Cable Tenders
Cable Tenders
DEPT OF THE ARMY USA Tender
Civil And Construction...+2Others, Civil Works Others
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents
Details: The Nevada National Guard Intends To Issue An Invitation For Bids To Award A Single Firm Fixed-price Contract For Services, Non-personal, To Provide All Plant, Labor, Transportation, Materials, Tools, Equipment, Appliances And Supervision Necessary For The Construction Of An Outdoor Modified Qualification Training Range. The Qtr Will Be Programmed To Train And Test Soldiers On The Skills Necessary To Detect, Identify, Engage, And Defeat Stationary Infantry Targets In A Tactical Array, Using The M16/m4, M9 Pistol, M249 Squad Automatic Weapon, M60, And M240b. The Qtr Will Combine The Capabilities Of The 10/25m Zeroing Range, Automated Record Fire Range, Combat Pistol Qualification Course, And The Multipurpose Machine Gun Range Into A Multi-use Training Facility. This Qtr Improvement Project Will Support Units From The Nevada Army National Guard At Hawthorne Army Depot, Nevada 89415. The New Complex Will Be Constructed On Federal Land. Qtr Components: Site Access Gate, Flagpole, Range Operations Control Area With Support Buildings, Four Multipurpose Machine Gun (mpmg) And Automated Record Fire (arf) Fighting Positions, 12 Arf Fighting Positions, 222 Stationary Infantry Target (sit) Emplacements, 16 Barricades, 36 Target Boots, Four Range Limit Markers, 38 Range Lane Markers. Supporting Facilities Include Electric Service, Site Improvements, And Information Systems. Facilities Were Designed To A Minimum Life Of 40 Years In Accordance With Dod's Unified Facilities Criteria (ufc 1-200-02) Including Energy Efficiencies, Building Envelope And Integrated Building Systems Performance. Air Conditioning (estimated 6 Tons). In Addition To The Base Work Described Above, The Solicitation Will Include The Following Option Line Items: 1. Secondary Access Roads (250m, 400m, 500m, 600m, 700m). Construct Primary Access Road And Associated Drainage For 250m, As Well As For 300m, 400m, 500m, And 700m Of Secondary Access Roads; 2. (bleachers. Provide And Install Two Sets Of 16-foot-long By 10-row-high Aluminum Bleacher Sections Under The Bleacher Enclosure And Anchor To The Concrete Pad; 3. Covered Mess Tables. Install Fixed Tables With Perforated Tops, Where Indicated Under The Covered Mess Structure; 4. Downrange Conduit. Cpqc – Pvc 40 Conduits With Xhhw-2 Cables, Conduits, Handholes, And Manholes. Downrange – Pvc 40 Conduits With Xhhw-2 Cables, Conduits, Handholes, And Manholes; 5. Hose Bibbs. Provide And Install Two Hose Bibbs On Site, One At The Latrines And One At The Covered Mess. the Contract Duration Will Be 400 Calendar Days After Notice To Proceed To Include Inspection And Punch List. This Project Is Set Aside 100% For Small Businesses. The North American Industry Classification System (naics) Code Is 236220, With A Small Business Size Standard Of $45,000,000. The Magnitude Of Construction Is Between $10,000,000 And $25,000,000. the Tentative Date For Issuing The Solicitation Is On-or-about 21 January 2025. The Tentative Date For The Pre-bid Conference/site Visit Is On-or-about 6 February 2025, 10:00 Am Local Time, Location To Be Provided In The Solicitation. Interested Contractors Are Encouraged To Attend And Shall Follow Conference Registration And Base Access Requirements Shown In The Solicitation. A Site Visit Will Follow The Pre-bid Conference. All Questions For The Pre-bid Conference Must Be Submitted By 3 February 2025 Via Email To Alex.norris@us.af.mil And Keith.trimble.1@us.af.mil. the Bid Opening Date Is Tentatively Planned For On-or-about 28 February 2025. Actual Dates And Times Will Be Identified In The Solicitation. Interested Offerors Must Be Registered In The System For Award Management (sam). To Register Go To Www.sam.gov. Instructions For Registering Are On The Web Page (there Is No Fee For Registration). the Solicitation And Associated Information Will Be Available Only From The Contract Opportunities Page At Sam.gov. your Attention Is Directed To Far Clause 52.219-14(e)(3) (deviation 2021-o0008), Limitations On Subcontracting, Which States “by Submission Of An Offer And Execution Of A Contract, The Offeror/contractor Agrees In Performance Of The Contract For General Construction, It Will Not Pay More Than 85 Percent Of The Amount Paid By The Government For Contract Performance, Excluding The Cost Of Materials, To Subcontractors That Are Not Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Prime Contractor’s 85 Percent Subcontract Amount That Cannot Be Exceeded”. in Accordance With Far 36.211(b), The Following Information Is Provided: the National Guard Has No Agency-specific Policies Or Procedures Applicable To Definitization Of Equitable Adjustments For Change Orders Under Construction Contracts Other Than Those Described At Far 43.204, Dfars 243.204 And Afars 5143.204. data For The Prior 3 Fiscal Years Regarding The Time Required To Definitize Equitable Adjustments For Change Orders Under Construction Contracts For The National Guard Is Currently Not Available, But Will Be Compiled And Provided In Future Announcements. disclaimer: The Official Plans And Specifications Are Located On The Official Government Webpage And The Government Is Not Liable For Information Furnished By Any Other Source. Amendments, If/when Issued Will Be Posted To Contract Opportunities For Electronic Downloading. This Will Normally Be The Only Method Of Distributing Amendments Prior To Closing; Therefore, It Is The Offeror’s Responsibility To Check The Website Periodically For Any Amendments To The Solicitation. Websites Are Occasionally Inaccessible For Various Reasons. The Government Is Not Responsible For Any Loss Of Internet Connectivity Or For An Offeror’s Inability To Access The Documents Posted On The Referenced Web Pages. The Government Will Not Issue Paper Copies.
