estimation Of Radio Wave Propagation In The Selected Frequency Range; 35. Evaluation And Assessment Module; 36. Navtex Functionality: · Ability To Send Navtex Messages On Behalf Of A Navtex Station; · Ability To Edit And Use The Navtex Station Used-defined List; · Ability To Save And Use Navtex Message Templates. 37. “intercom” Panel. To Monitor Intercom Communication, Execute Voice Messages From The Instructor's Side. 38. Vhf Radio Station Module. To Monitor Vhf Communication, Send Voice Messages From The Instructor’s Side, Play Pre-recorded *.wav Files. 39. Coastal Radio Station Module. Screen Layout: 40. Use Of The Mouse Wheel For Chart Centering And Scaling; 41. On-screen Display Of Mooring Walls And Piers; 42. On-screen Display Of Actual Contours Of Any Ship; 43. On-screen Display Of The Object’s Route Line And Its Actual Track; 44. On-screen Display Of The True And Relative Speed Vectors; 45. Selectable Display Mode: True Motion, Relative Motion, Course Up Or North Up; 46. Display Of Prompt And Other Information In The Status Bar: · Bearing And Distance From The Current Cursor On-chart Position To The Reference Point; · Coordinates Of The Current Cursor On-chart Position; · Depth In The Current Cursor Position; · Current Exercise Time (absolute And Relative). 47. Displaying Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamp; 48. Displaying Of Walls And Piers; 49. Use Of A Mouse Wheel For Chart Centering And Scaling; 50. User Configurable Workplace; 51. Different Panels For The Control And Monitoring Of The Exercise Fulfillment: · Reports Panel – To Form And Print Exercise Fulfillment Reports; · Ship Info Panel – To Display Courses, Longitudinal And Transverse Speeds, Rates Of Turn For All The Ships Involved In The Exercise. · Evaluation And Assessment Module Panel; · Target Panel – To Control Vessel Target And Flight And Sar Objects; · Objects Panel – To Promptly Select An Object On The Chart From The List Of All The Objects Available In The Exercise; · Flags Panel – To Hoist/lower Ics Flag Signals On Any Of The Ships, Including Ability To Set And Keep Flag Templates · Events Panel – For The Automatic Recording Of Any Important Events Related To The Incorrect Trainee Actions; · Flash Light Panel – To Send Light Signals From Target Vessels, Including Automated Translation Into Morse Code; · Magnetic Deviation Panel – To Configure The Magnetic Deviation Panel For The Vessels, Participating In The Exercise, Save The Panel And Apply Desired Template To Any Own Vessel, Print The Magnetic Deviation Table; · Procedural Alarms Panel – For Defining User Set Of Alarm For Dedicated Vessels. 52. Setting Navigational Equipment Parameters And Faults: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; 53. Setting The Exercise Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases; 54. Observing Own Ships And Targets On The Chart: Ship Info Panel, Cpatcpa Panel, Events Panel; 55. Control Of Own Ships And Targets On The Chart: Direct Control Of Steering And Propulsion Systems, Autopilot, Mooring Lines, Anchors; 56. Setting Faults Of Navigational Equipment, Steering And Propulsion System, Fire And General Alarms; 57. Continuous Data Logging During Exercises; 58. Playback Of Recorded Exercises In Real And Fast-time Modes; 59. Performing Preliminary Exercises On The Map To Check Their Suitability For Training On The Simulator; 60. Distress Signals (flare, Smoke Signals, Dye Markers); 61. Adding New Target Ships; 62. Changing Weather Conditions; 63. Moving Buoys, Turning Off Lights On Them And Hiding Them On Both The Visualization System And Radar; 64. Control Of Automatic Tugboats On Commands From The Bridge Or From The Instructor; 65. Generating And Printing Exercise Reports 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section A 5.5.3) B. Full Mission Engine Room Simulator (fmers) And Mini Er Stations’ Features And Applications, Major Components And Engine Room Simulator Performance Standards 1. Major Components The Full Mission Engine Simulators That Can Be Integrated With Bridge Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Engine Room Station (class A Configuration) B. Ten (10) Mini Engine Room Stations (class B Configuration) C. One (1) Server Station D. One (1) Instructor Station E. One (1) Simulator Scenario Development Station F. One (1) Briefing/ Debriefing Station 2. Features And Applications 2.1 The Man Electronic Engine Model Simulates A Suez Max Crude Oil Carrier With A Man Slow Speed Turbo Charged Diesel Engine As Propulsion Unit Modeled With Fixed Propeller. The Main Engine Models Respond Dynamically To Variations In Operation And Conditions Of The Ship Model, And The Ship Models Have Mutual Responses To The Main Engine Models. The Model Is Based On Real Engine Data That Makes The Dynamic Behavior Of The Simulator Close To Real Engine Response. In Addition To The Man Engine, The Vessel Has An Electrical Power Plant Including Three 1125 Kva Diesel Generators And One 250 Kva Emergency Generator. The Steam Plant Includes Two D-type Steam Boilers, Based On Alfa Laval And One Composite Boiler (aalborg), 3 Cargo Turbines, Condensing And Feed Water Systems. Control Room Operator Station, Bridge And Steering Panels Are Included. The System Shall Also Be Connected To The High Voltage Engine Simulator. 2.2 The Simulator Models Complies With The Requirements In The Stcw Convention, Regulation 1/12 And Fulfill The Standards Of An Internationally Recognized Classification Society For Maritime Simulator Systems. 2.3 The Engine Model Main Specifications High Fidelity Engine Room Systems Include: - Sea & Lt/ht Fresh Water Systems, Incl. Fw Generator - Electrical Power Plant, Incl. Diesel Generators And Power Management - Start & Service Air Compressors, Incl. Compressor Intermediate Coolers And Emergency Compressor - Integrated Automation System, Incl. Vessel Performance Monitor - Steam Plant Incl. D-type Oil Fired Boilers And Combined Exhaust/oil Fired Boiler - Diesel/heavy Fuel/oil Systems, Incl. Hfo, Lshfo And Mdo Tanks, Separators, Viscometers - Lubricating Oil Systems, Incl. Separator - Stern Tube Systems - Steering Gear - Main Engine Control System (man) - Main Engine Remote Control System (ac 600) - Main Engine Maneuvering System - Main Engine Hydraulic Oil System - Main Engine Hydraulic Cylinder Units System - Cylinder Indication Diagrams - Air Ventilation System - Bilge Wells & Bilge Separator - Sewage Treatment Plant - Incinerator Plant - Inert Gas System - Ballast System - Refrigeration System - Ship Loading System - Fire Detection System - Fire Fighting System - Remote Co2 Release, Emergency Stops And Quick Release Valves - Emission Control System (water Scrubbing And Me Low Nox Mode) 2.4 The Engine Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate: · Table A-iii/1.1 – Maintain Safe Engineering Watch · Table A-iii/1.3 – Used Of Internal Communication Systems · Table A-iii/1.4 – Operate Main And Auxiliary Machinery And Associated Controls · Table A-iii/1.5 – Operate Fuel, Lubrication, Ballast And Other Pumping Systems And Associated Control Systems · Table A-iii/1.6 – Operate Electrical, Electronic And Control Systems · Table A-iii/1.7 – Maintenance And Repair Of Electrical And Electronic Equipment · Table A-iii/1.11 – Maintain Seaworthiness Of The Ship 2.5 Interface To Engine Room High Voltage System - The Engine Room Model Will Be Interfaced To A Corresponding High Voltage Simulator And Gas Turbine Installed In The Academy. 3. Engine Room Simulator Performance Standards 3.1 Physical Realism The Engine Simulator Stations Shall Have The Following Physical Realism: A. Equipment And Consoles Shall Be Installed, Mounted, And Arranged In A Ship-like Manner B. The Control Room Consoles Shall Include Control And Monitoring Of The Main Engine, Auxiliary Engines And Electrical Power Generation, Steam Boiler, Pump, Compressors And All Other Alarms. C. The Remote Monitoring And Control Systems Shall Be In Compliance With The Functional Requirements Of The Classification Societies For Periodically Unattended Machinery Spaces. D. The Main Engine Remote Control Console Shall Include Command Functions And Status Indication Normally Found On Board Ships. E. The Electric Power Generation Shall Be Under Automatic Or Manual Control. Such System Should Be Able To Constantly Monitor Demand And Supply. When Deviation From Pre-set Limits Arises, The System Should Be Able To Act In Order To Normalize The Situation. The System Shall Also Perform Continuous Control Of The Frequency And Load Sharing. F. The Electric Power Supply System Shall Be Operated Either From The Switchboard Or The Power Management System. - Remote Start/stop Of Auxiliary Diesel Generators - Operation For Shaft Generator - Connect/ Disconnect Of All Generators - Automatic And Priority Selection - Non-essential Systems Trip - Constant Frequency Mode - Different Control Modes Of Load Sharing G. The Main Switchboard Shall Be A Full Scale Model Of A Typical Switchboard, And Comprise The Necessary Controls And Indicators Usually Available Of Real Generators. H. The Remote Control And Automation System Must Include Control Of The Following Equipment: - Me Lubricating Oil Pumps - Me Fresh Water