Cable Tenders
Cable Tenders
City Of Bayawan Tender
Civil And Construction...+1Construction Material
Philippines
Closing Date7 Jan 2025
Tender AmountPHP 2.1 Million (USD 37.8 K)
Details: Description Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Projects: Lot No. I Tarpaulin Printing 1 4 Lot "labor And Materials ( Tarpaulin Printing ) 4 Sets - 2' X 4' (signage)" Lot No. Iii Sand & Gravel 4 7 Cu.m. Sand, Washed, Mixing/screened 5 8 Cu.m. Gravel, Mixing, Crushed, Screened & Washed, Max. Size 38mm Dia Lot No. V Construction Supplies/materials 16 72 Kg/s Tie Wire, # 16 17 3 Kg/s Nylon, #100 18 5 L.m. Mesh Wire, 3mm Eyehole X 0.90m Width (m) 19 15 Pc/s Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 20 5 Kg/s Nails, Concrete, 75mm 21 6 Kilo/s Nails, Umbrella/roofing, 62mm 22 2 Box/es Nails, Common Wire, 100mm (25kgs/box) 23 1 Box/es Nails, Common Wire, 75mm (25kgs/bx) 24 1 Box/es Nails, Common Wire, 62mm (25kgs/box) 25 1 Box/es Nails, Common Wire, 38mm (25kgs/box) 26 3 Box/es Rod/electrode, Welding, E6013, 1/8" (bx)) (matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) 27 6 Pc/s Drill Bit, Masonry, 1/8" Dia 28 9 Pc/s Drill Bit, 1/8" Dia, For Steel 29 3 Pc/s Drill Bit, 3/16" Dia, For Steel 30 3 Pc/s Drill Bit, 1/4" Dia, For Steel 31 3 Pc/s Drill Bit, 3/8" Dia, For Steel 32 3 Pc/s Drill Bit, Masonry, 3/16" Dia 33 3 Pc/s Drill Bit, Masonry, 1/4" Dia 34 3 Pc/s Drill Bit, Masonry, 3/8" Dia 35 13 Pc/s Cutting Disc, Masonry/concrete, 100mm 36 10 Pc/s Cutting Disc, 100mm Dia, For Metal 38 5 Can/s Silicon Sealant, (300ml/can), For Polycarbonate 39 2 Can/s Sealant, Elastomeric/roof (1 Lit/can) 40 2 Can/s Solvent Cement, Pvc (500 Cc/can) 41 2 Roll/s Sack Cloth, 2.40m Width (100m/roll), Blue 42 10 Can/s Epoxy All Purpose (a And B), 1/4 Lit/can, Non Conductive, All Purpose Adhesive 43 50 Set/s Lag Screw, 6mm Dia. X 32mm With Expansion Shield 44 200 Set/s Bolt, Fine Threaded, 3.5mm X 25mm, With Nut And Washer 45 1 Sheet/s Steel Plate, G.i., Gauge # 16 X 1.2m X 2.4m 46 20 Pc/s Tiles, Granite, Polished, 0.60m X 0.60m, Color: Jet Black 47 65 Pc/s Tiles, Floor, Ceramic, 40cm X 40cm Non Skid 48 14 Pc/s Staircase Nosing, Brass Ochre (2m/length) 49 6 Pack/s Tile Grout (2kg/pk), Light Beige 50 1 Can/s Acrylic Spray Paint, Flat Black(400cc/can) 51 1 Lit/s Paint, Enamel, Quick Dry (lit), Red 52 10 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Marking Yellow Or Equivalent 53 5 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Black 54 12 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, White Or Equivalent 56 1 Gal/s Paint, Epoxy, Silver Finish With Aluminum With Catalyst 57 15 Gal/s Paint, Epoxy, Enamel, Black (gal) 58 4 Gal/s Enamel Paint, Silver Finish Aluminum (gal) 59 3 Can/s Thinner, Lacquer (3.75lit/can) 60 11 Gal/s Reducer/thinner, Epoxy Paint (gal) 61 8 Gal/s Adcoat Rust Converter And Primer 62 6 Gal/s Liquid Tile Paint, Primer White Acrylic Solvent-based Primer 63 6 Gal/s Liquid Tile, Topcoat Gloss White 64 4 Gal/s Liquid Tile, Top Coat Clear 65 5 Can/s Liquid Tile, Solvent Based-tinting Color Venetial Red, 1/4lit Per Can 66 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Blue, 1/4lit Per Can 67 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Green, 1/4lit Per Can 68 5 Can/s Liquid Tile, Solvent Based-tinting Color Hanza Yellow, 1/4lit Per Can 69 5 Can/s Liquid Tile, Solvent Based-tinting Color Lamp Black, 1/4lit Per Can 70 5 Gal/s Liquid Tile, Reducer Clear Liquid 71 10 Gal/s Plexibond, Cementitious Waterproofing System, Acrylic 72 10 Pc/s Sand Paper, #80, 225mm X 275mm 73 10 Pc/s Sand Paper, #100, 225mm X 275mm 74 10 Pc/s Sand Paper, #120, 225mm X 275mm 75 10 Pc/s Sand Paper, # 180, 225mm X 275mm 76 14 Pc/s Paint Roller W/ Handle, 100mm 77 150 Meter/s Service Drop Wire, # 4 Awg (m) 78 5 Pc/s Service Grip, # 2 79 4 Pc/s Service Grip, Dead End Performed Type, Size # 4awg 80 1 Length/s Pipe, Pvc, 40mm Dia X 3m, W/ Entrance Cap, Clip Type 81 70 Meter/s Thw Wire, # 4 (22mm2), Black (m) 82 70 Meter/s Thw Wire, # 4 (22mm2), White (m) 83 40 Meter/s Thw Wire, # 6 (14mm2), Stranded(m), Green 84 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Black 85 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), White 86 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Green 87 6 Roll/box Thw Wire, # 12 (3.5mm2), Stranded (150m/roll/bx), Black 90 1 Length/s Pipe, G.i. 65mm Ø X 6m, Wt=5.20mm , Outside Dia= 73.00, 8.694kg/m, Heavy Gauge 92 1 Pc/s Circuit Breaker, 100a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 93 1 Pc/s Circuit Breaker, 30a, 2 Pole, Bolt-on 94 3 Pc/s Circuit Breaker, 20a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 95 4 Roll/s Royal Cord, # 14 Awg, 2 Wire (75m/roll) 96 7 Length/s Pipe, Pvc, Electrical, 40mm Dia X 3m, Thickwall, Orange 97 200 Length/s Pipe, Pvc, Electrical, 25mm Dia X 3m, Thickwall, Orange 98 150 Length/s Pipe, Pvc, Electrical, 20mm Dia X 3m, Thickwall, Orange 99 3 Pack/s C-clamp/clip, Pvc, 20mm Dia, W/ Concrete Nails (100's/pk) 100 6 Pack/s C-clamp/clip, Pvc, 25mm Dia W/ Concrete Nails (100pcs/pk) 101 3 Pack/s Pipe Connector, Pvc, Electrical, 20mm Dia (100's/pk)) 102 3 Pack/s Pipe Connector, Pvc, Electrical, 25mm Dia (100pcs/pk) 103 10 Pc/s Connector, Split Bolt, # 6 (14mm2), Burndy 104 3 Set/s Magnetic Contactor, 40a 220-240vac Coil W/ Metal. Enclosure 105 2 Pc/s Photo Control (photo Switch), 220v, 6a, Operating Illumination: Turn-on At 31.5 Lux, Turn-off At 125 Lux 106 2 Unit/s Timer, Time Switch, 24hr Back Up 107 50 Roll/s Tape, Electrical, Vinyl, .177mm X 3/4"/19mm X 16m, Flame Retardant, 600v 108 5 Roll/s Tape, Electrical, Rubber, 18mm X 5m, Self Fusing Ethylene Propylene Rubber 109 5 Roll/s Tape, Electrical, Waterproof, 600v 111 29 Set/s Recessed Ground Lamps, Ip67 1w, Ac85-265v Dc 12v (1 Side), Natural White (4000k), 42mm X 70mm 113 8 Set/s Metal Hallide Flood Light Fixture 250w Set With Tubular Metal Hallide Bulb (firefly), Warm White, Model: Flh 121/s/250/fhimh 250dl/t 114 10 Set/s Solar Blinker Arrow Signage Warning Lights, Direction Signs, Size: Length:47"; Height:42", Arrow Sign, Size: Length: 47"; Height:16", Solar Panel Size: 10" X7", Led Color: Red, Ip Grade: Ip54 119 18 Set/s Lamp Post, Steel Tapered, Single Arm,t-6-30' Sb Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish, Amco 120 6 Set/s Lamp Post, Steel Tapered, Double Arm, T-6-30' Db Double Arm, Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish 122 32 Pc/s Led Fountain Lights, Rgb With Stainless Steel Toughed Glass Cover, Ac 220; Dc 12-24v Dmx 512 Built In Control With Decoder, 9x3w Led Rgb Color Changing 2700-6500k Ip68 Water Proof Grade Junction Box 124 5 Roll Cable Wire; 5c X 16 Twg/1.025mm Premium Multi-conductor Royal Cable Wire (75m/roll) 126 32 Set/s Fountain Nozzle, 1.0" Dn40 Female Thread Flower Column Style Fountain Nozzle Sprinkler Spray Head, Brass 127 1 Unit/s 37.5 Kva Ditribution Transformer, 7620/13200vy - 240/480 Volts Oisc, W/ 2-2½, Taps Above And N.v., Fuse Link, Fuse Cut-out And Accessories 128 2 Meter/s Fuse, Cut-out, 100a, 25kv, Ab Chance 129 1 Set/s Transformer Cluster Hanger, With Complete Accessories 130 1 Pc/s Clamp, Hot Line, #2 - #4/0 Acsr 131 3 Set/s Pull Box, Metal Enclosure, 900mm X 200mm X 150mm, With Cover 132 50 Pc/s Screw, Lag Screw, 10mm Dia X 50mm, W/ Plain Washer And Expansion Shield 133 200 Pc/s Bolt With Nut And Washer, (fine Thread) 3.5mm Dia X 25mm 134 200 Pc/s Bolt With Nut And Washer, (fine Thread) 4.5mm Dia X 25mm 135 5 Pack/s Ubolt Galvanized/ U Bolt With Nut And Washer Inches For Gi Pipe Screw Depot, 1/4 For 3", 1/4" Dia, 10 Pcs Per Pack 139 30 Gal/s Concrete Epoxy, With Low Viscosity For Construction 140 22 Length/s Pipe, Upvc, 20mm Outside Dia, Wt=1.8min, L=3.0m, Blue 141 12 Pc/s Tee, Upvc, 20mm Inside Dia, Blue 142 14 Pc/s Elbow, Upvc, 20mm Inside Dia X 90 Deg. Bend, Plain, Blue 143 4 Pc/s Tee Reducer, Upvc,32mm X 20mm Nominal Dia, Blue 144 3 Pc/s Tee, Upvc, 25mm Inside Dia, Plain, Blue 145 4 Pc/s Adaptor, Upvc, Male, 20mm Dia., Nominal Size, Blue 146 8 Pc/s Adaptor, Upvc, Female, 20mm Dia Nominal Size, Blue 147 4 Pc/s Ball Valve, Pvc, 20mm Outside Dia 148 10 Length/s Pipe, Upvc, 32mm Outside Dia, Wt=2.0min, L=3.0m, Blue 149 1 Pc/s Gate Valve, 25mm Dia, Brass/bronze 150 1 Pc/s Check Valve, 25mm Dia, Brass/bronze 151 2 Pc/s Adaptor, Upvc, Male, 25mm Dia., Nominal Size, Blue 152 8 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 153 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 154 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 155 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 156 3 Pc/s Gate Valve, 40mm Dia, Brass/bronze 157 5 Pc/s Check Valve, Horizontal Swing 40mm Dia, Brass/bronze 158 6 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 159 2 Pc/s Tee, Upvc, 32mm Inside Dia, Blue 160 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 161 4 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 162 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 163 4 Length/s Pipe, Pvc, 57.15mm Outside Dia X T=2.54mm X L=3.0m, S-1000, Orange 164 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 90 Deg. Bend, S-1000, Orange 165 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 45deg Bend, S-1000, Orange 166 8 Length/s Pipe, Pvc, 82.55mm Outside Dia X T=3.75mm X L=3.0m, S-1000, Orange 167 2 Pc/s Pvc Tee, Inside Dia: 82.55mm, S-1000, Orange 168 2 Pc/s Floor Drain, 150mm X 150mm Dia, Stainless 169 8 Length/s Pipe, Pvc, 107.10mm Outside Dia X T=3.81mm X L=3.0m, S-1000, Orange 170 2 Pc/s Elbow, Pvc, 107.10mm Inside Dia X 90 Deg. Bend, S-1000, Orange 171 2 Pc/s Pvc Elbow, Inside Dia: 107.10mm X 45 Deg Bend, S-1000, Orange 172 1 Pc/s Gate Valve, 100mm Dia, Brass/bronze 173 1 Pc/s Gate Valve, 80mm Dia, Brass/bronze, Threaded Type 174 3322.536611 Sq.ft. Brass Metal Etching Engraved Marker 175 5 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Brown 176 20 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Yellow 177 20 Pc/s Vest, Reflectorized, Safety, Orange 178 20 Pair/s Raincoat, Jacket W/ Hood & Pants, Size: X-large With Reflectorized Strips 179 15 Pc/s Plastic Road Barriers 180 20 Pc/s Spectacles, Safety Goggles, Clear 181 8 Pair/s Gloves, Welding Leathear Long, 16', Ce Certified En 12477 182 5 Roll/s Caution Tape, Yellow, 3" X 50' 183 5 Roll/s Danger Tape, Red, 3" X 50' 184 15 Pc/s Traffic Cones 28" Tall, 14" X 14" Base With Reflective Collars Lot No. Vi Road Stud Installation 137 1 Set/s Solar Road Stud Installation Machine, Equipped With Running Wheel, Accurate Hole Position With Good Hole Forming Quality, 5.0hp, 220v With 3900w 50/60hz, 570rmp; Height: 800mm; Weight: 200kgs; Pure Copper Self-priming Pump, Manual Electric Starter, Free Adjustment Depth And Bearing Seat Assembly Complete With Coring Bit And Other Accessories ** ** ** Nothing Follows ** ** ** Bid Documents Shall Be Available At The Bac Office, New City Hall, Lgu Bayawan City Upon Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00 Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Postqualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents December 17, 2024 To January 6, 2025 @ 5:00 Pm Pre-bid Conference December 26, 2024 @ 9:00 Am Deadline/opeing Of Bids January 7, 2025 @ 9:00 Am Post Qualification January 14, 2025 @ 9:00 Am Awarding Of Bids January 21, 2025 @ 9:00 Am Approved: (sgd)virginia D. Sadiasa City Civil Registrar Bac Chairman Received By: Name:___________________________ Date:___________________________ Geps Publication : Geps December 17, 2024 Newspaper : None
