Cctv Tenders
Cctv Tenders
Department Of Social Welfare And Development Region Xii Tender
Others
Philippines
Closing Soon3 Dec 2024
Tender AmountPHP 360 K (USD 6.1 K)
Details: Description 1. Hotel Accommodation And Catering Service -60 Pax "accommodation And Catering Services (2 Day Live In) (3 Meals And 2 Snacks) Specification: A.room Accommodation Triple Sharing With Individual Bed Per Pax With Free Provisions Replesnished Daily(fully Airconditioned) B. Meals Requirements (breakfast) Coffee/choco/tea Drinks; Plain Rice; Egg; Breakfast Viands/vegetable Selection; Fruits (am Snack) Heavy Snack Served With Cold Beverage In Can/bottle (lunch) 3 Viands With Rice, 1 Vegetable, 1 Dessert, 1 Soup And Beverage In Can/bottle/glass (pm Snack) Heavy Snack With Cold Beverage In Can/bottle/glass (dinner) 3 Viands With Rice, 1 Vegetable, 1 Dessert, 1 Soup And Beverage In Can/bottle/glass (choice Of Viands: Fish,beef,chicken)" "c. Function Rooms * Free Use Of Function Room That Can Accommodate Number Of Participants For Plenary And Breakout Rooms Until 10 P.m. (for Night Sessions) Whenever Necessary (use Of Breakout Rooms Should Be Specified With Dates) * Function Room Should Have No Pillars That Can Block The View Of Participants And Speaker. * With Good Sound System With At Least 3 Microphones And Audio Jack(audio Technician On Standby) * Free Socialization Night (food, Drinks, & Pica Pica ) * Sound Proof ,well-lighted And Ventilated * Free Strong Wi-fi Connection (within Rooms And Function Hall) * Free Use Of Minimum 4 Lcd Projector ,wide Screen And Electrical Connections Including Extension Cords For The Use Of Participants And Secretariat. * Free Use Of Whiteboard And Eraser * Free Flowing Coffee/tea/water With Hot And Cold Water Dispenser * With 3 Standby Waiters * Cctv Protected" "d. Other Amenities * Free Secretariat Room * With Hot And Cold Shower * With Outdoor Pool * Free Use Of Hotel Amenities * Discount At The Business Center For Fax, Printing, Photocopying, Etc. E. Notes * Hotel Location Must Be Appropriate For The Conduct Of Professional Discussion And Conducive For Productivity And Creative Thinking. * Hotel Should Not Be Offering Short-term Lodging Associated With Motels And Should Not Be Situated Beside Or Across Gambling Establishments/casinos And Should Not Beside Or Across Funeral Parlor. * Hotel Can Provide The Required Number Of Rooms And Should Not Transfer Participants To Another Hotel. * Compliance To Safety Protocols Must Be Observed And Must Be Strictly Followed. Temperature Check For All Participants. Social Distancing For All Participants. Provision Of Alcohol Or Hand Snitizers. All The Participants Must Wear Face Mask At All Times. * Strictly No Pork Serve Delivery Term: As Per Schedule Venue: Within General Santos City " Please Attach The Following Documentary Requirements: Copy Of Mayor's/business Permit Copy Of Philgeps Registration Number Copy Of Registration Certificate From Sec, Dti, Or Cda Or Its Equivalent Copy Of Bir Certificate Of Registration Copy Of Omnibus Sworn Statement (for Abc Above P50,000.00) Delivery Term: As Per Schedule Place Of Delivery / Venue: Within General Santos City ****************************************************************************** Department Of Social Welfare & Development Field Office Xii, Koronadal City Request For Quotation Company Name: ________________________________________ Rfq No.: 2024-11-0956 Address: _______________________________________________ Date: 29-nov-24 Contact Person: _________________________________________ Contact No.: ____________________________________________ Sir/madam: Please Quote Your Government Price/s Including Delivery Charges, Vat Or Other Applicable Taxes, And Other Incidental Expenses For The Goods Listed In Annex A. Also, Furnish Us With Descriptive Brochures, Catalogues, Literatures And/or Samples, If Applicable. If You Are The Exclusive Manufacturer, Distributor Or Agent In The Philippines For The Goods Listed Below, Please Attach In Your Quotations A Duly Notarized Certification To This Effect. Please Accomplish And Submit This Form Together With Annex A To Dswd-bac Secretariat At Dswd Regional Office Xii, Brgy. Carpenter Hill, Koronadal City Or Email Us Your Accomplished Forms At Procurement.fo12@dswd.gov.ph. Kindly Indicate In The Subject The Reference Number For Quotations Submitted Through Said Email Address. Quotations Submitted To Different Email Address(es) As Stated Above Shall Not Be Considered For Evaluation. For Manual Submission, Please Submit These Documents Signed And Sealed, Not To Be Disclosed To Canvassers And Other Parties Until Bid Opening Of Bac. Deadline Of Bid Submission Is On ______december 3, 2024_____ At 10:00am Note: Submission Of Quotations Beyond The Deadline Shall Be Ground For Disqualification Very Truly Yours, (sgd.) Abdulquddus R. Barambangan Head, Procurement Section Terms And Conditions: 1. Award Shall Be Made On Per: [ ] Item Basis [ / ] Total Quoted [ ] Lot Basis 2. Quotations Validity Shall Be Ninety (90) Calendar Days From The Deadline Of Submission Of Quotations. 3. Good/s Shall Be Delivered On: As Per Schedule 4. Place Of Delivery: Within General Santos City 5. Terms Of Payment: N/30. 6. Liquidated Damages/penalty: One-tenth (1/10) Of One Percent For Every Day Of Delay 7. For Goods, Please Indicate Brand, Model, And Country Of Origin 8. Must Be Philgeps Registered. 9. In Case Of Discrepancy Between Unit Cost And Total Cost, Unit Cost Shall Prevail. 10. In Case Of A Tie, The Contract Shall Be Awarded Through A "tie-breaking" Method To Determine The Winning Bidder In Accordance With Gppb Circular 06-2005 "11. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s" 12. Warranty: (if Applicable) (signature Over Printed Name) Supplier
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date17 Dec 2024
Tender AmountPHP 6.4 Million (USD 109.5 K)
Details: Description 25go0134 - Construction Of Multi-purpose Building, Brgy. Mansilingan, Bacolod City, Negros Occidental 1. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Public Works And Highways Bacolod City District Engineering Office Now Invites Bids For The Hereunder Works: Locations: Brgy. Mansilingan, Bacolod City, Negros Occidental Scope Of Works: Construction Of Multi-purpose Building Which Includes Permits And Clearances, Dpwh Project Billboards, Occupational Safety And Health, Mobilization / Demobilization, Removal Of Structures And Obstruction, Structure Excavation, Embankment From Structure Excavation, Structural Concrete (class A, 28 Days), Reinforcing Steel (deformed, Grade 40), Formworks And Falseworks, Finishing And Other Civil Works (such As Storm Drainage And Downspout, Plumbing Fixtures, Ceiling, Prepainted Metal Roofing And Accessories, Painting Works, 100mm And 150mm Chb, And Metal Structure Accessories), Electrical Works W/ Cctv System, And Fire Extinguisher 9.07kg (abc With Bracket) Approved Budget For The Contract: P 6,435,000.00 Contract Duration: 240 Calendar Days 3. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of At Least C & D (small B). 4. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. Only Authorized Liaison Officer(s), Whose Name Appears On The Contractor's Registration Certificate (crc) With The Presentation Of His/her Id Duly Issued By Its Construction Firm Shall Be Allowed To Purchase And Submit/drop Bidding Documents. 5. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non- Discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 6. Interested Bidders May Obtain Further Information From Department Of Public Works And Highways Bacolod City District Engineering Office And Inspect The Bidding Documents At Zardonyx St., City Heights Subd., Brgy. Taculing, Bacolod City During Weekdays From 8:00 Am To 5:00 Pm. 7. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 27 – December 17, 2024 From Given Address And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 10,000.00. 8. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 9. The Department Of Public Works And Highways Bacolod City District Engineering Office Will Hold A Pre-bid Conference On December 4, 2024 @ 10:00 A.m. At The Bac Conference Room Of Dpwh - Bacolod City District Engineering Office, Zardonyx St., City Heights Subd., Brgy. Taculing, Bacolod City And/or Through Videoconferencing/webcasting, Which Shall Be Open To Prospective Bidders. 10. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In Bds. 11. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_bacolodcity@dpwh.gov.ph For Electronic Submission On Or Before December 17, 2024, 9:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 12. Bid Opening Shall Be On December 17, 2024, Immediately After The Deadline For The Submission Of Bid, At The Bac Conference Room Of Dpwh - Bacolod City District Engineering Office, Zardonyx St., City Heights Subd., Brgy. Taculing, Bacolod City And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 13. The Department Of Public Works And Highways Bacolod City District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Helen S. Esperancilla Bac Secretariat Head (034)433-2804, Local 60618 Esperancillahelen@gmail.com / Procurementbcdeo@gmail.com Ferdinand S. Magada Bac Chairperson (034)433-2804,local 60621 Magada.ferdinand@dpwh.gov.ph