Cooling Pumps - Me Sea Water Cooling Pumps - Me Auxiliary Blowers - Fuel Oil System And Pumps - Air Compressors - Steering Gear Pumps - Fire Pump Each Of The Above Individual Units Shall Allow Manual Start And Stop From The Control Room Consoles. It Shall Also Be Possible To Use Automatic Start And Stop Where Applicable. I. The Alarm Monitoring System Shall Consist Of A Typical Shipboard Alarm System. J. An Alarm Shall Be Announced By Sound And By Flashing Light In The Control Room. K. A Printer Or A Computer In The Engine Room Control Shall Be Used As An Alarm Log And Event Log. L. “dead Man Alarm System” The Simulator Shall Have The Following Additional Requirements For Low Speed Engine: M. The Simulated Engine Room Shall As A Minimum Reflect Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Low Speed Engine: - Main Engine Including Turbocharger System - 2 Auxiliary Diesel Generators - Lubrication Oil Separator - Steering Gear System - Fire Pump - Shaft Generator - Cooling Water System Including Freshwater Generation System - Turbo Generator - Fuel Oil Bunkering System - Fuel Oil Settling And Service Systems - 2 Heavy Fuel Oil Separators - 1 Diesel Oil Separator - Steam Generation Plant Including Exhaust And Oil-fired Boilers - Diesel Oil And Heavy Fuel Oil Supply To Main And Auxiliary Engines - Main Engine Operation From Engine Room, Engine Control Room And Bridge - Turbocharger System - Air Ventilation System For Engine And Control Room - Bilge Water System Including Oily Water Treatment Systems - Stern Tube System - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall Have The Following Additional Requirements For Medium And High Speed Engine: N. The Simulated Engine Room Shall Consist Of Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Medium And High Speed Engine: - One Or More Main Engines - Main Sw System - 2 Auxiliary Engines - Fuel Oil Tanks - Fuel Oil Separator - Lubrication Oil Separator - Main Engine(s), Including: • Fresh Water System • Lubrication System • Turbocharger System • Me Sw System - Reduction Gear System - Controllable Propeller Pitch Were Applicable - Steam Generation System As Applicable - Freshwater Generator - Bilge Wells And Bilge Separation System - 2 Air Compressors - Steering Gear System - Fire Pump - Electrical Power Plant - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall At Least Have The Following Additional Requirements For Machinery Spaces: O. The Simulated Machinery Spaces Shall At Least Include One Dedicated Room For This Purpose. P. At Least The Following Main Components Of The Machinery Spaces Shall Be Graphically Presented Or Represented By Mock-ups Or In Realistic Visualization (to Illustrate Physical Presence) In The Simulated Machinery Spaces: - Main Engine - Auxiliary Diesel Generators - Steam Boiler - Fire Pump Q. The Facilities For Local Operation In The Simulated Machinery Spaces Shall Consist Of Local Operating Stations For Each System. Each Station Shall Be Furnished With Start/stop (open/closed) Buttons And Status Lights, Various Numbers Of Pressure -, Temperature Indicators, Etc. The Local Operating Stations Shall At Least Give Means To Operate The Following: - Main Engine (me) - Me Lubricating Oil Systems Including Separator - Me Fresh Water Cooling System - Me Sea Water Cooling System - Me Auxiliary Blowers - 2 Auxiliary Diesel Generators - Steam Boiler - Fuel Oil System (diesel And Heavy Fuel Oil) Including Separator - 2 Air Compressors - Steering Gear System - Bilge Water System - Fire Pump R. All Valves Typically Associated With The Operation Of Above Machinery May Be Operated At The Computer Screen In A 3d Visual Form Or Mouse Operated By The Candidate. S. Internal Communication System. 3.2 Behavioral Realism The Engine Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulator Models Shall Be Able To Replicate The Dynamic Behaviour Of The Machinery Systems And All Its Visual Parameters As Well As The Interactions Between The Sub-systems. B. The Simulator Models Shall Simulate The Engine Room Components With Their Procedures, As Well As Modelled Controller Systems (sensors, Controllers, Actuators, And Valves) Connected To The Processes. C. When Simulating Real Equipment The Behaviour Of Such Simulated Equipment Should Behave As Identical Aw Possible As The Original. Critical Parameters Of The Behaviour Shall Be Documented D. The Simulator Model Shall Make Applicable Controllers Available And Adjustable With Regards To Pid (proportional-integral-derivative Controller) Parameters. E. The Simulator Model Shall Provide Facilities To Allow The Injection And Resetting Of Malfunctions At Appropriate Times During Operation As Necessary. F. It Shall Be Possible To Simulate Change In Seawater Temperature And Demonstrate How This Affects The Complete Simulation Model. G. It Shall Be Possible To Simulate A Change In Air Temperature And Demonstrate How This Affects The Complete Simulation Model. H. The Simulator Shall Have All Heat Exchangers Available And Adjustable With Regards To Their Parameters (heat-transfer Factor, Heat Dissipation Are Etc.) I. The Simulator Shall Make All Pumps Available And Adjustable With Regards To Their Parameters (pump Capacity, Wear, Etc.) J. It Shall Be Possible To Demonstrate Systematically The Tests That Are Made On The Ums (unmanned Machinery Space) Alarm System. K. It Shall Be Possible To Simulate Auto Slow-down And Emergency Shut Down L. It Shall Be Possible To Simulate Safe Methods To Test Inert Gas Generator (ig) Alarms And Control. M. It Shall Be Possible To Simulate Testing Of The 24v D.c. Power Supply To The Navigation, Communication And Engine Room Control Console In Event Of Power Failure. N. It Shall Be Possible To Simulate Safe Method Of Testing The Insulation For Rotor And Stator. O. It Shall Be Possible To Simulate Of Reading A Power Factor Meter With Reference To Four Segments P. It Shall Be Possible To Simulate Testing Of The Devices And Relays Provided For Generator Protection Q. It Shall Be Possible To Simulate Tests Related To Avr (automatic Voltage Regulator) R. It Shall Be Possible To Simulate Methods Of Cooling And Checking Of Air Gap S. It Shall Be Possible To Simulate The Precautionary Measures When Megger Testing The Rotor Of A Brushless Generator T. It Shall Be Possible To Simulate Routine Tests On An Emergency Generator U. It Shall Be Possible To Simulate How A Generator Circuit Breaker Ocr (over Current Relay) Is Set And Tested. V. It Shall Be Possible To Simulate The Process Of Connecting A Shaft Generator On Load And Specific Conditions For Taking Off Load. W. It Shall Be Possible To Simulate The Procedure For Megger Testing A High Voltage System X. It Shall Be Possible To Simulate The Maintenance And Checks Carried Out On An Acb (air Circuit Breaker) Y. It Shall Be Possible To Simulate Recovery From “dead Ship” Condition. Z. It Shall Be Possible To Simulate Methods Test The “preferential Tripping Sequence” Aa. It Shall Be Possible To Simulate Methods To Tests Auto “cut In” Of Stand Fault Bb. It Shall Be Possible To Simulate Methods Of Diagnosing Single Phasing Fault. Cc. It Shall Be Possible To Simulate Operation And Maintenance Of Variable Speed Motor Starters. Dd. It Shall Be Possible To Simulate Operational Test Methods Of Oily Water Separator Monitors Ee. It Shall Be Possible To Simulate Test Methods For Level Alarms And Function Tests Of Bilge Pumping Arrangement Ff. It Shall Be Possible To Simulate The Functional Tests Of Odmcs (oil Discharge Monitoring And Control System) And Odme (oil Discharge Monitoring Equipment) System Gg. It Shall Be Possible To Simulate The Function Test Of Ows (oily Water Separator) And Ppm (parts Per Million) Unit. 3.3 Operating Environment The Engine Simulator Stations Shall Have The Following Operating Environment: A. It Shall Be To Adjust The Noise Level In The Simulated Machinery Spaces Infinite From No Added Noise Up To Minimum 100 Db(a). The Noise Shall Have A Frequency Distribution Typical For Machinery Spaces. Headset Is Provided For Each Workstation. B. It Shall Be Possible To Simulate The Sea Water Temperature At Least Infinite Between +1ºc And +30 ºc C. An Alarm Can Be Heard Through Headset Of A Candidate And By Flashing Light In The Machinery Spaces 4. Hardware Requirements 1 Set 4.1 Full Mission Engine Room Simulator A. Engine Control Room Consoles I. Ecr Pump Compressor And Power Management Console 1. 1 X Console 2. 1 X Computer 3. 2 X 24 Touch Monitors Ii. Ecr2 Alarm, Monitoring And Remote-control Console: 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Iii. Ecr3 Main Engine Remote Control And Indication Console 1. 2 X Console 2. 1 X Computer 3. 3 X 24” Touch Monitors 4. 1 X Speed Set Lever For Main Engine Remote Control And 5. Indication Console 6. Dead Man Alarm (dma) 7. Engineers Reset 8. Included Power Relay To Which Illumination In Engine Control Room And Engine Room Can Be Connected, Causing Lights In The Rooms To Go Out During A Blackout To Increase Realism. Iv. Simulated Cctv Touch Monitor 1. 1 X Computer 2. 1 X 24 Monitor V. Internal Telephone At The Following Locations 1. Instructors Station 2. Engine Control Room 3. Engine Room 4. Emergency Generator Room Vi. Main Switchboard 1. 