FLORENTINO GALANG SR NATIONAL HIGH SCHOOL KABANKALAN CITY Tender
Solar Installation and Products...+1Electrical and Electronics
Philippines
Closing Date10 Jan 2025
Tender AmountPHP 285.8 K (USD 4.9 K)
Details: Description Property/ Stock No. Unit Description Quantity Unit Cost Amount Price Offered Statement Of Compliance (state "comply" Or "not Comply") 1 Gallon Alcohol - 1 Gallon 20 300.00 6,000.00 2 Piece All Purpose Cream 25 90.00 2,250.00 3 Piece Aluminum Pie Plate 6 Inches 5 70.00 350.00 4 Piece Angle Grinder (100 Mm) 2 2,500.00 5,000.00 5 Piece Angle Grinder (180-230 Mm) 1 3,000.00 3,000.00 6 Piece Baking Pan 6/3 Inches 5 50.00 250.00 7 Piece Baking Powder 10 50.00 500.00 8 Piece Baking Soda 1 50.00 50.00 9 Piece Ballpen Black 50 10.00 500.00 10 Piece Ballpen, Blue 50 10.00 500.00 11 Piece Bench Grinder 3/4 Hd 1 2,400.00 2,400.00 12 Piece Bleach Colorsafe, 3600 Ml 30 300.00 9,000.00 13 Piece Bleach, 3785 Ml 30 200.00 6,000.00 14 Piece Butter 20 100.00 2,000.00 15 Piece Desktop Calculator - 12 Digits, 2-way Powered (solar + Battery) Calculator 10 1,600.00 16,000.00 16 Piece Chipping Hammer 10 350.00 3,500.00 17 Piece Circuit Breaker 20 Amps 5 240.00 1,200.00 18 Piece Claw Hammer 5 250.00 1,250.00 19 Piece Computer Keyboard 5 1,000.00 5,000.00 20 Piece Computer Mouse 5 500.00 2,500.00 21 Piece Conference Notebook 50 190.00 9,500.00 22 Piece Corn Oil 2 250.00 500.00 23 Piece Correction Tape 50 30.00 1,500.00 24 Piece Cross Cut Saw 5 250.00 1,250.00 25 Piece Customized Received Stamp For The Principal's Office 2 500.00 1,000.00 26 Piece Cutting Disc 4 Inches 100 85.00 8,500.00 27 Kg Cw Nails # 1 20 75.00 1,500.00 28 Kg Cw Nails # 1 1/2 20 75.00 1,500.00 29 Kg Cw Nails # 2 20 75.00 1,500.00 30 Kg Cw Nails # 2 1/2 20 75.00 1,500.00 31 Kg Cw Nails # 3 20 75.00 1,500.00 32 Kg Cw Nails # 4 20 75.00 1,500.00 33 Piece Dater Stamp 10 1,800.00 18,000.00 34 Piece Diploma 580 25.00 14,500.00 35 Piece Diploma Jacket 580 40.00 23,200.00 36 Piece Dishwashing Liquid 20 200.00 4,000.00 37 Piece Disinfectant Spray, 510 G 50 650.00 32,500.00 38 Piece Double Sided Tape 5 50.00 250.00 39 Piece Dry Seal Of The School 2 2,500.00 5,000.00 40 Tray Egg 20 300.00 6,000.00 41 Kg Electrode Welding Holder 300-500 Amps 5 300.00 1,500.00 42 Piece Multi-purpose Glue, 130g 50 40.00 2,000.00 43 Can Evaporated Milk 20 70.00 1,400.00 44 Piece Expanded Plastic Envelope, Long 50 95.00 4,750.00 45 Piece Floor Wax - 90 Grams 70 40.00 2,800.00 46 Kg Flour 20 75.00 1,500.00 47 Piece Foot Rug 30 30.00 900.00 48 Piece Frame, A4 50 100.00 5,000.00 49 Meter Fringes, Green 150 30.00 4,500.00 50 Meter Fringes, Yellow 150 30.00 4,500.00 51 Piece Glue Stick 50 5.00 250.00 52 Piece Glue Stick, Small 100 5.00 500.00 53 Piece Grinding Disc 4 Inches 50 30.00 1,500.00 54 Piece Grinding Disc 7 Inches 20 50.00 1,000.00 55 Piece Ground Clamp For Welding 5 300.00 1,500.00 56 Piece Hand Soap 50 50.00 2,500.00 57 Piece Hand Towel 10 40.00 400.00 58 Piece Hdmi Cable - 5 Meter 50 350.00 17,500.00 59 Piece L Square 2 300.00 600.00 60 Piece Led Buld 100 Watts 80 150.00 12,000.00 61 Tank Lpg Refill 10 1,300.00 13,000.00 62 Piece Masking Tape, 2" 50 120.00 6,000.00 63 Piece Medal Bronze 500 40.00 20,000.00 64 Piece Medal, Gold 200 40.00 8,000.00 65 Piece Medal, Silver 200 40.00 8,000.00 66 Meter Organsa Cloth 10 60.00 600.00 67 Can Paint, Tinting 1/4l, Black 3 160.00 480.00 68 Can Paint, Tinting 1/4l, Blue 3 160.00 480.00 69 Can Paint, Tinting 1/4l, Green 3 160.00 480.00 70 Can Paint, Tinting 1/4l, Red 3 160.00 480.00 71 Can Paint, Tinting 1/4l, Yellow 3 160.00 480.00 72 Can Paint, White , Gallon 4 800.00 3,200.00 73 Piece Paper Cutter 20 50.00 