DEPT OF THE ARMY USA Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Electrical Works
United States
Closing Date2 Jan 2025
Tender AmountRefer Documents
Details: Hannibal 4 Corners Hydraulic System . The U.s. Army Corps Of Engineers, Pittsburgh District, Has A Project That Involves The Replacement Of The Central Hydraulic System For The Main And Auxiliary Lock Chambers At Hannibal Locks And Dam, Ohio River, Ohio. The Contract Will Include A New Modified Four Corner Hydraulic System For Each Lock Chamber Consisting Of Hydraulic Power Units (hpus) For The Miter Gates And Culvert Filling/emptying Valves. The New Hpus Shall Be Located In New Precast Buildings At The Following Locations: ? Two (2) Hpus On The River Wall; One Upstream And One Downstream For Operation Of The Main Chamber Culvert Valves And Miter Gates.? Two (2) Hpus On The Middle Wall; One Upstream And One Downstream For Operation Of Main Chamber Culvert Valves And Miter Gates. In Addition, The Two Hpus On The Middle Wall Are For Operation Of The Auxiliary Chamber Miter Gates. The Modified Four-corner System Reduces The Number Of Hpus On The Middle Wall From Four To Two.? Two (2) Hpus On The Land Wall; One Upstream And One Downstream For Operation Of The Auxiliary Chamber Culvert Valves And Miter Gates. The Contract Specifically Includes: A. Installation Of New Power, Control, And Fiber Optic Cables For The Six (6) Hpus. Includes Modifying The Existing Control Stations In Each Control Shelter For The Addition Of The New Hpus And Miter Gate Controls. B. Furnishing And Installation Of Six (6) Hpus, Fourteen (14) Manifold Blocks, Stainless Steel Hydraulic Piping, And Hydraulic Oil.c. Furnishing And Installation Of Six (6) Precast Buildings Which Includes Raised Concrete Pads, Power Distribution Equipment, Associated Electronics And Hardware, And New Utility Trench Covers In Various Areas Of The Lock.d. Furnishing And Installation Of New Motor Control Center (mcc) Distribution Equipment.e. Demolition And Disposal Of Existing Central Hydraulic System Located In The Middle Wall Operations Building. This Includes All Motors, Pumps, Reservoir, Filters, Associated Piping, And Proper Disposal Of Hydraulic Oil.f. Demolition And Removal Of All Existing Central Hydraulic Oil Lines On The River, Middle, And Land Walls. This Includes All Lines For Pressure And Return To Each Miter Gate And Culvert Valve Cylinder. Removal And Proper Disposal Of Hydraulic Oil And Components Will Be Required. Removal And Proper Disposal Of Electrical Equipment Will Be Required. Ferrous And All Other Construction Waste Material Will Be Disposed Of At Commercially Permitted Facilities Licensed To Accept Waste Or Recyclable Materials As Applicable. Construction Work Will Occur In Close Proximity To Waterway Traffic And Operating Lock And Dam Gates. The Existing Lock Chambers And Dams Are Currently Operated And Staffed By Government Personnel 24 Hours A Day 365 Days Of The Year. Lock Closures For Installation And Testing Of New Equipment Will Be Required To Be Minimal And At The Approval Of Government.the Work Shall Be Completed Within 365 Calendar Days After Written Notice To Proceed. Disclosure Of Magnitude Of Construction (far 36.204 And Dfars 236.204)between $10,000,000.00 To $25,000,000.00the Acquisition Will Be Procured As Full And Open Competition. The Resulting Award Will Be For One (1) Firm-fixed-price (ffp) Contract. All Responsible Bidders Are Encouraged To Participate. The Invitation For Bid (ifb) Will Be Issued On Or About 3 January 2024, Online Through Procurement Integrated Enterprise Environment (piee) Which Posts The Opportunity To Sam.gov; Therefore, Requests For Hardcopies Of The Solicitation Will Not Be Honored.the North American Industrial Classification System (naics) Code For This Acquisition Is 237990 ? Other Heavy And Civil Engineering Constructionthe Small Business Size Standard For This Naics Code Is $45,000,000.00.in Order To Submit A Bid On This Project, Your Company Must-1) be Registered In System For Award Management (sam) And Maintain An Active Registration Status. 2) be Registered In The Procurement Integrated Enterprise Environment (piee) For The Solicitation Module With The Proposal Manager Manger Role. System For Award Management (sam) Registrationregistering In Sam.gov Includes Both Entity Validation And Entity Registration.to Register In Sam:a. navigate To Sam.govb. select Sign-in (top Right)c. select Create An Account Then Follow The Instructions. D. after Account Is Set-up, Select Sign In.e. under The Entity Management Widget, Select Get Started Button. F. select Register Entity. As Part Of Entity Registration, A Unique Entity Id Will Be Assigned.for Additional Information On Samto Register Your Entity (company), Please Visit Https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here You Will Find The Following, get Started With Your Registration check Registration Status ? Active, Inactive, Pending update Your Registration become An Entity Administrator validate Your Entity *access User Guides *by Selecting This Option, You Can Obtain A Quick Start Guide For Contract Registrations.also, Here You Will Find In Addition To The User Guides - Faqs, Videos, And Definitions.please Noteit Is Mandatory That All Companies Be Registered In Sam In Order To Receive Federal Contracts.there Is No Charge To Register Or Maintain Your Company (entity) Registration.login.gov Manages Usernames And Passwords For Sam.gov. *important* Registration Informationregistration Can Take At Least Ten (10) Business Days To Be Active In Sam.gov.registration Must Be In Active Status Upon Offer Submission And Remain Active During Award Period.registration Must Be Renewed Every 365 Days To Remain Active.the Federal Service Desk (fsd) For Sam Questions, May Be Contacted. Phone Number: 866-606-8220hours Of Operation: Monday-friday 8 A.m. To 8 P.m. Etprocurement Integrated Enterprise Environment (piee) Solicitation Module Registrationto Register For Piee Follow The Below Instructions. Register In Piee:a. Navigate To Https://piee.eb.mil/b. Select Register [top Right]c. Select Vendord. Create A User Id And Password And Follow The Prompts [next]e. Create Security Questions [next]f. Complete Your User Profile Information [next]g. Complete Your Supervisor Or Approving Official Information [next]h. Complete Rolesi. Step 1. Select Sol-solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill In Your Location Code (cage Code) [next]i. Provide A Justification For Your Registration [next]j. Follow The Remaining Prompts To Submit Your Registrationthe Procurement Integrated Enterprise Environment (piee) Help Desk May Be Reached By Calling Telephone Number 866-618-5988 For Assistance.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Closing Date10 Jan 2025
Tender AmountRefer Documents
Details: This Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. 1. General Information Veterans Health Administration (vha) Program Contracting Activity Central (pcac) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For The Development Of Complete Construction Documents, Which Include Working Drawings, Specifications, And Reports, And Construction Period Services For Project #676-336 Fire Station Design-tomah Va Medical Center. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. 2. Project Information This Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $25.5m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract By Late March 2025. The Anticipated Period Of Performance For Completion Of Design Is 160 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $5,000,000 And $10,000,000. Please Note That The 160-calendar-day Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. 3. A-e Selection Process Firms Submitting Sf 330s In Response To This Announcement, Not Later Than The Closing Date And Time Specified Herein And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: Sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Pre-solicitation Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. In Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. All Firms Not Invited To Participate In Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. Discussions Will Be Held With The Most Highly Qualified Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Email And Provided Further Instructions, Including Any Questions Or Topics To Address. Following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. The Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit Will Be Authorized During The Negotiation Process. An Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made. 4. Selection Criteria: Firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. Primary Selection Criteria: Professional Qualifications: Professional Qualifications Necessary For Satisfactory Performance Of Required Service. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. Disciplines Requiring A Florida License Include Civil/structural And Hazardous Material Abatement/industrial Hygiene. A Resume For Each Of These Key Positions Must Be Provided In Section E Of The Sf330. Key Positions And Disciplines Required For This Project Include, But Are Not Limited To: Architect (leed Certification/us Green Build Council Certification) Cost Estimator Civil Engineer Electrical Engineer Environmental Engineer Fire Protection Engineer Mechanical Engineer Plumbing Engineer Project Manager Quality Assurance Manager Structural Engineer Physical Security Specialists Commissioning Agent Offeror Must Include The Following Statement Of Sdvosb Compliance When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I, [signatory Authority], Of [company Name], Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database In Compliance With Vaar 852.219-73. The Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Factor. Do Not Include This Information In Section H Unless It Is Pertinent To Support The Information Listed In The Other Sections. Specialized Experience And Technical Competence: Specialized Experience And Technical Competence In The Design And Construction Period Services Shall Be Provided For Network Infrastructure Installation, Renovations, Or Upgrades. Projects Experience Should Include Upgrading Large Scale (multi-building With Multiple Generational Oit Systems) Fiber Optics, Data Cable, Structured Cabling, Electrical Distribution Design, Electrical Upgrades, Uninterruptable Power Systems (ups), Electrical Bonding, Building Management Systems/building Automation Systems (bms/bas), Hvac, It Room Renovations/expansion/relocations, Data Centers/server Rooms Reconfiguration, And Physical Security Upgrades, Duct Bank And Direct Boring Operations. Other Specialized Experience To Provide Should Include Experience In Critical Path Scheduling, Fire Protection, Construction Infection Control Protocols, Energy Conservation, Transition, And Sustainable Design Practices. Submissions Shall Include No More And No Less Than Five (5) Recent And Relevant Government And Private Experience Projects Similar In Size, Scope, And Complexity, And Experience With The Type Of Projects/competence Above. Relevant Is Defined As Those Task Requirements Identified In The Statement Of Work. Recent Is Defined As Services Provided Within The Past Five (5) Years. Include The Following For Each Submitted Project: Project Title And Location Detailed Narrative Describing The Scope Of Services Provided, Including The Type Of Work Performed By The Offeror And Its Role In The Project (i.e., Prime Contractor, Teaming Partner, Or Subcontractor) Project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. Services & Deliverables Provided Under The Contract/task Order. Period Of Performance, Including Start And Completion Dates Total Dollar Value Of The Project Ae Cost Estimate Vs. Actual Construction Cost Contract Number Associated With The Project. The Information Provided In Section F Of The Sf 330 Will Be Used To Evaluate Relevant Specialized Experience And Technical Competence. Any Projects Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. The Information Provided In Section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Relevant Projects. The Offeror Must Include Narratives Of How The Firm Addresses Each Of The Following Topics In Section H. Simply Restating This List In Section H Will Not Be Sufficient. The Management Approaches. The Coordination Of Disciplines And Subcontractors Quality Control Procedures, And Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. Capacity: The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va, Any Federal Agency, And Private Sector, During The Previous Twelve (12) Months Or Any Active Projects At Pcac. Include The Full Potential Value Of Any Current Indefinite Delivery Contracts The Prime Firm Has Been Awarded From Any Source. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Award Date, Completion Percentages, And Expected Completion Date For The Va Projects Awarded In The Previous Twelve (12) Months Or Active At Pcac. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Proposed Team/personnel Provided In The Sf 330. Past Performance: Past Performance Will Be Evaluated On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. Past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Reporting System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Va Cpars Entry. Va Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted For Each Project Provided In Section F So Cpars Can Be Reviewed In The Database. Please Note We Are Unable To Review Any Cpars From Other Federal Agencies Outside Of The Va. For Any Project That Does Not Have Va Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. If The Firm (prime Or Subcontractor) Was Not The Prime Contractor On Any Project Submitted In The Sf330, A Ppq Must Be Submitted Listing Their Specific Role (key Disciplines) As A Subcontractor. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Completed Ppq Requested From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. The Government May Consider Additional Performance Related Information Regarding The Firm, To Include Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Will Result In A Firm Being Considered Less Qualified. The Information For This Factor Must Be Provided In Section H Of The Sf 330. For Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330. Ppqs Should Not Be Submitted To Vha Pcac Directly. Any Ppqs Will Not Be Counted Towards The Page Limitation For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. Knowledge Of Locality: Demonstrate And Describe Experience In The Local Area And The Specific Knowledge Of Certain Local Conditions Or Project Site Features The Experience Provided. This Description May Include (if Applicable): Any Prime Firm Or Subcontractor Experience Within The Visn Or At The Vamc State Or Local Construction Codes, Laws, Or Regulations Climate And Seismic Related Conditions Or Features The Information For This Factor Must Be Provided In Section H Of The Sf 330. Note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Instead Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. Experience In Construction Period Services: Experience In Construction Period Services Must Be Demonstrated Via Project Experience. These May Be The Same Projects Identified Above In Factor 1; However, The Firm Shall Clearly Delineate The Types Of Construction Period Services Performed For Each. Refer To The Statement Of Work For Review Timeline Expectations. Project Descriptions Must Include Experience With: Solicitation Support Services, Professional Field Inspections During The Construction Period Coordination With Commissioning Requirements Review Of Construction Submittals Support In Answering Requests For Information During The Construction Period. Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates. Attendance At Weekly Conference Calls Providing Minutes Of Meetings Between The Ae, Va, And Contractors Pre-final Inspection Site Visits Generation Of Punch-list Reports, And Production Of As-built Documentation. The Firm Shall Provide A Detailed Description Of Projects Worked That Illustrate Experience In These Areas. Projects Must Be Within The Last Ten (10) Years. In Addition, The Firm Must Include A Description Of Experience Addressing Unforeseen Conditions And Emergent Situations, Conducting Situation Evaluations, And Making Midcourse Corrections. Include Description On How The Firm Can Be Proactive Or Responsive In These Situations. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Secondary Selection Criterion*: Geographic Location. Location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Tomah Va Medical Center 500 E Veterans Street, Tomah, Wi. 54660. . Determination Of The Mileage Will Be Based On Google Maps (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. 5. Submission Requirements: The Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: Submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Johnna Mcgraw At Johnna.mcgraw@va.gov . This Must Include Parts I And Ii And Any Applicable Attachments. The Submission Must Include The Sf 330, Architect-engineer Qualifications (form Is Available Online At Https://www.gsa.gov/reference/forms/architectengineer-qualifications). The Sf 330 Submission Is Due By January 10th 2025 At 1pm Est. The Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. The Subject Line Of The Email Must Read: Sf 330 Submission Fire Station Design- Tomah Wi. The Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. A Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. Firms Must Include The Following Information In Section B Of The Sf 330 Submission: 1) Sam Unique Entity Identifier 2) Tax Id Number 3) Cage Code 4) Primary Point Of Contact S Email Address And Phone Number. All Questions Must Be Submitted To Johnna Mcgraw With The Subject Line Sf 330 Questions Fire Station Design-tomah Wi. The Cutoff For Question Submission Is 1:00 Pm Est On December 16th, 2024. Questions Will Be Answered Through Modification To The Pre-sol Notice Posted To Contract Opportunities At Sam.gov. This Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. All Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission, Written Response Submission, And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. All Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. Sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. It Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330.