14 X Touch Screen Monitors 2. 7 X Computers 3. 1 Set Of Speakers 4. Installed In A Switchboard Manner Vii. Engine Room Equipment 1. 4 Dome Type Virtual Walkthrough 2. 4 X High Resolution Short Throw Projector 3. 4 X Computer With Graphics Card 4. 4 X Controller Viii. Local Operating Station Console 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Ix. Engine Room Sound 1. 1 X Sub Woofer 2. 4 X Satellite Speaker X. Alarm Horn And Lamp 1. 1 X Column With Lights And Sirens Xi. Emergency Generator Room 1. 1 X Dome Type Virtual Walkthrough 2. 1 X High Resolution Short Throw Projector 3. 1 X Computer With Graphics Card 4. 1 X Controller 5. With Sound System B. All Computers Must Be The Latest Generation This Includes Processors, Memory, Graphics Card And Storage. I. Monitors: Full Hd Resolution Ii. Storage: Solid-state Drive (ssd) Iii. Processor Generation: Must Be From The Latest Generation Of Processors Iv. Graphics: Integrated Graphics Dedicated Gpu If Needed. C. Touchscreens For Durability, Responsiveness, And Multi-touch Support. D. Each Computer Must Be Paired With A Ups Unit Rated For At Least 1.5 Kva And Automatic Voltage Regulation To Handle Voltage Fluctuations. E. The Engine Control Console Must Be Made From Steel W/ Handrails 10 Sets 4.2 Mini Engine Room Simulator A. 1x Computer Specification (minimum Requirement) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 256 M.2. Ssd 4. Video Card 5. Keyboard/mouse 6. 2x At Least 24" Monitor (touchscreen) 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm C. 1x Chairs 1 Set 4.3 Engine Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 3x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iii. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel Iv. 1x Smart Tv 55” Tv Led For Cctv V. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Vi. Instructor Station Table Specification: Vii. 11x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Viii. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Ix. 1x Ergodynamic Chair X. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Engine Simulator Scenario Development Station A. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 1. 1x Computer (minimum Requirements) 2. 2x 24” Monitor 3. Intel Core I5 Processor 4. 16 Gb Ram 5. 256 M.2 Ssd 6. Rtx 4070 Or Higher 7. Keyboard/mouse 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm I. Material: Formica Matt Laminate On Chipboard Ii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Engine Room Simulator 5.2 Mini Engine Room Simulator 5.3 Instructor Station 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section B 5.5.3) 1 Set C. Briefing/ Debriefing Station For Bridge And Engine A. 2x Computer (minimum Requirements) 1. 1 X Pc 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 500gb Ssd 5. Low Profile Video Card 6. 1x Keyboard/mouse 7. 1x Ups 1kva 8. 1x W/ Computer Table Size: At Least L 1700 X W 700 X H 750 Mm 9. Briefing And Debriefing Rooms With Playback Capability (playing Of Recorded Exercise And Assessment In Simulator B. 50x Chairs C. 1x Solid Round Table (at Least 6100 X 1220 Mm) (for Bridge Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) D. 1x Solid Round Table (at Least 4880 X 1220 Mm) (for Engine Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) E. 1x Smart Tv At Least 70" 4k 1. Wall Mounted. 2. 2x Hdmi 10meters F. 4x Bridge And 4x Engine) Hardware For Virtual Bridge Familiarization (minimum Requirements) 1. Display: A. Type: Lcd B. Resolution: 2064 X 2208 Per Eye C. Refresh Rate: 120 Hz D. Field Of View: E. Horizontal: 97 Degrees F. Vertical: 93 Degrees 2. Processor: A. Chipset: Qualcomm Snapdragon Xr2 Gen 2 3. Ram: 12gb 4. Storage: A. Options: 128gb, 256gb, And 512gb Variants 5. Audio: 6. Hand Tracking: Improved Hand Tracking Capability 7. Controllers: A. Type: Meta Touch Pro Controllers B. Features: Haptic Feedback, Improved Ergonomics, Rechargeable Batteries 8. Battery: A. Headset: Approximately 2-3 Hours Of Active Use B. Charging: Usb-c Fast Charging 9. Connectivity: A. Wireless: Wi-fi 6e Support B. Bluetooth: 5.2 10. Inclusions: A. Headset B. Touch Pro Controllers (pair) C. Charging Cable (usb-c) D. Power Adapter W/ Extra 1 Battery Each E. Controller Lanyards F. Glasses Spacer Ii. Add On’s: 1. 2x Strap With Battery 2. 8x Silicone Cover Face Cover 3. 4x Silicone Protective Case 4. 8x Silicone Case For Controller 5. 3 Row Vr Storage Cabinet With Lock G. The Virtual Reality Bridge Must Be Complete With Hotspots, Identification Tags And Descriptions. It Shall Also Be Available On An Offline System, Navigable. H. Playback Capability With The Following Functions: · Loading A Previously Created Exercise On A Chart Or In Engine Room; · Playing The Exercise To Explain The Task; · Uploading A Sample Log Of The Same Exercise To Explain The Correct Actions. I. Virtual Bridge Familiarization W/ Virtual Reality Device The Vr System Aims To Simulate The Overhauling Process, Enabling Immersive, Hands-on Learning And Pre-assessment Without Direct Physical Intervention On The Engine. This Approach Will Enhance Technical Skills, Reduce Risk, And Improve Efficiency In Real-world Engine Maintenance And Overhauling. The Supplier Shall Provide A Virtual Bridge And Engine With The Use Of Virtual Reality Providing The Following Visualizations: 1. Bridge Wing Equipment 2. Speaker Mic 3. Rate Of Turn 4. Engine Rpm 5. Quick Release Lifebouy 6. Remote Panel 7. Gyro Compass Repeater 8. Fire Box 9. Hatch For Maintenance 10. Thermometer Ii. Main Bridge 1. Epirb 2. Sart 3. Clear View Screen 4. Location Of Fire Extinguishers 5. Pantry With Equipment 6. Pilot Chair 7. Smoke Detectors 8. Damage Control Plans 9. Radar 1 And 2 And 3 10. Gps With Other Equipment 11. Helm Wheel 12. Indicator Control 13. Deck Light Control 14. Admiralty And Other Maritime Publications 15. Fireplan 16. Rudder Angle Indicator 17. Voice Recorder 18. Whistle Horn 19. Water Tight Door Indicators 20. Window Wipers 21. Pa Systems 22. Cargo Hold Fan Control 23. Smoke Alarm System 24. Fire Alarm System 25. General Alarm System 26. Vhf System 27. Log Books And Other Documentation 28. Ecdis Voyage Planner 29. Pressure Recorder 30. Portable Uhfs 31. Lifejackets, Rocket Flare, And Rocket Line 32. Location Of Immersion Suits 33. Barometer 34. Utc Clock 35. Radio Room Configuration 36. Posters 37. Charts 38. Compass Deck / Monkey Island 39. Radar Equipment 40. Antennas 41. Anemometer 42. And Other Equipment On The Monkey Bridge Iii. The Me-b Main Engine Vr Overhauling System Cover The Following Features Full-scale, Interactive Models Allowing For A Detailed Exploration Of All Engine Components, Including: Iv. Connection Rod & Crosshead Assembly V. Stuffing Box Assembly Vi. Piston Assembly Vii. Cylinder Liner Assembly Viii. Cylinder Cover Assembly Ix. Exhaust Valve Assembly X. The Vr Simulation Guides Users Through Disassembling, Inspecting, And Reassembling The Exhaust Valve, Focusing On Critical Tasks Like Checking Valve Seats, Spindle Condition, And Wear On Sealing Surfaces. Users Can Also Simulate Tasks Such As Lapping The Valve, Inspecting Hydraulic Actuators, And Ensuring Proper Seating Of The Valve During Reassembly. 1 Set D. Server Station For Bridge And Engine A. 2x Set Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 4x 500 Ssd 4. Keyboard/mouse 5. License Operating System B. 1x Nas And Exercise Server 1. 4 Bay Nas Disk Station Quadcore Processor 2. 4x 4 Tb Hdd C. 1x Server Rack 1. Server Rack At Least 32u 2. W/ Fan D. 1x Ups 1. 5kva (5kw) 2. Sealed Lead-acid (sla) Or Lithium-ion 3. Output Voltage: 230v Ac 4. Surge Protection 5. Stabilizes Incoming Voltage Without Switching To Battery Mode 25 Sets E. Cloud Simulator-ready Computers A. Laptop 1. 13th Gen Intel Core I5-1335u 2. 16 Gb, 2 X 8 Gb, Ddr4. 2666 Mhz 3. 512 Gb, M2, Pcie Nvme, Ssd 4. Intel Iris Xe Graphics 5. Windows 11 Pro License 6. Wi-fi 6 Wireless Lan And Bluetooth 7. Keyboard With Numeric Keypad 8. 15.6", Fhd 1920x1080, 120hz, Wva, Non-touch, Anti-glare, 250 Nit, Narrow Border, Led-backlit 9. Ports: Usb 2.0, Headset Jack, Power Jack,hdmi 1.4, Usb 3.2 Gen 1 Type-a, Usb 3.2 Gen 1 Type-c™ 10. Power Adapter: 220v Ac Input, 65w 11. Accessories: Wireless Mouse 1 Set F. Network And Cctv A. 1 X High Speed Router For Remote Support B. Network Switch 1. Network Switch Specifications Manage: 2. 4x 24 Ports 10/100/1000mbps Rj45 Ports 3. 1x 8 Ports 10/100/1000mbps Rj45 Ports C. Set Cctv Monitoring 1. 1x Nvr At Least 32 Channel 2. 20x 6 Mp Fixed Dome Network Camera With Mic 3. 