1,000.00 74 Piece Pencil 50 15.00 750.00 75 Roll Plastic Cover, Regular, Roll 10 950.00 9,500.00 76 Piece Plier / Tong 10 350.00 3,500.00 77 Sheet Plywood 1/4x4x8 10 240.00 2,400.00 78 Piece Pull-push-roll 3 150.00 450.00 79 Spool Ribbon, Green 1", Spools 50 190.00 9,500.00 80 Spool Ribbon, Yellow 1", Spools 50 190.00 9,500.00 81 Pack Rubber Band 15 30.00 450.00 82 Piece Scissors 50 100.00 5,000.00 83 Piece Scotch Tape, 2" 50 70.00 3,500.00 84 Meter Silk Satin Green 30 50.00 1,500.00 85 Meter Silk Satin Yellow 30 50.00 1,500.00 86 Set Soft Broom With Dust Pan 70 150.00 10,500.00 87 Set Sponge Mop With Squeezer 30 500.00 15,000.00 88 Piece Staple Gun Tacker (heavy Duty) 5 160.00 800.00 89 Box Stranded Wire # 12 1 2,500.00 2,500.00 90 Sheet Sytrofoam Board, 75cmx35cmx2cm 50 200.00 10,000.00 91 Box Thumbtacks 50 10.00 500.00 92 Pack Tissue Paper, 12's 50 160.00 8,000.00 93 Piece Token For Guest Speakers 3 500.00 1,500.00 94 Piece Usb Flash Drive 1tb 20 500.00 10,000.00 95 Pack Vellum, A4 150 50.00 7,500.00 96 Piece Vise Grip 25 250.00 6,250.00 97 Piece Weighing Scale (25 Kg Capacity) 3 2,000.00 6,000.00 98 Piece Welding Aprons 20 400.00 8,000.00 99 Meter Welding Cable 2/0 50mm 20 Meters 1 2,000.00 2,000.00 100 Kg Welding Electrode # 6011 10 140.00 1,400.00 101 Kg Welding Electrode # 6013 10 140.00 1,400.00 102 Kg Welding Electrode # 7018 10 140.00 1,400.00 103 Piece Welding Gloves 20 250.00 5,000.00 104 Piece Welding Machine 300 Amp, Ac Welder Single Phase, Fan Cooled, Good Arc Starting And Arc Force, Stable Arc High Quality Welding, Deep Melting Pool Stepless Current Adjustment Stable Performance, Can Work Continuously Rated Output Current : 300a Power Voltage : 220v Current Range : 90 To 300a Coil Winding: Copper Usable Electrode : 2.5mm To 6mm 25kva / 13kw 1 15,000.00 15,000.00 105 Piece Welding Mask 20 400.00 8,000.00 106 Kg White Sugar 10 120.00 1,200.00 Total 285,850.00 Amount In Words: Two Hundred Eighty Five Thousand Eight Hundred Fifty Pesos Only
Province Of Cebu Tender
Civil And Construction...+1Construction Material
Philippines
Closing Date7 Jan 2025
Tender AmountPHP 720 K (USD 12.4 K)
Details: Description Republic Of The Philippines Province Of Cebu Bids And Awards Committee - Goods And Services Cebu Capitol, Cebu City Mode Of Procurement : Negotiated 53.9 Control No. 24-12-058 Dated : December 23, 2024 Note: Please Attached Latest & Not Expired Bac Certificate Of P. R. No. 24-12-0070 Dated : December 23, 2024 Registration & Omnibus Sworn Statement For Abc Worth O.r. No. 100-24-12-1414 Dated : Of 500k & Above. Abc: P720,000.00 Gentlemen: Please Quote Your Prices On The Following Listed Articles Which The Province Of Cebu Desires To Buy If To The Government. For Clarification & Inquiry Call Telefax Nos. 888-2328 Local 1228 - 1229, Fax #: 1229 Or Email Us At Bacgscapitol02@gmail.com. ♥ Prices Quoted Should Be Vat Inclusive And Subject To Withholding Tax. ♥ Philgeps Registration Number: ______________________ ♥ Price Quoted Valid Until: ______________________ ♥ Terms Of Payment: _________________________ ♥ Delivery Date: 15cd Bids And Awards Committee ♥ Deadline Of Quotation: _______________________ ♥ Tin No.: ______________________________________________________________ (sgd) ♥ Place Of Delivery: Onsite Danilo K. Rodas ♥ Note: Must Have A Satellite Office/service Center In Cebu (for Supplier Outside Cebu). Bac-goods Chairman ♥ Please Submit Certified True Copy Of Business/mayor's Permit. Item Quantity Unit Articles And Description Brand Offer Unit Cost Total Price 1 6 Units Industrial Fan, Large Ceiling Type, W/ Inst. *7.32 Meters In Diameter *1.5 Kilowatts, 220-volts, * 60hz. Frequency