Municipality Of Conner, Apayao Tender
Civil And Construction...+1Building Construction
Philippines
Closing Soon9 Dec 2024
Tender AmountPHP 24.6 Million (USD 419.3 K)
Details: Description Republic Of The Philippines Province Of Apayao Municipality Of Conner Local Government Unit Invitation To Bid For; Project Title: 50,000 Bags Capacity Warehouse Construction In Conner, Apayao: Enhancing Storage Facilities Location: Paddaoan, Conner, Apayao Project Id: 24mgu-infra-048 The Local Government Unit Of Conner, Apayao, Through The Da-rfo-car Intends To Apply The Sum Of Twenty-four Million Six Hundred Twenty-four Thousand One Hundred Forty-eight Pesos And Eighty-nine Centavos Only(24,624,148.89) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 50,000 Bags Capacity Warehouse Construction In Conner, Apayao: Enhancing Storage Facilities Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Local Government Unit Of Conner, Apayao Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required 683 Calendar Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 3. Interested Bidders May Obtain Further Information From Local Government Unit Of Conner, Apayao And Inspect The Bidding Documents At The Address Given Below From Civil Registrar Office 4. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders At The Office Of The Municipal Civil Registrar On November 16, 2024. {insert If Necessary: And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P 25,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 5. The Local Government Unit Of Conner, Apayao Will Hold A Pre-bid Conference On November 25, 2024 @ 10:00 Am At The Lgu-premises, Caglayan, Conner, Apayao Which Shall Be Open To Prospective Bidders. 6. Bids Must Be Duly Received By The Bac Secretariat In Person At The Office Of Civil Registrar Office On Or Before December 9, 2024 @ 9:00 Am (i) Manual Submission At The Office Address As Indicated Above. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On December 9, 2024 @ 9:30 Am At The Given Address Below Lgu-premises, Caglayan, Conner, Apayao. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 9. The Local Government Unit Of Conner, Apayao Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. Scope Of Work Item No. Description Unit Quantity B.3 Permit And Clearances Lot 1.00 B.5 Project Billboard/signboard Each 1.00 B.7(2) Occupational Safety And Health Ls 1.00 B.9 Mobilization/demobilization Ls 1.00 102(2)b Surplus Common Earth Excavation Cu.m. 1,800.00 802(2) Surplus Common Excavation Cu.m. 1,077.68 804(1)a Embankment Cu.m. 218.40 804(4) Gravel Fill Cu.m. 88.09 1000(1) Soil Poisoning Ltr. 173.35 900(1)c2 Structural Concrete (footing And Slab On Fill) Cu.m. 259.29 900(1)c1 Structural Concrete Cu.m. 4.05 900(1)c4 Structural Concrete (column) Cu.m. 115.45 900(1)c6 Structural Concrete (beams/girders) Cu.m. 72.60 902(1)a1 Reinforcing Steel (deformed) Kgs. 45,065.92 903(2) Formworks And Falseworks Sq.m. 1,102.50 1046(2)a1 Chb Non-load Bearing (including Reinforcing Steel) Sq.m. 644.12 1047(1) Structure Steel (roof Framing) Lumpsum 1,245.83 1014(1)b2 Prepainted Metal Sheets Sq.m 1,245.83 1013(2)b Fabricated Metal Roofing Accessory (flashings) Ln.m 157.80 1013(2)c Fabricated Metal Roofing Accessory (gutters) Ln.m 52.50 1010(2) Doors And Windows Sq.m. 280.10 1027(1) Cement Plaster Finish Sq.m. 1,267.24 1018(7) Glazed Tiles Sq.m. 421.34 1018(2) Unglazed Tiles Sq.m. 53.92 1100(30) Conduit, Boxes And Fittings Lumpsum 1.00 1101(42) Wires And Wiring Devices Lumpsum 1.00 1103(1) Lighting Fixtures Lumpsum 1.00 1003 Carpentry Sq.m. 1,849.69 1032 Painting Sq.m. 3,116.84 1002 Plumbing Works Ln.m. 186.00 1053(2) Stainless Steel Railings Lot 1.00 1106 Cctv System Lot 1.00 Spl I Facilities For The Engineers Lot 1.00 Spl Ii Transhipment Lot 1.00 13. For Further Information, Please Refer To: Edmundo B. Desiderio Jr, Ce. Bac Sec Head-infrastructure Office Of The Municipal Engineer Vivian B. Pacis Bac Chairman-infrastructure Office Of The Civil Registrar 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: [philgeps, Local Government Unit Of Conner, Apayao]
Las Pi as General Hospital And Satellite Trauma Center Tender
Others
Philippines
Closing Date20 Dec 2024
Tender AmountPHP 4.2 Million (USD 71.9 K)
Details: Description 1 Lot Supply, Delivery, And Installation Of New Hospital Elevator 1. Introduction This Term Of Reference (tor) Outlines The Requirements And Expectations For The Replacement Of An Elevator At Las Piñas General Hospital & Satellite Trauma Center. The Project Aims To Enhance The Safety, Efficiency, And Reliability Of Elevator Services Within The Hospital Premises. 2. Project Overview Project Title: Replacement Of One (1) Unit Of Hospital Elevator Location: Las Piñas General Hospital & Satellite Trauma Center 3. Objectives The Main Objectives Of This Project Are: To Replace The Existing Elevator With A Modern, Efficient, And Reliable System. To Ensure The New Elevator Meets All Relevant Safety And Regulatory Standards. To Minimize Disruption To Hospital Operations During The Installation Process. 4. Scope Of Work The Scope Of Work Includes, But Is Not Limited To: Pre-installation Phase: • Conduct A Thorough Inspection Of The, Existing Elevator System To Assess Wear And Tear, Mechanical Issues, And Operational Deficiencies • Ensure That The Building Can Support The New Elevator System By Evaluating Structural Integrity, Elevator Shaft Dimensions, And Electrical Capacity • Obtain The Necessary Permits For Elevator Replacement From Local Authorities • Preparation Of The Elevator Shaft And Surrounding Areas Of Any Debris Or Obstacles • Ensure That Electrical Wiring, Power Supply, And Ventilation Are Ready For The New System • Develop A Comprehensive Safety Plan, Ensuring The Protection Of Workers, Building Occupant, And Equipment • Plan The Delivery Of Elevator Components And Make Sure Storage Space Is Available • Set Up A Staging Area For Installation Materials And Equipment To Ensure Smooth Workflow • Safely Remove The Old Cab, Rails, Counterweights, Motor, And Other Components Installation Phase: • Secure The Work Area With Barriers, Signage, And Safety Protocols • Ensure All Workers Have The Appropriate Protective Equipment (ppe) • Shut Down The Old Elevator System And Disconnect Power Sources • Inspect The Elevator Shaft For Any Obstruction Or Structural Issues • Check That Any Modifications Required During Pre – Installation Phase Have Been Completed • Conduct A Final Inspection Of The Elevator Shaft For Wear, Damage, Or Debris Before New Installation • Start With The Installation Of The New Elevator System Post-installation Phase: • Perform A Full Run-through Of The Elevator To Ensure Smooth Operation At All Floors • Check That The Elevator Stops Level With Each Floor And That The Doors Open/close Correctly • Conduct A Final Load Test To Ensure The Elevator Can Handle The Maximum Rated Load • Verify The Safety Mechanisms Function Properly • Test All Safety Features • Test Emergency Communication Systems • Measure The Elevator’s Speed, Acceleration, And Deceleration To Ensure It Meets Specifications • Test The Levelling Accuracy And Ride Quality • Ensure The System Complies With All Local Building Codes, Safety Regulations, And Standards • Secured Required Operating Permits And Certifications To Verify The Elevator Is Safe To Use • Provide Detailed Documentation To Building Management, Including: O Operating Manuals O Maintenance Schedules O Warranty Certificate O Contact Details Of The Elevator Manufacturer Or Installer • Provide Any Updated Or Revised Drawings And Electrical Schematics For The New System • Train Building Maintenance Staff On How To Operate, Monitor, And Troubleshoot The Elevator System • Train Building Maintenance Staff On The Use Of Emergency Features • Set Up Detailed Maintenance Plan With Regular Checks And Servicing Intervals To Keep The Elevator In Peak Condition • If The Elevator Has Remote Monitoring Capabilities, Ensure That The System Is Configured And Active To Alert Maintenance Teams To Any Issues In Real Time Technical Specifications The New Elevator Must Meet The Following Technical Specifications: - Type: Hospital Elevator (machine Room Less Elevator) - Capacity: 1600kg - Speed: 1.0 Mps - Stops: 4 - Drive: Gearless - Dimensions: As Per Actual - Finishes: • Homogenous Porcelain Tiles For Flooring • Stainless Steel Sheet Satin Finish For Walls And Ceiling - Safety Features: • Gong In Car • Alarm Bell • Elevator Announcer • Emergency Exit Contact • Emergency Stop Switch • False Car Call Cancel • Emergency Intercom • Automatic Landing Door Locking • Cctv System • Car Air Purifier • Blower - Energy Efficient - Including Avr 5. Bidder Requirements Bidders Must Meet The Following Requirements: • Must Be Operating In The Philippines For The Past Ten (10) Years. • The Brand Of The Elevator To Be Supplied Should Be None-proprietary And Must Be On The Philippine Market For At Least Ten (10) Years. • Must Have At Least 3 Certificates Of Very Satisfactory Performance From Previous Clients Within The Last 2 Years. • With Experience In Supply And Installation Of Hospital Elevator 6. Proposal Submission Requirements Interested Bidders Must Submit The Following: Technical Proposal: Company Profile And Relevant Experience. Detailed Methodology And Work Plan. Technical Specifications Of The Proposed Elevator System. Project Timeline And Milestones. Financial Proposal: Detailed Cost Breakdown, Including Equipment, Labor, And Any Additional Costs. Legal And Compliance Documents: Valid Business License. Proof Of Compliance With Relevant Regulations And Standards. Terms And Conditions 1. The Contract Duration For The Project Shall Be Two Hundred Ten (210) Calendar Days. 2. A Penalty Of One-tenth (1/10) Of One (1) Percent For Every Day Of Delay In The Completion Of The Project Shall Be Imposed, Warranty A. The Elevator Shall Be Covered By Warranty On All Parts, Components, And After Sales Services And Will Commence Upon Inspection And Acceptance By Lpgh&stc. B. The Supplier Warrants That The Goods Supplies Are New, Unused And Of The Most Recent Or Current Models And Of Prevailing/current Standard Production Of The Manufacturer And Shall Not Supply An Equipment That Is Likely To Be Declared End Of Sale Or Out Of Production Within Five (5) Years From The Date Of The Supply Of The Said Equipment. C. From The Date Of Delivery And Acceptance Of The Equipment, The Supplier Shall Warrant That The Equipment Are Free From Defects In Material And Workmanship Or Any Act Of Omission Of The Supplier And Shall Undertake Repair Or Replacement Of Any Part(s) Or Portion Of The Equipment Without Cost To Lpgh&stc. D. The Supplier Shall Submit A Notarized Certificate Of Availability Of Spare Parts For The Next Ten (10) Years. E. The Contractor Shall Submit A Warranty Certificate Indicating A Warranty Period Of Three (3) Years On Parts And Five (5) Years On Service. Payment Terms 90 % Billing Once The Installation Is 100% Completed 100% Billing Upon Issuance Of License To Operate All Payment Shall Be Subject To The Applicable Taxes, And Existing Accounting And Auditing Rules And Regulations Applicable To Lpgh&stc.
OFFICE OF CIVIL DEFENSE REGION IV A Tender
Security and Emergency Services...+1Manpower Supply
Philippines
Closing Date11 Dec 2024
Tender AmountPHP 494.1 K (USD 8.4 K)
Details: Description Technical Specifications Bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Supplies/materials/services Offered. 1 Lot Procurement Of Manpower Services (security Services) For Ocd Region Calabarzon For The Period Of 6 Months Terms Of Reference Valid And Regular License To Operate (lto) Issued By The Philippine National Police (pnp) For The Current Year. Provisional Lto Will Not Be Accepted; The Service Provided Shall Provide The Number Of Security Personnel (based Central And Regional Office Requirement/s; The Service Provider Shall Pay The Mandatory Contributions Of Security Personnel To Sss, Philhealth, Pag-ibig, Bir And Other Related Contribution Remittances Must Be At Least Five (5) Years In Frontline Security Services; Must Be Compliant With Provisions Of Ra 11917 “the Private Security Services Industry Act” With At Least 100 Licensed Security Personnel Under Its Employ; (supported By Duly Signed List Of Existing Manpower Compliment As Of June 2024) Qualification Of A Security Guard Filipino Citizen; At Least High School Graduate; Physically And Mentally Fit; At Least Three (3) Years Of Experience As Licensed Security Guard; Must Be Over 18 Years Of Age; Height Must Be At Least 5’4” For Male And 5’2” For Female; Must Have Passed The Neuropsychiatric And Drug Tests Conducted By Any Philippine Government Accredited Center, Duly Approved By The Doh Within One (1) Year Prior To Posting; Must Have No Derogatory Record; Must Have Undergone Basic Security Training From Reputable Institution Authorized Or Accredited By Pnp Supervisory Office For Security And Investigation Agency (sosia); Must Have Taken A Private Security Course/seminar And/or Must Have Adequate Training Or Experience In Security Business Or Rendering Security/detective Services; Must Be Trained In Handling Firearms With Appropriate Certificate Or Gun Safety Seminar; Must Be Trained In Basic First Aid Treatment, Firefighting, Search And Rescue Operations, Evacuation, General Emergency Procedure Appropriate Certifications; Must Have Basic Knowledge In Operating A Computer And Cctv System; Must Possess All The Qualifications For A “private Security Professional” Under The Provisions Of Ra 11917 “the Private Security Services Industry Act” Other Requirements: Valid And Regular License To Operate (lto) Issued By The Philippine National Police (pnp) For The Current Year. Provisional Lto Will Not Be Accepted; Certification That The Agency Has No Derogatory Records Issued By Pnp-sosia As Of The Current Year; Certification From Department Of Labor And Employment (dole) That The Agency Has No Pending Case And/or Complaints As Of One (1) Month Prior To Publication Of This Invitation To Bid; Duly Certified Copy Of Certificate Of Membership From Social Security System (sss), Pag-ibig Home Development Mutual Fund And Philhealth; The Agency Shall Submit To Ocd The Updated Bio-data Of The Security Guards To Be Deployed Supported By The Following Documents: Valid Pnp And Nbi Clearances; Certification From The Agency That They Are Of Good Moral Character, Courteous, Honest, Non-alcoholic And Not Engaged In Any Illegal Activity; Certified True Copy Of Their Respective Security Guard/officer Licenses; Certified True Copy Of The Result Of Neuro-psychiatric Exam And Drug Testing Conducted And Issued By Pnp And/or Doh Accredited Laboratory/clinic. The Agency Shall, In The Presence Of Afms Representative/s, Hold A Briefing The Security Guards Before Their Deployment To Specific Assignments Concerning Among Others, Their Wages, Other Benefits And Other Instructions/matters Relevant To Efficient Performance Of Their Duties; The Agency Shall Assume Full Responsibility For The Proper And Efficient Performance Of Duties By The Personnel Employed By It. The Agency Shall Make Available At Least One (1) Area Coordinator/overseer. The Said Coordinator Will Conduct Regular Ocular Inspection In The Area Of Ocd Calabarzon. Ocd Calabarzon Through Afms Shall Be Furnished With The Result Of Evaluation; Ocd Shall However Have The Right To Conduct Spot Inspections In Order To Determine The Quality And Acceptability Of The Services Being Performed. The Agency Shall Equip And Provide Each Security Guard Who Must Always Be In Proper Uniform, With Logbook To Be Used For Recording People And Events Affecting Security Matters, Full Loaded Serviceable Firearms And Other Equipment Which Are Essentials For Security Purposes; The Agency Shall Provide At Lease One (1) Set Of Prescribed Uniform To All Guards As Mandated By Rule Viii Of The Irr Of Ra 5487; The Agency Shall Conform To The Rules And Regulations As Mandated In The Irr Of Ra 5487 As Amended, P.d> 442 (labor Code Of The Philippines) As Amended Including Ocd Issuances And Other Applicable Laws: The Agency Shall Issue A Duty Detail Order (ddo) For Every Security Guard To Be Assigned/posted Indicating Therein The Name Of The Guard, Issued Firearms, The Particular Place Of Assignment And The Inclusive Dates (duration) Within Which The Guards Are To Render Services. The Same Shall Also Apply For The Deployment Of Relievers In The Event A Regular Posted Guard Will