3x 6tb Storage (design For Cctv) D. Network Requirements: I. 72x Lan Port Ii. 1x Lot: Of Upvc, Conduit, Pull Box, Fittings, Hanger, And Support And Other Materials If Needed. Including Utp Cat6 Shielded Pure Copper, Fiber Optic Cable, Patch Panels. Iii. Installation, Engineering Labor For Entire Project. Iv. Cable Laying, Labeling, Harnessing V. Mobilization And Di-mobilization Vi. All Cabling Will Be Endpoint At Server Room (back Of Full Mission Bridge Simulator) E. Structured Cabling Systems Standard I. Stations Must Include Lan Outlets And Patch Cords. Ii. Backbone Cabling Will Be Using The Cable Tray For Lan Distribution. Iii. Lan Outlets Must Have Network Labeling Iv. Patch Panels Are Required G. Civil Works A. Program Of Work Separate Documents (attached) Part Ii. Other General Requirements 1 Ea. Project Billboard/signboard 1 L.s Occupational Safety And Health Program 1 L.s Mobilization/demobilization Part Iii. Civil, Mechanical, Electrical, & Sanitary/plumbing Works Part A. Earthworks 1 L.s Removal Of Structures And Obstruction Part C. Finishings And Other Civil Works 179.71 M² Wall, Metal Frame, Fiber Cement Board 6mm 37.92 M² Tempered Glass Door, 12mm, Reflective 23.04 M² Aluminum Glass Window 4.05 M² Doors, Solid Panel 406.28 M² Acoustical Ceiling Panel 745.2 M² Painting Works, Masonry/concrete 4.05 M² Painting Works, Wood 48.38 M² 150mm Chb Nonload Bearing(including Reinforcing Steel) 48.38 M² Plain Cement Plaster Finish 116 M² Floor Tiles, Imo Rubber, On Finish Floor 211.6 M² Floor Tiles, Imo Rubber, On Raised Floor System Part D. Electrical 1 L.s Panelboard With Main And Branch Breakers 1 L.s Wires And Wiring Devices 1 L.s Lighting Fixtures And Lamps 1 L.s Conduit, Boxes, And Fittings 1 L.s Pole Mounted Power Transformer (oisc) 1 L.s Network Cabling Part E. Mechanical 1 L.s. Door Access And Card Reader System Part F. Simulator Equipment 1 L.s Airconditioning, Package/split Type H. Terms And Conditions 1. A 3-year Warranty For The Computer Hardware And Console Peripherals 2. All Workstations Shall Have Imo Standard Rubber Mat Flooring. 3. The Software Comes With A 3-year Warranty Inclusive Of New Updates. 4. The Project Will Be Implemented Within 150 Cd. Liquidating Damages Will Be Applicable For Any Delays. 5. A Comprehensive Guide Will Be Provided, Offering Detailed Instructions On System Operation And Maintenance Activities, Facilitating Ease Of Use And System Upkeep. 6. Onsite Training Sessions Will Be Conducted By Certified Instructors And Technical Experts, Facilitating Smooth Knowledge Transfer And Ensuring Proficient System Operation. Certificates Will Be Provided Upon Completion Of Training Sessions. 7. Structured Cabling Standards To Establish A Reliable And Efficient Network Infrastructure. 8. The Simulator Manufacturer Should Be An Iso 9001:2015 And Iso 14001:2015 Certified Business. 9. The Simulator Should Be Certified By An Internationally Recognized Classification Society And May Also Be Certified By National Authorities. 10. The Software Must Be Perpetual License. 11. The Supplier Shall Conduct An Annual Face-to-face Maintenance Session To Ensure The System's Optimal Functionality And Performance. 12. The Supplier Must Resolve Any Software Or Hardware Issues Within 2 To 5 Cd Of Their Occurrence To Minimize Downtime And Disruptions. 13. All Hardware Installations Must Adhere To Software Specifications To Guarantee Seamless Integration And Operation. 14. The Computer Hardware Supplied Must Be Sourced From Proven Technology Hardware Companies, Quality And Performance Standards To Ensure Optimal Functionality And Compatibility With The Software. 15. Bidders Are Required To Offer Continuous Retraining Sessions Free Of Charge During The Warranty Period To Ensure Users' Proficiency With The System. 16. Bidders Should Provide Manufacturer Authorization Or Exclusivity Certificate To Ensure The Authenticity And Legality Of The Supplied Products. 17. The Bidder Is Responsible For Performing A Thorough Site Inspection, And A Site Inspection Certificate Issued By The Agency Shall Be Submitted As Part Of The Eligibility Requirements. 18. The Bridge Simulator Shall Be Integrated With The Engine Simulator Ensuring Compatibility And Functionality. 19. All Simulator Stations Can Connect And Enable Them To Interact With Each Other In A Coordinated Scenario. 20. The Simulator Scenario Development Station Shall Be Capable Same As An Instructor Station Capable Of Deploying Scenarios To Other Stations. 21. All Other Simulator Specifications And Capabilities Not Indicated Herein, The Simulator Shall Comply With The Simulator Performance Standards As Required In Maritime Industry Authority (marina) Evaluation Instrument For Full Mission Bridge And Engine Simulator. 22. The Bidders Should Provide A Breakdown Of The Unit Prices Of The Major Components In The Original Of Duly Signed And Accomplished Price Schedule(s) Under Financial Component Envelope Upon Bid Submission. Furthermore, They Should Provide A More Detailed Breakdown As A Condition For Issuance Of Notice To Proceed. ~~~~nothing Follows~~~~
Municipality Of Polomolok, South Cotabato Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date2 Dec 2024
Tender AmountPHP 80 Million (USD 1.3 Million)
Details: Description Construction Of 3-storey Additional Hospital Building In Brgy. Pagalungan 2024 -mo(2202) Item No. Qty Unit Description Of Articles Of Materials 1 1 Lot Supply Of Labor, Materials, Tools, Equipment And Other Incidental Expenses Necessary To Complete The Project For The Construction Of 3-storey Additional Hospital Building In Brgy. Pagalungan, Psc Item No. / Description / Quantity / Unit A.1.1(8) Provision Of Field Office For The Engineer 1.00 L.s. B.5 Project Billboard/signboard 1.00 Ea B.7(2) Occupational Safety & Health Program 1.00 L.s. B.9 Mobilization/demobilization 1.00 L.s. 803(1)a Structure Excavation (common Soil) 1,075.49 Cu.m. 804(1)a Embankment (from Excavation) 996.24 Cu.m. 804(1)b Embankment (from Borrow) 173.23 Cu.m. 804(4) Gravel Bedding 78.72 Cu.m. 900 Structural Concrete Class A (3000 Psi Ready Mix - 28 Days) 861.71 Cu.m. 901(1) Lean Concrete ( Ready Mix 28 Days) 44.31 Cu.m. 902(1) (grade 40) 903(2) Reinforcing Steel For Reinforced Concrete Structure 121,505.78 Kg Formworks And Falseworks 5,624.25 Sq.m. 1001(1)a 100mm Pvc Pipe Series 1000 (rain Water Drain) 110.00 M 1001(1)b 100mm Pvc Pipe Series 1000 (downspout) 363.50 M 1001(1)c 50mm Pvc Pipe Series 1000 (sanitary Line) 687.50 M 1001(1)d 100mm Pvc Pipe Series 1000 (sanitary Line) 723.50 Sq.m. 1001(6) Catch Basin (chb) 19.00 Unit 1002(3)a1 1"ø Polypropylene Random Copolymer (ppr-c)pn10 Water Supply Line 41.00 Pcs 1002(3)a2 1/2"ø Polypropylene Random Copolymer (ppr-c) Pn10 Water Supply Line 170.00 Pcs 1002(5) Water Closet With Complete Accessories 30.00 Set 1002(5)b 4"x4" Ss Floor Drain Plate 59.00 Set 1002(5)c Bedit, Lavatory Faucet, Faucet, And Two Way Nagle Valve With Complete Accessories 130.00 Pcs 1002(5)d Ss Grab Bar(swing Up And Grab Bar For Toilet And Grab Bar For Bathroom 87.00 Set 1002(5)e Two Way Faucet With Handshower 27.00 Set 1002(5)o Ss Steel Bath Towel Holder (60cm) 27.00 Set 1002(11)a Stainless Steel Sink With Complete Accessories 6.00 Set 1002(11)b Heavy Duty Janitorial Cart With 20l Mop Squeezer 4.00 Set 1002(11)c Stainless Linen Hamper (stainless Tubular Mounted On 4 Pcs Swivel Caster Wheel With Cover Canvass Bag(l-20", W- 20", H36") 3.00 Set 1002(14)a Lavatory With Wall Hung 40cm, X 70cm Pvc Cabinet (set) 34.00 Set 1002(14)a1 Ante Room 485x485x1400mm Ss Sink With Stand With Accessories. 3.00 Set 1003(1)a 4.5mm Fiber Cement Board On Metal Frame Ceiling 1,447.02 Sq.m. 1003(1)b 4.5mm Fiber Cement Board On Metal Frame Ceiling Roof Ceiling 442.32 Sq.m. 1003(1)g2 Ceiling (pvc Panel) On Metal Frame 31.19 Sq.m. 1003(3)a Built In Cabinet 96.46 Sq.m. 1003(3)b Wire Basket With Pull Out Rail White(80x55cm, Max Load -7kg, Materials - Steel, Polyestercoating Acetal Plastic 36.00 Set 1003(3)c Equipment Storage Metal Cabinet With Glass Door (l- 16",x W-31"x H-60") 3.00 Set 1003(3)d 5-layer Metal Ppe Rack ( L-35.5"x W- 13.75", H - 59") 3.00 Set 1004(2)a Losse Pin Hinges 200.00 Pair 1004(2)b Door Knob 750.00 Set 1006(5) Fire Rated Fire Exit Swing Steel Door With Panic Locking Device 12.60 Sq.m. 1007(1)a Powder Coated Aluminum Frame 6.0mm Clear Glass Swing Door 12.60 Sq.m. 1007(1)a1 Powder Coated Aluminum Frame 6.0mm Clear Glass Sliding Door 13.05 Sq.m. 1008(1)a Analok Frame Reflective Dark Gray Glass Fixed With Sliding Window 386.62 Sq.m. 1008(1)a1 Analok Frame Reflective Dark Gray Glass Sliding Window 10.95 Sq.m. 1008(1)c Analok Frame Reflective Dark Gray Glass Awning Window 36.99 Sq.m. 1010(2) Wooden Flush Swing Door 8.40 Sq.m. 1010(2)a Double Swing Wooden Flush Door With Ss Push Plate (back To Back) 65.52 Sq.m. 1010(2)b Double Swing Wooden Flush Door With View Glass And Ss Push Plate (back To Back) 7.56 Sq.m. 1012(1) Tempered Clear Glass Door In Powder Coated Aluminum Frame Swing Door 22.38 Sq.m. 1013(2)a Pre Painted Flashing 307.44 M 1013(2)c Pre Painted Gutter 78.12 M 1014 Pre Painted Metal Sheet (0.40mm Rib Type Long Span) 507.30 Sq.m. 1017 Roof Drain With Strainer 18.00 Set 1018(2) 0.60m X 0.60m Unglazed Granite Floor Tiles 1,479.54 Sq.m. 1018(2)a 0.40m X0.40m Unglazed Floor Tiles 343.79 Sq.m. 1018(2)b 0.60m X 0.60m Outdoor Rough Finish Floor Tiles With Stair Nosing 8.92 Sq.m. 1018(2)c 0.40m X0.40m Glazed Wall Tiles And Trims 917.55 Sq.m. 1018(2)d 0.30m X0.30m Glazed Wall Tiles And Trims 16.22 Sq.m. 1018(2)e 0.30m X0.30m Non-skid Floor Tiles For Stairs And Stair Nosing 170.19 Sq.m. 1018(2)f 12mm Thk. Solflex Slab 8.82 Sq.m. 1021(1)a Plain Cement Non-skid Floor Rough Finish With 5mm Groove On Ramp With Pwd Signage 415.05 Sq.m. 1027(1) Cement Plaster Finish 10,500.00 Sq.m. 1032(1)a Painting Works (masonry Painting) 10,667.00 Sq.m. 1032(1)b Painting Works (ficem Board Ceiling) 1,889.33 Sq.m. 1032(1)c Painting Works (wood Painting) 