DEPT OF THE NAVY USA Tender
Scraps
United States
Closing Date9 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n743.49|wvm|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001aa|25|365|0001ab|lot|see Dd1423|0001ac|1|150||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a
|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--government Testing (sep 1989)|7|1|0001ac|150|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000|30|x||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
progress Payments (nov 2021)|4|||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|13|335931|600||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
type Of Contract (apr 1984)|1|firm Fixed|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x||
evaluation Of First Article Testing|3|x|$42,000||
this Amendment Is Issued To Update Solicitation Clauses.
this Requirement Is Not A Small Business Set-aside And Is Full And Open.
\
---this Requirement Is Not A Small Business Set-aside.---
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already Onfile At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. The Following Proposed Delivery Schedule Applies:
submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery.
weld Procedure And Qual Data 120 Days Adc Lt
approval Of Weld Procedures And Qual Data
60 Days After Receipt
fat Report 150 Days After Approval Of Pr Lt
approval Of Fat Report 30 Days After Receipt Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract.
4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000.
6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation.
7. This Solicitation Requires First Article Testing. Far 52.290-4 First Article Approval - Government Testing For More Details.
8. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Or Faxed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=1197258 |53711| C| |d|0001 | C|49998|0876328
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080211|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;the Electrical Hull Fitting And Transmitter Cable Assembly For The An/bst-1 Must Be In Accordance With Naval Ship Engineering Center Drawing 803-1197258, Except As Amplified Or Modified Herein.;
3.2 ;ls2swu-12 Cable Is To Be Used In Lieu Of Ls2swua-12 Cable.;
3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.4 ;the First Article Test (fat) Sample(s) Must Not Be Delivered Against The Contract Quantity.;
3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;receptacle Body, Item 14;
material - ;qq-n-281, Class A;
part - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
material - ;qq-n-286, Form 2, Cold Drawn Or Hot Finished, Annealed And Age Hardened And Must Meet The Mechanical Requirements Cited In Note 2.h Of Drawing 803-1197258 Except The Brinell Hardness Minimum Is 250 Instead Of 265 As Listed In Note 2.h;
3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;each Electrical Hull Fitting Assembly;
performance - ;mil-dtl-24231, Table I For Type Iv And Note 22 On Drawing 803-1197258;
acceptance - ;mil-dtl-24231;
test - ;dye Penetrant Inspection;
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Annealing And Age Hardening
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - Qq-n-286
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1); Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240.
(207-438-5445) Kittery, Me 03904-5000; For First Article Tests In Accordance With The ;requirements Of Mil-dtl-24231, Table I For Type Iv And Note 21 On Drawing 803-1197258; .
3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection -
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting -
3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt
- Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 12 - See Clause 52.209-3 For Submittal Timeframes.
PUBLIC BUILDINGS SERVICE USA Tender
Civil And Construction...+1Building Construction
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents
Details: This Is A Sources Sought Notice. No Proposals Are Being Requested Or Will Be Accepted In Response To This Posting. If You Are Interested In Proposing On The General Scope Of Work Stated Below For A Design-build Project, Please Respond By Email Only To Krista.miller@gsa.gov. Please Provide Your Bonding Capacity, A Capability Statement, And Your Small Business And Small Business Socioeconomic Status, If Any. Please Include In Your Capability Statement Projects Which Your Firm Has Completed That Are Particularly Relevant To This Scope Of Work, Especially Involving Exterior Structural And Glazing Improvements, And/or Performed In Hawaii. general Statement Of Work Summary: the Prince Jonah Kuhio Kalaniana’ole (pjkk) Federal Building And Courthouse Is Located At 300
ala Moana Blvd., Honolulu, Within The Hawaii Capital District And On The Outskirts Of The Downtown
central Business District. This Reinforced, Cast In Place Concrete With Concrete Masonry And Glass
curtain Walls Is A Two-building Mid-century Modern Complex Originally Constructed In 1977. The
illuminated Entry Pavilion Was Originally Designed By Gensler Sf And Constructed By Swinerton
construction In January 2015. The Illuminated Entry Pavilion Design Was An Elegant, Iconic Aia
award Winning Design That Unified Two Separate Entries Into A Single, Sky Lighted And Transparent
entrance For The Pjkk Complex. The Single Portal/pavilion Simplified The Circulation For The Public
and Created A Strong Sense Of Entry For Pjkk. on April 6, 2021 A Fire Occurred At The Entry Pavilion That Created Significant Damage. On January
24, 2022, Clifford Planning Architecture Completed A Fire Investigation Report That Stated “it Is
probable The Entry Pavilion Fire Initiated Was A Result Of An Electrical Fault Within The Led Light Panel
installed Adjacent To The Bottom Panel Of The South Wall Of The Entry Pavilion. Low Level Arcing Over
a Period Of Time Was The Likely Source Of Heat For Ignition Of The Acrylic Panel Material” (see
volume 4 – Fire Investigation). As Further Defined In The Fire Investigation Report, There Was Fire
damage To Architectural Finishes And Structural Members. The Scope Of Work For The Entry Pavilion
includes, But Is Not Limited To, Installing (2) Temporary Covered Entry Tunnels To The Existing United
states Marshal Service (usms) And Federal Protection Services (fps) Security Check-point
locations, Providing Code Compliant Construction Documents And Full Design Services That Adhere
to The Original Gensler Design And Architectural Appearance Of The Original Entry Pavilion, While
also Making The Necessary Design Changes To Address The Issues That Contributed To The Fire And
smoke Damage As Further Defined In Volume 4 - Fire Investigation. The Design Should Also
include Solutions For The Following Known Building Maintenance Issues: 1. The Original Design Led Panels Were Located Behind Heavy Glass Panels That Created
issues For Regular Maintenance And Care. 2. The Original Designed Entry Door Operated On A Small Pin That Would Fail And Was Difficult
to Replace. in Addition To The Scope Above, The Design And Construction Of The Courthouse Hardening Upgrades To The
entry Pavilion And Ground Level Windows And Doors Facing Halekauwila Street And Ala Moana Boulevard
are A Requirement For This Project. The Judiciary Had Previously Sought From Congress Supplemental
appropriations To Fund Enhanced Security Measures To Protect Judges And The Judicial Process In Response
to The Civil Unrest Following The Murder Of George Floyd And The January 6th Attack On The U.s. Capitol.
the Judicial Conference Approved Funding To Begin Enhanced Security Measure Projects To Harden
courthouses. initial Stakeholders From The General Services Administration (gsa), The Administrative Office Of The U.s.
courts (ao), U.s Marshals Service (usms), And The Federal Protective Service (fps) Worked Together To
analyze Potential Security Measures To Be Used In This Program. This Scope Of Work Covers The
countermeasures For The Pjkk Courthouse In Honolulu, Hi: 1. Windows: Impact Resistant Window Glazing System At The Entry Pavilion And
ground Level Courthouse Windows And Doors Facing Halekauwila Street And Ala
moana Boulevard, Excluding Ground Level Windows Along The United States
marshal Service Offices And Within The Confines Of The Exterior Secured Courtyard:
● Windows / Doors / Frames – Shall Meet A Minimum 15-minute Forced
entry Resistance Per Astm F3038 Or Dept Of State (dos)
sd-std.01.01 Rev G (amended) – Forced Entry Resistance Is The
standard That Shall Apply.
● The Contractor Shall Install A New Shatter Break Resistance Riot Glazing
system
● Contractor Is Responsible To Field Verify And Measure Each Opening.
2. Exterior Doors And Hardware (see Volume 2b_existing Pavilion Design
drawings For Specific Locations):
● All Exterior Pavilion Entry Doors And Interior Courthouse Pavilion Vestibule
doors Shall Be Equipped With Hardware And Controls To Engage
electro-magnetic And/or Electro-mechanical Remote Locks.
● Remote Locks Shall Give The Ability For The Court Security Officers And The
usms To Lock All Doors Immediately In Case Of An Emergency.