Single Phase *covering Area 1200 M2 *cooling-425,000 Cfm/1500 Watts *speed- 50 Rpm *no. Of Blades-5 Or 6 Airfoil/op *max. Noise Level - 60 Db *weight -+ / - 156kg *3-years Warrantly For Spare Parts And Labor *including Of Electrical Wirings And Supply/materials Including Panel Control Protection "metal Enclosure", And Incidental Services In The Special Condition Of The Contract *mounting Heigh Of Control Panel Must Be 1.8m From The Ground. *motor Name/ Specification Must Be Engraved In Metal Plate / Sheet >the Base/suspension Rod Of The Industrial Fan Should Only Be Anchored/ Connected To Main/full Truss. >connection Guide Set By The Supplier Should Be Followed During Installation >use High-strength Alloy Steel Bolts And Anti-skid Nuts. >provide Tension Rods/steel Wire Cables With Turn-buckle As Additional Supports In Order To Resist Buckling Moment And Ensure Safety/stability. Anchor These To The Main Truss Or Middle Rigid Strut Only. >adjust Electrical Lighting Fixtures That Will Obstruct The Rotating Blades Of The Industrial Fan. The Contractor Must Have An Actual Inspection To Countercheck The Truss Vertical/pitch Clearance With Respect To The Industrial Fan’s Suspension Rod Designed Length That Should Be Safe. >observe Sufficient & Safe Spacing Of 2-units Industrial Fan Or More That Have Been Scheduled To Specific Covered Courts. >provide Sufficient Scaffoldings / Staging During Installation Progress For Safety Purposes. Designed Length That Should Be Safe. Purpose: ***for The Installation Of Industrial Fan In Barangay Anajao And Taloot In The Municipality Of Argao, And In The Barangay Of Atabay , Barangay Guiwang And Sitio Cancaya Covered Court In The Municipality Of Alcoy (sp Caminero)*** Page 2 Of 2 Canvassed By ____________________ Signature Of Bidder Or His/her Representative Over Printed Name
BATANGAS STATE UNIVERSITY ALANGILAN Tender
Machinery and Tools
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 63.7 K (USD 1.1 K)
Details: Description Republic Of The Philippines Batangas State University Alangilan, Batangas City Request For Quotation "procurement Of Other Supplies For Research Project Sagip" 1. The Batangas State University (batstate U) Through The Bids And Awards Committee Invites Interested Firms/supplier To Submit Quotation For The Project "procurement Of Other Supplies For Research Project Sagip" With An Approved Budget For The Contract (abc) Sixty-three Thousand Seven Hundred Twenty-four Pesos And Seventy-eight Centavos Only (php 63,724.78). Quotation Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening. Item No. Qty Description Total 1. 1 Kilogram 6013 Welding Rod Hji 6013 2. 3 Piece Abs Pvc Junction Box Dimension: 200 X 155 X 80 Mm Ip: 65 Water Proof Material Properties 3. 3 Piece Arduino Mkr 1010 Speed: 48 Mhz Digital I/o: 22 Wireless Connectivity: Wifi, Lo-ra Pwm Pins: 12 Analog I/o: 8 4. 3 Piece Bi Slip On Flange Size: 1-inch Internal Diameter 15 Cm External Diameter 1 Cm Thickness Stainless Steel 304 5. 3 Piece Carbon Monoxide Sensor Mics-5524 Carbon Monoxide Co2 Hydrogen H2 Methane Ch4 Air Quality Monitoring Gas Sensor Module Mics5524 6. 3 Piece Cutting Disc 4 Inch 7. 3 Piece Dc Voltage Regulator Xh-m404 Dc 4-38v 8a Voltage Regulator Module Digital Pwm Adjustabl Dc-dc Step Down Voltage Regulator Xl4016e1 8. 3 Piece Electrical Tape 3m 9. 3 Piece Galvanized Steel Pipe Size: 1 Inch X 1.2 X 20 Ft Thickness: 1.0mm Density: 7850 Kg/cm3 Ultimate Tensile Strength: 400 Mpa Yield Tensile Strength: 300 Mpa Young Modulus: 2010 Gpa Melting Point: 1,260°c 10. 3 Piece Grinding Disc 4 Inch 11. 