555.84 Sq.m. 1032(1)d Painting Works ( Metal Painting) 2,026.34 Sq.m. 1043(1) Pvc Doors And Frames 98.70 Sq.m. 1046 100mm Thk. Chb Non-load Bearing (including Reinforcing Steel) 3,965.00 Sq.m. 1047(2) Structural Steel ( Steel Ramp Columns And Beams) 21,031.41 Kg 1047(2)a Structural Steel (5.0mm X 4" X 2" Channel Bar Steel Ramp Floor Joist) 4,528.80 Kg 1047(2)b Structural Steel (5.0mm Checkered Plate Steel Ramp Flooring) 10,412.93 Kg 1047(2)c Structural Steel Purlins (cee Purlins And Facia Frames) 2,341.96 Kg 1047(2)c1 Structural Steel Purlins (purlin Cleat) 41.98 Kg 1047(3)a Metal Structure Accessories (anchore Bolt) 418.00 Pcs 1047(3)b Metal Structure Accessories (sag Rods &cross Bracing) 243.94 Kg 1047(3)c Metal Structure Accessories (turnbuckle) 30.00 Pcs 1047(5) Consstruc Metal Structure Accessories (steel Base Plate) 587.77 Kg 1047(6) Railings (ss Railings For Stairs Ss Pipe Sch. 10 And Rectangular Tubing For Roofdeck) 1.00 L.s. 1047(6)a Railings (2"ø Gi Pipe Sch. 20 Steel Ramp Railings) 1.00 L.s. 1100 20mm & 25mm Pvc Electrical Pipe 2,500.00 Lg 1100(1) Utility Box / Junction Box 1,622.00 Pcs 1101(2) 2.0mm², 3.5mm², 5.5mm² Thhn Electric Wire 13,200.00 M 1101(7) 38mm² Thhn Copper Wire With Terminal Lugs Long Barrel 90.00 M 1101(7)a 80mm² & 125mm² Thhn Copper Wire With Terminal Lugs Long Barrel 430.00 M 1101(7)b Pdx Wire 150.00 M 1101(8) Switches 182.00 Set 1101(16) Outlet (flush Type) And Acu Outlet 215.00 Set 1101(42) Rubber Tape, Electrical Tape, 20mmø Flexible Hose 900m , Triple Secondary Rack With Spool-15 Set 1.00 L.s. 1101(42)a Metal Cable Tray With Cover Including Bolts 1.00 L.s. 1101(42)b 25ft Concrete Pole 3.00 Lg 1102 Panel Board - 12 Branches , 3 Phase Connection With 100at Main Cb 1.00 Set 1102(1) Panel Board - 30 Branches , 3 Phase Connection With 100at Main Cb 3.00 Set 1102(1)a Panel Board - 30 Branches , 3 Phase Connection With 225at Main Cb 3.00 Set 1102(1)b Circuit Breaker - 15,20,30amp, 2-pole Bolt On Type 121.00 Set 1102(1)c Circuit Breaker - 60amp, 3-pole Molded Case 3.00 Set 1102(1)d Circuit Breaker - 100amp, 3-pole Molded Case 2.00 Set 1102(1)e Circuit Breaker - 300amp, 3-pole Molded Case 3.00 Set 1102(1)f Circuit Breaker - 750amp, 3-pole Molded Case 2.00 Set 1103 Led Strip Light 300.00 Pcs 1103(1) Round Surface Type Ceiling Led Light Panel 115.00 Set 1103(1)a 20cm X 40cm & 40cm X 40cm Led Surface Type Ceiling Light Panel 255.00 Set 1103(1)b 60cm X 60cm Led Surface Type Ceiling Light Panel 18.00 Set 1103(1)c Outdoor Wall Lamp 8.00 Set Auxiliary System 1105(1)a Network System (active) Supply, Delivery, Installation, Testing, And Commissioning, Rg-nbs 3100-48gt4sfp -p = 3 Set, Rg-nbs300-24gt4sfp-p = 2 Set,rg-nbs3100- 8gt2sfp-p = 1set 1.00 L.s. 1105(1)b Network System (wap) Supply, Delivery, Installation, Testing, And Commissioning Ua Ap-ac = 4 Sets 14.00 Set 1105(1)c Network System (passive) Supply, Delivery, Installation, Testing And Commissioning 1.00 L.s. Data Cabinet 42u With Pdu = 1set, Intermidiate Distribution Frame (idf) = 4 Set, Cable Manger 2u = 7 Set, Utf Cat6 Patch 48 Port Panelfully Loaded = 5 Set, Sfp Module = 5 Set, 1 Portwith Io Cat6 = 26 Set, 2 Port With 10 Io Cat6 = 48 Set, Rj 45=376 Set. Hdmi 30m = 2 Set, Fiber Patch Panel 24 Port = 4 Set, Fiber Backbone 24-core = 1 Set, Utp Cable Cat6, 305m = 44 Set, Faceplate With Duplex = 48 Set, Faceplate With Simplex = 26 Set, Surface Box = 74 Set, Lc-st Fiber Patchcord = 10 Set, Utp Patchcord 1.5m = 168 Set, Ups 1.5 Kva = 4 Set. 1105(1)d Voip - Telephone 1.00 L.s. Ip7ww Pabx Main Chassis = 1set, Sl2100 Main Processor Board = 1 Set, Entry Ip Phone = 23set, Model Ip Phone = 23set, Model Ip Phone = 12 Set, Ip Extension License For Ip Phone = 35set, Hybrid Extension Board + 3 Analog Trunks = 8set, Ip7ww-voippdb-c1 (voip Daughter Board) = 3set 1106(1) Cctv System 1.00 L.s. 4mp Bullet Camera Hi Watch Series = 10 Set, 2mp Dome Camera Hi Watch Series = 36 Set, 32 Channel Nvr = 2 Set, 8tb Hdd = 6 Set, 65" Tv = 2 Set. 1107(1) Paging System 1.00 L.s. Poe Wall Mount Speaker = 12 Set, Ip Network Ceiling Speaker = 26 Set, Network Pa Host 2u = 1 Set, Ip Network Paging Station = 1 Set, Desktop Computer = 1 Set 1200 Exhaust And Ceiling Fan 136.00 Unit 1200(1) Air Conditioning Units ( 4 Units - 1hp, 3 Units - 2 Hp Split Type 7.00 Unit Automatic Fire Sprinkler System. Fittings 1202(1)a 75mmø X 90° Elbow 38.00 Pcs 1202(1)b 65mmø X 90° Elbow 32.00 Pcs 1202(1)c 50mmø X 90° Elbow 43.00 Pcs 1202(1)d 40mmø X 90° Elbow 104.00 Pcs 1202(1)e 25mmø X 90° Elbow 890.00 Pcs 1202(2)a Tee Straight (40mm) 48.00 Pcs 1202(2)a1 Tee Straight (25mm) 184.00 Pcs 1202(2)b Coupling And Bushing Reducer (50 X 40) 12.00 Pcs 1202(2)b2 Coupling And Bushing Reducer (40 X 32) 18.00 Pcs 1202(2)b3 Coupling And Bushing Reducer (32 X 25) 72.00 Pcs 1202(2)b4 Coupling And Bushing Reducer (40 X 25) 32.00 Pcs 1202(2)b5 Coupling And Bushing Reducer (25 X 12.5) 244.00 Pcs 1202(2)b6 Slip On Flange (75mm) 40.00 Pcs 1202(2)b7 Slip On Flange (65mm) 4.00 Pcs 1202(2)b8 Slip On Flange (50mm) 8.00 Pcs 1202(2)c1 Blind Flange (75mm) 4.00 Pcs 1202(3)a Sprinkler Heads 218.00 Pcs 1202(3)b Alarm Test Valve (25mmø) 1.00 Pcs 1202(3)c Water Flow Switch (75mmø) 4.00 Pcs 1202(3)d 75mmø Gate Valve (flange Type) 5.00 Pcs 1202(3)d1 50mmø Gate Valve (flange Type) 2.00 Pcs 1202(3)d2 75mmø Check Valve (flange Type) 2.00 Pcs 1202(3)d3 50mmø Check Valve (flange Type) 2.00 Pcs 1202(3)d4 25mmø Ball Valve (screw Type) 14.00 Pcs 1202(3)h Inspector Valve (25mm) 5.00 Pcs 1202(3)h2 Inspector Test Connector ( Sight Glass 25mmø) 4.00 Pcs 1202(3)i Pressure Gauge (0-200 Psi) 1/4" 6.00 Pcs 1202(3)i1 Pressure Alarm Switch 1/2" 2.00 Pcs 1202(3)i2 Auxiliary Drain (50mmø And 32mmø 2.00 Pcs 1202(4) 75mmø Black Iron Pipe (sch. 40) 22.00 Pcs 1202(4)1 65mmø Black Iron Pipe (sch. 40) 26.00 Pcs 1202(4)1a 50mmø Black Iron Pipe (sch. 40) 15.00 Pcs 1202(4)1b 40mmø Black Iron Pipe (sch. 40) 31.00 Pcs 1202(4)1c 25mmø Black Iron Pipe (sch. 40) 114.00 Pcs 1202(10) Fdc Siamese Twin (65mmø X 65mmø X 150mmø With Cap And Chain) 1.00 Pcs 1202(11) Fire Hose Cabinet Fhc 100 Ft With Complete Accessories 8.00 Pcs 1202(12) Support, Hanger, And Paint (automatic Fire Sprinkler System) 1.00 L.s. 1202(12)a Consumables (automatic Fire Sprinkler System) 1.00 L.s. Fire Detection And Alarm System Active 1208 Conventional Aw- Cf2166- 4 Fire Alarm Panel 8 Zone 1.00 L.s. 1208(1) Conventional Repeater / Annunciator 3.00 Set 1208(1)a Conventional Aw- Csd381conventional Smoke Detector 64.00 Set 1208(1)b Conventional Aw-d135c Resettable Maual Call Point 16.00 Set 1208(1)c Conventional Aw-css2166- 2 Fire Strobe Siren 16.00 Set Passive 1208(1)d Tf Wire #18 Twisted Pair, Black And Red 30.00 Set Spl - 1 5000 Ltrs. Capacity Ss Cylindrical Water Storage Tank Horizontal ( Dia. = 187cm, L=268cm, H=197cm 1.00 Unit
Department Of Agriculture Tender
Others
Philippines
Closing Soon26 Nov 2024
Tender AmountPHP 3.8 Million (USD 66 K)
Details: Description Invitation To Bid For The Procurement Of Supply And Delivery Of Ict Equipment For Da Wv 1. The Department Of Agriculture-western Visayas, Through The National Expenditure Program 2025 (early Procurement Short Of Award) Intends To Apply The Sum Three Million Eight Hundred Ninety Five Thousand Pesos (php3,895,000.00) Being The Abc To Payments Under The Contract For Procurement Of Supply And Delivery Of Ict Equipment For Da Wv/ib No. 2025-002 (gas). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-western Visayas Now Invites Bids For The Procurement Of Supply And Delivery Of Ict Equipment For Da Wv With The Following Specifications: Mini Pc 10 Units Amd Ryzen 7 5700u, Amd Radeon Rx Vega 8, 16gb Ddr4 3200 (up To 32gb) , 512 Gb M.2 Nvme Pcle 3.0 Ssd, 2x 2.5g Gigabit Network Wifi 6 & Bluetooth 5.2, 2*usb3.2 Ports, 1x Hdmi, 1dp & 1x Type C Triple Screen 4k Output Us Power Adapter (dc In 65w), Hdmi Cable, Windows 11 Wifi Access Point (ap) 15 Units Wifi 6 Ap With Spatial Streams, 140 M2 Coverage Powered Using Poe, Networking Interface: (1) Gbe Rj45 Port, Powered Using Poe, Networking Interface: (1) Gbe Rj45 Port, Mounting: Wall And Ceiling (included), 802.11a/b/g/n/ac/ax (wifi 6), Wpa-psk, Wpa-enterprise (wpa/wpa2/wpa3), Bssid : 8 Per Radio, Vlan : 802.1q, Advanced Qos: Per-user Rate Limiting, Guest Traffic Isolation, Vlan : 802.1q, Advanced Qos: Per-user Rate Limiting, Guest Traffic Isolation, Concurrent Clients: 350+, 802.11ax (wifi 6): 7.3 Mbps To 4.8 Gbps (mcs0-mcs11 Nss1/2/3/4, He 20/40/80/160) Mini Pc 1 Unit Intel Core Ultra 9 Processor 185h, Ddr5 Dual Channels 32gb Ram (sodium Slots, Up To 5600mhz, Max 96gb), M.2 1tb Ssd Intel Arc Graphics, Equipped With 4 Inch Touch Screen For System Performance Monitoring With Dc 19v (adapter Included), Hdmi Cable, Stand And User Manual Ad Windows 11 Operating System Mini Pc 2 Units M2 With 8-core Cpu, 10-core Gpu, 16-core Neural Engine With 16gb Unified Memory, 512gb Ssd Storage, 10 Gigabit Ethernet, Two Thunderbolt 4 Ports, Hdmi Port, Two Usb-a Ports, Headphone Jack Pc Monitor 15 Units 27-inch Ips Screen Full Hd Resolution (1920 X 1080), 75 Hz, 16.7 Million Colors, Hdmi Input Signal Wi-fi Extender 5 Units Wifi 6, 6 Spatial Streams, 115 M2 (1,250 Ft2) Coverage, 300+ Connected Devices Powered With Standard Ac Wall Outlet, Bssid: 8 Per Radio; Supported Data Rates: 802.11ax (wifi 6) 7.3 Mbps To 4.8 Gbps Servo Automatic Voltage Regulator (avr) 2 Units Capacity : 3kva/2400w, Servo Motor Controlled Design Input Voltage : 220vac Or 230vac Single Phase Input Voltage Range : 130 – 270vac Input Frequency : 50hz / 60hz Output Voltage : 220vac Or 230vac Single Phase +/- 1-3% Output Frequency : 50hz / 60hz Efficiency : 90% Input Protection Delay Time : 3s Ink Tank Printer 1 Unit Printer Technology: Micropiezo Printhead 5760x1440 Dpi Maximum Print Resolution, 1.5 Pl Minimum Ink Droplet Size Nozzle Configuration (180x1 Nozzle Black; 1 Per Colour For Cyan, Magenta, Yellow, Light Cyan, Light Magenta) Paper Hold Capacity: Input Capacity: Up To 80 Sheets Of A3 Plain Paper (80g/m2) 50 Sheets Of Premium Glossy Photo Paper Output Capacity: Up To 100 Sheets Of A3 Plain Paper Up To 30 Sheets Premium Glossy Photo Paper Support Paper Size: A6, A5, A4, A3, A3+, B6, B5, B4, 8k, 16k. Indian-legal, Letter, 8 X 10”, 8.5 X 13”, Legal, 5 X 7”, 4 X 6”, 16:9 Wide, 105 X 148 Mm, 3.5 X 5”, 54 X 86 Mm (id Card), Envelopes #10, Dl, C6, C4 Ink Tank Printer 30 Units Print Type: Print, Scan And Copy Print Method: On-demand Inkjet (piezoelectric) Nozzle Configuration: 180 X 1 Nozzles Black, 59 X 1, Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 5760 X 1440 Dpi, Photo Default – 10 X 15 Cm / 4 X 6” *1, Approx. 