Not Be Able To Report To Work; **ocd Calabarzon Thru Afms Shall Be Furnished With A Copy Of The Ddo Under No Circumstances Shall A Security Guard Be Allowed To Render Two (2) Successive Shifts In One Day Nor Shall Each Guard’s Schedule Of Duty Overlap With That Of Another; Otherwise, Ocd Shall Have No Obligation To Pay The Security Guard For The Unauthorized Excess Hours. Rendering Of Services Beyond Twelve (12) Hours Shall Not Be Allowed Unless In Special Instances When Ocd Requires The Need To, In Such Instance, A Written Approval Shall Be Issued By Ocd; The Security Agency Must Ensure That All Security Posts Are Manned At All Times. The Agency Shall Provide Replacement Within The First Hour Of Each Shift For Those Security Guard Who Are Absent For Any Cause In Order To Maintain The Required Number Of Guards. Afms Shall Be Notified In Advance In Writing Or In Any Form Of Communication Of Such Replacement; The Security Agency Shall Ensure The Existing Security Personnel Shall Be Absorbed Based On The Recommendation Of The Procuring Entity Provided They Met The Basic Qualifications And Licenses Required For A Security Guard; The Service Provider Shall Ensure That The Procuring Entity Shall Have The Privileged To Endorse Its Personnel/applicants; All Payments Shall Be Based On The Actual Number Of Security Personnel Provided With Complete Tools/equipment Throughout The Contract Period; Agency Fee Must Not Exceed To 20% Of The Monthly Rate Of Security Guard Price Offered Must Be Vat Inclusive’ All Contracts Will Be Subject To Extension Or Renewal Upon Discretion Of The Hope Other Terms: Location Of Service: Units 301 & 302, Milan Prestige, Halang, Calamba City, Laguna Payment Terms: Progress Billing Fund Source: Regular Fund
Bureau Of Plant Industry Tender
Others
Philippines
Closing Soon3 Dec 2024
Tender AmountPHP 293.2 K (USD 4.9 K)
Details: Description Rfq No. 1298 Pr No. 3545-24bac Request For Quotation For Goods And Services Section 53.9 Negotiated Procurement - Small Value Procurement Supply And Delivery Of Furniture And Fixtures Section I. Mandatory Requirements (note: Failure To Submit Any Of The Following Requirements Will Be Automatically Disqualified) A. Philgeps Registration (platinum Membership And Red Membership) Ü Mayor's / Business Permit Ü Income/business Tax Return (for Abc 500k And Above) Ü Certificate Of Bir Registration (for Abc 50k And Above) Ü Dti Registration Submit A Clear Copy Or Documentation Of The Proof Of Payment For The Renewal Of Expired Permit/s. B. Photocopy Of One (1) Company Id Or One (1) Valid Id W/ Three (3) Specimen Signature C. Notarized Original Omnibus Sworn Statement (for Abc 50k And Above) D. Professional License/curriculum Vitae (consulting Services) E. Menu List For Catering Services F. The Supplier Must Not Have Any Record Of Non-compliance Over The Past Three (3) Years. Section Ii. Instructions: 1. Please Write Legibly. 2. The Bidders/suppliers Or Their Authorized Representative Shall Accomplish This Form Including Unit Price And Total Price As Well As Sub- Total And Grand Total (if Applicable) And Affix Their Signature Over Printed Name Indicated In The Lower Portion Of This Form. 3. Indicate Offered Brands And Specifications (if Applicable). 4. Quotation(s)/proposal(s) Shall Be Submitted At The Procurement Management Section (bac Office), Bureau Of Plant Industry, 692 San Andres Street, Malate, Manila Or Through Courier Or Email (pms.rfq@buplant.da.gov.ph). 5. Only Sealed Canvass Submitted In Person Or Through Courier Shall Be Considered By The Bac. The Bidders/suppliers Shall Reflect On The Envelope The Rfq Number And The Pr No. The Bac Shall Not Be Responsible On The Pre-emptive/premature Opening Of The Proposal. 6. Any Insertions, Erasures, Or Overwriting Shall Be Valid If Only They Are Signed Or Initialed By The Bidders/suppliers Or Their Authorized Representative. 7. Quotation Must Include All Kinds Of Taxes For The Item(s)/services Listed Hereunder, Including Delivery Charges. 8. Price Quotation(s) Submitted Shall Be Valid For A Period Of One Hundred Twenty (120) Days Reckoned From The Deadline For Submission Of Quotations As Reflected In This Form. 9. Awarding Shall Be Done Per Lot. 10. Deadline For Submission Of Bids: December 2,2024 10:00am 11. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Quotation Or Highest Rated And Responsive Quotation For Consultancy Services, The Bpi- Bac Shall Employ The Rules Specified In The Irr Of Ra 9184. 12. Delivery/installation/completion Period: December 20,2024 Property And Supply Section-bpi San Andres, Malate, Manila. 13. The Uniform Guidelines For Blacklisting Set Forth In Appendix 17 Of The 2016 Revised Irr Of Ra 9184 Shall Apply. 14. The Supplier/bidder/contractor Must Have No Violation With Its Transactions With The Bureau Based On Bpi Records And Bpi Memorandum Order 328 Series Of 2023. 15. The Bureau Of Plant Industry Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. "notice/announcement: Bureau Of Plant Industry Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. " Approved Budget For The Contract: Php 293,245.00 End User: Pqs-south Harbor Qty Unit Item/description Ceiling Price/ Offered Unit Total Per Unit(php) Brand Price Price 2 Units Sofabed, 3 Seater, Solid Wood, Side Folding, Bluish-gray Color, Polyester Fabrix 16,897.00 7 Units Bed, Double Deck, With Foam, Black, Measurements Width: 200.5 Cm Depth: 99 Cm Kgs- Bottom 15,314.00 1 Unit Table, Console, Floor Mount, Slab Door Type, Engineered Wood, Contemporary Style, For Cctv Monitor 7,988.00 1 Set Table, 3-in-1, Glass, All Black, 8mm Thickness Of Glass, Glass Metal Frame Material, 23.62" D X 39.37" W X 17.7" H Product Dimension, Rectangular 15,133.00 1 Unit Table, Freestanding Table With Mobile Pedestal , Mfc Board Metal Frame, Cherry Finish, W1600xd700xh750mm 24,440.00 1 Set Chair, Sofa, Leather, Color Choco, 3- Seater Sofa Plus 2 Pcs 1- Seater Sofa, Including 4 Pcs Cozy Pillow 26,000.00 1 Unit Chair, Executive, Gay, High Back, Aluminum Base, Pu Castor Mould Foam With Seat Cover, Height Adjustable Armrest 16,575.00 4 Units Chair, High Chair, Adjustable Chair With Foot Ring And Sculptured Foam Seat, Black Vinyl, For Laboratory Use 10,657.00 5 Units Chair. Syool, Plastic, Anti-slip, Stackable, For Laboratory Use 259.00 1 Unit Cabinet, 4 Drawer Filing Cabinet, Gray, 90 X 45 X 103 (wdh), 65kgs Weight 18,194.00 ***** (please See Attachments For Item Descriptions And Specifications) "place Of Delivery: Property And Supply Section - Bpi San Andres, Malate, Manila Proposed Delivery Period: December 20,2024" Grand Total 293,245.00 Philgeps Posted Joan-may R. Tolentino Bac Chairman Canvasser The Bpi-bids And Awards Committee (bac) 692 San Andres, Malate Manila In Connection With The Above Request, I/we Submit Our Quotation Indicated Above. I/we Have Carefully Read And Fully Understand The Minimum Requirements And Agree To Furnish And/ Or Deliver The Above Mentioned Requirement(s) In Conformity With The Specifications/terms Or Reference/scope Of Work Indicated/attached Thereto. ________________________________________ ________________________________________ ________________________________________ Signature Over Printed Name Company Name Of Bidder Philgeps Registration Number ________________________________________ ________________________________________ ________________________________________ Contact Number(s) Office Address Email Address Of The Bidder ________________________________________ ________________________________________ Tax Identification Number (tin) Date Accomplished Payment Shall Be Made Through Land Bank's Lddap-ada/bank Transfer; Bank Transfer Fee Shall Be Charged Against The Creditor's Account. Payment Details: Banking Institution: ________________________________________________ Account Number:___________________________________________________ Account Name:______________________________________________________ Branch:_______________________________________________________________
Province Of Negros Oriental Tender
Manpower Supply
Philippines
Closing Soon10 Dec 2024
Tender AmountPHP 18.2 Million (USD 310.1 K)