3 Piece Lcd Display 4.3 Inch Esp32-s3 Hmi 8m Psram 16m Flash 480*270 Rgb Lcd Tft Module For Arduino Lvgl Wifi Bluetooth Smart Display Touch Screen 12. 3 Piece Nitrogen Oxide Sensor -4541 Mics-4514 Carbon Monoxide Nitrogen Oxygen Sensor Co/no2/h2/nh3/ch4 13. 3 Piece Pcb Board Pcb Prototyping Universal Board Fiberglass Plate 14. 3 Piece Rechargeable Battery Lifepo4 Cylindrical Battery Model Number 3.2v 20ah Weight 380g Charging Ratio 1c Discharge Rate 1c Model Ev C40 20ah 3.2v Lifepo4 Cell Voltage 3.2v Capacity 20ah Weight 0.38kg Cycle Life 6000 Cycles Usage Storage System Shape Cylinder Storage Type -25c To 40c Anode Material Lfp 15. 3 Meter Soldering Lead Soldering Lead 280g 1.0mm 16. 3 Piece Spray Paint Bosny Silver 17. 8 Piece Stainless Steel Bolts And Nuts Size: M10 X 1 Inch Tensile Strength: 700n/mm2 Yield Strength: 450n/mm2 18. 20 Meter Stranded Jumper Cable Wires #24 Copper 19. 3 Piece Sulfur Dioxide Sensor Sensor Type: Mos Figaro Typical Detection Range: 400-2000 Ppm 20. 3 Piece Voc Sensor Sensor Manufacture: Ams Sensor Model: Ccs811 Module Model: Cjmcu-811 Supply Voltage: 1.8v – 3.6v Current Consumption During Measurement: 26 Ma (max. 30 Ma In Mode 1) Current Consumption During Sleep: 19 Ua (@1.8v) Work Temperature: -5 Do 50 C 5 Modes Interface: I2c (10 - 400 Khz) Size: 20.1 X 14.7 X 2.7 Mm 21. 3 Piece Wind Direction Sensor Transducer Sensor Wind Direction Robot Detection 22. 3 Piece Wind Speed Sensor 30ms Polycarbon Wind Speed Direction Sensor Weather Station Outdoor 3 Cup Anemometer Sensor Output Rs485 4-20ma 0-5v 0-10v Note: Kindly Indicate The Brand On Your Quotation. Kindly Use The Canvass Form Provided For Your Quotation. 2. Philgeps Registration Certificate And Other Business Permits Shall Be Attached Upon Submission Of The Quotation. 3. The Quotation Must Be Submitted (can Also Be Send Thru Fax And Email At The Contact Details Listed Below) Or To The Alangilan Campus, Alangilan, Batangas City And Shall Be Received By The Committee On Or Before 5:00 Pm Of January 03, 2025. E-mail : Procurementquotation.alangilan@g.batstate-u.edu.ph 4. The Bsu Reserves The Right To Reject Any Or All Quotations And/or Proposals And Waive Any Formalities/informalities Therein And To Accept Such Bids It May Consider As Most Advantageous To The Agency And To The Government. Batstate U Neither Assumes Any Obligation For Whatsoever Losses That May Be Incurred In The Preparation Of Bids, Nor Does It Guarantee That An Award Will Be Made. Engr. Nomer M. Sarmiento Head, Procurement Office Alangilan Campus, Alangilan, Batangas City (043) 415-0139 Local 2130
U S COAST GUARD USA Tender
Aerospace and Defence
United States
Closing Date7 Jan 2025
Tender AmountRefer Documents
Details: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With (iaw) The Format In Federal Acquisition Regulation (far) Subpart 12.6 And Part 13 As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotations Are Being Requested And A Written Solicitation Will Not Be Issued. Solicitation Number 70z03825qk0000009 Is Issued As A Request For Quotation (rfq). This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular Number 2025-01, Effective 12 November 2024. iaw Far 6.302-1(b)(2), The United States Coast Guard (uscg). Aviation Logistics Center (alc) Plans To Award One (1) Purchase Order And Negotiate Only With Faro Technologies, Inc. (cage Code 0vgy2) As The Only Known Source Of Supply. All Responsible Sources May Submit A Capability Statement, Proposal, Or Quotation Which Shall Be Considered By The Agency. the Applicable North American Industry Classification System (naics) Code Is 334513. The Small Business Size Standard Is 750 Employees. This Is An Unrestricted Requirement. it Is Anticipated That A Firm-fixed Price Purchase Order Will Be Awarded On A Sole Source Basis As A Result Of This Solicitation For The Following Items: schedule Of Supplies item 1 item Name: Faro® Quantum X.s 3.5m 7-axis