69 Sec Per Photo (border) / 90 Sec Per Photo (borderless)*2 Draft, A4 (black/colour): Up To 33.0 Ppm / 15.0 Ppm*2, Iso 24734, A4 Simplex (black/colour): Up To 10.0 Ipm / 5.0 Ipm*2, First Page Out Time From Ready Mode (black/colour): Approx. 10 Sec / 16 Sec*2, Copying: Maximum Copies From Standalone: 20 Copies, Maximum Copy Resolution: 600 X 600 Dpi, Maximum Copy Size: A4, Letter, Iso 29183, A4 Simplex (black/colour): Up To 7.0 Ipm / 1.7 Ipm Full Colored 4mp Cctv System 5 Sets 4 Channel Poe+ Network Video Recorder With 4k Hdmi Video Outputs & 16mp Decoding Capacity: Sharp Image Definition Up To 8mp And A 4-channel Display, 24/7 Continuous Recording: Stores Up To 10tb Of Footage Following Includes: 2 4mp Full-color Turret Network Camera, 2 4mp Outdoor Full-color Bullet Network Camera, 4 20m Patch Utp Cable Inclusion: 256gb Sd Card For Storage (compatible With Nvr) Wi-fi 6 Tri-band Router 2 Units Wi-fi Speeds Over 10 Gbps: 4804 Mbps (5 Ghz) + 4804 Mbps ( Ghz) + 1148 Mbps (2.4 Ghz) 2.5 Gbps Wan Port And Eight Gigabit Lan Ports, Usb 3.0 In Type A And Type C, Working Modes: Router Mode, Access Point Mode, Wan Types: Dynamic Ip, Static Ip, Pppoe, Pptp, L2tp, 8x Detachable High-performance Antennas 4u Data Cabinet 7 Units Standard 600w*450d*280mmh; Glass Front Door; Mounting Type; 1 Fixed Tray; Removable Side Panel; Powder Coated Finish Black; Aggregation Switch 2 Units 8-port, Layer 2 Switch Made For 10g Sfp+ Connections, With Management Interface: Ethernet In-band, Switching Capacity: 160 Gbps, Forwarding Rate: 119.04 Mpps, Power Method: Universal Input, 100-240v Ac, 50/60 Hz, Power Supply, Ac/dc, Internal, 36w, Lcm Display: (1) 1.3” Lcm Color Touchscreen, Button: Factory Reset, With The Following Peripherals: 2 Pcs – 10g Direct Attach Cable Sfp+ To Sfp+, 1m Length 2 Pcs – 10g Multi-mode Optical Module 4 Pcs – Sfp+ To Rj45 Adapter Network Switch 5 Units Management Interface: Ethernet In-band, Networking Interface (24) Gbe Rj45 Ports (2) 1/10g Sfp+ Ports, Poe Interface: (16) Poe/poe+ (pins 1,2+; 3, 6-), (8) 60w Poe++; Poe/poe+ (pins 1, 2+; 3, 6-) / Poe++ (pair A 1, 2+; 3, 6-) (pair B 4, 5+; 7, 8-), Forwarding Rate: 65.472 Mpps, Voltage Range Poe Mode Poe: 44-57v Poe+: 50-57v, Supported Voltage Range 100-240v Ac, Lcm Display: (1) 1.3” Touchscreen, Button: Factory Reset, Lcm Display: (1) 1.3” Touchscreen, Button: Factory Reset Rack-mounted Power Backup 5 Units 950w Redundant Power Supply For Rack-mounted, Networking Interface (1) Gbe Rj45 Port, Power Output (6) Rps Dc Ports, Power Method (1) Universal Ac Input, 100-240v Ac, Display 1.3” Touchscreen 10g Cloud Gateway 1 Unit 1,000+ Client Support And 3.5 Gbps Ips Routing And Built-in Poe Switching, Lcm Display: (1) 1.3” Touchscreen, Button: Factory Reset, System Memory : 4 Gb Ddr4, On-board Storage: 16gb Emmc, Integrated 128 Gb Ssd, Lan: (8) Gbe Rj45 Ports, (1) 10g Sfp+ Port; Wan: (1) 2.5 Gbe Rj45 Port, (1) 10g Sfp+ Port, Ids/ips Throughput: 3.5 Gbps*, Lcm Display: (1) 1.3* Touchscreen, Button: Factory Reset, With The Following Items: 1 – 10g Direct Attach Cable Sfp+ To Sfp +, 1m Length 2 – Sfp+ To Rj45 Adapter Compact Cloud Gateway 6 Units Built-in Wifi 6 Ap, 140 M2 (1,500 Ft2) Single-unit Coverage, 50+ Connected Wifi Device*, Management Interface: Ethernet, Bluetooth, Management Interface: Ethernet, Bluetooth, Power Method: Usb Type C (5v Dc/3a), Max, Power Consumption: 10w, Throughput Rate: 2.4 Ghz: 573.5 Mbps ; 5 Ghz : 2.4 Gbps, Lcm Display: 0.96” Status Display, Button: Factory Reset Power Station 2 Units Capacity: 192wh, Power Via Usb-c: 60w Max, Number Of Ports: 2 Usb-c, 2 Usb-a With Power A 3w Led Lamp For 42.3 Hours. Poe Switch Hub 5 Units Networking Interface: (8) Gbe Rj45 Ports (2), 10g Sfp+ Ports, Poe Interface (6) Poe/poe+ (pins 1, 2+; 3, 6-), (2) 60w Poe++ (pair A 1, 2+; 3, 6-) (pair B 4, 5+; 7, 8-): Forwarding Rate: 41.664 Gbps : Voltage Range: Poe Mode, Poe: 44-57v, Poe+: 40-57v, Poe++: 50-57v Open Data Rack 22u Double Bay 1 Unit Unassembled Structure, Modular Design, Easy To Assembly; 19 Inch Standard Data Rack, With 4 Castor, Easy To Move; Various Optional Accessories For Common Using; Double Row Open Rack With 4 Casters, 20 Sets Of Screws And Nuts Smart Fingerprint Lock 1 Unit Aluminum Alloy Panel Material, Left Inward, Unlocking Method (finger Print, Passcode, Proximity Card), Support Up To 50 Users Portable Speaker 1 Unit 8000w Pmpo, 12” X 2 Woofer & 3” Tweeter Speaker, 7000mah Battery, Bluetooth, Usb & Micro Sd Slot, Fm Radio And Aux-in, 1 Wired Mic Input, 1 Guitar Input, Remote Control, 2 Wireless Uhf Mic Tws (true Wireless Stereo) Internet Satellite (2 Units Residential & 1 Unit Roam) 3 Units Gen 3 Antenna Electronic Phased Array (standard), 110 Deg Field Of View, Wifi6, Tri Band 4x4 Mu-mimo, With 2 Latching Ethernet Lan Ports With Removable Cover, Wpa2 Security, - Peripherals: Kickstand, Gen 3 Router, 15m Cable, Ac Cable, Power Supply - Base With 2 Months Subscription For 3 Units Laptop 15 Units Intel® Core™ I3-1115g4 Processor 3.0 Ghz (6m Cache, Up To 4.1 Ghz, 2 Cores) With 8 Gb Ddr4 Memory, 128gb M.2 Nvme™ Pcle® 3.0 Ssd, 1tb Sata 5400rpm 2.5” Hdd, Integrated Gpu Intel® Uhd Graphics, Panel Size: 15.6-inch, Backlit: Led Backlit, Oled: Lcd, Wireless: Ntel Wi-fi 6(gig+)(802.11ax)+bluetooth 5.0 (dual Band) 2*2, Windows 10, Microsoft Office Home And Student 2019 Included All In One Desktop 10 Units Intel® Core™ I3-1315u With 8gb Ddr4 Ram, 1tb Pci-e Ssd, Intel® Uhd Graphics, Office For Home And Student, Dts® Audio Audio, Built-in Stereo Speakers, Wi-fi 6e And Bluetooth® 5, Screen Size: 60.5 Cm (23.8”), Screen Resolution: 1920*1080,os: Windows 11 5g Nr Mifi Mobile Hotspot 2 Units Wifi 5 Ac950 Technology Up To 950mbps 5g Sim Card Router With Rechargeable, 10000 Mah Li-on Battery (type-c Port) Monitor 4 Units 27” Screen Size, Hdr10, 2560x1440 Resolution Or Higher, Hdmi 2.0, Anti Glare Ip Phone 20 Units Voip Call Services Voice Mail, Caller Id, Call Waiting, Call Forwarding, Call Transfer, Call Hold, Message Waiting Capability, And Featuring Two Ethernet 10base-t/100base-tx Network Ports And Integrated Power Over Ethernet (poe) Support, And Equipped With 128-bit And 256-bit Aes Encryption, Along With Ieee 802.1x And Tls Security Protocols, Placing: Wall-mountable, Table-top Inclusion: Corded Hand Set And Ac Power Adapter (compatible With Cisco 4331 Call Manger Router) Terms And Conditions: • All Equipment Must Come With A Minimum One (1) Year Warranty And Must Be Brand New, Not Refurbished Or Cloned • For Laptops And Desktops, The Winning Bidder Must Provide Dealer Or Reseller Certification Addressed To The Head Of The Procuring Entity Indicating The Project Number And Project Title. This Is To Ensure That The Bidder Is An Authorized Dealer/reseller Of The Brand And To Ensure That The Supplied Materials Are Original, Brand-new, And Not Counterfeit. • For Network Equipment, The Winning Bidder Must Provide Manufacturer Or Dealer Certification As A Proof That The Product Offered Is Authentic And Branded. • In The Event Of Defects Arising Within The Warranty Period, The Supplier Is Responsible For Collecting The Defective Equipment From The Department’s Main Office And Ensuring It Is Promptly Processed Under The Warranty Service. Delivery Of The Goods Is Required Within 60 Calendar Days From Receipt Of Notice To Proceed And To Be Delivered At 2nd Floor Organic Building, Wesviarc, Buntatala, Jaro, Iloilo City. Bidders Should Have Completed, Within Three (3) Years (2021-present) From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. The Prospective Bidder Must Be Registered In The Philgeps. 4. Prospective Bidders May Obtain Further Information From Department Of Agriculture - Visayas And Inspect The Bidding Documents At The Address Given Below During Office Hours, 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 6, 2024 – November 26, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php5,000.00).the Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person. 