Details: Description Invitation To Bid Bid No. B-395-2024 1. The Provincial Government Of Negros Oriental, Through Source Of Fund: Early Procurement Activity (epa), Intends To Apply The Sum Of Eighteen Million Two Hundred Sixteen Thousand Sixty-five Pesos & 62/100 (php 18,216,065.62) Being The Abc To Payments Under The Contract To Furnish Security Services Good For One Hundred Eighty-five (185) Security Guards To Perform Duties From January 1 To April 30, 2025 To The Different Offices And Hospitals Of The Provincial Government Of Negros Oriental, For 395 Days Factor (24 Hours For 7 Days A Week With At Least 8 Hours Per Shift) For 185 Security Guards. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Negros Oriental Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00pm (monday To Friday). Wilma D. Padilla Bac Secretariat Office, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City Telephone Number : (035) 225-4835, Local 475 Or 477 / Telefax Number Of Bac Secretariat: (035) 226-3804 Email Address Of Bac Secretariat: Bac-secretariat@negor.gov.ph / Bac.secretariat.neg.or@gmail.com 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20, 2024 To December 10, 2024 Up To 1:00 In The Afternoon From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifteen Thousand Pesos (php 15,000.00). 6. The Bids And Awards Committee Will Hold A Pre-bid Conference On November 27, 2024 At 2:30 In The Afternoon At The Bac Conference Room, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City And/or Through Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before December 10, 2024 At 1:00 In The Afternoon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On December 10, 2024 At 1:30 In The Morning, Bac Conference Room, Ground Floor, Convention Hotel, Capitol Area, Dumaguete City At The Given Address Below. The Attendance Of The Prospective Bidders Or His/her Duly Representative Is Highly Encouraged. 10. Submitted Documents Without Proper Tabbing For All Copies (3 Envelopes) With Name Of The Document (not Letters Or Numbers) And Not Book Bounded (soft/hard) Is Automatically Disqualified. 11. The Bac Of The Province Of Negros Oriental Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Engr. Berchmans N. Patrimonio (end-user) Provincial General Services Officer Capitol Area, Dumaguete City, Neg. Or. Arthur Fran P. Tolcidas Bac Chairman To Furnish Security Services Good For One Hundred Eighty-five (185) Security Guards To Perform Duties From January 1 To April 30, 2025 To The Different Offices And Hospitals Of The Provincial Government Of Negros Oriental, For 395 Days Factor (24 Hours For 7 Days A Week With At Least 8 Hours Per Shift) For 185 Security Guards Note: Please Refer To The Attached Security Personnel Posting List For The Different Offices And Hospitals In The Province, The Additional Contract Requirements, And Terms And Conditions Of The Contract. -x-x-x-x-x-x-x-x-x-x-x-x-x-x- Total Abc: P18,216,065.62 Technical Specifications Additional Set Of Technical Parameters 1. Stability A) Years Of Experience – 5 Years - Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project B) Liquidity Of The Contractor – Details As To The Stability Of The Agency, Data Of Resources And Other Factors Considered As Additional Set Technical Parameters C) Organizational Set Up – Based On The Standards Set By Padpao, Must Have A Branch Office In Metro Dumaguete Area With Base Radio And Landline Telephone At The Start Of Operation, Must Have A Duly Designated Supervisor For Every Guard Shift Within The Metro Dumaguete Area. Base Radio Must Be Located At The Branch Office. 2. Resources A) No. Of Licensed Firearms – One Is To One Per Shift B) No. Of Kinds Of Communication Devices – Functioning Vhf Base Radio & Portable Radio Units Equipped With Charger Plus One Extra Battery Pack For Each Guard Per Shift C) No. And Kind Of Motor Powered Vehicles – Minimum Of One Vehicle Per Shift For The Duly Designated Supervisor D) No. Of Licensed Guards – All Guards Assigned For Duty Should Be Duly Licensed 3. Security Plan - Security Plan For The Different Establishments To Be Secured - Comprehensive Security Plan Detailing The Areas Covered, Their Location And The Number Of Guards Involved 4. Other Factors A) Recruitment And Selection Criteria – Submission Of Quarterly Payroll And Remittance Report To The Procuring Entity And Submission Of Clearances From Sss, Hdmf And Philhealth On Their Regular Remittances B) Completeness Of Uniforms And Other Paraphernalias - Close Circuit Tv On Sensitive Areas (6 Cctv Camera) - Relatively Brand New Firearms Which Are Either Shotguns With Sling And/or 9mm Pistols Or .38 Cal. Revolvers With Extra Rounds Of Ammunitions - Nightstick, Whistle And Flashlight For Night Duty - First Aid Kit - Metal Detectors For The Capitol Building, Hospitals, And For Special Events At The Sports And Cultural Facilities Of The Province. C) Site Inspection
City Of Malabon Tender
Others
Philippines
Closing Soon4 Dec 2024
Tender AmountPHP 4.2 Million (USD 71.7 K)
Details: Description Invitation To Bid For Procurement Of Various Tools And Equipments For The City Of Malabon University 1. The City Government Of Malabon, Through The Malasakit Fund Intends To Apply The Sum Of Four Million Two Hundred Forteen Thousand Two Hundred Seventy Two Pesos Only (p 4,214,272.00), Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Procurement Of Various Tools And Equipments For The City Of Malabon University. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Malabon Now Invites Bids From Eligible Bidders For Procurement Of Various Tools And Equipments For The City Of Malabon University. Delivery Of Goods Is Required Within The Period Specified Under Section Vi. Schedule Of Requirements. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (r.a. 9184), Otherwise Known As The “government Procurement Reform Act,” And Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To R.a. 5183 And Subject To Commonwealth Act 138. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Secretariat And Inspect The Bidding Documents At The Address Given Below From November 15, 2024 To December 04, 2024; 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee In The Amount Of Five Thousand Pesos (p 5, 000. 00). 6. The City Government Of Malabon Will Hold A Pre-bid Conference On November 25, 2024 (monday); 3:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. 7. Bids Must Be Delivered To The Address Below On Or Before December 05, 2024 (thursday); 12:00 N.n. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms Set In The Amount Stated In Itb Clause 18. 8. Bid Opening Shall Be On December 05, 2024 (thursday); 2:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 9. The City Government Of Malabon Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information Please Refer To: (originally Signed) Florlinda Ayroso Head- Bac Secretariat (originally Signed) Mr. Alexander T. Rosete Chairperson - Bids And Awards Committee 1 Unit Desktop Set Windows Home 11, Intel Core I5-13400, 8 Gb Ddr4, 1tb Hdd, 256 Gb M.2 2280 Pci-e Ssd, Intel Uhd 730 Graphics For 13th Generation Ms Office For Home & Student, 21.5” Screen Monitor, 1920x1080 @ 100hz, Apc Bvx650 650w Ups Web Cam A4 Tech Headset Noise Cancelling A4 Tech Keyboard And Mouse Set (a4 Tech) 2 Unit Printer Print Speed Of Up To 25.0 Ipm, Prints Up To A3+ (for Simplex), Automatic Duplex Printing, Ultra High Page Yield Of 7500 Pages (black) And 6000 Pages (colour), Wifi, Wifi Direct, Ethernet, Remote Print Driver, Scan To Cloud 3 Unit Mobile Phone 602” Fhd + Dynamic Amolded 2x Galaxy Ai (circle To Search, Live Translate, Chat Assist, Note Assist, Photo Assist), 50mp Ois Wide Lens Dual Sim + Esim 4000mah Battery 3 Unit 55 Inch Smart Tv 55” Smart Tv With Wall Bracket 2 Unit Air Conditioning Unit Dual Standard Inverter Split Type Air Conditioner 2.5hp 3 Unit Closed Circuit Television 6channel 4mp Colorvu Audio Poe 16cameras Outdoor Ip Cctv Package Ip 16/16cra4 8* 4mp Colorvu Audio Bullet Ip Camera (ds-2cd1047g2-luf), 8* 4mp Colorvu Audio Turret Ip Camera (ds-2cd1347g2-luf), 1* 16ch Nvr (ds-7716ni-i4) , 1* 16-port Unmanaged Poe Switch For 16port Switch Kit, 2*8-port Poe Switch For 8 Port Switch Kit., H.265+/h.265/h.264+/h.264 Video Formats, Up To 16/32-ch Ip Camera Inputs, Up To 1-ch@32 Mp/2-ch@12 Mp/16-ch@1080p Decoding Capacity, Up To 160/256 Mbps Incoming Bandwidth, 4mp Colorvu Audio Bullet Ip Camera (ds-2cd1047g2-luf) Specs, High Quality Imaging With 4 Mp Resolution, 24/7 Colorful Imaging, Support Human And Vehicle Detection, Water And Dust Resistant (ip67), Clear Imaging Even With Strong Back Lighting Due To 120 Db Wdr, Efficient H.265+ Compression Technology, Support On-board Storage Up To 256gb (sd Card Slot), Built-in Microphone For Real-time Audio Security , 4mp Colorvu Audio Turret Ip Camera (ds-2cd1347g2-luf) , 16port Switch (ds-3e1318p-ei/m) 2 Unit Projector High Performance Home Cinema,4k Enhanced, Full Hd, Uhd Bd And Hdr Support, Smooth Fast Moving Action, Farme Interpolation And Detail Enhancement, 5000 Hours Lamp Life In Eco Mode, Fully Motorized Optics, Powered Zoom, Focus And Lens Shift, Wide Lens Shift, Vertical +96.3% And Horizontal +47.1 %