description: Includes: 6th Generation Faroarm, Calibration Kit, Mounting Plate, 3mm And 6mm Iprobes, Usb Cable, Power Supply, Heavy-duty Case, One (1) Rechargeable Battery And One (1) Year Factory Warranty.
part Number (pn): Arm-0050-7fe
quantity: One (1) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) item 2
item Name: Probe-laser Line, Faroblu Xp
description: Includes: Faroblu Xp Laser-line Probe, Calibration Kit, Case And One (1) Year Factory Warranty.
part Number (pn): Accs-llp-0010-000
quantity: One (1) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) item 3
item Name: Battery Module-g5, Arm
description: Lithium-ion Replacement Battery For All Gen 5 Arms.
part Number (pn): 20147
quantity: One (1) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) item 4
item Name: Super Power User Notebook
description: High-end Notebook Computer.
part Number (pn): Comp0121x64
quantity: One (1) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) item 5
item Name: Pw Insp Prem+mod Prem (n)
description: Polyworks Inspector Premium + Modeler Premium Package. Includes: Real-time Quality Meshing, The Augmented Reality Plug-in, All Plug-ins For Manually Operated And Cnc Point Cloud Digitizing And Probing Devices, And One (1) Year Of Polyworks Support/maintenance.
part Number (pn): Soft90001-n
quantity: One (1) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) item 6
item Name: Pw Modeler – Basic 3 Day Onsite Training
description: 3-day On-site Training On Polyworks Modeler. Trainer Travel And Living Expenses Included. Training At Customer Site For Up To Six (6) Trainees.
part Number (pn): T3osm
quantity: One (1) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) item 7
item Name: Pw Inspector – App Spec 3 Day Onsite Training
description: Up To Six (6) Trainees With Prior Polyworks Inspector Basic Training.
part Number (pn): T3osia
quantity: One (1) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) item 8
item Name: Mandatory Uid Code (label)
part Number (pn): 14567
quantity: Two (2) Each
manufacturer Cage Code: 0vgy2
required Delivery Date: Eighteen (18) Weeks After Receipt Of Order (aro) only The Items Requested In This Solicitation Will Be Considered For Award. All Items Shall Have Clear Traceability To The Original Equipment Manufacturer (oem), Faro Technologies, Inc. (cage Code 0vgy2). Traceability Means A Clear, Complete, Documented, And Auditable Paper Trail That Traces Each Step From An Oem Or Distributor To Its Current Location. the Contractor Shall Furnish A Certificate Of Conformance (coc) Iaw Far Clause 52.246-15. The Coc Must Be Submitted In The Format Specified In The Clause And Shall Include The National Stock Number (if Applicable), Part Number, Serial Number (if Applicable), And Purchase Order Number, And Be Signed By The Contractor’s Authorized Representative. note: No Drawings, Specifications, Or Schematics Are Available From The Uscg. please Carefully Review This Solicitation’s Attachments For Additional Information And Requirements Such As Applicable Clauses, Instructions To Offerors, And Evaluation Criteria: terms And Conditions j And A For Other Than Full And Open Competition the Closing Date And Time For Receipt Of Offers Is 07 January 2025 At 4:30 P.m. Eastern Time. Anticipated Award Date Is On Or About 08 January 2025. Email Quotations Are Preferred And May Be Sent To Denise.j.bulone@uscg.mil. Please Indicate 70z03825qk0000009 In The Subject Line.