6. The Department Of Agriculture-western Visayas Will Hold A Pre-bid Conference At 9:30 P.m. On November 14, 2024 At The Rcpc Library, Rcpc Building, Da Wesviarc Compound, Brgy. Buntatala, Jaro, Iloilo City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:30 A.m. On November 26, 2024. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In The Amount Of Any Of The Acceptable Forms And In The Amount Of Php77,900.00 (if The Bid Security Is In The Form Of Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit) Or Php194,750.00 (if The Bid Security Is In The Form Of Surety Bond). In Lieu Of A Bid Security, The Bidder May Submit A Duly Notarized Bid Securing Declaration That Is An Undertaking Which States, Among Others, That The Bidder Shall Enter Into Contract With The Procuring Entity And Furnish The Required Performance Security Within 10 Calendar Days From Receipt Of The Notice Of Award, And Committing To Pay The Corresponding Fine And Be Suspended For A Period Of Time From Being Qualified To Participate In Any Government Procurement Activity In The Event That It Violates Any Of The Conditions Stated Therein As Required In The Guidelines Issued By The Gppb. 9. Bid Opening Shall Be At 9:30 A.m. On November 26, 2024 At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agriculture-western Visayas Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. The Department Of Agriculture-western Visayas Does Not Condone Any Forms Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Zarlina B. Cuello Bac Chairperson Da-wesviarc Compound Brgy. Buntatala, Jaro, Iloilo City Tel. No. (033) 320-23-73 Www.westernvisayas.da.gov.ph Procurement@wv.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps November 6, 2024 Zarlina B. Cuello Bac Chairperson
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Civil Works Others
Philippines
Closing Soon28 Nov 2024
Tender AmountPHP 144.7 Million (USD 2.4 Million)
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Iv-a Canlubang Interchange, Brgy. Mayapa, Calamba, Laguna Invitation To Bid 1. The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 1. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Local Program National Building Program Buildings And Other Structures Multipurpose / Facilities Construction Of Area Equipment Management Section Shop, Regional Office Iv-a, Cavite Contract Id No. : 25d00067 Contract Location : Cavite Province Scope Of Works : Earthwork Includes: - Clearing And Grubbing - Structure Excavation (common Soil) - Gravel Fill - Structure Excavation (hard Rock) Plain And Reinforced Concrete Work Includes: - Structural Concrete, 4000psi (class A 28days) - Reinforcing Steel (deformed) Grade 40 - Reinforcing Steel (deformed) Grade 60 - Formworks And Falsework Finishing And Other Civil Works Includes: - Soil Poisoning Approved Budget For The Contract : ₱12,645,360.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 180 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱25,000.00 2. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Construction Of Pnpa Engineering Office, Camp General Mariano Castaneda, Silang, Cavite, Phase Iii Contract Id No. : 25d00070 Contract Location : Cavite Province Scope Of Works : Architectural - Installation Of Aluminum Cladding Finish For Exterior Wall - Installation Of Ceiling And Application Of Paint Finish At Third Floor - Installation Of Natural Stone Cladding Finish For Exterior Wall At Entry Porch - Repainting Of Interior Walls At Third Floor - Site Development (perimeter Fence And Concrete Pavement) Structural - Construction Of Canopy At The Entrance Of The Building - Construction Of Parking Space With Roof Electrical - Installation Of Service Entrance Pedestal - Installation Of Lighting Fixtures At Third Floor - Installation Of Electrical Wires At Third Floor Plumbing - Installation Of Bidet And Faucet At Second And Third Floor Mechanical - Supply Of Fire Extinguishers - Installation Of Air Conditioning Units At All Floor Levels Approved Budget For The Contract : ₱9,650,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱10,000.00 3. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Rehabilitation Of 4 Lakan Dormitories, Camp Gen Mariano Castañeda, Silang, Cavite, Phase Iii Contract Id No. : 25d00071 Contract Location : Cavite Province Scope Of Works : Architectural - Roofing Sheet And Accessories - Installation Of Aluminum Glass Window - Installation Of Ceramic Tiles - All Painting Works For Masonry/concrete - Installation Of Doors And Glass Windows - All Waterproofing Works Plumbing - Installation Of Plumbing Fixtures - Installation Of Water Closet, Elongated, Complete (flush Type) - Installation Of Floor Drain - Installation Of Lavatory, Wall Hung, Complete (manually Operated) Electrical And Auxiliaries - Installation Of Lighting Fixtures - Installation Of Auxiliary System - Installation Of Fire Alarm System - Fire Extinguisher With Bracket Approved Budget For The Contract : ₱19,300,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 210 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱25,000.00 4. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Construction Of Police Commissioned Officers Quarters Building 1, Camp Bgen Vicente P. Lim, Calamba City, Laguna, Phase Iii Contract Id No. : 25d00072 Contract Location : Laguna Province Scope Of Works : The Scope Of Works Are Finishing And Other Civil Works The Scope Of Works Are Installation Of Ceiling Works From Ground Floor Up To Third Floor. Application Of Liquid Waterproofing For Comfort Rooms From Ground Floor Up To Fourth Floor. Application Of Waterproofing Membrane For Roof Deck. Installation Of Unglazed For Comfort Rooms (floor) And Installation Of Vinyl Floor Tiles (bedrooms) From Ground Floor Up To Fourth Floor. Application Of Cement Plaster Finish (exterior). For The Electrical And Auxiliaries The Scope Of Works Are Installation Of Fittings And Accessories For The Service Entrance. Approved Budget For The Contract : ₱7,044,500.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 180 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱10,000.00 5. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Construction Of Police Commissioned Officers Quarters Building 2, Camp Bgen Vicente P. Lim, Calamba City, Laguna, Phase Ii Contract Id No. : 25d00073 Contract Location : Laguna Province Scope Of Works : The Scope Of Works Are Finishing And Other Civil Works The Scope Of Works Are Installation Of Plumbing Fixtures Such As Kitchen Sink And Faucet From Ground Floor Up To Fifth Floor. Installation Of Ceiling Works From Ground Floor Up To Fifth Floor. Construction Of Cabinet And Counter Tops From Ground Floor Up To Fifth Floor. Application Of Liquid Waterproofing For Comfort Rooms From Ground Floor Up To Fifth Floor. Application Of Waterproofing Membrane For Roof Deck. Installation Of Unglazed For Comfort Rooms (floor), Installation Of Glazed Tiles And Installation Of Vinyl Floor Tiles (bedrooms) From Ground Floor Up To Fifth Floor. Application Of Cement Plaster Finish (exterior And Façade At The Roof Deck). Application Of Painting Works For Ceiling, Façade And Exterior And Interior Wall. Construction Of Façade At Roof Deck And Installation Of Metal Railings From Second Floor Up To Fifth Floor. For The Electrical And Auxiliaries The Scope Of Works Are Installation Of Fittings And Accessories For The Service Entrance And Installation Of Electric Elevator. Approved Budget For The Contract : ₱24,125,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 240 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱25,000.00 6. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Construction Of Regional Police Security And Protection Units (rpspus) And Presidential Protection Division (ppd) Building, Under The Police Security And Protection Group (pspg) - Pnp - Rpspu, Camp Bgen Vicente P. Lim, Calamba City, Laguna, Phase Iii Contract Id No. : 25d00074 Contract Location : Laguna Province Scope Of Works : Structural - All Concrete Foundation Works - All Concrete Slabs, Beams And Concrete Columns - All Roof Works (trusses, Purlins And Sagrods) Architectural - Roofing Sheet And Accessories - Metal Frame For Ceilings - All Cement Plaster Finish - All Cement Floor Finish - All Chb Masonry Walls: Exterior (150mm Thk.) And Interior (100mm Thk.) - Painting Works For Masonry/concrete - Doors And Glass Windows - Unglazed And Granite Tiles For Floor Finish Plumbing - Sewer Line Pipes And Fittings - Catch Basin - Plumbing Fixtures (kitchen Sink) - Floor Drain Plates Electrical And Auxiliaries - Fittings And Accessories - Rough-in For Switch Boards, Panel Boxes, And Conduits - Intermediate Metal Conduit (imc) With The Diameter Of 20 - Electric Wires (3.5mm2, 5.5mm2, 8.0mm2, 22.0mm2) - Wires And Wiring Devices - Grounding System Mechanical - Installation Of Air Conditioning Units Approved Budget For The Contract : ₱5,886,500.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 180 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱10,000.00 7. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (sipag) Major/strategic Public Buildings/facilities Structural And Resilience Program Construction Of Department Of Labor And Employment (dole) Regional Office Iv-a Building, Cabuyao City, Laguna, Phase Ii Contract Id No. : 25d00076 Contract Location : Laguna Province Scope Of Works : Structural - Structural Concrete, 5000 Psi - Reinforced Steel (deformed) Grade 40 - Reinforced Steel (deformed) Grade 60 Plumbing - Pipes And Fittings Electrical - Conduit Works/ Conduit Rough-ins Approved Budget For The Contract : ₱41,806,695.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱25,000.00 8. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Basic Infrastructure Program (bip) Multi-purpose Buildings/ Facilities To Support Social Services Construction Of Multi-purpose Building, Southern Luzon Multi-specialty Medical Center, Tayabas City, Quezon Contract Id No. : 25d00078 Contract Location : Quezon Province Scope Of Works : The Scope Of Works Are Structural Works From Second Floor To Fourth Floor Level Only Such As Installation Of Steel Deck. Installation Of Stiffener, Anchor Bolts And Baseplate For Steel Columns. Installation Of Steel Columns, Steel Beams And Steel Stairs. Application Of Cement Based Waterproofing At Fourth Floor Slab Only. Approved Budget For The Contract : ₱198,000,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 C.d. Size Range : Medium B License Category : A Cost Of Bidding Documents : ₱50,000.00 9. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (sipag) Evacuation Centers/ Quarantine Facilities/ Public Health Facilities Construction Of Kalayaan Hospital, Phase 3, Kawit, Cavite Contract Id No. : 25d00103 Contract Location : Cavite Province Scope Of Works : Structural - Structural Concrete, 4000 Psi - Reinforced Steel (deformed) Grade 40 - Reinforced Steel (deformed) Grade 60 - Expansion Joint For Bridge Architectural - Fiber Cement Board (4.5mm), Metal Frame For Ceilings - Wall - Cabinets - Glass Partitions - Fabricated Metal Roofing – Flashings - Fabricated Metal Roofing – Gutter - Prepainted Metal Sheets Rib-type, Long Span - Granite Tiles - Floor Finishes - Cement Plaster Finish - Painting Works (masonry/concrete) - Structural Steel - Railing Electrical - Conduit Works/ Conduit Rough-ins - Wires And Wiring Devices - Panel Board With Main And Branch Breakers - Generator, Single Phase (stand-by) - Lighting Fixtures And Lamps Mechanical - Electric Elevator (501kg-1000kg) - Airconditioning (vrf) - Ventilating System - Medical Gas System Approved Budget For The Contract : ₱81,060,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱50,000.00 10. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (sipag) Major/strategic Public Buildings/facilities Structural And Resilience Program Construction Of Multi-purpose Building Including Facilities (department Of Agriculture), Brgy. Marawoy, Lipa City, Batangas Contract Id No. : 25d00104 Contract Location : Batangas Province Scope Of Works : The Scope Of Work Are Structural Works It Includes The Clearing And Grubbing, Foundation, Grade Beam, Slab On Grade, Columns And Beams. Installation Of Purlins, Sag-rods And Trusses For The Generator Room. Also Included In The Structural Works Are The Concreting Of Road Around The Main Building. For The Architectural Works For The Main Building Includes The Installation Of All Doors And All Windows. Installation Of Ceiling At All Rooms. Installation Of All Floor Finishes. Application Of Waterproofing. Installation Of Railing At Main Stair And Fire Exits. Application Of Paint Finish At All Masonry Works And Steel Works. For The Architectural Works For The Generator Room It Includes The Installation Of Steel Louvered Door. Installation Of Rib-type Long Span Roofing With Reflective Insulation. Installation Of Masonry Wall And Installation Of Floor, Wall And Ceiling Finish. For The Electrical And Auxiliaries Scope Of Works It Includes The Installation Of Wires And Wiring Devices. Installation Of Intermediate Metal Conduit And Flexible Metal Pipes. Installation Of Fittings And Accessories. Installation Of Panel Boards & Branch Breakers. Installation Of Generator. Installation Of Lighting Fixtures And Lamps. Installation Of Auxiliary System, Air Conditioning System, Ventilating System, Electric Elevator And Fire Extinguishers. Approved Budget For The Contract : ₱144,750,000.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 300 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱50,000.00 11. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Construction Of Pnp Administrative Building, Camp Bgen Vicente P. Lim, Calamba City, Laguna, Phase Iii Contract Id No. : 25d00105 Contract Location : Laguna Province Scope Of Works : Architectural - Application Of Waterproofing At Roof Deck And Upper Roof Deck - Installation Of Unglazed Tiles At Roof Deck And Upper Roof Deck - Installation Of Stainless Steel Railing At Upper Roof Deck At Genset Room: - Application Of Waterproofing (liquid-based) - All Chb Masonry Walls (150mm Thk.) - Plastering - Installation Of Roll-up Door And Louver Blocks - Painting Works Structural Construction Of Genset Room - All Concrete Foundation Works: Combined Footing - All Grade Beams And Slab-on-grade - All Steel Columns - All Steel Beams And Girders - Suspended Slab On Steel Deck Electrical - Installation Of Generator Set And Automatic Transfer Switch - Installation Of Lighting Fixtures, Wires And Wiring Devices, And Conduit Rough-in At Genset Room Plumbing - Replacement Of Plumbing Fixtures Mechanical - Air Conditioning Units - Fire Extinguishers Electronics - Cctv Monitors And Wiring Approved Budget For The Contract : ₱14,764,500.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 180 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱25,000.00 12. Name Of Contract : Fy 2025 Dpwh Infrastructure Program Convergence And Special Support Program Construction/improvement Of Various Infrastructures In Support Of National Security (tatag Ng Imprastraktura Para Sa Kapayapaan At Seguridad Program - Tikas) Rehabilitation Of Pnp Training Institute, Camp Bgen Vicente P. Lim, Calamba City, Laguna, Phase Ii Contract Id No. : 25d00106 Contract Location : Laguna Province Scope Of Works : Structural - Slab On 2nd Floor - Steel Stairs (for Two Fire Exits) With Paint Finish Architectural - Chb Wall (with Plaster And Paint Finish) - Granite Tiles - Door Panel (with Finishing Hardware) - Stainless Steel Railing At Sidewalk - Painting (exterior Walls) Site Development - Concreting Of Sidewalk Approved Budget For The Contract : ₱4,535,500.00 Source Of Funds : Fy 2025 Nep For Dpwh Infra Program Contract Duration : 180 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : ₱5,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. The Bac Is Conducting The Public Bidding For This Contract Pursuant To Gppb Circular 06-2019 Dated July 17, 2019 (guidelines On The Implementation Of Early Procurement Activities) In Relation To The Provisions Of The Republic Act 9184 And Its Implementing Rules And Regulations (irr). The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a, And Inspect The Bidding Documents At The Address Given Below During Weekdays From 8am – 2pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting On November 08, 2024 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents (amount Indicated On The Above Table). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a, Will Hold A Pre-bid Conference On November 15, 2024 @ 10:00 A.m. At Bidding Room, Dpwh Regional Office No. Iv-a, Canlubang Interchange, Brgy. Mayapa, City Of Calamba, Laguna And Through Video Conferencing Via Zoom And Live – Streamed On Youtube Https://www.youtube.com/channel/ucbiu3eadzp_ckg02rjmipfg Which Shall Be Open To Prospective Bidders. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_r4a@dpwh.gov.ph For Electronic Submission On Or Before November 28, 2024 @ 10:00 A.m. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On November 28, 2024 @ 10:00 A.m. At Bidding Room, Dpwh Regional Office No. Iv-a, Canlubang Interchange, Brgy. Mayapa, City Of Calamba, Laguna Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above Or Through Video Conferencing Via Zoom Which Shall Also Be Live – Streamed On Youtube Https://www.youtube.com/channel/ucbiu3eadzp_ckg02rjmipfg. Late Bids Shall Not Be Accepted. 10. If At The Time Of The Post – Qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b) (ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject To Be Bid. 11. The Department Of Public Works And Highways (dpwh) Regional Office No. Iv-a, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Joel F. Limpengco Bac, Chairperson Director Iii Assistant Regional Director Telephone No. (02) (049) 34810215 Email Address: R4a.procurement@gmail.com Alex B. Virtudazo Bac Secretariat Head Telephone No. (02) (049) 34810215 / 34810225 Email Address: R4a.procurement@gmail.com Department Of Public Works And Highways Regional Office No. Iv-a Canlubang Interchange, Brgy. Mayapa, City Of Calamba, Laguna 13. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph. For Online Bid Submission At Electronicbids_r4a@dpwh.gov.ph. November 7, 2024 Approved By: Sgd Joel F. Limpengco Director Iii Assistant Regional Director Bac Chairperson
1191-1200 of 1219 active Tenders