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Civil Works Others
United States
Closing Date13 Dec 2024
Tender AmountRefer Documents
Details: Pre-solicitation Notice / Synopsis project Description: Motco Containerized Ammunition Holding Facilities anticipated Posting Date: 18 October 2024 pre-solicitation Notice Number: W9123825b0001 sam Posting Title: Usace Spk Dbb – Military Ocean Terminal Concord (motco) Containerized Ammunition Holding Facilities - Design-bid-build Construction – Concord, California (ca) sam Posting Description: the United States Army Corps Of Engineers (usace) Sacramento District (spk) Anticipates A Design-bid-build (dbb) Requirement To Construct Eleven (11) Containerized Ammunition Holding Facilities (cahf), A.k.a. Holding Pads, Each With Ammunition Storage Pads, Protective Earthen Berms, Reinforced Concrete Retaining Walls, All Designed In Accordance With Department Of Defense (dod) Explosive Safety Standards. the Cahf Must Support Container Handling Equipment For Day And Night Operations, Which Must Include Improved Or New Pavements, Lighting, Fire Protection, Alarm Systems, Lightning Protection Systems, Security Fencing, Intrusion Detection Systems (ids), Closed Circuit Television (cctv), Information Systems, And Storm Water Drainage Systems. supporting Facilities Include Utilities And Connections (water And Fire Suppression System, Electric, Storm Water, And Communications) And Site Development Grading, Landscaping, And Pavement Improvements, All Focused On The Management Of Munitions And Explosives (mec). the Intended Facilities Will Be Designed In Iaw Dod’s Unified Facilities Criteria (ufc 1-200-02) Which Includes A Minimum Of Forty (40) Year Life And Energy Efficiencies, Building Envelope And Integrated Building Systems Performance. in Consideration Of The Final Rule Amending The Federal Acquisition Regulation (far) On 22 December 2023, To Implement Executive Order 14063, Use Of Project Labor Agreements (plas) On Federal Construction Projects Mandated The Use Of Plas Where The Total Estimated Cost Of The Construction Contract Is Expected To Be $35 M Or More. Therefore, Far 52.222-33 Alt I (jan 2024) Notice Of Requirement For Project Labor Agreement, A Project Labor Agreement Will Be Required From The Apparent Successful Offeror Included In The Forthcoming Solicitation As A Result. the Government Anticipates A 540-day (calendar) Period Of Performance (pop) For This Project From Receipt Of The Notice To Proceed To Include Performance On All Options. due To The Security Posture At Motco, All Individuals Attempting To Gain Access To The Facilities Will Have To Comply With All Security Training Protocols. Moreover, Any Individual That Is Not A United States Citizen Will Not Be Allowed To Enter The Facility. in Accordance With Defense Federal Acquisition Regulation Supplement (dfars) 236.204(ii), The Magnitude Of Construction For The Anticipated Project Is Between $25,000,000 And $100,000,000. the Government Intends To Solicit An Invitation For Bids (ifb) In Accordance With Far Part 14, That Will Result In Award Of A Firm-fixed Price Contract. the Solicitation Is Anticipated To Be Issued Using North American Industrial Classification System (naics) Code 237990 Other Heavy And Civil Engineering Construction. The Small Business Size Standard For This Naics, As Established By The United States Small Business Administration (sba), Is $45,000,000 Annual Revenue. The Product And Service Code (psc) Is Anticipated To Be Y1ga Construction Of Ammunition Storage Buildings. the Solicitation Is Anticipated To Be Issued As Full And Open Competition Through The Procurement Integrated Enterprise Environment (piee - Https://piee.eb.mil) And Governmentwide Point Of Entry, The System For Award Management (sam - Www.sam.gov) On Or About 1 November 2024 With Bids Tentatively Due 13 December 2024. it Is Currently Anticipated That The Government Will Conduct A Pre-bid, Site Visit Approximately Ten Days After Issuance Of The Solicitation. The Solicitation Will Provide Additional Information Regarding The Exact Date And Time. Site Visit Participants Must Complete An Ncic Consent Form And Motco Form 190-3 In Accordance With Site Visit Access Requirements. If You Intend To Attend The Solicitation Site Visit, Please Consider Preparing The Forms In Advance And Submitting As Soon As The Solicitation Is Posted. Access Is Restricted To U.s. Citizens Only And There Is No Guarantee That Late Submissions Will Be Processed. Review And Follow The Instructions And Guidance Provided In Attachments 1 - 3, Which Provide (1) Instructions For Requesting Access And Completing Forms, As Well As Common Reasons For Denial, (2) Required Ncic Consent Form (one Per Attendee), And (3) Required Motco Form 190-3 (one Spreadsheet Per Company). The Ncic Consent Forms And Motco Form 190-3 Must Be Digitally Filled Out (not Printed With Handwritten Answers) Then Sent To Motco_correspondence@usace.army.mil After The Date And Time Have Been Finalized And Posted Within The Solicitation. When Completing The Motco Form 190-3, Ensure The Form Specifies The Project Is Located On The Tidal Side Of The Motco Installation. the Work In Totality Includes Sites That Are Non-contiguous. Due To The Location Of The Work Sites, It Is Anticipated That The Site Visit Will Take A Full Day To Complete. Please Plan Accordingly. The Specific Date, Time, Location, And Access Requirements Will Be Identified In Any Forthcoming Solicitation. please Do Not Request An Updated Schedule If Estimated Dates Are Surpassed; The Government Will Release All Information Publicly Through Piee And Sam When Updates Are Available. Requests For Schedule Updates May Be Ignored. please Do Not Request A Copy Of The Solicitation, Or Draft Plans Or Specs, As They Are Not Currently Available. Any Available Technical Data Will Be Furnished With Any Forthcoming Solicitation. Following Solicitation Release, All Responsible Sources May Submit A Bid That Shall Be Considered By The Agency. This Project And/or The Anticipated Solicitation May Be Changed, Delayed, Or Canceled At Any Time. the Anticipated Solicitation And Attachments Will Be Posted In Portable Document Format (.pdf) Which Will Require Adobe Acrobat Reader To Open And View Files. Adobe Acrobat Reader May Be Downloaded Free Of Charge At Http://www.adobe.com/products/reader. all Prospective Offerors Must Be Registered In The Piee System At Least One (1) Week Prior To The Anticipated Bid Due Date. Registration Is Not Required To Download Any Forthcoming Solicitation Documents, Plans, And/or Specifications, But Is Required To Submit A Bid. Copies Of The Solicitation And Attachments Will Be Made Available For Inspection Without Charge After The Solicitation Is Released, When Accessed Through Piee. Failure To Register In Piee Will Prevent Submission Of Bids As The Government Will Not Accept Them By Any Other Means. See Linked Piee Registration Instructions And Web-based Training For Information About How To Access The Piee Solicitation Module And Submit Bids. all Prospective Offerors Must Be Registered In Sam Before The Anticipated Solicitation Closing Date. Please See The Sam Website For Information About Sam Registration Requirements And Approval Timelines. as Mentioned, Bidders Will Be Required To Comply With Far 2.504 Pla Requirements. Plas In Connection With Public-sector Construction Contracts Must Be Structured To Allow All Contractors (union And Non-union) To Participate. Union Hiring Halls Through Which Applicants Must Ordinarily Pass To Obtain Work On A Particular Project Must Be Operated In A Manner That Does Not Discriminate Based On Union Membership. Potential Bidders Are Encouraged To Review The Requirements Of Far 22.504 And Establish Compliant Plas To Ensure Eligibility For Award. usace Will Not Notify Prospective Offerors Of Any Changes To The Solicitation; Offerors Must Monitor Piee And Sam For The Solicitation To Be Posted, And For Any Posted Changes Or Amendments. the Only Interested Vendors / Plan Holders / Bidders List Is Available Through Sam.gov; Contractors Are Responsible For Identifying Their Entity As An Interested Vendor And Contacting Other Interested Vendors. Usace Spk Will Not Review Capabilities Statements Submitted In Response To This Synopsis Or Coordinate Partnering Arrangements Between Parties. Contractors Should Check Sam.gov Frequently For Changes To The Interested Vendors List And This Notice.