Nueva Ecija University Of Science And Technology - NEUST Tender
Electrical Goods and Equipments...+1Electrical and Electronics
Philippines
Closing Date6 Jan 2025
Tender AmountPHP 27 Million (USD 465.5 K)
Details: Description Invitation To Bid The Nueva Ecija University Of Science And Technology (neust) Through The Bids And Awards Committee (bac), Hereby Invites All Interested Entities Registered With The Philippine Government Electronic Procurement System (philgeps) To Bid For The Hereunder Project, Subject To The General Conditions Stated Herein. Name Of Project: Supply, Delivery And Installation Of Hybrid And Electric Vehicles For Advanced Learning And Instruction In The Mechanical Engineering Program Location: College Of Engineering, Neust Sumacab Campus, Cabanatuan City Approved Budget For The Contract: Php27,017,500.00 Contract Duration: 120 Calendar Days Source Of Fund: Income Cost Of Bidding Documents: Php25,000.00 Project Description: 1lot Item No. Description Qty Unit 1 Car Train "hybrid And Electric Vehicles 1 Set Hybrid And Electric Vehicles Sybapro Experiment Trolley For Unit, 1070x1350x800mm With 5 Layer Hanging Base Cabinet Safety Zone Unit (hybrid And Electric Vehicles) Standard Group Lock Box For Lockout/tagout (with 1 Padlock) Composite Insulating Gloves, Class 0 Insulation Tester (1000v/2gω, Cat Iii 1000v, Cat Iv 600v) Charging Station For Pev And Phev Sideways Training Panel Frame Extension Two-pole Voltage Tester, 12-690v/ac/dc Cat Iii 690v, Cat Iv 600v Extended Safety Equipment For Diagnostics On Hv Vehicles Includes Safety Helmet, Face Shield, Balaclava, Insulating Stand Mat And Other Ppes Suited For The Experiment Fiber Pole For High Voltage Systems Protection Cover For Unit Experiment Trolleys Monitor Holder For Flat Screen Monitor Of Weight Up To 15kg/33lbs Hv Safety 2000 2 System 1 Set Car Train Interface With Virtual Instruments Car Train Experimenter Car Train Measurement Accessories, Shunts And Connection Cables Computer-based Training And Experimentation System Multimedia Combines Cognitive And Hands-on (haptic) Training Units Areas Of Basic And Advanced Electrical Engineering, Electronics And Automotive Technology Labsoft, An Open Experiment Delivery Platform Courses Teach The Theoretical Building Blocks And Provide Experiments Intelligent Measurement Interface Supplies Analog And Digital Measuring And Control I/o High Quality Item Of Laboratory Equipment With Virtual Instruments Vehicle Stabilization Systems - Abs, Esc And Tcs Course: Vehicle Stabilization Systems - Abs, Esc And Tcs Car Train Storage Case For Experiment Board Terms And Conditions: 1. Bidder Should Provide 1 To 2 Years Full Warranty On Parts And Labor 2. Delivery Period: 120 Calendar Days 3. Bidder Should Provide Continuous Free Training And Maintenance During Warranty Period. 4. Bidder Should Submit 100% Credit Line Certificate Equivalent To Approved Budget Ceiling 5. Bidder Should Perform The Site Inspection, Site Inspection Certificate Issued By The End User Shall Be Part Of The Eligibility Requirements 6. The Bidder Must Provide Instructional Manual, Brochures And Assembly Drawings Of Unit. 7. Provide Extra Consumables (wire, Connection Ports, Extra Sockets And Cables, Ferrules, Crimper, Wire Cutter) 8. Lifetime Software License. The Summary Of The Bidding Activities Is As Follows: Activities Schedule 1. Advertisement December 11-18, 2024 2. Issuance Of Bid Documents December 19, 2024 To January 3, 2025 3. Pre-bid Conference December 19, 2024, 2:30pm (via Zoom) 4. Deadline For Submission Of Bids (manual Submission) January 3, 2025, Until 5:00pm Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City 5. Opening Of Bids (face To Face) January 6, 2025, 9:00am Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City General Conditions: All Particulars To The Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 And Its Implementing Rules And Regulations. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Business Organizations With At Least Sixty Percent (60%) Interest Or Ownership Of At Least 60% Of The Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Business Organizations Of A Country Where The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 19, 2024 To January 3, 2025 Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Pay The Applicable Fee For The Bidding Documents Not Later Than The Deadline For Submission Of Bids. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 3, 2025, Until 5:00pm. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In The Pbd. Late Bids Shall Not Be Accepted. On The Last Day For The Submission Of Bids And No Prospective Bidder/s Submitted Its Bid Documents Or Only One (1) Bid Was Submitted For The Above-mentioned Project, The Same Is Deemed Extended Until January 10, 2025, 5:00 Pm. This Is To Protect The Interest Of The University And Full Opportunity For A Competitive Bidding May Be Achieved. The University Likewise Reserves The Right To Cause Extension Or Postponement Of The Filing Of Bids Should Similar Situation Arises. Bid Opening Shall Be On January 6, 2025, 9:00 Am At The Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City Unless Extended. Bids Will Be Opened In The Presence Of The Bidder Or His/her/its Duly Authorized Representative/s. Failure To Attend During The Opening Of Bids Shall Be Considered A Waiver On The Part Of The Bidder Who Likewise Waives His/her/its Right To Raise Questions During The Bidding Procedures. The Nueva Ecija University Of Science And Technology Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For More Information Concerning This Bidding, Please Contact The Following: Engr. Joel G. De Mesa Head, Bac Secretariat For Goods And Services Neust Gen. Tinio St., Cabanatuan City Email Address: Neust.bacsec@gmail.com Approved By: Dr. Honorato P. Panahon (sgd.) Bac Chairperson
Offizielle Bezeichnung Hessen Mobil Tender
Civil And Construction...+1Others
Germany
Closing Date7 Jan 2025
Tender AmountRefer Documents
Description: Negotiated award with public participation competition (service) 2024-00293. Object planning for traffic systems, phases 6 and 8 with local construction monitoring, Sigeko. Object planning for traffic systems, phases 6 and 8 with local construction monitoring, Sigeko. The new construction section to be considered is located parallel to the K 12 from NK 6418 027 to NK 6418 213 from km 0.142 to ... Multi-object planning for traffic systems, phases 6 and 8 with local construction monitoring, Sigeko. The new construction section to be considered is located parallel to the K 12 from NK 6418 027 to NK 6418 213 from km 0.142 to 1.595 (total length approx. 1.595 km). It is located in the Birkenau and Mörlenbach districts. The cycle and footpath closes the gap in the existing Mörlenbach-Reisen cycle path and connects public transport at the "Reisen" train stop on the Weschnitztalbahn and also non-motorized traffic from Mumbach. The cycle and footpath connection is planned to be built parallel to the K 12 on the southern side of the slope. Due to the location in the area of the current roadside greenery, certain terrain adjustments are planned for the construction. The cycle and footpath to be built has a standard width of 2.50 m and a length of around 1.58 km. Due to different traffic and topographical conditions (e.g. sections with and without agricultural traffic), different widths occur along the route of the entrance to and exit from Ober-Mumbach and at Reisen (plans for this will be made available after the contract has been awarded or are attached). Expected execution times: - Start of execution: no later than 6 working days after the contract has been awarded. - Latest award of contract: January 22nd, 2025 - Completion of Lph 6: Up to 10 kW after award of contract - Completion of Lph 8: Up to 41 kW after award of contract - Completion of total output Up to 70 kW after award of contract Service to be provided: - Object planning of traffic system ? Service phase 6; Preparation of the award ? Service phase 8; Construction management Special services for service phase 6 ? Determination of the quantities for the planned construction work based on on-site inventories. The traffic safety required for the on-site inventory must be provided independently. ? Coordination of the division of the excavated soil into homogeneous areas with Hessen Mobil Ba 3 (formerly the Hessian Office for Building Materials and Soil Management) and the responsible project engineer in the construction area Pb 15 in accordance with the specifications in Ars No. 03/2017 dated January 16, 2017 and the appendix "modification of the Ztv E-stb" ? Coordination of the measure with those involved in the planning, such as the nature conservation authority, water protection authority, supply and disposal companies, municipality ? Coordination of the measure with the traffic department, landscaping and the road maintenance department of the Ag. ? Determination of construction time (bar chart), including setting of contract deadlines in the special contract conditions ? Processing of cost allocations for the various cost bearers and handover to the Ag ? Preparation of the information for the road database and handover to the Ag ? Handover of the checked inventory documents ? Coordination and coordination with parallel and subsequent work, such as laying cables and road construction work? Conducting and recording weekly construction meetings with the client, the contractor and the other parties involved - Local construction monitoring incl. ? Cost control ? Checking of supplements - Safety and health coordination during planning and execution - Safety and health coordination during execution
2521-2530 of 2562 archived Tenders