● Remote Lock Override Control Shall Run To The Main Usms / Cso Control
room the Courthouse Hardening Upgrades Will Upgrade The Ground Level Courthouse Windows And
doors And Replace All Window, Exterior Doors, And Hardware Included In The Original Gensler
designed Pjkk Entry Pavilion. the Forced Entry Resistance Doors And Windows Shall Meet A Minimum 15 Minute Forced Entry
resistance In Accordance With Astm Standard F3038-21, With The Following Exception. Astm
standard F3038-21 Requires A Full Scale Test For Each Unique System Size And Configuration,
however, If The Actual Overall System Dimensions Are Within 6” (both Height And Width Dimension)
of Another Successfully Tested System Meeting The Requirements Of Astm Standard 3038-21, And
the System Components Are Of Similar Size And Makeup, The Proposed System Shall Be Considered
acceptable. Support Documentation Shall Be Provided Prior To Installation. the Construction Services Scope Of Work Includes Demolition Of The Remaining Pavilion Structure,
build-out Of (2) Temporary Tunnels To Access The Existing Usms And Fps Security Check-points,
the Build-out Of The New Entry Pavilion, Installation Of The Courthouse Hardening Window And Door
upgrades, Including But Not Limited To Structural, Architectural Finishes, Lighting, Mechanical,
electrical, Plumbing, Fire And Life Safety, And Data/cabling Infrastructure. the Federal Building And Courthouse Must Remain Fully Operational Throughout Design And
construction. All Construction Work Related To This Project Shall Be Scheduled From 5:00 Pm To 7:00
am, After Normal Building Operation Hours To Minimize Disruptions To Building Occupants And To
maintain Public Safety. Normal Building Operation Hours Are From 7:00 A.m. To 5:00 P.m.
weekdays. the Project Delivery Method Is Design-build (db).
the Db Contractor Shall Provide All Supervision, Labor, Materials, Equipment, And Testing Required
to Accomplish The Design And Construction For The Pjkk Entry Pavilion And Courthouse Hardening
project. design Services Shall Include, But Are Not Limited To, Design And Certification By A State Of Hawaii
licensed Architect-engineer (a/e), Design Reviews, Weekly Progress Meetings, Design
development, Construction Documents, Basis Of Design Documents, Site Investigation, Site
measurements And Verification, Code Compliance, Reproduction Services, Consultant Coordination,
contract Administration, Contract Close-out, Record Drawings And As-builts.
construction Services Shall Include, But Are Not Limited To, Complete And Timely Submission Of
security Clearance Applications For Workers (hspd-12 And Tenant Agency Review), Project
schedule, Cost Estimating, 3-week Look Ahead Schedules, Demolition, Site Supervision, Drywall,
mechanical, Electrical, Automatic Sprinkler System, Architectural Finishes, Submittal Samples,
submittal Schedule, Hvac, System Balancing, Structural, Fire And Life Safety, Security Infrastructure,
protocols For Utility Outages, Separation Of Utilities To Avoid Impacts To Occupied Areas, Temporary
barricade Plan, Noise Mitigation, Clean Up After Work, Lead Weekly Meetings And Provide Minutes,
file And Record Management, And All Other Work To Meet The Contract Requirements.
Nueva Ecija University Of Science And Technology - NEUST Tender
Electronics Equipment...+1Electrical and Electronics
Philippines
Closing Date6 Jan 2025
Tender AmountPHP 6.4 Million (USD 110.6 K)
Details: Description Invitation To Bid The Nueva Ecija University Of Science And Technology (neust) Through The Bids And Awards Committee (bac), Hereby Invites All Interested Entities Registered With The Philippine Government Electronic Procurement System (philgeps) To Bid For The Hereunder Project, Subject To The General Conditions Stated Herein. Name Of Project: Upgrading Of Programmable Logic Controller (plc) System In The Mechatronics Laboratory Location: College Of Industrial Technology, Neust Gen. Tinio (st.) Campus, Cabanatuan City Approved Budget For The Contract: Php6,419,764.00 Contract Duration: 120 Calendar Days Source Of Fund: Income Cost Of Bidding Documents: Php10,000.00 Project Description: 1lot Item No. Description Qty Unit 1 Programmable Logic Controller For Mechatronics Training System Training Device For The A4 Mounting Frame Or As A Desktop Device With Modern, Industrially Used Programmable Logic Controller And System Interfaces For A Mechatronics Station. It Ensures Highest Performance And User-friendliness For Medium And High-end Applications Of Machine And Plant Automation. Benefits • Stable, Powder-coated, Sheet-steel Mounting System • Suitable For One Mechatronics Station And Suitable As A Tabletop Unit • Mounting Rail For 19" Module Is Attached To The Mounting System • Equipped With 4 Mm Safety Sockets • Integrated Power Supply Further Information The Stable Powder-coated Sheet Steel Support System Contains A 19" Module System Plug Syslink (9 Te), With 2x Syslink Plug-in Connection For Mechatronics Station And Control Panel, Each With 8 Digital Inputs And 8 Digital Outputs And 1x D-sub 15-pin Plug-in Connection With 4 Analog Inputs And 2 Analog Outputs, Emergency Stop Bridge For Connecting A Safety Circuit To Switch Off 8 Digital Outputs. Technical Data: - Dimensions (w X H): 305 Mm X 297 Mm (size 1) - Integrated Power Pack: 100 ... 240 V Ac ±10%; Necessary Accessories: Iec Cables 5 Units 2 Programmable Logic Controller For Electro-pneumatics Training Device For Er Recording Frame (pneumatic/hydraulic) For Solutions In Discrete And Stand-alone Automation Applications Of The Lower Power Range. Further Information The Modular Small Controller Can Be Used For Solutions In Discrete And Stand-alone Automation Applications In The Lower Performance Range. Technical Details: • Digital Inputs On 4 Mm Safety Sockets And Switches/buttons For Signal Simulation • Digital Outputs On 4 Mm Safety Sockets • Analog Inputs And Outputs On 4 Mm Safety Sockets • Simulation Module With 2x Syslink Connector For Control Panel With Digital Inputs And Outputs And D-sub 15-pin Connector With Analog Inputs And Outputs; 4 Mm Safety Sockets For Emergency Stop Bridge To Connect A Safety Circuit For Digital Outputs The Carrier System Consists Of A Lightweight Injection-moulded Housing, Suitable For An Er Mounting Frame Size 2, Dimensions (w X H X D): 364 Mm X 170 Mm X Approx. 80 Mm. The Unit Is Delivered Fully Assembled. Special Licensing Rules Apply To Schools And Training Centers In The Commercial Sector. 6 Units 3 Electro-pneumatics Simulator Software Simulation Software For Pneumatics Is An Application For Creating And Simulating Pneumatic And Electropneumatic Circuits. Valuable Technical Skills Are Learned By Designing Circuits And Simulating Them Interactively. Learning Goals • Creation Of Circuit Diagrams • Identifying And Preventing Errors • Optimization Of Solution Circuit Diagrams Through Interactive Simulations • Understanding Solution Development • Observing Effects Through Real-time Simulations Benefits • Convenient Creation Of Circuit Diagrams And Their Interactive Simulation • Content Tailored To Festo Didactic Learning Systems • Can Be Used Online And Offline • Learning The Effects Of Changes In A Technical Setup And Observing Their Immediate Consequences Through Real-time Simulation • Extensive Library Of Pneumatic, Hydraulic, Electrical Engineering, Electronic And Digital Components. • Further Information Simulation Software For Pneumatics Makes It Possible To Create (electro-)pneumatic Circuits And Simulate Them Interactively. State Changes And Switching Processes Are Calculated Realistically, And Interactive Interventions Can Be Made By Actuating Switches Or Switching Valves. Signals Can Also Be Transmitted Via Connected Hardware Or From Other Programs. In Addition To Real Measuring Devices, Fluidsim 6 Offers Virtual Measuring Devices. Circuits Can Be Constructed From A Library Of Various Electropneumatic Components. In Addition, Grafcet Diagrams Can Be Created And Included In The Simulation If Desired. Simulation Software For Pneumatics Covers The Following Topics: • Pneumatics/electropneumatics • Closed-loop Pneumatics • Vacuum Technology • Electrical Controllers • Digital Technology • Grafcet 6 Units Warranty: • One (1) Year Against Factory Defects Must Include: • On-site Installation And Testing • Three (3) Days Rigid Training For Faculty And Laboratory Technicians • Must Provide Official Partner Or Authorization To Bid From Manufacturer • Iso 9001:2015 Quality Management System Certification From The Manufacturer • Iso 14001: 2015 Environmental Management Certificate From The Manufacturer The Summary Of The Bidding Activities Is As Follows: Activities Schedule 1. Advertisement December 11-18, 2024 2. Issuance Of Bid Documents December 19, 2024 To January 3, 2025 3. Pre-bid Conference December 19, 2024, 2:30pm (via Zoom) 4. Deadline For Submission Of Bids (manual Submission) January 3, 2025, Until 5:00pm Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City 5. Opening Of Bids (face To Face) January 6, 2025, 9:00am Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City General Conditions: All Particulars To The Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 And Its Implementing Rules And Regulations. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Business Organizations With At Least Sixty Percent (60%) Interest Or Ownership Of At Least 60% Of The Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Business Organizations Of A Country Where The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 19, 2024 To January 3, 2025 Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Pay The Applicable Fee For The Bidding Documents Not Later Than The Deadline For Submission Of Bids. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 3, 2025, Until 5:00pm. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In The Pbd. Late Bids Shall Not Be Accepted. On The Last Day For The Submission Of Bids And No Prospective Bidder/s Submitted Its Bid Documents Or Only One (1) Bid Was Submitted For The Above-mentioned Project, The Same Is Deemed Extended Until January 10, 2025, 5:00 Pm. This Is To Protect The Interest Of The University And Full Opportunity For A Competitive Bidding May Be Achieved. The University Likewise Reserves The Right To Cause Extension Or Postponement Of The Filing Of Bids Should Similar Situation Arises. Bid Opening Shall Be On January 6, 2025, 9:00 Am At The Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City Unless Extended. Bids Will Be Opened In The Presence Of The Bidder Or His/her/its Duly Authorized Representative/s. Failure To Attend During The Opening Of Bids Shall Be Considered A Waiver On The Part Of The Bidder Who Likewise Waives His/her/its Right To Raise Questions During The Bidding Procedures. The Nueva Ecija University Of Science And Technology Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For More Information Concerning This Bidding, Please Contact The Following: Engr. Joel G. De Mesa Head, Bac Secretariat For Goods And Services Neust Gen. Tinio St., Cabanatuan City Email Address: Neust.bacsec@gmail.com Approved By: Dr. Honorato P. Panahon (sgd.) Bac Chairperson
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||x||
annual Representations And Certifications (may 2024)|13|334515|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Purpose Of This Amendment Is To Extend The Due Date To 06 Jan 2025. All Other Terms And Conditions Remain The Same.