Don Emilio Del Valle Memorial Hospital Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date16 Dec 2024
Tender AmountPHP 30 Million (USD 510.8 K)
Details: Description Subject : Design And Build Of Dedvmh Multi-purpose / Evacuation Area Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives This Project Aims To Construct A Safe Center While Providing Prime Patient Care During Weather Adversities. This Is In Consonance As Well With Our Continuing Drive In Developing Health Measures To Adapt To Climate Change. This Center Shall Serve As A Safe Sport Avenue Promoting Healthy Lifestyles To Healthcare Workers. This Will Also Be Utilized To House Hospital Activities To Shield Participants From Heat And Rain. It Also Aims To Create A Versatile Multi-purpose/evacuation Center Housing The Health Information Management Systems (himo) Department On The Lower Ground Floor To Support Secure And Efficient Data Management Critical To Hospital Operations. With Future Funding, The Center Is Planned To Include A Multi-purpose Court On The Upper Ground Floor, Promoting Wellness And Recreational Activities For Healthcare Staff, As Well As Office Spaces On The Second Floor To Support Future Departmental Growth And Administrative Needs, Ensuring The Facility Remains Adaptable And Functional For Various Purposes. The Design Must Also Conform To The Standards Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Lower Ground Floor B. Upper Ground Floor (partitions For Funding) C. Second Floor (above Stage Area) All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Health Information Management Systems Department Offices & Storage, Waiting Area - Wellness Area - Covered Area Proposed For Multi-purpose Court - Proposed Area For Offices Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To: Review And Confirm The Submitted Design Documents. Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule. Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From Foundation (entire Building); Includes Slabs, Beams And Girders D) Architectural Works I) Exterior Walls – All Exterior Wall At Lower Ground Floor To Upper Ground Floor Including Plastering Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits From Lower Ground Floor To Upper Ground Floor Including Cable Tray Ii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iii) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers Iv) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. V) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Drainage System I) Electronics / Auxiliary Works - At Functional Areas: Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). D. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. E. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. F. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. G. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category B “medium A” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To: Medium-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 6-storey Building. Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 15 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 10 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 10 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Multi-purpose / Evacuation Area 5% - 7% Of Abc Construction Of Dedvmh Multi-purpose / Evacuation Area 93% - 95% Of Abc Total Abc Php 30,000,000.00 The Approved Budget For The Design-build Contract Is Thirty Million Pesos (php 30,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital Multi-purpose/evacuation Area. Detailed Architectural And Engineering Design Services Shall Not Exceed Seven Percent (7%) Of The Approved Budget Cost (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred (300) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 240 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons. Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In: Recognition And Avoidance Of Unsafe Conditions Workplace Safety And Health Requirements Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties. Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency. Plan Must Be In Writing For Employers With Greater Than 10 Employees All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Structural Analysis And Design Five (5) Sets Duly Signed And Seal Structural Analysis And Design Report In Hard Bound Including The Executable E-files (staad/etabs,etc.) Five (5) Sets Duly Signed And Seal Structural Specifications In Hard Bound (refer To Structural Analysis And Design Specification And Parameters) 1.2 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors: Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling. Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain All Floors Shall Have Direct Access To Ramp Both Stairs Are For Service And Emergency Use External Window At Second Floor And Up Shall Be Of Awning Type. Provision Of Electrical Room Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.). Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building. Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair. Exits Terminate Directly At Open Space To The Outside Of The Building. Lower Ground Floor – Health Information Management Systems Department • Waiting Area - This Area Is Dedicated For Waiting Area Of Patients, Patient’s Immediate Family Members, Hospital Staffs, And Client/visitors For Receiving And Issuance Of Medical/medico-legal Certificates, Birth And Death Certificates. It Is Designed As An Open Space To Promote Cross-ventilation, Ensuring Comfort And Improved Air Quality For All Users. - Planning Relationships: A. Accessible To Receiving/releasing Area - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Security System: F. Provide Closed – Circuit Television Cctv Shall Be Installed At The Lobby And Corridor Or Hallway Of This Floor With Central Monitor Located At The Reception Area And At Least Two Views Or Angles Of Cctv • Staff Office And Releasing/receiving Area - This Area Is Dedicated For Hims Staff And Other Authorized Users To Conduct Medical Studies, Read, Write, And Retrieve Records, Processing And Filing Of Opd, Er, And Or Records, Transcription Of Birth And Death Certificates, Staff Assembling/inputting Of Inpatient Charts And Updated Death Registry, And Receiving/issuance Of Medical/medico Legal Certificates, Birth, And Death Certificates. This Shall House Thirty-three (33) To Thirty-nine (39) Staff Desks And Chairs, Cabinet Filing, Adjustable Stool At Receiving/releasing/transaction Counter, Transaction Counter Window, Space For Photocopier, Risograph Machine, And Paper Shredder. This Should Be Designed To Incorporate Windows To Enable Cross-ventilation, Ensuring A Well-ventilated, Fresh-air Environment. In Addition To Being Well-lit And Featuring Two Exits, The Area Should Use Noise-reducing Materials To Maintain A Quiet, Efficient Workspace. - Planning Relationships: A. Accessible To Filing Area - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Fifteen (15) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Four (4) Units Smoke Detector. - Security System: F. Provide Closed – Circuit Television Cctv Shall Be Installed At The Lobby And Corridor Or Hallway Of This Floor With Central Monitor Located At The Reception Area And At Least Two Views Or Angles Of Cctv • Wellness Area - The Wellness Area For Hospital Staffs Will Feature Separate Male And Female Comfort Rooms And Showers, Lockers, Space For Exercise Equipment, A Mirrored Wall, And A Full-length, One-way Tinted Framed Operable Awning Window And A Swing-in Double Entrance Door, That Will Offer A Wide View Of The Hospital Grounds, Providing Natural Light And Cross Ventilation For An Inviting And Refreshing Environment. Main Floor Tiles Should Be Of Vinyl Flooring, Ensuring A Safe, Durable Surface For Exercise Equipment And Activities. This Choice Adds Comfort And Safety To The Space For Staff Use. - Planning Relationships: A. Adjacent To Hims Department Waiting Area - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Six (6) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Security System: F. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles. • Head Office With Toilet - This Area Is Where Health Information Management Officer (himo) Reads, Transcribes, And Updates Disease And Operation Coding And Indexing, Prepares Communications And Other Pertinent Papers Related To Medical Records As Requested By Patients, Protects Confidentiality Of Medical Records, Performs Statistical And Other Reports Required By Doh And Other Institutions, And Performs Qualitative And Quantitative Analysis Of Hospital Health Records. This Will Feature A Glass Partition With A Door, Providing Visibility And Privacy Between The Office And The Staff Office And Releasing/receiving Area. It Will Also Include A Comfort Room And A Sofa For Receiving Visitors. - Planning Relationships: A. Accessible To Receiving/releasing Area B. Accessible To Staff Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Five (5) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air-conditioning System: G. Provide Air Conditioning System. • Completion Area/conference Room Toilet - This Room/area Is Where Researchers/doctors And Other Authorized Users Discuss And Finalize Pertinent Papers/documents Related To Medical Records As Requested By Patient/relatives. This Space Will Also Function As A Conference Room, Designed With Soundproofing Materials And A Glass Fixed Window Directly Facing The Staff Office To Provide Visibility While Maintaining Privacy And Minimizing Noise. - Planning Relationships: A. Accessible To Staff Office - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air-conditioning System: F. Provide Air Conditioning System. • Administrative Records Room - This Room/area Is Where Hims Staff Stores/files Administrative Records For Easy Access And Retrieves Records On File. It Will Include An Operable Sliding Window At A Reachable Height, Allowing For Natural Ventilation And Lighting. - Planning Relationships: A. Accessible To Staff Office - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air-conditioning System: F. Provide Air Conditioning System - Security System: G. Provide At Least One (1) Closed – Circuit Television Cctv With At Least Two Views Or Angles. • File Storage Area - This Room/area Is Dedicated As Storage Of Inactive Files That Have Passed The Ten-to-thirty-year Filing Period, Of Files To Ensure Protection From Fire, Floor And Theft, For Periodic Evaluation Of Inactive Health Records/files, And To Keep Medical Records Accessible As Many Years As Possible. It Will Include An Operable Sliding Window At A Reachable Height, Allowing For Natural Ventilation And Lighting. - Planning Relationships: A. Adjacent To Hims Department - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Fourteen (14) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Seven (7) Units Smoke Detector. - Air-conditioning System: F. Provide Air Conditioning System. - Security System: G. Provide At Least One (1) Closed – Circuit Television Cctv With At Least Two Views Or Angles. • Records Room - This Room/area Within The File Storage Area Is Where Hims Staff Stores/files Opd, Er, And Or/dr Records, Birth And Death Certificates For Easy Access, Retrieves Records On File For Request/follow-up Of Patients/relatives And Researchers/doctors And Refiles Them, And Records Individual Charts By Patient’s Data For Complete Inventory Control. - Planning Relationships: A. Adjacent To Hims Department - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air-conditioning System: F. Provide Air Conditioning System. - Security System: G. Provide At Least One (1) Closed – Circuit Television Cctv With At Least Two Views Or Angles. • Staff Pantry And Lockers - This Is The Lounging Area For Hims Staff And For Storing Of Their Personal Belongings. This Will Be Well-ventilated With Natural Lighting, Providing Ample Space For Pantry Furniture, A Refrigerator, A Stainless-steel Sink, And Steel Lockers Measuring 300 X 500 Mm. - Planning Relationships: A. Adjacent To Hims Department - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Ground Fault Circuit Interrupter (gfci). Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air-conditioning System: F. Provide Air Conditioning System. - Security System: G. Provide At Least One (1) Closed – Circuit Television Cctv With At Least Two Views Or Angles. • Staff Female And Male Toilet - Separate Staff Female And Male Toilets For Staff Use, Located Within The Staff Pantry And Lockers Area For Convenience And Accessibility. - Planning Relationships: A. Within Staff Pantry B. Adjacent To Hims Department - Lighting System: C. For General Illumination, Provide At Least 500 Lux. • All Gender/pwd Public Toilet - This Restroom Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Directly Accessible To Public. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 500 Lux. • Electrical/auxiliary Room - Located On The Ground Floor Near Staff Office Exit, It Is Strategically Placed Away From Direct Client/visitors Access To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Access Ramp - Ramps Designed To Provide A Smooth, Accessible Pathway For Individuals With Mobility Challenges, Such As Wheelchair Users, To Enter Or Exit A Building. These Ramps Should Meet Accessibility Standards, Including Proper Slope (usually 1:12), Non-slip Surfaces, Handrails On Both Sides, And Clear Signage. They Are Essential For Ensuring Equal Access To All Areas Of A Building, In Compliance With Accessibility Laws Like The Amended Irr Of Bp 344. - Planning Relationships: A. A Ramp Shall Have A Minimum Clear Width Of 1.22 Meters (or 4 Feet) In One Direction (or 2.44 Meters Or 8 Feet In Two Opposite Directions). B. The Slope Of The Ramp Shall Not Be Steeper Than 1:12 Meters. - Lighting System: C. For General Illumination, Provide At Least 500 Lux. • Janitor’s Closet - This Room/space Is Designed To Keep Cleaning Materials With Mop Sink And As Storage For Janitor’s Cleaning Tools. This Will Be Strategically Located For Easy Access By Utility Workers, Ensuring They Can Reach It Without Needing To Pass Through The Staff Office. - Planning Relationships: A. Adjacent To Hims Department Office And Waiting Area - Lighting System: B. For General Illumination, Provide At Least 500 Lux. Upper Ground Floor – Multi-purpose Court • Covered Area For Proposed Multi-purpose Court - This Area Is Designed With A Covered Roof And Perimeter Walls At A Height Of 1.2 Meters For Safety, Providing Space For The Proposed Multi-purpose Court And Second-floor Offices, With Plans For Future Funding. - Planning Relationships: A. Accessible To Receiving/releasing Area - Lighting System: B. For General Illumination, Provide At Least 1000 Lux. C. Provide High Bay Led Lights - Power System: D. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Security System: E. Provide At Least One (1) Closed – Circuit Television Cctv With At Least Two Views Or Angles. Xii. Structural Design And Analysis Specifications And Parameters A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances Standards 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Dpwh Blue Book 4. American Concrete Institute (aci) 5. American Society For Testing Materials (astm) 6. American Welding Society (aws) B. Design Criteria Shall Be Submitted First To The Procuring Entity For Concurrence Of The Following Minimum Design Requirements: 1. Design Loads (dead Load, Live Load, Wind Load, Seismic Load And Analysis Procedure, Load Combinations) 2. Materials (concrete, Reinforcing Steel Bars, Structural Steels) 3. Foundation (allowable Foundation Pressure) 4. Design References C. Minimum Design Input File In Structural Software And Required Reports 1. Job Information 2. Joint Coordinates 3. Material Definition/specification 4. Member Property 5. Support Definition 6. Load Definition (seismic/dead/live/wind/load Combinations) 7. Analysis Procedure 8. Analysis Result 9. Load List 10. Support Reaction List 11. Design Results (footing/ Column/ Beam) 12. Load Diagrams 13. Structural Plans -end Of Structural Design And Analysis- Xiii. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards. Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies. Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans. Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans. Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters. Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters. Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details. Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing. Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing. Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes. Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings. The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans. Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01. Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures. Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections. The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning Window And All Awning Windows Should Be A 45-deg. Opening Angle. 8. Details Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design. Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation. Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles. Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following: Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line Road Network And Curbs And Sidewalks Parking Spaces Reference Location Of Existing Trees Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides: The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments. The Inner Zone Shall Include The Wards. The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services. The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers. There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks. In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation. Covered Walkways Shall Be Provided For Access And Connection To All The Buildings. Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised. The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans. Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements. Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works. Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing. Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound. Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission. Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 3. Floors If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design. Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections. The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern. The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details. If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details. Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould. Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation. 5. Doors And Windows Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal. Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors. Toilets And Other Wet Areas Shall Have Steel Doors. Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Pwd Toilet Doors Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers. Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines. Aluminum Frames Of Glass Doors Shall Be Powder-coated. Door Finish And Color Shall Be Approved First Before Application. Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope. All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines. Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details. All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details. Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344. Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines. Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall. Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These. Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor. Electrical Light Switches Shall Be Located By The Knob Side Of The Door. Electrical Switches And Outlets Shall Be Installed Plumb And Level. Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers. Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344. A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies. Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage. Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details. Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details. Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details. The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish. Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint. Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish. Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish. Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified. Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following: Gutter, Eaves, And Parapet Ceiling - Covelight, Special Connections And Design, Mouldings, Valances Stairs - Handrail, And Baluster Design Ramps - Handrail Design And Floor Pattern Doors, Windows And Gates - Grille Works, Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counter/transaction Window Special Carpentry Works, E.g. Partitions, Cabinetry Building And Room Signages And Wayfinding Systems All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet” Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Office, Including Furniture Arrangements And Outlets With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Wellness Area C. Waiting Area D. E. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels. Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles. Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material. Vinyl Floor Tiles For Sterile Areas Of Delivery & Nicu Suite Shall Be Homogenous And Not Less 3mm. Thick. Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified. Aluminum T-runners Shall Be Powder Coated. Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings. Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xiv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia. And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xv. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House. The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa. The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp); For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Waste Line And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant. For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Summary Of Materials Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings) Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified) Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp) 300mm Dia. And Above, Reinforced Concrete Pipe (rcdp) Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888 Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified) Floor Drains/deck Drains; Cast Iron Brass (bps Certified) Gutter Drains; Cast Iron Dome Type Brass (bps Certified) Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Trench Grating; Galvanized/stainless Steel Iron Grates Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified) Water Closet-tank Type Push Button Flush Lavatory - (pedestal/counter Type) With C-spout Spray Faucet Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet Urinal-wall Hung Flush Valve Type E. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvi. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse. An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building. Hazard Classification Shall Be Light Hazard Occupancy. Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M. Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing. All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System. Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller. Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes. Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary. Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways). Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xvii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards. Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System: Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Master Or Cable Antenna Television Fire Alarm System Security System 5. Lightning Protection System The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following: Lighting Fixtures/luminaires Panelboard And Circuit Breakers Switchgear And Other Metering Devices Electrical And Hospital Equipment Installation And Termination Of Auxiliary And Other Special Devices And Equipment Power And Telephone Handholes (as May Be Required) Pedestal And Service Entrance To Bldg. Grounding System Layout Substation/power House And Electrical Room Transformer And Generator Mounting Others As May Be Required. C. Summary Of Materials General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied. Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure. Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40. Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size. Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building. Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service. Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality. Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Waiting Area. Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xviii. Design Parameters (green And Safe Health Facilities) Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards. Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government. The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals. In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities. Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun. Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain. Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System. Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials. Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc. Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible. Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology. Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals. All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security. Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms. Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank Use Of Waterless Urinals And Dual Flush Water Closets. Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets. Use Of Water-saving Shower Heads For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act. A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied. Waterless Urinals Must Be Provided For Male Toilets. There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint. Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used. Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop. Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing. Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality Harvest Natural Daylight If Applicable. Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained. Use Of Acoustic Privacy Partitions Is Required. Separate Entrances For Ambulances And Walk-in Patients. In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia. In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible. Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45. Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xix. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement Contractor’s Temporary Facility And Lay Down Yard. Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos Material Testing (rsb, Chb, Concrete, Steel) Safety Requirements (warning Signs, Hardhat, Etc.) As Built Plan Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction. All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative Soil Excavation And Soil Treatment Restoration Of Any Damaged Properties During The Construction Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers. No Implementation Of The Project Without An Approved Plan And Other Related Documents. Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules. Shall Abide By The Medical Center Hospital House Rules Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives. Soil Investigation Concrete Strength Testing Reinforcing Bar Strength Testing Concrete Masonry Unit (cmu) Testing All Plumbing And Sanitary System Automatic Fire Sprinkler System Ventilation And Air Conditioning System All Electrical System And Other Tests That Necessary To Perform To Ensure The Quality Of The Project All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives. The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation. No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Telephone System 2. Paging System 3. Lan System 4. Fire Alarm System 5. Security System Cctv 6. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.
1121-1130 of 1141 active Tenders