the Purpose Of This Amendment Is To Change The Procurement From A Restricted Environment To A Sbsa. The Solicitation Point Of Contact Is Hereby Changed To Carly Gassert, Carly.a.gassert.civ@us.navy.mil. Revised Irpod And Drawing Documents Are Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory. The Due Date Is Hereby Extended To 06 Dec 2024. All Other Terms And Conditions Remain The Same.
unless Otherwise Specified, Pricing For This Request For Quote Is Valid For 60 Days After The Closing Date As Indicated On The Proposal. Please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via E-mail Or Neco Please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such Ase-mail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
technical Documents Associated With This Solicitation, Such As Drawings, Individual Repair Part Ordering Data (irpod), Strs And Other Procurement Related Documents May Be Obtained At:
https://logistics.unnpp.gov
this Website Requires A Password And Pre-registration. Please Contact The E-commerce Help Desk At 518-395-4357 To Register Or For Help Logging Into The Website.
a Hard Copy Of The Individual Repair Part Ordering Data (irpod) And/or Drawingswill Not Be Mailed To You.
to Request A Copy Of The Solicitation, Please Contact The Contracting Officer Listed And Provide Your Cage Code.
in Order For Your Offer To Be Considered, You Must Submit Your Quote Prior To The Closing Date/time Listed On This Solicitation.
section "s" Of Clause 52.212-4, Order Of Precedence, Is Not Applicable To This Procurement.
\
all Drawings Required For Procurement Of 109022gp8, Probe & Cable Assembly Havebeen Identified And A New Irpod Has Been Created To Include These Drawings. Pd Has Been Revalidated And New Irpod And All Drawings Are Now Available In E-commerce.
unless Otherwise Specified, Pricing For This Request For Quote Is Valid For 60 Days After The Closing Date As Indicated On The Proposal. Please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via E-mail Or Neco Please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such Ase-mail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
technical Documents Associated With This Solicitation, Such As Drawings, Individual Repair Part Ordering Data (irpod), Strs And Other Procurement Related Documents May Be Obtained At:
https://logistics.unnpp.gov
this Website Requires A Password And Pre-registration. Please Contact The E-commerce Help Desk At 518-395-4357 To Register Or For Help Logging Into The Website.
a Hard Copy Of The Individual Repair Part Ordering Data (irpod) And/or Drawingswill Not Be Mailed To You.
to Request A Copy Of The Solicitation, Please Contact The Contracting Officer Listed And Provide Your Cage Code.
in Order For Your Offer To Be Considered, You Must Submit Your Quote Prior To The Closing Date/time Listed On This Solicitation.
section "s" Of Clause 52.212-4, Order Of Precedence, Is Not Applicable To This Procurement.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
the Packaging Label Shall Be Marked With The Nomenclature As Cited On Irpod. date Of First Submission=eoc
submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock
number And Item Nomenclature Specified In The Schedule Of Supply/services.
di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control
number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev).
Batangas State University Tender
Publishing and Printing
Philippines
Closing Date10 Jan 2025
Tender AmountPHP 458.5 K (USD 7.9 K)
Details: Description Republic Of The Philippines Batangas State University Batangas City Request For Quotation "procurement Of Semi-expandable Ict Equipment For Various Offices " 1. The Batangas State University (batstate U) Through The Bids And Awards Committee Invites Interested Firms/supplier To Submit Quotation For The Project "procurement Of Semi-expandable Ict Equipment For Various Offices " With An Approved Budget For The Contract (abc) Four Hundred Fifty-eight Thousand Five Hundred Pesos Only (php 458,500.00). Quotation Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening. Item No. Qty Description Total 1 4 Unit All In One Printer Functions : Print, Scan, Copy Memory: 128mb Display: 1 Line Lcd Interface: Hi-speed Usb 2.0 Wired/wireless Network: Wireless Lan Print Speed (laser Comparable): Up To 17ipm (mono) And 16.5ipm (colour) Print Speed (fast Mode): Up To 30ppm (mono) And 26ppm (colour) Print Resolution: Up To 1200 X 6000 Dpi 2-sided Print: Automatic (up To A4/ltr) Direct Wireless Connection: Wi-fi Direct Maximum Copy Size: A4 Copy Speed (laser Comparable): Up To 13ipm (mono) And 10.5ipm (colour) Copy Speed (fcot): Up To 10.5 Sec (mono) And 21 Sec (colour) Copy Resolution (colour): Print Max. 1200 X 2400 Dpi; Scan Max. 1200 X 600 Dpi Maximum Scan Size: Up To A4 Scan Resolution: Optical: Up To 1200 X 2400 Dpi; Adf: Up To 1200 X 600 Dpi) Scan Speed: From 3.35 Sec/4.38 Sec (a4 Size, 100 X 100 Dpi) Paper Input (standard Type): Up To 150 Sheets (80g/m2) Paper Output: Up To 50 Sheets (up To A4) Paper Handling Sizes: A4, Ltr, Exe, A5, A6, Photo 4" X 6", Indexcard 5" X 8", C5 Envelope, Com-10, Dl Envelope, Monarch 57,600.00 2 1 Unit All-in-one Color Ink Tank Printer Function: Multi-function (print, Scan & Copy) Output Color: Color Print Technology: Inkjet Print Speed: Black - 8.8ppm; Color - 5ppm Number Of Nozzles: Total 1,472 Nozzles Resolution: 4800 X 1200dpi (max.) Paper Size: A4, A5, B5, Letter, Legal, 4 X 6 Inch, 5 X 7 Inch, 8x 10 Inch, Envelopes (dl, Com10), Square (5 X 5 Inch), Business Card. Custom: (width 55 – 215.9mm, Length 89 – 676mm) Paper Type: Plain Paper, High Resolution Paper, Photo Paper Plus Glossy Ii, Photo Paper Plus Semigloss, Matte Photo Paper, Envelope, Glossy Photo Paper, Photo Sticker Paper Weight: Plain Paper: 64 – 105g/m2, Canon Specialty Paper 275g/m2; Photo Paper Plus Glossy Ii (pp-201). Input Capacity: 100 Sheets Input Tray Output Capacity: 50 Sheets Output Tray Duplex Printing: Manual (driver Support Provided) Scanner Type: Flatbed Scanning Speed: 19s Scan Resolution: 600 X 1 200dpi Scan Paper Size: A4, Letter 10,700.00 Page 1 Of 5 Item No. Qty Description Total Multiple Copy: 1 – 20 Pages Copy Speed: 3.5ppm Connectivity: 1 Hi-speed Usb 2.0, Wi-fi Display: 1.2 Inch Segment Lcd Display Wireless: Yes, Ieee 802.11n / Ieee 802.11g / Ieee 802.11b Ink Tank: Yes Power: Input Voltage: Ac 100 – 240v; 50 / 60hz; Power Consumption: 11w (1.2w Standby) Ink Bottle: Gi-790 Black (6,000) Pages, Gi-790 Cyan, Magenta, Yellow (7,000) Pages 3 3 Unit All-in-one Ink Tank Printer Printer Type: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Printer Language: Esc/p-r, Esc/p Raster Nozzle Configuration: 180 X 1 Nozzles Black, 59 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 5760 X 1440 Dpi Automatic 2-sided Printing: No Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 69 Sec Per Photo (border) / 90 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 33.0 Ppm / 15.0 Ppm*2 Iso 24734, A4 Simplex (black / Colour): Up To 10.0 Ipm / 5.0 Ipm*2 First Page Out Time From Ready Mode (black / Colour): Approx. 10 Sec / 16 Sec*2 Maximum Copies From Standalone: 20 Copies Maximum Copy Resolution: 600 X 600 Dpi Maximum Copy Size: A4, Letter Iso 29183, A4 Simplex (black / Colour): Up To 7.0 Ipm / 1.7 Ipm Scanner Type: Flatbed Colour Image Scanner Sensor Type: Cis Optical Resolution: 600 X 1200 Dpi Maximum Scan Area: 216 X 297 Mm Scanner Bit Depth (colour): 48-bit Input, 24-bit Output Scanner Bit Depth (grayscale): 16-bit Input, 8-bit Output Scanner Bit Depth (black & White): 16-bit Input, 1-bit Output Flatbed (black / Colour): 200dpi: Up To 11 Sec / Up To 32 Sec Number Of Paper Trays: 1 Standard Paper Input Capacity: Up To 100 Sheets Of Plain Paper (80 G/m2); Up To 20 Sheets Of Premium Glossy Photo Paper Output Capacity: Up To 30 Sheets Of Plain Paper (80 G/m2); Up To 20 Sheets Of Premium Glossy Photo Paper Maximum Paper Size: 215.9 X 1200 Mm Paper Sizes: Legal (8.5 X 14"), Indian-legal (215 X 345 Mm), 8.5 X 13", Letter, A4, 16k (195 X 270 Mm), B5, A5, B6, A6, Hagaki (100 X 148 Mm), 5 X 7", 5 X 8", 4 X 6", Envelopes: #10, Dl, C6 Print Margin: 0 Mm Top, Left, Right, Bottom Via Custom Settings In Printer Driver*3 Operating System Compatibility: Windows Xp / Xp Professional / Vista / 7 / 8 / 8.1 / 10 Windows Server 2003 / 2008 / 2012 / 2016 / 2019 Mac Os X 10.6.8 Or Later Usb: Usb 2.0 Printer Software: Epson Scansmart 28,800.00 4 5 Unit Color Document Scanner Specifications Scanner: 249,500.00 Page 2 Of 5 Item No. Qty Description Total Scanner Type: Sheet-fed, 1-pass, Duplex Color Scanner Optical Resolution:600 Dpi Maximum Resolution:1200 Dpi Interpolated Monochrome Bit Depth:1-bitoutput Resolution:50 To 1200 Dpi Effective Pixels:5100 X 9300 Light Source:3-color Rgb Led Scanning Speed:letter Size: 45 Ppm/70 Ipm: 300 Dpi Black-and-white, Color, Gray Automatic Document Feeder: Capacity:100 Sheets Document Sizes: Paper Size Minimum: 2" X 2" Paper Size Maximum: 8.5" X 240" At 200 Dpi, 8.5" X 215" At 300 Dpi Daily Duty Cycle: 5,000 Sheets Paper Weight: 27 –413 G/m2 Consumables: Roller Assembly Kit: 200,000 Pages General: Operating Systems: Windows® 10 Windows 8/8.1 Windows 7 Mac Os X® 10.9.8 – Macos® 10.12.x Software Requires Internet Connection For Download And Installation. Temperature: Operating: 41 ° To 95 °f (5 ° To 35 °c) Storage: -13 ° To 140 °f (-25 ° To 60 °c) Humidity: Operating: 10 – 80% (no Condensation) Dimensions: Product Only: 11.7" X 7.7" X 12.5" Product In Package: 14.5" X 9.9" X 11.5" Weight: Product Only: 8.1 Lb. Product In Package: 10.6 Lb. 5 4 Unit Computer Speaker Dimensions Height: 110 Mm Width: 90 Mm Depth: 88 Mm Weight: .25 Kg Technical Specifications Total Watt (rms): 1.2w 3.5 Mm Input: 1 Usb Cable For Power: 1 Controls Power And Volume Controls On Right Speaker 3,000.00 6 3 Unit Computer Web Camera Resolution: Full Hd 1080p, 1920*1080 Pixels Lens Type: Full Hd Glass Lens Viewing Angle: 70 Degrees Focus Type: Fixed Focus Focus Range: 60cm And Beyond Built-in Mic.: Digital Hd Mic. Output Format: Mjpeg Frame Rate: 30fps Usb: Usb 2.0 System Requirements Compatible With: Windows 7 /8 / 8.1 / 10 Or Later Works In Usb Video Device Class (uvc) Mode: Mac Os 10.10 Or Later 3,900.00 Page 3 Of 5 Item No. Qty Description Total Linux Os 2.6 Or Later Chrome Os 6.0 Or Later Android V6.0 Or Later Compatible With Social And Video Calling Software Of The Above System 7 1 Unit Dot Matrix Printer Print Method: Impact Dot Matrix Print Direction: Bi-direction With Logic Seeking Number Of Pins In Head: 9 Pins Print Speed: High Speed Draft: (10 / 12 / 15 Cpi): 347 / 357 / 390 Cps (condensed, 17 / 20 Cpi): 383 / 298 Cps Draft: (10 / 12 / 15 Cpi): 260 / 312 / 223 Cps (condensed, 17 / 20 Cpi): 222 / 260 Cps (emphasized, 10 Cpi): 130 Cps Nlq: (10 / 12 / 15 / 17 / 20 Cpi): 65 / 78 / 55 / 47 / 56 Cps Reliability: Printhead Life: Approx. 400 Million Strokes/wire Mean Print Volume Between Failure (mvbf): Approx. 20 Million Lines (except Print Head) Mean Time Between Failure (mtbf): Approx. 10,000 Poh (25% Duty) Print Characteristics: Character Sets: Italic Table, Pc437 (us Standard Europe), Pc850 (multilingual), Pc860 (portugese), Pc861 (icelandic), Pc863 (canadian French), Pc865 (nordic), Abicomp, Brascii, Roman 8, Iso Latin 1, Pc 858, Iso 8859-15 Paper Path: Manual Insertion: Rear In, Top Out Push Tractor: Rear In, Top Out Paper Media: Cut Sheet (single Sheet): Length: 100 ~ 364mm (3.9 ~ 14.3") Width: 100 ~ 257mm (3.9 ~ 10.1") Thickness: 0.065 ~ 0.14mm (0.0025 ~ 0.0055") Cut Sheet (multi-part Forms): Length: 100 ~ 364mm (3.9 ~ 14.3") Width: 100 ~ 257mm (3.9 ~ 10.1") Thickness: 0.12 ~ 0.39mm (0.0047 ~ 0.015") (total) Continuous Paper (single Sheet / Multi-part): Length: 101.6 ~ 558.8mm (4.0 ~ 22.0") Width: 101.6 ~ 254.0mm 4.0 ~ 10.0") Thickness: 0.065 ~ 0.39mm (0.0025 ~ 0.015") (total) Envelope (no.6): 14,000.00 Page 4 Of 5 Item No. Qty Description Total Length: 92mm (3.6") Width: 165mm (6.5") Thickness: 0.16 ~ 0.52mm (0.0063 ~ 0,0205") (total) Envelope (no.10): Length: 105mm (4.1") Width: 241mm (9.5") Thickness: 0.16 ~ 0.52mm (0.0063 ~ 0.0205") (total) Roll Paper: Width: 216mm (8.5") Thickness: 0.07 ~ 0.09mm (0.0028 ~ 0.0035") Supported Os And Applications: Supported Os: Microsoft® Windows® 2000 / Xp / Vista / 7 / 8 / 8.1 / 10 8 6 Piece External Hard Drive Connection Interface: Usb 3.0 Capacity: 1tb Storage Media: 2.5" Hdd 19,200.00 9 1 Unit Monitor 34 Inches” Wqhd (3440x1440) High Resolution 21:9 Ultra Wide Display 121% Srgb 144hz High Refresh Rate Immersive 1500r Curvature 144hz Curved Monitor 20,000.00 10 14 Piece Ssd Form Factor 2.5? Capacity 1 Tb Interface Sata Iii Dimensions (l X W X H) 0.28? X 3.96? X 2.75? Sequential Read Performance 535mb/s Sequential Write Performance 450mb/s" 51,800.00 Note: Kindly Indicate The Brand On Your Quotation. 2. Philgeps Registration Certificate And Other Business Permits Shall Be Attached Upon Submission Of The Quotation. 3. The Quotation Must Be Submitted (can Also Be Send Thru Fax And Email At The Contact Details Listed Below) Or To The Rizal Avenue Extension, Batangas City And Shall Be Received By The Committee On Or Before 5:00 Pm Of January 10, 2025. E-mail : Procurement.central.external@g.batstate-u.edu.ph 4. The Bsu Reserves The Right To Reject Any Or All Quotations And/or Proposals And Waive Any Formalities/informalities Therein And To Accept Such Bids It May Consider As Most Advantageous To The Agency And To The Government. Batstate U Neither Assumes Any Obligation For Whatsoever Losses That May Be Incurred In The Preparation Of Bids, Nor Does It Guarantee That An Award Will Be Made. Mr. Jonas Erik L Ebora Assistant Director, Procurement Rizal Avenue Extension, Batangas City 980-0385 Loc. 1230
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Software and IT Solutions
United States
Closing Date10 Jan 2025
Tender AmountRefer Documents
Details: Sources Sought Notice sources Sought Notice page 4 Of 4
sources Sought Notice
*= Required Field
sources Sought Notice page 1 Of 4
this Not A Request For Quotes; The Government Is Seeking Information For Market Research Purposes Only. the West Texas Va Health Care System (wtvahcs) Requires Comprehensive Maintenance And Repair Services To Include Hardware /software Support Services, Software Upgrades And Annual Preventive Maintenance/calibration Coverage For The Ge Health Care Case V6.7 Serial Number Ste23140014sa, Muse Nx, And Cardio Day System. The Cardioday Holter System Is Required To Work Seamlessly With Ge Healthcare Muse Nx, Vista, And Ge Healthcare Seer Light Holter Recorders. Server Software Must Be Server Win 2019. Service And Software Agreement Will Cover Software Errors, Technical Support And Clinical Applications Support, Software Updates, And Remote Diagnostics Services.
conformance Standards: a. Contractor Shall Ensure That The Equipment Functions In Conformance With The Latest Published Edition Of The Applicable Standards, Such As: Nfpa-99, Ul, Osha, Jcaho, Va, Etc. And The Manufacturer's Performance Standards/ Specifications As Used When The Equipment Was Originally Procured And That Any Upgrades/updates Will Meet Or Exceed The Stated Standards/specifications. b. Contractor Must Comply With The Privacy Act Of 1974 And The Agency Rules And Regulations Issued Under The Act. c. Contractor Must Comply With Health Insurance Portability And Accountability Act Of 1996 (hipaa) And The Agency Rules And Regulations Issued Under The Act Surrounding Access, Protection And Confidentiality Of Personal Health Information And Individually Identifiable Information.
hours Of Coverage:
a. Contractor Will Provide Technical Telephone Support 24 Hours A Day, 7 Days A Week. Contractor Will Provide A Reasonable Amount Of Clinical Applications Support, Monday Friday, 8:00am To 4:30pm Cst, Excluding Federal Holidays, By Telephone In Response To Inquiries. Contractor Will Make Reasonable Efforts To Respond By Telephone To A Report Of An Error Or Malfunction Within One Hour After Notification By Customer, And Provide On-site Support Within Twenty-four Hours, During Covered Days, Of Notification By Customer.
b. Contractor Will Provide Planned Maintenance For The Hardware In Accordance With Ge Healthcare And Oem Recommended Frequencies And Hardware Specifications As Set Forth In The Ge Healthcare Service Manuals. All Inspections Will Be Scheduled At A Mutually Agreeable Time Between Mondays - Fridays, 8:00am-4:30pm Local Site Time. c. Cor Or Designated Alternate Shall Provide Reasonable Access To The Equipment, Reasonable Working Space, And A Reasonable Safe, Hazard-free Operating Environment For Contractor S Employees And Representatives Providing Services Hereunder During Hours Of Coverage.
d. Federal Holidays Observed By The Wtvahcs Are: New Years' Day Labor Day Martin Luther King Day Columbus Day Presidents' Day Veterans' Day Memorial Day Thanksgiving Day Juneteenth Day Christmas Day Independence Day unscheduled Maintenance (repair Service):
a. Contractor Shall Maintain The Equipment In Accordance With Manufacturer S Guidance With An Onsite Response Time Within 24 Hours For Repairs (next Business Day). Contractor Shall Make Reasonable Efforts For Fse To Respond By Telephone Within One (1) Hour After Notification Of A Malfunction. The Co Or Cor Has The Authority To Approve/request A Service Call From The Contractor. b. Coverage Includes On-site Support, Service Parts, Software, And Labor. c. Contractor Will Provide Telephone Support Per Section C, Iv, Hours Of Coverage.
d. When The Contractor Leaves On-site Location Where Maintenance Services Are Being Performed, The Site Shall Be Left In A Clean, Neat, And Orderly Condition Ensuring The Hospital/clinic Staff And Patients Are Not Subjected To Any Safety Hazards, Including But Not Limited To Expose Wiring, Open Circuit Panels, Or Tripping Hazards. e. The Cor Will Be Informed Personally Or In Writing Of The Equipment Status Prior To The Contractor Leaving The Work Site.
f. The Contractor Is Not Responsible For The Maintenance Of Equipment Listed When Damage Resulted From Act Of God Or When Services From Other Than The Contractor S Personnel Have Been Performed. The Contractor Is Not Responsible For The Maintenance Of Equipment Listed When Damage Results From Government Neglect, Misuse, Abuse, Unauthorized Attachments, Or Alterations To Factory Settings Of The Unit.
scheduled Maintenance:
a. The Contractor Shall Perform Pm Services To Ensure That Equipment Listed In The Schedule Performs In Accordance With Section C, Iii, Conformance Standards. Such Maintenance Will Be Performed At Mutually Agreed Times During Pm Coverage Hours. All Exceptions To The Pm Schedule Shall Be Arranged And Approved In Advance With The Cor.
b. The Contractor Shall Provide And Utilize Procedures And Checklists With Worksheet Originals Indicating Work Performed And Actual Values Obtained (as Applicable). Any Charges For Parts, Services, Manuals, Tools, Or Software Required To Successfully Complete Scheduled Pm Are Included Within This Contract, Unless Specifically Stated In Writing.
c. The Contractor Shall Provide Written Description Of Preventive Maintenance Inspections (pmi). This Description Shall Include An Itemized List Of The Procedures Performed. Pm Services Shall Include, But Need Not Be Limited To, The Following:
1. Cleaning Of Equipment.
2. Calibrating And Lubricating The Equipment.
3. Performing Remedial Maintenance Of Non-emergent Nature.
4. Testing And Replacing Faulty And Worn Parts And/or Parts Likely To Become Faulty, Fail Or Become Worn.
5. Inspecting And Replacing Where Indicated, Electrical Wiring And Cables For Wear And Fraying.
6. Inspecting And Replacing, Where Indicated, All Mechanical Components. 7. Returning The Equipment To The Operating Condition. 8. Providing Documentation Of Services Performed. parts:
a. The Contractor Has Ready Access, No More Than Three (3) Business Days, To All Parts, Including Unique And/or High Mortality Replacement Parts. The Contract Shall Include All Parts Except, If Applicable, Those Parts Specifically Listed As Being Excluded. The Contractor Shall Use New Or Rebuilt Parts Which Meet Or Exceed Oem Standards For Equivalent Quality And Reliability As A New Part. Used Parts Or Those Removed From Another System Shall Not Be Installed Without Specific Approval By The Co Or The Cor.
b. The Contractor Shall Not Modify The System To Facilitate Replacement Parts That Are Not Identical To The Part Being Replaced Unless Such Modification Was Developed, Approved And Released By The Oem.
c. The Following Items Are Excluded From Coverage: User-replaceable Expendable Parts/supplies And Parts Replaced For Cosmetic Reasons. The Contractor Shall Also List Any Additional Excluded Parts Under The Service Contract.
d. Any Hardware, Such As A Hard Drive, Which Contained Patient Information, Must Be Sanitized In Accordance With National Security Agency Standards By Wtvahcs Staff Prior To Being Removed From The Wtvahcs.
service Manuals/tools/equipment:
a. The Wtvahcs Shall Not Provide Tools, (test) Equipment, Service Manuals, Or Service Diagnostic Software To The Contractor. Contractor Shall Obtain, Have On File, And Make Available To Its Fse All Operational And Technical Documentation (such As Operational And Service Manuals, Schematics, And Parts List) Which Are Necessary To Meet The Performance Requirements Of This Contract. b. Contractor Shall Provide The Cor Two (2) Copies Of All Documentation That Pertains To Any Hardware, Software, Or Firmware Upgrade Or Repair. documentation/reports:
the Documentation Shall Include Detailed Descriptions Of The Maintenance Procedures Performed, Including Replaced Parts. In Addition, Each Esr Must, At A Minimum, Document The Following Data Legibly And In Complete Detail: A. Name Of Contractor And Contract Number. B. Name Of Fse Who Performed Services. C. Contractor Service Esr Number/log Number. D. Description Of Problem Reported By Cor. E. Identification Of Equipment Serviced. F. Itemized Description Of Service Performed, With Parts And Part Numbers. G. Itemized Costs Of Any Approved Billable Parts And Services, If Applicable. reporting Requirements: The Contractor Shall Report His Arrival In Person Or By Telephone To Biomedical Engineering. When The Service Is Completed, The Fse Shall Document Services Rendered On A Legible Esr(s). The Fse Shall Check Out With Biomedical Engineering And Submit The Esr(s) To The Cor. If The Cor Is Unavailable, A Copy Of The Esr Will Be Sent To The Cor After The Work For Review.
the North American Industry Classification System (naics) Is 811210 Electronic And Precision Equipment Repair And Maintenance, Service Code (psc) Is J065 - Maintenance, Repair, And Rebuilding Of Equipment Medical, Dental, And Veterinary Equipment And Supplies. The Full-service Contract Will Cover One (1) Base Year And 4 Option Years With A Start Date On Or About May 1, 2025 Through April 30, 2026.
responses To This Notice Shall Include Company/individual Name, Size Status For The Above Reference Naics Code, A Service Capability Statement, Sam Entity Unique Identifier (eui), Duns Number, Address, Point Of Contact And Examples Of Similar Facilities To Which Similar Services Have Been Provided To. Contractors Should Provide Information On Whether They Are Certified Sdvosb, Vosb, Hub Zone, 8(a), Women-owned Concern. If Standard Company Brochures Will Be Provided As A Response To This Source Sought, Ensure That Additional Information Tailored To This Notice Is Included. If You Are In Gsa, Please Provide Schedule And Contract Number.
a Solicitation Is Not Currently Available. If A Solicitation Is Issued, It Will Be Announced On The Contract Opportunities Website Https://sam.gov At A Later Date, And All Interested Parties Must Respond To That Solicitation Announcement Separately From The Response To This Announcement. Contractors Must Be Registered In System For Award Management (sam), See Internet Site: Https://www.sam.gov For Information About Registration.
responses To This Notice Must Be Submitted Via Email To Anitra.carter@va.gov No Later Than January 10, 2025 At 10:00 Am Ct. No Telephone Inquiries Will Be Accepted.
disclaimer
this Rfi Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Rfi That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi.
2551-2560 of 2569 archived Tenders